Format Jadwal

1
JADWAL PELAKSANAAN PEKERJAAN SATUAN KERJA SEMENTARA BRR-INFRASTRUKTUR KAWASAN DAN PERMUKIMAN NAMA PAKET : PRASARANA DASAR PERMUKIMAN KAWASAN GAMPONG BLANG-LAMJABAT NO./KODE PAKET : IKP-I.1.1 KONTRAKTOR : PT.YUDHA BAKTI UTAMA LOKASI : PROVINSI NANGGROE ACEH DARUSSALAM KONSULTAN : ITEM U R A I A N SAT. HARGA KONTRAK AWAL JADWAL KEGIATAN PEKERJAAN TAHUN 2006 / 2007 VOLUME JUMLAH HARGA BOBOT % ,NOVEMBER 2006 DESEMBER 2006 JANUARI 2007 FEBRUARI 2007 KET. SATUAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 18 8 15 24 29 6 13 20 24 3 10 17 24 1 8 13 5 9 16 25 31 7 14 21 25 4 11 18 25 2 9 A. PEKERJAAN JALAN I DIVISI 1. U M U M 1.2 Mobilisasi Ls 86,930,000.00 1.00 86,930,000.00 1.118 II DIVISI 3. PEKERJAAN TANAH 3.1 (1) Galian Biasa 36,754.55 608.12 22,351,176.95 0.287 3.2 (1) Timbunan Biasa 113,362.83 2,871.50 325,521,366.35 4.185 3.2 (2) Timbunan Pilihan 52,228.29 9,080.50 474,258,987.35 6.097 3.3 Penyiapan Badan Jalan 2,838.48 19,250.00 54,640,740.00 0.703 III DIVISI 5. PERKERASAN BERBUTIR 5.1 (1) Lapis Pondasi Agregat Kelas A 335,288.11 2,100.00 704,105,031.00 9.053 5.1 (2) Lapis Pondasi Agregat Kelas B 276,079.11 2,800.00 773,021,508.00 9.939 IV DIVISI 6. PERKERASAN ASPAL 6.1 (1) Lapis Resap Pengikat Ltr 8,160.54 21,175.00 172,799,434.50 2.222 6.3 (6) Laston-Lapis Pengikat Aspal beton (AC BC) tebal = 5 cm 1,665,208.06 700.00 1,165,645,642.00 14.986 6.6 Lapis Penetrasi Macadam ( Permukaan ) 1,105,898.34 367.50 406,417,639.95 5.225 V DIVISI 7. STRUKTUR 7.9 Pasangan Batu 525,804.16 661.00 347,556,549.76 4.468 VI DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.4 (1) Marka Jalan Bukan Thermoplastic 118,629.50 313.63 37,205,770.09 0.478 B. PEKERJAAN DRAINASE 1 Galian Tanah 24,237.50 9,329.71 226,128,846.13 2.907 2 Urugan Pasir 93,695.00 1,320.44 123,718,625.80 1.591 3 Pekerjaan Saluran Batu Belah 510,346.00 1,225.44 625,398,402.24 8.041 4 Plesteran 24,583.80 2,376.55 58,424,629.89 0.751 5 Pekerjaan Saluran Beton 649,447.98 573.25 372,296,054.54 4.787 6 Acian 7,524.00 11,105.71 83,559,362.04 1.074 7 Kerb 101,816.50 1,057.50 107,670,948.75 1.384 8 Paving Block 79,913.40 1,109.00 88,623,960.60 1.139 9 Suling-suling 5,134.25 1,959.00 10,057,995.75 0.129 10 Beton Penutup Saluran 2,450,230.00 184.50 452,067,435.00 5.812 11 Begisting Tutup Saluran 69,657.50 36.37 2,533,443.28 0.033 C. PEKERJAAN AIR BERSIH I PEKERJAAN PERSIAPAN 1 Mobilisasi dan Demobilisasi Ls 2,000,000.00 2.00 4,000,000.00 0.051 2 Pengukuran dan Pematokan Ls 1,000,000.00 2.00 2,000,000.00 0.026 II PEMASANGAN PIPA DAN ACCESSORIES 1 ND. 100 MM M 17,174.65 780.00 13,396,227.00 0.172 2 ND. 75 MM M 14,347.24 546.00 7,833,593.04 0.101 3 ND. 50 MM M 13,717.06 2,950.00 40,465,327.00 0.520 4 ND. 40 MM M 11,435.06 4,929.00 56,363,410.74 0.725 III PENGETESAN PIPA 1 ND. 100 MM M 1,255.00 780.00 978,900.00 0.013 2 ND. 75 MM M 1,013.00 546.00 553,098.00 0.007 3 ND. 50 MM M 784.00 2,950.00 2,312,800.00 0.030 4 ND. 40 MM M 784.00 4,929.00 3,864,336.00 0.050 IV DESINFEKSI PIPA 1 ND. 100 MM M 694.00 780.00 541,320.00 0.007 2 ND. 75 MM M 545.00 546.00 297,570.00 0.004 3 ND. 50 MM M 409.00 2,950.00 1,206,550.00 0.016 4 ND. 40 MM M 409.00 4,929.00 2,015,961.00 0.026 V PEMASANGAN SAMBUNGAN RUMAH 1 PEMASANGAN SAMBUNGAN RUMAH M 230,000.00 125.00 28,750,000.00 0.370 VI PEKERJAAN LAIN-LAIN 1 AS BUILT DRAWING Ls 200,000.00 2.00 400,000.00 0.005 D. PEKERJAAN AIR KOTOR 1 JUMLAH TOTAL PEKERJAAN AIR KOTOR Ls 87,369,122.71 1.00 87,369,122.71 1.123 E. PEKERJAAN PERSAMPAHAN 1 JUMLAH TOTAL PEKERJAAN PERSAMPAHAN Ls 97,881,664.87 1.00 97,881,664.87 1.258 F. PEKERJAAN LAND SCAPE 1 JUMLAH TOTAL PEKERJAAN LAND SCAPE Ls 706,853,127.36 1.00 706,853,127.36 9.088 (A) J U M L A H 7,778,016,557.66 100.00 (B) PPN 10 % (A x 10 %) 777,801,655.77 (C) JUMLAH TOTAL (A + B) 8,555,818,213.42 (D) DIBULATKAN 8,555,816,000.00 RENCANA PEKERJAAN PERMINGGU RENCANA PEKERJAAN KOMULATIF ( PERMINGGU ) RENCANA PEKERJAAN PERMINGGU ( C.C.O ) RENCANA PEKERJAAN KOMULATIF ( C.C.O ) REALISASI KEMAJUAN KERJA PERMINGGU REALISASI KEMAJUAN KERJA KOMULATIF ( PER MINGGU ) DEVIASI Mengetahui Diperiksa Oleh Dibuat Oleh Kepala Satuan Kerja Sementara Konsultan Pengawas Kontraktor Pelaksana BRR - Infrastruktur Kawasan dan Permukiman NAD NAMA PERUSAHAAN NAMA PERUSAHAAN N A M A N A M A N A M A NIP. Team Leader / Co Team Leader Direktur Utama/General Superintendent M 3 M 3 M 3 M 2 M 3 M 3 M 3 M 3 M 3 M 1 M 3 M 3 M 3 M 2 M 3 M 2 M 1 M 2 M 1 M 3 M 2

description

sipil

Transcript of Format Jadwal

Page 1: Format Jadwal

JADWAL PELAKSANAAN PEKERJAANSATUAN KERJA SEMENTARA BRR-INFRASTRUKTUR KAWASAN DAN PERMUKIMAN

NAMA PAKET : PRASARANA DASAR PERMUKIMAN KAWASAN GAMPONG BLANG-LAMJABATNO./KODE PAKET : IKP-I.1.1KONTRAKTOR : PT.YUDHA BAKTI UTAMALOKASI : PROVINSI NANGGROE ACEH DARUSSALAMKONSULTAN :

ITEM U R A I A N SAT. HARGA

KONTRAK AWALJADWAL KEGIATAN PEKERJAAN

TAHUN 2006 / 2007

VOLUME JUMLAH HARGA BOBOT %

,NOVEMBER 2006 DESEMBER 2006 JANUARI 2007 FEBRUARI 2007 KET.SATUAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 18

8 15 24 29 6 13 20 24 3 10 17 24 1 8 135 9 16 25 31 7 14 21 25 4 11 18 25 2 9

A. PEKERJAAN JALANI DIVISI 1. U M U M

1.2 MobilisasiLs 86,930,000.00 1.00 86,930,000.00 1.118

II DIVISI 3. PEKERJAAN TANAH

3.1 (1) Galian Biasa36,754.55 608.12 22,351,176.95 0.287

3.2 (1) Timbunan Biasa113,362.83 2,871.50 325,521,366.35 4.185

3.2 (2) Timbunan Pilihan52,228.29 9,080.50 474,258,987.35 6.097

3.3 Penyiapan Badan Jalan2,838.48 19,250.00 54,640,740.00 0.703

III DIVISI 5. PERKERASAN BERBUTIR

5.1 (1) Lapis Pondasi Agregat Kelas A335,288.11 2,100.00 704,105,031.00 9.053

5.1 (2) Lapis Pondasi Agregat Kelas B276,079.11 2,800.00 773,021,508.00 9.939

IV DIVISI 6. PERKERASAN ASPAL

6.1 (1) Lapis Resap PengikatLtr 8,160.54 21,175.00 172,799,434.50 2.222

6.3 (6) Laston-Lapis Pengikat Aspal beton (AC BC) tebal = 5 cm1,665,208.06 700.00 1,165,645,642.00 14.986

6.6 Lapis Penetrasi Macadam ( Permukaan )1,105,898.34 367.50 406,417,639.95 5.225

V DIVISI 7. STRUKTUR

7.9 Pasangan Batu525,804.16 661.00 347,556,549.76 4.468

VI DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

8.4 (1) Marka Jalan Bukan Thermoplastic118,629.50 313.63 37,205,770.09 0.478

B. PEKERJAAN DRAINASE

1 Galian Tanah24,237.50 9,329.71 226,128,846.12 2.907

2 Urugan Pasir93,695.00 1,320.44 123,718,625.80 1.591

3 Pekerjaan Saluran Batu Belah510,346.00 1,225.44 625,398,402.24 8.041

4 Plesteran24,583.80 2,376.55 58,424,629.89 0.751

5 Pekerjaan Saluran Beton649,447.98 573.25 372,296,054.53 4.787

6 Acian7,524.00 11,105.71 83,559,362.04 1.074

7 Kerb101,816.50 1,057.50 107,670,948.75 1.384

8 Paving Block79,913.40 1,109.00 88,623,960.60 1.139

9 Suling-suling5,134.25 1,959.00 10,057,995.75 0.129

10 Beton Penutup Saluran2,450,230.00 184.50 452,067,435.00 5.812

11 Begisting Tutup Saluran69,657.50 36.37 2,533,443.28 0.033

C. PEKERJAAN AIR BERSIHI PEKERJAAN PERSIAPAN

1 Mobilisasi dan DemobilisasiLs 2,000,000.00 2.00 4,000,000.00 0.051

2 Pengukuran dan PematokanLs 1,000,000.00 2.00 2,000,000.00 0.026

II PEMASANGAN PIPA DAN ACCESSORIES

1 ND. 100 MMM 17,174.65 780.00 13,396,227.00 0.172

2 ND. 75 MMM 14,347.24 546.00 7,833,593.04 0.101

3 ND. 50 MMM 13,717.06 2,950.00 40,465,327.00 0.520

4 ND. 40 MMM 11,435.06 4,929.00 56,363,410.74 0.725

III PENGETESAN PIPA

1 ND. 100 MMM 1,255.00 780.00 978,900.00 0.013

2 ND. 75 MMM 1,013.00 546.00 553,098.00 0.007

3 ND. 50 MMM 784.00 2,950.00 2,312,800.00 0.030

4 ND. 40 MMM 784.00 4,929.00 3,864,336.00 0.050

IV DESINFEKSI PIPA

1 ND. 100 MMM 694.00 780.00 541,320.00 0.007

2 ND. 75 MMM 545.00 546.00 297,570.00 0.004

3 ND. 50 MMM 409.00 2,950.00 1,206,550.00 0.016

4 ND. 40 MMM 409.00 4,929.00 2,015,961.00 0.026

V PEMASANGAN SAMBUNGAN RUMAH

1 PEMASANGAN SAMBUNGAN RUMAHM 230,000.00 125.00 28,750,000.00 0.370

VI PEKERJAAN LAIN-LAIN

1 AS BUILT DRAWINGLs 200,000.00 2.00 400,000.00 0.005

D. PEKERJAAN AIR KOTOR

1 JUMLAH TOTAL PEKERJAAN AIR KOTORLs 87,369,122.71 1.00 87,369,122.71 1.123

E. PEKERJAAN PERSAMPAHAN

1 JUMLAH TOTAL PEKERJAAN PERSAMPAHANLs 97,881,664.87 1.00 97,881,664.87 1.258

F. PEKERJAAN LAND SCAPE

1 JUMLAH TOTAL PEKERJAAN LAND SCAPELs 706,853,127.36 1.00 706,853,127.36 9.088

(A) J U M L A H 7,778,016,557.66 100.00

(B) PPN 10 % (A x 10 %) 777,801,655.77

(C) JUMLAH TOTAL (A + B) 8,555,818,213.42

(D) DIBULATKAN 8,555,816,000.00

RENCANA PEKERJAAN PERMINGGU

RENCANA PEKERJAAN KOMULATIF ( PERMINGGU )

RENCANA PEKERJAAN PERMINGGU ( C.C.O )

RENCANA PEKERJAAN KOMULATIF ( C.C.O )

REALISASI KEMAJUAN KERJA PERMINGGU

REALISASI KEMAJUAN KERJA KOMULATIF ( PER MINGGU )

DEVIASI

Mengetahui Diperiksa Oleh Dibuat Oleh

Kepala Satuan Kerja Sementara Konsultan Pengawas Kontraktor Pelaksana

BRR - Infrastruktur Kawasan dan Permukiman NAD NAMA PERUSAHAAN NAMA PERUSAHAAN

N A M A N A M A N A M ANIP. Team Leader / Co Team Leader Direktur Utama/General Superintendent

M3

M3

M3

M2

M3

M3

M3

M3

M3

M1

M3

M3

M3

M2

M3

M2

M1

M2

M1

M3

M2