Dukungan BPPT pada Inovasi Teknologi Bidang Kedirgantaraan
Transcript of Dukungan BPPT pada Inovasi Teknologi Bidang Kedirgantaraan
Dukungan BPPT pada Inovasi Teknologi
Bidang KedirgantaraanFGD Balitbang Kementerian Perhubungan
1
Surabaya, 25 September 2019
Dr Ir Adhi Dharma Permana, MSc
Direktur Pusat Teknologi Industri Pertahanan, BPPT
Kerangka
• PROSES DESAIN & REKAYASA
• PERAN DUKUNGAN BPPT
• UJI YANG DILAKUKAN DI BPPT
• PENUTUP
2
2019/09/25 :: BPPT :: BALAI BESAR TEKNOLOGI AERODINAMIKA AEROELASTIKA AEROAKUSTIKA
PROSES DESAIN REKAYASA
3
• Evaluasi• Sesuaisasaran?
• Desain ulang?
• Pengujian daneksperimen
• Coba buatberdasarkan
rencana
• Tentukanmasalah
• Tentukan kondisibatas
• Terapkan ilmu• Curah
pendapat(brainstorming)
• Tetapkan solusi
• Buat gambar• Daftar
material
IMPROVE
ASK
EXPERIMENT
CREATE
PLAN
THE GOAL
IMAGINE
1
2
34
5
6 • Design Requirement & Objective (DRO)
• Conceptual Design
• Basic Design to Detailed Design
• Manufacturing: Prototype to industrial scale
• Operation Testing & Evaluation (OTE)
• Certification
2019/09/25 :: BPPT :: BALAI BESAR TEKNOLOGI AERODINAMIKA AEROELASTIKA AEROAKUSTIKA
ALTERNATIF PROSES DESAIN REKAYASA
4
EIETE
N2130
Tahap 4 : Penelitian
Keindustrian
2004
Tahap 1: Pengenalan
Teknologi
NC 2121980
1976Roll out , First Flight 1976
Capaian Pembangunan Kemampuan Industri Dirgantara
N250Tahap 3 : Pengembangan Teknologi
Roll out 1994 ,
First Flight 1995
1999
CN235
tahap 2 : Integrasi Teknologi
Roll out , First Flight 1983
1989
1976 19991980 1989 2004
E & O
D,E & O
R,D,E & O
R & D
Merpati , TNI-AU
United Arab Emirates AF
Tentara Udara Diraja Malaysia
Tentara Udara Diraja Brunei Darussalam
Ministry of Agricultures, Royal Thailand
Republic of korea AF
Pakistan AF
Argentina AF
United States Coast Guard
Merpati , Pelita ,
Deraya, Bouraq
TNI-AU , TNI-AL,
TNI-AD, POLRI
Dua flying prototip PA1
dan PA2, total 800 jam
uji terbang.
Program dihentikan
sebagai syarat IMF
Kerja sama BPPT-IPTN , 1976 - 1999
5
Sumber Daya Manusia
Su
mb
er
Da
ya
Fas
ilit
as
N2130
Tahap 4 : Penelitian
Keindustrian
2004
Tahap 1: Pengenalan
Teknologi
NC 2121980
1976Roll out , First Flight 1976
Capaian Pembangunan Industri Dirgantara 1976 - 1997
N250
Tahap 3 : Pengembangan Teknologi
Roll out 1994 ,
First Flight 1995
1999
Laboratoria Uji Konstruksi BPPT
CN235
tahap 2 : Integrasi Teknologi
Roll out , First Flight 1983
1989
Laboratoria Aero- gas
dinamika , & Getaran ,
BPPT
Lab Aerodinamika ITB
Lab Struktur Ringan ITB
Kurikulum S1 distandard Internasionalkan
Kurikulum S2 distandard
Internasionalkan
Lab Terbang LIFT , ITB
Simulator Sistem Pesawat
ITB
Simulator sistem terpadu Pesawat Terbang
Engineering Flight
Simulator
Pembangunan STM dan
Politeknik Penerbangan
Flight Test Center
Lab CFD , ITB
Lab CSD , ITB
Program S3 / Kerja sama riset
6BPPT-LAPAN-2010
System Engineering Approach
System Engineering Fields
Alternatif Bangkit Kembalidengan Pengembangan Pesawat N-219
N219 is a 19-pax commuter aircraft designed to meet Indonesian
geographical conditions (archipelago, mountainous, hilly) and
infrastructure in a relatively remote area (short and unprepared
runway).
Aerodynamic Wind Tunnel
Test
Design and Development of
Ditching Test Equipment.
Ditching Test.
Peran Dukungan BPPT
di dalam Penguasaan Teknologi
Penerbangan
BBTA3 (LAGG)LABORATORIA UJI PENDUKUNG
INDUSTRI DIRGANTARA
2019/09/25 :: BPPT :: BALAI BESAR TEKNOLOGI AERODINAMIKA AEROELASTIKA AEROAKUSTIKA
BBTA3: SUMBERDAYA
11
13
47
163
< D3 S1 S2 S3
12
67
AERODYNAMICS(30 years of experiences)
ILST, LIWET, LSWT,
PIV, Hotwire
1
AEROELASTICS(20 years of experiences)
2
AEROACOUSTICSMasih mengembangkan:
• SDM
• Metoda
• Peralatan3
Uji Aerodinamikdi Laboratory Facility
Aero-Gasdynamic and Vibration
Indonesian Low Speed Tunnel
( ILST)Max speed : 400 km/hr
Test section: 4m x 3m x 10m
The biggest industrial wind tunnel in Asean – Australia.
15-11-201012BPPT-LAPAN-2010
2019/09/25 :: BPPT :: BALAI BESAR TEKNOLOGI AERODINAMIKA AEROELASTIKA AEROAKUSTIKA
WIND TUNNEL TEST HOURS
13
Turkish Aerospace: ANKA (MALE) 2008-2016: 1314 polars
IPTN: N2501987-1995: 2000 polars lebih
Fig. Peran terowongan angin dalam rancang bangun, riset danpengembangan pesawat udara (Baals & Corliss, 1981; Rasuo2012)
Marketdata
2019/09/25 :: BPPT :: BALAI BESAR TEKNOLOGI AERODINAMIKA AEROELASTIKA AEROAKUSTIKA
2009
PERIODE 2008-2017
14
2008 2010 2011 2012 2013 2014 2015 2016 2017
Experience
2019/09/25 :: BPPT :: BALAI BESAR TEKNOLOGI AERODINAMIKA AEROELASTIKA AEROAKUSTIKA
KEGIATAN UJI BBTA3 2018
15
Awal Kegiatan
Perawatan dan
PemeliharaanKebisingan atap
galvalum
Aerodinamika mobil
Pylon Jembatan
CN-235 FTB
Kebisinga…
kompressor di
anechoic chamber
R-122:1
N219 AMPHIBI
Rudal PTIPK BPPT
YFYK ANKA2 …
R-122:2
MALE Konsorsium
R-80 isolated …
Pengujian Grille
Akhir Kegiatan
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Experience
2019/09/25 :: BPPT :: BALAI BESAR TEKNOLOGI AERODINAMIKA AEROELASTIKA AEROAKUSTIKA
KESIAPAN TEST R-80
16
16
Sting Support
Wing struts
ENGINE OFF
Central struts
ENGINE ON
Half model
Full model
Isolated parts
2019/09/25 :: BPPT :: BALAI BESAR TEKNOLOGI AERODINAMIKA AEROELASTIKA AEROAKUSTIKA
KESIAPAN TEST
17
17
Flow VisualizationMini tufts
Naphthalene
Oil film
Smoke tracerKaolin
Particular tests
Isolated empennage test
Dragchute test
Drop test
TakeOff–landing simulation
Perhitungan dan Analisis
• Flutter test N-219 (Perhitungan FEM, Ground Vibration Test, Wind Tunnel Test)
18
55th SATA, Annual Meeting 2-7 June 2019
Indonesia Low Speed Tunnel
19
UAV Wulung
UAV Alap-alap
SHORT RANGE UAV MODELs
WulungScale 1:2
Re 5.5×105
Alap-alapScale 1:1Re 6 ×106
Bilangan Re# 650K (full scale Re#) @V 5m/s. Skala 1:1.6. Landing gear unretractable.
Model for MALE UAV
Indonesian MALE UAV Program(Consorsium of multi institution)
Re 6.0×105
Configuration 1
118 POLAR of Configuration 3
55th SATA, Annual Meeting 2-7 June 2019
Indonesia Low Speed Tunnel
20
Bilangan sd Re# 750K @ 70 m/s. Skala 1:5
Konfigurasi-1 rancangan awal tanpa bidang control, tanpa HLD, profilsayap konvensional, fuselage bentuk awal, sudut V tail awal, Konfigurasi-2 ada bidang control dan HLD untuk uji stabilitas dankinerja, profil laminar flow airfoil, modifikasi fuselage, modifikasisudut ekorKonfigurasi-3 modifikasi ekor, menambahkan kamera, landing gear, intake engine
BBTKS (LUK)LABORATORIA UJI PENDUKUNG
INDUSTRI DIRGANTARA
Uji Kekuatan Struktur
• Keputusan Kepala BPPT No.214/KA/BPPT/XI/84 tanggal 9 November 1984
• LUK telah melakukan uji konstruksipesawat CN235 secara full scale untukfatigue test pada struktur CN235
22
Uji Kekuatan Struktur di Laboratory FacilityStructural Strength Technology
Test hall – Strong Floor : (40 x 40) m
Hydraulic Power Pack for Actuator
driving
Universal Rig
Specific Rig for Automotive
Komponen TestAircraft Static Test
Rubber Fender Static TestAutomobile Test Rig
23BPPT-LAPAN-2010
BALAI TEKNOLOGI HIDRODINAMIKA (BTH)LABORATORIA UJI PENDUKUNG
INDUSTRI DIRGANTARA
25
1. Towing Tank• L = 234.5 m ; W = 11 m ; D = 5.5 m• Model test s/d 9 m, Kecepatan Carriage ~ 6 m/s• Jenis Pengujian: Resistance, Self Propulsion Test, Open Water
Test, Hydrodynamic Forces & Movement Measurement,Planar Motion Experiment
2. Moneouvring Ocean Basin• L = 60 m ; B = 35 m ; D = 2.5 m
L = 45 m ; B = 35 m ; D = 1.25 m• Kecepatan carriage s/d 1.8 m/s• Jenis Pengujian: Monoevering Test, Seakeeping Test,
Offshore Structure, Transport & Launching , Installation Tests, Mooring Tests
3. Cavitation Tunnel• Spesifikasi model propeller diameter s/d 300 mm, Variable
kecepatan dan tekanan, putaran 30 – 1500 RPM • Test Section: 0.85m x 0.85m x 4m• Jenis Pengujian: Cavitation Observation Tests, Cavitation
Inception Tests, Propeller Performance Tests, Hull Pressure Fluctuation Test, Force Torque Measurements
FASILITAS PENGUJIAN di BTH
Copyright by Laboratory for Hydrodynamics Technology, Desember 2018
26
Uji Hidrodinamika Floater N219AV
Gaya dan Momen yang akan diukur dan ditransformasikan pada titik MRP antara lain: Lift Coefficient (CL-t) Drag Coefficient (CD-t) Pitching Moment Coeff. (CL-t) Side force Coeff. (CY-t) Rolling moment Coeff. (Cl-t) Yawing Moment Coeff. (Cn-t) Velocity (V-t) Hull trim angle (Trim-t)
Alat Ukur: Kecepatan carriage (m/s) 6 DOF (Fx, Fy, Fz, Mx, My,Mz) Pengukur sudut trim (deg) Pengukur gerak heave (mm)
Source: PT DI Source: PT DI
Source: BTH
Copyright by Laboratory for Hydrodynamics Technology, Desember 2018
27
Aft pontoon strut Forward pontoon strut
Floater 01A-Rev1
Aft pontoon strut
Forward pontoon strut
Floater 01B-Rev1
Ada 2 buah model floater akan diuji di kolam uji Towing TankKecepatan pengujian model maksimum: 6 m/s
Uji Hidrodinamika Floater N219AV
Source: PT DI
Source: BTH
Copyright by Laboratory for Hydrodynamics Technology, Desember 2018
Diskusi
28
Dukungan BPPT dalan Inovasi Teknologi Bidang Kedirgantaraan:• Fungsi Uji Lab Struktur, Aerodinamika, Hidrodinamika• Perhitungan dan Analisis• Rekomendasi dalam pengembangan berdasarkan hasil uji sebagai
iterasi dalam desain atau pengembangan produk berikutnya
Proses Rancang Bangun dan Rekayasa: • Upaya penguasaan menyeluruh dari produk inovasi teknologi• Sebagai penggerak untuk meningkatkan TKDN produk teknologi
TERIMA KASIH
29
Kontak : Pusat Teknologi Industri Pertahanan (PTIPK) – BPPTEmail : [email protected]