gedung kantor menteri.pptx

download gedung kantor menteri.pptx

of 95

Transcript of gedung kantor menteri.pptx

DI PROYEKPEMBANGUNAN GEDUNG MENTERI KEMENTERIAN PEKERJAAN UMUM KSO. PP - BRANTASPROJECT OVERVIEWDATA ADMINISTRASIDATA ADMINISTRASINAMA PROYEK PROYEK PEMBANGUNAN GEDUNG MENTERI KEMENTERIAN PEKERJAAN UMUMLOKASI PROYEK JL. PATTIMURA NO. 20, JAKARTA SELATANPEMBERI TUGAS KEMENTERIAN PEKERJAAN UMUMSTATUS PROYEK KSO PP-BRANTAS PERENCANA PT JAKARTA KONSULTINDO KONSULTAN MK PT ARTEFAK ARKINDONK RP. 358.700.000.000,00WAKTU PELAKSANAAN 371 HARI (8 DESEMBER 2010 12 DESEMBER 2011)MASA PEMELIHARAAN 180 HARICARA PEMBAYARAN MONTHLY PAYMENTTIPE KONTRAK LUMP SUMSUMBER DANA A P B NUANG MUKA 20 % x RP. 358.700.000.000,00 = RP. 71.740.000.000,00RETENSI 5 % x RP. 358.700.000.000,00 = RP. 17.935.000.000,00DATA TEKNISKarakteristik Proyek Pembangunan Gedung Menteri Kementerian PekerjaanUmum Gedung Menteri dan Gedung Parkiro Gedung Menteri : 17 lantai dan 1 lantai semi-basemento Gedung Parkir : 12 lapis dan 1 lantai semi-basement Lingkup pekerjaan:o Pekerjaan Strukturo Pekerjaan Arsitekturo Pekerjaan Interioro Pekerjaan Mekanikal / Elektrikalo Pekerjaan Landscape Proyek berada di lokasi dengan Lalu Lintas yang padat Merupakan Pilot Project Green Building di IndonesiaLantai 10Lantai 6LantaiElevasiLantai 81315.954.15+ 30.20Lantai 41731.384.15+ 13.30GAMBAR TAMPAKGEDUNG MENTERILuas Tinggi(m2) (m)Lantai Atap 1509.10 - + 74.55Lantai 17 1509.10 4.15 + 70.40Lantai Atap Lantai 16 1509.10 5.30 + 65.10Lantai 17 Lantai 15 1509.10 5.00 + 60.10Lantai 16 Lantai 14 1315.95 5.00 + 55.10Lantai 15 Lantai 13 1315.95 4.15 + 50.95Lantai 14 Lantai 12 1315.95 4.15 + 46.80Lantai 13 Lantai 11 1315.95 4.15 + 42.65Lantai 12 Lantai 10 1315.95 4.15 + 38.50Lantai 11 Lantai 9 1315.95 4.15 + 34.35Lantai 9 Lantai 7 1315.95 4.15 + 26.05Lantai 8 Lantai 6 1315.95 4.15 + 21.90Lantai 7 Lantai 5 1731.38 4.15 + 17.75Lantai 5 Lantai 3 1731.38 4.15 + 9.15Lantai 4 Lantai 2 1497.15 4.15 + 5.00Lantai 3 Lantai 1 1894.15 5.00 + 0.00Lantai 2 Semi-Basement 1984.29 4.15 - 4.15Lantai 1 Total 26648.07 74.25Semi BasementLantai AtapLantai 11Lantai 10Lantai 4(m2)(m)1435.433.001435.433.001435.433.00Lantai P8A+ 22.50Lantai P8+ 21.001435.433.00Lantai P6A+ 16.50Lantai P6+ 15.001435.433.001435.433.00Lantai P3A+ 7.50Lantai P3+ 6.001435.433.00Lantai P1A+ 1.50Lantai P1+ 0.00GAMBAR TAMPAKGEDUNG PARKIR Lantai Luas Tinggi ElevasiLantai Atap 1435.43 - + 36.00Lantai P12 1435.43 4.50 + 33.00Lantai P11A + 31.50Lantai P11 + 30.00Lantai P10A + 28.50Lantai P10 + 27.00Lantai 12 Lantai P9A + 25.50Lantai P9 + 24.001435.43 3.00Lantai 9 Lantai P7A + 19.50Lantai 8 Lantai P7 + 18.00Lantai 7 1435.43 3.00Lantai 6 Lantai P5A + 13.50Lantai 5 Lantai P5 + 12.00Lantai P4A + 10.50Lantai 3 Lantai P4 + 9.00Lantai 2 1435.43 3.00Entrance Lantai P2A + 4.50Semi Basement Lantai P2 + 3.001720.43 3.00Semi-Basement 1720.43 3.50 - 5.00Total 20381.02 41.00VISUALISASI BANGUNANGEDUNG MENTERIVISUALISASI BANGUNANGEDUNG PARKIRSTRUKTUR ORGANISASIDANSCHEDULE PELAKSANAANSTRUKTUR ORGANISASIMETODE PELAKSANAANGALIAN TANAH BASEMENTMETODE : OPEN CUT BOTTOM UPUpper structureGalian Sub structurePondasiMETODEDEWATERINGAKeterangan :SumpitSumur dewateringDewatering well Gutter bawah Gutter atas Recharge wellBak penjernihanTreatmentWC pekerjaDrainase kotaAplantWash bayDrainase kotaMETODEDEWATERINGPipa drainasePemompaan airke gutter atasDrum penggantilubang bor dewateringGutter bawahGaris mukaair tanahSump pitPOTONGAN A-AMETODE DEWATERINGTreatment plant beton1.5 m1.5 m2 mAATampak AtasPotongan A-A0.150.1Reuse untuk KM pekerjadan car wash0.50.650.70.30.80.85.00.40Treatment plantKolam penjernihanRecharge wellTawasKoralSTRUKTUR BAWAH4 - 5 m450 Galian dilakukan secaraGALIAN TANAHKETERANGAN :B D F H J L Nopen cut dengan sudut galian sebesar 450.Terdapat 6 elevasi galian yang berbeda,yaitu-6.40, -6.05, -5.40, -4.70,-4.60 dan -1.90ZONE 1ZONING PEKERJAAN GALIAN TANAHKETERANGAN : Galian tanah dilakukanZONE 1 dengan 2 alat Back Hoe. Produktivitas = 30m3/jam Durasi Pekerjaan @10 jam/hari Vol. Galiano Ged. Mentri = 7469.40 m3 Zone 1 = 1949.16 m3ZONE 2 Durasi = 7 hari Zone 2 = 2760.12 m3Durasi = 9 hari Zone 3 = 2760.12 m3Durasi = 9 hario Ged. Parkir = 8909.3 m3 Zone 1 = 1208.60 m3ZONE 2 ZONE 3 Durasi = 4 hari Zone 2 = 7700.7 m3Durasi = 22 hariUPPER STRUCTURE(Tipikal untuk lt. 3 5, dan lt. 15 17)STRUKTUR ATAS GEDUNG MENTERILantai 1 KETERANGAN :Luas lantai = 1894.15 m2Kapasitas Cor = 150 ~250m3/hr Zone 1Luas = 465.51 m2Volume = 116.4 m3Durasi = 7 hariZONE 1 Zone 2Luas = 714.27 m2Volume = 178.57 m3ZONE 2 ZONE 3 Durasi = 7 hari Zone 3Luas = 714.27 m2Volume = 178 57 m3Durasi = 7 hariSTRUKTUR ATAS GEDUNG PARKIRKETERANGAN :Luas lantai = 1435.43 m2Kapasitas Cor = 150 ~200m3/hr Zone 1Luas = 592.82m2Volume = 148.20 m3ZONE 1 Durasi = 7 hari Zone 2Luas = 842.61 m2Volume = 210.65 m3Durasi = 7 hariZONE 2UPPER STRUCTUREBalok PrestressLantai 12baja profil IWF, H-beam, danLantai 10STRUKTUR ATAS GEDUNG MENTERIMetode Bekisting GantungLantai AtapUntuk menunjang bekisting Lantai 17 lantai 15, dipasang platform Lantai 16 struktur baja di lantai 14 Lantai 15Lantai 14Struktur platform terdiri atas Lantai 13honeycomb Lantai 11Lantai 9Lantai 8Struktur kolom support baja Lantai 7Lantai 6Lantai 5Lantai 4Lantai 3Lantai 2Lantai 1SemiBasementSTRUKTUR ATAS GEDUNG MENTERIVisualisasi 3D PlatformSTRUKTUR ATAS GEDUNG MENTERIMetodePlatformRangkaBajaLantai AtapLantai 17Lantai 16Lantai 15Lantai 14Lantai 13Lantai 12Lantai 11FOTO PLATFORM RANGKA BAJAFOTO PELAKSANAAN PRESTRESSEDSetting Anchor Head Stressing BalokSetting Stressing Jack Pembacaan HasilUPPER STRUCTURETangga MelayangSTRUKTUR TANGGA MELAYANGY6Y546Tangga ini terletak di As Y5-6 / 4-6Dari Lantai 2 sampai dengan Lantai AtapTangga MelayangSTRUKTUR TANGGA MELAYANGPELAKSANAAN TANGGA MELAYANGDESAIN BEKISTINGSISTEM PREFAB BEKISTING BALOKSpedshore PCH untuk perancah plat lantai dan balok, dengan menggunakan sistempengaturan pada siku yang disesuaikan dengan dimensi balok.Pertemuan plat dengan balok.Sistem siku pada balok.PREFAB BEKISTING BALOKSISTEM PREFAB BEKISTING KOLOMPREFAB BEKISTING KOLOMSISTEM PREFAB BEKISTING DINDING DAN CORE WALLMaterial Bekisting terbuat dari Plat baja dengan rangka Hollow, yang di satukan oleh waller double CNP.PREFAB BEKISTING DINDINGPREFAB BEKISTING CORE WALLINOVASI PERCEPATAN PROYEKPRECASTPRECASTPrecast diproduksi Keunggulan sendiri1. Mempersingkat waktu pekerjaan2. Efisiensi dalam penggunaan material bekisting3. Salah satu bentuk penerapan Green Construction Mengurangi penggunaan material bekisting kayu Mengurangi masalah sampah pada proyekIMPLEMENTASI GREEN CONSTRUCTIONPRECAST HALF SLABDENAH TIPE HALF SLABKETERANGAN:Digunakan 20 tipe plat half slab seperti yang dapat dilihat padagambar di sampingPola lantai di gedung parkir tipikal, sehingga denah tipe plat half slab sama untuk tiap lantai1 23 4PRECAST HALF SLABPengangkatanPemasanganPenumpukkanBALOK PRECAST DAN U-SHELLDATA U-SHELLLokasiGEDUNG PARKIRPenerapan balok U-shell pada balok anak Gedung ParkirDengan mempertimbangkan :1. Bentangan balok precast2. Berat sendiri balok3. Kapasitas angkat alat pemasang (Tower Crane)DENAH U-SHELLU-shellFull precastPRECAST HALF SLABBekisting Hasil PengecoranPemasanganPRECAST PLANTER BOXPLANTER BOXPLANTER BOXHasil PengecoranPRECAST PLANTER BOXFabrikasi PrecastFabrikasi BesiPemasanganPLAT METALDECKMETAL DECK SLAB Keunggulan pelat metaldeck:1. Mempersingkat waktu pekerjaan2. Flexible3. Easy Handling4. Sebagai pengganti tulangan lentur pada pelat5. Salah satu bentuk penerapan Green Construction Mengurangi penggunaan material bekisting kayu Mengurangi masalah sampah pada proyek Lokasi proyek menjadi lebih bersihMETODE PELAKSANAAN1. Instal metal deck 2. Instal tulangan atas 3. Cor toppingPLAT METPALLADTECK COMBIDECKPLAT METALDECKMETAL DECKPemasanganPengecoran Metal Deck Tampak dari BawahGREEN PLANTARGETPREDIKATPLATINUM7473TARGET RATINGKesesuaian dengan Konsep NILAI TERKECILBangunan Hijau NILAI PRESENTASE (%) Sesuai dan menjadi suritauladanEMAS Sangat Sesuai 58 57PERAK Sesuai 47 46PERUNGGU Dapat tersertifikasi 35 35KONSEP GREEN BUILDINGBangunan dimana sejak dimulai dalam tahap perencanaan, pembangunan, pengoperasian hingga dalam operasional pemeliharaannya memperhatikan aspek-aspek dalam melindungi, menghemat, mengurangi penggunaan sumber daya alam, menjaga mutu baik bangunan maupun mutu dari kualitas udara di dalam ruangan, dan memperhatikan kesehatan penghuninya yang semuanya berpegang kepada kaidah berkesinambunganKRITERIA EVALUASI GREEN BUILDINGTepat Guna Lahan (Appropriate Site Development / ASD)Efisiensi Energi & Refrigeran (Energy Efficiency & Refrigerant / EER) Konservasi Air (Water Conservation / WAC)Sumber & Siklus Material (Material Resources & Cycle / MRC)Kualitas Udara & Kenyamanan Ruangan (Indoor Air Health & Comfort / IHC) Manajemen Lingkungan Bangunan (Building & Environment Management / BEM)ANALISIS GEDUNGTeknologi Tambahan Pada ArsitekturalSUN SHADINGTHERMAL INSULATIONRockwoolParapet calsiboardTebal 6 mm tinggi 80 cmDengan finishing catGREEN IMPLEMENTATIONPemanfaatan Waste MaterialPEMANFAATAN WASTE MATERIALPemanfaatan Waste Material Besi Untuk PenunjangPelaksanaan Proyek dan Pekerjaan Non-StrukturalPemanfaatan Waste Material BetonUntuk Car StopperPemanfaatan Waste Material BesiUntuk Penunjang Pelaksanaan ProyekGREEN IMPLEMENTATIONSeleksi Vendor dan Material Bersertifikat Greenyang sudahbersertifikasi GreenDisyaratkan semuasetiap instalasi yangada diwajibkanmeteran atauBEM-4 KOMISIONING SISTEM YANG BAIK DAN BENARMelakukan prosedur komisioning dengan baik dan benar yang diperlukan agardan dilaksanaan oleh pihak ketiga yang idependen, mendapatkan nilai 1 poin2sistem di atas telah terpasang instalasi (bukan portable), mendapatkan nilai 1Apakah material mengandung produk urea formaldehida ?1MRC-2Enviromental Processed Material2MRC-3Regional MaterialsLokasi Workshop apakah masih dalam radius 1000 km dari lokasi Proyek ? SELEKS I VENDOR DAN MATERI AL BERS ERTI F IK AT G REEN Disyaratkan material MATERIAL RESOURCE & CYCLE (MRC)maupun management Apakah pabrik bersertifikasi ISO 14001 ?vendor memenuhi Apakah material merupakan hasil proses daur ulang ?persyaratan sesuaiGreenship GBCI, Lokasi asal bahan baku utama material apakah masih dalam radius 1000 kmdiutamakan material dari Workshop ?Apakah material berada di dalam wilayah pabean Republik Indonesia ?1 IHC-3 Chemical PollutantApakah material mengandung VOCs (Volatile Organic Compounds) rendah ?peralatan dan Apakah material mengandung produk asbestos, merkuri, dan styrofoam ?sistem terkalibrasidan tervalidasidengan baik. Untuk1 semua peralatan/sistem berfungsi dan menunjukkan kinerja sesuai perencanaanuntuk memasang Apabila alat ukur dan ulat adjusment yang dibutuhkan untuk komisoning sistem-indikator yang poinpermanen.GREEN IMPLEMENTATIONSistem M/E Pendukung Konsep GreenSISTEM PENGKONDISIAN UDARA1. Sistem AC Sentral Water Cooled Chiller2. Sistem AC Variable Refrigerant Volume (VRV)Chiller Water CooledWater Cooled ScrewType : Chiller Kapasitas : 300 TR Refrigerant : R- 134 A Chilled Water In/Out Temp. : 12 / 7 C Condensing Water In/Out Temp. : 30 / 35 F Efficiency : 0,569 KW/TRVariable Refrigerant Volume (VRV) AC System Tegangan Listrik : 380 V/3 Ph/50 HzJumlah : 3 UnitType : Cross Flow, Closed type COOLING TOWERKapasitas/Heat Rejection : 510 TR /1,221 kW Flow Rate : 3500 LPM Temperatur air kondenser masuk : 35 CTemperatur air kondenser keluar : 30 C Temperatur udara luar TWB : 27,5 Tegangan Listrik : 380 V/3 Ph/50 HzJumlah : 2 UnitDIAGRAM SISTEM PENGKONDISIAN UDARA/ACOutdoor Unit VRV GEDUNG MENTERI Ozon Depletion Potential ( ODP) rendahRuang KontrolGEDUNG PARKIRCooling Towerindoor Unit VRVWater Cooled Chiller Sumber : Enviromental Comparison of All The Fluorocarbons, DickGrantOzon depletion potensial merupakan tingkat pengaruh bahan refrigerant terhadap proses penipisan lapisan Ozon. Berdasarkan data penelitian Dick Grant, HFC 134-a tidak mempengaruhi penipisan lapisan ozon.DOKUMENTASI INSTALASI ACFCU Ducting PUDokumentasi Pemasangan Instalasi AC Sentral pada FCU (Fan Coil Unit)Penggunaan Ducting PU (Polyurethene) memiliki kelebihan dari ducting BJLS (Baja LapisSeng) yaitu :1. Fabrikasi lebih cepat2. Material ringan3. Friction Losses rendah::RTCarbonFilterRTL. AtapL. AtapTANGKI ATASJS: Jet ShowerTANGKI ATASLt 1Lt 1HDeep Well PumpTankdari PDAMFC, LV, JS, WCLV, JS, WC, URJS, WCJS, WCJS, WCJS, WCJS, WCJS, WC , JS, WCRaw Water Sand DARI KAPASITAS GROUND WATER , LEBI:40 m3 Water Treatment WaterSISTEM AIR BERSIH SKEMATIK AIR BERSIHPipa BertekananPipa GravitasiFC : Faucet WudhuLV : LavatoryGedung Menteri 50 m3 UR : UrinoirWC : Toilet5 m3 Gedung ParkirLt 17Lt 16 FC, LV, JS, WC LV, JS, WC, UR JS, WC JS, WC Lt 12FC, LV, JS, WC LV, JS, WC, UR JS, WC JS, WC Lt 11Lt 4 FC, LV, JS, WC LV, JS, WC, URLt 3 FC, LV, JS, WC LV, JS, WC, UR JS, WC Lt 3Lt 2 FC, LV, JS, WC LV, JS, WC, UR Lt 2FC, LV, JS, WC LV, JS, WC, URTAMAN TAMAN KeRoof Tank Gedung Menteri Ke Roof Tank Gedung ParkirBasement KAPASITAS RAW WATER TANK HANYA 10 %Tank Filter Clean HEMAT AIR TANAH1x 150 L/mnt Pump400 m3L. AtapLt 1SISTEM AIR KOTOR, BEKAS DAN AIR HUJANSKEMATIK AIR BERSIH: Pipa Vent: Pipa Air Kotor: Pipa Air BekasFD : Floor DrainLV : LavatoryUR : UrinoirWC : ToiletFCO: Floor Clean OutRD : Roof DrainGedung MenteriVent CupRDFCOFCODFCOLVFDLVFCOURWCURWCLt 17Lt 16Vent CupRDFCOGedung ParkirFCOFCOLVFDFCOFDLVURWCURWCLt 12FCOFCOFCOFCOLVFDFCOURFD LVLt 4WCFCOURWCFCOLt 11LVFDFCOFDLVURUR WCWCFCOFCOLt 3FCOLVFDFCOFDLVURWCURWCFCOFCOFCOFCOLVFDFCOFDLVFCOURLV FDFCOWCFCOURFDLVWCURWCURWCLt 2Lt 2Lt 1FCOFCOFCOFCOFCOLV FDFCOFDLVURURFCOWCWCLVFDFCOFDLVURRoof RecyclingTank GedungParkirWCURWCRoof Recycling TankGedung MenteriLt BasementRecyclingTankSTPWTPSaluran DrainasiSumur ResapanFWater2.Air kotor, air bekas diolah dalam STP.siappakaiuntukflushingdansiramAirhujanWATER RECYCLE SYSTEMW: WastafelSTPT W BT W BTB BWT WLt. 17Lt. 16Lt. 5Lt. 3WATER RECYCLING SYSTEMRoof Tank Recycle Penjelasan Teknik Water RecyclingRoof Tank System:1. Air kotor dan air bekas dari toilet, wastafel, Booster Lt. Atap dan urinoir dialirkan ke STP melalui sistem Pump U gravitasi3. Hasil olahan STP, diolah lagi menjadi airtanaman menggunakan WTPAir Lt. 6 s/d 15 typikal lt.5 4. Air olahan WTP ditampung di recycle tank kotor, T 5. Air recyle tank dipompa ke recycle roof tank Bekas menggunakan pompa transferdan Air T W B Lt. 4 6. Air sipa digunakan untuk kebutuhan flushing closet dan siram tanamanT W B Lt. 2T W B Lt. DasarT W B Lt. Semibasement WAC -5 = 3 POINTKeterangan :Air siram STP : Sewage Treatment Plantaman Tangki WTP : Water Treatment Plan120 M3 penampung T : ToiletWTP Pompa transfer B : BathroomPumpmenjadi air siram tanam dan flushingWTP pada Sistem Air Bersih WTP menunjang pengoperasian GreenWATER TREATMENT PLAN (WTP)GroundWater Tank WTP pada sistem air bersih berfungsi Sand Filter Carbon Filter untuk mengolah air deep well menjadi air bersih dengan kualitas setara AirPDAM.Raw Water Tank WTP pada sistem air kotor bergunaWater Treatment untuk memproses air hasil olahan STPtoilet (proses recycling)Building.Recycling TankSand Filter Carbon FilterEffluentTank (Air olahanSTP)Water TreatmentPumpWTP pada Sistem Air KotorSCDBMSLSSC:SwitchControl GroupKabel Data +MCURepeaterOperationalLantai BasementSCDBMSLSSINGLE LINE SISTEM LIGHTING CONTROLLantai AtapKETERANGAN : DB : Distribution Box DB MS LS SC Lantai 17 MS : Motion Sensor LS : Lux Sensor Lantai 16Lt 8 s/d lantai 15Repeater typikal 8 lDB MS LS SC Lantai 7DB MS LS SC Lantai 6KonduitDB MS LS SC Lantai 5DB MS LS SC Lantai 4DB MS LS SC Lantai 3DB MS LS SC Lantai 2Main DB MS LS SC Lantai DasarPanelMCU kapasitas 512 pointINTELEGENT LIGHTING CONTROL SYSTEMIntellegent Lighting Control System merupakan sistem kontrol pencahayaan gedung. Sistem ini dapat mengatur status ON, OFF dan dimming untuk tiap group titik lampu. Sistem ini merupakan bentuk implementasi penghematan energi listrik untuk pencahayaan buatan gedung.Pada Gedung ini menggunakan MESL (Multi Channel Energy Saved Load Control System ) produk ToshibaLighting controlAda orang Tidak orang (lampu mati otomatis)Lux SensorDIAGRAM SISTEM MESLMotion Sensor Manual control Output lampu ON/OFF/ DIMMINGSwitch Control GroupON/OFF/DIMMINGMESL main controlpenerangandigunakansesuaifungsidan2% Refrigeration, 3%Ventilasi 5%Peralatan kantor, 6%31%7%SISTEM MESL LEBIH HEMAT ENERGIMESL dilengkapi dengan sensor :1995 Commercial Building End-Use Splits 1. Motion Sensor- hemat hingga 40 %Memasak, energi listrik2.Lux sensor hemat hingga 40 % energi listrikPencahayaan, 3. Timer control hemat hingga 25 %Lain-lain, energi listrik6%Penggunaan sensor dan timer sehinggaPemanas air,waktunya. Hal ini akan menghemat penggunaan energi listrikPendingin udara, 18%Pemanas ruangan, 22% Total Quads = 14.6PENCAHAYAAN31 %Pencahayaan buatan dengan Intellegent Lighting Control SystemSISTEM LIFT1. Sistem Variable Voltage Variable Frequency (VVVF)a. putaran motor lebih halus (soft starting)b.Inrush current lebih kecil sehingga lebih hemat energi listrik2. Car light /Fan Shut Off Lampu dan Kipas akan mati secara ototmatis ketika elevator tidak digunakan.Lift Dilengkapi Regenerative Converter Traction machine dapat difungsikan sebagai Generator ketika lift bergerak turun. Sehingga lift tersebut dapat juga dapatmenghasilkan listrik. Sistem yang mengaplikasi regenerative converter dapatmenghemat energi lebih dari 35 % Point GBCI : EER-2(mengurangi emisi CO2 1400 kg/thn) TRANSPORTASI VERTIKALIMPLEMENTASI:1. Menggunakan sistem VVVF (Variable Voltage and Variable Frequency) pada lift dan dilengkapi Traffic Management System2. Menggunakan fitur untuk menghemat konsumsi energi seperti sensor gerak atau sleep mode pada elevtorTotal point :2 poinGREEN IMPLEMENTATIONMaterial Pendukung Konsep GreenKREDIT POIN PENILAIAN GREEN BUILDING COUNCIL INDONESIA (GBCI)Point GBCI : MRC- 3MATERIAL YANG TERSEDIA DARI TEMPAT YANG BERDEKATANIMPLEMENTASI:1. Menggunakan material yang lokasi asal bahan baku utama dan fabrikasinya berada di dalam radius 1000 km dari lokasi proyek2. Apabila material di atas berasal daridalam wilayah pabean RepublikIndonesiaTotal point : 2Point GBCI :MRC -2PRODUK YANG PROSES PEMBUATANNYA RAMAH LINGKUNGANIMPLEMENTASI :Menggunakan material dari pabrik yang bersertifikast ISO 14001Total point : 1GREEN TARGETa)Penghijauan di sekitar keetc)Pemasangan stiker gunakan air secukupnyacb G REEN TARG ET TEPAT GUNA LAHANMemelihara kehijauan lingkungan serta mengurangi/menyerapCO2 dan polutan cb) Tidak menebang pohonMengurangi pencemaran pada drainase kotac) Filterisasi air sebelum memasuki saluran kota aKONSERVASI AIRPemantauan dan pencatatan pemakaian air a) Pemasangan meteran airb) Monitor pemakaian air per bulanPenghematan konsumsi air baa) Pemasangan KWH meterdan tata ruang) G REEN TARG ET EFISIENSI DAN KONSERVASI ENERGIPemantauan/pencatatan pemakaian listrik hb) Monitoring pemakaian listrik per bulan c ebPenghematan konsumsi energic) Pemanfataan sinar matahari untuk penerangan (optimalisasi desain jendela a dd) Melakukan pengukuran instensitas cahaya (25 lux / sesuai ketentuan)e) Penggunaan water reservoir untuk penyimpanan air bersihf) Penggunaan LHE untuk kantor dan lapangan fg) Tata tertib penggunaan peralatan elektronik kantor h) Mengatur temperatur AC (25 1 C)i) Penggunaan sensor cahaya untuk lampu penerangan di lokasi proyek i gMengendalikan penggunaan sumber energi yang memberikan dampak terhadap lingkunganj) Melakukan pengukuran getarank) Melakukan pengukuran kebisinganl) Penyediaan absorban untuk penyimpanan material B3m) Kendaraan dan alat berat proyek telah lulus pengecekan emisi gas buang j k l m(Tempat Pembuangan Akhir)nn) Penggunaan veldplesg G REEN TARG ET MANAJEMEN LINGKUNGAN PROYEKPengelolaan sampah (selama proses konstruksi)a) Penyediaan tempat sampah konstruksib) Penyediaan tempat sampah non-konstruksi (organik, un-organik, B3)c) Pemilahan sampah konstruksi dan non-konstruksi sesuai sejenisnya a bd) Kerjasama dengan pihak ke-3 (pengumpul)e) Monitoring volume yang dikeluarkanMendorong mengurangi terjadinya sampah sehingga mengurangi beban TPA ff) Penyajian makanan dengan sistem katering (minim sampah) hg) Menyediakan minuman isi ulang (galon)h) Pemakaian kertas bolak-balik untuk kebutuhan internali) Menyediakan cetakan untuk limbah/limpahan betonj) Pemanfaatan sisa buangan besi beton < 1 mk) Tidak menggunakan minuman kemasanl) Pemanfaatan bekas bobokan/puing im) Pembuatan lubang resapan biopori jProgram promosi green constructiono) Menggunakan leaflet pp) Pemasangan simbol 3R (Reduce, Reuse, Recycle) pada helmq) Pemasangan papan wajib baca/slogan greenr) Mencantumkan persyaratan green contractor dalam kontrak kerja q os) Melakukan terobosan (inovasi) penerapan greenh) Melakukan penyiraman lapangan (untuk mengurangi debu)i) Pengadaan washing baybig G REEN TARG ET KESEHATAN DAN KENYAMANAN DI DALAM PROYEKMengurangi dampak asap rokoka) Memasang tanda dilarang merokok di setiap ruangan di kontraktor keetb) Memasang tanda dilarang merokok di lokasi kerjac) Menyediakan fasilitas area merokok di luar kontraktor keet dan area kerja( 5 m)Mengurangi polusi zat kimia berbahaya bagi kesehatan d) Tidak menggunakan material asbese) Tidak menggunakan lampu mercuryf) Tidak menggunakan styloform untuk insulasi panasMenjaga kebersihan dan kenyamanang) Penggunaan safety net (untuk mengurangi debu)hacDOKUMENTASIDOKUMENTASI PEKERJAANTanggaPlat LantaiKolomCore WallDOKUMENTASI PEKERJAANGranitCurtain WallHomogenous TilePasangan BataSHE (Safety, Health, and Environment)SHE TalkSHE TrainingSHE InductionSHE PatrolSite ViewSite View