  • FORUM LOGISTIK INDONESIA KEPASTIAN PENGEMBANGAN PELABUHAN CILAMAYA UNTUK EFISIENSI LOGISTIK NASIONAL

    5 MARET 2015

  • PERATURAN PRESIDEN REPUBLIK INDONESIA NOMOR NOMOR 32 TAHUN 2011 TENTANG MASTERPLAN PERCEPATAN DAN PERLUASAN PEMBANGUNAN EKONOMI INDONESIA 2011-2025 Upaya pengembangan Jabodetabek Area dalam mendukung konektivitas (infrastruktur) adalah melalui Pengembangan Pelabuhan Tanjung Priok dan Pembangunan Pelabuhan Baru Cilamaya

    PERATURAN DAERAH PROVINSI JAWA BARAT NOMOR 22 TAHUN 2010 TENTANG RENCANA TATA RUANG WILAYAH PROVINSI JAWA BARAT TAHUN 2009-2029

    Salah satu rencana pengembangan infrastruktur wilayah di WP Purwasuka adalah Pembangunan Pelabuhan Laut Internasional Cilamaya di Karawang

    PERATURAN DAERAH KABUPATEN KARAWANG NOMOR 2 TAHUN 2013 TENTANG RENCANA TATA RUANG WILAYAH KABUPATEN KARAWANG TAHUN 2011-2031

    Salah satu rencana pengembangan transportasi laut adalah Pembangunan Pelabuhan Internasional Cilamaya di Kecamatan Tempuran

    KEPUTUSAN MENTERI PERHUBUNGAN NOMOR KP. 414 TAHUN 2013 TENTANG RENCANA INDUK PELABUHAN NASIONAL (RIPN)

    Pelabuhan Cilamaya sebagai Pelabuhan Utama

    RENCANA INDUK PELABUHAN TANJUNG PRIOK NOMOR PM 38 TAHUN 2012 Rencana Pengembangan Pelabuhan Cilamaya sudah termasuk di dalam Rencana Induk Pelabuhan

    Tanjung Priok PM 38 Tahun 2012

    JABODETABEK METROPOLITAN PRIORITY AREA (MPA) Salah satu Potential Fast-track Projects (FTPS) and Priority Projects for Multiple Gateways Goals

    and Programs adalah Pembangunan Pelabuhan Cilamaya (Studi MPA dilakukan tahun 2011)

  • TERKAIT KONEKTIVITAS (INFRASTRUKTUR) DI JABODETABEK AREA, BEBERAPA UPAYA PENGEMBANGAN BERDASARKAN MP3EI (TERKAIT CILAMAYA) YAITU : 1. Mengembangkan Pelabuhan

    Tanjung Priok dan membangun Pelabuhan baru Cilamaya

    2. Mengembangkan jaringan logistik dari pusat-pusat industri di kawasan pinggiran Jabodetabek untuk perbaikan akses ke Pelabuhan Tanjung Priok, Pelabuhan Cilamaya, dan Bandar Udara Soekarno Hatta

  • RENCANA STRUKTUR RUANG KABUPATEN KARAWANG

    RENCANA POLA RUANG KABUPATEN KARAWANG

    PEMBANGUNAN PELABUHAN INTERNASIONAL CILAMAYA DI KECAMATAN

    TEMPURAN (Dalam RTRW Kabupaten Karawang

    berdasarkan Perda Kabupaten Karawang Nomor 2 tahun 2013)

    SEJALAN DENGAN RTRW PROVINSI JAWA BARAT BERDASARKAN PERDA PROVINSI JAWA BARAT NOMOR 22 TAHUN 2010

  • KETERANGAN:

    1. Terminal Tanjung Priok

    2. Terminal Marunda

    3. Terminal Marunda Center

    4. Terminal Tarumanegara

    5. Terminal FSRU Trans LNG

    6. Terminal Cilamaya

    PENGEMBANGAN PELABUHAN CILAMAYA MERUPAKAN RENCANA PENGEMBANGAN JANGKA MENENGAH PELABUHAN TANJUNG PRIOK (20122023)

    BERDASARKAN PERATURAN MENTERI PERHUBUNGAN NOMOR PM 38 TAHUN 2012 TENTANG PENETAPAN RENCANA INDUK PELABUHAN TANJUNG PRIOK

  • Jakarta

    Existing

    Gateway

    Proposed

    Gateway

    Proposed

    Gateway

    WEST

    SOUTH

    EAST

    NORTH

    Existing

    Gateway

    Tangerang

    Tangerang

    Selatan

    Depok Bogor

    Bekasi

    Tanjung

    Priok

    Port

    Soekarno

    Hatta Airport

    Karawang

    Cilamaya

    New Port

    SALAH SATU POTENTIAL FAST-TRACK PROJECTS (FTPS) AND PRIORITY PROJECTS FOR MULTIPLE GATEWAYS GOALS AND PROGRAMS ADALAH PEMBANGUNAN PELABUHAN CILAMAYA, Sumber : Jabodetabek Metropolitan Priority Area (MPA) Study - 2010

    menekan biaya logistik dengan mendekatkan pusat produksi

    dengan outlet pelabuhan dari Tanjung Priok (70 km) ke Pelabuhan

    Cilamaya (30 km);

    memperkuat ketahanan perekonomian dengan menyediakan

    backup outlet pelabuhan;

    menurunkan tingkat kemacetan di Ibukota dengan memindahkan

    sebagian trafik angkutan berat ke luar wilayah;

    menekan penggunaan BBM bersubsidi dan meningkatkan utilisasi

    truk kontainer;

    menjamin keselamatan pelayaran dan area eksplorasi migas di

    kawasan lepas pantai Pelabuhan Cilamaya.

  • SINGAPURA

    TANJUNG PRIOK CILAMAYA

    COMPARATION OF DISTANCE IS SIMILAR

    591 MILES

    KARAWANG

    CILAMAYA

    TANJUNG PRIOK

    70 KM (ROUND TRIP)

    140 KM (ROUND TRIP)

    Cikarang to Tanjung Priok (Indonesia)

    Pasir Gudang to Tanjung Pelepas (Malaysia)

    Truck Distance: 55.4 Km Logistics costs: US$750

    Truck Distance: 56.4 Km Logistics costs US$450

    LOCATION DISTANCE CORRELATION OF DISTANCE USING FUEL

    (Asumption 1 Litre/5 KM) CORRELATION OF DISTANCE WITH

    TRAVEL TIME OF CONTAINER TRUCK

    TANJUNG PRIOK KARAWANG 140 KM (RT) 28 Litres 6 Hour

    KARAWANG - CILAMAYA 70 KM (RT) 14 Litres 2 Hour

    LOCATION PHASE INVESTMENT ($ BILLION )

    CAPACITY (TEUS)

    INVESTMENT PER TEUS ($ BILLION/TEUS)

    KALIBARU PHASE I 2,47 4,5 0,55

    CILAMAYA

    PHASE I 2,39 3,5 0,68

    PHASE II 1,06 3,5 0,30

    TOTAL 3,45 7 0,49

  • PETI KEMAS

    -

    5,000

    10,000

    15,000

    20,000

    25,000

    '00

    0 T

    EU

    s p

    er

    Yea

    r

    Year

    Cilamaya

    North Kalibaru

    Existing Wharves of Tanjung Priok Port

    Cilamaya

    Kalibaru Utara

    Eksisting Tanjung Priok

    Permintaan Peti Kemas Internasional dan Domestik

    Permintaan Peti Kemas Internasional

    Tahun

    TE

    Us P

    er

    Ta

    hu

    n

    * Cilamaya Tahap I : 3,75 Juta TEUs ; Tahap II : 3,75 Juta TEUs

    CONTAINER SHORT TERM (2020) MEDIUM TERM (2025) LONG TERM (2030)

    KEBUTUHAN 10,21 Million TEUs 14,11 Million TEUs 19,36 Million TEUs

    TOTAL KAPASITAS 12,70 Million TEUs 16,45 Million TEUs 20,20 Million TEUs

    CILAMAYA* 3,75 Million TEUs 7,50 Million TEUs

    TANJUNG PRIOK 12,70 Million TEUs 12,70 Million TEUs 12,70 Million TEUs

  • -

    200,000

    400,000

    600,000

    800,000

    1,000,000

    1,200,000

    Ve

    hic

    les

    in

    CB

    U U

    nit

    pe

    r Ye

    ar

    Year

    Capacity of Cilamaya Terminal

    Capacity of Tanjung Priok Terminal

    Vehicle Demand (CBU)

    KENDARAAN

  • STUDI OLEH JICA : - PRE-FS DILAKUKAN 2010 - FS DILAKUKAN 2011-2012 (DRAFT FINAL FS SELESAI 2013) - EIA STUDY UNTUK PELABUHAN DAN JALAN AKSES TELAH SELESAI (KECUALI INPUT DARI

    SURVEY LARAP UNTUK JALAN AKSES) (2012) - SURVEY DATA UNTUK STUDI AMDAL LOKASI BARU (2015)

    STUDI OLEH OTORITAS PELABUHAN TANJUNG PRIOK : - RENCANA INDUK PELABUHAN TANJUNG PRIOK PERMEN 38 TAHUN 2012

    (DIDALAMNYA TERMASUK CILAMAYA) - AMDAL 2012

  • ALTERNATIF LOKASI POTENSIAL

    PERTIMBANGAN PEMILIHAN LOKASI :

    - KESESUAIAN TATA RUANG

    - LINGKUNGAN (AREA HUTAN LINDUNG & AREA KONSERVASI BURUNG)

    - PERUBAHAN GARIS PANTAI (EROSI & SEDIMENTASI)

    - KAWASAN INDUSTRI DAN HINTERLAND

    - LALU LINTAS & DISTRIBUSI BARANG

  • PEMILIHAN LOKASI PELABUHAN

    SEPANJANG GARIS PANTAI DARI BANTEN KE CIASEM MEMILIKI KARAKTERISTIK BERBEDA

    LOKASI CILAMAYA MERUPAKAN PILIHAN TERBAIK UNTUK LOKASI PELABUHAN, DAN

    MEMILIKI JARAK TERDEKAT DENGAN KAWASAN INDUSTRI

  • SELATAN-BARAT PROVINSI JAWA BARAT

    1%

    DKI JAKARTA

    (5%) BANTEN

    9%

    UTARA-TIMUR PROVINSI JAWA BARAT

    75%

    PROVINSI JAWA BARAT, DKI JAKARTA DAN BANTEN DALAM

    KERANGKA GREATER JAKARTA METROPOLITAN AREA

    AREA LAIN 10%

  • HINTERLAND

  • TAHAPAN SCREENING PEMILIHAN LOKASI

  • MATRIKS PENENTUAN LOKASI REGULASI DI

    KEMENHUTRTRW PROV RTRW KAB

    KAWASAN

    EKOLOGI

    PERUBAHAN

    GARIS

    PANTAI

    KEPADATAN

    LALU LINTAS

    AREA

    PERAIRAN

    1 KALIBARU UTARA PADAT

    2 MARUNDA PADAT

    3 MARUNDA CENTER PADAT

    4 TARUMAJAYA TDK SESUAI TINGGI PADAT

    5 MUARA GEMBONG TDK SESUAI TDK SESUAI TDK SESUAI BURUNG TINGGI PADAT

    KARAWANG 6 CILAMAYA MIGAS

    SUBANG 7 CIASEM TDK SESUAI TDK SESUAI TDK SESUAI MIGAS

    TANGERANG 8 TANGERANG PADAT

    SERANG 9 BOJONEGARA PADAT

    BEKASI

    JAWA BARAT

    BANTEN

    DKI JAKARTA

    Tidak sesuai untuk pembangunan pelabuhan

    Dampak yang masih dapat diterima

    LOKASI CILAMAYA DI KABUPATEN KARAWANG MENJADI OPSI PALING BAIK UNTUK PEMBANGUNAN

    PELABUHAN BERDASARKAN STUDI YANG DILAKUKAN

  • Lebar : 380 m

    Panjang : 9 km

    Kedalaman : 17 m

    Volume Keruk : 16.8 Juta m3

  • DESCRIPTION REMARKS

    1 General Cost 91,815,896.00 40,752,813.00 Mobi/Demobilization Costs, etc. 5% of DC

    2 Direct Construction Cost (DC)Ratio

    Over DC

    Ratio

    Over DC

    a Breakwater 60,007,949.50 3.30%

    b Outer Seawalls/Revetment 58,861,296.00 3.20%

    c Dredging 511,696,620.00 27.90% Basin & Channel (-17 m Lws, B : 380 m)

    d Quay Wall Reclamation & Soil

    Improvement

    459,645,757.00 25.00% 182,749,578.00 22.40%

    e Yard Pavement & Building 140,909,250.00 7.70% 148,686,000.00 18.20% Included Utilities

    f Revetment for Phase II 38,777,229.00 2.10%

    g Backup Area (Onland) 31,749,296.00 1.70%

    h Road & Bridge 82,215,500.00 4.50% 56,237,340.00 6.90%

    i Container Handling Equipment 427,383,360.00 23.30% 427,383,360.00 52.40%

    j Navigational Aids 16,520,000.00 0.90%

    k Training Dyke 8,551,662.30 0.50%

    Sub-Total of DC 1,836,317,919.80 100.00% 815,056,278.00 100.00%

    3 Project Related Expenses 247,902,919.20 110,032,597.50

    a Engineering Cost 45,907,948.00 20,376,407.00

    b Contingency 183,631,792.00 81,505,627.80 10% of the DC

    c Administration Cost 18,363,179.20 8,150,562.80

    4 Total Construction Cost 2,176,036,734.90 965,841,689.40 Total of a, b, c

    VAT 217,603,673.50 96,584,168.90 10%

    TOTAL PROJECT COST 2,393,640,408.40 1,062,425,858.40

    Unit : US$

    PHASE I PHASE IINO

  • Parking area

    For the vehicle on the toll road Capacity

    Semi-trailer: 6

    Large vehicle: 3

    Small vehicle: 1

    Toll gate and office

    Interchange,

    toll gate and office

    Rice field shall be

    protected.

    No extra interchange

    No pedestrian

    No motorbike to protect existing land use

  • TOTAL OF BACKUP AREA 205 HA

    SINKRONISASI TATA GUNA LAHAN

    DALAM RTRW KABUPATEN KARAWANG

    TINDAK LANJUT :

    Perlu dilakukan penyesuaian peruntukan

    ruang dan penggunaan lahan di dalam

    RTRW Kabupaten Karawang (atau

    ditetapkan dengan produk perencanaan lain)

    termasuk di dalamnya alokasi kawasan

    untuk Back Up Area dan akses ke

    Pelabuhan Cilamaya

  • Jalan akses dan jalur KA harus terlebih dahulu masuk dalam perencanaan tata ruang wilayah

    Studi LARAP (Land Acquisition and Resettlement Action Plan) untuk jalan akses belum dapat

    diselesaikan.

    JALAN AKSES (TOL) DAN JALUR KA MENUJU PELABUHAN

    TINDAK LANJUT :

    Koordinasi lebih lanjut dengan Kemenko Perekonomian dan Kementerian PU agar jalan akses serta

    jalur KA ke Pelabuhan Cilamaya dapat terakomodir dalam rencana tata ruang wilayah

    Penyelesaian studi LARAP untuk jalan akses (ditargetkan selesai akhir tahun 2014)

  • TINDAK LANJUT PENYELESAIAN MASALAH :

    Sudah dilakukan studi khusus oleh Konsultan ndependen (Booz & Co sebagai Supervisor Consultant,

    Mott McDonald untuk pelabuhan & DNV-GL untuk migas) di bawah koordinasi Kementerian

    Perekonomian.

    FAKTA DAN EKOMENDASI STUDI :

    Studi telah dipaparkan di hadapan Tim Steering Committee (tanggal 3 Juni 2014)

    Konsultan Independen menghasilkan rekomendasi penggeseran lokasi pelabuhan sekitar 2,9 km sehingga memiliki jarak yang memadai dari prospect reserve area PHE ONWJ. Selain itu, juga dilakukan mitigasi resiko terhadap pipa minyak dan gas yang berada di dasar laut sehingga operasional migas dan pelayanan pelabuhan dapat berjalan secara berdampingan (co-exist) tanpa saling mengganggu sepanjang semua pihak menaati sistem dan prosedur yang ditetapkan.

    Banyak negara lain di dunia juga dapat mengatur operasi pelabuhan dan migas secara bersama tanpa saling merugikan, bahkan pada tingkat kompleksitas persoalan yang lebih tinggi. Sebagai contoh, Pelabuhan Houston dapat mengatur perjalanan 8.000 kapal dan 200.000 pergerakan tongkang setiap tahunnya melintasi banyak pipa bawah laut dan melalui alur navigasi di antara banyak lapangan minyak dan gas. Demikian pula di Singapura yang jalur pelayarannya sangat sibuk dan melintasi major submarine pipeline dari Natuna dan Sumatra. Begitu pula halnya dengan Pelabuhan Rio de Janeiro yang menangani sekitar 7 juta ton kargo curah serta 350 ribu TEUs dengan alur navigasi yang hanya berjarak 500 m dari safety zone installation.

    Kondisi yang sama juga terjadi di dalam negeri seperti di Pelabuhan Balikpapan dengan area migas Mahakam dari PT Total EP Indonesie. Bahkan alur pelayaran Pelabuhan Tanjung Priok dengan trafik 12.600 kapal per tahun dapat dengan baik melintasi jalur pipa gas bawah laut dari PHE ONWJ ke PLTU Muara Karang dan jalur pipa gas PGN dari Sumatra ke Muara Bekasi di Jawa Barat.

    OVERLAPING DENGAN FASILITAS EKSISTING MIGAS MILIK PERTAMINA

  • Solusi adanya lapangan migas prospect reserve area milik PHE ONWJ: 1. Penggeseran rencana lokasi pelabuhan sekitar 2,9 km ke arah Barat dari lokasi semula. 2. Perubahan alur pelayaran untuk menyesuaikan dengan lokasi pelabuhan yang baru tersebut dan juga untuk

    menyesuaikan dengan beberapa Lead dan Prospect Area yang sudah diidentifikasi oleh PHE ONWJ. 3. mitigasi melalui perubahan alur pelayaran yang dibatasi pada jarak terdekat 2 km pada setiap sisi alur pelayaran

    untuk mengurangi potensi kecelakaan terhadap area eksplorasi migas. Jarak ini dianggap cukup aman untuk menghindari terjadinya benturan antara kapal dengan rig migas.

    4. Pendalaman pipa-pipa milik PHE ONWJ dan proteksi menggunakan armour rock dan selimut beton (concrete mat untuk kebutuhan alur pelayaran yang membutuhkan kedalaman perairan -17 m LWS

    5. Jika ada gangguan terhadap operasi migas oleh aktivitas pelabuhan, diperkirakan gangguan pada total or worst case scenario masih berada pada level yang dapat dikendalikan (manageable). Perbedaan yang besar antara estimasi kerugian dari pihak PHE ONWJ dengan hasil perhitungan Konsultan Independen dikarenakan pihak PHE ONWJ melakukan perhitungan pada kondisi awal tanpa ada pergeseran lokasi dan tanpa dilakukan solusi mitigasi seperti yang disarankan Konsultan Independen.

  • Alur pelayaran Cilamaya akan ditetapkan sebagai perairan wajib pandu dan tunda serta

    dilakukan pemasangan SBNP;

    Setiap kapal yang masuk akan diawasi pergerakannya oleh Syahbandar Pelabuhan

    Cilamaya dan akan dipandu oleh petugas pandu yang profesional;

    Setiap kapal diharuskan menggunakan kapal tunda sehingga kapal akan memasuki

    perairan dalam kondisi mesin utama mati dan hanya digerakkan kapal tunda.

    Tidak ada kapal yang masuk alur dan area migas tanpa izin dan pengawasan

    Syahbandar Pelabuhan Cilamaya, termasuk kapal-kapal milik PHE-ONWJ.

    ASPEK KESELAMATAN PELAYARAN DAN OPERASIONAL MIGAS

  • PHASE I

    1. BREAKWATER 2. OUTER SEAWALLS/REVETMENT 3. DREDGING 4. QUAYWALL RECLAMATION & SOIL 5. IMPROVEMENT (BERTH NO. 1, 2,3,7,8 & 6. PETROLEUM JETTY) 7. YARD PAVEMENT & BUILDING 8. REVETMENT FOR PHASE II 9. BACKUP AREA (ONLAND) 10. ROAD & BRIDGE 11. CONTAINER HANDLING EQUIPMENT 12. NAVIGATIONAL AIDS 13. TRAINING DYKE

    LENGTH OF THE WHARF - PHASE I : 3.530 M

    TOTAL INVESTMENT PHASE I:

    2,39 BILLION US$

    1. QUAYWALL RECLAMATION & SOIL IMPROVEMENT (BERTH NO. 4, 5, 6 & 9)

    2. YARD PAVEMENT & BUILDING 3. ROAD & BRIDGE 4. CONTAINER HANDLING EQUIPMENT LENGTH OF THE WHARF PHASE II: 2.790 M

    TOTAL INVESTMENT PHASE II :

    1,06 BILLION US$

    3,75 MILLION TEUs 1,030,000 CARS

    3,75 MILLION TEUs

  • 1. Skema Opsi Kerjasama Pemerintah Swasta (PPP)

    Dalam skema KPS, Pemerintah menyediakan infrastruktur dasar untuk pengerukan alur, pembangunan breakwater dan reklamasi lahan. Melalui skema ini, rencana tahap konstruksi akan selesai dan dioperasikan 2023. Jika skema ini disetujui, diperlukan studi DED dan studi Kelayakan KPS PPP, serta dilakukan penganggaran dana APBN untuk infrastruktur dasar.

    2. Skema Opsi Konsesi

    Dalam skema Konsesi, seluruh infrastruktur dibangun dan dioperasikan oleh BUP (swasta). Melalui skema ini, perlu disusun studi KPS tahun 2015 untuk kemudian ditawarkan kepada BUP (market sounding). Melalui skema ini, rencana penyelesaian konstruksi dan operasi pelabuhan dapat dipercepat menjadi tahun 2021.

  • Usulan Skema Opsi PPP

  • PROCESS 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

    FS

    AMDAL (EIA)

    DED

    PEMBEBASAN (BACKUP AREA)

    PROSES TENDER

    KONSTRUKSI

    OPERASIONAL

    Skema Awal Loan JICA

    Kerangka Waktu Skema Opsi PPP

  • Usulan Skema Opsi Konsesi

  • PROCESS 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

    FS

    STUDI FS KONSESI

    AMDAL (EIA)

    DED

    PEMBEBASAN (BACKUP AREA)

    TENDER KONSESI

    KONSTRUKSI

    OPERASIONAL

    Kerangka Waktu Skema Opsi Konsesi