PT. BEKASI POWER COMBINED CYCLE POWER PLANT - 130 MW (PHASE I) JABABEKA, INDONESIA A S A PT. BEKASI POWER GARDU TENANT PT. RODA MAS LAYOUT STRAUSS PILE DAN LAYOUT PONDASI JB-BP-GT-RM-CV-L-001

description

Layout Gardu Pt. Roda Mas a1-c

Transcript of Gt Pt. Roda Mas (2015!10!09)_shop Drawing

PT. BEKASI POWERCOMBINED CYCLE

POWER PLANT - 130 MW(PHASE I)

JABABEKA, INDONESIA

A S A

PT. BEKASI POWER

GARDU TENANTPT. RODA MAS

LAYOUT STRAUSS PILEDAN LAYOUT PONDASI

JB-BP-GT-RM-CV-L-001

PT. BEKASI POWERCOMBINED CYCLE

POWER PLANT - 130 MW(PHASE I)

JABABEKA, INDONESIA

A S A

PT. BEKASI POWER

2

JB-BP-GT-RM-CV-L-002

1

GARDU TENANTPT. RODA MAS

LAYOUT SLOOF DANLAYOUT GARDU

3

JB-BP-GT-RM-CV-V-001

PT. BEKASI POWERCOMBINED CYCLE

POWER PLANT - 130 MW(PHASE I)

JABABEKA, INDONESIA

A S A

PT. BEKASI POWER

GARDU TENANTPT. RODA MAS

LAYOUT ATAP DAN TAMPAK