DAFTAR HARGA SATUAN UPAH, BAHAN DAN PERALATAN

Transcript of Harga Satuan Bahan Dan Upah Kota Metro 2010

  • 1 3 4

    A. HARGA UPAH :

    1 Mandor Hari 55,000

    2 Kepala Tukang Hari 52,500

    3 Tukang Hari 50,000

    4 Pekerja Hari 40,000

    5 Operator Hari 60,000

    B. HARGA BAHAN :

    1 Kayu Balok kelas I M3 4,000,000

    2 Kayu Balok kelas II M3 2,500,000

    3 Kayu Balok kelas III M3 1,800,000

    4 Kayu Papan kelas I M3 4,500,000

    5 Kayu Papan kelas II M3 2,800,000

    6 Kayu Papan kelas III M3 2,000,000

    7 Kayu Kelas IV / Perancah / Dolken M3 1,250,000

    8 Kayu Kasau kelas I M3 4,000,000

    9 Kayu Kasau kelas II M3 2,500,000

    10 Kayu Kasau kelas III M3 1,800,000

    11 Kayu Reng kelas I M3 4,000,000

    12 Kayu Reng kelas II M3 2,500,000

    13 Kayu Reng kelas III M3 1,800,000

    14 Kayu Dolken Batang 11,000

    15 Bambu Dia 6-8/600cm Batang 8,000

    16 Timbunan pilihan M3 40,000

    17 Pasir Urug M3 65,000

    18 Pasir Pasang M3 90,000

    19 Pasir beton M3 100,000

    20 Kerikil Kali disaring M3 120,000

    21 Sirtu M3 135,000

    22 Aspal Kg 7,900

    23 Batu Belah hitam M3 135,000

    24 Agregat Kasar M3 240,000

    25 Agregat Halus M3 285,000

    26 Batu Pecah 0.5-1 cm (Screening) M3 250,000

    27 Batu Pecah 1-2 cm (Split) M3 295,000

    28 Batu Pecah 2-3 cm (Split) M3 290,000

    29 Batu Pecah 3-5 cm (Split) M3 270,000

    30 Batu Pecah 5-7 cm (Steenslag) M3 255,000

    31 Batu Pecah 10-15 cm (Onderlaag) M3 220,000

    32 Abu Batu 0-0.5 cm M3 280,000

    33 AC-WC tebal 4 cm M2 98,000

    34 AC-BC M3 2,400,000

    35 AC Base M3 2,900,000

    36 HRS Surface 3 cm M2 95,000

    37 HRS Surface 4 cm M2 125,000

    38 HRS Base M3 3,100,000

    39 Filler Kg 500

    40 Batu muka M2 40,000

    41 Batu bata Buah 300

    42 Batu Jagung (Gravel) Dia= 5 s/d 7 mm M3 280,000

    43 Batu Apung Kg 17,500

    44 Paving Blok (lokal) Buah 1,000

    45 Paving Blok Sinar Laut 6 Cm M2 71,500

    46 Paving Blok Sinar Laut 8 Cm M2 93,500

    47 Roster Buah 2,750

    48 List Keramik Buah 5,000

    49 Plint Keramik 10 x 10 cm Buah 1,200

    2

    DAFTAR HARGA SATUAN UPAH DAN BAHAN

    SEMESTER I TAHUN ANGGARAN 2010

    NO U R A I A N SATUAN HARGA UPAH/BAHAN (Rp)

  • 50 Plint Keramik 10 x 20 cm Buah 1,600

    51 Plin Keramik 10 x 30 cm Buah 3,000

    52 Plint marmer 10 x 30 cm Buah 15,000

    53 Plint marmer 10 x 40 cm Buah 18,000

    54 Granit 40 x 40 cm Buah 40,000

    55 Ubin Granito 30x30 cm Buah 30,000

    56 Keramik 20 x 20 cm Buah 1,850

    57 Keramik 25 x 25 cm Buah 3,100

    58 Keramik 30 x 30 cm Buah 4,000

    59 Keramik 40 x 40 cm Buah 8,250

    60 Marmer 40 x 40 cm Buah 35,000

    61 Marmer 40 x 60 cm Buah 43,250

    62 Batu Palimanan M2 85,000

    63 Tegel 20 x 20 cm Buah 1,200

    64 Tegel 30 x 30 cm Buah 2,000

    65 Kuku macan M' 5,000

    66 Genteng Mantili Buah 800

    67 Genteng Kodok Buah 900

    68 Genteng Plentong besar Buah 2,000

    69 Genteng Plentong kecil Buah 1,600

    70 Genteng Beton Buah 5,000

    71 Bubungan Genteng Mantili Buah 2,000

    72 Bubungan Genteng Kodok Buah 2,500

    73 Bubungan Genteng Plentong Buah 3,500

    74 Bubungan Genteng Beton Buah 6,000

    75 Kloset Jongkok Porselin Buah 150,000

    76 Kloset Duduk Porselint Buah 1,350,000

    77 Westafel Porselen Buah 900,000

    78 Water drain + asesories Set 100,000

    79 Bak Cuci piring Satinles Steel 1 lubang Buah 175,000

    80 Bak besar Porselen Buah 300,000

    81 Bak kecil porselen Buah 192,500

    82 Bak Fiber glass 50.50.70 Buah 165,000

    83 Urinoir Buah 450,000

    84 Buisde 1/2 lingk. dia. 20 cm Buah 15,000

    85 Buisde 1/2 lingk. dia. 30 cm Buah 20,000

    86 Buisde 1/2 lingk. dia. 50 cm Buah 30,000

    87 Buisde dia. 20 cm Buah 30,000

    88 Buisde dia. 30 cm Buah 40,000

    89 Buisde dia. 50 cm Buah 60,000

    90 Buisde dia. 100 cm Buah 500,000

    91 Buisde dia. 100 cm + Tulangan Buah 400,000

    92 Semen PC 50 Kg Zak 53,000

    93 Semen Putih / warna Zak 65,000

    94 Plamir kayu / besi Kg 12,000

    95 Meny Kayu/Besi Kg 13,000

    96 Seng Alumunium M2 48,500

    97 Seng Gelombang Lbr 37,000

    98 Seng Bubungan M' 22,000

    99 Seng Rata Lbr 30,000

    100 Asbes Bubungan Lbr 22,000

    101 Asbes Gelombang (180x 80 x 0,4) cm Lbr 23,650

    102 Asbes Gelombang (240x105x0,4) cm Lbr 38,500

    103 Asbes Gelombang (300x105x0,4) cm Lbr 50,000

    104 Nok Asbes Gelombang Stl 22,000

    105 Seng BJLS 35" M2 23,000

    106 Baja Ringan M2 190,000

    107 Genteng Zincalume M2 45,000

    108 Bubungan Genteng Zincalume M 45,000

    109 Penyambungan Alumunium Voil M' 17,500

    110 Eternit (240 x 120 x 0,3)cm M2 40,000

    111 Teakwood (240 x 120 x 0,3) cm Lbr 75,000

    112 Triplek / Plywood (240x120x0,3) cm Lbr 66,000

    113 Plywood (240x120x0,9) cm Lbr 125,000

  • 114 Triplek (240 x 120 x0,5) cm Lbr 70,000

    115 Triplek (240 x 120 x0,3) cm Lbr 48,000

    116 Gypsum Lbr 50,000

    117 Kaca Putih / Polos Uk. 3 mm M2 38,000

    118 Kaca Ribben/Buram Uk. 3 mm M2 51,000

    119 Kaca Putih / Polos Uk. 5 mm M2 52,000

    120 Kaca Ribben/Buram Uk. 5 mm M2 68,000

    121 Kaca Patri M2 1,300,000

    122 Pipa GIP Diameter 0,50" (Galvanis) Btg 130,000

    123 Pipa GIP Diameter 0,75" (Galvanis) Btg 160,000

    124 Pipa GIP Diameter 1,00" (Galvanis) Btg 265,000

    125 Pipa GIP Diameter 1,25" (Galvanis) Btg 332,500

    126 Pipa GIP Diameter 2,00" (Galvanis) Btg 550,000

    127 Pipa GIP Diameter 4,00" (Galvanis) Btg 1,182,500

    128 Pipa GIP Diameter 6,00" (Galvanis) Btg 1,775,000

    129 Pipa PVC Diameter 0,50" PVC AW Btg 16,500

    130 Pipa PVC Diameter 0,75" PVC AW Btg 17,500

    131 Pipa PVC Diameter 1,00" PVC AW Btg 22,500

    132 Pipa PVC Diameter 1,25" PVC AW Btg 35,000

    133 Pipa PVC Diameter 1,50" PVC AW Btg 38,000

    134 Pipa PVC Diameter 2,00" PVC AW Btg 50,000

    135 Pipa PVC Diameter 4,00" PVC AW Btg 172,000

    136 Pipa PVC Diameter 6,00" PVC AW Btg 365,000

    137 Pipa PVC Diameter 8,00" PVC AW Btg 665,000

    138 Dop 2"AW Buah 20,000

    139 Dop 3"AW Buah 30,000

    140 Dop 4" PVC Buah 42,500

    141 Dop 6" PVC Buah 125,000

    142 Knie GIP 1/2" Buah 4,500

    143 Knie GIP 3/4" Buah 5,500

    144 Knie GIP 1" Buah 7,500

    145 Knie GIP 2" Buah 25,000

    146 Knie PVC 1/2" Buah 2,000

    147 Knie PVC 3/4" Buah 2,500

    148 Knie PVC 1" Buah 4,500

    149 Knie PVC 2" Buah 12,500

    150 Stop Kran 1/2" Buah 55,000

    151 Stop Kran 3/4" Buah 75,000

    152 Stop Kran 1" Buah 110,000

    153 Stop Kran 11/4" Buah 175,000

    154 Stop Kran 2" Buah 350,000

    155 Watter Moor 11/4" Buah 25,000

    156 Watter Moor 11/2" Buah 30,000

    157 Sock 1/2" GIP Buah 3,500

    158 Sock 3/4" GIP Buah 5,000

    159 Sock 1" GIP Buah 6,500

    160 Sock 2" GIP Buah 15,000

    161 Sock 1/2" PVC Buah 1,750

    162 Sock 3/4" PVC Buah 2,500

    163 Sock 1" PVC Buah 3,500

    164 Sock 2" PVC Buah 10,500

    165 Sock derat Luar 1/2" Buah 1,500

    166 Sock derat Luar 3/4" Buah 2,000

    167 Sock derat Luar 1" Buah 2,500

    168 Sock derat Luar 1 1/4" Buah 4,500

    169 Sock derat Luar 2" Buah 8,000

    170 TEE 1/2" PVC Buah 3,000

    171 TEE 3/4" PVC Buah 3,500

    172 TEE 1" PVC Buah 6,000

    173 TEE 2" PVC Buah 15,000

    174 TEE 1/2" GIP Buah 6,000

    175 TEE 3/4" GIP Buah 7,500

    176 TEE 1" GIP Buah 10,000

    177 TEE 2" GIP Buah 27,500

  • 178 Chek Valve 11/4" Buah 160,000

    179 Chek Valve 11/2" Buah 200,000

    180 Doble Nepel 1/2" Buah 4,500

    181 Doble Nepel 3/4" Buah 7,000

    182 Doble Nepel 1" Buah 9,500

    183 Stop Kran 3" Buah 577,500

    184 Clemp Sadle dia 2" Buah 28,750

    185 Clemp Sadle dia 3" Buah 40,250

    186 Clemp Sadle dia 4" Buah 51,750

    187 Seal Tape Buah 1,750

    188 Lem PVC Buah 6,000

    189 Tambang Plastik 8 mm M' 3,000

    190 Hidran 3 m3 Buah 4,700,000

    191 Pompa sentrifugal H40 Q= 0,8 m3/h Unit 1.500.000 s/d 3.000.000

    192 Pompa Submersible SP 1 HP H=40 m, Q= 3 m3/h Unit 8,500,000

    193 Pompa Submersible SP 3/4 HP H=40 m, Q= 2,4 m3/h Unit 7,700,000

    194 Panel Pompa Unit 1,250,000

    195 Kabel Pompa dia= 2,5 mm x 3 M' 15,000

    196 Box Meter Unit 50,000

    197 Otomatis Pompa Unit 90,000

    198 TEE Over 3" ke 2" PVC Buah 12,500

    199 TEE Over 2" ke 1" PVC Buah 26,500

    200 Over Sock GIP 3/4" ke 1/2" Buah 6,000

    201 Atap Kran 1/2" Buah 17,500

    202 Atap Kran 3/4" Buah 30,000

    203 Paku Sekrup (50 Bh / Kg) Kg 23,000

    204 Paku Seng (100 Bh / Kg) Kg 18,000

    205 Paku Cacing Kg 20,000

    206 Paku Triplek Kg 15,000

    207 Paku Kasau/balok Kg 14,000

    208 Paku Papan / Reng Kg 14,000

    209 Paku Keling Buah 875

    210 Paku Gypsum Kg 19,000

    211 Besi Beton ulir Kg 11,000

    212 Besi Beton polos Kg 10,000

    213 kawat Beton Kg 15,000

    214 Kawat Berduri M' 3,000

    215 Tali Ijuk Kg 12,000

    216 Kawat Harmonika M2 17,000

    217 Kawat Nyamuk M2 15,000

    218 Plat 400 x 300/3 Btg 40,000

    219 Besi Siku Kg 12,000

    220 Besi Strip Kg 12,000

    221 Besi plat 1 mm M2 150,000

    222 Besi plat 1,2 mm M2 186,000

    223 Kawat Bronjong 5 mm Kg 13,000

    224 Kawat Las / Electroda Dus 120,000

    225 Kayu Bakar M3 70,000

    226 Papan GRC Lbr 42,000

    227 Paku GRC Kg 22,000

    228 Tralis Besi M2 250,000

    229 Dempul Kayu Kg 10,000

    230 Dempul Tembok Kg 10,000

    231 Cat Tembok Kg 12,000

    232 Cat Marka (Non Thermoplast) Kg 30,000

    233 Cat Marka Thermoplast Kg 32,000

    234 Plamir Tembok Kg 10,000

    235 Ter / Residu Kg 15,000

    236 Minyak bekisting Ltr 15,000

    237 Minyak Tanah / Kerosin Ltr 4,000

    238 Premium Ltr 4,500

    239 Solar Ltr 4,300

    240 Minyak pelumas / Oli Ltr 20,000

    241 Cherlag Kg 60,000

  • 242 Cat Warna Kg 27,500

    243 Cat Meni kayu / besi Kg 12,500

    244 Cat Genteng Kg 39,000

    245 Cat Taman Kg 62,000

    246 Thinner Ltr 16,500

    247 Plitur Jadi Ltr 30,000

    248 Soda api Kg 25,000

    249 Lem Plastik / Kayu Kg 40,000

    250 Bubungan karpet M' 7,000

    251 Talang karpet M' 7,000

    252 Talang Fiber M' 32,000

    253 Amplas Lbr 2,500

    254 Plat mur, Plong, baut / Begel U Kg 15,000

    255 Engsel Pintu Buah 6,000

    256 Grendel Pintu Buah 2,500

    257 Kunci pintu 1 slag Buah 75,000

    258 Kunci pintu 2 slag Buah 85,000

    259 Kunci pintu 2 slag Kualitas baik Buah 125,000

    260 Engsel Jendela Buah 5,000

    261 Grendel Jendela Buah 5,000

    262 Hak Angin Buah 5,000

    263 Tarikan Jendela Buah 9,000

    264 Kran Stenlis Buah 25,000

    265 Kran air diameter 1/2 " Buah 11,000

    266 Saringan Air / Floor Drain Buah 10,000

    267 Rolling Door / Folding Gate M2 450,000

    268 Pintu Fibber Buah 175,000

    269 Glass Block Buah 22,000

    270 Penyambungan Api Listrik 1300 VA Unit 2,000,000

    271 Saklar tunggal Buah 15,000

    272 Saklar Ganda Buah 23,000

    273 Stop Kontak Buah 14,000

    274 Box Sekering + Sekering Buah 55,000

    275 Lampu Hias/sorot Buah 85,000

    276 Lampu Pijar 40 Watt lengkap dengan Fitting Buah 7,500

    277 Lampu Down Light Buah 30,000

    278 Lampu TL 20 Watt Buah 45,000

    279 Mangkokan listrik (Durados) Buah 5,000

    280 Kabel Listrik NYA 1 x 2,5 mm Rol 225,000

    281 Kabel Listrik NYA 1 x 1,5 mm Rol 195,000

    282 Kabel Listrik NYM 2 x 2,5 mm Rol 315,000

    283 Kabel Listrik NYM 2 x 1,5 mm Rol 295,000

    284 Kabel Listrik NYM 3 x 2,5 mm Rol 425,000

    285 Accessories listrik set 7,000

    286 Penangkal Petir Unit 2,500,000

    287 Septicktank dan Peresapan Unit 2,500,000

    288 Water Torn / tower 1 M3 Unit 965,000

    289 List Plafond Propil 4 cm M' 7,500

    290 Grass Block Buah 7,500

    291 Gebalan Rumput M2 5,000

    292 Rumput Gajah mini M2 45,000

    293 Rumput Gajah biasa M2 15,000

    294 Rumput Golf M2 25,000

    295 Alumunium Voil M2 25,000

    C. BARANG CETAKAN FORM DINAS PU

    1 Bukti Kas Pengeluaran NCR blok 25,000

    2 Juknis Pokmas buku 25,000

    3 Buku Materi kegiatan P3A eksp 10,000

    4 Laporan Kegiatan P3A eksp 15,000

    5 Laporan kegiatan Komisi Irigasi eksp 15,000

    6 Juknis / Juklak PNPM buku 25,000

    7 Blanko Disposisi pak 9,800

    8 Amplop Kop Dinas besar pak 52,000

  • 9 Amplop Kop Dinas kecil pak 45,500

    10 Map Folio berlambang bh 4,300

    11 Blanko KP4 blok 32,500

    12 Blanko Struk Gaji lbr 13,000

    13 DP3 Double Quarto rim 366,000

    14 Blanko SPPD 109,800

    15 Nota Dinas 1/2 Folio bh 24,700

    16 Blanko Penerimaan PAD pak 30,000

    17 Blanko Rekening PAM dus 750,000

    18 Rekening Denda PAM blok 28,500

    19 Kartu Meteran Langganan PAM lbr 200

    20 Stiker Konsumen PAM lbr 500

    21 Blanko Perhitungan Rekening PAM bk 20,000

    22 Blanko Pengendali Rekening PAM bk 45,000

    23 Blanko Laporan Penerimaan Harian (LPH) PAM bk 52,000

    24 Blanko Laporan Harian Kas (LHK) PAM bk 50,000

    25 Blanko Laporan Penerimaan Penagihan (LPP) PAM bk 50,000

    26 Blanko Daftar Penerimaan Harian (DPH) PAM bk 50,000

    27 Blanko Daftar Permintaan Barang (DPB) PAM blok 50,000

    28 Blanko Laporan Penerimaan Barang (LPB) PAM bk 50,000

    29 Blanko Bukti Permintaan dan Pengeluaran Barang PAM bk 50,000

    30 Blanko Kartu Barang bk 20,000

    31 Blanko Kartu Persediaan bk 20,000

    32 Map Kop UPTS bh 1,300

    D. HARGA SEWA ALAT - ALAT

    1 ASPHALT MIXING PLANT T/Jam 5,500,000

    2 ASPHALT FINISHER Ton 280,000

    3 ASPHALT SPRAYER Liter 70,000

    4 BULLDOZER 100-150 HP 100-150 HP 450,000

    5 COMPRESSOR 4000-6500 L\M 4000-6500 L/M 150,000

    6 CONCRETE MIXER 0.3-0.6 M3 0,3-0,6 M3 Liter 55,000

    7 CRANE 10-15 TON 10-15 TON Ton 400,000

    8 DUMP TRUCK 3-4 M3 3-4 M3 Ton 180,000

    9 DUMP TRUCK 6 - 8 M3 6-8 M3 Ton 240,000

    10 EXCAVATOR 80-140 HP 80-140 HP M3 350,000

    11 FLAT BED TRUCK 3-4 M3 3-4 M3 M3 180,000

    12 GENERATOR SET KVA 300,000

    13 MOTOR GRADER >100 HP >100 HP 325,000

    14 TRACK LOADER 75-100 HP 75-100 HP M3 300,000

    15 WHEEL LOADER 1.0-1.6 M3 1.0-1.6 M3 M3 300,000

    16 THREE WHEEL ROLLER 6-8 T 6-8 TON Ton 150,000

    17 TANDEM ROLLER 6-8 T. 6-8 TON Ton 150,000

    18 TIRE ROLLER 8-10 T. 8-10 TON Ton 200,000

    19 VIBRATORY ROLLER 5-8 T. 5-8 TON Ton 300,000

    20 CONCRETE VIBRATOR 50,000

    21 STONE CRUSHER T/Jam 900,000

    22 WATER PUMP 70-100 mm 70-100 mm 30,000

    23 WATER TANKER 3000-4500 L. 3000-4500 L Liter 200,000

    24 PEDESTRIAN ROLLER Ton 50,000

    25 TAMPER Ton 35,000

    26 JACK HAMMER 38,000

    27 FULVI MIXER 150,000

    28 ALAT BANTU LS 100

    29 TANAH TIMBUNAN M3 45,000