NO UNDANGAN 01-PU/UMUM/KONST/POKJA.1-T1/ TANGGAL UNDANGAN Tanggal 15 April 2013 POKJA POKJA 1 ULP KAB. BENGKALIS NO PAKET 015-K/PU/KONST/PJ.1-TI/IV/20 KEGIATAN PENINGKATAN JALAN LINGKUNGAN NAMA PAKET PENINGKATAN JALAN PULAU RT.0 LOKASI KEC. BANTAN HPS PAKET Rp 478,000,000.00 PERUSAHAAN CV. HELLIV ANUGRAH NAMA DIREKTUR ISKANDAR HS JABATAN Direktur NOMOR PENAWARAN 001/SPEN/ULP.1/IV/2013 TANGGAL PENAWARAN Bengkalis, 22 Oktober 2014 HARGA PENAWARAN Rp 746,200,000.00 TERBILANG #NAME? BANTINGAN -56.109%

description

contoh ee jalan kab. bengkalis

Transcript of EE Jalan Pulau Desa Kembung

BANK DATANO UNDANGAN01-PU/UMUM/KONST/POKJA.1-T1/IV/2013TANGGAL UNDANGANTanggal 15 April 2013POKJAPOKJA 1 ULP KAB. BENGKALIS

NO PAKET015-K/PU/KONST/PJ.1-TI/IV/2013KEGIATANPENINGKATAN JALAN LINGKUNGAN KECAMATAN BANTAN BNAMA PAKETPENINGKATAN JALAN PULAU RT.03 RW.04 DUSUN SEPAKAT DESA KEMBUNG BARULOKASIKEC. BANTANHPS PAKETRp 478,000,000.00

PERUSAHAANCV. HELLIV ANUGRAHNAMA DIREKTURISKANDAR HSJABATANDirektur

NOMOR PENAWARAN001/SPEN/ULP.1/IV/2013TANGGAL PENAWARAN Bengkalis, 22 Oktober 2014HARGA PENAWARANRp 746,200,000.00TERBILANGTujuh Ratus Empat Puluh Enam Juta Dua Ratus Ribu RupiahBANTINGAN-56.109%

KOPLAP

PEMERINTAH KABUPATEN BENGKALISDINAS PEKERJAAN UMUM KABUPATEN BENGKALISJl. Pertanian No.BENGKALIS

ENGINEER ESTIMATE( E E ): : Lanjutan Pembangunan Pengaman Pantai Desa Sekodi Kecamatan Bengkalis 1 Unit

KEGIATANPENINGKATAN JALAN LINGKUNGAN KECAMATAN BANTAN B

PEKERJAANPENINGKATAN JALAN PULAU RT.03 RW.04 DUSUN SEPAKAT DESA KEMBUNG BARU

TAHUN ANGGARAN2015

KONSULTAN

REKAPREKAPITULASIPERKIRAAN HARGA PEKERJAAN

Nama Kegiatan:PENINGKATAN JALAN LINGKUNGAN KECAMATAN BANTAN BNama Pekerjaan:PENINGKATAN JALAN PULAU RT.03 RW.04 DUSUN SEPAKAT DESA KEMBUNG BARU

Lokasi:KEC. BANTAN

No. DivisiUraianJumlah Harga Pekerjaan (Rupiah)

1DIVISI 1. UMUMRp 13,500,000.000.01989978942DIVISI 3. PEKERJAAN TANAHRp 16,266,349.440.02397755023DIVISI 5. PERKERASAN BERBUTIRRp 648,632,790.330.9561226604

Rp 570,000(A) Jumlah Harga Pekerjaan (termasuk Biaya Umum dan Keuntungan )Rp 678,399,139.77(B) Pajak Pertambahan Nilai ( PPn ) = 10% x (A)Rp 67,839,913.98Rp 478,000,000(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)Rp 746,239,053.740.0000%-56.1088%(D) JUMLAH TOTAL DIBULATKANRp 746,200,000.00Rp 478,000,000Terbilang :Tujuh Ratus Empat Puluh Enam Juta Dua Ratus Ribu Rupiah-Rp 268,200,000.00ERROR:#REF!Bengkalis, 2015ERROR:#REF!KONSULTANpanjang480NAMA Jabatan

RABDAFTAR KUANTITAS DAN HARGA

No. Paket :0Nama Kegiatan:PENINGKATAN JALAN LINGKUNGAN KECAMATAN BANTAN BNama Pekerjaan:PENINGKATAN JALAN PULAU RT.03 RW.04 DUSUN SEPAKAT DESA KEMBUNG BARU

Lokasi:KEC. BANTAN

No. MataPembayaranUraianSatuanPerkiraanKuantitasHarga Satuan(Rupiah)Jumlah Harga-Harga(Rupiah)abcdef = (d x e)

DIVISI 1. UMUMpanjang480m'1,2Mobilisasi dan DemobilisasiLs1.00Rp 13,500,000.00Rp 13,500,000.00lebar5m'

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)Rp 13,500,000.00

DIVISI 3. PEKERJAAN TANAH

Penyiapan Badan JalanM22,400.00Rp 6,777.65Rp 16,266,349.44

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)Rp 16,266,349.44

DIVISI 5. PERKERASAN BERBUTIR

Lapis Pondasi Agregat Kelas BM3648.00Rp 825,578.92Rp 534,975,138.09GeotextileM22,400.00Rp 47,357.36Rp 113,657,652.24

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)Rp 648,632,790.33

MOBILISASIITEM PEMBAYARAN: 1,2JENIS PEKERJAAN: MOBILISASILembar 1,2-1No.U R A I A NSATUANVOL.HARGA SATUAN (Rp.)JUMLAH HARGA (Rp.)

APERALATANPeriksa lembar 1.2-2Rp 6,300,000.00

BFASILITAS KONTRAKTORPapan Nama ProyekLs1.00Rp 400,000.00Rp 400,000.00

CMOBILISASI LAINNYA1As build DrawingSet1.00Rp 500,000.00Rp 500,000.00

DDEMOBILISASILS1.00Rp 6,300,000.00Rp 6,300,000.00Total Biaya MobilisasiRp 13,500,000.00Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.ITEM PEMBAYARAN: 1,2,2JENIS PEKERJAAN: MOBILISASI

No.JENIS ALATKODE ALATSATUANVOL.HARGA SATUAN(Rp.)JUMLAH HARGA (Rp.)

BPERALATAN1DUMP TRUCK 3-5 TONE08unit3.00Rp 300,000Rp 900,0002GENERATOR SETE12unit1.00Rp 200,000Rp 200,0003TANDEM ROLLERE17unit1.00Rp 2,500,000Rp 2,500,0004WATER PUMP 70-100 MME22unit1.00Rp 200,000Rp 200,0005MOTOR GRADER >100 HPE13unit1.00Rp 2,500,000Rp 2,500,000

Total Biaya MobilisasiRp 6,300,000.00

AlatURAIAN ANALISA ALATANALISA BIAYA SEWA PERALATAN PER JAM KERJADAFTAR BIAYA SEWA PERALATAN PER JAM KERJAPERHITUNGAN ALAT UTAMASTONE CRUSHERBIAYANo.U R A I A NKODEKOEF.SATUANKET.TENAGAKAPASITASHARGAALAT YANG DIPAKAINILAIFAKTORBIAYA PASTI PER JAMBIAYA OPERASI PER JAM KERJATOTALNo.URAIANKOHPKAP.HARGASEWAKET.Tabel-tabel di bawah iniALATALATALATJAMSISAPENGEM-BIAYAASURANSITOTALBAHAN BAKAR & PELUMASWORKSHOPPERBAIKAN & PERAWATANUPAHTOTALBIAYADEALATALAT/JAMNo.U R A I A NKODEKOEF.SATUANKET.jangan di "delete" !!!UMURKERJAHARGAALATBALIANPENGEM-DANBIAYABAHANMINYAKOPERATORPEMBANTUBIAYASEWA ALAT(di luar PPN)Merupakan acuan untukA.URAIAN PERALATANALAT1 TAHUNALATMODALBALIANLAIN-LAINPASTI / JAMBAKARPELUMASBIAYAKOEF.BIAYAKOEF.BIAYA/ SOPIROPERATOROPERASIPERformula depresiasi 1.Jenis PeralatanASPHALT MIXING PLANTE01MODAL/ SOPIR/ JAMJAM KERJA1.ASPHALT MIXING PLANTE01150.060.0T/Jam3,857,000,0001,600,886.20 Alat baruIBERAT JENIS BAHANalat berat yang dipakai. 2.TenagaPw150.0HP(HP)-(Tahun)(Tahun)(Jam)(Rp.)(Rp.)-(Rp.)(Rp.)(Rp.)Lt/HP/JamLtr/HP/Jam(Rp.)-(Rp.)-(Rp.)(Rp.)(Rp.)(Rp.)(Rp.)KET.2.ASPHALT FINISHERE0247.08.0Ton509,437,500179,722.40 Alat baruUEUPDepresiasi 3.KapasitasCp60.0T/JamNo.JENIS PERALATANKODEf1 x HP x1 Orang1 Orang3.ASPHALT SPRAYERE0315.0800.0Liter180,984,37567,729.07 Alat baru1.Agregat BaseD12.20Ton/M3E011003,857,000,000 4.Alat Baru : a. Umur EkonomisA10.0TahunALATi(1+i)^A(B - C) x D0.002 x B0.1250.01Harga BBM0.0625(g1 x B')0.125(g1 x B')PerPer4.BULLDOZER 100-150 HPE04100.0- - 1,185,000,000354,067.03 Alat baru2.ATB / ATBL / AC / HRSD22.30Ton/M3913,155,727,273 b. Jam Kerja Dalam 1 TahunW1,500.0Jam(10% X B)---------------------------------(e1 + e2)s / ds / d+s / d-----s / d-----------Jam KerjaJam KerjaF+G+H+IE + J5.COMPRESSOR 4000-6500 L\ME0580.0- - 265,971,230113,824.07 Alat baru3.SBST / DBSTD32.00Ton/M3822,524,581,818 c. Harga Alat B3,857,000,000Rupiah(1+i)^A-1WW0.1750.02f2 x HP x0.0875W0.175W==6.CONCRETE MIXER 0.3-0.6 M3E0615.0500.0Liter9,000,00023,543.11 Alat baru731,963,563,636 5.Alat Yang Dipakai : a. Umur EkonomisA'10.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convertHarga OlieRp8,950.0Rp5,114.37.CRANE 10-15 TONE07150.015.0Ton853,875,000300,215.80 Alat baruIITEBAL RATA-RATA HAMPARAN PADAT641,472,672,727 b. Jam Kerja Dalam 1 Tahun W'1,500.0Jam Alat baruHPCpBAWBCDe1e2Ef1f2Fg1Gg1GHIJKL8.DUMP TRUCK 3-4 M3E08100.06.0Ton144,000,000101,207.73 Alat baru551,051,909,091 c. Harga Alat (*)B'3,857,000,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru122a3456789101112131415161718171819202122239.DUMP TRUCKE09125.08.0Ton286,000,000143,332.80 Alat baru1.Agregat Baset10.150M46701,272,72710.EXCAVATOR 80-140 HPE10110.00.5M31,185,000,000317,012.58 Alat baru2.Asphalt Concrete (AC)t20.040M37420,763,636B.BIAYA PASTI PER JAM KERJA1.ASPHALT MIXING PLANTE01150.060.0T/Jam3,857,000,00010.01,500.03,857,000,000385,700,0000.23852551,989.365,142.67557,132.030.12500.01002,115,000.000.00000.000.1250321,416.678,950.0015,342.862,460,709.523,017,841.55 Alat baru11.FLAT BED TRUCK 3-4 M3E11100.04.0M3230,343,750117,339.79 Alat baru3.Hot Rolled Sheet (HRS)t30.030M28210,381,818 1.Nilai Sisa Alat= 10 % x BC385,700,000Rupiah2.ASPHALT FINISHERE0247.08.0Ton509,437,5006.02,000.0509,437,50050,943,7500.3007168,935.85509.4469,445.290.12500.010031,020.000.00000.000.125031,839.848,950.005,114.2976,924.13146,369.42 Alat baru12.GENERATOR SETE12175.0125.0KVA231,000,000159,476.02 Alat baru4.SBSTt40.020M1970,127,2733.ASPHALT SPRAYERE0315.0800.0Liter180,984,3755.02,000.0180,984,37518,098,4380.3343827,232.88180.9827,413.860.12500.01009,900.000.00000.000.125011,311.528,950.005,114.2935,275.8162,689.67 Alat baru13.MOTOR GRADER >100 HPE130.0- - 845,000,000321,784.50 Alat baru5.DBSTt50.030M0100 2.Faktor Angsuran Modal =i x (1 + i)^A'D0.23852-4.BULLDOZER 100-150 HPE04100.0- - 1,231,579,6805.02,000.01,185,000,000123,157,9680.33438177,529.211,185.00178,714.210.12500.010066,000.000.00000.000.125074,062.508,950.005,114.29154,126.79332,841.00 Alat baru14.TRACK LOADER 75-100 HPE1490.01.6M3189,000,000351,023.17 Alat baru-1110(1 + i)^A' - 15.COMPRESSOR 4000-6500 L\ME0580.0- - 265,971,2305.02,000.0265,971,23026,597,1230.3343840,020.92265.9740,286.890.12500.010052,800.000.00000.000.125016,623.208,950.005,114.2983,487.49123,774.38 Alat baru15.WHEEL LOADER 1.0-1.6 M3E15105.01.5M3786,742,500282,025.32 Alat baruIIIVOLUME PEKERJAAN-21270,127,273 3.Biaya Pasti per Jam :6.CONCRETE MIXER 0.3-0.6 M3E0615.0500.0Liter55,687,5004.02,000.09,000,0005,568,7500.38629662.739.00671.730.12500.01009,900.000.00000.000.1250562.508,950.005,114.2924,526.7925,198.51 Alat baru16.THREE WHEEL ROLLER 6-8 TE1655.08.0Ton173,250,00086,961.27 Alat baru-313210,381,818a. Biaya Pengembalian Modal =( B' - C ) x DE551,989.36Rupiah7.CRANE 10-15 TONE07150.015.0Ton853,875,0005.02,000.0853,875,00085,387,5000.33438128,483.31853.88129,337.190.12500.010099,000.000.00000.000.125053,367.198,950.005,114.29166,431.47295,768.66 Alat baru17.TANDEM ROLLER 6-8 T.E1750.08.0Ton831,542,000239,420.95 Alat baru1.Agregat Kelas Av180.00M3-414420,763,636W'8.DUMP TRUCK 3-4 M3E08100.06.0Ton144,000,000
A satisfied Microsoft Office User: Formula failed to convert5.02,000.0144,000,00014,400,0000.3343821,667.80144.0021,811.800.12500.010066,000.000.00000.000.12509,000.008,950.005,114.2989,064.29110,876.09 Alat baru18.TIRE ROLLER 8-10 T.E1860.010.0Ton593,210,000210,463.00 Alat baru2.Agregat Kelas Bv20.00M355559.DUMP TRUCKE09125.08.0Ton286,000,0005.02,000.0286,000,00028,600,0000.3343843,034.67286.0043,320.670.12500.010082,500.000.00000.000.125017,875.008,950.005,114.29114,439.29157,759.95 Alat baru19.VIBRATORY ROLLER 5-8 T.E1975.07.0Ton616,891,000210,343.42 Alat baru3.ATBv30.00M3 Kondisi Alat Umur >10 th.b. Asuransi, dll =0.002 x B'F5,142.67Rupiah10.EXCAVATOR 80-140 HPE10110.00.5M3971,579,5305.02,000.01,185,000,00097,157,9530.33438181,876.151,185.00183,061.150.12500.010072,600.000.00000.000.125074,062.508,950.005,114.29160,726.79343,787.94 Alat baru20.CONCRETE VIBRATORE2010.0- - 7,115,00022,789.03 Alat baru4.ATBLv4ERROR:#REF!Ton Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convertW'11.FLAT BED TRUCK 3-4 M3E11100.04.0M3230,343,7505.02,000.0230,343,75023,034,3750.3343834,660.02230.3434,890.370.12500.010066,000.000.00000.000.125014,396.488,950.005,114.2994,460.77129,351.14 Alat baru21.STONE CRUSHERE21220.030.0T/Jam1,720,250,000516,528.00 Alat baru5.ACv50.00M2 DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert12.GENERATOR SETE12175.0125.0KVA231,000,0005.02,000.0231,000,00023,100,0000.3343834,758.77231.0034,989.770.12500.0100115,500.000.00000.000.125014,437.508,950.005,114.29144,001.79178,991.56 Alat baru22.WATER PUMP 70-100 mmE226.0- - 24,750,00023,719.58 Alat baru6.HRSv60.00M2Biaya Pasti per Jam =( E + F )G557,132.03Rupiah13.MOTOR GRADER >100 HPE130.0- - 845,000,0005.02,000.0845,000,00084,500,0000.33438127,147.88845.00127,992.880.12500.01000.000.00000.000.125052,812.508,950.005,114.2966,876.79194,869.67 Alat baru23.WATER TANKER 3000-4500 L.E23100.04,000.0Liter77,565,00090,640.78 Alat baru7.SBSTv70.00M2E0260509,437,50014.TRACK LOADER 75-100 HPE1490.01.6M3189,000,0005.02,000.0189,000,00018,900,0000.3343828,438.99189.0028,627.990.12500.010059,400.000.00000.000.125011,812.508,950.005,114.2985,276.79113,904.78 Alat baru24.PEDESTRIAN ROLLERE2411.00.98Ton52,031,00031,357.27 Alat baru8.DBSTv80.00M251363,883,929C.BIAYA OPERASI PER JAM KERJA15.WHEEL LOADER 1.0-1.6 M3E15105.01.5M3786,742,5005.02,000.0786,742,50078,674,2500.33438118,381.83786.74119,168.570.12500.010069,300.000.00000.000.125049,171.418,950.005,114.29132,535.69251,704.26 Alat baru25.TAMPERE255.00.17Ton9,500,00020,240.52 Alat baru42242,589,28616.THREE WHEEL ROLLER 6-8 TE1655.08.0Ton173,250,0005.02,000.0173,250,00017,325,0000.3343826,069.08173.2526,242.330.12500.010036,300.000.00000.000.125010,828.138,950.005,114.2961,192.4187,434.74 Alat baru26.JACK HAMMERE263.0- - 9,850,00019,314.15 Alat baruIVVOLUME PEKERJAAN ALAT33145,553,571 1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H175,000.00Rupiah17.TANDEM ROLLER 6-8 T.E1750.08.0Ton831,542,0005.02,000.0831,542,00083,154,2000.33438125,122.85831.54125,954.390.12500.010033,000.000.00000.000.125051,971.388,950.005,114.2999,035.66224,990.05 Alat baru27.FULVI MIXERE2775.0- - 46,000,00063,875.60 Alat baru2472,776,786Bahan Bakar Pemanasan Material= 12 x 0.7Cp x MsH22,016,000.00Rupiah Khusus AMP18.TIRE ROLLER 8-10 T.E1860.010.0Ton593,210,0005.01,800.0593,210,00059,321,0000.3343899,178.69659.1299,837.810.12500.010039,600.000.00000.000.125041,195.148,950.005,114.2994,859.42194,697.24 Alat baru28.CONCRETE PUMPE28100.08.00M3112,500,00089,991.98 Alat baru1.Agregat Kelas A= v1 x D1 x 80% x 1.05w1147.84Ton1524,258,92919.VIBRATORY ROLLER 5-8 T.E1975.07.0Ton616,891,0004.02,000.0616,891,00061,689,1000.38629107,234.23616.89107,851.120.12500.010049,500.000.00000.000.125038,555.698,950.005,114.29102,119.97209,971.09 Alat baru29.TRAILER 20 TONE29175.010.00Ton377,692,000184,779.06 Alat baru2.Agregat Kelas B= v2 x D1 x 80% x 1.05w20.00Ton060 2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI24,000.00Rupiah20.CONCRETE VIBRATORE2010.0- - 7,115,0004.01,000.07,115,000711,5000.386292,473.6014.232,487.830.12500.01006,600.000.00000.000.1250889.388,950.005,114.2921,553.6624,041.49 Alat baru30.PILE DRIVER + HAMMERE3025.02.50Ton70,000,00061,961.44 Alat baru3.ATB= v3 x D2 x 1.05w30.00Ton-17021.STONE CRUSHERE21220.030.0T/Jam1,720,250,0005.02,000.01,720,250,000172,025,0000.33438258,847.511,720.25260,567.760.12500.0100145,200.000.00000.000.1250107,515.638,950.0010,228.57271,894.20532,461.95 Alat baru31.CRANE ON TRACK 35 TONE31125.035.00Ton350,000,000154,545.53 Alat baru4.ATBL= v4 x 1.05w4ERROR:#REF!Ton-2824,258,929 3.Perawatan dan =(12,5 % - 17,5 %) x B'K321,416.67Rupiah22.WATER PUMP 70-100 mmE226.0- - 24,750,0002.02,000.024,750,0002,475,0000.654557,290.0024.757,314.750.12500.01003,960.000.00000.000.12501,546.888,950.005,114.2919,571.1626,885.91 Alat baru32.WELDING SETE3240.0250.00Amp17,500,00038,594.49 Alat baru5.AC= v5 x t2 x D2 x 1.05w50.00Ton-3972,776,786 perbaikanW'23.WATER TANKER 3000-4500 L.E23100.04,000.0Liter77,565,0005.02,000.077,565,0007,756,5000.3343811,671.2777.5711,748.840.12500.010066,000.000.00000.000.12504,847.818,950.005,114.2984,912.1096,660.94 Alat baru33.BORE PILE MACHINEE33150.0200.0Meter2,250,000,000542,277.07 Alat baru6.HRS= v6 x t3 x D2 x 1.05w60.00Ton-410145,553,571 4.Operator= ( 1 Orang / Jam ) x U1L8,950.00Rupiah24.PEDESTRIAN ROLLERE2411.01.0Ton52,031,0004.02,000.052,031,0005,203,1000.386299,044.5552.039,096.590.12500.01007,260.000.00000.000.12503,251.948,950.005,114.2924,576.2233,672.81 Alat baru7.SBST= v7 x t4 x D3 x 1.05w70.00Ton-511242,589,286 5.Pembantu Operator= ( 3 Orang / Jam ) x U2M15,342.86Rupiah25.TAMPERE255.00.2Ton9,500,0004.01,000.09,500,000950,0000.386293,302.7719.003,321.770.12500.01003,300.000.00000.000.12501,187.508,950.005,114.2918,551.7921,873.56 Alat baru8.DBST= v8 x t4 x D3 x 1.05w80.00Ton-612363,883,92926.JACK HAMMERE263.0- - 9,850,0004.01,000.09,850,000985,0000.386293,424.4519.703,444.150.12500.01001,980.000.00000.000.12501,231.258,950.005,114.2917,275.5420,719.69 Alat baru-713509,437,500Biaya Operasi per Jam =(H+I+K+L+M)P2,460,709.52Rupiah27.FULVI MIXERE2775.0- - 46,000,0005.02,000.046,000,0004,600,0000.334386,921.6646.006,967.660.12500.010049,500.000.00000.000.12502,875.008,950.005,114.2966,439.2973,406.95 Alat baruTotal Volume Pekerjaan Alat= w1 + . . . + w8WERROR:#REF!Ton-814679,250,00028.CONCRETE PUMPE28100.08.00M3112,500,0006.02,000.0112,500,00011,250,0000.3007115,223.23112.5015,335.730.12500.010066,000.000.12507,031.258,950.005,114.2987,095.54102,431.26 Alat baru21> 15th ?D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )T3,017,841.55Rupiah29.TRAILER 20 TONE29175.010.00Ton377,692,0006.02,000.0377,692,00037,769,2000.3007151,108.37377.6951,486.060.12500.0100115,500.000.125023,605.758,950.005,114.29153,170.04204,656.10 Alat baruVPERHITUNGAN KAPASITAS ALAT Kondisi Alat Umur >10 th.30PILE DRIVER + HAMMERE3025.02.50Ton70,000,0005.02,000.070,000,0007,000,0000.3343810,532.9670.0010,602.960.12500.010016,500.000.12504,375.008,950.005,114.2934,939.2945,542.25 Alat baru1.Masa Mobilisasi / DemobilisasiTm3.00Bulan Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert31.CRANE ON TRACK 35 TONE31125.035.00Ton350,000,0006.02,000.0350,000,00035,000,0000.3007147,361.15350.0047,711.150.12500.010082,500.000.125021,875.008,950.005,114.29118,439.29166,150.44 Alat baru2.Waktu Produksi (Di luar masa Mobilisasi & Hari Libur)T2.50Bulan DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convertE.LAIN - LAIN32.WELDING SETE3240.0250.00Amp17,500,0005.02,000.017,500,0001,750,0000.334382,633.2417.502,650.740.12500.010026,400.000.12501,093.758,950.005,114.2941,558.0444,208.78 Alat baru3.Jumlah hari kerja efektif / bulanTe125.00Hari/Bln 1.Tingkat Suku Bungai20.00% / Tahun33.BORE PILE MACHINEE33150.02,000.0Meter2,250,000,0006.02,000.02,250,000,000225,000,0000.30071304,464.572,250.00306,714.570.12500.010099,000.000.1250140,625.008,950.005,114.29253,689.29560,403.85 Alat baru4.Jumlah jam kerja efektif / hariTe27.00Jam/HariE0350180,984,375 2.Upah Operator / SopirU18,950.00Rp./Jam34.5.Faktor efisiensi alatFa0.70-41120,656,250 3.Upah Pembantu Operator / Pmb.SopirU25,114.29Rp./JamKETERANGAN : 1.Tingkat Suku Bunga=20.00% per-tahun3272,393,750 4.Bahan Bakar BensinMb4,000.00Liter2.Upah Operator / Sopir / Mekanik=8,950.00Rupiah per-orang/jamKapasitas alat yang diperlukan =WSCERROR:#REF!Ton/Jam2336,196,875 5.Bahan Bakar SolarMs4,000.00Liter3.Upah Pembantu Operator/Sopir/Mekanik=5,114.29Rupiah per-orang/jamT x Te1 x Te2 x Fa1412,065,625 6.Minyak PelumasMp16,000.00Liter4.Harga Bahan Bakar Bensin=4,000.00Rupiah per-liter050 7.PPN diperhitungkan pada lembar Rekapitulasi5.Harga Bahan Bakar Solar=4,000.00Rupiah per-literVI.ALAT YANG DIPAKAI-160Biaya Pekerjaan6.Minyak Pelumas=16,000.00Rupiah per-literKapasitas alat yang dipakai pada proyek iniSCa30.00Ton/Jam OK-2712,065,6257.Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan-3836,196,8758.Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)-4972,393,750URAIAN ANALISA ALATPERHITUNGAN ALAT UTAMA-510120,656,250ASPHALT MIXING PLANT-611180,984,375-712253,378,125No.U R A I A NKODEKOEF.SATUANKET.-813337,837,500No.U R A I A NKODEKOEF.SATUANKET.-914434,362,50015> 15th ?A.URAIAN PERALATAN Kondisi Alat Umur >10 th. 1.Jenis PeralatanASPHALT FINISHERE02IBERAT JENIS BAHAN Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 2.TenagaPw47.0HP DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 3.KapasitasCp8.0Ton1.Agregat BaseD12.20Ton/M3 4.Alat Baru : a. Umur EkonomisA6.0Tahun2.ATB / ATBL / AC / HRSD22.30Ton/M3E04501,185,000,000 b. Jam Kerja Dalam 1 TahunW2,000.0Jam3.SBST / DBSTD32.00Ton/M341790,000,000 c. Harga AlatB509,437,500Rupiah32474,000,000 5.Alat Yang Dipakai : a. Umur EkonomisA'6.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convertIITEBAL RATA-RATA HAMPARAN PADAT23237,000,000 b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru1479,000,000 c. Harga Alat (*)B'509,437,500
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru1.Agregat Baset10.150M0502.Asphalt Concrete (AC)t20.040M-160B.BIAYA PASTI PER JAM KERJA3.Hot Rolled Sheet (HRS)t30.030M-2779,000,000 1.Nilai Sisa Alat= 10 % x BC50,943,750Rupiah4.SBSTt40.020M-38237,000,0005.DBSTt50.030M-49474,000,000 2.Faktor Angsuran Modal =i x (1 + i)^A'D0.30071--510790,000,000(1 + i)^A' - 1IIIVOLUME PEKERJAAN-6111,185,000,000 3.Biaya Pasti per Jam :-7121,659,000,000a. Biaya Pengembalian Modal =( B' - C ) x DE68,935.85Rupiah1.Agregat Kelas Av1- M3-8132,212,000,000W'2.Agregat Kelas Bv2- M3-9142,844,000,0003.ATBv30.00M315> 15th ?b. Asuransi, dll =0.002 x B'F509.44Rupiah4.ATBLv4ERROR:#REF!Ton Kondisi Alat Umur >10 th.W'5.ACv50.00M2 Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert6.HRSv60.00M2 DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convertBiaya Pasti per Jam =( E + F )G69,445.29Rupiah7.SBSTv70.00M28.DBSTv80.00M2E0550265,971,230C.BIAYA OPERASI PER JAM KERJA41177,314,153IVVOLUME PEKERJAAN ALAT32106,388,492 1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H18,424.00Rupiah2353,194,2461.Agregat Kelas A= v1 x D1 x 80% x 1.05w1ERROR:#VALUE!Ton1417,731,415 2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI11,580.80Rupiah2.Agregat Kelas B= v2 x D1 x 80% x 1.05w2ERROR:#VALUE!Ton0503.ATB= v3 x D2 x 1.05w30.00Ton-160 3.Perawatan dan(12,5 % - 17,5 %) x B'K31,839.84Rupiah4.ATBL= v4 x 1.05w4ERROR:#REF!Ton-2717,731,415 perbaikan =W'5.AC= v5 x t2 x D2 x 1.05w50.00Ton-3853,194,2466.HRS= v6 x t3 x D2 x 1.05w60.00Ton-49106,388,492 4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah7.SBST= v7 x t4 x D3 x 1.05w70.00Ton-510177,314,153 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah8.DBST= v8 x t4 x D3 x 1.05w80.00Ton-611265,971,230-712372,359,722Biaya Operasi per Jam =(H+I+K+L+M)P71,844.64RupiahTotal Volume Pekerjaan Alat= w1 + . . . + w8WERROR:#VALUE!Ton-813496,479,629-914638,330,952D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S141,289.93RupiahVPERHITUNGAN KAPASITAS ALAT15> 15th ?1.Masa Mobilisasi / DemobilisasiTm3.00Bulan Kondisi Alat Umur >10 th.2.Waktu Produksi (Di luar masa Mobilisasi & Hari Libur)T2.50Bulan Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convertE.LAIN - LAIN3.Jumlah hari kerja efektif / bulanTe125.00Hari/Bln DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 1.Tingkat Suku Bungai20.00% / Tahun4.Jumlah jam kerja efektif / hariTe27.00Jam/Hari 2.Upah Operator / SopirU15,714.29Rp./Jam5.Faktor efisiensi alatFa0.70-E06409,000,000 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam315,400,000 4.Bahan Bakar BensinMb3,080.00LiterKapasitas alat yang diperlukan =WSCERROR:#VALUE!Ton/Jam222,700,000 5.Bahan Bakar SolarMs3,136.00LiterT x Te1 x Te2 x Fa13900,000 6.Minyak PelumasMp24,640.00Liter040 7.PPN diperhitungkan pada lembar RekapitulasiVI.ALAT YANG DIPAKAI-150Biaya PekerjaanKapasitas alat yang dipakai pada proyek iniSCa60.00Ton/Jam OK-26900,000-372,700,000-485,400,000URAIAN ANALISA ALAT-599,000,000-61013,500,000-71118,900,000No.U R A I A NKODEKOEF.SATUANKET.-81225,200,000-91332,400,000-101440,500,000A.URAIAN PERALATAN10> 15th ? 1.Jenis PeralatanASPHALT SPRAYERE03 Kondisi Alat Umur >10 th. 2.TenagaPw15.0HP Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 3.KapasitasCp800.0Liter DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0JamE0750853,875,000 c. Harga AlatB180,984,375Rupiah41569,250,000 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert32341,550,000 b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru23170,775,000 c. Harga Alat (*)B'180,984,375
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru1456,925,000050B.BIAYA PASTI PER JAM KERJA-160 1.Nilai Sisa Alat= 10 % x BC18,098,438Rupiah-2756,925,000-38170,775,000 2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438--49341,550,000(1 + i)^A' - 1-510569,250,000 3.Biaya Pasti per Jam :-611853,875,000a. Biaya Pengembalian Modal =( B' - C ) x DE27,232.88Rupiah-7121,195,425,000W'-8131,593,900,000-9142,049,300,000b. Asuransi, dll =0.002 x B'F180.98Rupiah15> 15th ?W' Kondisi Alat Umur >10 th. Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convertBiaya Pasti per Jam =( E + F )G27,413.86Rupiah DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert

C.BIAYA OPERASI PER JAM KERJAE0850144,000,0004196,000,000 1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H5,880.00Rupiah3257,600,0002328,800,000 2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI3,696.00Rupiah149,600,000050 3.Perawatan dan(12,5 % - 17,5 %) x B'K11,311.52Rupiah-160 perbaikan =W'-279,600,000-3828,800,000 4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah-4957,600,000 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah-51096,000,000-611144,000,000Biaya Operasi per Jam =(H+I+K+L+M)P30,887.52Rupiah-712201,600,000-813268,800,000D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S58,301.38Rupiah-914345,600,00015> 15th ? Kondisi Alat Umur >10 th.E.LAIN - LAIN Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 1.Tingkat Suku Bungai20.00% / Tahun DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./JamE0950286,000,000 4.Bahan Bakar BensinMb3,080.00Liter41190,666,667 5.Bahan Bakar SolarMs3,136.00Liter32114,400,000 6.Minyak PelumasMp24,640.00Liter2357,200,000 7.PPN diperhitungkan pada lembar Rekapitulasi1419,066,667Biaya Pekerjaan050-160-2719,066,667URAIAN ANALISA ALAT-3857,200,000-49114,400,000-510190,666,667No.U R A I A NKODEKOEF.SATUANKET.-611286,000,000-712400,400,000-813533,866,667A.URAIAN PERALATAN-914686,400,000 1.Jenis PeralatanBULLDOZER 100-150 HPE0415> 15th ? 2.TenagaPw100.0HP Kondisi Alat Umur >10 th. 3.KapasitasCp- - Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 4.Alat Baru : a. Umur EkonomisA5.0Tahun DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB1,185,000,000RupiahE10501,185,000,000 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert41790,000,000 b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru32474,000,000 c. Harga Alat (*)B'1,185,000,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru23237,000,0001479,000,000B.BIAYA PASTI PER JAM KERJA050 1.Nilai Sisa Alat= 10 % x BC118,500,000Rupiah-160-2779,000,000 2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438--38237,000,000(1 + i)^A' - 1-49474,000,000 3.Biaya Pasti per Jam :-510790,000,000a. Biaya Pengembalian Modal =( B' - C ) x DE178,307.98Rupiah-6111,185,000,000W'-7121,659,000,000-8132,212,000,000b. Asuransi, dll =0.002 x B'F1,185.00Rupiah-9142,844,000,000W'15> 15th ? Kondisi Alat Umur >10 th.Biaya Pasti per Jam =( E + F )G179,492.98Rupiah Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convertC.BIAYA OPERASI PER JAM KERJAE1150230,343,750 1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H137,500.00Rupiah41153,562,5003292,137,500 2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI35,400.00Rupiah2346,068,7501415,356,250 3.Perawatan dan(12,5 % - 17,5 %) x B'K74,062.50Rupiah050 perbaikan =W'-160-2715,356,250 4.Operator= ( 1 Orang / Jam ) x U1L17,500.00Rupiah-3846,068,750 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M13,500.00Rupiah-4992,137,500-510153,562,500Biaya Operasi per Jam =(H+I+K+L+M)P277,962.50Rupiah-611230,343,750-712322,481,250D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S457,455.48Rupiah-813429,975,000-914552,825,00015> 15th ?E.LAIN - LAIN Kondisi Alat Umur >10 th. 1.Tingkat Suku Bungai20.00% / Tahun Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 2.Upah Operator / SopirU117,500.00Rp./Jam DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 3.Upah Pembantu Operator / Pmb.SopirU213,500.00Rp./Jam 4.Bahan Bakar BensinMb8,500.00LiterE1250231,000,000 5.Bahan Bakar SolarMs11,000.00Liter41154,000,000 6.Minyak PelumasMp35,400.00Liter3292,400,000 7.PPN diperhitungkan pada lembar Rekapitulasi2346,200,000Biaya Pekerjaan1415,400,000050-160URAIAN ANALISA ALAT-2715,400,000-3846,200,000-4992,400,000No.U R A I A NKODEKOEF.SATUANKET.-510154,000,000-611231,000,000-712323,400,000A.URAIAN PERALATAN-813431,200,000 1.Jenis PeralatanCOMPRESSOR 4000-6500 L\ME05-914554,400,000 2.TenagaPw80.0HP15> 15th ? 3.KapasitasCp- - Kondisi Alat Umur >10 th. 4.Alat Baru : a. Umur EkonomisA5.0Tahun Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 TahunW2,000.0Jam DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert c. Harga AlatB265,971,230Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convertE1350530,000,000 b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru41353,333,333 c. Harga Alat (*)B'265,971,230
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru32212,000,00023106,000,000B.BIAYA PASTI PER JAM KERJA1435,333,333 1.Nilai Sisa Alat= 10 % x BC26,597,123Rupiah050-160 2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438--2735,333,333(1 + i)^A' - 1-38106,000,000 3.Biaya Pasti per Jam :-49212,000,000a. Biaya Pengembalian Modal =( B' - C ) x DE40,020.92Rupiah-510353,333,333W'-611530,000,000-712742,000,000b. Asuransi, dll =0.002 x B'F265.97Rupiah-813989,333,333W'-9141,272,000,00015> 15th ?Biaya Pasti per Jam =( E + F )G40,286.89Rupiah Kondisi Alat Umur >10 th. Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convertC.BIAYA OPERASI PER JAM KERJA DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H31,360.00RupiahE1450189,000,00041126,000,000 2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI19,712.00Rupiah3275,600,0002337,800,000 3.Perawatan dan(12,5 % - 17,5 %) x B'K16,623.20Rupiah1412,600,000 perbaikan =W'050-160 4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah-2712,600,000 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah-3837,800,000-4975,600,000Biaya Operasi per Jam =(H+I+K+L+M)P77,695.20Rupiah-510126,000,000-611189,000,000D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S117,982.09Rupiah-712264,600,000-813352,800,000-914453,600,000E.LAIN - LAIN15> 15th ? 1.Tingkat Suku Bungai20.00% / Tahun Kondisi Alat Umur >10 th. 2.Upah Operator / SopirU15,714.29Rp./Jam Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00LiterE1550786,742,500 6.Minyak PelumasMp24,640.00Liter41524,495,000 7.PPN diperhitungkan pada lembar Rekapitulasi32314,697,000Biaya Pekerjaan23157,348,5001452,449,500050URAIAN ANALISA ALAT-160-2752,449,500-38157,348,500No.U R A I A NKODEKOEF.SATUANKET.-49314,697,000-510524,495,000-611786,742,500A.URAIAN PERALATAN-7121,101,439,500 1.Jenis PeralatanCONCRETE MIXER 0.3-0.6 M3E06-8131,468,586,000 2.TenagaPw15.0HP-9141,888,182,000 3.KapasitasCp500.0Liter15> 15th ? 4.Alat Baru : a. Umur EkonomisA4.0Tahun Kondisi Alat Umur >10 th. b. Jam Kerja Dalam 1 TahunW2,000.0Jam Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert c. Harga AlatB9,000,000Rupiah DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 5.Alat Yang Dipakai : a. Umur EkonomisA'4.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baruE1650173,250,000 c. Harga Alat (*)B'9,000,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru41115,500,0003269,300,000B.BIAYA PASTI PER JAM KERJA2334,650,000 1.Nilai Sisa Alat= 10 % x BC900,000Rupiah1411,550,000050 2.Faktor Angsuran Modal =i x (1 + i)^A'D0.38629--160(1 + i)^A' - 1-2711,550,000 3.Biaya Pasti per Jam :-3834,650,000a. Biaya Pengembalian Modal =( B' - C ) x DE1,564.47Rupiah-4969,300,000W'-510115,500,000-611173,250,000b. Asuransi, dll =0.002 x B'F9.00Rupiah-712242,550,000W'-813323,400,000-914415,800,000Biaya Pasti per Jam =( E + F )G1,573.47Rupiah15> 15th ? Kondisi Alat Umur >10 th.C.BIAYA OPERASI PER JAM KERJA Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H7,500.00RupiahE1750831,542,000 2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI2,400.00Rupiah41554,361,33332332,616,800 3.Perawatan dan(12,5 % - 17,5 %) x B'K562.50Rupiah23166,308,400 perbaikan =W'1455,436,133050 4.Operator= ( 1 Orang / Jam ) x U1L6,392.86Rupiah-160 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M5,114.29Rupiah-2755,436,133-38166,308,400Biaya Operasi per Jam =(H+I+K+L+M)P21,969.64Rupiah-49332,616,800-510554,361,333D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S23,543.11Rupiah-611831,542,000-7121,164,158,800-8131,552,211,733E.LAIN - LAIN-9141,995,700,800 1.Tingkat Suku Bungai20.00% / Tahun15> 15th ? 2.Upah Operator / SopirU16,392.86Rp./Jam Kondisi Alat Umur >10 th. 3.Upah Pembantu Operator / Pmb.SopirU25,114.29Rp./Jam Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 4.Bahan Bakar BensinMb4,000.00Liter DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 5.Bahan Bakar SolarMs4,000.00Liter 6.Minyak PelumasMp16,000.00LiterE1850593,210,000 7.PPN diperhitungkan pada lembar Rekapitulasi41395,473,333Biaya Pekerjaan32237,284,00023118,642,0001439,547,333URAIAN ANALISA ALAT050-160-2739,547,333No.U R A I A NKODEKOEF.SATUANKET.-38118,642,000-49237,284,000-510395,473,333A.URAIAN PERALATAN-611593,210,000 1.Jenis PeralatanCRANE 10-15 TONE07-712830,494,000 2.TenagaPw150.0HP-8131,107,325,333 3.KapasitasCp15.0Ton-9141,423,704,000 4.Alat Baru : a. Umur EkonomisA5.0Tahun15> 15th ? b. Jam Kerja Dalam 1 TahunW2,000.0Jam Kondisi Alat Umur >10 th. c. Harga AlatB853,875,000Rupiah Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'853,875,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baruE1940616,891,00031370,134,600B.BIAYA PASTI PER JAM KERJA22185,067,300 1.Nilai Sisa Alat= 10 % x BC85,387,500Rupiah1361,689,100040 2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438--150(1 + i)^A' - 1-2661,689,100 3.Biaya Pasti per Jam :-37185,067,300a. Biaya Pengembalian Modal =( B' - C ) x DE128,483.31Rupiah-48370,134,600W'-59616,891,000-610925,336,500b. Asuransi, dll =0.002 x B'F853.88Rupiah-7111,295,471,100W'-8121,727,294,800-9132,220,807,600Biaya Pasti per Jam =( E + F )G129,337.19Rupiah-10142,776,009,50010> 15th ?C.BIAYA OPERASI PER JAM KERJA Kondisi Alat Umur >10 th. Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H58,800.00Rupiah DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI36,960.00RupiahE20407,115,000314,269,000 3.Perawatan dan(12,5 % - 17,5 %) x B'K53,367.19Rupiah222,134,500 perbaikan =W'13711,500040 4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah-150 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah-26711,500-372,134,500Biaya Operasi per Jam =(H+I+K+L+M)P159,127.19Rupiah-484,269,000-597,115,000D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S288,464.37Rupiah-61010,672,500-71114,941,500-81219,922,000E.LAIN - LAIN-91325,614,000 1.Tingkat Suku Bungai20.00% / Tahun-101432,017,500 2.Upah Operator / SopirU15,714.29Rp./Jam10> 15th ? 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam Kondisi Alat Umur >10 th. 4.Bahan Bakar BensinMb3,080.00Liter Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 5.Bahan Bakar SolarMs3,136.00Liter DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiE21501,720,250,000Biaya Pekerjaan411,146,833,33332688,100,00023344,050,000URAIAN ANALISA ALAT14114,683,333050-160No.U R A I A NKODEKOEF.SATUANKET.-27114,683,333-38344,050,000-49688,100,000A.URAIAN PERALATAN-5101,146,833,333 1.Jenis PeralatanDUMP TRUCK 3-4 M3E08-6111,720,250,000 2.TenagaPw100.0HP-7122,408,350,000 3.KapasitasCp6.0Ton-8133,211,133,333 4.Alat Baru : a. Umur EkonomisA5.0Tahun-9144,128,600,000 b. Jam Kerja Dalam 1 TahunW2,000.0Jam15> 15th ? c. Harga AlatB144,000,000Rupiah Kondisi Alat Umur >10 th. 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert c. Harga Alat (*)B'144,000,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baruE222024,750,000B.BIAYA PASTI PER JAM KERJA118,250,000 1.Nilai Sisa Alat= 10 % x BC14,400,000Rupiah020-130 2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438--248,250,000(1 + i)^A' - 1-3524,750,000 3.Biaya Pasti per Jam :-4649,500,000a. Biaya Pengembalian Modal =( B' - C ) x DE21,667.80Rupiah-5782,500,000W'-68123,750,000-79173,250,000b. Asuransi, dll =0.002 x B'F144.00Rupiah-810231,000,000W'-911297,000,000-1012371,250,000Biaya Pasti per Jam =( E + F )G21,811.80Rupiah-1113453,750,000-1214544,500,000C.BIAYA OPERASI PER JAM KERJA3> 15th ? Kondisi Alat Umur >10 th. 1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H39,200.00Rupiah Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI24,640.00RupiahE235077,565,000 3.Perawatan dan(12,5 % - 17,5 %) x B'K9,000.00Rupiah4151,710,000 perbaikan =W'3231,026,0002315,513,000 4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah145,171,000 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah050-160Biaya Operasi per Jam =(H+I+K+L+M)P82,840.00Rupiah-275,171,000-3815,513,000D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S104,651.80Rupiah-4931,026,000-51051,710,000-61177,565,000E.LAIN - LAIN-712108,591,000 1.Tingkat Suku Bungai20.00% / Tahun-813144,788,000 2.Upah Operator / Sopir / MekanikU15,714.29Rp./Jam-914186,156,000 3.Upah Pembantu Operator / Pmb.Sopir / Pmb.MekanikU24,285.71Rp./Jam15> 15th ? 4.Bahan Bakar BensinMb3,080.00Liter Kondisi Alat Umur >10 th. 5.Bahan Bakar SolarMs3,136.00Liter Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 6.Minyak PelumasMp24,640.00Liter DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 7.PPN diperhitungkan pada lembar RekapitulasiBiaya PekerjaanE244018,500,0003111,100,000225,550,000URAIAN ANALISA ALAT131,850,000040-150No.U R A I A NKODEKOEF.SATUANKET.-261,850,000-375,550,000-4811,100,000A.URAIAN PERALATAN-5918,500,000 1.Jenis PeralatanDUMP TRUCKE09-61027,750,000 2.TenagaPw125.0HP-71138,850,000 3.KapasitasCp8.0Ton-81251,800,000 4.Alat Baru : a. Umur EkonomisA5.0Tahun-91366,600,000 b. Jam Kerja Dalam 1 TahunW2,000.0Jam-101483,250,000 c. Harga AlatB286,000,000Rupiah10> 15th ? 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert Kondisi Alat Umur >10 th. b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert c. Harga Alat (*)B'286,000,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert

B.BIAYA PASTI PER JAM KERJAE25403,000,000 1.Nilai Sisa Alat= 10 % x BC28,600,000Rupiah311,800,00022900,000 2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-13300,000(1 + i)^A' - 1040 3.Biaya Pasti per Jam :-150a. Biaya Pengembalian Modal =( B' - C ) x DE43,034.67Rupiah-26300,000W'-37900,000-481,800,000b. Asuransi, dll =0.002 x B'F286.00Rupiah-593,000,000W'-6104,500,000-7116,300,000Biaya Pasti per Jam =( E + F )G43,320.67Rupiah-8128,400,000-91310,800,000C.BIAYA OPERASI PER JAM KERJA-101413,500,00010> 15th ? 1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H49,000.00Rupiah Kondisi Alat Umur >10 th. Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI30,800.00Rupiah DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert

3.Perawatan dan(12,5 % - 17,5 %) x B'K17,875.00RupiahE26403,500,000 perbaikan =W'312,100,000221,050,000 4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah13350,000 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah040-150Biaya Operasi per Jam =(H+I+K+L+M)P107,675.00Rupiah-26350,000-371,050,000D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S150,995.67Rupiah-482,100,000-593,500,000-6105,250,000E.LAIN - LAIN-7117,350,000 1.Tingkat Suku Bungai20.00% / Tahun-8129,800,000 2.Upah Operator / Sopir / MekanikU15,714.29Rp./Jam-91312,600,000 3.Upah Pembantu Operator / Pmb.Sopir / Pmb.MekanikU24,285.71Rp./Jam-101415,750,000 4.Bahan Bakar BensinMb3,080.00Liter10> 15th ? 5.Bahan Bakar SolarMs3,136.00Liter Kondisi Alat Umur >10 th. 6.Minyak PelumasMp24,640.00Liter Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 7.PPN diperhitungkan pada lembar Rekapitulasi DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convertBiaya PekerjaanE275046,000,0004130,666,667URAIAN ANALISA ALAT3218,400,000239,200,000143,066,667No.U R A I A NKODEKOEF.SATUANKET.050-160-273,066,667A.URAIAN PERALATAN-389,200,000 1.Jenis PeralatanEXCAVATOR 80-140 HPE10-4918,400,000 2.TenagaPw110.0HP-51030,666,667 3.KapasitasCp0.45M3-61146,000,000 4.Alat Baru : a. Umur EkonomisA5.0Tahun-71264,400,000 b. Jam Kerja Dalam 1 TahunW2,000.0Jam-81385,866,667 c. Harga AlatB1,185,000,000Rupiah-914110,400,000 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert15> 15th ? b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru Kondisi Alat Umur >10 th. c. Harga Alat (*)B'1,185,000,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convertB.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC118,500,000RupiahE285046,000,0004130,666,667 2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-3218,400,000(1 + i)^A' - 1239,200,000 3.Biaya Pasti per Jam :143,066,667a. Biaya Pengembalian Modal =( B' - C ) x DE178,307.98Rupiah050W'-160-273,066,667b. Asuransi, dll =0.002 x B'F1,185.00Rupiah-389,200,000W'-4918,400,000-51030,666,667Biaya Pasti per Jam =( E + F )G179,492.98Rupiah-61146,000,000-71264,400,000C.BIAYA OPERASI PER JAM KERJA-81385,866,667-914110,400,000 1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H151,250.00Rupiah15> 15th ? Kondisi Alat Umur >10 th. 2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI38,940.00Rupiah Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 3.Perawatan dan(12,5 % - 17,5 %) x B'K74,062.50Rupiah perbaikan =W'E295046,000,0004130,666,667 4.Operator= ( 1 Orang / Jam ) x U1L17,500.00Rupiah3218,400,000 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M13,500.00Rupiah239,200,000143,066,667Biaya Operasi per Jam =(H+I+K+L+M)P295,252.50Rupiah050-160D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S474,745.48Rupiah-273,066,667-389,200,000-4918,400,000E.LAIN - LAIN-51030,666,667 1.Tingkat Suku Bungai20.00% / Tahun-61146,000,000 2.Upah Operator / SopirU117,500.00Rp./Jam-71264,400,000 3.Upah Pembantu Operator / Pmb.SopirU213,500.00Rp./Jam-81385,866,667 4.Bahan Bakar BensinMb8,500.00Liter-914110,400,000 5.Bahan Bakar SolarMs11,000.00Liter15> 15th ? 6.Minyak PelumasMp35,400.00Liter Kondisi Alat Umur >10 th. 7.PPN diperhitungkan pada lembar Rekapitulasi Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convertBiaya Pekerjaan DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert

E305046,000,000URAIAN ANALISA ALAT4130,666,6673218,400,000239,200,000No.U R A I A NKODEKOEF.SATUANKET.143,066,667050-160A.URAIAN PERALATAN-273,066,667 1.Jenis PeralatanFLAT BED TRUCK 3-4 M3E11-389,200,000 2.TenagaPw100.0HP-4918,400,000 3.KapasitasCp4.0M3-51030,666,667 4.Alat Baru : a. Umur EkonomisA5.0Tahun-61146,000,000 b. Jam Kerja Dalam 1 TahunW2,000.0Jam-71264,400,000 c. Harga AlatB230,343,750Rupiah-81385,866,667 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert-914110,400,000 b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru15> 15th ? c. Harga Alat (*)B'230,343,750
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru Kondisi Alat Umur >10 th. Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convertB.BIAYA PASTI PER JAM KERJA DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 1.Nilai Sisa Alat= 10 % x BC23,034,375Rupiah315046,000,000 2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-4130,666,667(1 + i)^A' - 13218,400,000 3.Biaya Pasti per Jam :239,200,000a. Biaya Pengembalian Modal =( B' - C ) x DE34,660.02Rupiah143,066,667W'050-160b. Asuransi, dll =0.002 x B'F230.34Rupiah-273,066,667W'-389,200,000-4918,400,000Biaya Pasti per Jam =( E + F )G34,890.37Rupiah-51030,666,667-61146,000,000C.BIAYA OPERASI PER JAM KERJA-71264,400,000-81385,866,667 1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H39,200.00Rupiah-914110,400,00015> 15th ? 2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI24,640.00Rupiah Kondisi Alat Umur >10 th. Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 3.Perawatan dan(12,5 % - 17,5 %) x B'K14,396.48Rupiah DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert perbaikan =W'E325046,000,000 4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah4130,666,667 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah3218,400,000239,200,000Biaya Operasi per Jam =(H+I+K+L+M)P88,236.48Rupiah143,066,667050D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S123,126.85Rupiah-160-273,066,667-389,200,000E.LAIN - LAIN-4918,400,000 1.Tingkat Suku Bungai20.00% / Tahun-51030,666,667 2.Upah Operator / SopirU15,714.29Rp./Jam-61146,000,000 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam-71264,400,000 4.Bahan Bakar BensinMb3,080.00Liter-81385,866,667 5.Bahan Bakar SolarMs3,136.00Liter-914110,400,000 6.Minyak PelumasMp24,640.00Liter15> 15th ? 7.PPN diperhitungkan pada lembar Rekapitulasi Kondisi Alat Umur >10 th.Biaya Pekerjaan Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert

URAIAN ANALISA ALATE335046,000,0004130,666,6673218,400,000No.U R A I A NKODEKOEF.SATUANKET.239,200,000143,066,667050A.URAIAN PERALATAN-160 1.Jenis PeralatanGENERATOR SETE12-273,066,667 2.TenagaPw175.0HP-389,200,000 3.KapasitasCp125.0KVA-4918,400,000 4.Alat Baru : a. Umur EkonomisA5.0Tahun-51030,666,667 b. Jam Kerja Dalam 1 TahunW2,000.0Jam-61146,000,000 c. Harga AlatB231,000,000Rupiah-71264,400,000 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert-81385,866,667 b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru-914110,400,000 c. Harga Alat (*)B'231,000,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru15> 15th ? Kondisi Alat Umur >10 th.B.BIAYA PASTI PER JAM KERJA Nilai B' dariA>15th ?
A satisfied Microsoft Office User: Formula failed to convert 1.Nilai Sisa Alat= 10 % x BC23,100,000Rupiah DepresiasiA>15th ?
A satisfied Microsoft Office User: Formula failed to convert

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-1 Usia 1 th.(1 + i)^A' - 12 Usia 2 th. 3.Biaya Pasti per Jam :3 Usia 3 th.a. Biaya Pengembalian Modal =( B' - C ) x DE34,758.77Rupiah4 Usia 4 th.W'5 Usia 5 th.6 Usia 6 th.b. Asuransi, dll =0.002 x B'F231.00Rupiah7 Usia 7 th.W'8 Usia 8 th.9 Usia 9 th.Biaya Pasti per Jam =( E + F )G34,989.77Rupiah10 Usia 10 th.

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H68,600.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI43,120.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K14,437.50Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P136,157.50Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S171,147.27Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanMOTOR GRADER >100 HPE13 2.TenagaPwHP 3.KapasitasCp- - 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB530,000,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'845,000,000Rupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC53,000,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE132,414.36RupiahW'

b. Asuransi, dll =0.002 x B'F845.00RupiahW'

Biaya Pasti per Jam =( E + F )G133,259.36Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H0.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI0.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K52,812.50Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P62,812.50Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S196,071.86Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanTRACK LOADER 75-100 HPE14 2.TenagaPw90.0HP 3.KapasitasCp1.6M3 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB189,000,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'189,000,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC18,900,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE28,438.99RupiahW'

b. Asuransi, dll =0.002 x B'F189.00RupiahW'

Biaya Pasti per Jam =( E + F )G28,627.99Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H35,280.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI22,176.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K11,812.50Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P79,268.50Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S107,896.49Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanWHEEL LOADER 1.0-1.6 M3E15 2.TenagaPw105.0HP 3.KapasitasCp1.5M3 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB786,742,500Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'786,742,500
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC78,674,250Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE118,381.83RupiahW'

b. Asuransi, dll =0.002 x B'F786.74RupiahW'

Biaya Pasti per Jam =( E + F )G119,168.57Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H41,160.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI25,872.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K49,171.41Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P126,203.41Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S245,371.97Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanTHREE WHEEL ROLLER 6-8 TE16 2.TenagaPw55.0HP 3.KapasitasCp8.0Ton 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB173,250,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'173,250,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC17,325,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE26,069.08RupiahW'

b. Asuransi, dll =0.002 x B'F173.25RupiahW'

Biaya Pasti per Jam =( E + F )G26,242.33Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H21,560.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI13,552.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K10,828.13Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P55,940.13Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S82,182.45Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanTANDEM ROLLER 6-8 T.E17 2.TenagaPw50.0HP 3.KapasitasCp8.0Ton 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB831,542,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'831,542,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC83,154,200Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE125,122.85RupiahW'

b. Asuransi, dll =0.002 x B'F831.54RupiahW'

Biaya Pasti per Jam =( E + F )G125,954.39Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H19,600.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI12,320.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K51,971.38Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P93,891.38Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S219,845.76Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanTIRE ROLLER 8-10 T.E18 2.TenagaPw60.0HP 3.KapasitasCp10.0Ton 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW1,800.0Jam c. Harga AlatB593,210,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'1,800.0Jam Alat baru c. Harga Alat (*)B'593,210,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC59,321,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE99,178.69RupiahW'

b. Asuransi, dll =0.002 x B'F659.12RupiahW'

Biaya Pasti per Jam =( E + F )G99,837.81Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H23,520.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI14,784.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K41,195.14Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P89,499.14Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S189,336.95Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanVIBRATORY ROLLER 5-8 T.E19 2.TenagaPw75.0HP 3.KapasitasCp7.0Ton 4.Alat Baru : a. Umur EkonomisA4.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB616,891,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'4.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'616,891,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJARFH 1.Nilai Sisa Alat= 10 % x BC61,689,100Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.38629-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE107,234.23RupiahW'

b. Asuransi, dll =0.002 x B'F616.89RupiahW'

Biaya Pasti per Jam =( E + F )G107,851.12Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H29,400.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI18,480.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K38,555.69Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P96,435.69Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S204,286.81Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanCONCRETE VIBRATORE20 2.TenagaPw10.0HP 3.KapasitasCp- - 4.Alat Baru : a. Umur EkonomisA4.0Tahun b. Jam Kerja Dalam 1 TahunW1,000.0Jam c. Harga AlatB7,115,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'4.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'1,000.0Jam Alat baru c. Harga Alat (*)B'7,115,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC711,500Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.38629-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE2,473.60RupiahW'

b. Asuransi, dll =0.002 x B'F14.23RupiahW'

Biaya Pasti per Jam =( E + F )G2,487.83Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H3,920.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI2,464.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K889.38Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P17,273.38Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S19,761.21Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanSTONE CRUSHERE21 2.TenagaPw220.0HP 3.KapasitasCp30.0T/Jam 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB1,720,250,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'1,720,250,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC172,025,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE258,847.51RupiahW'

b. Asuransi, dll =0.002 x B'F1,720.25RupiahW'

Biaya Pasti per Jam =( E + F )G260,567.76Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H86,240.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI54,208.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K107,515.63Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 2 Orang / Jam ) x U2M8,571.43Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P262,249.34Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S522,817.10Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanWATER PUMP 70-100 mmE22 2.TenagaPw6.0HP 3.KapasitasCp- - 4.Alat Baru : a. Umur EkonomisA2.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB24,750,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'2.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'24,750,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC2,475,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.65455-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE7,290.00RupiahW'

b. Asuransi, dll =0.002 x B'F24.75RupiahW'

Biaya Pasti per Jam =( E + F )G7,314.75Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H2,352.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI1,478.40Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K1,546.88Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P15,377.28Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S22,692.03Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanWATER TANKER 3000-4500 L.E23 2.TenagaPw100.0HP 3.KapasitasCp4,000.0Liter 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB77,565,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'77,565,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC7,756,500Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE11,671.27RupiahW'

b. Asuransi, dll =0.002 x B'F77.57RupiahW'

Biaya Pasti per Jam =( E + F )G11,748.84Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H39,200.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI24,640.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K4,847.81Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P78,687.81Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S90,436.65Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanPEDESTRIAN ROLLERE24 2.TenagaPw11.0HP 3.KapasitasCp0.980Ton 4.Alat Baru : a. Umur EkonomisA4.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB52,031,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'4.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'52,031,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC5,203,100Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.38629-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE9,044.55RupiahW'

b. Asuransi, dll =0.002 x B'F52.03RupiahW'

Biaya Pasti per Jam =( E + F )G9,096.59Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H4,312.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI2,710.40Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K3,251.94Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P20,274.34Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S29,370.92Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanTAMPERE25 2.TenagaPw5.0HP 3.KapasitasCp0.170Ton 4.Alat Baru : a. Umur EkonomisA4.0Tahun b. Jam Kerja Dalam 1 TahunW1,000.0Jam c. Harga AlatB9,500,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'4.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'1,000.0Jam Alat baru c. Harga Alat (*)B'9,500,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC950,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.38629-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE3,302.77RupiahW'

b. Asuransi, dll =0.002 x B'F19.00RupiahW'

Biaya Pasti per Jam =( E + F )G3,321.77Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H1,960.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI1,232.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K1,187.50Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P14,379.50Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S17,701.27Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanJACK HAMMERE26 2.TenagaPw3.0HP 3.KapasitasCp- - 4.Alat Baru : a. Umur EkonomisA4.0Tahun b. Jam Kerja Dalam 1 TahunW1,000.0Jam c. Harga AlatB9,850,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'4.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'1,000.0Jam Alat baru c. Harga Alat (*)B'9,850,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC985,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.38629-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE3,424.45RupiahW'

b. Asuransi, dll =0.002 x B'F19.70RupiahW'

Biaya Pasti per Jam =( E + F )G3,444.15Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H1,176.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI739.20Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K1,231.25Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P13,146.45Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S16,590.60Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanFULVI MIXERE27 2.TenagaPw75.0HP 3.KapasitasCp- - 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB46,000,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'46,000,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC4,600,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE6,921.66RupiahW'

b. Asuransi, dll =0.002 x B'F46.00RupiahW'

Biaya Pasti per Jam =( E + F )G6,967.66Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H29,400.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI18,480.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K2,875.00Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P60,755.00Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S67,722.66Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanCONCRETE PUMPE28 2.TenagaPw100.0HP 3.KapasitasCp8.00M3 4.Alat Baru : a. Umur EkonomisA6.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB112,500,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'6.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'112,500,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC11,250,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.30071-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE15,223.23RupiahW'

b. Asuransi, dll =0.002 x B'F112.50RupiahW'

Biaya Pasti per Jam =( E + F )G15,335.73Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H39,200.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI24,640.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K7,031.25Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P80,871.25Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S96,206.98Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanTRAILER 20 TONE29 2.TenagaPw175.0HP 3.KapasitasCp10.00Ton 4.Alat Baru : a. Umur EkonomisA6.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB377,692,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'6.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'377,692,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC37,769,200Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.30071-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE51,108.37RupiahW'

b. Asuransi, dll =0.002 x B'F377.69RupiahW'

Biaya Pasti per Jam =( E + F )G51,486.06Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H68,600.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI43,120.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K23,605.75Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P145,325.75Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S196,811.81Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanPILE DRIVER + HAMMERE30 2.TenagaPw25.0HP 3.KapasitasCp2.50Ton 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB70,000,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'70,000,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC7,000,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.33438-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE10,532.96RupiahW'

b. Asuransi, dll =0.002 x B'F70.00RupiahW'

Biaya Pasti per Jam =( E + F )G10,602.96Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H9,800.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI6,160.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K4,375.00Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P30,335.00Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S40,937.96Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanCRANE ON TRACK 35 TONE31 2.TenagaPw125.0HP 3.KapasitasCp35.00Ton 4.Alat Baru : a. Umur EkonomisA6.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB350,000,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'6.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'350,000,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC35,000,000Rupiah

2.Faktor Angsuran Modal =i x (1 + i)^A'D0.30071-(1 + i)^A' - 1 3.Biaya Pasti per Jam :a. Biaya Pengembalian Modal =( B' - C ) x DE47,361.15RupiahW'

b. Asuransi, dll =0.002 x B'F350.00RupiahW'

Biaya Pasti per Jam =( E + F )G47,711.15Rupiah

C.BIAYA OPERASI PER JAM KERJA

1.Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H49,000.00Rupiah

2.Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x MpI30,800.00Rupiah

3.Perawatan dan(12,5 % - 17,5 %) x B'K21,875.00Rupiah perbaikan =W'

4.Operator= ( 1 Orang / Jam ) x U1L5,714.29Rupiah 5.Pembantu Operator= ( 1 Orang / Jam ) x U2M4,285.71Rupiah

Biaya Operasi per Jam =(H+I+K+L+M)P111,675.00Rupiah

D.TOTAL BIAYA SEWA ALAT / JAM = ( G + P )S159,386.15Rupiah

E.LAIN - LAIN 1.Tingkat Suku Bungai20.00% / Tahun 2.Upah Operator / SopirU15,714.29Rp./Jam 3.Upah Pembantu Operator / Pmb.SopirU24,285.71Rp./Jam 4.Bahan Bakar BensinMb3,080.00Liter 5.Bahan Bakar SolarMs3,136.00Liter 6.Minyak PelumasMp24,640.00Liter 7.PPN diperhitungkan pada lembar RekapitulasiBiaya Pekerjaan

URAIAN ANALISA ALAT

No.U R A I A NKODEKOEF.SATUANKET.

A.URAIAN PERALATAN 1.Jenis PeralatanWELDING SETE32 2.TenagaPw40.0HP 3.KapasitasCp250.00Amp 4.Alat Baru : a. Umur EkonomisA5.0Tahun b. Jam Kerja Dalam 1 TahunW2,000.0Jam c. Harga AlatB17,500,000Rupiah 5.Alat Yang Dipakai : a. Umur EkonomisA'5.0Tahun Alat baru
A satisfied Microsoft Office User: Formula failed to convert b. Jam Kerja Dalam 1 Tahun W'2,000.0Jam Alat baru c. Harga Alat (*)B'17,500,000
A satisfied Microsoft Office User: Formula failed to convertRupiah Alat baru

B.BIAYA PASTI PER JAM KERJA 1.Nilai Sisa Alat= 10 % x BC1,750,000Rupiah

2.Faktor Angsur