3
RAB PENGERJAAN TOWER 8 No. Item Material / Upah Sat Jumlah 1 SEMEN sak 20 2 PASIR COR 4 3 SUPLIT 4 4 PASIR PASANG 4 5 PASIR URUG 4 5 KERIKIL 0 5 AIR ltr 1500 5 MULTIPLEK lbr 5 5 KASO btg 25 5 PAKU kg 5 5 KAWAT BENDRAT kg 10 11 btg 20 12 btg 10 13 btg 10 14 btg 10 15 btg 10 16 btg 5 17 SEMEN SIKAGROUT sak 2 18 BATU BATA bh 19 BATU BELAH 4 20 PAPAN lbr 10 21 ALAT BANTU ls 1 22 CAT HITAM (MOWILEX) kg 2.0048 23 TANAH URUG 0 24 BESI SIKU 5x5 Cm btg 5 m 3 m 3 m 3 m 3 m 3 BESI BETON POLOS Ø 12 mm BESI BETON POLOS Ø 8 mm BESI KS Ø 10mm BESI KS Ø 12mm BESI KS Ø 16mm BESI KS Ø8mm m 3 m 3

description

harga materia besi

Transcript of Harga Material

RAB PENGERJAAN TOWER MINI CME TRIANGLE 20 METER SITE VALE PT. INCO POMALA8No. Item Material / Upah Sat1SEMENsak2PASIR COR 3SUPLIT 4PASIR PASANG5PASIR URUG 5KERIKIL 5AIRltr5MULTIPLEKlbr5KASObtg5PAKUkg5KAWAT BENRATkg11 btg12 btg13 btg14 btg15 btg1! btg1"SEMEN SIKAGROUTsak1#BATU BATAb$1%BATU BELA& 2'PAPANlbr21ALAT BANTUls22CAT &ITAM (MOWILE)*kg23TANA& URUG 24BESI SIKU 5+5 C,btg,3,3,3,3,3BESI BETON POLOS 12 mmBESI BETON POLOS 8 mmBESI KS 1',,BESI KS 12,,BESI KS 1!,,BESI KS #,,,3,3RAB PENGERJAAN TOWER MINI CME TRIANGLE 20 METER SITE VALE PT. INCO POMALA8LIST UPAH PEKERJAANJumlah TOTAL No. Deskripsi Pekerjaan2' 1-34'-''' 1 U.a$ K/r0a B12.la3k42''-''' 2 Gal4a3 ta3a$ 44''-''' 3 Ur5ga3 k/,bal4 ta3a$ 42''-''' 4 B5a3ga3 ta3a$ k/ l5ar l1kas442''-''' 5 U.a$La.4sa3 .as4r ba2a$ .136as4 64.a6atka3 t/bal ' ! U.a$ K/r0a C1r b/t1315''2''-''' " U.a$ K/r0a B/s4512'-''' # U.a$ B/g/st43g 7 B13gkar25 35-'''% P/38/t/la3 a3gk5r 6a3 bas/ .lat/515-''' 1' U.a$ Gr15t43g ./6/stal 64 ba2a$ bas/ .lat/ 9 S4ka Gr1'1#-''' 11 U.a$ Pasa3g Bata2'%5-''' 12 U.a$ P/k/r0a A:4a31' 45-'''1'-3''13 U.a$ P/,b5ata3 P136as4 s$/lt/r1'"'-''' 14 U.a$ P/,asa3ga3 Pa3/l Pagar BRC1'12#-544 15 U.a$ P/,asa3ga3 T4a3g Pagar BRC1'1"'-''' 1! U.a$ P/,asa3ga3 P43t5 Pagar BRC54%-""' 1" U.a$ P/,asa3ga3 Ka2at 5r42115-5'' 1# Ur5ga3 .as4r ba2a$ 1% U.a$ Ur5g Pas4r Pasa3g 435'-''' 2' U.a$ Pasa3g Aa3sta,.43g1'4'-''' 21 U.a$ K/r0a Bat5 Kal4 13''-''' 22 P/,b/rs4$a3 la$a3 (s4t/ :l/ar43g*2;''4#1''-''' 23 U.a$ rabat b/t13'!5-''' 25 U.a$ ./,a6ata3 .as4r545'-''' 2! U.a$ Ur5ga3 K/r4k4l4"'!#14 2" U.a$ Ur5g Bat5 P/:a$2#2% U.a$ B13gkar M5at Mat/r4al T12/r3' Er/ks4 t12/r31P/3g/:ata3 t12/r 32U.a$ ./3g/:1ra3 Bak :13tr1l33 U.a$ ME < Gr153643g 4" S/2a M1l/34# S/2a =4brat1r4% S/2a .1,.a a4r5' S/2a Sta,./rRAB PENGERJAAN TOWER MINI CME TRIANGLE 20 METER SITE VALE PT. INCO POMALALIST UPAH PEKERJAANDeskripsi Pekerjaan Satuan ar!a "#p$Ls25'-''' 3'-''' 15-''' B5a3ga3 ta3a$ k/ l5ar l1kas425-''' U.a$La.4sa3 .as4r ba2a$ .136as4 64.a6atka3 t/bal 2'-''' 1''-''' kg1-''' 25-''' P/38/t/la3 a3gk5r 6a3 bas/ .lat/ Ls 3''-''' U.a$ Gr15t43g ./6/stal 64 ba2a$ bas/ .lat/ 9 S4ka Gr Ls15'-''' 1'-''' 1'-''' U.a$ P/,b5ata3 P136as4 s$/lt/r ls "5'-''' U.a$ P/,asa3ga3 Pa3/l Pagar BRC Lbr15-''' U.a$ P/,asa3ga3 T4a3g Pagar BRC Btg1'-''' U.a$ P/,asa3ga3 P43t5 Pagar BRC S/t2''-''' U.a$ P/,asa3ga3 Ka2at 5r4 ,4-''' 2-''' 2'-''' ,34'-''' !'-''' P/,b/rs4$a3 la$a3 (s4t/ :l/ar43g* ls25'-''' 14'-''' 2-''' 2'-''' 2'-''' Kg1'' U.a$ B13gkar M5at Mat/r4al T12/r Ls1-5''-''' kg 1-''' kg!'' U.a$ ./3g/:1ra3 Bak :13tr1l Ls 1''-''' Ls3-5''-''' $r3''-''' $r25'-''' $r15'-''' 3''-''' ,3,3,3,3,3,2,2,2,2,3,3,3,2,3,3,2