DAFTAR HARGA SATUAN UPAH NO. JENIS UPAH SATUAN UPAH (Rp.) 1 2 3 4 1 Mandor OH 90,000 2 Pekerja OH 62,500 3 Pekerja Terlatih OH 68,700 4 Pekerja di Hutan OH 73,700 5 Pemasak Aspal OH 75,000 6 Tukang Batu OH 85,000 7 Kepala Tukang Batu OH 90,000 8 Tukang Kayu OH 85,000 9 Kepala Tukang Kayu OH 90,000 10 Tukang Besi Beton OH 85,000 11 Kepala Tukang Besi Beton OH 90,000 12 Tukang Las OH 92,000 13 Kepala Tukang Las OH 106,000 14 Tukang Pelitur OH 85,000 15 Tukang Cat OH 85,000 16 Kepala Tukang Cat OH 95,000 17 Tukang Pipa OH 85,000 18 Kepala Tukang Pipa OH 95,000 19 Tukang Listrik OH 92,000 20 Kepala Tukang Listrik OH 106,000 21 Penganyam Bronjong OH 79,000 22 Pengisi Bronjong OH 62,500 23 Kepala Penganyam Bronjong OH 92,000 24 Pemecah Batu OH 59,000 25 Penggergaji OH 59,000 26 Sopir OH 95,000 27 Pembantu Sopir OH 58,000 28 Mekanik OH 127,000 29 Pembantu Mekanik OH 95,000 30 Operator Alat Ringan OH 75,000 31 Operator Alat Berat OH 159,000 32 Pembantu Operator OH 69,000 33 Penunjuk Jalan OH 114,000 34 Penjaga Malam OH 52,000

description

Harga Satuan Untuk Menghitung RAB

Transcript of Harga Satuan Lombok Timur

Page 1: Harga Satuan Lombok Timur

DAFTAR HARGA SATUAN UPAH

NO. JENIS UPAH SATUAN UPAH KETERANGAN(Rp.)

1 2 3 4 51 Mandor OH 90,0002 Pekerja OH 62,5003 Pekerja Terlatih OH 68,7004 Pekerja di Hutan OH 73,7005 Pemasak Aspal OH 75,0006 Tukang Batu OH 85,0007 Kepala Tukang Batu OH 90,0008 Tukang Kayu OH 85,0009 Kepala Tukang Kayu OH 90,000

10 Tukang Besi Beton OH 85,00011 Kepala Tukang Besi Beton OH 90,00012 Tukang Las OH 92,00013 Kepala Tukang Las OH 106,00014 Tukang Pelitur OH 85,00015 Tukang Cat OH 85,00016 Kepala Tukang Cat OH 95,00017 Tukang Pipa OH 85,00018 Kepala Tukang Pipa OH 95,00019 Tukang Listrik OH 92,00020 Kepala Tukang Listrik OH 106,00021 Penganyam Bronjong OH 79,00022 Pengisi Bronjong OH 62,50023 Kepala Penganyam Bronjong OH 92,00024 Pemecah Batu OH 59,00025 Penggergaji OH 59,00026 Sopir OH 95,00027 Pembantu Sopir OH 58,00028 Mekanik OH 127,00029 Pembantu Mekanik OH 95,00030 Operator Alat Ringan OH 75,00031 Operator Alat Berat OH 159,00032 Pembantu Operator OH 69,00033 Penunjuk Jalan OH 114,00034 Penjaga Malam OH 52,000

Page 2: Harga Satuan Lombok Timur

DAFTAR HARGA SATUAN UPAH

2.1. Bahan PasanganNO. JENIS BAHAN / BARANG SATUAN HARGA

(Rp.)1 2 3 41 Batu Kali Alam M3 119,7002 Batu Gunung W = 500 - 700 Kg M3 113,3003 Kerikil Sungai/Royalty (MR 012) M3 113,500

Batu Pecah (Manual)4 Batu Pecah 5-7 cm M3 150,0005 Batu Pecah 3-5 cm M3 183,7006 Batu Pecah 2-3 cm M3 205,7007 Batu Pecah 1-2 cm M3 244,8008 Batu Pecah 0.5-1 cm M3 261,200

Batu Pecah (Menggunakan Mesin)9 Batu Pecah 3-5 cm M3 220,800

10 Batu Pecah 2-3 cm M3 233,30011 Batu Pecah 1-2 cm M3 252,00012 Batu Pecah 0.5-1 cm M3 266,60013 Batu Kali Utuh M3 96,80014 Batu Kali Belah M3 143,70015 Filler (Abu Batu) M3 250,00016 Kerikil Alam 5-7 cm M3 128,10017 Kerikil Alam 3-5 cm M3 138,70018 Kerikil Alam 2-3 cm M3 162,00019 Kerikil Alam 1-2 cm M3 171,80020 Kerikil Alam 0.5-1 cm M3 125,60021 M3 195,80022 M3 247,90023 Pasir Ayak Untuk Beton M3 260,20024 Pasir Pasangan M3 105,00025 Pasir Urug M3 72,30026 Sirtu M3 60,50027 Tanah Urug Biasa M3 48,00028 Tanah Urug Pilihan M3 74,00029 Bata Merah Buah 62530 Bata Beton Ringan (10x20x60 cm) Buah 17,50031 Kapur Pasangan M3 17,00032 Kapur Gamping Kg 2,00033 Aspal (Aspal Concrete/AC) Kg 14,20034 Aspal (Medium Curing/MC) Kg 17,10035 Aspal Emulsi Liter 15,40036 Aditif Liter 133,30037 Grevel M3 269,00038 Buton Granular Ashpalt (BUTAS) Kg 1,000

Agregat Kasar (Stone Crusher)Agregat Halus (Stone Crusher)

Page 3: Harga Satuan Lombok Timur

2.2. Bahan Pasangan (Materal Non Galian C)NO. JENIS BAHAN / BARANG SATUAN HARGA

(Rp.)1 2 3 41 Semen Warna Kwalitas Sedang Kg 17,6002 Semen Warna Kwalitas Baik Kg 25,5003 Portland Pozzoland Cement (Tiga Roda) 40 Kg Zak 75,0004 Portland Pozzoland Cement (Gersik) 40 Kg Zak 75,0005 Portland Cement (Tiga Roda) 50 Kg Zak 91,7006 Portland Cement (Gersik) 50 Kg Zak 89,7007 Portland Cement (Tonasa) 50 Kg Zak 87,2008 Portland Cement (Holcim) 50 Kg Zak 86,1009 Portland Cement (Merah Putih) 50 Kg Zak 84,300

10 Portland Cement (Bossowa) 50 Kg Zak 84,100

2.3. Bahan AtapNO. JENIS BAHAN / BARANG SATUAN HARGA

(Rp.)1 2 3 41 Genteng Kaca Pejaten 3 mm Buah 22,9002 Genteng Kaca Pejaten 5 mm Buah 27,3003 Genteng Kaca Kodok 3 mm Buah 37,5004 Genteng Kaca Kodok 5 mm Buah 37,5005 Genteng Pejaten Lokal Buah 1,9006 Bubungan Genteng Pejaten Lokal Buah 3,9007 Gentang Pejaten Non Lokal Buah 3,4008 Bubungan Genteng Pejaten Non Lokal Buah 6,2009 Genteng Silang/Kodok Lokal Buah 3,700

10 Bubungan Genteng Silang/Kodok Lokal Buah 5,00011 Genteng Silang/Kodok Non Lokal Buah 6,50012 Bubungan Genteng Silang/Kodok Non Lokal Buah 11,20013 Genten Beton Manual Buah 3,00014 Bubungan Genteng Beton Manual Buah 4,50015 Genteng Pres Beton Buah 4,10016 Bubungan Genteng Pres Beton Buah 5,40017 Genteng Keramik Buah 16,80018 Bubungan Genteng Keramik Buah 35,00019 Asbes Gelombang 1,80x0,80x4 mm Lembar 45,10020 Asbes Gelombang 2,10x0,80x4 mm Lembar 58,10021 Bubungan Asbes Gelombang 1,8x0,4x4 mm Set 37,10022 Seng Gelombang BJLS 18 Lembar 61,60023 Seng Gelombang BJLS 20 Lembar 66,50024 Seng Gelombang BJLS 25 Lembar 84,50025 Seng Gelombang BJLS 30 Lembar 96,00026 Seng Plat BJLS 18 Lembar 80,20027 Seng Plat BJLS 20 Lembar 80,30028 Seng Plat BJLS 25 Lembar 100,00029 Seng Plat BJLS 30 Lembar 117,700

Page 4: Harga Satuan Lombok Timur

30 Genteng Multiroof M2 45,60031 Rangka Atap Baja Ringan M2 200,00032 Spandek 3 mm Lebar 70 cm Meter 54,60033 Spandek 3,5 mm Lebar 70 cm Meter 69,10034 Spandek 4 mm Lebar 70 cm Meter 85,400

2.4. Baja RinganNO. JENIS BAHAN / BARANG SATUAN HARGA

(Rp.)1 2 3 4

RANGKA C75, RENG B30 DAN TALANG GALVALUM1 Reng B-30 T=0,45 Galv (P= 6 meter) Batang 47,1502 Reng B-30 T=0,40 Galv (P= 6 meter) Batang 45,6003 Rangka C-7575 Galv (P= 6 meter) Batang 116,9504 Rangka C-7585 Galv (P= 6 meter) Batang 107,8005 Rangka C-75100 Galv (P= 6 meter) Batang 164,050

BAUT-BAUT BAJA RINGAN6 Skrew # 12 (Baut Kuda-kuda) @ 800 Pc Pc 3007 Skrew # 10 (Baut Ring) @ 1,000 Pc Pc 2008 Baut Listplang 12 # T1 x 1/2 @ 200 Pc 5009 Fisher (S10) Pc 600

10 Taping (Pasangan Fisher S 10) @ 400 Pc 30011 Dinabolt 10 x 65 @ 150 Pc 4,40012 Baut SDS 12 x 50 (Baut Spandek) @ 200 Pc 90013 Ripet 440 Pc 19514 Ripet 550 Pc 223

ALAT KERJA BAJA RINGAN15 Bor Maktek Type 601 Unit 562,50016 Bor Beton Merk Makita Type HR 2020 Unit 1,254,63617 Screw Driver M10 (Elektrik) Unit 531,20018 Mata Bor Beton Dia. 10 mm SDS Unit 128,55019 Gunting Baja Ringan (Domax) Buah 167,050

RANGKA C85, RENG B41 GALVALUM (Eceran Khusus)20 Rangka C8585 Panjang @ 9 meter Batang 216,75021 Rangka C8565 Panjang @ 9 meter Batang 183,50022 Reng B41 Panjang @ 9 meter Batang 74,15023 Upah Pasang M2 37,500

Page 5: Harga Satuan Lombok Timur

DAFTAR HARGA SATUAN UPAH