PT PLN (PERSERO) DISTRIBUSI LAMPUNG GABUNGAN Kepdir No : 21 LAPORAN REALISASI ENERGI (kWh) MARET, 2015 NO URAIAN REALISASI Bulan Ini Akumulasi s/d Bulan Ini TOTAL SISI TR SISI TM SISI TT TOTAL SISI TR SISI TM (1) (2) (3) (4) (5) (6) (7) (8) (9) 1. PRODUKSI SENDIRI (1.1+1.2) 0 16,648 0 16,648 0 47,235 0 47,235 1.1 Bahan Bakar Minyak(1.1.1+...+1.1.4) 0 13,678 0 13,678 0 38,807 0 38,807 1.1.1 PLT Uap (PLTU) 0 0 0 0 0 0 0 0 1.1.2 PLT Diesel (PLTD) 0 13,678 0 13,678 0 38,807 0 38,807 1.1.3 PLT Gas Turbin (PLTG) 0 0 0 0 0 0 0 0 1.1.4 PLT Gas Uap (PLTGU) 0 0 0 0 0 0 0 0 0 0 1.2 Bahan Bakar Minyak(1.2.1+...+1.2.7) 0 2,970 0 2,970 0 8,428 0 8,428 1.2.1 PLT Air (PLTA) 0 0 0 0 0 0 0 0 1.2.2 PLT Uap (PLTU) - Batubara 0 0 0 0 0 0 0 0 1.2.3 PLT Uap (PLTU) - Gas Alam 0 0 0 0 0 0 0 0 1.2.4 PLT Diesel (PLTD) - Gas Alam 0 0 0 0 0 0 0 0 1.2.5 PLT Gas Turbin (PLTG) - Gas Alam 0 0 0 0 0 0 0 0 1.2.6 PLT Gas Uap (PLTGU) - Gas Alam 0 0 0 0 0 0 0 0 1.2.7 PLT Panas Bumi (PLTP) 0 0 0 0 0 0 0 0 1.2.8 PLT Surya (PLTS) 0 0 0 0 0 0 0 0 1.2.9 PLT Bayu 0 0 0 0 0 0 0 0 1.2.10 BIO DIESEL 0 2,970 0 2,970 0 8,428 0 8,428 1.2.11 OLEIN 0 0 0 0 0 0 0 0 1.2.12 BIOMASS 0 0 0 0 0 0 0 0 2. PEMAKAIAN SENDIRI SENTRAL (2.1+2.2) 0 43 0 43 0 146 0 146 2.1 PS Sentral Di Jaringan Transmisi 0 0 0 0 0 0 2.2 PS Sentral Di Jaringan Distribusi 0 43 0 43 146 0 146 3. PRODUKSI SENDIRI NETTO (3.1+3.2) 0 16,605 0 16,605 0 47,089 0 47,089 3.1 Produksi Sendiri Netto DI Jaringan Transmisi ( 0 0 0 0 0 0 3.2 Produksi Sendiri Netto DI Jaringan Distribusi 0 16,605 0 16,605 47,089 0 47,089 4. DITERIMA (4.1+4.2) 0 372,330,029 0 372,330,029 0 1,062,904,075 0 1,062,904,075 4.1 Terima Di Jaringan Transmisi *) 0 0 0 0 0 0 0 0 4.2 Terima Di Jaringan Distribusi *) 0 372,330,029 0 372,330,029 0 1,062,904,075 0 1,062,904,075 5. PRODUKSI TOTAL NETTO (5.1.+5.2) 0 372,346,634 0 372,346,634 0 1,062,951,165 0 1,062,951,165 5.1 Loko Transmisi Netto (3.1+4.1) 0 0 0 0 0 0 0 0 5.2 Loko Distribusi Netto (3.2+4.2) 0 372,346,634 0 372,346,634 0 1,062,951,165 0 1,062,951,165 6. PEMAKAIAN SENDIRI GARDU INDUK 0 0 0 0 0 0 0 0 7. SUSUT TRANSMISI (5.1-6-8) 0 0 0 0 0 0 0 0 8. SIAP SALUR TRANSMISI 0 0 0 0 0 0 0 0 Target Tahunan

description

1515

Transcript of Fy TW I 2015 Dist

PT PLN (PERSERO) DISTRIBUSI LAMPUNG Lampiran 1-1

GABUNGAN Form 12 R/B 2005

Kepdir No : 217-1.K / Dir /2005

LAPORAN REALISASI ENERGI (kWh)MARET, 2015

(kWh)

NO URAIAN Target Tahunan

REALISASI

Bulan Ini Akumulasi s/d Bulan Ini

TOTAL SISI TR SISI TM SISI TT TOTAL SISI TR SISI TM SISI TT (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1. PRODUKSI SENDIRI (1.1+1.2) 0 16,648 0 16,648 0 47,235 0 47,235 0 1.1 Bahan Bakar Minyak(1.1.1+...+1.1.4) 0 13,678 0 13,678 0 38,807 0 38,807 0 1.1.1 PLT Uap (PLTU) 0 0 0 0 0 0 0 0 0 1.1.2 PLT Diesel (PLTD) 0 13,678 0 13,678 0 38,807 0 38,807 0 1.1.3 PLT Gas Turbin (PLTG) 0 0 0 0 0 0 0 0 0

1.1.4 PLT Gas Uap (PLTGU) 0 0 0 0 0 0 0 0 0 0 0

1.2 Bahan Bakar Minyak(1.2.1+...+1.2.7) 0 2,970 0 2,970 0 8,428 0 8,428 0 1.2.1 PLT Air (PLTA) 0 0 0 0 0 0 0 0 0 1.2.2 PLT Uap (PLTU) - Batubara 0 0 0 0 0 0 0 0 0 1.2.3 PLT Uap (PLTU) - Gas Alam 0 0 0 0 0 0 0 0 0 1.2.4 PLT Diesel (PLTD) - Gas Alam 0 0 0 0 0 0 0 0 0 1.2.5 PLT Gas Turbin (PLTG) - Gas Alam 0 0 0 0 0 0 0 0 0 1.2.6 PLT Gas Uap (PLTGU) - Gas Alam 0 0 0 0 0 0 0 0 0 1.2.7 PLT Panas Bumi (PLTP) 0 0 0 0 0 0 0 0 0 1.2.8 PLT Surya (PLTS) 0 0 0 0 0 0 0 0 0 1.2.9 PLT Bayu 0 0 0 0 0 0 0 0 0 1.2.10 BIO DIESEL 0 2,970 0 2,970 0 8,428 0 8,428 0 1.2.11 OLEIN 0 0 0 0 0 0 0 0 0 1.2.12 BIOMASS 0 0 0 0 0 0 0 0 0

2. PEMAKAIAN SENDIRI SENTRAL (2.1+2.2) 0 43 0 43 0 146 0 146 0 2.1 PS Sentral Di Jaringan Transmisi 0 0 0 0 0 0 0 2.2 PS Sentral Di Jaringan Distribusi 0 43 0 43 146 0 146 0

3. PRODUKSI SENDIRI NETTO (3.1+3.2) 0 16,605 0 16,605 0 47,089 0 47,089 0 3.1 Produksi Sendiri Netto DI Jaringan Transmisi (1-2.1) 0 0 0 0 0 0 0 3.2 Produksi Sendiri Netto DI Jaringan Distribusi (1-2.2) 0 16,605 0 16,605 47,089 0 47,089 0

4. DITERIMA (4.1+4.2) 0 372,330,029 0 372,330,029 0 1,062,904,075 0 1,062,904,075 0 4.1 Terima Di Jaringan Transmisi *) 0 0 0 0 0 0 0 0 0 4.2 Terima Di Jaringan Distribusi *) 0 372,330,029 0 372,330,029 0 1,062,904,075 0 1,062,904,075 0

5. PRODUKSI TOTAL NETTO (5.1.+5.2) 0 372,346,634 0 372,346,634 0 1,062,951,165 0 1,062,951,165 0 5.1 Loko Transmisi Netto (3.1+4.1) 0 0 0 0 0 0 0 0 0 5.2 Loko Distribusi Netto (3.2+4.2) 0 372,346,634 0 372,346,634 0 1,062,951,165 0 1,062,951,165 0

6. PEMAKAIAN SENDIRI GARDU INDUK 0 0 0 0 0 0 0 0 0 7. SUSUT TRANSMISI (5.1-6-8) 0 0 0 0 0 0 0 0 0 8. SIAP SALUR TRANSMISI 0 0 0 0 0 0 0 0 0

9. DIKIRIM KE (9.1+9.2+9.3+9.4) 0 372,346,634 0 372,346,634 0 1,062,951,165 0 1,062,951,165 0 9.1 Siap Salur Distribusi 0 372,346,634 0 372,346,634 0 1,062,951,165 0 1,062,951,165 0 9.2 Unit PLN Lain **) 0 0 0 0 0 0 0 0 0 9.3 Unit Proyek Pembangunan **) 0 0 0 0 0 0 0 0 0 9.4 IPP 0 0 0 0 0 0 0 0 0

10. PEMAKAIAN SENDIRI SISTEM DISTRIBUSI 0 6,078,771 0 6,078,771 0 15,472,958 0 15,472,958 0 11. SIAP JUAL (9.1-10) 0 366,267,863 0 366,267,863 0 1,047,478,207 0 1,047,478,207 0 12. SUSUT DISTRIBUSI (11-14-15) 0 46,802,841 0 46,802,841 0 142,019,070 0 142,019,070 0 13. SUSUT JARINGAN (7+12) 0 46,802,841 0 46,802,841 0 142,019,070 0 142,019,070 0 14. DIKIRIM DARI DISTRIBUSI KE UNIT PLN LAIN **) 0 21,001,692 0 21,001,692 0 49,767,095 0 49,767,095 0 15. KWH TERJUAL (TULL III-09) 0 298,463,330 0 298,463,330 0 855,692,042 0 855,692,042 0

15.1 kWh Tagihan Susulan (P2TL) 0 2,150,890 0 2,150,890 0 11,331,503 0 11,331,503 0 15.2 kWh PJU Ilegal 0 33,853 0 33,853 0 252,437 0 252,437 0 15.3 Koreksi (Termasuk Kurang Tagih) 0 46,546,659 0 46,546,659 0 132,446,492 0 132,446,492 0 15.4 kWh Rekening (TUL III-307) 0 249,731,928 0 249,731,928 0 711,661,610 0 711,661,610 0

REKAPITULASI SUSUT BULANAN (%) REKAPITULASI SUSUT AKUMULASI BULANAN (%)

a. Susut Transmisi ( 7 / 5.1 x 100 ) - a. Susut Transmisi ( 7 / 5.1 x 100 ) - b. Susut Distribusi ( 12 / 9.1 x 100 ) 12.57 b. Susut Distribusi ( 12 / 9.1 x 100 ) 13.36

c. Susut Jaringan ( 13/5 x 100 ) 12.57 c. Susut Jaringan ( 13/5 x 100 ) 13.36

REKAPITULASI LAPORAN GANGGUAN PENYULANG

MARET , 2015

24-Sep-14

NO UNIT

JUMLAH PANJANG GANGGUAN (KALI)

PENYULANG PENYEBAB INTERNAL

(bh) (kms) I-1 I-2 I-3 I-4

1 2 3 4 5 6 7 8

1 LAMPUNG 135 10,423.24 10 8 3 1

1.1 65 2,962.91 0 2 0 1

1.2 24 3,657.32 7 2 2 0

1.3 46 3,803.01 3 4 1 0

TW I 2015 135

 PT PLN (PERSERO) DISTRIBUSI LAMPUNG

PENYULANG

  CAB. TANJUNG KARANG

  CAB. KOTABUMI

  CAB. METRO

REKAPITULASI LAPORAN GANGGUAN PENYULANG

MARET , 2015

24-Sep-14

GANGGUAN (KALI) PER PER

PENYEBAB INTERNAL PENYEBAB EKSTERNAL JUMLAH GANGGUAN 100 kms 100 kms

JUMLAH I E-1 E-2 E-3 E-4 JUMLAH E ≤5' >5'

9=5+6+7+8 10 11 12 13 15 16=9+14 17=16/4 18=(15+16)/4

22 15 10 5 43 73 193 95 0.91 0.03

3 2 5 2 11 20 58 23 0.78 0.03

11 13 0 1 18 32 78 43 1.18 0.03

8 0 5 2 14 21 57 29 0.76 0.02

(Gangguan >5")

(Gangguan Total)

14=10+11+12+13

PT PLN (PERSERO) DISTRIBUSI LAMPUNG

GAB. DISTRIBUSI LAMPUNG

LAPORAN PENJUALAN ALIRAN LISTRIK (TUL III.09)

(GABUNGAN)

25-Jun-14

GOLONGAN TARIF

JUMLAH Pangsa DAYA (VA) Pangsa PEMAKAIAN / MUTASI KWH

PELANGGAN (%) TERSAMBUNG (%) Jumlah

1 2 3 4 5 6=8+9

- 0 0 0 0 0

I 7,115 0.43 3,201,750 0.15 1,822,553

II 0 0 0 0 0

III 0 0 0 0 0

I 19,416 1.17 17,474,400 0.84 4,624,574

II 0 0 0 0 0

III 0 0 0 0 0

- 3072 0.19 3,993,600 0.19 8,819,987

- 1504 0.09 3,308,800 0.16 1,225,757

- 1844 0.11 28,838,700 1.38 9,479,184

- 19 0 9,855,000 0.47 5,103,980

32,970 1.99 66,672,250 3.19 31,076,035

I 335,029 20.19 150,763,050 7.22 104,814,343

II 0 0 0 0 0

III 0 0 0 0 0

I 1,120,268 67.51 1,008,241,200 48.29 326,652,604

II 0 0 0 0 0

III 0 0 0 0 0

- 92,068 5.55 119,688,400 5.73 45,752,871

- 28,868 1.74 63,509,600 3.04 23,656,312

- 7,717 0.47 31,292,400 1.5 11,323,929

I 1456 0.09 16,530,500 0.79 5,376,211

II 0 0 0 0 0

1,585,406 95.55 1,390,025,150 66.57 517,576,270

I 3,004 0.18 1,351,800 0.06 893,056

II 0 0 0 0 0

I 8,735 0.53 7,861,500 0.38 2,993,831

II 0 0 0 0 0

- 6,393 0.39 8,310,900 0.4 3,085,410

- 9,749 0.59 29,581,100 1.42 9,812,613

I 7,859 0.47 147,697,900 7.07 58,420,924

II 0 0 0 0 0

- 66 0 50,090,000 2.4 19,700,557

35,806 2.16 244,893,200 11.73 94,906,391

I 0 0 0 0 0

II 0 0 0 0 0

I 5 0 4,500 0 1637

II 0 0 0 0 0

- 0 0 0 0 0

- 4 0 8,800 0 3,633

- 33 0 297,600 0.01 79,121

- 261 0.02 36,558,500 1.75 15,626,179

- 250 0.02 301,836,000 14.46 164,500,189

- 0 0 0 0 0

553 0.03 338,705,400 16.22 180,210,759

- 245 0.01 110,250 0.01 123,971

- 752 0.05 676,800 0.03 244,815

DESEMBER  2013

 S.1 / 220 VA

 S.2 / 450 VA

 S.2 / 900 VA

 S.2 / 1.300 VA

 S.2 / 2.200 VA

 S.2 / 3.500 VA s/d 200 kVA

 S.3 > 200 Kva

 JUMLAH S

 R.1 / 450 VA

 R.1 / 900 VA

 R.1 / 1.300 VA

 R.1 / 2.200 VA

 R.2 / 3.500 VA s/d 5.500 VA

 R.3 / 6.600 VA keatas

 JUMLAH R

 B.1 / 450 VA

 B.1 / 900 VA

 B.1 / 1.300 VA

 B.1 / 2.200 VA s/d 5.500 VA

 B.2 / 6.600 VA s/d 200 kVA

 B.3 / > 200 kVA

 JUMLAH B

 I.1 / 450 VA

 I.1 / 900 VA

 I.1 / 1.300 VA

 I.1 / 2.200 VA

 I.1 / 3.500 s/d 14 kVA

 I.2 / > 14 kVA s/d 200 kVA

 I.3 / > 200 kVA

 I.4 / 30.000 kVA keatas

 JUMLAH I

 P.1 / 450 VA

 P.1 / 900 VA

- 510 0.03 663,000 0.03 287,000

- 831 0.05 2,802,900 0.13 1,017,194

I 753 0.05 19,540,700 0.94 8,209,178

II 0 0 0 0 0

- 13 0 6,600,000 0.32 2,135,460

- 1459 0.09 17,257,015 0.83 19,359,837

4,563 0.27 47,650,665 2.28 31,377,455

- 0 0 0 0 0

- 0 0 0 0 0

- 3 0 19,400 0 545,132

1,659,301 100 2,087,966,065 100 855,692,042

Pelanggan 2013 1,536,690

Pelanggan 2014

TW I 2014 1,567,127

S.D. MEI 2014 1,579,224

TW II2014

TW III 2014

TW IV 2014

HITUNG LF TRAFOJUMLAH KWH TR 1,719,585 KVA

0.8FAKTOR KEBERSAMAAN 0.45WAKTU (JAM) 2160 90 HARI

ENERGY MAKSIMUM 1,337,149,347 ENERGY JUAL 664,251,856 KWH

LF TRAFO 0.497

HITUNG LF TR/ SRJUMLAH KWH R 1,390,025 KVA

0.7FAKTOR KEBERSAMAAN 0.45WAKTU (JAM) 2160 365 HARI

ENERGY MAKSIMUM 945,773,112 ENERGY JUAL R 517,576,270 KWH

LF TR & SR 0.547

JUMLAH PELANGGAN TM 348 TM 1,658,953 TR - TT 1,659,301

KWH TR 664,251,856 77.62744 TRKWH TM 191,440,186 22.37256 TMKWH TT - 0 TT

855,692,042 100

HITUNG LF TMJUMLAH KWH TM 368,381 KVA

0.9FAKTOR KEBERSAMAAN 0.45

 P.1 / 1.300 VA

 P.1 / 2.200 VA s/d 5.500 VA

 P.1 / 6.600 VA s/d 200 kVA

 P.2 / > 200 kVA

 P.3

 JUMLAH P

 T / > 200 kVA

 C /TM > 200 kVA

 L

 JUMLAH TOTAL

COS q

COS q

COS q

WAKTU (JAM) 2160 365 HARI

ENERGY MAKSIMUM 322,259,699 ENERGY JUAL 191,440,186 KWH

LF TRAFO 0.594

PT PLN (PERSERO) DISTRIBUSI LAMPUNG

GAB. DISTRIBUSI LAMPUNG

LAPORAN PENJUALAN ALIRAN LISTRIK (TUL III.09)

(GABUNGAN)

25-Jun-14

PEMAKAIAN / MUTASI KWH PENDAPATAN Pangsa

RP./KWHPangsa (%) LWBP WBP RUPIAH (%)

7 8 9 10 11 12=10/6

0 0 0 0 0 0 TR0.21 590,140 0 588,786,438 0.08 323.06 TR

0 366,172 0 0 0 0 TR0 866,241 0 0 0 0 TR

0.54 1,626,310 0 2,072,613,307 0.28 448.17 TR0 884,505 0 0 0 0 TR0 2,113,759 0 0 0 0 TR

1.03 8,819,987 0 1,056,410,433 0.14 119.78 TR0.14 1,225,757 0 934,862,034 0.12 762.68 TR1.11 9,479,184 0 8,526,401,632 1.14 899.49 TR0.6 4,330,256 773,724 4,741,492,732 0.63 928.98 TM

3.63 30,302,311 773,724 17,920,566,576 2.39 576.67 JUMLAH S12.25 31,647,701 0 44,481,770,448 5.94 424.39 TR

0 22,885,889 0 0 0 0 TR0 50,280,753 0 0 0 0 TR

38.17 135,417,257 0 195,984,348,499 26.18 599.98 TR0 65,773,437 0 0 0 0 TR0 125,461,910 0 0 0 0 TR

5.35 45,752,871 0 61,751,398,429 8.25 1349.67 TR2.76 23,656,312 0 31,949,448,885 4.27 1350.57 TR1.32 11,323,929 0 16,498,258,861 2.2 1,456.94 TR0.63 5,376,211 0 7,865,615,208 1.05 1,463.04 TR

0 0 0 0 0 0 TR60.49 517,576,270 0 358,530,840,330 47.9 692.71 JUMLAH R

0.1 237,096 0 432,357,837 0.06 484.13 TR0 655,960 0 0 0 0 TR

0.35 1,817,154 0 1,812,968,621 0.24 605.57 TR0 1,176,677 0 0 0 0 TR

0.36 3,085,410 0 2,980,562,186 0.4 966.02 TR1.15 9,812,613 0 10,808,998,273 1.44 1,101.54 TR6.83 58,420,924 0 85,518,247,743 11.43 1,463.83 TR

0 0 0 0 0 0 TR2.3 16,140,782 3,559,775 22,765,021,751 3.04 1,155.55 TM

11.09 91,346,616 3,559,775 124,318,156,411 16.61 1,309.90 JUMLAH B0 0 0 0 0 0 TR0 0 0 0 0 0 TR0 1637 0 981,459 0 599.55 TR0 0 0 0 0 0 TR0 0 0 0 0 0 TR0 3,633 0 3,488,036 0 960.1 TR

0.01 79,121 0 87,982,675 0.01 1,112.00 TR1.83 13,563,359 2,062,820 16,752,431,166 2.24 1,072.08 TR

19.22 142,561,367 21,938,822 186,125,599,392 24.87 1131.46 TM0 0 0 0 0 0 TT

21.06 156,209,117 24,001,642 202,970,482,728 27.12 1126.3 JUMLAH I0.01 123,971 0 77,817,565 0.01 627.71 TR0.03 244,815 0 182,590,071 0.02 745.83 TR

DESEMBER  2013

0.03 287,000 0 300,880,905 0.04 1,048.37 TR0.12 1,017,194 0 1,097,470,909 0.15 1,078.92 TR0.96 8,209,178 0 11,842,627,416 1.58 1,442.61 TR

0 0 0 0 0 0 TR0.25 1,900,730 234,730 2,385,857,313 0.32 1117.26 TM2.26 19,359,837 0 28,325,222,194 3.78 1463.09 TR3.67 31,142,725 234,730 44,212,466,373 5.91 1,409.05 JUMLAH P

0 0 0 0 0 0 TM0 0 0 0 0 0 TM

0.06 545,132 0 550,841,368 0.07 1,010.47 TR

100 827,122,171 28,569,871 748,503,353,786 100 874.74

WILAYAH : GAB. DISTRIBUSI LAMPUNG

AREA : GAB. DISTRIBUSI LAMPUNG

No. GAB. DISTRIBUSI LAMPUNG TM Trafo JTR SR TM Trafo JTR SR1 Tahun 2014 0.80 0.50 0.547 0.547 0.9 0.8 0.7 0.6

Catatan Pak Eris : Cos phi TM 0,9; untuk Trafo 0,8; JTR/SR 0,7 -> Dibuat 0,8 semua OK sajaFaktor Kebersamaan pada TR dan SR > Trafo

- Trafo 0,45- JTR/SR 0,50

LF TM = LF TRAFO

Cos j

Tahun 2014

Penerimaan 1,062,951,165 Penjualan Total 855,692,042 Penjualan TT

Penjualan TM 191,440,186 Kirim ke unit lain 49,767,095 PS GD 15,472,958 Periode Perhitungan 2,160

13.36

SAIDI (JAM) 0

-> Dibuat 0,8 semua OK saja

DISBALIDISJATIMDISJATENGDISJABARDISJAYA

PANJANG KABEL TEGANGAN MENENGAH 20 kV (meter sirkuit)

AREA : GAB. DISTRIBUSI LAMPUNG

TEMBAGA (Cu)

1.15 0.73 0.52 0.39 0.27 0.19 0.15

16 mm2 25 mm2 35 mm2 50 mm2 70 mm2 90 mm2 120 mm2

Tahun 2014 - 2,400 - 3,471 325 - 330

TGK 2400 0 3471 325MTR 0 0 0 0 0 0 330KTB

TEMBAGA (Cu) ALUMINIUM (Al)

0.12 0.10 0.08 0.06 0.05 1.91 1.20 0.87

150 mm2 185 mm2 240 mm2 300 mm2 400 mm2 16 mm2 25 mm2 35 mm2

3,260 - 2,485 - - - - - 2,400 -

2560 0 2485 2400 0700 0 0 0 0 0 0 0 0 0

#REF! #REF!

ALUMINIUM (Al)

0.64 0.44 0.32 0.25 0.21 0.16 0.13 0.10 0.08

50 mm2 70 mm2 90 mm2 120 mm2 150 mm2 185 mm2 240 mm2 300 mm2 400 mm2 Jumlah

2,251 990 - 34,482 35,694 1,852 4,099 - - 94,039

1933 900 34378 26865.8 2475318 90.08 0 0 6208 787 1224 0 0

104 2620 1065 400

R Total

25,471

PANJANG RUTE SALURAN UDARA TEGANGAN MENENGAH 20 kV (meter sirkuit)

AREA : GAB. DISTRIBUSI LAMPUNG

TEMBAGA (Cu)

1.15 0.75 0.53 0.38 0.28 0.20 0.17 0.16

16 mm2 25 mm2 35 mm2 50 mm2 70 mm2 95 mm2 110 mm2 120 mm2

Tahun 2014 - 8,760 22,890 3,300 795 - - -

TGK 0 8760 15,840 3300 794.5 0 0 0MTR 0 0 800 0 0 0 0 0KTB 6250

#REF!

ALUMINIUM (Al)

0.12 0.10 0.08 0.06 0.05 0.04 1.96 1.18 0.96 0.67

150 mm2 185 mm2 240 mm2 300 mm2 400 mm2 500 mm2 16 mm2 25 mm2 35 mm2 50 mm2

3,500 - - - - - - 30,960 840,815 66,653

1500 0 0 0 0 0 0 13240 173567 120652000 0 0 0 0 0 0 8120 310267.6336 49888

9600 356980 4700

ALUMINIUM (Al)

0.44 0.36 0.33 0.29 0.21 0.18 0.14 0.11 0.08

70 mm2 95 mm2 100 mm2 120 mm2 150 mm2 185 mm2 240 mm2 300 mm2 400 mm2

5,447,064 - - 4,760 3,407,830 7,400 242,510 180,000 -

1226906 0 0 0 1074583 0 134682 0 01787432.1 0 0 1310 1412976.161 7400 42988 180000 0

2432726 3450 920271 64840

0.07

500 mm2 Jumlah R Total R Eq

- 10,361,275 4,089,932 0.39

00

10,349 10,361 14172.716 (13)

PANJANG JARINGAN TEGANGAN RENDAH (meter sirkuit)

AREA : GAB. DISTRIBUSI LAMPUNG

TEMBAGA (Cu)

2.90 1.86 1.15 0.75 0.53 0.38

6 mm2 10 mm2 16 mm2 25 mm2 35 mm2 50 mm2

Tahun 2014 - 4,502 5,713 3,304 19,186 12,899

TGK 0 1000 0 0 229MTR 0 3502 5083 3304 7926 3,960 KTB 630 11260 8710

JUMLAH JURUSAN 2014 15,966

TEMBAGA (Cu)

0.28 0.20 0.17 0.16 0.12 0.10 0.08 0.06 0.05

70 mm2 95 mm2 110 mm2 120 mm2 150 mm2 185 mm2 240 mm2 300 mm2 400 mm2

2,193 810 - - - - - - -

2193 810 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0

TEMBAGA (Cu) ALUMINIUM (Al)

0.04 1.96 1.18 0.96 0.67 0.44 0.36 0.33

500 mm2 16 mm2 25 mm2 35 mm2 50 mm2 70 mm2 95 mm2 100 mm2

- - 134,607 514,199 7,322,560 1,091,412 4,954,120 10 -

0 113196 260869 1302296 98677 1812911 10 00 0 6161 171212 3213186 173692 2341148 0 0

15250 82118 2807078 819043 800061 0 0

ALUMINIUM (Al)

0.29 0.21 1.83 0.14 0.11 0.08 0.07

120 mm2 150 mm2 185 mm2 240 mm2 300 mm2 400 mm2 500 mm2 Jumlah R Tot

4,875 3,350 - - - - - 14,073,740 10,817,509

4875 70 0 0 0 0 00 0 0 0 0 0 00 3280 0 0 0 0 0

R Eq

0.77

PANJANG JARINGAN TEGANGAN RENDAH (meter sirkuit)

AREA : GAB. DISTRIBUSI LAMPUNG

TEMBAGA (Cu) ALUMINIUM (Al)

3.08 1.83 1.15 3.08 1.91

2 x 6 mm2 2 x 10 mm2 2 x 16 mm2 2 x 6 mm2 2 x 10 mm2 2 x 16 mm2

Tahun 2014 - - - - 58,087,689 149,430

TGK 13,613,625 89,130

MTR - - - - 32,016,054 -

KTB 12,458,010 60,300

Jmlh Konsumen 2013 TW 1 2014 MEI 2014

1,536,690 1,567,127 1,579,224

> 4.400 VA 19,736 19,736 13,890

450-4400 10 mm2

JUMLAH

58,237,119 179,195,493 3.08

TW 2 2014 JULI 2014 AGT 2014

1,586,437 1,595,346 1,598,000

19,736 14,075 14,135

R Tot R Equi

TABEL JUMLAH TRAFO AREA : GAB. DISTRIBUSI LAMPUNG

0.115 0.19 0.32 0.46 0.55 0.65 0.77 0.93 1.1 1.3 1.95 2.3 2.7 3.3 3.9 4.5

0.7 1.1 1.75 2.35 2.85 3.25 3.9 4.6 5.5 6.5 10.2 12.1 15 18.1 21 28 Jumlah Equivalent

KVA 25 50 100 160 200 250 315 400 500 630 800 1000 1250 1600 2000 2500 Trafo KVA

Tahun 2014 859 3,315 2,724 970 680 106 15 96 4 53 11 17 20 13 13 22 8,918 1,008,440 0.333 1.815

21,475 165,750 272,400 155,200 136,000 26,500 4,725 38,400 2,000 33,390 8,800 17,000 25,000 20,800 26,000 55,000

TGK 135 798 928 506 455 86 15 87 0 50 8 10 11 11 11 13 3124MTR 457 1,517 1,127 311 144 14 - 5 - - 3 5 - - - - 3,467 KTB 267 1000 669 153 81 6 4 4 3 2 9 2 2 9 2,457

LFE

LCU

LFE LCU

Formula Yogyakarta (tp I 4) APJ : DIST LPG 2013

Penerimaan * ) kWh 1,062,951,165

Penjualan total * ) kWh 855,692,042 TM Trafo TR SR

Penjualan di sisi TT * ) kWh -

Penjualan di sisi TM * ) kWh 191,440,186 - Penjualan di sisi TR kWh 664,251,856 Faktor Beban (LF) 0.80 0.50 0.55 0.55 -

Faktor Susut (LLF) 0.69 0.32 0.37 0.37

KWh Kirim ke Unit Lain kWh 49,767,095 0.90 0.80 0.70 0.60

Pemakaian Sendiri GD kWh 15,472,958 Tahan Penghantar ( R ) Ohm/km 0.39 0.77 3.08

Faktor Koreksi (FK) 0,2 - 1,4 0.31 0.42 2.00

Susut total kWh 142,019,070 Periode perhitungan Jam 2,160 2,160 2,160 2,160

kWh 94,473,355

kWh 47,545,715

Susut total % 13.36

% 8.89

% 4.47

TM Trafo JTR SR

Input kWh 1,013,184,070 781,065,428 760,603,387 723,901,296

* ) bh 135 8,918 15,966 1,659,301

* ) kms 10,361 1,008,440 14,074 58,237 38,297.04

kms 77 113 0.88 0.035

Node per Peny/Jurusan 67 18

Rugi besi 0.33

Rugi tembaga 1.81

kVA 2,807 106 34 0.62

kW 203 1 3 0.003377

kWh 40,678,456 4,989,083 36,702,092 12,103,725

% 4.01 0.64 4.83 1.672

% 3.83 0.47 3.45 1.14

Faktor Kerja (FK/Cos j)

Susut I 2 R

Susut non I 2 R

Susut I 2 R

Susut non I 2 R

Jml Peny/Trafo/Jur/Kons

Panjang JTM/KVA Trafo/JTR/SR

Panjang/KVA trafo rata-rata

Iek per Peny/Trafo/Jur/Kons

Rugi beban puncak per Peny/Trafo/Jur/Kons

Susut I 2 R

Susut I 2 R vs input

Susut I 2 R vs input total

J10
Diisi sesuai tabel perhitungan
L10
Diisi sesuai tabel perhitungan

PETA SUSUT DISTRIBUSI DISTRIBUSI LAMPUNG 2015

JTM 40,678,456 4.30% SUSUT TM

3.83%

GARDU 4,989,083

0.47%

SUSUT TEKNIK*)

8.89% JTR 36,702,092

94,473,355 3.45%

DISTRIBUSI SR 12,103,725

13.36 1.14%

142,019,070 9.06% SUSUT TR

INTERNAL 166,994

0.02%SUSUT NON TEKNIK

4.47%47,545,715 PJU ILEGAL 1,700,722

0.16%EKSTERNAL PEMAKAIAN ILEGAL 42,914,910

4.46% 4.04%47,379,305 APP RUSAK/HILANG 2,763,673

0.26%