Transcript of Estimasi harga pengujian tanah.xls

Kuliah PTIESTIMASI HARGA PENYELIDIKAN TANAHNoItem PekerjaanUnitunit rate Rp.1Umum1.01Mobilization & Demobilization < 30km and 1 weekLs60,000,0001.02Mobilization & Demobilization > 30km and or 1 weekday5,000,0001.03Site preparation for unaccesseble locationnos5,000,0002Field Test Investigation0.02.01Bore Holes (Soils) 2 points@max 40m or NSPT>50 3xmeter400,0002.02SPT (Standard Penetration Test)nos250,0002.03Undisturbed Samplingnos350,0002.04In Situ Shear Vanes (max 3m)nos300,0002.05CPT 2.5 ton capacitynos2,000,0002.06Soil resistvity testnos3,000,0003Laboratory Testing0.03.01Moisture Contentnos50,0003.02Unit Weightnos70,0003.03Specific Gravitynos80,0003.04Particle Size analysisnos150,0003.05Atterberg limitsnos110,0003.06Consolidation Testnos350,0003.07Undrained Triaxial Testnos350,0003.08Unconfined Compression Testnos160,0003.09Hydrometer Testnos120,0003.10Permeability testnos300,0003.11Moisture density (compaction) testnos500,0003.12CBR Testnos400,0003.13Corrosivity (chloride, sulfate, pH)nos900,0004Reporting and Analysis0.04.01Report on result of geotecnical InvestigationLS15,000,0004.02Final Report Analysis and RecommendationsLS20,000,0005SUMnote: nos = number of sampleLs = Lump Sum

Daftar ISI laporanBab1PendahuluanLatar BelakangTujuanLingkup Pekerjaan (Tugas)2Penyelidikan GeoteknikTahapan Pelaksanaan3Desain Penyelidikan GeoteknikGambaran Umum Pekerjaan KonstruksiLayout dan Detail Pengujian LapanganDetail Pengujian LaboratoriumRencana Anggaran Penyelidikan Geoteknik4Kesimpulan/ PenutupLampiran