5/13/2018 EeAzzahraUpload-slidepdf.com http://slidepdf.com/reader/full/ee-azzahra-upload 1/28 REKAPITULASI Err:509 ENGINEER'S ESTIMATES (EE) KEGIATAN : PEKERJAAN : LOKASI : KECAMATAN BENGKALIS (JUMLAH HARAGA NO. URAIAN PEKERJAAN (PEKERJAAN ) ((Rupiah) ) A. BANGUNAN MUSHALA I PEKERJAAN PERSIAPAN 4,550,000.00 II PEKERJAAN FONDASI 33,357,384.33 III PEK. BETON STRUKTUR ### IV PEK. DINDING, KONSEN, PINTU DAN JE 52,869,575.56 V PEKERJAAN LANTAI 56,831,879.11 VI PEK.KUDA-KUDA/ATAP 56,137,816.98 VII PEKERJAAN PLAFOND 29,762,424.44 VIII PEK. KUNCI DAN ALAT PENGGANTUNG 4,782,215.00 IX PEKERJAAN MEKANIKAL ELEKTRIKAL / 17,249,000.00 X PEKERJAAN PENGECATAN 7,164,995.86 XI PEKERJAAN RABAT KELILING BANGUN 10,332,539.20 B. TEMPAT WUDHU 52,942,844.39 C. PEMBANGUNAN DUIKER 14,772,301.34 (A) Jumlah Harga Pekerjaan (termasuk Biaya Umu ### (B) Dibulatkan ### Bengkalis, 30 Juni 2010 Konsultan Perencana  TRIANTO KURNIAWAN, ST.  Team Leader FASILITAS PEMBANGUNAN PRASARANA DAN SARANA DASAR PERMUKIMAN BERBASIS MASYARAKAT PEMBANGUNGAN MUSHALA AL-ZAHRA JALAN PRAMUKA  Terbilang : Empat Ratus Empat Puluh Sembilan Juta Enam Ratus Enam Puluh Sembilan Ribu Rupiah

Transcript of Ee Azzahra Upload

Page 1: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 1/28

REKAPITULASIErr:509

ENGINEER'S ESTIMATES (EE)

KEGIATAN :

PEKERJAAN :

LOKASI : KECAMATAN BENGKALIS

(JUMLAH HARAGA

NO. URAIAN PEKERJAAN (PEKERJAAN )

((Rupiah) )

A. BANGUNAN MUSHALA

I PEKERJAAN PERSIAPAN 4,550,000.00

II PEKERJAAN FONDASI 33,357,384.33

III PEK. BETON STRUKTUR ###IV PEK. DINDING, KONSEN, PINTU DAN JE 52,869,575.56

V PEKERJAAN LANTAI 56,831,879.11

VI PEK.KUDA-KUDA/ATAP 56,137,816.98

VII PEKERJAAN PLAFOND 29,762,424.44

VIII PEK. KUNCI DAN ALAT PENGGANTUNG 4,782,215.00

IX PEKERJAAN MEKANIKAL ELEKTRIKAL / 17,249,000.00

X PEKERJAAN PENGECATAN 7,164,995.86

XI PEKERJAAN RABAT KELILING BANGUN 10,332,539.20

B. TEMPAT WUDHU 52,942,844.39

C. PEMBANGUNAN DUIKER 14,772,301.34

(A) Jumlah Harga Pekerjaan (termasuk Biaya Umu ###

(B) Dibulatkan ###

Bengkalis, 30 Juni 2010

Konsultan Perencana

 

TRIANTO KURNIAWAN, ST.

 Team Leader

FASILITAS PEMBANGUNAN PRASARANA DAN SARANADASAR PERMUKIMAN BERBASIS MASYARAKAT

PEMBANGUNGAN MUSHALA AL-ZAHRA JALAN PRAMUKA

 Terbilang:

Empat Ratus Empat Puluh Sembilan Juta Enam RatusEnam Puluh Sembilan Ribu Rupiah

Page 2: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 2/28

RENCANA ANGGARAN BIAYA (RAB)ENGINEER'S ESTIMATES (EE)

KEGIATAN :

PEKERJAA :

LOKASI : KECAMATAN BENGKALIS

HARGA JUMLAH

NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA

(Rp). (Rp).

1. 2. 3. 4. 5.

A BANGUNAN MUSHALA

I. PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi ### m2 8000 2048000

2 Pengukuran Dan Pas. bouwplank 64.00 m 33625 21520003 Papan Nama Proyek 1.00 ls 350000 350000

SUB TOTAL 4550000

II. PEKERJAAN FONDASI

1 Pek. Galian tanah pondasi 62 m 20800 1292096

2 Pek. Pas. Cerucuk Dia. 8-10 pjg. 3 M 483 bt 2400 1159200

3 Pek. Urugan pasir bawah pondasi 4 m 158200 614765

4 Pek. Cor lantai kerja 1:3 :5 4 m 836505 3250658

5 Pek. Pondasi batu bata 1 batu 1:2 30 m2 234510 6976673

6 Pek. Raben pondasi camp. 1:3 60 m2 23596 14039747 Pek. Cor pondasi 90x90 (152 kg besi 6 m 3131105 18235556

8 Pek. Urugan tanah kembali 43 m 9970 424463

SUB TOTAL 33357384

III. PEK. BETON STRUKTUR

1 Pek. Cor sloof 20/30 (121 kg Besi + 6 m 2966945 19154597

2 Pek. Cor kolom 20/20 (167 kg besi + 5 m 4048545 21052434

3 Pek. Cor Balok 15x25 (187 kg besi + 5 m 4215765 20994510

4 Pek. Cor Atap Dag tbl 12cm (47 kg b 12m 2741765 326300745 Pek. Cor Plat Kanopi tbl 8cm (70 Kg b 4m 2994765 10541573

6 Pek. Cor Ringbalk 15x20 (156 Kg be 1m 4027565 4543093

SUB TOTAL 108916281

IV. PEK. DINDING, KONSEN, PINTU DAN JENDELA

1 Pek. Pas. dinding bata 1/2 Batu 1:4 184m2 105680 19416586

2 Pek. Plesteran 1:4 367 m2 47409 17420838

3 Pek. Afwerking beton 1:3 75 m2 29862 2234857

4 Pek. Kozen pintu/jendela/ventilasi 1 m 3669000 4391793

5 Pek. Pas. pintu panel 2 Daun 3 bh 750000 2250000

6 Pek. Pas. pintu panel 1 Daun 4 bh 375000 1500000

7 Pek. Pas. jendela kaca bingkai 15 m2 283280 4144386

8 Pek. Pas. Kaca Mati untuk Ventilasi 3 m2 98000 282240

9 Pek. Pas. Glassblock 14 m2 90625 1228875

SUB TOTAL 52869576

FASILITAS PEMBANGUNAN PRASARANA DAN SARANA DASARPERMUKIMAN BERBASIS MASYARAKAT

PEMBANGUNGAN MUSHALA AL-ZAHRA JALAN PRAMUKA DESA

Page 3: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 3/28

HARGA JUMLAH

NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA

(Rp). (Rp).

1. 2. 3. 4. 5.

V. PEKERJAAN LANTAI

1 Pek. Urugan tanah bawah lantai 107 m 107800 115673712 Pek. Urugan pasir bawah lantai 18 m 158200 2829249

3 Pek. Cor Lantai beton 1:2:5 tbl. 7cm 13 m 836505 10472039

4 Pek. Pas. Keramik lantai 40x40 cm 189 m2 133691 25304353

5 Pek. Pas. Dinding Keramik 20x25 cm 46 m2 145311 6658867

SUB TOTAL 56831879

VI. PEK.KUDA-KUDA/ATAP

1 Pek. Kuda-kuda Rangka Atap Baja Ri 184m 173994 31998471

2 Pek. Lisplank papan 2x3/20 49 m 45313 22094383 Pek. Pas. Atap Genteng Metal Stand 184m2 85520 15727607

4 Pek. Rabung atap genteng metal 32 m 37385 1202302

5 Pek. Pas. Mahkota Masjid stainless S 1 bh 5000000 5000000

SUB TOTAL 56137817

VII. PEKERJAAN PLAFOND

1 Pek. Plafond Gypsun 9mm rangka H 189m2 126795 23999149

2 Pek. Peri-peri + Rangka 30 m2 36045 1088847

3 Pek. List Profil Gypsun 158 m 29578 4674428

SUB TOTAL 29762424

VIII. PEK. KUNCI DAN ALAT PENGGANTUNG

1 Pek. Pas. kunci tanam 2 x putar seta 7 bh 118950 832650

2 Pek. Pas. engsel pintu 4" 30 bh 54953 1648575

3 Pek. Pas. engsel jendela 3" 28 bh 28950 810600

4 Pek. Pas. gerendel pintu 20 bh 24953 499050

5 Pek. Pas. gerendel jendela 14 bh 17953 2513356 Pek. Pas. tangan-tangan 14 bh 17953 251335

7 Pek. Pas. hak angin 28 bh 17453 488670

SUB TOTAL 4782215

IX. PEKERJAAN MEKANIKAL ELEKTRIKAL / ME

1 Pek. Pas. titik lampu 26 ttk 150000 3900000

2 Pek. Pas. stop kontak Setara Nationa 3 bh 24000 72000

3 Pek. Pas. Lampu Downlight 20 Watt 22 bh 25000 550000

4 Pek. Pas. Lampu Hias Gantung Dia. 1 bh 12500000 12500000

5 Pek. Pas. MCB 1 bh 15000 15000

6 Pek. Pas. Saklar Tunggal setara Nati 4 bh 24000 96000

7 Pek. Pas. Saklar Ganda Setara Natio 4 bh 29000 116000

SUB TOTAL 17249000

Page 4: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 4/28

HARGA JUMLAH

NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA

(Rp). (Rp).

1. 2. 3. 4. 5.

X. PEKERJAAN PENGECATAN

1 Pek. Cat dinding setara Lippopaint 367 m2 9510 34943612 Pek. Cat plafond setara Lippopaint 143 m2 9510 1361532

3 Pek. Cat minyak 104 m2 22305 2309103

SUB TOTAL 7164996

XI. PEKERJAAN RABAT KELILING BANGUNAN

1 Galian Tanah 4 m 20800 85197

2 Pasir Urug 1 m 158200 161997

3 Lantai Kerja beton 1 : 3 : 5 1 m 836505 856581

4 Pas. Batu bata 1/2 batu 1:2 29 m2 113422 32665545 Cor Rabat beton 1:3:5 3 m 836505 2409134

6 Plesteran Dinding 1:2 58 m2 53005 3053076

7 Pembersihan Akhir 1 ls 500000 500000

SUB TOTAL 10332539

TOTAL 381954112

B. TEMPAT WUDHU

I PEKERJAAN FONDASI

1 Pengukuran Dan Pas. bouwplank 32 m 33625 1076000

2 Pek. Galian tanah pondasi 8 m 20800 165880

3 Pek. Pas. Cerucuk Dia. 8-10 pjg. 3 M 67 bt 2400 160800

4 Pek. Urugan pasir bawah pondasi 1 m 158200 87880

5 Pek. Cor lantai kerja 1:3 :5 1 m 836505 464679

6 Pek. Pondasi batu bata 1 batu camp. 5 m2 234510 1110991

7 Pek. Raben pondasi camp. 1:3 9 m2 23596 223574

8 Pek. Cor pondasi 90x90 (152 kg besi 1 m 3131105 1646961

9 Pek. Urugan tanah kembali 5 m 9970 53743

SUB TOTAL 4990508

II. PEK. BETON STRUKTUR

1 Pek. Cor sloof 20/30 (121 kg Besi + 1 m 2966945 3373416

2 Pek. Cor kolom 20/20 (167 kg besi + m 4048545 1684195

3 Pek. Cor Ringbalk 15x20 (156 Kg be 1m 4027565 2289671

4 Pek. Cor Atap Dag tbl 12cm (47 kg b 2m 2741765 4847441

SUB TOTAL 12194722

III. PEK. DINDING / KONSEN

1 Pek. Pas. dinding bata 1/2 batu 1:4 84 m2 105680 8920449

2 Pek. Plesteran 1:4 169 m2 47409 8003554

3 Pek. Kozen pintu/ventilasi m 3669000 123278

SUB TOTAL 17047281

Page 5: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 5/28

HARGA JUMLAH

NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA

(Rp). (Rp).

1. 2. 3. 4. 5.

IV. PEK. LANTAI DAN KERAMIK 

1 Pek. Urug pasir bawah lantai 1 m 158200 1373182 Pek. Cor lantai 1:3:5 1 m 836505 508260

3 Pek. Keramik Lantai 20 x 20 9 m2 132690 1151749

4 Pek. Keramik Dinding 20 x 25 26 m2 145311 3792612

SUB TOTAL 5589939

V. PEKERJAAN SANITASI

1 Pek. Pas. Close Jongkok 2 bh 250000 500000

2 Pek. Pas . Bak Fiber 2 bh 235000 470000

3 Pek. Floor Drain 2 bh 20000 400004 Pek. Pas. Kran Air 8 bh 25000 200000

5 Pek. Pas. Pintu Fiber (lengkap) 2 bh 240000 480000

6 Pek. Instalasi Air Kotor 1 ls 275000 275000

7 Pek. Instalasi Air Bersih 1 ls 250000 250000

8 Pek. Sumur Boor 1 uni 5000000 5000000

9 Pas. Pompa Air 1 uni 800000 800000

10 Pas. Tangki Air Fiber 1000L 1 uni 1000000 1000000

11 Pek. Septictank + resapan 1 uni 2500000 2500000

SUB TOTAL 11515000

VI. PEKERJAAN PENGECATAN

1 Cat Air Dinding 169 m2 9510 1605394

SUB TOTAL 1605394

 TOTAL 52942844

C. PEMBANGUNAN DUIKER

1 Galian Tanah 3 M3 20800 520002 Pas. Kayu Cerucuk Bakau Dia. 8-10c 63 Bt 2400 151200

3 Pek. Cor Lantai Kerja M3 836505 292777

4 Pek. Pembesian 753 Kg 12541 9445003

5 Pek. Cor Duiker Camp. 1:2:3 5 M3 961785 4549243

6 Pek. Pas. Batu Bata 1 Batu 1:4 untuk 1 M2 234510 175883

7 Pek. Plesteran Camp. 1:4 untuk Leuni 2 M2 47409 106196

 TOTAL 14772301

Page 6: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 6/28

DAFTAR HARGA SATUAN UPAH DAN BAHAN

NO. NAMA BARANG / BAHAN / TENAGA SATUAN

I (TENAGA )

1 (Mandor ) hari 70,000.00

2 (Kepala tukang ) hari 65,000.00

3 (Tukang batu ) hari 55,000.00

4 (Tukang kayu ) hari 55,000.00

5 (Tukang besi ) hari 55,000.00

6 (Tukang Atap ) hari 55,000.00

7 (Tukang Keramik ) hari 55,000.00

8 (Tukang cat ) hari 55,000.00

9 (Pekerja ) hari 45,000.00

II (BAHAN BANGUNAN )

A (BAHAN PASANGAN )

1 (Tanah urug ) M3 78,000.00

2 (Pasir urug ) M3 120,000.00

3 (Pasir Cor ) M3 270,000.00

4 (Pasir Pasang ) M3 180,000.00

5 (Agregat Base C ) M3 375,000.00

6 (Kerikil/Batu Granit ) M3 400,000.00

7 (Batu Bata ) bh 900.008 (Semen type I 50Kg ) Kg 1,160.00

9 (Semen Warna ) Kg 9,000.00

10 ( Glass Block ) M2 42,000.00

B (BAHAN KAYU )

1 (Kayu Kulim (Kelas I) ) M3 1,950,000.00

2 (Kayu Meranti ) M3 1,175,000.00

3 (Kayu Papan Meranti ) M3 1,175,000.00

4 (Kayu Perancah/Kayu Galam ) Btg 3,000.00

5 (Kayu Perancah/Begisting ) M3 975,000.006 (Selembayung Ukir ) Psg 250,000.00

7 (Kayu Lambersering ) Lbr 13,000.00

8 (List Propil Kayu ) M' 2,500.00

9 (Papan Singap Ukir (GRC) ) M2 425,000.00

10 (Kayu cerucuk 6-8 cm pjg 3m ) btg 2,000.00

C (BAHAN BESI/BAJA, PAKU )

1 (Besi Beton ) Kg 11,000.00

2 (Kawat Ikat Beton ) Kg 15,000.00

3 (Baut Dia. 12-14 mm+ring ) Ps 13,000.004 (Paku Atap Genteng metal ) Kg 20,000.00

5 (Paku Biasa 2"-5" ) Kg 15,000.00

6 (Paku Tripleks ) Kg 15,000.00

7 (Besi Strip ) Kg 13,000.00

8 (Supertruss C75, 100 INT ) Kg 18,000.00

9 (Supertruss C75, 75 INT ) Kg 13,500.00

10 (Topspan 40,055 INT ) Kg 15,000.00

11 (WTEKS 12-14 X 20 HWFS Class II ) Pc 750.00

12 (CSP 10-16x16 HWFS Class II ) Pc 450.00

13 (SG 10 Multiple ) Pc 3,000.00

D (BAHAN LANTAI/LA. DINDING )

(HARGASATUAN(Rp.) )

Page 7: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 7/28

NO. NAMA BARANG / BAHAN / TENAGA SATUAN(HARGA

SATUAN(Rp.) )

1 (Keramik 40 x 40 ) Bh 11,500.00

2 (Keramik 30 x 30 ) Bh 6,200.00

3 (Keramik 20 x 20 ) Bh 2,720.00

4 (Keramik 20 x 25 ) Bh 3,400.00

5 (Keramik 10 x 30 ) Bh 2,066.67

6 (Keramik 60x60 Setara Granito ) M2 200,000.00

7 (Keramik 20x40 Setara Granito ) M2 200,000.00

E (BAHAN ATAP / LANGIT-LANGIT )

1 (Atap Genteng Metal Standart 0.3mm ) M2 65,000.00

2 (Atap Seng Gelombang BJLS ) M2 37,500.00

3 (Prabung Genteng Metal ) M' 14,000.00

4 ( Rabung Seng Gelombag ) lbr 12,000.00

5 (Bola-bola Genteng Metal ) M' 16,000.00

6 (Plywood 9mm ) Lbr 85,000.00

7 (Tripleks 6mm ) Lbr 59,000.00

8 (Tripleks 3.6 mm ) Lbr 54,000.00

9 (Papan Gypsun 9mm ) Lbr 80,000.00

10 (Rangka Hollow 4x4 tebal 1,2 mm ) M' 12,000.00

11 (Kasa Gypsun ) rol 10,000.00

12 (Tepung gypsum ) Kg 8,000.00

13 (Paku skrup ) Kg 20,000.00

14 (Kawat penggantung ) M' 500.00

15 (List profile Gypsun ) M' 12,000.00

F (BAHAN ALAT PENGGANTUNG, KACA )1 (Kunci Tanam 2 x putar ) Bh 90,000.00

2 (Engsel 4" Pintu ) Bh 45,000.00

3 (Engsel 3 " Jendela ) Bh 22,000.00

4 (Grendel 4" Pintu ) Bh 15,000.00

5 (Grendel 2" Jendela ) Bh 8,000.00

6 (Hak Angin ) Bh 7,500.00

7 (Handle Jendela ) Bh 8,000.00

8 (Kaca Bening 5mm ) M2 98,000.00

G (BAHAN LISTRIK / ARMATUR )1 (instalasi titik Api ) Ttk 150,000.00

2 (Stop Kontak Stara National ) Bh 24,000.00

3 (Saklar dobel setara National ) Bh 29,000.00

4 (Saklar Triple Setara National ) Bh 34,000.00

5 (Saklar tunggal Setara National ) Bh 24,000.00

6 (Lampu TL 40 W ) Bh 125,000.00

7 (Lampu Lilin 20Watt ) Bh 25,000.00

8 (Skering Khas ) Bh 15,000.00

H (BAHAN PIPA )

1 (Kran Air Dia/ 1/2" ) Bh 20,000.00

2 (Pipa PVC Dia. 1/2" ) Bh 4,000.00

3 (Pipa PVC Dia. 3" ) Bh 8,000.00

4 (Pipa PVC Dia. 4" ) Bh 9,000.00

H (BAHAN SANITAIR )

1 (Kloset Jongkok ) Bh 250,000.00

2 (Kloset Duduk ) Bh 900,000.00

3 (Floordrain ) Bh 20,000.00

4 (Bak Air Fiberglass ) Bh 235,000.00

5 (Kran Air ) Bh 25,000.00

6 (Washtafel ) Bh 270,000.00

7 (Urinoair ) Unit 725,000.00

Page 8: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 8/28

NO. NAMA BARANG / BAHAN / TENAGA SATUAN(HARGA

SATUAN(Rp.) )

8 (Bak Cuci Piring ) Bh 180,000.00

9 (Pek. Sumur Boor ) unit 5,000,000.00

10 (Pas. Pompa Air ) unit 800,000.00

11 (Pas. Tangki Air Fiber 1000L ) unit 1,000,000.00

12 (Pek. Septictank + resapan ) unit 2,500,000.00

I (BAHAN PINTU )

1 (Pintu Fiberglass ) Bh 240,000.00

2 (Pintu Besi Rolling Door ) M2 450,000.00

3 (Pintu Panel 1 daun Kayu Kelas I ) bh 375,000.00

4 (Pintu Panel 2 daun kayu Kelas I ) bh 750,000.00

H (BAHAN FINISHING )

1 (Cat Air setara Lippopaint ) Kg 9,000.00

2 (Cat Minyak ) Kg 28,500.00

3 (Cat Dasar ) Kg 9,000.00

4 (Amplas ) Lbr 3,000.00

5 (Kuas Golong ) bh 12,000.00

6 (Plamir/Dempul ) Kg 9,000.00

7 (Cat Menie Kayu ) Kg 7,000.00

8 (Minyak Cat ) Ltr 9,000.00

9 (Residu ) Ltr 2,500.00

10 (Minyak Begisting ) Ltr 1,500.00

Page 9: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 9/28

ANALISA SATUAN PEKERJAAN

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

(PEKERJAAN PERSIAPAN )

SNI ### Pengukuran dan pemasangan bouwplank 

6.4 0.0120 Kayu meranti 5/7 @ Rp. ### 14,100.00

03-2835-200 0.0200 kg Paku reng @ Rp. 15,000.00 300.00

0.0070 Kayu meranti papan 3/2 @ Rp. ### 8,225.00

0.1000 org Tukang kayu @ Rp. 55,000.00 5,500.00

0.0100 org Kepala tukang kayu @ Rp. 65,000.00 650.00

0.1000 org Pekerja @ Rp. 45,000.00 4,500.00

0.0050 org Mandor @ Rp. 70,000.00 350.00

 JUMLAH 11,000.00 22,625.00 ###

SNI ### Membersihkan lapangan dan perataan

6.8 0.1000 org Pekerja @ Rp. 45,000.00 4,500.00

03-2835-200 0.0500 org Mandor @ Rp. 70,000.00 3,500.00

  JUMLAH 8,000.00 8,000.00

(PEKERJAAN TANAH )SNI ### Galian tanah biasa sedalam sampai 1 meter 

6.1 0.4000 org Pekerja @ Rp. 45,000.00 18,000.00

03-2837-200 0.0400 org Mandor @ Rp. 70,000.00 2,800.00  JUMLAH 20,800.00 -###

SNI ### Urug kembali bekas galian

6.9 0.1920 org Pekerja @ Rp. 45,000.00 8,640.00

03-2837-200 0.0190 org Mandor @ Rp. 70,000.00 1,330.00

 JUMLAH 9,970.00 9,970.00

A18 ### Urug pasir  

03-2837-200 1.2000 Pasir urug @ Rp. ### ###

0.3000 org Pekerja @ Rp. 45,000.00 13,500.00

0.0100 org Mandor @ Rp. 70,000.00 700.00

  JUMLAH 14,200.00 ### ###

MOD ### Urug tanah mendatangkan

A18 1.2000 Tanah urug @ Rp. 78,000.00 93,600.00

03-2837-200 0.3000 org Pekerja @ Rp. 45,000.00 13,500.00

0.0100 org Mandor @ Rp. 70,000.00 700.00

 JUMLAH 14,200.00 93,600.00 ###

MOD ### Urugan Pilihan Base c

A18 1.2000 Agregat Base C @ Rp. ### ###

03-2837-200 0.3000 org Pekerja @ Rp. 45,000.00 13,500.00

0.0100 org Mandor @ Rp. 70,000.00 700.00

  JUMLAH 14,200.00 ### ###

AK  ### btg Pas. Pas. Cerucuk 6-8cm pjg 3m

1.0000 btg Kayu Cerucuk 6-8cm pjg@ Rp. 2,000.00 2,000.00

Upah 20% 400.00

 JUMLAH 400.00 2,000.00 2,400.00

m1

m3

m3

m2

m3

m3

m3

m3

m3

m3

m3

m3

Page 10: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 10/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

Page 11: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 11/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

(PEKERJAAN DINDING )

SNI ### Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps

6.2 ### bh Batu Bata @ Rp. 900.00 ###

03-2837-200 ### kg Semen type I @ Rp. 1,160.00 50,460.00

0.0800 Pasir pasang @ Rp. ### 14,400.00

0.2000 org Tukang batu @ Rp. 55,000.00 11,000.00

0.0200 org Kepala tukang batu @ Rp. 65,000.00 1,300.00

0.6500 org Pekerja @ Rp. 45,000.00 29,250.00

0.0300 org Mandor @ Rp. 70,000.00 2,100.00

  JUMLAH 43,650.00 ### ###

SNI ### Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps

6.9 ### bh Batu Bata @ Rp. 900.00 63,000.0003-2837-200 ### kg Semen type I @ Rp. 1,160.00 21,982.00

0.0380 Pasir pasang @ Rp. ### 6,840.00

0.1000 org Tukang batu @ Rp. 55,000.00 5,500.00

0.0100 org Kepala tukang batu @ Rp. 65,000.00 650.00

0.3200 org Pekerja @ Rp. 45,000.00 14,400.00

0.0150 org Mandor @ Rp. 70,000.00 1,050.00

 JUMLAH 21,600.00 91,822.00 ###

SNI ### Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps6.11 ### bh Batu Bata @ Rp. 900.00 63,000.00

03-2837-200 ### kg Semen type I @ Rp. 1,160.00 13,340.00

0.0430 Pasir pasang @ Rp. ### 7,740.00

0.1000 org Tukang batu @ Rp. 55,000.00 5,500.00

0.0100 org Kepala tukang batu @ Rp. 65,000.00 650.00

0.3200 org Pekerja @ Rp. 45,000.00 14,400.00

0.0150 org Mandor @ Rp. 70,000.00 1,050.00

 JUMLAH 21,600.00 84,080.00 ###

### Pasang Dinding Papan Kisi-kisi 

0.0105 Kayu Meranti Balok @ Rp. ### 12,337.50

0.0070 Kayu Meranti Papan @ Rp. ### 8,225.00

0.1000 Kg Paku Biasa 2"-5' @ Rp. 15,000.00 1,500.00

0.4500 org Tukang kayu @ Rp. 55,000.00 24,750.00

0.0450 org Kepala tukang kayu @ Rp. 65,000.00 2,925.00

0.1500 org Pekerja @ Rp. 45,000.00 6,750.00

0.0750 org Mandor @ Rp. 70,000.00 5,250.00

 JUMLAH 39,675.00 22,062.50 61,737.50

(PEKERJAAN PELESTERAN )

SNI ### Plesteran 1 Pc : 2 Ps, tebal 20 mm

6.13 ### kg Semen type I @ Rp. 1,160.00 16,564.80

03-2837-200 0.0230 Pasir pasang @ Rp. ### 4,140.00

0.2000 org Tukang batu @ Rp. 55,000.00 11,000.00

0.0200 org Kepala tukang batu @ Rp. 65,000.00 1,300.00

0.2500 org Pekerja @ Rp. 45,000.00 11,250.00

0.1250 org Mandor @ Rp. 70,000.00 8,750.00

 JUMLAH 32,300.00 20,704.80 ###

m2

m3

m2

m3

m2

m3

m2

m3

m2

m3

Page 12: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 12/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

SNI ### Plesteran 1 Pc : 3 Ps, tebal 20 mm

6.14 ### kg Semen type I @ Rp. 1,160.00 12,528.00

03-2837-200 0.0260 Pasir pasang @ Rp. ### 4,680.00

0.2000 org Tukang batu @ Rp. 55,000.00 11,000.00

0.0200 org Kepala tukang batu @ Rp. 65,000.00 1,300.00

0.2500 org Pekerja @ Rp. 45,000.00 11,250.00

0.1250 org Mandor @ Rp. 70,000.00 8,750.00

 JUMLAH 32,300.00 17,208.00 49,508.00

SNI ### Plesteran 1 Pc : 4 Ps, tebal 20 mm

6.15 8.6800 kg Semen type I @ Rp. 1,160.00 10,068.80

03-2837-200 0.0280 Pasir pasang @ Rp. ### 5,040.00

0.2000 org Tukang batu @ Rp. 55,000.00 11,000.00

0.0200 org Kepala tukang batu @ Rp. 65,000.00 1,300.000.2500 org Pekerja @ Rp. 45,000.00 11,250.00

0.1250 org Mandor @ Rp. 70,000.00 8,750.00

 JUMLAH 32,300.00 15,108.80 ###

SNI ### Berapen 1Pc : 3Ps (Tebal 30 mm)

6.27 7.0700 kg Semen type I @ Rp. 1,160.00 8,201.20

03-2837-200 0.0210 Pasir pasang @ Rp. ### 3,780.00

0.0700 org Tukang batu @ Rp. 55,000.00 3,850.00

0.0070 org Kepala tukang batu @ Rp. 65,000.00 455.000.1500 org Pekerja @ Rp. 45,000.00 6,750.00

0.0080 org Mandor @ Rp. 70,000.00 560.00

 JUMLAH 11,615.00 11,981.20 ###

SNI ### Afwerking Beton 1Pc : 3Ps (Tebal 15 mm)

6.27 6.4800 kg Semen type I @ Rp. 1,160.00 7,516.80

03-2837-200 0.0190 Pasir pasang @ Rp. ### 3,420.00

0.1500 org Tukang batu @ Rp. 55,000.00 8,250.00

0.0150 org Kepala tukang batu @ Rp. 65,000.00 975.000.2000 org Pekerja @ Rp. 45,000.00 9,000.00

0.0100 org Mandor @ Rp. 70,000.00 700.00

 JUMLAH 18,925.00 10,936.80 ###

(PEKERJAAN KAYU )

SNI ### Membuat kusen pintu dan jendela

6.1 1.1000 Kayu Kulim (Klas I) @ Rp. ### ###

03-3434-200 0.2000 Kg Paku Biasa 2"-5' @ Rp. 15,000.00 3,000.00

### org Tukang kayu @ Rp. 55,000.00 ###

2.0000 org Kepala tukang kayu @ Rp. 65,000.00 ###

6.0000 org Pekerja @ Rp. 45,000.00 ###

0.3000 org Mandor @ Rp. 70,000.00 21,000.00

 JUMLAH ### ### ###

SNI ### Pasang pintu dan jendela Kaca

6.9 0.0196 Kayu Kelas II @ Rp. ### 23,030.00

03-3434-200 0.0300 Kg Paku Biasa 2"-5' @ Rp. 15,000.00 450.00

1.0000 Kaca Bening 5mm @ Rp. 98,000.00 98,000.00

2.0000 org Tukang kayu @ Rp. 55,000.00 ###

0.2000 org Kepala tukang kayu @ Rp. 65,000.00 13,000.00

m2

m3

m2

m3

m2

m3

m2

m3

m3

m3

m2

m3

m2

Page 13: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 13/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

0.8000 org Pekerja @ Rp. 45,000.00 36,000.00

0.0400 org Mandor @ Rp. 70,000.00 2,800.00

 JUMLAH ### ### ###

Page 14: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 14/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

SNI ### Pasang Jalusi Ventilasi 

6.16 0.0196 Kayu Meranti @ Rp. ### 23,030.00

03-3434-200 0.0300 Kg Paku Biasa 2"-5' @ Rp. 15,000.00 450.00

1.0000 org Tukang kayu @ Rp. 55,000.00 55,000.00

0.2000 org Kepala tukang kayu @ Rp. 65,000.00 13,000.00

0.5000 org Pekerja @ Rp. 45,000.00 22,500.00

0.0250 org Mandor @ Rp. 70,000.00 1,750.00

  JUMLAH 92,250.00 23,480.00 ###

SNI ### Konstruksi kuda-kuda kayu

6.29 1.1000 Kayu Balok Meranti @ Rp. ### ###

03-3434-200 ### kg Besi strip @ Rp. 13,000.00 ###

0.8000 kg Paku biasa 2" - 5" @ Rp. 15,000.00 12,000.00

### org Tukang kayu @ Rp. 55,000.00 ###1.2000 org Kepala tukang kayu @ Rp. 65,000.00 78,000.00

4.0000 org Pekerja @ Rp. 45,000.00 ###

0.2000 org Mandor @ Rp. 70,000.00 14,000.00

 JUMLAH ### ### ###

SNI ### Konstruksi Rangka Atap (Gording Kayu)

03-3434-200 1.1000 Kayu Kelas II @ Rp. ### ###

0.5000 kg Paku biasa 2" - 5" @ Rp. 15,000.00 7,500.00

6.0000 org Tukang kayu @ Rp. 55,000.00 ###1.2000 org Kepala tukang kayu @ Rp. 65,000.00 78,000.00

2.0000 org Pekerja @ Rp. 45,000.00 90,000.00

0.2000 org Mandor @ Rp. 70,000.00 14,000.00

 JUMLAH ### ### ###

SNI ### Pasang Rangka Atap (Kaso+Reng Kayu)

6.31 0.0120 Kayu Balok Meranti @ Rp. ### 14,100.00

03-3434-200 0.1500 kg Paku biasa 2" - 5" @ Rp. 15,000.00 2,250.00

0.1000 org Tukang kayu @ Rp. 55,000.00 5,500.000.0100 org Kepala tukang kayu @ Rp. 65,000.00 650.00

0.1000 org Pekerja @ Rp. 45,000.00 4,500.00

0.0050 org Mandor @ Rp. 70,000.00 350.00

 JUMLAH 11,000.00 16,350.00 ###

SNI ### Pasang Rangka Langit-langit 

6.38 0.0120 Kayu Balok Meranti @ Rp. ### 14,100.00

03-3434-200 0.1000 kg Paku biasa 2" - 5" @ Rp. 15,000.00 1,500.00

0.2500 org Tukang kayu @ Rp. 55,000.00 13,750.00

0.0250 org Kepala tukang kayu @ Rp. 65,000.00 1,625.000.1500 org Pekerja @ Rp. 45,000.00 6,750.00

0.0750 org Mandor @ Rp. 70,000.00 5,250.00

 JUMLAH 27,375.00 15,600.00 ###

SNI ### Pasang Listplank Kayu Uk. 2(3x20) cm

6.51 0.0145 Kayu Kelas II @ Rp. ### 17,037.50

03-3434-200 0.0600 kg Paku biasa 2" - 5" @ Rp. 15,000.00 900.00

0.2500 org Tukang kayu @ Rp. 55,000.00 13,750.00

0.0250 org Kepala tukang kayu @ Rp. 65,000.00 1,625.00

0.1500 org Pekerja @ Rp. 45,000.00 6,750.00

0.0750 org Mandor @ Rp. 70,000.00 5,250.00

 JUMLAH 27,375.00 17,937.50 ###

m2

m3

m3

m3

m3

m3

m2

m3

m2

m3

m'

m3

Page 15: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 15/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

Page 16: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 16/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

SNI ### Pasang Singap papan

03-3434-200 0.0400 Kayu Kelas II @ Rp. ### 47,000.00

0.0250 kg Paku biasa 2" - 5" @ Rp. 15,000.00 375.00

0.0030 org Tukang kayu @ Rp. 55,000.00 165.00

0.0300 org Kepala tukang kayu @ Rp. 65,000.00 1,950.00

1.0000 org Pekerja @ Rp. 45,000.00 45,000.00

0.1000 org Mandor @ Rp. 70,000.00 7,000.00

  JUMLAH 54,115.00 47,375.00 ###

(PEKERJAAN BETON )

SNI ### Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr 

6.1 ### kg Semen Type I @ Rp. 1,160.00 ###

03-3434-200 0.5200 Pasir Cor @ Rp. ### ###0.8700 Kerikil @ Rp. ### ###

0.2500 org Tukang batu @ Rp. 55,000.00 13,750.00

0.0250 org Kepala tukang batu @ Rp. 65,000.00 1,625.00

1.6500 org Pekerja @ Rp. 45,000.00 74,250.00

0.0800 org Mandor @ Rp. 70,000.00 5,600.00

  JUMLAH 95,225.00 ### ###

### Beton tumbuk, 1 Pc : 3 Ps : 5 Kr tebal 5cm + Plester 

0.0500 Beton tumbuk, 1 Pc : 3 @ Rp. ### 41,825.25

1.0000 Plesteran 1Pc : 4Ps @ Rp. 47,408.80 47,408.80 JUMLAH - 89,234.05 89,234.05

### Membuat beton, 1 Pc : 2 Ps : 3 Kr 

### kg Semen Type I @ Rp. 1,160.00 ###

0.5200 Pasir Cor @ Rp. ### ###

0.8700 Kerikil @ Rp. ### ###

0.2500 org Tukang batu @ Rp. 55,000.00 13,750.00

0.0250 org Kepala tukang batu @ Rp. 65,000.00 1,625.00

1.6500 org Pekerja @ Rp. 45,000.00 74,250.00

0.0800 org Mandor @ Rp. 70,000.00 5,600.00  JUMLAH 95,225.00 ### ###

SNI ### kg Pembesian dengan besi polos

6.25 1.0500 kg Besi beton polos @ Rp. 11,000.00 11,550.00

0.0150 kg Kawat beton @ Rp. 15,000.00 225.00

0.0070 org Tukang besi @ Rp. 55,000.00 385.00

0.0007 org Kepala tukang besi @ Rp. 65,000.00 45.50

0.0070 org Pekerja @ Rp. 45,000.00 315.00

0.0003 org Mandor @ Rp. 70,000.00 21.00

 JUMLAH 766.50 11,775.00 12,541.50

DIBULATKAN ###

m2

m3

m3

m3

m3

m2

m3

m2

m3

m3

m3

Page 17: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 17/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

### Membuat Fondasi Beton Bertulang 90x90 (152 Kg Besi + Begisting)

0.2000 Kayu Papan Meranti @ Rp. ### ###

1.5000 Paku biasa 2"-5" @ Rp. 15,000.00 22,500.00

0.4000 Ltr Minyak Begisting @ Rp. 1,500.00 600.00

### Kg Besi Beton Polos @ Rp. 11,000.00 ###

2.4500 Kg Kawat Beton @ Rp. 15,000.00 36,750.00

### Kg Semen Portland @ Rp. 1,160.00 ###

0.5200 Pasir Beton @ Rp. ### ###

0.7800 Kerikil @ Rp. ### ###

0.3500 org Tukang Batu @ Rp. 55,000.00 19,250.00

1.0400 org Tukang Kayu @ Rp. 55,000.00 57,200.00

1.0500 org Tukang Besi @ Rp. 55,000.00 57,750.00

0.2450 org Kep. Tukang @ Rp. 65,000.00 15,925.00

3.9000 org Pekerja @ Rp. 45,000.00 ###

0.1650 org Mandor @ Rp. 70,000.00 11,550.00 JUMLAH ### ### ###

### Membuat Sloof Beton Bertulang 20/30 (121 Kg Besi + Begisting)

0.2700 Kayu Papan Meranti @ Rp. ### ###

2.0000 Paku biasa 2"-5" @ Rp. 15,000.00 30,000.00

0.6000 Ltr Minyak Begisting @ Rp. 1,500.00 900.00

### Kg Besi Beton Polos @ Rp. 11,000.00 ###

1.8000 Kg Kawat Beton @ Rp. 15,000.00 27,000.00

### Kg Semen Portland @ Rp. 1,160.00 ###0.5200 Pasir Beton @ Rp. ### ###

0.7800 Kerikil @ Rp. ### ###

0.3500 org Tukang Batu @ Rp. 55,000.00 19,250.00

1.5600 org Tukang Kayu @ Rp. 55,000.00 85,800.00

1.4000 org Tukang Besi @ Rp. 55,000.00 77,000.00

0.3310 org Kep. Tukang @ Rp. 65,000.00 21,515.00

4.8500 org Pekerja @ Rp. 45,000.00 ###

0.1700 org Mandor @ Rp. 70,000.00 11,900.00

 JUMLAH ### ### ###

### Membuat Kolom Beton Bertulang 20x20 (167 Kg Besi + Begisting)

0.4000 Kayu Papan Meranti @ Rp. ### ###

4.0000 Paku biasa 2"-5" @ Rp. 15,000.00 60,000.00

2.0000 Ltr Minyak Begisting @ Rp. 1,500.00 3,000.00

### Kg Besi Beton Polos @ Rp. 11,000.00 ###

3.5000 Kg Kawat Beton @ Rp. 15,000.00 52,500.00

### Kg Semen Portland @ Rp. 1,160.00 ###

0.5200 Pasir Beton @ Rp. ### ###

0.7800 Kerikil @ Rp. ### ###

0.1500 Kayu Balok Meranti @ Rp. ### ###

3.5000 Lbr Plywood 4mm @ Rp. 54,000.00 ###

0.3500 org Tukang Batu @ Rp. 55,000.00 19,250.00

1.5600 org Tukang Kayu @ Rp. 55,000.00 85,800.00

1.4000 org Tukang Besi @ Rp. 55,000.00 77,000.00

0.3310 org Kep. Tukang @ Rp. 65,000.00 21,515.00

4.8500 org Pekerja @ Rp. 45,000.00 ###

0.1700 org Mandor @ Rp. 70,000.00 11,900.00

 JUMLAH ### ### ###

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

Page 18: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 18/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

### Membuat Balok Beton Bertulang 15x25 (187 Kg Besi + Begisting)

0.3200 Kayu Papan Meranti @ Rp. ### ###

3.2000 Paku biasa 2"-5" @ Rp. 15,000.00 48,000.00

1.6000 Ltr Minyak Begisting @ Rp. 1,500.00 2,400.00

### Kg Besi Beton Polos @ Rp. 11,000.00 ###

1.8000 Kg Kawat Beton @ Rp. 15,000.00 27,000.00

### Kg Semen Portland @ Rp. 1,160.00 ###

0.5200 Pasir Beton @ Rp. ### ###

0.7800 Kerikil @ Rp. ### ###

0.1400 Kayu Balok Meranti @ Rp. ### ###

2.8000 Lbr Plywood 4mm @ Rp. 54,000.00 ###

0.3500 org Tukang Batu @ Rp. 55,000.00 19,250.00

2.8000 org Tukang Kayu @ Rp. 55,000.00 ###

1.4000 org Tukang Besi @ Rp. 55,000.00 77,000.000.4550 org Kep. Tukang @ Rp. 65,000.00 29,575.00

5.9600 org Pekerja @ Rp. 45,000.00 ###

0.2080 org Mandor @ Rp. 70,000.00 14,560.00

 JUMLAH ### ### ###

### Membuat Dag Beton Bertulang tbl. 12cm(47Kg Besi + Begisting)

0.3200 Kayu Papan Meranti @ Rp. ### ###

3.2000 Paku biasa 2"-5" @ Rp. 15,000.00 48,000.00

1.6000 Ltr Minyak Begisting @ Rp. 1,500.00 2,400.00### Kg Besi Beton Polos @ Rp. 11,000.00 ###

3.0000 Kg Kawat Beton @ Rp. 15,000.00 45,000.00

### Kg Semen Portland @ Rp. 1,160.00 ###

0.5200 Pasir Beton @ Rp. ### ###

0.7800 Kerikil @ Rp. ### ###

0.1400 Kayu Balok Meranti @ Rp. ### ###

2.8000 Lbr Plywood 4mm @ Rp. 54,000.00 ###

### Btg Kayu Bulat/ubar dia. 8c @ Rp. 3,000.00 48,000.00

0.3500 org Tukang Batu @ Rp. 55,000.00 19,250.00

2.8000 org Tukang Kayu @ Rp. 55,000.00 ###1.4000 org Tukang Besi @ Rp. 55,000.00 77,000.00

0.4550 org Kep. Tukang @ Rp. 65,000.00 29,575.00

5.9600 org Pekerja @ Rp. 45,000.00 ###

0.2080 org Mandor @ Rp. 70,000.00 14,560.00

 JUMLAH ### ### ###

### Membuat Kanopi Beton Bertulang tbl. 8cm(70 Kg Besi + Begisting)

0.3200 Kayu Papan Meranti @ Rp. ### ###

3.2000 Paku biasa 2"-5" @ Rp. 15,000.00 48,000.00

1.6000 Ltr Minyak Begisting @ Rp. 1,500.00 2,400.00

### Kg Besi Beton Polos @ Rp. 11,000.00 ###

3.0000 Kg Kawat Beton @ Rp. 15,000.00 45,000.00

### Kg Semen Portland @ Rp. 1,160.00 ###

0.5200 Pasir Beton @ Rp. ### ###

0.7800 Kerikil @ Rp. ### ###

0.1400 Kayu Balok Meranti @ Rp. ### ###

2.8000 Lbr Plywood 4mm @ Rp. 54,000.00 ###

### Btg Kayu Bulat/ubar dia. 8c @ Rp. 3,000.00 48,000.00

0.3500 org Tukang Batu @ Rp. 55,000.00 19,250.00

2.8000 org Tukang Kayu @ Rp. 55,000.00 ###

1.4000 org Tukang Besi @ Rp. 55,000.00 77,000.00

0.4550 org Kep. Tukang @ Rp. 65,000.00 29,575.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

Page 19: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 19/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

5.9600 org Pekerja @ Rp. 45,000.00 ###

0.2080 org Mandor @ Rp. 70,000.00 14,560.00

 JUMLAH ### ### ###

Page 20: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 20/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

### Membuat Ring Balok Beton Bertulang 15x20 (156 Kg Besi + Begisting)

0.3200 Kayu Papan Meranti @ Rp. ### ###

3.2000 Paku biasa 2"-5" @ Rp. 15,000.00 48,000.00

1.6000 Ltr Minyak Begisting @ Rp. 1,500.00 2,400.00

### Kg Besi Beton Polos @ Rp. 11,000.00 ###

3.0000 Kg Kawat Beton @ Rp. 15,000.00 45,000.00

### Kg Semen Portland @ Rp. 1,160.00 ###

0.5200 Pasir Beton @ Rp. ### ###

0.7800 Kerikil @ Rp. ### ###

0.1400 Kayu Balok Meranti @ Rp. ### ###

2.8000 Lbr Plywood 9mm @ Rp. 85,000.00 ###

### Btg Kayu Bulat/ubar dia. 8c @ Rp. 3,000.00 48,000.00

0.3500 org Tukang Batu @ Rp. 55,000.00 19,250.00

2.8000 org Tukang Kayu @ Rp. 55,000.00 ###

1.4000 org Tukang Besi @ Rp. 55,000.00 77,000.000.4550 org Kep. Tukang @ Rp. 65,000.00 29,575.00

5.9600 org Pekerja @ Rp. 45,000.00 ###

0.2080 org Mandor @ Rp. 70,000.00 14,560.00

 JUMLAH ### ### ###

### Membuat Kolom Penguat Beton Bertulang (11x11) cm Kolom Praktis

0.0020 Kayu Papan Meranti @ Rp. ### 2,350.00

0.0100 Paku biasa 2"-5" @ Rp. 15,000.00 150.00

3.0000 Kg Besi Beton Polos @ Rp. 11,000.00 33,000.000.4500 Kg Kawat Beton @ Rp. 15,000.00 6,750.00

4.0000 Kg Semen Portland @ Rp. 1,160.00 4,640.00

0.0060 Pasir Beton @ Rp. ### 1,620.00

0.0090 Kerikil @ Rp. ### 3,600.00

0.0200 org Tukang Batu @ Rp. 55,000.00 1,100.00

0.0200 org Tukang Kayu @ Rp. 55,000.00 1,100.00

0.0200 org Tukang Besi @ Rp. 55,000.00 1,100.00

0.0060 org Kep. Tukang @ Rp. 65,000.00 390.00

0.0600 org Pekerja @ Rp. 45,000.00 2,700.00

0.0030 org Mandor @ Rp. 70,000.00 210.00 JUMLAH 6,600.00 52,110.00 ###

(PEKERJAAN KONSTRUKSI BESI & ALUMUNIUM )

### PASANG KUDA-KUDA BAJA RINGAN

2.8500 Kg Supertruss C75, 100 IN @ Rp. 18,000.00 51,300.00

3.6700 Kg Supertruss C75, 75 INT @ Rp. 13,500.00 49,545.00

0.3400 Kg Topspan 40,055 INT @ Rp. 15,000.00 5,100.00

### Pc WTEKS 12-14 X 20 HWF @ Rp. 750.00 8,550.00

### Pc CSP 10-16x16 HWFS Cla@ Rp. 450.00 5,409.00

0.1300 Pc SG 10 Multiple @ Rp. 3,000.00 390.00

0.6000 org Tukang Atap @ Rp. 55,000.00 33,000.00

0.0200 org Kepala tukang @ Rp. 65,000.00 1,300.00

0.4000 org Pekerja @ Rp. 45,000.00 18,000.00

0.0200 org Mandor @ Rp. 70,000.00 1,400.00

  JUMLAH 53,700.00 ### ###

m3

m3

m3

m3

m3

m3

m1

m3

m3

m3

m3

m2

Page 21: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 21/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

(PEKERJAAN ATAP )

SNI ### Pasang atap genteng metal 

03-3436-200 1.0200 M2 Atap Genteng metal @ Rp. 65,000.00 66,300.00

6.32 0.2000 kg Paku Atap Genteng Met @ Rp. 20,000.00 4,000.00

0.1000 org Tukang Atap @ Rp. 55,000.00 5,500.00

0.0100 org Kepala tukang @ Rp. 65,000.00 650.00

0.2000 org Pekerja @ Rp. 45,000.00 9,000.00

0.0010 org Mandor @ Rp. 70,000.00 70.00

 JUMLAH 15,220.00 70,300.00 ###

Mod. SNI ### Pasang atap Seng gelombang BJLS

03-3436-200 1.0200 Atap Seng Gelombang B@ Rp. 37,500.00 38,250.00

6.32 0.2000 kg Paku atap @ Rp. 20,000.00 4,000.00

0.1000 org Tukang kayu @ Rp. 55,000.00 5,500.00

0.0100 org Kepala tukang kayu @ Rp. 65,000.00 650.00

0.2000 org Pekerja @ Rp. 45,000.00 9,000.00

0.0010 org Mandor @ Rp. 70,000.00 70.00

  JUMLAH 15,220.00 42,250.00 57,470

Mod. SNI ### Pasang Prabung atap genteng metal 

03-3436-200 1.0000 Prabung Atap Genteng @ Rp. 14,000.00 14,000.00

6.36 0.1000 bh Paku Atap Genteng Met @ Rp. 20,000.00 2,000.00

0.1500 org Tukang Atap @ Rp. 55,000.00 8,250.00

0.0150 org Kepala tukang @ Rp. 65,000.00 975.00

0.2500 org Pekerja @ Rp. 45,000.00 11,250.00

0.0130 org Mandor @ Rp. 70,000.00 910.00

 JUMLAH 21,385.00 16,000.00 37,385.00

Mod. SNI ### Pasang Prabung atap seng gelombang

03-3436-200 1.0000 Prabung Seng @ Rp. 12,000.00 12,000.00

6.36 0.1000 bh Paku Atap @ Rp. 20,000.00 2,000.000.1500 org Tukang Atap @ Rp. 55,000.00 8,250.00

0.0150 org Kepala tukang @ Rp. 65,000.00 975.00

0.2500 org Pekerja @ Rp. 45,000.00 11,250.00

0.0130 org Mandor @ Rp. 70,000.00 910.00

 JUMLAH 21,385.00 14,000.00 35,385.00

Mod. SNI ### Pasang Jurai Luar Dalam

03-3436-200 0.0170 Kayu Papan Meranti @ Rp. ### 19,975.00

6.39 0.5000 Lbr Prabung Seng Plat @ Rp. 16,000.00 8,000.000.2000 bh Paku Biasa 2"-5" @ Rp. 20,000.00 4,000.00

0.1500 org Tukang Atap @ Rp. 55,000.00 8,250.00

0.0150 org Kepala tukang @ Rp. 65,000.00 975.00

0.4000 org Pekerja @ Rp. 45,000.00 18,000.00

0.0200 org Mandor @ Rp. 70,000.00 1,400.00

 JUMLAH 28,625.00 31,975.00 ###

Mod. SNI ### Bola-bola Atap Genteng Metal 

03-3436-200 1.0000 Bola-bola Atap Genteng @ Rp. 16,000.00 16,000.00

0.0360 bh Paku Atap Genteng Met @ Rp. 20,000.00 720.00

0.1500 org Tukang Atap @ Rp. 55,000.00 8,250.00

0.0150 org Kepala tukang @ Rp. 65,000.00 975.00

m2

m2

m2

m1

m2

m1

m2

m1

m3

m1

m2

Page 22: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 22/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

0.2500 org Pekerja @ Rp. 45,000.00 11,250.00

0.0130 org Mandor @ Rp. 70,000.00 910.00

 JUMLAH 21,385.00 16,720.00 ###

Page 23: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 23/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

(PEKERJAAN PLAFOND )

SNI ### Langit-langit Plywood 60 x 120 cm tebal 3.6mm

03-3438-200 0.3750 Lbr Tripleks 3.6 mm @ Rp. 54,000.00 20,250.00

6.10 0.0300 kg Paku Tripleks @ Rp. 15,000.00 450.00

0.1000 org Tukang kayu @ Rp. 55,000.00 5,500.00

0.0100 org Kepala tukang kayu @ Rp. 65,000.00 650.00

0.0700 org Pekerja @ Rp. 45,000.00 3,150.00

0.0035 org Mandor @ Rp. 70,000.00 245.00

 JUMLAH 9,545.00 20,700.00 ###

### Pasang Piri-piri Papan Kelas II

0.0200 M3 Papan Meranti @ Rp. ### 23,500.00

0.2000 kg Paku Biasa 2"-5" @ Rp. 15,000.00 3,000.00

0.1000 org Tukang kayu @ Rp. 55,000.00 5,500.000.0100 org Kepala tukang kayu @ Rp. 65,000.00 650.00

0.0700 org Pekerja @ Rp. 45,000.00 3,150.00

0.0035 org Mandor @ Rp. 70,000.00 245.00

 JUMLAH 9,545.00 26,500.00 ###

SNI ### List langit-langit kayu profil 

6.19 1.1000 List kayu profil @ Rp. 2,500.00 2,750.00

03-2838-200 0.0100 kg Paku Biasa 2"-5" @ Rp. 15,000.00 150.00

0.0100 org Tukang kayu @ Rp. 55,000.00 550.000.0010 org Kepala tukang kayu @ Rp. 65,000.00 65.00

0.0100 org Pekerja @ Rp. 45,000.00 450.00

0.0010 org Mandor @ Rp. 70,000.00 70.00

  JUMLAH 1,135.00 2,900.00 4,035.00

### Langit-langit gypsum board tebal 9 mm, rangka hollow

4.5000 Rangka hollow 4x4 cm @ Rp. 12,000.00 54,000.00

0.3600 lbr Gypsum board 9 mm @ Rp. 80,000.00 28,800.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00 500.000.4500 kg Tepung gypsum @ Rp. 8,000.00 3,600.00

0.1500 kg Paku skrup @ Rp. 20,000.00 3,000.00

5.0000 Kawat penggantung @ Rp. 500.00 2,500.00

0.3700 org Tukang kayu @ Rp. 55,000.00 20,350.00

0.0370 org Kepala tukang kayu @ Rp. 65,000.00 2,405.00

0.2400 org Pekerja @ Rp. 45,000.00 10,800.00

0.0120 org Mandor @ Rp. 70,000.00 840.00

  JUMLAH 34,395.00 92,400.00 ###

### Pasang list profil cornees gypsum lebar lebih dari 10 cm

1.1000 List profil cornees gypsu@ Rp. 12,000.00 13,200.00

1.0500 kg Tepung gypsum @ Rp. 8,000.00 8,400.00

0.0400 org Tukang kayu @ Rp. 55,000.00 2,200.00

0.0040 org Kepala tukang kayu @ Rp. 65,000.00 260.00

0.1125 org Pekerja @ Rp. 45,000.00 5,062.50

0.0065 org Mandor @ Rp. 70,000.00 455.00

 JUMLAH 7,977.50 21,600.00 29,577.50

m2

m2

m1

m1

m2

m1

m1

m1

m1

Page 24: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 24/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

(PEKERJAAN SANITASI )SNI ### bh Memasang bak kontrol pas.bata (30 x 30) cm, tinggi 35 cm

6.16 ### bh Batu bata @ Rp. 900.00 99,000.00

03-2838-200 ### kg Semen Type I @ Rp. 1,160.00 51,040.00

0.0700 Pasir pasang @ Rp. ### 12,600.00

0.0700 Batu kerikil @ Rp. ### 28,000.00

0.0600 Pasir beton @ Rp. ### 16,200.00

0.1900 org Tukang batu @ Rp. 55,000.00 10,450.00

0.0190 org Kepala tukang batu @ Rp. 65,000.00 1,235.00

0.3800 org Pekerja @ Rp. 45,000.00 17,100.00

0.0190 org Mandor @ Rp. 70,000.00 1,330.00

  JUMLAH 30,115.00 ### ###

DIBULATKAN ###

### M' Saluran Keliling Bangunan

0.0800 M3 Galian Tanah @ Rp. 20,800.00 1,664.000.0100 M3 Pasir Urug @ Rp. ### 1,582.00

0.0600 M2 Pas. 1/2 bata 1:4 @ Rp. ### 6,340.80

1.1000 M2 Plesteran 1:4 @ Rp. 47,408.80 52,149.68

0.0300 M3 Cor Lantai Kerja @ Rp. ### 25,095.15

0.0100 M1 Pas. Bowplank @ Rp. 33,625.00 336.25

 JUMLAH - 87,167.88 ###

(PEKERJAAN KUNCI DAN KACA )

6.2 ### bh Pasang kunci tanam 2x putar 

1.0000 bh Kunci tanam 2xputar @ Rp. 90,000.00 90,000.00

0.5000 org Tukang kayu @ Rp. 55,000.00 27,500.00

0.0100 org Kepala tukang kayu @ Rp. 65,000.00 650.00

0.0100 org Pekerja @ Rp. 45,000.00 450.00

0.0050 org Mandor @ Rp. 70,000.00 350.00

  JUMLAH 28,950.00 90,000.00 ###

6.5 ### bh Pasang engsel pintu

1.0000 bh Engsel pintu @ Rp. 45,000.00 45,000.00

0.1500 org Tukang kayu @ Rp. 55,000.00 8,250.00

0.0150 org Kepala tukang kayu @ Rp. 65,000.00 975.00

0.0150 org Pekerja @ Rp. 45,000.00 675.00

0.0008 org Mandor @ Rp. 70,000.00 52.50

 JUMLAH 9,952.50 45,000.00 54,952.50

6.6 ### bh Pasang engsel jendela

1.0000 bh Engsel jendela @ Rp. 22,000.00 22,000.00

0.1000 org Tukang kayu @ Rp. 55,000.00 5,500.00

0.0100 org Kepala tukang kayu @ Rp. 65,000.00 650.00

0.0100 org Pekerja @ Rp. 45,000.00 450.00

0.0050 org Mandor @ Rp. 70,000.00 350.00

 JUMLAH 6,950.00 22,000.00 28,950.00

6.9 ### bh Pasang kait angin

1.0000 bh Kait angin @ Rp. 7,500.00 7,500.00

0.1500 org Tukang kayu @ Rp. 55,000.00 8,250.00

0.0150 org Kepala tukang kayu @ Rp. 65,000.00 975.00

0.0150 org Pekerja @ Rp. 45,000.00 675.00

m3

m3

m3

Page 25: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 25/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

0.0008 org Mandor @ Rp. 70,000.00 52.50

 JUMLAH ( BELUM PPN ) 9,952.50 7,500.00 17,452.50

Page 26: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 26/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

6.9 ### bh Pasang Tangan-tangan jendela

1.0000 bh Tangan jendela @ Rp. 8,000.00 8,000.00

0.1500 org Tukang kayu @ Rp. 55,000.00 8,250.00

0.0150 org Kepala tukang kayu @ Rp. 65,000.00 975.00

0.0150 org Pekerja @ Rp. 45,000.00 675.00

0.0008 org Mandor @ Rp. 70,000.00 52.50

 JUMLAH ( BELUM PPN ) 9,952.50 8,000.00 17,952.50

6.10 ### bh Pasang Grendel Pintu

1.0000 bh Grendel 4" pintu @ Rp. 15,000.00 15,000.00

0.1500 org Tukang kayu @ Rp. 55,000.00 8,250.00

0.0150 org Kepala tukang kayu @ Rp. 65,000.00 975.00

0.0150 org Pekerja @ Rp. 45,000.00 675.00

0.0008 org Mandor @ Rp. 70,000.00 52.50

 JUMLAH 9,952.50 15,000.00 24,952.50

6.11 ### bh Pasang grendel jendela

1.0000 bh Grendel 2" jendela @ Rp. 8,000.00 8,000.00

0.1500 org Tukang kayu @ Rp. 55,000.00 8,250.00

0.0150 org Kepala tukang kayu @ Rp. 65,000.00 975.00

0.0150 org Pekerja @ Rp. 45,000.00 675.00

0.0008 org Mandor @ Rp. 70,000.00 52.50

  JUMLAH 9,952.50 8,000.00 17,952.50

(PEKERJAAN PENUTUP LANTAI DAN DINDING )

AK  ### Pasang Lantai Granit Setara Granito

1.0000 Lantai Granit 60 x 60 @ Rp. ### ###

9.3800 kg Semen Type I @ Rp. 1,160.00 10,880.80

0.0420 Pasir pasang @ Rp. ### 7,560.00

0.3750 kg Semen Warna @ Rp. 9,000.00 3,375.00

0.6000 org Tukang Keramik @ Rp. 55,000.00 33,000.00

0.0600 org Kep. Tukang @ Rp. 65,000.00 3,900.00

0.3000 org Pekerja @ Rp. 45,000.00 13,500.00

0.0150 org Mandor @ Rp. 70,000.00 1,050.00

  JUMLAH 51,450.00 ### ###

### Pasang Lantai keramik 40 x 40 cm

6.0000 Bh Keramik 40 x 40 @ Rp. 11,500.00 69,000.00

9.3800 kg Semen Type I @ Rp. 1,160.00 10,880.80

0.0420 Pasir pasang @ Rp. ### 7,560.00

0.3750 kg Semen Warna @ Rp. 9,000.00 3,375.000.5000 org Tukang Keramik @ Rp. 55,000.00 27,500.00

0.0500 org Kep. Tukang @ Rp. 65,000.00 3,250.00

0.2500 org Pekerja @ Rp. 45,000.00 11,250.00

0.0125 org Mandor @ Rp. 70,000.00 875.00

 JUMLAH 42,875.00 90,815.80 ###

m2

m2

m3

m2

m3

Page 27: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 27/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

6.47 ### Pasang Lantai keramik 30 x 30 cm

### Bh Keramik 30 x 30 @ Rp. 6,200.00 68,200.00

9.3800 kg Semen Type I @ Rp. 1,160.00 10,880.80

0.0420 Pasir pasang @ Rp. ### 7,560.00

0.3750 kg Semen Warna @ Rp. 9,000.00 3,375.00

0.5000 org Tukang Keramik @ Rp. 55,000.00 27,500.00

0.0500 org Kep. Tukang @ Rp. 65,000.00 3,250.00

0.2500 org Pekerja @ Rp. 45,000.00 11,250.00

0.0125 org Mandor @ Rp. 70,000.00 875.00

 JUMLAH 42,875.00 90,015.80 ###

6.44 ### Pasang Lantai keramik 20 x 20 cm

### Bh Keramik 20 x 20 @ Rp. 2,720.00 68,000.00

9.3800 kg Semen Type I @ Rp. 1,160.00 10,880.80

0.0420 Pasir pasang @ Rp. ### 7,560.000.3750 kg Semen Warna @ Rp. 9,000.00 3,375.00

0.5000 org Tukang Keramik @ Rp. 55,000.00 27,500.00

0.0500 org Kep. Tukang @ Rp. 65,000.00 3,250.00

0.2500 org Pekerja @ Rp. 45,000.00 11,250.00

0.0125 org Mandor @ Rp. 70,000.00 875.00

  JUMLAH 42,875.00 89,815.80 ###

DIBULATKAN ###

### Pasang Dinding keramik 20 x 25 cm

### Bh Keramik 20 x 25 @ Rp. 3,400.00 68,000.00

9.3800 kg Semen Type I @ Rp. 1,160.00 10,880.800.0420 Pasir pasang @ Rp. ### 7,560.00

0.3750 kg Semen Warna @ Rp. 9,000.00 3,375.00

0.6500 org Tukang Keramik @ Rp. 55,000.00 35,750.00

0.0650 org Kep. Tukang @ Rp. 65,000.00 4,225.00

0.3200 org Pekerja @ Rp. 45,000.00 14,400.00

0.0160 org Mandor @ Rp. 70,000.00 1,120.00

 JUMLAH 55,495.00 89,815.80 ###

AK  ### Pasang Dinding Granit 20 x 40 cm Setara Granito

1.0000 Granit 20 x 40 setara Gr@ Rp. ### ###9.3800 kg Semen Type I @ Rp. 1,160.00 10,880.80

0.0420 Pasir pasang @ Rp. ### 7,560.00

0.3750 kg Semen Warna @ Rp. 9,000.00 3,375.00

0.6500 org Tukang Keramik @ Rp. 55,000.00 35,750.00

0.0650 org Kep. Tukang @ Rp. 65,000.00 4,225.00

0.3200 org Pekerja @ Rp. 45,000.00 14,400.00

0.0160 org Mandor @ Rp. 70,000.00 1,120.00

  JUMLAH 55,495.00 ### ###

### Pasang grassblock tebal 10 cm

1.0000 Grassblock @ Rp. 42,000.00 42,000.00

0.0500 Pasir pasang @ Rp. ### 9,000.00

0.2500 org Tukang batu @ Rp. 55,000.00 13,750.00

0.0250 org Kep. Tk. Batu @ Rp. 65,000.00 1,625.00

0.5000 org Pekerja @ Rp. 45,000.00 22,500.00

0.0250 org Mandor @ Rp. 70,000.00 1,750.00

 JUMLAH ( BELUM PPN ) 39,625.00 51,000.00 90,625.00

m2

m3

m2

m3

m2

m3

m2

m

2

m3

m2

m2

m3

Page 28: Ee Azzahra Upload

5/13/2018 Ee Azzahra Upload - slidepdf.com

http://slidepdf.com/reader/full/ee-azzahra-upload 28/28

No. Macam Pekerjaan Upah (Bahan ) (Jumlah )

(1) (2) (3) ((4) ) ((5) )

(PEKERJAAN PENGECATAN )

SNI ### Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis

6.8 0.1500 kg Plamir/dempul @ Rp. 9,000.00 1,350.00

0.2000 Kg Cat Menie @ Rp. 7,000.00 1,400.00

0.1700 kg Cat dasar @ Rp. 9,000.00 1,530.00

0.2600 kg Cat Minyak 2x @ Rp. 28,500.00 7,410.00

0.0020 m2 Perancah @ Rp. ### 1,950.00

0.0900 org Tukang cat @ Rp. 55,000.00 4,950.00

0.0060 org Kepala tukang @ Rp. 65,000.00 390.00

0.0700 org Pekerja @ Rp. 45,000.00 3,150.00

0.0025 org Mandor @ Rp. 70,000.00 175.00

 JUMLAH 8,665.00 13,640.00 ###

SNI ### Pengecatan Residu6.12 0.3500 kg Residu @ Rp. 2,500.00 875.00

0.1000 org Pekerja @ Rp. 45,000.00 4,500.00

0.0060 org Mandor @ Rp. 70,000.00 420.00

  JUMLAH 4,920.00 875.005,795.00

SNI ### Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat p

6.14 0.1000 kg Plamir/dempul @ Rp. 9,000.00 900.00

0.1000 Lbr Amplas @ Rp. 3,000.00 300.00

0.0100 Bh Kuas Golong @ Rp. 12,000.00 120.000.1000 kg Cat dasar @ Rp. 9,000.00 900.00

0.2600 kg Cat Air 2 x @ Rp. 9,000.00 2,340.00

0.0630 org Tukang cat @ Rp. 55,000.00 3,465.00

0.0063 org Kepala tukang @ Rp. 65,000.00 409.50

0.0200 org Pekerja @ Rp. 45,000.00 900.00

0.0025 org Mandor @ Rp. 70,000.00 175.00

  JUMLAH 4,949.50 4,560.00 9,509.50

SNI ### Pengecacatan permukaan Kayu dengan cat meni 6.20 0.1000 kg Cat Meni Kayu @ Rp. 7,000.00 700.00

0.0100 bh Kuas @ Rp. 8,000.00 80.00

0.2000 org Tukang cat @ Rp. 55,000.00 11,000.00

0.0200 org Kepala tukang @ Rp. 65,000.00 1,300.00

0.0200 org Pekerja @ Rp. 45,000.00 900.00

0.0100 org Mandor @ Rp. 70,000.00 700.00

  JUMLAH 13,900.00 780.00 ###

m2

m2

m2

m

2