Dokumen Lelang

48
DOKUMEN PENGADAAN NOMOR:D46/HS/X/PA/2008 PAKET PEKERJAAN: PENGADAAN PERANGKAT KERAS & LUNAK TAHUN ANGGARAN: 2008 SUMBER DANA: ANGGARAN LEMBAGA PENJAMIN SIMPANAN Pelelangan ini dilakukan oleh: PANITIA PENGADAAN BARANG/JASA DALAM RANGKA PROYEK PENGEMBANGAN DAN IMPLEMENTASI TEKNOLOGI INFORMASI Gedung BRI II Lantai 11, Jl Jenderal Sudirman Kav. 4446, Jakarta 10210 Telepon : (6221) 571 3500 (Hunting) Faksimile: (6221) 573 5006, 573 5007

Transcript of Dokumen Lelang

Page 1: Dokumen Lelang

 

 

  

DOKUMEN PENGADAAN NOMOR: D‐46/HS/X/PA/2008  PAKET PEKERJAAN: PENGADAAN PERANGKAT KERAS  & LUNAK   TAHUN ANGGARAN: 2008 SUMBER DANA:  ANGGARAN LEMBAGA PENJAMIN SIMPANAN  

          

Pelelangan ini  dilakukan oleh:  PANITIA PENGADAAN  BARANG/JASA  DALAM RANGKA PROYEK PENGEMBANGAN DAN IMPLEMENTASI TEKNOLOGI INFORMASI  Gedung BRI II Lantai 11,  Jl Jenderal Sudirman Kav. 44‐46, Jakarta 10210 Telepon : (62‐21) 571 3500 (Hunting)   Faksimile: (62‐21) 573 5006, 573 5007

Page 2: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 1 dari 44

DAFTAR ISI   BAB I. PENGUMUMAN LELANG ........................................................................................................2 BAB II. PENDAHULUAN .....................................................................................................................3

A. INFORMASI UMUM.............................................................................................................................. 3 B. DASAR HUKUM..................................................................................................................................... 3 C. RENCANA KEGIATAN LELANG .............................................................................................................. 3

BAB III. RENCANA KERJA DAN SYARAT‐SYARAT (RKS) ......................................................................5 A.  UMUM................................................................................................................................................. 5 B.  DOKUMEN LELANG.............................................................................................................................. 6 C. PENYUSUNAN DOKUMEN PENAWARAN.............................................................................................. 7 D.  PEMBUKAAN DAN EVALUASI PENAWARAN...................................................................................... 10

BAB III LEMBAR DATA PENGADAAN (LDP)......................................................................................16 BAB VI. KERANGKA ACUAN TEKNIS ................................................................................................18

A. BLADE SERVER SPECIFICATION........................................................................................................... 18 B. SAN STORAGE SPECIFICATION............................................................................................................ 23 C. UPS SPECIFICATION ............................................................................................................................ 24 D. DESKTOP............................................................................................................................................. 25 E. SOFTWARE SPECIFICATION................................................................................................................. 25

LAMPIRAN I  FORMAT SURAT PENAWARAN ..................................................................................26 LAMPIRAN 2 SURAT JAMINAN PENAWARAN.................................................................................27 LAMPIRAN 3  CONTOH SURAT KUASA............................................................................................28 LAMPIRAN 4  DOKUMEN ISIAN.......................................................................................................29 LAMPIRAN 5 FORM ISIAN DATA TEKNIS .........................................................................................38 LAMPIRAN 6 FORMAT PENAWARAN HARGA .................................................................................39

  

Page 3: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 2 dari 43

BAB I. PENGUMUMAN LELANG   

 

UNDANGAN LELANG Nomor : PENG‐47/HS/XI/PA/2008 

 

Lembaga  Penjamin  Simpanan  (LPS)  mengundang  perusahaan  untuk  mengikuti  proses  lelang  Pengadaan Perangkat Keras dan Perangkat Lunak.    I. Persyaratan Perusahaan yang dapat mengikuti lelang. 

- Mengisi dan mengirimkan dokumen penawaran; - Mempunyai partnership dengan major principal perangkat keras dan perangkat lunak; - Memiliki pengalaman dalam pengadaan dan implementasi perangkat keras dan perangkat 

lunak; - Memiliki surat  izin usaha sesuai dengan bidang usahanya yang dikeluarkan oleh  instansi 

pemerintah yang berwenang ;      

II. Dokumen  lelang dapat dilihat dan diunduh mulai tanggal 3 s.d 5 November 2008 di   website LPS (www.lps.go.id). 

III. Peserta  yang  berhak  mengikuti  aanwijzing  adalah  peserta  yang  mendaftar  dan  mampu menunjukan bukti partnership dengan major principal pada saat pendaftaran. 

 Jakarta, 3 November  2008 

PANITIA PENGADAAN  BARANG/JASA  DALAM RANGKA PROYEK PENGEMBANGAN DAN IMPLEMENTASI TEKNOLOGI INFORMASI LEMBAGA PENJAMIN SIMPANAN 

 

Page 4: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 3 dari 44

BAB II. PENDAHULUAN  A. INFORMASI UMUM 

1. Pengguna  Jasa  Teknologi  Informasi  adalah  Lembaga  Penjamin  Simpanan  (LPS).  LPS adalah suatu  lembaga  independen, yang dibentuk berdasarkan Undang‐Undang Nomor 24 Tahun 2005 tentang Lembaga Penjamin Simpanan. 

2. Sumber pendanaan adalah Anggaran Lembaga Penjamin Simpanan. 

 B. DASAR HUKUM 

1. Keputusan Dewan Komisioner Nomor 013/DK‐LPS/X/2005 tentang Pedoman Pengadaan Barang dan Jasa di Lingkungan Lembaga Penjamin Simpanan. 

2. Keputusan Kepala Eksekutif Nomor: KEP‐035/KE/IV/2008 tanggal 11 April 2008 tentang Pembentukan Proyek Pengembangan dan Implementasi Teknologi Informasi; 

3. Keputusan  Koordinator  Proyek  No.    NOMOR:    KEP‐01/ERP/IV/KP/2008  tentang Pengangkatan  Panitia  Pengadaan    Barang/Jasa   Dalam  Rangka  Proyek  Pengembangan dan Implementasi Teknologi Informasi Lembaga Penjamin Simpanan. 

4. Keputusan  Kepala  Eksekutif  Nomor:  003/KE/I/2008  tanggal  18  Januari  2008  tentang Tahapan  Pengembangan  Teknologi  Informasi  Lembaga  Penjaminan  Simpanan sebagaimana  telah  diubah  dengan    Keputusan  Kepala  Eksekutif  Nomor:  KEP‐034/KE/IV/2008  tanggal  10  April  2008  Tentang  Perubahan  Atas  Keputusan  Kepala Eksekutif   Nomor: 003/Ke/I/2008  tentang Tahapan Pengembangan Teknologi  Informasi Lembaga  Penjaminan  Simpanan,  Tahapan  Pengembangan  Teknologi  Informasi (Information Technology Roadmap) Lembaga Penjamin Simpanan.    

5. Sumber pendanaan adalah anggaran LPS tahun 2008. 

C. RENCANA KEGIATAN LELANG 

Rncian rencana jadwal dan kegiatan lelang adalah: 

No.  Kegiatan  Waktu  Jadwal 

1.  Pengumunan di Surat Kabar dan Web Site 

3/11/2008   

2.  Pengambilan dokumen lelang di Website 

3 s.d 5/11/2008   

3.  Pendaftaran Peserta Aanwaijzing  4 s.d 6/11/2008 

Tempat Pendaftaran : Gedung BRI II Lantai 11, Jl. Jenderal Sudirman Kav 44‐46,  Jakarta 10210 Telp. 62‐21‐5713500 Fax. 62‐21‐5735006 

 

4.  Rapat penjelasan pekerjaan (aanwajzing) 

13/11/2008   

5.  Pemasukan dokumen penawaran  14 s.d 20/11/2008   

6.  Pembukaan dokumen penawaran  20/11/2008 Waktu: 

16.30 WIB di Kantor LPS 

7.  Penilaian  dokumen penawaran  21 s.d 25/11/2008   

Page 5: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 4 dari 44

8.  Klarifikasi   26/11/2008   

9.  Usulan dan penetapan pemenang  27 s.d 28/11/2008   

10.  Pengumuman hasil evaluasi  2/12/2008 Diumumkan di web site lps www.lps.go.id 

 11.  Masa Sanggah  3 s.d 5/12/2008   

12.  Penandatanganan kontrak  8s.d 10/12/2008   

 

Peserta dianggap menyatakan diri telah membaca dan mengetahui dengan benar isi seluruh dokumen pengadaan ini apabila telah menyerahkan dokumen penawarannya. 

Page 6: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 5 dari 44

BAB III. RENCANA KERJA DAN SYARAT‐SYARAT (RKS) 

A.  UMUM 

Dalam RKS ini dipergunakan istilah‐istilah dan singkatan‐singkatan sebagai berikut: • KKN adalah Korupsi, Kolusi dan Nepotisme; • LDP  adalah Lembar Data Pengadaan (Bab III); • KAT adalah Kerangka Acuan Teknis (Bab IV); • Panitia  Pengadaan  adalah  tim  yang  diangkat  /  dibentuk  oleh  Koordinator  Proyek  untuk 

melaksanakan pengadaan barang dan jasa; • Koordinator  Proyek  adalah  Pejabat  setingkat  Direktur  yang  berwenang  dan  bertanggung 

jawab atas pelaksanaan Proyek Pengembangan dan Implementasi Teknologi Informasi. • RKS adalah Rencana Kerja dan Syarat; • SPP adalah Surat Penetapan Pemenang; • SPPP adalah Surat Penunjukan Pelaksana Pekerjaan;  

1. Lingkup Pekerjaan 

1.1   Lingkup  pekerjaan  sebagaimana  ditetapkan  dalam  KAT  termasuk  instalasi  dan konfigurasi sistem perangkat keras dan perangkat lunak. 

1.2  Peserta  yang  ditunjuk  menjadi  pemenang  lelang  berkewajiban  untuk menyelesaikan pekerjaan dalam jangka waktu yang tercantum dalam LDP.  

2. Sumber Dana 

2.1    Sumber pendanaan adalah anggaran Lembaga Penjamin Simpanan sebagaimana tercantum dalam LDP. 

3. Peserta Lelang  

3.1   Peserta yang dapat mengikuti  tahapan  lelang  ini adalah Peserta yang memenuhi kriteria sesuai dengan LDP.  

4. Larangan Korupsi, Kolusi, dan  Nepotisme (KKN) serta Penipuan 

4.1   Peserta Lelang dan pihak yang terkait dengan pengadaan  ini berkewajiban untuk mematuhi  etika  pengadaan  barang  dan  jasa  dan  tidak  melakukan  tindakan‐tindakan yang dilarang sebagai berikut: (a)   berusaha mempengaruhi Koordinator Proyek   atau anggota Panitia dalam 

bentuk  dan  cara  apapun,  baik  langsung  maupun  tidak  langsung  untuk memenuhi  keinginan Peserta  Lelang  yang bertentangan dengan  ketentuan dan  prosedur  dalam  Dokumen  Lelang,  dan/atau  peraturan  perundang‐undangan yang berlaku; 

(b)   melakukan  persekongkolan  dengan  peserta  lain  untuk  mengatur  harga penawaran  di  luar  prosedur  pelaksanaan  pengadaan  sehingga mengurangi/menghambat/memperkecil  dan/atau  meniadakan  persaingan yang sehat dan/atau merugikan pihak lain; 

(c)   membuat  dan/atau  menyampaikan  dokumen  dan/atau  keterangan  lain yang tidak benar untuk memenuhi persyaratan dalam Dokumen Lelang; 

(d)  melakukan  tindakan    korupsi,  kolusi  dan  nepotisme  serta  penipuan  selain sebagaimana tersebut pada butir a, b dan c. 

 

Page 7: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 6 dari 44

4.2  Peserta Lelang yang terbukti melanggar kewajiban sebagaimana dimaksud di atas dapat dikenakan sanksi‐sanksi sebagai berikut: (a)   sanksi  administrasi,  yaitu  sanksi  yang  dikenakan  oleh  Koordinator  Proyek, 

berupa digugurkan dari proses lelang, dibatalkan sebagai Pemenang Lelang, dibatalkan Kontraknya, dan atau dimasukkan dalam daftar hitam; dan 

(b)   sanksi berdasarkan  peraturan  perundang‐undangan,  berupa  dituntut  ganti rugi/digugat  secara  perdata,  dan/atau  dilaporkan  untuk  diproses  secara pidana. 

   

5. Larangan Pertentangan Kepentingan dan Pembatasan Lainnya 

5.1  Peserta  lelang  dilarang  untuk  memiliki  pertentangan  kepentingan,  khususnya dalam  hal  sedang  atau  pernah memiliki  hubungan  baik  langsung maupun  tidak langsung dengan peserta yang terkait dengan pelaksanaan pekerjaan ini  

 

6. Satu Penawaran Tiap Peserta Lelang 

6.1   Setiap  Peserta  Lelang,  hanya  diperbolehkan  untuk  menyampaikan  satu penawaran. Peserta Lelang yang menyampaikan  lebih dari satu penawaran akan digugurkan.  

 

B.  DOKUMEN LELANG 

7.  Isi Dokumen Lelang 

7.1   Dokumen Lelang yang akan diterima peserta terdiri dari: 1. Pengumuman; 2. Rencana Kerja dan Syarat(RKS); 3. Lembar Data Pengadaan (LDP); 4. Kerangka Acuan Teknis (KAT); dan 5. Lampiran .  

7.2.  Dokumen Penawaran  yang harus disampaikan kepada Panitia Pengadaan  terdiri dari:  a. Surat Penawaran; b. Jaminan Penawaran(3% dari Harga Penawaran); c. Surat Kuasa (jika yang menandatangani surat penawaran bukan pejabat yang 

memiliki kewenangan); d. Dokumen Administrasi; e. Dokumen Teknis;dan f. Dokumen Penawaran Harga. 

 7.3  Peserta  Lelang  berkewajiban  memeriksa  keseluruhan  instruksi,  bentuk‐bentuk 

dokumen, syarat‐syarat, dan spesifikasi yang ditetapkan dalam Dokumen Lelang. Kelalaian menyampaikan  keterangan  yang  disyaratkan  dalam  Dokumen  Lelang atau menyampaikan Dokumen Penawaran yang tidak memenuhi persyaratan yang ditetapkan dalam Dokumen Lelang sepenuhnya merupakan risiko Peserta Lelang. 

 

8. Rapat Penjelasan (Aanwijzing) 

8.1   Bagi peserta yang akan mengkuti Rapat Penjelasan diwajibkan untuk mendaftar terlebih dahulu ke LPS. 

Page 8: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 7 dari 44

8.2  Panitia akan mengadakan acara penjelasan  (aanwijzing) pada tempat dan waktu yang ditentukan dalam LDP. 

8.3  Peserta  Lelang  yang  tidak  menghadiri  acara  penjelasan  tidak  dapat ditolak/digugurkan. 

8.4   Dalam  acara  penjelasan,  Panitia menjelaskan  kepada  peserta  lelang  sekurang‐kurangnya mengenai: (a)   metode lelang; (b)   metode penyampaian Dokumen Penawaran; (c)   dokumen penawaran yang diatur dalam RKS; (d)   acara pembukaan penawaran; (e)   metode evaluasi penawaran;   (g)   Bentuk kontrak harga paket pekerjaan yang akan digunakan.  

8.5  Hasil  acara  penjelasan  akan  dituangkan  dalam  Berita  Acara  Penjelasan  yang ditandatangani oleh Panitia dan sekurang‐kurangnya 1 (satu) wakil Peserta Lelang yang hadir. Berita Acara Penjelasan merupakan bagian yang tidak terpisahkan dari Dokumen Lelang.  

C. PENYUSUNAN DOKUMEN PENAWARAN 

10. Biaya dalam Penyiapan Penawaran 

10.1 Peserta  Lelang menanggung  semua biaya dan/atau kerugian yang  terjadi   dalam proses lelang. 

11. Bahasa dalam Penawaran 

11.1. Dokumen Penawaran beserta seluruh korespondensi tertulis menggunakan Bahasa Indonesia.  

11.2.Terminologi  yang  terkait  dengan  Data/Informasi  Teknis  pekerjaan  dapat menggunakan Bahasa Indonesia atau Bahasa Inggris. 

12. Penyampaian Dokumen Penawaran 

12. 1   Surat Penawaran (Contoh Surat Penawaran Lampiran 1) • Surat  penawaran mencakup  penawaran  tentang  dokumen  administrasi, 

dokumen teknis dan dokumen penawaran harga. • Surat  penawaran  dibuat  menurut  bentuk  tertentu  sesuai  contoh  pada 

lampiran I dokumen pengadaan ini. • Surat penawaran asli harus bermeterai Rp 6.000,00 (enam ribu rupiah)  

12.2  Jaminan Penawaran (Contoh Jaminan Penawaran Lampiran 2) • Jaminan  penawaran  berupa  bank  garansi  yang  diterbitkan  oleh  bank 

umum. • Jaminan  penawaran  ditentukan  sebesar  3%  (tiga  per  seratus)  dari  nilai 

penawaran yang diajukan dengan masa berlaku selama 60  (enam puluh) hari kalender terhitung sejak tanggal surat penawaran. 

• Apabila  diperlukan,  panitia  dapat  meminta  agar  jaminan  dimaksud diperpanjang masa berlakunya. 

• Jaminan  penawaran  dapat  dicairkan  oleh  panitia  apabila  pelaksana pekerjaan yang ditunjuk sebagai pemenang mengundurkan diri. 

• Jaminan  penawaran  segera  dikembalikan  apabila  peserta  tidak menjadi calon pemenang. 

 

Page 9: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 8 dari 44

12.3  Surat  Kuasa  dari  pemimpin/direktur  utama  perusahaan  kepada  penerima  kuasa yang  namanya  tercantum  dalam  akta  pendirian  atau  perubahannya,  apabila dianggap perlu (Contoh Surat Kuasa dalam Lampiran 3);  

 12.4  Surat  penawaran  dan  jaminan  disertai  dengan  dokumen  penawaran  1  (satu) 

sampul yang memuat Penawaran Administrasi, Penawaran Teknis dan Penawaran Harga. 

 12.5  Penawaran Administrasi  terdirI dari : 

(a) Formulir Data Isian (lihat lampiran 4)  (b) Copy Dokumen yang terdiri dari : 

• Dokumen administrasi disampaikan dengan urutan: • Fotokopi  akta  pendirian  perusahaan  yang  telah  diumumkan  dalam 

tambahan berita negara dan akta perubahan terakhir anggaran dasar (jika ada); 

• Fotokopi  neraca  perusahaan  tahun  terakhir  (neraca  yang  sudah  diaudit oleh akuntan publik, untuk perusahaan dengan aset di atas Rp 2 milyar); 

• Fotokopi surat keterangan Nomor Pokok Wajib Pajak (NPWP); • Fotokopi surat pengukuhan sebagai Pengusaha Kena Pajak (PKP); • Fotokopi Surat Izin Usaha Perdagangan (SIUP); • Fotokopi Tanda Daftar Perusahaan (TDP) yang masih berlaku; • Fotokopi bukti pelunasan pajak tahun 2007; • Fotokopi  kontrak  pengalaman  perusahaan  dalam  pengadaan  perangkat 

keras  dan  perangkat  lunak  dalam  2  (dua)  tahun  terakhir,  dengan  nilai kontrak    Rp 2  Milyar ,‐ (dua milyar) atau lebih. 

 12.6 Dokumen‐dokumen asli yang harus diperlihatkan pada waktu pembukaan sampul 

adalah: (a) Akta pendirian perusahaan dan perubahannya; (b) Surat Kuasa (bila ada). 

 12.7   Untuk  dokumen‐dokumen  yang  telah  habis masa  berlakunya  dan masih  dalam 

proses  pengurusan  perpanjangannya,  agar  diperlihatkan  bukti  asli  pengurusan perpanjangannya dan disampaikan fotokopinya. 

 12.8 Penawaran Teknis terdiri dari : 

(a)   Form Isian Data Teknis (dalam bentuk Excel File dalam lampiran 5)  (b)  Asli  surat  dukungan  dari  principal/pabrikan  untuk  mengikuti  pengadaan 

blade chassis dan server, storage, serta ups; (c)  Merk,  tipe, dan  spesifikasi  teknis dari barang  yang ditawarkan  serta masa 

purna jualnya; (d)   Asli brosur dari barang yang ditawarkan atau fotokopi brosur yang distempel 

prinsipal/distributor. (e)  Jangka waktu pelaksanaan pekerjaan.  

12.9  Penawaran harga dibuat menurut bentuk tertentu sesuai contoh pada  lampiran 6  dokumen pengadaan ini.    

12.10   Syarat Penawaran Harga  (a)   Persyaratan dokumen harga/biaya: 

• Biaya  pekerjaan  adalah  seluruh  biaya  yang  dikeluarkan  yang  terkait dengan proyek ini dari awal sampai dengan selesai. 

Page 10: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 9 dari 44

• Harga  barang  yang  ditawarkan  sudah  termasuk  biaya  meterai,  biaya pengiriman, biaya pemeriksaan/pemasangan/ujicoba, purna jual selama 3 (tiga) bulan, dan pajak‐pajak yang berlaku serta biaya  lain sesuai dengan ketentuan yang berlaku. 

• Penawaran harga menggunakan mata uang rupiah.  (b)   Dalam menyusun  penawaran  harga  peserta  lelang  harus memperhatikan 

hal‐hal sebagai berikut: • Peserta  Lelang  berkewajiban  untuk  mencantumkan  harga  satuan  dan 

harga total untuk tiap mata pembayaran/pekerjaan dalam Rincian Harga. • Jika harga satuan ditulis nol atau tidak dicantumkan maka kegiatan dalam 

mata pembayaran tersebut dianggap telah termasuk dalam harga satuan kegiatan yang lain dan kegiatan tersebut tetap harus dilaksanakan. 

• Semua  pajak,  bea,  retribusi,  dan pungutan  lain  yang  harus  dibayar oleh Peserta untuk Pengadaan Perangkat Keras dan Perangkat Lunak termasuk dalam total harga penawaran. 

13. Mata Uang  

13.1   Semua harga dalam penawaran harus diajukan dalam mata uang Rupiah.  

14. Cara Pembayaran 

14.1   Tata cara pembayaran akan diatur dalam Kontrak. 

15. Masa Berlaku Penawaran 

15.1  Masa berlaku Penawaran sesuai dengan ketentuan dalam LDP. 

16.  Jangka Waktu Pelaksanaan 

16.1    Jangka  waktu  pelaksanaan    pekerjaan  yang    ditawarkan  tidak  diperkenankan melebihi jangka waktu yang ditetapkan dalam LDP. 

17. Tata Cara Penyampaian Dokumen Penawaran 

17.1  Peserta Lelang berkewajiban untuk menyampaikan 1 (satu) Dokumen Penawaran asli   dan mencantumkan kata “ASLI” pada   halaman   terdepan.     Selain dokumen asli,    Peserta    Pengadaan  berkewajiban  untuk  menyampaikan  copy  dokumen sebanyak 2 (dua) rangkap.  

18. Penandatanganan Surat Penawaran 

18.1  Surat  Penawaran  dan  Formulir  Penawaran Harga  asli  harus  ditandatangani  oleh pemimpin/direksi  perusahaan  atau  penerima  kuasa  dari  direksi  sebagaimana diatur dalam akte pendirian/perubahannya yang dibuktikan dengan Surat Kuasa, atau  kepala  cabang  perusahaan  yang  diangkat  oleh  kantor  pusat  yg  dibuktikan dengan Akta Otentik.  

18.2   Surat Penawaran harus bertanggal dan bermaterai. 

19. Penyampulan Dokumen Penawaran dan Penandaan Sampul Penawaran 

19.1  Peserta  Lelang  berkewajiban  menyampaikan  satu  berkas  asli  atas  Dokumen Administrasi, Dokumen  Teknis  dan Dokumen  Penawaran Harga, masing–masing dimasukkan  ke  dalam  sampul/amplop  yang  terpisah.  Pada  bagian  luar sampul/amplop tersebut dicantumkan kalimat “ASLI PENAWARAN ” atau  dan jenis pekerjaan, identitas serta alamat Peserta Lelang.  

Page 11: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 10 dari 44

19.2  Berkas  penawaran  asli  yang  telah  tersampul  tersebut,  bersama  dengan  3  (tiga) berkas  copy  untuk  masing‐masing  Penawaran  Administrasi,  Teknis  dan  Harga kemudian digabungkan ke dalam   satu sampul, direkat, dan pada bagian  luarnya hanya dicantumkan kata untuk: 

 (a)  “DOKUMEN  PENAWARAN  PENGADAAN  PERANGKAT  KERAS  DAN  PERANGKAT 

LUNAK,  DATA PENAWARAN ASLI dan 3 (TIGA) COPY • ADMINISTRASI,  • TEKNIS • HARGA  ” 

(b)   jenis pekerjaan; (c)  nama Peserta Lelang; (d)   alamat Peserta Lelang ; dan  (e)   alamat yang dituju adalah  

PANITIA  PENGADAAN    BARANG/JASA    DALAM  RANGKA  PROYEK PENGEMBANGAN  DAN  IMPLEMENTASI  TEKNOLOGI  INFORMASI  LEMBAGA PENJAMIN SIMPANAN   di Gedung BRI II Lantai 11,  Jl. Jenderal Sudirman Kav 44‐46,  Jakarta 10210 

20. Batas Akhir Waktu Penyampaian Penawaran 

20.1  Penawaran  harus    sudah  diterima  oleh  Panitia  Pengadan  paling  lambat  pada tempat dan waktu yang ditentukan dalam LDP. 

 20.2   Panitia dapat mengundurkan batas akhir waktu penyampaian penawaran dengan 

menetapkan Adendum yang diatur dalam RKS sehingga semua hak dan kewajiban Panitia Pengadaan dan para Peserta Lelang disesuaikan dengan batas akhir waktu penyampaian penawaran yang baru. 

21. Penawaran Terlambat 

21.1   Setiap  penawaran  yang  diterima  oleh  Panitia  Pengadaan  setelah  batas  akhir waktu  penyampaian  penawaran  akan  ditolak  dan  dikembalikan  kepada  Peserta lelang  yang bersangkutan.  Jika  tidak diambil dalam waktu 7  (tujuh) hari Panitia Pengadaan tidak bertanggungjawab atas dokumen tersebut. 

 

22.Penarikan, Penggantian, Pengubahan, dan Penambahan Penawaran 

22.1   Penawaran  yang  telah  diterima  Panitia  tidak  dapat  ditarik/  diganti  /diubah /ditambah oleh Peserta Lelang setelah batas akhir penyampaian penawaran. 

 22.2   Penarikan  dan  atau  pengubahan Dokumen  Penawaran  yang  telah diterima oleh 

Panitia  hanya  dapat  dilakukan  sebelum  batas  akhir  waktu  penyampaian penawaran.  

D.  PEMBUKAAN DAN EVALUASI PENAWARAN 

23. Pembukaan Penawaran 

23.1  Dokumen  Penawaran  akan  dibuka  di  hadapan  Peserta  Lelang  pada waktu  dan tempat sesuai ketentuan dalam LDP. 

 23.2  Pembukaan  penawaran  dilakukan  dengan  dihadiri  sekurang‐kurangnya  2  (dua) 

wakil Peserta  lelang sebagai saksi. Apabila setelah ditunda 2 (dua) jam, dan tidak 

Page 12: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 11 dari 44

terdapat  2  (dua)  orang  saksi  dari  Peserta  lelang,  maka  pembukaan  Dokumen Penawaran tetap dilanjutkan dengan menunjuk 2 (dua) orang saksi di luar Panitia Pengadaan. 

 23.3   Pada  acara  pembukaan  dimulai,  Panitia  Pengadaan  memeriksa  dokumen 

penawaran dengan menunjukkan Data  Harga Penawaran ke semua peserta yang hadir. 

   23.4   Panitia Pengadaan akan membuat berita acara pembukaan penawaran.  

24. Kerahasiaan Proses 

24.1   Proses  dan  hasil  evaluasi  penawaran,  keterangan‐keterangan  lain  yang  terkait, dan usulan penetapan pemenang yang keseluruhannya disimpulkan dalam berita acara  hasil  lelang  oleh  Panitia  bersifat  rahasia  dan  tidak  boleh  diungkapkan kepada  peserta  lelang  atau  pihak  lain  yang  tidak  terkait  dengan  pelaksanaan pemilihan sampai dengan saat penandatanganan Kontrak.  

 24.2   Peserta  Lelang  dilarang  untuk  mempengaruhi  Panitia  agar  mengevaluasi 

penawaran  atau menetapkan  usulan  pemenang  sesuai  dengan  kepentingannya. Pelanggaran atas larangan ini dapat dikenakan sanksi yang diatur dalam  RKS. 

 

25. Klarifikasi Dokumen Penawaran 

25.1  Jika  dalam  evaluasi  penawaran  terdapat  hal‐hal  yang  kurang  jelas  atau meragukan dari paparan administratif, teknis, dan harga, Panitia dapat meminta klarifikasi dari Peserta Lelang  yang terkait. Hasil klarifikasi tersebut akan dijadikan dasar dalam proses penilaian Dokumen Penawaran. 

  25.2  Klarifikasi akan dilakukan oleh Panitia Pengadaan kepada pemimpin/ pejabat yang 

memiliki kewenangan atau wakil yang memperoleh kuasa penuh dari pemimpin/ pejabat yang memiliki kewenangan yang dinyatakan dengan Surat Kuasa. 

  25.3  Hasil  klarifikasi  oleh  Panitia  Pengadaan  tidak  dapat  mengubah  substansi 

penawaran.   

26. Evaluasi Penawaran 

26.1   Panitia  Pengadaan  akan  melakukan  evaluasi  terhadap  semua  dokumen penawaran. 

 26.2   Penawaran  dievaluasi  dengan  cara  memeriksa  dan  membandingkan  Dokumen 

Penawaran  terhadap  pemenuhan  persyaratan  yang  diurut mulai  dari  penilaian terhadap persyaratan administrasi, persyaratan teknis, dan kewajaran harga. 

 26.3  Penawaran dievaluasi berdasarkan metode sistem gugur.  

 

27. Evaluasi Administrasi 

27.1   Evaluasi administrasi merupakan proses evaluasi sebelum dilakukan evaluasi teknis dan harga. 

 

Page 13: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 12 dari 44

27.2  Evaluasi  administrasi menghasilkan dua  kesimpulan,  yaitu memenuhi   atau  tidak memenuhi  persyaratan  administrasi.  Penawaran  memenuhi  persyaratan administrasi jika: (a)   persyaratan dalam Dokumen  Lelang dipenuhi dan diisi dengan  keterangan 

yang  benar  tanpa  ada  penyimpangan  yang  bersifat  penting/pokok  atau penawaran bersyarat;  

(b)   Surat Penawaran: 1)   ditandatangani sesuai dengan RKS;  2)   masa berlaku sesuai dengan RKS;  3)   jangka waktu pelaksanaan pengadaan sesuai dengan  RKS; 4)   bertanggal dan bermeterai cukup; 5)   Surat Jaminan Penawaran memenuhi persyaratan yang ditentukan; dan 6)   Daftar Kuantitas dan Harga diisi dengan lengkap. 

(c)   Jaminan Penawaran memenuhi persyaratan yang diatur dalam  RKS; dan (d)   Daftar Kuantitas dan Harga diisi dengan lengkap.   

27.3   Penawaran yang tidak memenuhi persyaratan administrasi dinyatakan gugur.  27.4  Peserta  yang  dinyatakan  gugur  dapat mengambil  dokumen  penawaran  setelah 

pengumuman  pemenang,    kecuali  dokumen  asli  tetap  disimpan  oleh  Panitia Pengadaan.  Jika  tidak  diambil  dalam  waktu  waktu  7  (tujuh)  hari  panitia  tidak bertanggungjawab atas dokumen tersebut. 

 

28. Evaluasi Teknis  

28.1 Evaluasi teknis dilakukan terhadap semua penawaran yang memenuhi persyaratan administrasi. Evaluasi teknis menghasilkan dua kesimpulan, yaitu memenuhi  atau tidak  memenuhi  persyaratan  teknis.  Penawaran  dinyatakan  memenuhi persyaratan teknis apabila:  (a)   memenuhi spesifikasi teknis pengadaan seperti yang ditetapkan dalam KAT;  (b)   jadwal waktu penyelesaian pengadaan  tidak melampaui batas waktu yang 

diatur dalam LDP;  (c)   model  barang yang ditawarkan tercantum dengan lengkap dan jelas;  (d)   jumlah  item  barang  dan  penyelesaian  pekerjaan  terkait  tidak  kurang  dari 

yang ditetapkan dalam KAT; dan (e)   memenuhi syarat teknis lainnya yang ditetapkan. 

 28.2   Penawaran yang tidak memenuhi persyaratan teknis  dinyatakan gugur. 

 

29. Evaluasi Harga 

29.1  Evaluasi  harga  penawaran  berdasarkan  Daftar  Kuantitas  dan Harga  yang  telah dilengkapi  oleh  Peserta  Pengadaan  dilakukan  terhadap  semua  penawaran  yang lulus teknis.  

 29.2  Dampak  perubahan  harga  yang  mungkin  terjadi  selama  masa  pelaksanaan 

Kontrak berdasarkan ketentuan tidak diperhitungkan dalam evaluasi penawaran.  29.3   Panitia Pengadaan dapat melakukan koreksi aritmatik dengan ketentuan sebagai 

berikut: (a)  jika terdapat perbedaan antara penulisan nilai dalam angka dan huruf maka 

yang berlaku adalah nilai dalam huruf; 

Page 14: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 13 dari 44

(b)  jenis  pekerjaan  yang  tidak  diberi  harga  satuan  dianggap  sudah  termasuk dalam harga satuan pekerjaan yang  lain, dan kolom harga satuan tersebut tetap dibiarkan kosong; 

(c)  volume  pekerjaan  yang  tercantum  dalam  Penawaran  Harga  disesuaikan dengan yang tercantum dalam Penawaran Teknis; 

(c)  jika  terjadi  kesalahan hasil pengalian antara  volume dengan harga  satuan pekerjaan  maka  dilakukan  pembetulan,  dengan  ketentuan  harga  satuan tidak boleh diubah; 

 29.4  Berdasarkan hasil keseluruhan evaluasi penawaran Panitia akan menyusun urutan 

3 (tiga) penawaran terendah yang responsif.  

30. Usulan Nominasi Pemenang 

30.1   Berdasarkan  hasil  penilaian  administrasi,  teknis  dan  harga,    Panitia  Pengadaan menyusun  Peringkat  Pemenang  yang  dituangkan  dalam  Berita  Acara  Penilaian. Panitia Pengadaan mengusulkan Peringkat Pemenang kepada Koordinator Proyek untuk memilih dan menetapkan Pemenang Lelang.  

 

31. Pengumuman Pemenang 

31.1   Koordinator Proyek akan menetapkan Pemenang Lelang melalui SPP.  31.2  Panitia  Pengadaan  mengumumkan  Pemenang  Lelang  pada  web  site  LPS 

(www.lps.go.id).    

32. Sanggahan 

32.1  Peserta Lelang dapat mengajukan sanggahan secara  tertulis kepada Koordinator Proyek  selambat‐lambatnya  3  (tiga)  hari  kerja  setelah  Pengumuman  Pemenang Lelang. 

  32.2  Sanggahan  hanya  dapat  diajukan  jika  disertai  bukti‐bukti  terjadinya 

penyimpangan prosedur yang  meliputi: (a)  Panitia  Pengadaan  dan/atau  Koordinator  Proyek/Pejabat  yang  berwenang 

menyalahgunakan wewenangnya; dan/atau (b)   pelaksanaan  pelelangan  menyimpang  dari  ketentuan  Dokumen  Lelang; 

dan/atau (c)   terjadi  praktik  KKN  di  antara  peserta  lelang  dan/atau  dengan  anggota 

Panitia/Koordinator Proyek/Pejabat yang berwenang; dan/atau (d)   terdapat rekayasa pihak‐pihak tertentu sehingga pelelangan tidak adil, tidak 

transparan, dan tidak terjadi persaingan yang sehat.  

32.3  Terhadap sanggahan yang disampaikan, Koordinator Proyek memberikan jawaban selambat‐lambatnya 5 (lima) hari kerja setelah sanggahan diterima.  

 

33. Penunjukan Pelaksana Pekerjaan  

33.1   Koordinator  Proyek  segera menerbitkan  SPPP  kepada  Pemenang  Lelang  sebagai Pelaksana Pekerjaan. 

 

Page 15: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 14 dari 44

33.2  Peserta  Lelang  yang  ditetapkan  sebagai  pemenang  wajib  untuk  melaksanakan pekerjaan  tersebut.  Jika  pemenang  tersebut  mengundurkan  diri  maka  jaminan penawaran akan dicairkan oleh LPS. 

 33.3  Dalam  hal  Pemenang  Lelang  yang  ditunjuk mengundurkan  diri maka  Pemenang 

Lelang  selanjutnya  adalah  dipilih  dan  ditetapkan  oleh  Koordinator  Proyek  dari peringkat yang telah diajukan Panitia Pengadaan.. 

 33.4  Peserta yang menjadi pemenang dan ditunjuk menjadi Pelaksana Pekerjaan harus 

menyampaikan jaminan pelaksanaan dengan persyaratan sebagai berikut: a)  Dalam  waktu  7  (tujuh)  hari  kalender  sejak  tanggal  surat  penunjukkan 

pemenang,  Pelaksana  Pekerjaan  diwajibkan  menyerahkan  jaminan pelaksanaan  pekerjaan  berupa  bank  garansi  yang  diterbitkan  oleh  bank umum dan disetujui oleh panitia. 

b)  Bank garansi untuk jaminan pelaksanaan pekerjaan sebagaimana dimaksud pada  angka  1  diterbitkan  dalam mata  uang  rupiah  sebesar  5%  (lima  per seratus) dari total harga kontrak. 

c)  Masa  berlakunya  jaminan  pelaksanaan  pekerjaan  adalah  sampai  dengan jangka  waktu  kontrak.  Apabila  waktu  pelaksanaan  terlambat  dari  waktu yang  telah  ditentukan  maka  jaminan  pelaksanaan  tersebut  harus  segera diperpanjang masa berlakunya atas beban Pelaksana Pekerjaan. 

 33.5  Jaminan pelaksanaan dapat dicairkan oleh Koordinator Proyek apabila Pelaksana 

Pekerjaan gagal dalam melaksanakan pekerjaan.   

34 Lelang Gagal dan Lelang Ulang 

34.1  Lelang dinyatakan gagal jika: (a)   jumlah peserta yang memasukkan penawaran kurang dari 3 (tiga); atau (b)   tidak ada penawaran yang memenuhi persyaratan Dokumen Lelang; atau (c)   semua penawaran di atas pagu dana yang tersedia; atau (d)  sanggahan  dari  Peserta  Lelang  atas  kesalahan  prosedur  yang  tercantum 

dalam Dokumen Lelang ternyata benar; atau (e)  sanggahan  dari  Peserta  Lelang  atas  terjadinya  KKN  oleh  calon  Pemenang 

Lelang ternyata benar; atau (f)  semua  calon  Pemenang  Lelang  mengundurkan  diri  dan  tidak  bersedia 

ditunjuk; atau (g)   pelaksanaan  lelang  tidak  sesuai  dengan  ketentuan  Dokumen  Lelang  atau 

prosedur yang berlaku; atau (h)  pengaduan  masyarakat  atas  terjadinya  KKN  dalam  pelaksanaan  lelang 

ternyata benar.  

34.2   Dalam  hal    lelang  dinyatakan  gagal  maka  Koordinator  Proyek memerintahkan lelang  ulang,  dan  jika  dalam  pelaksanaan  lelang    ulang  terjadi  KKN  maka koordinator proyek wajib menghentikan proses pengadaan. 

 34.3   Sehubungan dengan lelang gagal dan lelang ulang, Koordinator Proyek dan Panitia 

tidak bertanggung jawab atas kerugian apapun yang diderita oleh Peserta Lelang.  

35. Penandatanganan Kontrak 

35.1   Sebelum menandatangani Kontrak, Koordinator Proyek dan Pelaksana Pekerjaan berkewajiban  untuk  memeriksa  konsep  Kontrak  yang  meliputi  substansi, 

Page 16: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 15 dari 44

bahasa/redaksional,  angka,  huruf  serta membubuhkan  paraf  pada  lembar  demi lembar dokumen Kontrak. 

 35.2   Jika  Pelaksana  Pekerjaan  menolak  menandatangani  Kontrak  maka  SPPP  yang 

bersangkutan  dibatalkan  dan  jaminan  penawaran  dicairkan  oleh  Koordinator Proyek. 

 353   Pelaksana  Pekerjaan  harus memulai  pelaksanaan  pekerjaan  setelah  dikeluarkan 

SPMK (Surat Perintah Mulai Kerja) oleh Koordinator Proyek. 

Page 17: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 16 dari 44

BAB III LEMBAR DATA PENGADAAN (LDP)   

Jenis  Uraian A. Lingkup Pekerjaan  1. Judul pekerjaan  :  

”Pengadaan Perangkat Keras dan Perangkat Lunak” 2. Alamat Pekerjaan  :  

Gedung BRI II Lantai 11,  Jl. Jenderal Sudirman Kav 44‐46,  Jakarta 10210 Telp. 62‐21‐5713500 Fax. 62‐21‐5735006 

 3. Nomor pekerjaan  : 02 4. Kategori pekerjaan  : Pengadaan Barang   

B. Jangka Waktu Pelaksanaan Pekerjaan 

60 hari kalender  

C. Harga Perkiraan Sendiri dan Sumber Dana 

HPS: Rp 1.021.000.000,00 (sebagai informasi asumsi US$ 1 = Rp 9.100,‐) termasuk pajak yang terkait. 

Anggaran 2008 Lembaga Penjamin Simpanan.  Penjelasan  isi  Dokumen  Lelang  (aanwijzing)  akan dilaksanakan pada: 

D. Penjelasan Dokumen Lelang 

Hari Tanggal Pukul Tempat 

: Kamis : 13 November 2008 :  10.00 WIB s.d Selesai :  Gedung BRI II Lantai 11,   Jl. Jenderal Sudirman Kav 44‐46,   Jakarta 10210  Telp. 62‐21‐5713500 

    Fax. 62‐21‐5735006  

E. Mata Uang Penawaran  

Bentuk mata uang penawaran: Rupiah   

F. Cara Pembayaran  Pembayaran  dilakukan  dengan  cara  Termin  sesuai  dengan yang tercantum dalam kontrak  

G. Masa Berlaku Penawaran dan Jaminan Penawaran 

Masa  berlaku  penawaran:  60  (enam  puluh)   Hari  Kalender sejak batas akhir penyampaian penawaran.  Mulai Tanggal : 11 s.d 20 November 2008 H. Waktu Penyampaian 

Penawaran  Pukul Tempat 

: 14.00 s.d 16.00 WIB : Gedung BRI II Lantai 11,  Jl. Jenderal Sudirman Kav 44‐46,  Jakarta 10210 Telp. 62‐21‐5713500 

  Fax. 62‐21‐5735006  

I. Pembukaan Penawaran  Pembukaan penawaran akan dilaksanakan pada: 

Page 18: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 17 dari 44

Hari Tanggal Pukul Tempat 

: Kamis : 20 November 2008 : 16.30 WIB : Gedung BRI II Lantai 11,  Jl. Jenderal Sudirman Kav 44‐46,  Jakarta 10210 Telp. 62‐21‐5713500 

  Fax. 62‐21‐5735006  

J. Evaluasi Penawaran  Metode evaluasi:  Sistem Gugur dengan preferensi harga yang terendah  

K. Kriteria Peserta Lelang  i. Mengisi dan mengirimkan dokumen penawaran; ii. Mempunyai  partnership  dengan  major  principal 

perangkat keras dan perangkat lunak; iii. Memiliki  pengalaman  dalam  pengadaan  perangkat 

keras dan perangkat lunak; iv. Memiliki  surat  izin  usaha  sesuai  dengan  bidang 

usahanya  yang  dikeluarkan  oleh  instansi  pemerintah yang berwenang ; 

v. Surat  penyampaian  dokumen  penawaraan ditandatangani oleh pejabat yang berwenang;   

vi. Tidak  dalam  pengawasan  pengadilan,  tidak  bangkrut, kegiatan  usahanya  tidak  sedang  dihentikan,  dan/atau tidak sedang menjalani sanksi pidana yang dinyatakan dalam Surat Pernyataan; 

vii. Telah  melunasi  kewajiban  pajak  tahun  terakhir (SPT/PPh) serta memiliki laporan bulanan PPh Pasal 25 atau Pasal 21/Pasal 23 atau PPN sekurang‐kurangnya 3 (tiga)  bulan  terakhir,  kecuali  untuk  perusahaan  baru yang belum berkewajiban untuk melapor; 

viii. Selama  4  (empat)  tahun  terakhir  pernah  memiliki pengalaman  menyediakan  perangkat  keras  dan perangkat lunak termasuk pengalaman subkontrak; 

ix. Memiliki  kinerja  baik  dan  tidak  masuk  dalam  daftar sanksi atau daftar hitam di suatu instansi pemerintah; 

x. Memiliki  personil  yang mempunyai  kompetensi untuk melaksanakan pekerjaan; 

xi. Tidak membuat  pernyataan  yang  tidak  benar  tentang kompetensi dan kemampuan usaha yang dimiliki; 

 

Page 19: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 18 dari 44

BAB VI. KERANGKA ACUAN TEKNIS 

Spesifikasi teknis pengadaan perangkat keras dan perangkat lunak tercantum dibawah ini: 

A. BLADE SERVER SPECIFICATION 

  I. Chassis Blade 

 

  1.1 Blade chassis shall be 19" Electronic Industries Alliance Standard width rack mountable and provide appropriate rack mount kit. 

    1.2 Blade chassis shall support at least twelve 1 height unit (1U) hot swappable blades. 

 

  1.3 Blade chassis shall be shipped with all cables and parts required to attach all included peripherals to other blade chassis as required for normal operation (e.g. power cords, keyboard / mouse cables, video cables, network and internal disk cables). 

 

  1.4 Blade chassis shall provide a device capable of reading a 1.44 MB floppy or provide an alternate way of installing operating system and application software and performing firmware upgrades. This device shall be dynamically re‐configurable and assignable to any one of the blades in the chassis for the purpose of transferring data to and from the floppy disk to and from the blade. 

 

  1.5 Blade chassis shall provide a device capable of reading a CD/DVD disc at a minimum 48x speed or provide an alternate way of installing operating system and application software and performing firmware upgrades. This device shall be dynamically re‐configurable and assignable to any one of the blades in the chassis for the purpose of transferring data to and from the CD‐ROM disc to and from the blade. 

 

  1.6 The Blade Chassis power supply shall operate at a nominal input voltage of 200VAC to 240VAC and with a power rating that supports a fully loaded system running at a 100% duty‐cycle 24 hours a day, 365 days a year. A fully loaded system is defined by this specification as: 

 

    1.6.1 All expansion slots and ports are populated with devices certified for operation in said system by the system Vendor. 

 

    1.6.2 Processor, memory and internal storage are configured at the maximum allowable level as documented by the system Vendor. 

 

    1.6.3 The aforementioned power requirement is to be fulfilled without modification to said system, peripherals or power supply. The aforementioned requirement(s) apply equally to systems with a single power supply configuration, as well as a system with an online fail‐over power supply configuration. Failure to meet these requirements, to the letter, will void any contract. 

    1.7 Blade chassis power supply shall operate at single phase power subsystem. 

 

  1.8 Blade chassis shall be configured with redundant power functionality to mitigate risk of internal power loss. 

    1.9 Blade chassis shall be configured to provide full power to all blade slots. 

 

  1.10 Blade chassis shall be configured with the necessary modules and/or controllers to enable specified blade functionality. 

    1.11 Blade chassis shall be configured to provide full redundant cooling to all blade slots. 

 

  1.12 Blade chassis shall be configured to provide KVM capability from an external keyboard, video monitor and mouse to all blades installed in the chassis – one blade at a time. 

 

  1.13 Blade chassis shall provide a redundant chassis and blade management capability through any one or a combination of firmware, software and hardware. Chassis and blade management shall be accomplished through a web interface. 

 

  1.14 Blade chassis and blade management capability shall monitor the chassis and blades for failure for report to an administrator and for logging to an event log. 

    1.15 Blade chassis and blade management shall provide a capability for firmware upgrades. 

Page 20: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 19 dari 44

 

  1.16 Blade chassis and blade management shall provide a capability for configuring all configurable hardware (e.g. modules or controllers) in the blade chassis and all configurable hardware in all installed blades. 

 

  1.17 Blade chassis shall support at least Xeon Intel processor blades.  Any additional processor support such as AMD, Itanium, Itanium 2 and Power is optional. 

   1.18 Blade chassis shall support all Wake‐on‐Lan (WoL) and Preboot‐eXecution Environment (PXE) 

enabled products. 

 

  1.19 Vendor shall provide documentation of or reference to information published on the internet documenting compliance with requirements 1.1 through 1.18. 

  II. Blade Server 

    2.1 Each blade server shall have at least 1 (one) CPU and support minimal 2 (two) CPUs. 

    2.2 The blade CPUs shall support the x86 instruction set. 

 

  2.3 The blade CPUs shall be AMD or Pentium Chipset (Chipset E7520 or equivalent), and at a minimum, have performance within at least 5% of an Intel 3.0 GHz Xeon with a minimum 2 MB Level 2 (L2) cache.  System shall employ a CPU with performance capabilities equivalent to AMD and/or Pentium 4 chipsets. 

    2.4 The blade shall be WoL and PXE capable. 

   2.5 The blade shall be hot swappable. 

    2.6 The blade shall support at least Xeon Dual Core Intel processor. 

 

  2.7 Vendor shall provide documentation of or reference to information published on the internet documenting compliance with requirements 2.1 through 2.6. 

  III. Blade Server Memory 

 

  3.1 Blade shall contain a minimum Random Access Memory of 1GB DDR2 or higher and can be expanded to at least 8GB without requiring replacing the initial memory. 

    3.2 Blade Random Access Memory (RAM) shall include an error correcting (ECC) feature. 

    3.3 Blade RAM shall have the option for additional DDR2 or higher memory. 

    3.4 Blade RAM shall have the option for DDR2 or higher memory. 

 

  3.5 Vendor shall provide documentation of or reference to information published on the Internet documenting compliance with requirements 3.1 through 3.4. 

  IV. Blade Server Network 

 

  4.1 Each blade shall provide dual integrated network controllers with IPSec, 10/100/1000 Mbps Ethernet bandwidth, auto‐negotiating, load balancing, and fail over capabilities. 

 

  4.2 Vendor shall provide documentation of or reference to information published on the internet documenting compliance with requirements 4.1. 

  V. Blade Media Internal/External Storage: 

 

  5.1 The blade server shall support fibre‐channel host bus adapters to accommodate SANs (Storage Area Networks) devices. 

 

  5.2 The blade shall have, at a minimum, two (2) internal 73 GB Ultra320 SCSI 15000‐rpm to support mirroring. 

 

  5.3 Vendor shall provide documentation of or reference to information published on the internet documenting compliance with requirements 5.1 through 5.2. 

  VI. Graphics/Monitor 

    6.1 Graphics interface not required. 

    6.2 Monitor not required. 

Page 21: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 20 dari 44

 

  6.3 Vendor shall provide documentation of or reference to information published on the Internet documenting compliance with requirements 6.1 through 6.2. 

  VII. Sound 

    7.1 Sound capability not required. 

  VIII. Environmental 

    8.1 The video monitor (when required) shall be MPR‐II compliant. 

    8.2 The fully populated blade chassis shall carry an FCC Class A rating. 

   8.3 The system shall be capable of normal operations in ambient temperatures from 65oF to 90oF. 

 

  8.4 The fully populated blade chassis shall be capable of normal operations in environments with a non‐condensing relative humidity of 20% to 80%. 

 

  8.5 The fully populated blade chassis shall be capable of normal operations at altitudes from sea level to 7,000 feet. 

 

  8.6 The video monitor (when required) shall meet the requirements for United States EPA Energy Star compliance. 

 

  8.7 Vendor shall provide documentation of or reference to information published on the Internet documenting compliance with requirements 8.1 through 8.6. 

  IX. Blade Server Operating System Software 

    9.1 Each Blade shall be offered with the following Operating System (OS) and license options: 

      9.1.1 No Operating System 

     9.1.2 Any current production version of Microsoft Windows Server compatible with the 

offered blade hardware. 

 

    9.1.3 A software image. See terms and conditions paragraph 12 imaging and device driver requirements. 

     9.1.4 License only for the offered version(s) of Microsoft Windows Server edition 

      9.1.5 Red Hat Enterprise Linux 4.x Server operating system and license 

 

   NOTE:  Options 9.1.1, 9.1.2, 9.1.3 and 9.1.5 are mutually exclusive. Option 4 may be added to any of the first three options and will always be combined with option 2. Operating System Software, when required, shall be installed on blade boot device.  License, when required, to be included with system. 

 

  9.2 All offered Blades shall be certified through the Microsoft HCL to execute Windows Server 2003, and through the Red Hat Hardware Catalog to execute Red Hat Enterprise Linux 4.x Server operating system. 

 

  9.3 Blades designated as Windows blades shall have the option of being pre‐loaded with the least cost Windows Server 2003 operating system software available as dictated by the Government. 

 

  9.4 Blades designated with a Red Hat Enterprise Linux requirement shall have the option of being pre‐loaded with the least cost Red Hat Linux operating system software available as dictated by the Government. 

 

  9.5 Media (e.g. 3.5" diskettes, CD‐ROM/DVD) and documentation shall be provided for all pre‐installed software identified in requirements 9.1 through 9.4. 

  X. Warranty 

 

  10.1 All hardware components associated with this contract shall have a minimum 60‐month warranty that shall go into effect at the time of installation by the corporate.  By definition, "all hardware" consists of the blade chassis and the blades therein and its internal components (cards, disk drives, power supply, etc.), monitor (when required), keyboard (when required), and cables. 

 

  10.2 The warranty shall provide 9 x 5 phone and web technical support for vendor supplied hardware and software, utilities and drivers. 

Page 22: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 21 dari 44

 

  10.3 The warranty shall provide two business day on‐site parts and labor maintenance performed by factory trained, authorized technicians for three full years. 

 

  10.4 During the warranty period, the contractor shall be responsible for all repair costs associated with the hardware equipment, except where there is evidence that the corporate physically abused the equipment. 

    10.5 The warranty shall provide higher levels of service 8 hour response time as an available option. 

 

  10.6 An additional year of warranty for hardware, sevice and maintenance shall be provided as an option as indentified in requirements 10.1 through 10.5. 

  XI. Delivery 

 

  11.1 The equipment may be delivered to a site in quantities as specified by the corporate at time of purchase. 

 

  11.2 System unit and all peripherals will be delivered with a detailed shipping invoice indicating the configuration detail of the system associated options/peripherals shipped. This will include the following information: system model, system type, processor speed, number of processors, amount of memory, type of memory, amount of internal disk storage, type of internal disk storage, adapters (additional and integrated), redundant power supply configurations as applicable, required cables, power cord(s) included, Customer added options and associated configuration detail. 

    11.3 All units shall be delivered with a custom image as provided by the corporate (when required). 

 

  11.4 All units shipped shall include blade chassis, blades, options, and video monitor (when required) of the same type and version. 

  XII. Initial Configuration 

   12.1 One complete chassis/enclosure including 

      12.1.1 Full redundant power & cooling 

 

    12.1.2 1 x L2/3 Ethernet Gb switch module (support full layer 3 function and at least has 4 external port and full loaded blade internal port) 

     12.1.3 1 x 4Gb SAN switch module (at least has 4 external port and full loaded blade internal 

port) 

     12.1.4 1 x PCI Express I/O Expansion Unit 

      12.1.5 1 x Eicon SNA Card S91 V2 

     12.1.6 Chassis warranty 5 years parts, labor, onsite, Next Business Day (NBD), and 9x5 

    12.2 Eight blade servers. 

      12.2.1 First Blade 

 

     12.2.1.1   1 (one) Intel Xeon Quad Core E5430 80W 2.66 GHz/1333 MHz/12 MB Processor or better 

       12.2.1.2   4 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better 

       12.2.1.3   2 x 73GB 15K SAS HDD or better 

       12.2.1.4   2 x Gigabit Network Ports or better 

      12.2.1.5   2 x 4Gb FC Host Bus Adapter or better 

       12.2.1.6   Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5 

      12.2.2 Second Blade 

 

     12.2.2.1   1 (one) Intel Xeon Quad Core E5430 80W 2.66 GHz/1333 MHz/12 MB Processor or better 

      12.2.2.2   2 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better 

       12.2.2.3   2 x 73GB 15K SAS HDD or better 

Page 23: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 22 dari 44

       12.2.2.4   2 x Gigabit Network Ports or better 

      12.2.2.5   2 x 4Gb FC Host Bus Adapter or better 

       12.2.2.6   Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5 

      12.2.3 Third Blade 

 

     12.2.3.1   1 (one) Intel Xeon Quad Core E5430 80W 2.66 GHz/1333 MHz/12 MB Processor or better 

      12.2.3.2   2 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better 

       12.2.3.3   2 x 73GB 15K SAS HDD or better 

      12.2.3.4   2 x Gigabit Network Ports or better 

       12.2.3.5 Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5 

      12.2.4 Fourth Blade 

      12.2.4.1   1 (one) Intel Xeon Quad Core E5430 80W 2.66 GHz/1333 MHz/12 MB 

Processor or better 

       12.2.4.2   2 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better 

       12.2.4.3   2 x 73GB 15K SAS HDD or better 

       12.2.4.4   2 x Gigabit Network Ports or better 

       12.2.4.5   Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5 

      12.2.5 Fifth Blade 

 

     12.2.5.1   1 (one) Intel Xeon Quad Core E5405 80W 2.00 GHz/1333 MHz/12 MB Processor or better 

       12.2.5.2   2 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better 

       12.2.5.3   2 x 73GB 15K SAS HDD or better 

       12.2.5.4   2 x Gigabit Network Ports or better 

       12.2.5.5   2 x 4Gb FC Host Bus Adapter or better 

       12.2.5.6   Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5 

      12.2.6 Sixth Blade 

 

     12.2.6.1   1 (one) Intel Xeon Quad Core E5405 80W 2.00 GHz/1333 MHz/12 MB Processor or better 

       12.2.6.2   2 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better 

       12.2.6.3   2 x 73GB 15K SAS HDD or better 

       12.2.6.4   2 x Gigabit Network Ports or better 

       12.2.6.5   2 x 4Gb FC Host Bus Adapter or better 

       12.2.6.6   Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5 

      12.2.7 Seventh Blade 

      12.2.7.1   1 (one) Intel Xeon Quad Core E5405 80W 2.00 GHz/1333 MHz/12 MB 

Processor or better 

       12.2.7.2   2 x 1GB PC2‐5300 ECC DDR2 fully‐buffered memory or better 

       12.2.7.3   2 x 73GB 15K SAS HDD or better 

       12.2.7.4   2 x Gigabit Network Ports or better 

       12.2.7.5   2 x 4Gb FC Host Bus Adapter or better 

       12.2.7.6   Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5 

      12.2.8 Eighth Blade 

      12.2.8.1   1 (one) Intel Xeon Dual Core E5140 65W 2.33 GHz/1333 MHz/4 MB Processor 

or better 

       12.2.8.2   2 x 1GB PC2‐5300 ECC DDR2 fully‐buffered memory or better 

Page 24: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 23 dari 44

       12.2.8.3   2 x 73GB 15K SAS HDD or better 

       12.2.8.4   2 x Gigabit Network Ports or better 

       12.2.8.5   2 x 4Gb FC Host Bus Adapter or better 

       12.2.8.6   Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5 

   12.3 All necessary software management for managing the enclosure and blade server 

    12.4 All necessary pheripheral in order for the server to run at a normal operation 

   12.5 All necessary manuals and documents 

    12.6 All necessary licenses 

  XIII. Price 

 

  13.1 The price shall include necessary fee for installation, configuration, shipping and handling, etc. in order for the system to run a normal operation. 

    13.2 The price shall include the software management license and kit. 

 

  13.3 The price shall include the operating system installation and configuration fee including 2 (two) Windows Server 2003 licence excluding the Windows Server 2003 media kit. 

 

  13.4 Additional Operating System (Windows 2003 and/or Linux)  installation and configuration not included license (purchased separately)  

   13.5 The price shall include all taxes required by the Law. 

    13.6 The price shall list all necessary fees in detail. 

B. SAN STORAGE SPECIFICATION   I.  Disk System Storage 

 

  1.1 Storage shall be 19" Electronic Industries Alliance Standard width rack mountable and provide appropriate rack mount kit. 

    1.2 Storage shall be shipped with all cables and parts required for normal operation. 

 

  1.3 Storage shall support at least SAS drives. Any additional drives support such as FC, FATA, and SATA is optional. 

    1.4 Storage shall support at least 25 SAS drives. The drives shall be hot swappable. 

   1.5 Storage shall have at least 3TB of raw capacity . 

    1.6 Storage shall have at least 120.000 IOPs of I/O rates performace. 

   1.7 Storage shall have at least 1GB cache per controller. 

    1.8 Storage shall have at least 2 (two) port Fibre Channel 4 Gbps per controller. 

   1.9 Storage shall be configured with dual active controller. 

 

  1.10 Storage shall be configured with redundant power supply and cooling/fans. The power supply and cooling shall be hot swappable. 

 

  1.11 Stroage shall support 146GB SAS drives 10k rpm, 146GB SAS drives 15k rpm, 300GB SAS drives 10k rpm, 300GB SAS drives 15k rpm. 

   1.12 Storage shall support RAID levels 0, 1, 3, 5, 10. 

    1.13 Storage shall support at least 10 hosts/partitions. 

   1.14 Storage shall operate at nominal input voltage of 200VAC ‐ 240VAC. 

 

  1.15 Storage shall support at least Windows Server 2003 / 2003 R2 w/SP1, Windows Server x64, and Red Hat Enterprise Linux 5 Operating System. 

Page 25: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 24 dari 44

 

  1.16 Storage shall provide a redundant management capability through any one or combination of firmware, software, and hardware. Storage management shall be accomplished through a web interface. 

    1.17 Storage management shall provide a capability for firmware upgrades 

 

  1.18 Vendor shall provide documentation of or reference to information published on the Internet documenting compliance with requirements 1.1 through 1.17. 

  II Initial Configuration 

    2.1 One Disk System Storage Enclosure 

     2.1.1  Dual power supply and cooling/fans 

     2.1.2  2 x 1 GB cache controller 

     2.1.3  4 x Fibre Cable LC/LC 5m multimode 

     2.1.4  Storage warranty 5 years parts, labor, onsite, NBD, and 9x5 

    2.2 Six SAS Drives 

     2.2.1  6 x 146GB 15K rpm SAS drive 

     2.2.2  Drives warranty 5 years parts, labor, onsite, NBD, and 9x5 

    2.3 All necessary software management for managing the storage 

    2.4 All necessary pheripheral in order for the storage to run at a normal operation 

    2.5 All necessary manuals and documents 

    2.6 All necessary licenses 

C. UPS SPECIFICATION   I. UPS   

 

  1.1 UPS output power capacity shall be at least 2800 watts / 4000 VA . The UPS output power capacity can be expanded to at least 5600 watts / 8000 VA. 

    1.2 UPS nominal output voltage shall be 230V . 

    1.3 UPS shall provide a capability for configuring nominal output voltage of 220, 230 or 240 

    1.4 UPS waveform type shall be sine wave. 

    1.5 UPS output and input frequency shall be 50/60 Hz +/‐ 3 Hz 

    1.6 UPS internal bypass shall be automatic and manual. 

    1.7 UPS input voltage shall be 220V ‐ 400V 

 

  1.8 UPS battery type shall be maintenance‐free sealed lead‐acid battery with suspended electrolyte:leakproof 

 

  1.9 UPS shall have at least one empty battery module slot available. Any additional battery module slot is optional. 

   1.10 UPS interfaces shall be at least DB9, RS323, and RJ45. Any additional interface support is 

optional. 

    1.11 UPS shall have a double conversion online technology. 

 

  1.12 UPS shall provide a management capability through any one or a combination of firmware, software, and hardware. UPS management shall be accomplished through a web interface. 

   1.13 UPS shall be a tower type. 

    1.14 UPS shall be shipped with all cables and parts required for its normal operation 

   1.15 UPS shall support N+1 redundancy. 

 

  1.16 Storage shall support at least Windows Server 2003 / 2003 R2 w/SP1, Windows Server x64, and Red Hat Enterprise Linux 5 Operating System. 

Page 26: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 25 dari 44

BLADE

WAN

SAN

LAN

Blade Server

Blade Server

BladeServer

 

  1.17 Vendor shall provide documentation of or reference to information published on the Internet documenting compliance with requirements 1.1 through 1.16. 

D. DESKTOP    1.1  Platform  Minitower 

  1.2  Processor  Intel Pentium Dual Core E2200 (2.2 GHz, 800 MHz FSB, 1 MB L2 Cache) 

  1.3  Operating 

System Windows XP Pro SP3 

  1.4  Chipset  Intel Express Chipset 

  1.5  Memory  2 x 512MB DDR2 PC2‐6400 (800 MHz) Non‐ECC 

  1.6  Graphics  Yes, shared 

  1.7  Audio  Yes, HDA ready 

  1.8  Hard Drive  80 GB SATA HDD SMART (7200 rpm) 

  1.9  Removable Drive  SATA CD‐RW/DVD‐ROM Combo Drive 

  1.10  Network  10/100/1000 NIC 

  1.11  Expansion slot  2 full‐height PCI slots, 1 PCI‐Express X1 slot, 1 PCI‐Express X16 slot 

  1.12  Input Device  USB Standard Keyboard & USB 2‐Button Optical Scroll Mouse 

  1.13  Interface 

Provided Rear: 6 USB 2.0, 1 serial port, 1 parallel port, 2 PS/2, 1 RJ‐45, 1 VGA, audio port 

      Front: 2 USB 2.0, audio port 

  1.14  Monitor  LCD 17" 

  1.15  Warranty  3/3/3 

E. SOFTWARE SPECIFICATION  I.  MICROSOFT      1.1  2 x Microsoft Svr Std 2008 Sngl OLP    1.2  BizTalk Svr Brach Ed 2006 R2 Sngl OLP NL 1 Proc    1.3  BizTalk Server 2004 English Disk Kit    1.4  SQL Svr Std Edtn 2005 Win32 Sngl OLP NL    1.5  SQL Svr Standard Edtn 2000 Win32 English Disk Kit    1.6  5 x SQL 2005 Sngl OLP NL User CAL    1.7  1 x Microsoft Office Std Edtn 2007 

II.  SYMANTEC   

  1.1  9 x Symantec AV Corporate Edition CAL 

 Skema Infrastruktur 

Page 27: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 26 dari 44

LAMPIRAN I  FORMAT SURAT PENAWARAN  

    Nomor   :  [nomor surat]                                 ……………., [tgl/bl/th] Lampiran  :  [jumlah lampiran] Perihal  :  Penawaran  Kepada Yth. PANITIA PENGADAAN  BARANG/JASA  DALAM RANGKA PROYEK PENGEMBANGAN DAN IMPLEMENTASI TEKNOLOGI INFORMASI LEMBAGA PENJAMIN SIMPANAN   di Gedung BRI II Lantai 11,  Jl. Jenderal Sudirman Kav 44‐46,  Jakarta 10210  Dengan hormat,  

Setelah membaca dan mempelajari dokumen pengadaan yang telah kami terima, maka dengan ini  kami mengajukan penawaran untuk pekerjaan Pengadaan Perangkat Keras dan Perangkat  Lunak   di Lembaga Penjamin Simpanan. 

Dengan  ini  kami  mengajukan  penawaran  harga  untuk  pekerjaan  tersebut  sebesar  [jumlah  harga penawaran dalam angka dan huruf], dengan rincian  jenis dan spesifikasi barang, volume, harga satuan, dan  jumlah  harga  dalam  lampiran  5  Format  Penawaran Harga  (terlampir). Harga  yang  kami  tawarkan tersebut  sudah  termasuk  pajak‐pajak  yang  berlaku  dan  biaya‐biaya  lainnya  yang  tercantum  dalam dokumen  pengadaan  serta berlaku untuk  jangka waktu  60  (enam  puluh) hari  kalender  terhitung  sejak tanggal batas akhir penyampaian dokumen penawaran.  

Sebagai  kelengkapan  penawaran,  kami  serahkan  jaminan  penawaran  yang  diterbitkan  oleh  [nama lembaga  penerbit  dan  nomor  jaminan],  dengan  nilai  jaminan  sebesar  [nilai  jaminan  penawaran  yang disebutkan  dalam  angka  dan  huruf]  dengan  jangka  waktu  berlakunya  selama  60  (enam  puluh)  hari terhitung sejak tanggal batas akhir penyampaian dokumen penawaran.  

Bila  kami  ditunjuk  sebagai  Pelaksana  Pekerjaan,  kami  akan menyelesaikan  pekerjaan  tersebut  selama [angka]  hari  kalender  terhitung  sejak  tanggal  penunjukan.  Kami  bersedia  menyerahkan  jaminan pelaksanaan dalam jangka waktu 7 (tujuh) hari kalender sejak tanggal penunjukan. 

Kami menyetujui untuk  terikat pada penawaran  ini untuk  jangka waktu 60  (enam puluh) hari  terhitung sejak tanggal batas akhir penyampaian dokumen penawaran. 

Dengan  ini  kami  menyatakan  bahwa  kami  akan  mematuhi  sepenuhnya  segala  peraturan  yang  telah ditetapkan oleh Panitia dan dokumen penawaran ini telah kami susun dengan sebenarnya. 

Demikianlah penawaran kami, atas perhatiannya kami ucapkan terima kasih.  Hormat kami, [nama perusahaan]  [Tanda tangan diatas Materai Rp. 6.000,‐]  [nama direktur atau yang diberi kuasa] [jabatan] 

Kop Surat Perusahaan  Peserta

Page 28: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 27 dari 44

LAMPIRAN 2 SURAT JAMINAN PENAWARAN    

__________[nama dan alamat bank umum]  Terjamin:  Koordinator Proyek Pengembangan dan Implementasi Teknologi Informasi, Lembaga  

    Penjamin Simpanan  Tanggal: __________  SURAT JAMINAN PENAWARAN No.: __________    Kami  telah diberitahu bahwa  __________[nama Peserta]  (selanjutnya disebut  “Peserta”)  telah menyampaikan penawaran kepada Terjamin pada tanggal __________ (selanjutnya disebut ”Penawaran”) untuk Pelaksanaan Pekerjaan Pengadaan Perangkat Keras dan Perangkat Lunak.    Selanjutnya,  kami memahami  bahwa  sesuai  dengan  persyaratan  Terjamin,  setiap  Penawaran harus disertai dengan Surat Jaminan Penawaran.    Berdasarkan permohonan Peserta Pengadaan, kami __________[nama bank umum] bersama ini dengan  tidak dapat ditarik  kembali menyetujui untuk membayar  kepada  Terjamin  sejumlah uang  yang secara  keseluruhan  tidak  melebihi  __________[nilai  dalam  angka]  (__________)  [nilai  dalam  huruf]. Sejumlah uang tersebut harus segera dibayarkan kepada Terjamin pada saat kami menerima permintaan pertama  Terjamin  secara  tertulis  beserta  pernyataan  tertulis mengenai  wanprestasi  atau  cidera  janji Peserta terhadap persyaratan Penawaran dalam hal Peserta:  

(a)  telah menarik Penawarannya selama masa berlaku Penawaran yang ditentukan oleh Peserta dalam Surat Penawaran; atau 

 (b)   setelah disampaikan Surat Penunjukan Pelaksana Pekerjaan   oleh Koordinator Proyekselama 

masa berlaku Penawaran (i) gagal atau menolak untuk menandatangani Surat Perjanjian, atau (ii)  gagal  atau  menolak  untuk  menyerahkan  Surat  Jaminan  Pelaksanaan  sesuai  dengan ketentuan Instruksi kepada Peserta. 

   Surat  Jaminan  ini akan berakhir:  (a)  jika Peserta merupakan Pemenang Lelang, pada  saat kami terima salinan Kontrak yang ditandatangani oleh Peserta dan Surat Jaminan Pelaksanaan telah diterbitkan kepada Terjamin; dan  (b)  jika Peserta bukan merupakan Pemenang Lelang maka yang mana yang  lebih dahulu:  (i) pada saat kami terima pengumuman Pemenang Lelang; atau  (ii) 28  (dua puluh delapan) hari kalender setelah masa berlaku Penawaran. Setiap permohonan pencairan Surat Jaminan  ini harus sudah kami terima di kantor kami tersebut di atas pada atau sebelum akhir masa berlaku Surat Jaminan ini.    Kami  setuju  untuk  tidak  mensyaratkan  Terjamin  menagihkan  terlebih  dahulu  kerugian  yang dialami  atas  wanprestasi  atau  cidera  janji  Peserta  sebelum  Terjamin  dapat mengajukan  permohonan pencairan Surat Jaminan ini.    Menyimpang  dari  ketentuan  Pasal  1831  Kitab  Undang‐Undang  Hukum  Perdata,  kami mengabaikan hak preferensi kami atas harta benda milik Peserta yang berkenaan dengan penyitaan dan penjualan  harta  benda  tersebut  untuk melunasi  utangnya  sebagaimana  ditentukan  dalam  Pasal  1832 Kitab Undang‐Undang Hukum Perdata.  

[materai yang dibubuhi tanda tangan  dan cap perusahaan]  Penjamin 

Page 29: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 28 dari 44

LAMPIRAN 3  CONTOH SURAT KUASA    

 

SURAT KUASA 

Nomor :.......................... 

 

Yang bertandatangan di bawah ini: Nama     : ................................................................................ Jabatan   : Direktur Utama/Direktur PT................................... Dalam  hal  ini  bertindak  untuk  dan  atas  nama  perusahaan  berdasarkan  Akte Notaris.................................  di  ...................................  No..........................  tanggal .......................................................  beserta  perubahannya  yang  berkedudukan  di ............................................................................................  (alamat perusahaan), yang selanjutnya disebut Pemberi Kuasa.  Memberi kuasa kepada : Nama     : ................................................................................ Jabatan   : ................................................................................ Yang  diangkat  berdasarkan  Akte  Notaris.................................  di  ....................  No ................................  tanggal  .................................beserta  perubahannya  yang  berkedudukan di....................................................................  (alamat  perusahaan),  yang  selanjutnya  disebut Penerima Kuasa.   Untuk dan atas nama Pemberi Kuasa diberi wewenang untuk menandatangani surat  penawaran  Pengadaan  Perangkat  Keras  dan  Perangkat  Lunak  pada  Lembaga  Penjamin Simpanan beserta lampirannya. Surat kuasa ini tidak dapat dilimpahkan lagi kepada orang lain     …………………………, 2008 

 PT. ……………………………… 

Pemimpin/ Direktur Utama     

………………………….. ( Nama Jelas) 

 

Page 30: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 29 dari 44

LAMPIRAN 4 DOKUMEN ISIAN

   Lembaga Penjamin Simpanan Tahun Anggaran  2008   Dokumen Isian terdiri dari:  (a) Surat Pernyataan Minat (b) Pakta Integritas (c) Surat Pernyataan (d) Formulir Isian Administrasi  

          

              

 

Page 31: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 30 dari 44

PETUNJUK CARA PENGISIAN FORMULIR ISIAN                                               

I. Formulir 1 :   Surat Pernyataan Minat  

Surat  pernyataan  minat  ditandatangani  oleh  Pemimpin/Direktur  Utama  Perusahaan  atau penerima kuasa dari Direktur Utama yang nama kuasanya  tercantum dalam akta pendirian atau perubahannya, atau kepala  cabang perusahaan  yang diangkat oleh kantor pusat yang dibuktikan dengan dokumen otentik, atau pejabat yang menurut perjanjian kerjasama adalah yang berhak mewakili perusahaan yang bekerjasama.                 

II. Formulir 2  :   Pakta Integritas  a. Nama dan tanda tangan panitia pengadaan   b. Nama dan tanda tangan Pemimpin/Direktur Utama Perusahaan atau penerima kuasa dari 

Direktur Utama yang nama kuasanya tercantum dalam akta pendirian atau perubahannya, atau kepala cabang perusahaan yang diangkat oleh kantor pusat yang dibuktikan dengan dokumen  otentik,  atau pejabat  yang menurut  perjanjian  kerjasama  adalah  yang berhak mewakili perusahaan yang bekerjasama. 

 III. Formulir 3:    Surat Pernyataan 

 Surat pernyataan ditandatangani oleh Pemimpin/Direktur Utama Perusahaan atau penerima kuasa  dari  Direktur  Utama  yang  nama  kuasanya  tercantum  dalam  akta  pendirian  atau perubahannya,  atau  kepala  cabang  perusahaan  yang  diangkat  oleh  kantor  pusat  yang dibuktikan dengan dokumen otentik, atau pejabat yang menurut perjanjian kerjasama adalah yang berhak mewakili perusahaan yang bekerjasama.            

   IV. Formulir 4: Formulir Isian Administrasi 

         a. Nilai  3  (tiga)  paket  tertinggi  pengalaman  dibidang/subbidang  yang  sesuai  dalam  kurun 

waktu  4  (empat)  tahun  terakhir.    Lampirkan  Copy  kontrak  yang  disahkan  oleh  proyek tersebut.                   

b. Tanggal  selesai menurut  kontrak  dan  tanggal  selesai menurut  berita  acara  penyerahan laporan akhir.  

c. Pemimpin/Direktur  Utama  Perusahaan  atau  penerima  kuasa  dari  Direktur  Utama  yang nama kuasanya tercantum dalam akta pendirian atau perubahannya, atau kepala cabang perusahaan  yang  diangkat  oleh  kantor  pusat  yang  dibuktikan dengan dokumen otentik, atau pejabat yang menurut perjanjian kerjasama adalah yang berhak mewakili perusahaan yang bekerjasama.   

              

Page 32: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 31 dari 44

 

  

SURAT PENGANTAR     Kepada Yth. PANITIA PENGADAAN  BARANG/JASA   DALAM RANGKA PROYEK PENGEMBANGAN DAN IMPLEMENTASI TEKNOLOGI INFORMASI Lembaga Penjamin Simpanan  di    Jakarta    Perihal : Formulir Isian    Menunjuk pengumuman di Harian ...............  tanggal …….………… dan web site Lembaga Penjamin Simpanan di www.lps.go.id dengan  ini kami sampaikan  formulir  isian  (terlampir) dalam bentuk hardcopy beserta print‐outnya    guna mengikuti  lelang   pekerjaan Pengadaan Perangkat Keras dan Perangkat Lunak pada Lembaga Penjamin Simpanan  Demikian disampaikan, atas perhatiannya kami ucapkan terima kasih.        …………………………, 2008 

 PT. ……………………………… 

Pemimpin/ Direktur Utama     

………………………….. ( Nama Jelas) 

  

Kop Surat Perusahaan / Penyedia Jasa/Barang 

Page 33: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 32 dari 44

Materai Rp. 6.000,‐ Tanggal dan Cap Perusahaa

Formulir  1  

CONTOH SURAT PERNYATAAN MINAT  

 

 SURAT  PERNYATAAN  MINAT  

Untuk Mengikuti  PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK 

      Yang bertanda tangan di bawah ini:    Nama                        :    . . . . . . . . . . . . . . . . . . . . . . . . . . . .  Jabatan                      :    . . . . . . . . . . . . . . . . . . . . . . . . . . . .  Bertindak untuk        :    PT/CV/..................... . . . . . . . . . dan atas nama  Alamat                      :    . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  Telepon/Fax              :    . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  Email                         :     . . . . . . . . . . . . . . . . . . . . . . . . . . . . .    Menyatakan dengan sebenarnya bahwa setelah mengetahui  pengadaan yang akan dilaksanakan oleh  Lembaga  Penjamin  Simpanan  Tahun  Anggaran  2008, maka  dengan  ini  saya menyatakan berminat untuk mengikuti proses Pengadaan Perangkat Keras dan Perangkat Lunak.               Demikian pernyataan ini kami buat dengan penuh kesadaran dan rasa tanggung jawab.   

 ……………….. , ……………. ……..2008   

PT/CV................ ……………………..          

(Nama   Jelas) Jabatan  

  

Kop Surat Perusahaan / Peserta 

Page 34: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 33 dari 44

  

Formulir  2 CONTOH PAKTA INTEGRITAS 

  PAKTA INTEGRITAS 

    

  Saya  yang  bertanda  tangan  di  bawah  ini,  dalam  rangka  Pengadaan  Perangkat  Keras  dan Perangkat Lunak , dengan ini menyatakan bahwa saya :  

  1.  Tidak akan melakukan praktek korupsi, kolusi dan nepotisme (KKN);   2.   Akan melaporkan kepada pihak yang berwajib/berwenang apabila mengetahui ada  indikasi 

KKN di dalam proses pengadaan ini;   3.   Dalam  proses  pengadaan  ini, berjanji  akan melaksanakan  tugas  secara  bersih,  transparan, 

dan profesional dalam arti akan mengerahkan segala kemampuan dan sumber daya secara optimal  untuk  memberikan  hasil  kerja  terbaik  mulai  dari  penyiapan  penawaran, pelaksanaan, dan penyelesaian pekerjaan/kegiatan ini; 

  4.   Apabila saya melanggar hal‐hal yang telah saya nyatakan dalam PAKTA INTEGRITAS ini, saya 

bersedia  dikenakan  sanksi moral,  sanksi  administrasi  serta  dituntut  ganti  rugi  dan  pidana sesuai dengan ketentuan peraturan perundang‐undangan yang berlaku.  

  Jakarta , ………….2008…. 

  1.  Koordinator Proyek  :   .......................  2.  Panitia Pengadaan           

  a. Ketua  :    ....................... 

  b. Sekretaris merangkap anggota  :    ....................... 

  c. Anggota  :    ....................... 

  d. Anggota  :    ....................... 

  e. Anggota  :    ....................... 

  f. Anggota  :    ....................... 

  g. Anggota  :    ....................... 

  3.  Peserta PT/CV  :  ...............................................          

...............................................  ....................... 

      Nama Jelas  Tanda Tangan  

Page 35: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 34 dari 44

 Formulir 3 

CONTOH SURAT PERNYATAAN  

PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK PADA  

LEMBAGA PENJAMIN SIMPANAN Tahun Anggaran  2008 

   

Yang bertanda tangan di bawah ini :   Nama                 : …………………………………………………………..... Jabatan            : ………………………………………………………………   

Bertindak untuk    :    PT/CV ……………………….……….......... dan atas nama  Alamat   : ……………………………………………………………… Telepon/Fax  : ……………………………………………………………… Email                      : ………………………………………………………………     Menyatakan dengan sesungguhnya bahwa :   

1. Saya secara hukum mempunyai kapasitas menandatangani kontrak berdasarkan Surat  ……………………     

2. Saya/Perusahaan  saya  tidak  sedang  dinyatakan  pailit  atau  kegiatan  usahanya  tidak sedang  dihentikan  atau  tidak  sedang  menjalani  sanksi  pidana  atau  sedang  dalam pengawasan pengadilan; 

3. Saya  tidak  pernah  dihukum  berdasarkan  putusan  pengadilan  atas  tindakan  yang berkaitan dengan kondite profesional saya; 

4. Data perusahaan saya adalah sebagai berikut : 

  

Page 36: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 35 dari 44

Formulir 4 FORMULIR ISIAN ADMINISTRASI  A.Data Administrasi 

 1. Umum 

                                 1.  Nama(PT/CV  :                                                                                                   3.  Alamat PT/CV    :                 No. Telepon    :                 No. Fax      :                 Email      :                                                                              4.  Alamat Kantor Pusat    :  ….......................................................................…    No. Telepon    :                 No. Fax      :                 Email      :                                              

 2.  Ijin Usaha                 

                                 No. SIUP *)  :  No. ……….................  Tanggal. ………................... Masa Berlaku ijin usaha    :  s/d tanggal……….........................200………………….. Instansi pemberi ijin usaha    :  ……….................................…                                 

 3.  Landasan Hukum Pendirian Perusahaan       

                                 1.  Akta Pendirian                      PT/CV                   a. Nomor Akta    :                 b. Tanggal      :                 c. Nama Notaris    :                                                                              2.  Akta Perubahan Terakhir                   a. Nomor Akta    :                 b. Tanggal                       c. Nama Notaris    :                                              

 

Page 37: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 36 dari 44

 B.Pengurus 1. Komisaris (untuk PT) 

No.  Nama  Jabatan dalam Perusahaan 

                                    

2. Direksi/Penanggung jawab/Pengurus Perusahaan  

No.  Nama  Jabatan dalam Perusahaan 

                                   C.Data Keuangan 1.Susunan Kepemilikan PT/CV  No.  Nama  Alamat  Persentase 

                                            2. Pajak                                  1.  Nomor Pokok Wajib Pajak  :                                   2.  Nomor Penetapan 

PKP      :           

3.  Bukti Pelunasan Pajak      :               Tahun terakhir Nomor/                   Tanggal                                           3.  Laporan bulanan PPH/    :               PPN tiga bulan terakhir                   Nomor/tanggal                                                  

 

Page 38: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 37 dari 44

 D. Data Pengalaman Perusahaan dalam Pengadaan Perangkat Keras dan Perangkat Lunak 4 (empat) tahun terakhir 

 

Pemberi Tugas / Pengguna Jasa 

Kontrak  

Tanggal Selesai Menurut  No.  

Nama Paket 

Pekerjaan 

Bidang/sub Bidang 

Pekerjaan Lokasi 

Nama Alamat/Telepon 

No./ Tanggal 

Nilai (Rp.) 

Kontrak Berita Acara Serah Terima 

1  2  3  4  5  6  7  8  9  10                                                                                                                             E. Data Pekerjaan Yang Sedang Dilaksanakan  

Pemberi Tugas / Penggunaan Jasa 

Kontrak  *)  Progress Terakhir No.  

Bidang Pekerjaan 

Sub Bidang 

Pekerjaan Lokasi 

Nama Alamat/ Telepon 

No./ Tangga

Nilai (Rp.) 

Tanggal 

Prestasi Kerja(%) 

1  2  3  4  5  6  7  8  9  10                                                                

  

A. Adakah proyek yang tidak diselesaikan ? Jika ada berapa jumlah proyek yang tidak selesai?  dan apa alasan tidak selesainya proyek tersebut.  

B. Informasi lain yang menurut perusahaan perlu disampaikan kepada panitia pengadaan.  Keterangan : Diisi  informasi  masukan  dan  saran  terkait  dengan  pengadaan  perangkat  keras  dan  perangkat  lunak termasuk perkembangan terakhir mengenai harga.  Demikian pernyataan ini kami buat dengan sebenarnya dan penuh rasa tanggung jawab. Apabila dikemudian  hari,  ditemui  bahwa  data/dokumen  yang  kami  sampaikan  tidak  benar  dan  ada pemalsuan, maka kami bersedia dikenakan sanksi administratif. 

 _________[tempat],__[tanggal]__[bulan] 2008   PT/CV  __________[pilih  yang  sesuai  dan  cantumkan nama]   [rekatkan materai Rp6.000,‐ bubuhkan  tanda tangan dan cap perusahaan]   (nama lengkap wakil sah) [jabatan jika badan usaha]  

Page 39: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 38 dari 44

 

LAMPIRAN 5 FORM ISIAN DATA TEKNIS  Peserta mengisi Format Isian Data Teknis dalam bentuk Excel file (file dapat di download dalam pengumuman  lelang  di  web  site  lps  di  www.lps.go.id  dan menyerahkan  file  yang  telah  diisi  dalam bentuk CD Read Only serta dimasukkan dalam dokumen penawaran disertai dengan hard copy file tersebut dengan ditandatangani oleh pejabat yang berwenang.   

 Catatan: Peserta harus mengisi Formulir  Isian dengan benar dan dapat dipertanggung  jawabkan  secara hukum.    Apabila  dikemudian  hari  ditemukan  hal‐hal  yang  tidak  sah,  panitia  berhak  untuk menggugurkan.  

  

Page 40: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 39 dari 44

LAMPIRAN 6 FORMAT PENAWARAN HARGA  

Rincian Harga Penawaran Perangkat Keras dan Perangkat Lunak 

No  Jenis dan Spesifikasi Barang  Volume  

Harga Satuan (setelah Pajak) 

Jumlah Harga 

Tgl Pengiriman 

A.  Chassis Blade         1  BladeCenter(tm) Chassis with 2x2000W PSU  1       2  BladeCenter 2000W Power Supplies 3 & 4  1       3  BladeCenter (TM) Acoustic Attenuation Module  1       4  Cisco Catalyst Switch Module 3012  1       5  Short Wave SFP Module  12       6  BladeCenter PCI Express I/O Expansion Unit  1       7  BladeCenter Redundant KVM/Advanced 

Management Module 1       

8  DPI 32amp/250V Front‐end PDU with IEC 309 2P+Gnd 

2       

9  Blade Center Setup (Blade Chassis setup only)  1       10  Blades Ethernet Switch Module Setup (per Switch) 

up to L2 Configuartion 1       

11  Bladecenter SAN Switches (all models) Installation (per Switch)  

1       

12  STORAGE Partition Expansion License  1       13  Blade Server Setup (per Blade)  7       14  STORAGE Implementation ( with 2 hosts)  1       15  Additional Host Setup (Per Host)  3       16  5 Y P, L, O/S, NBD, 9x5 for Blade Center   1       17  Eicon SNA Card S91 V2    1       

         

B.  Server         1  Blade server (1) ‐ 2 P Intel Xeon QC E5430 

2.66Ghz/ 8GB (4x2GB)Mem, 2x146GB 10K, Dual HBA (DB Production) 

       

•  Xeon Quad Core E5430 80w 2.66GHz/1333MHz/12MB L2, 2x1GB Chk, O/Bay SAS 

1       

• Quad‐Core Intel Xeon Processor E5430 80w 2.66GHz/1333MHz/12MB L2 

1       

• 4GB (2x2GB) PC2‐5300 CL5 ECC DDR2 Chipkill FBDIMM Memory Kit 

2       

• ServerBlade 73GB 15K SFF Non HS SAS HDD  2       • QLogic 4Gb Fibre Channel Expansion Card (CFFv) 

for IBM BladeCenter 1       

           2  Blade server (2) ‐ 1 P Intel Xeon QC E5430 

2.66Ghz/ 4GB (4x1GB)Mem, 2x146GB 10K, Dual HBA (DB Production) 

       

•  Xeon Quad Core E5430 80w 2.66GHz/1333MHz/12MB L2, 2x1GB Chk, O/Bay SAS 

1       

Page 41: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 40 dari 44

• 2GB (2x1GB) PC2‐5300 CL5 ECC DDR2 Chipkill FBDIMM Memory Kit 

1       

• ServerBlade 73GB 15K SFF Non HS SAS HDD  2       • QLogic 4Gb Fibre Channel Expansion Card (CFFv)   1       

           3.  Blade server (3) ‐ 1 P Intel Xeon QC E5430 

2.66Ghz/ 4GB (4x1GB)Mem, 2x146GB 10K (Application) 

       

•  Xeon Quad Core E5430 80w 2.66GHz/1333MHz/12MB L2, 2x1GB Chk, O/Bay SAS 

1       

• 2GB (2x1GB) PC2‐5300 CL5 ECC DDR2 Chipkill FBDIMM Memory Kit 

1       

• ServerBlade 73GB 15K SFF Non HS SAS HDD  2                  4.  Blade server (4) ‐ 1 P Intel Xeon QC E5430 

2.66Ghz/ 4GB (4x1GB)Mem, 2x146GB 10K (Application) 

       

•  Xeon Quad Core E5430 80w 2.66GHz/1333MHz/12MB L2, 2x1GB Chk, O/Bay SAS 

1       

• 2GB (2x1GB) PC2‐5300 CL5 ECC DDR2 Chipkill FBDIMM Memory Kit 

1       

• ServerBlade 73GB 15K SFF Non HS SAS HDD  2                  5.  Blade server (5) ‐ 1 P Intel Xeon QC E5405 

2.0Ghz/ 4GB (4x1GB)Mem, 2x146GB 10K, Dual HBA (DB Development) 

       

•  Xeon Quad Core E5405 80W 2.00GHz/1333MHz/12MB L2, 2x1GB Chk, O/Bay SAS 

1       

• 2GB (2x1GB) PC2‐5300 CL5 ECC DDR2 Chipkill FBDIMM Memory Kit 

1       

• ServerBlade 73GB 15K SFF Non HS SAS HDD  2       • QLogic 4Gb Fibre Channel Expansion Card (CFFv)   1       

           6.  Blade server (6) ‐ 1 P Intel Xeon QC E5405 

2.0Ghz/ 4GB (4x1GB)Mem, 2x146GB 10K, Dual HBA (DB Development) 

       

•  Xeon Quad Core E5405 80W 2.00GHz/1333MHz/12MB L2, 2x1GB Chk, O/Bay SAS 

1       

• 2GB (2x1GB) PC2‐5300 CL5 ECC DDR2 Chipkill FBDIMM Memory Kit 

1       

• ServerBlade 73GB 15K SFF Non HS SAS HDD  2       • QLogic 4Gb Fibre Channel Expansion Card (CFFv)   1       

           7.  Blade server (7)  Xeon QC E5405 2.00GHz, 2x1GB 

Mem, 2x73GB 15K SAS, Qlogic Dual HBA (Infrastructure) 

       

•  Xeon Quad Core E5405 80W 2.00GHz/1333MHz/12MB L2, 2x1GB Chk, O/Bay SAS 

1       

Page 42: Dokumen Lelang

DOKUMEN PENGADAAN PERANGKAT KERAS DAN PERANGKAT LUNAK Halaman 41 dari 43

• ServerBlade 73GB 15K SFF Non HS SAS HDD  2       • QLogic 4Gb Fibre Channel Expansion Card (CFFv)  1       

           8.  Blade server (8) 1 unit  Xeon DC 5140 2.33GHz, 

2x512MB Mem, 2x73GB 15K SAS, Qlogic Dual HBA (BISSSS) 

       

•  Xeon Dual Core 5140 2.33GHz/1333MHz/4MB L2, 2x512MB, O/Bay SAS 

1       

• ServerBlade 73GB 15K SFF Non HS SAS HDD  2       • Blade Server Setup (per Blade)  1       • 5 Y P, L, O/S, NBD, 9x5   1       

           

C.  SAN STORAGE         1.   2GB Cache Memory, 4x146GB 15K, FC LCLC Cable         2.   System Storage DS3400 Dual Controller  1       3.   Short Wave SFP Module  4       4.   Storage 1GB Cache Memory Upgrade  2       5.   146GB 15K 3.5in HS SAS HDD  6       6.   Line cord ‐ 2.8m, 220‐240V, C13 to CEE7‐VII 

(European/Indonesian) 2       

7.   5m Fiber Optic Cable LC‐LC  2       8.   Brocade(R) 20‐port 4 Gb SAN Switch Module   1       9.   5 Y P, L, O/S, NBD, 9x5   1                  

D.  UPS          1.  APC SYMMETRA LX  4 kVA scalable to 8kVA N+1  1                 

E.  Personal Computer   1              

F.  Perangkat Lunak         1.   Microsoft Svr Std 2008 Sngl OLP  2       2.   BizTalk Svr Branch Ed 2006 R2 Sngl OLP NL 1 Proc  1       3.   BizTalk Server 2004 English Disk Kit  1       4.   SQL Svr Std Edtn 2005 Win32 Sngl OLP NL  1       5.   SQL Svr Standard Edtn 2000 Win32 English Disk Kit  1       6.   SQL CAL 2005 Sngl OLP NL User CAL  5       7.   Microsoft Office Std Edtn 2007  1       

Jumlah Harga Rp.     

Terbilang: [jumlah harga yang disebutkan dengan huruf]     

Harga‐harga diatas sudah termasuk : 1. Instalasi  dan  konfigurasi  untuk  perangkat  keras  maupun  untuk  perangkat  lunak  sesuai 

dengan Kerangka Acuan Teknis Dokumen lelang. 2. Biaya‐biaya lainnya termasuk pajak. 

[nama perusahaan]    

[nama direktur atau yang diberi kuasa] [jabatan] 

Page 43: Dokumen Lelang
Page 44: Dokumen Lelang

FORM ISIAN DATA TEKNIS

A. Pemenuhan KeteranganI.

1.1

1.2

1.3

1.4

1.5

1.6

1.6.1

1.6.2

1.6.3

1.7

1.8

1.9

1.10

1.11

1.12

1.13

1.14

1.15

1.16

1.17

1.18

1.19

II.

2.1

2.2

2.3

2.4

2.5

2.6

2.7

III.

3.1

3.2

3.3

3.4

3.5

IV.

4.1 Each blade shall provide dual integrated network controllers with IPSec, 10/100/1000 Mbps Ethernet bandwidth, auto‐negotiating, load balancing, and fail over capabilities.

Blade RAM shall have the option for additional DDR2 or higher memory.

Blade RAM shall have the option for DDR2 or higher memory.

Vendor shall provide documentation of or reference to information published on the Internet documenting compliance with requirements 3.1 through 3.4.

Blade Server Network

Vendor shall provide documentation of or reference to information published on the internet documenting compliance with requirements 2.1 through 2.6.

Blade Server Memory

Blade shall contain a minimum Random Access Memory of 1GB DDR2 or higher and can be expanded to at least 8GB without requiring replacing the initial memory.

Blade Random Access Memory (RAM) shall include an error correcting (ECC) feature.

The blade CPUs shall be AMD or Pentium Chipset (Chipset E7520 or equivalent), and at a minimum, have performance within at least 5% of an Intel 3.0 GHz Xeon with a minimum 2 MB Level 2 (L2) cache.  System shall employ a CPU with performance capabilities equivalent to AMD and/or Pentium 4 chipsets.

The blade shall be WoL and PXE capable.

The blade shall be hot swappable.

The blade shall support at least Xeon Dual Core Intel processor.

Vendor shall provide documentation of or reference to information published on the internet documenting compliance with requirements 1.1 through 1.18.

Blade Server

Each blade server shall have at least 1 (one) CPU and support minimal 2 (two) CPUs.

The blade CPUs shall support the x86 instruction set.

Blade chassis and blade management shall provide a capability for firmware upgrades.

Blade chassis and blade management shall provide a capability for configuring all configurable hardware (e.g. modules or controllers) in the blade chassis and all configurable hardware in all installed blades.

Blade chassis shall support at least Xeon Intel processor blades.  Any additional processor support such as AMD, Itanium, Itanium 2 and Power is optional.

Blade chassis shall support all Wake‐on‐Lan (WoL) and Preboot‐eXecution Environment (PXE) enabled products.

Blade chassis shall be configured to provide full redundant cooling to all blade slots.

Blade chassis shall be configured to provide KVM capability from an external keyboard, video monitor and mouse to all blades installed in the chassis – one blade at a time.

Blade chassis shall provide a redundant chassis and blade management capability through any one or a combination of firmware, software and hardware. Chassis and blade management shall be accomplished through a web interface.

Blade chassis and blade management capability shall monitor the chassis and blades for failure for report to an administrator and for logging to an event log.

Blade chassis power supply shall operate at single phase power subsystem.

Blade chassis shall be configured with redundant power functionality to mitigate risk of internal power loss.

Blade chassis shall be configured to provide full power to all blade slots.

Blade chassis shall be configured with the necessary modules and/or controllers to enable specified blade functionality.

The Blade Chassis power supply shall operate at a nominal input voltage of 200VAC to 240VAC and with a power rating that supports a fully loaded system running at a 100% duty‐cycle 24 hours a day, 365 days a year. A fully loaded system is defined by this specification as:

All expansion slots and ports are populated with devices certified for operation in said system by the system Vendor.Processor, memory and internal storage are configured at the maximum allowable level as documented by the system Vendor.

The aforementioned power requirement is to be fulfilled without modification to said system, peripherals or power supply. The aforementioned requirement(s) apply equally to systems with a single power supply configuration, as well as a system with an online fail‐over power supply configuration. Failure to meet these requirements, to the letter, will void any contract.

Blade chassis shall support at least twelve 1 height unit (1U) hot swappable blades.

Blade chassis shall be shipped with all cables and parts required to attach all included peripherals to other bladechassis as required for normal operation (e.g. power cords, keyboard / mouse cables, video cables, network andinternal disk cables).Blade chassis shall provide a device capable of reading a 1.44 MB floppy or provide an alternate way of installing operating system and application software and performing firmware upgrades. This device shall be dynamically re‐configurable and assignable to any one of the blades in the chassis for the purpose of transferring data to and from the floppy disk to and from the blade.Blade chassis shall provide a device capable of reading a CD/DVD disc at a minimum 48x speed or provide an alternate way of installing operating system and application software and performing firmware upgrades. This device shall be dynamically re‐configurable and assignable to any one of the blades in the chassis for the purpose of transferring data to and from the CD‐ROM disc to and from the blade.

Blade Server SpecificationChassis Blade

Blade chassis shall be 19" Electronic Industries Alliance Standard width rack mountable and provide appropriate rack mount kit.

Form Isian Data Teknis.xls103/11/2008

Page 45: Dokumen Lelang

FORM ISIAN DATA TEKNIS

4.2

V.

5.1

5.2

5.3

VI.

6.1

6.2

6.3

VII.

7.1

VIII.

8.18.2

8.3

8.4

8.5

8.6

8.7

IX.

9.1

9.1.1

9.1.2

9.1.3

9.1.4

9.1.5

NOTE:

9.2

9.3

9.4

9.5

X.

10.1

10.2

10.3

10.4

10.5

10.6

XI.

11.1

11.2

The equipment may be delivered to a site in quantities as specified by the corporate at time of purchase.

System unit and all peripherals will be delivered with a detailed shipping invoice indicating the configuration detail of the system associated options/peripherals shipped. This will include the following information: system model, system type, processor speed, number of processors, amount of memory, type of memory, amount of internal disk storage, type of internal disk storage, adapters (additional and integrated), redundant power supply configurations as applicable, required cables, power cord(s) included, Customer added options and associated configuration detail.

During the warranty period, the contractor shall be responsible for all repair costs associated with the hardware equipment, except where there is evidence that the corporate physically abused the equipment.

The warranty shall provide higher levels of service 8 hour response time as an available option.

An additional year of warranty for hardware, sevice and maintenance shall be provided as an option as indentified in requirements 10.1 through 10.5.

Delivery

Warranty

All hardware components associated with this contract shall have a minimum 60‐month warranty that shall go into effect at the time of installation by the corporate.  By definition, "all hardware" consists of the blade chassis and the blades therein and its internal components (cards, disk drives, power supply, etc.), monitor (when required), keyboard (when required), and cables.

The warranty shall provide 9 x 5 phone and web technical support for vendor supplied hardware and software, utilities and drivers.

The warranty shall provide two business day on‐site parts and labor maintenance performed by factory trained, authorized technicians for three full years.

All offered Blades shall be certified through the Microsoft HCL to execute Windows Server 2003, and through the Red Hat Hardware Catalog to execute Red Hat Enterprise Linux 4.x Server operating system.

Blades designated as Windows blades shall have the option of being pre‐loaded with the least cost Windows Server 2003 operating system software available as dictated by the Government.

Blades designated with a Red Hat Enterprise Linux requirement shall have the option of being pre‐loaded with the least cost Red Hat Linux operating system software available as dictated by the Government.

Media (e.g. 3.5" diskettes, CD‐ROM/DVD) and documentation shall be provided for all pre‐installed software identified in requirements 9.1 through 9.4.

A software image. See terms and conditions paragraph 12 imaging and device driver requirements.

License only for the offered version(s) of Microsoft Windows Server edition

Red Hat Enterprise Linux 4.x Server operating system and license

Options 9.1.1, 9.1.2, 9.1.3 and 9.1.5 are mutually exclusive. Option 4 may be added to any of the first three options and will always be combined with option 2.Operating System Software, when required, shall be installed on blade boot device.  License, when required, to be included with system.

Blade Server Operating System Software

Each Blade shall be offered with the following Operating System (OS) and license options:

No Operating System

Any current production version of Microsoft Windows Server compatible with the offered blade hardware.

The fully populated blade chassis shall be capable of normal operations in environments with a non‐condensing relative humidity of 20% to 80%.

The fully populated blade chassis shall be capable of normal operations at altitudes from sea level to 7,000 feet.

The video monitor (when required) shall meet the requirements for United States EPA Energy Star compliance.

Vendor shall provide documentation of or reference to information published on the Internet documenting compliance with requirements 8.1 through 8.6.

Environmental

The video monitor (when required) shall be MPR‐II compliant.The fully populated blade chassis shall carry an FCC Class A rating.

The system shall be capable of normal operations in ambient temperatures from 65oF to 90oF.

Monitor not required.

Vendor shall provide documentation of or reference to information published on the Internet documenting compliance with requirements 6.1 through 6.2.

Sound

Sound capability not required.

The blade shall have, at a minimum, two (2) internal 73 GB Ultra320 SCSI 15000‐rpm to support mirroring.

Vendor shall provide documentation of or reference to information published on the internet documenting compliance with requirements 5.1 through 5.2.

Graphics/Monitor

Graphics interface not required.

Vendor shall provide documentation of or reference to information published on the internet documenting compliance with requirements 4.1.

Blade Media Internal/External Storage:

The blade server shall support fibre‐channel host bus adapters to accommodate SANs (Storage Area Networks) devices.

Form Isian Data Teknis.xls203/11/2008

Page 46: Dokumen Lelang

FORM ISIAN DATA TEKNIS

11.3

11.4

XII.

12.1

12.1.1

12.1.2

12.1.3

12.1.4

12.1.5

12.1.6

12.2

12.2.1 First Blade

12.2.1.1

12.2.1.2

12.2.1.3

12.2.1.4

12.2.1.5

12.2.1.6

12.2.2 Second Blade12.2.2.1

12.2.2.2

12.2.2.3

12.2.2.4

12.2.2.5

12.2.2.6

12.2.3 Third Blade

12.2.3.1

12.2.3.2

12.2.3.3

12.2.3.4

12.2.3.5

12.2.4 Fourth Blade

12.2.4.1

12.2.4.2

12.2.4.3

12.2.4.4

12.2.4.5

12.2.5 Fifth Blade

12.2.5.1

12.2.5.2

12.2.5.3

12.2.5.4

12.2.5.5

12.2.5.6

12.2.6 Sixth Blade

12.2.6.1

12.2.6.2

12.2.6.3

12.2.6.4

12.2.6.5

12.2.6.6

12.2.7 Seventh Blade

12.2.7.1

12.2.7.2

12.2.7.3

12.2.7.4

12.2.7.5

12.2.7.6

12.2.8 Eighth Blade

12.2.8.1

12.2.8.2

Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5

1 (one) Intel Xeon Dual Core E5140 65W 2.33 GHz/1333 MHz/4 MB Processor or better

2 x 1GB PC2‐5300 ECC DDR2 fully‐buffered memory or better

2 x 1GB PC2‐5300 ECC DDR2 fully‐buffered memory or better

2 x 73GB 15K SAS HDD or better

2 x Gigabit Network Ports or better

2 x 4Gb FC Host Bus Adapter or better

2 x Gigabit Network Ports or better

2 x 4Gb FC Host Bus Adapter or better

Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5

1 (one) Intel Xeon Quad Core E5405 80W 2.00 GHz/1333 MHz/12 MB Processor or better

Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5

1 (one) Intel Xeon Quad Core E5405 80W 2.00 GHz/1333 MHz/12 MB Processor or better

2 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better

2 x 73GB 15K SAS HDD or better

2 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better

2 x 73GB 15K SAS HDD or better

2 x Gigabit Network Ports or better

2 x 4Gb FC Host Bus Adapter or better

2 x 73GB 15K SAS HDD or better

2 x Gigabit Network Ports or better

Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5

1 (one) Intel Xeon Quad Core E5405 80W 2.00 GHz/1333 MHz/12 MB Processor or better

2 x Gigabit Network Ports or better

Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5

1 (one) Intel Xeon Quad Core E5430 80W 2.66 GHz/1333 MHz/12 MB Processor or better

2 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better

Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5

1 (one) Intel Xeon Quad Core E5430 80W 2.66 GHz/1333 MHz/12 MB Processor or better

2 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better

2 x 73GB 15K SAS HDD or better

2 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better

2 x 73GB 15K SAS HDD or better

2 x Gigabit Network Ports or better

2 x 4Gb FC Host Bus Adapter or better

2 x Gigabit Network Ports or better

2 x 4Gb FC Host Bus Adapter or better

Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5

1 (one) Intel Xeon Quad Core E5430 80W 2.66 GHz/1333 MHz/12 MB Processor or better

Eight blade servers.

1 (one) Intel Xeon Quad Core E5430 80W 2.66 GHz/1333 MHz/12 MB Processor or better

4 x 2GB PC2‐5300 ECC DDR2 fully‐buffered memory or better

2 x 73GB 15K SAS HDD or better

1 x 4Gb SAN switch module (at least has 4 external port and full loaded blade internal port)

1 x PCI Express I/O Expansion Unit

1 x Eicon SNA Card S91 V2

Chassis warranty 5 years parts, labor, onsite, Next Business Day (NBD), and 9x5

Initial Configuration

One complete chassis/enclosure including

Full redundant power & cooling

1 x L2/3 Ethernet Gb switch module (support full layer 3 function and at least has 4 external port and full loaded blade internal port)

All units shall be delivered with a custom image as provided by the corporate (when required).

All units shipped shall include blade chassis, blades, options, and video monitor (when required) of the same type and version.

Form Isian Data Teknis.xls303/11/2008

Page 47: Dokumen Lelang

FORM ISIAN DATA TEKNIS

12.2.8.3

12.2.8.4

12.2.8.5

12.2.8.6

12.3

12.4

12.5

12.6

XIII.

13.1

13.2

13.3

13.4

13.5

13.6

B. Pemenuhan KeteranganI.

1.1

1.2

1.3

1.4

1.5

1.6

1.7

1.8

1.9

1.10

1.11

1.12

1.13

1.14

1.15

1.16

1.17

1.18

II

2.1

2.1.1

2.1.2

2.1.3

2.1.4

2.2

2.2.1

2.2.2

2.3

2.4

2.5

2.6

C. Pemenuhan KeteranganI.

1.1

1.2

1.3

1.4

1.5

1.6

UPS waveform type shall be sine wave.

UPS output and input frequency shall be 50/60 Hz +/‐ 3 Hz

UPS internal bypass shall be automatic and manual.

UPS

UPS output power capacity shall be at least 2800 watts / 4000 VA . The UPS output power capacity can be expanded to at least 5600 watts / 8000 VA.

UPS nominal output voltage shall be 230V .

UPS shall provide a capability for configuring nominal output voltage of 220, 230 or 240

Six SAS Drives

6 x 146GB 15K rpm SAS drive

Drives warranty 5 years parts, labor, onsite, NBD, and 9x5

UPS Specification

All necessary software management for managing the storage

All necessary pheripheral in order for the storage to run at a normal operation

All necessary manuals and documents

All necessary licenses

Dual power supply and cooling/fans

2 x 1 GB cache controller

4 x Fibre Cable LC/LC 5m multimode

Storage warranty 5 years parts, labor, onsite, NBD, and 9x5

Storage management shall provide a capability for firmware upgrades

Vendor shall provide documentation of or reference to information published on the Internet documenting compliance with requirements 1.1 through 1.17.

Initial Configuration

One Disk System Storage Enclosure

Storage shall support at least 10 hosts/partitions.

Storage shall operate at nominal input voltage of 200VAC ‐ 240VAC.

Storage shall support at least Windows Server 2003 / 2003 R2 w/SP1, Windows Server x64, and Red Hat Enterprise Linux 5 Operating System.

Storage shall provide a redundant management capability through any one or combination of firmware, software, and hardware. Storage management shall be accomplished through a web interface.

Storage shall be configured with dual active controller.

Storage shall be configured with redundant power supply and cooling/fans. The power supply and cooling shall be hot swappable.

Stroage shall support 146GB SAS drives 10k rpm, 146GB SAS drives 15k rpm, 300GB SAS drives 10k rpm, 300GB SAS drives 15k rpm.

Storage shall support RAID levels 0, 1, 3, 5, 10.

Storage shall have at least 3TB of raw capacity .

Storage shall have at least 120.000 IOPs of I/O rates performace.

Storage shall have at least 1GB cache per controller.

Storage shall have at least 2 (two) port Fibre Channel 4 Gbps per controller.

Storage shall be 19" Electronic Industries Alliance Standard width rack mountable and provide appropriate rack mount kit.

Storage shall be shipped with all cables and parts required for normal operation.

Storage shall support at least SAS drives. Any additional drives support such as FC, FATA, and SATA is optional.

Storage shall support at least 25 SAS drives. The drives shall be hot swappable.

The price shall include all taxes required by the Law.

The price shall list all necessary fees in detail.

SAN Storage SpecificationDisk System Storage

The price shall include necessary fee for installation, configuration, shipping and handling, etc. in order for the system to run a normal operation.

The price shall include the software management license and kit.

The price shall include the operating system installation and configuration fee including 2 (two) Windows Server 2003 licence excluding the Windows Server 2003 media kit.

Additional Operating System (Windows 2003 and/or Linux)  installation and configuration not included license (purchased separately) 

All necessary pheripheral in order for the server to run at a normal operation

All necessary manuals and documents

All necessary licenses

Price

2 x Gigabit Network Ports or better

2 x 4Gb FC Host Bus Adapter or better

Blade server warranty 5 years parts, labor, onsite, NBD, and 9x5

All necessary software management for managing the enclosure and blade server

2 x 73GB 15K SAS HDD or better

Form Isian Data Teknis.xls403/11/2008

Page 48: Dokumen Lelang

FORM ISIAN DATA TEKNIS

1.7

1.8

1.9

1.10

1.11

1.12

1.13

1.14

1.15

1.16

D. Pemenuhan KeteranganI.

1.1

1.2

1.3

1.4

1.5

1.6

1.7

1.8

1.9

1.10

1.11

1.12

1.13

1.14

1.15

E. Pemenuhan KeteranganI.

1.1

1.2

1.3

1.4

1.5

1.6

1.7

II.

1.1

Perusahaan

Tanda TanganNama Pejabat Yang Berwenang

1 x Microsoft Office Std Edtn 2007

SYMANTEC

9 x Symantec AV Corporate Edition CAL

BizTalk Server 2004 English Disk Kit

SQL Svr Std Edtn 2005 Win32 Sngl OLP NL

SQL Svr Standard Edtn 2000 Win32 English Disk Kit

5 x SQL 2005 Sngl OLP NL User CAL

Software SpecificationMICROSOFT

2 x Microsoft Svr Std 2008 Sngl OLP

BizTalk Svr Brach Ed 2006 R2 Sngl OLP NL 1 Proc

Monitor LCD 17"

Warranty 3/3/3

Input Device USB Standard Keyboard & USB 2‐Button Optical Scroll Mouse

Interface Provided Rear: 6 USB 2.0, 1 serial port, 1 parallel port, 2 PS/2, 1 RJ‐45, 1 VGA, audio port

Front: 2 USB 2.0, audio port

Network 10/100/1000 NIC

Expansion slot 2 full‐height PCI slots, 1 PCI‐Express X1 slot, 1 PCI‐Express X16 slot

Hard Drive 80 GB SATA HDD SMART (7200 rpm)

Removable Drive SATA CD‐RW/DVD‐ROM Combo Drive

Graphics Yes, shared

Audio Yes, HDA ready

Chipset Intel Express Chipset

Memory 2 x 512MB DDR2 PC2‐6400 (800 MHz) Non‐ECC

Processor Intel Pentium Dual Core E2200 (2.2 GHz, 800 MHz FSB, 1 MB L2 Cache)

Operating System Windows XP Pro SP3

Storage shall support at least Windows Server 2003 / 2003 R2 w/SP1, Windows Server x64, and Red Hat Enterprise Linux 5 Operating System.

Desktop SpecificationDesktop

Platform Minitower

UPS shall provide a management capability through any one or a combination of firmware, software, and hardware. UPS management shall be accomplished through a web interface.

UPS shall be a tower type.

UPS shall be shipped with all cables and parts required for normal operation

UPS shall support N+1 redundancy.

UPS battery type shall be maintenance‐free sealed lead‐acid battery with suspended electrolyte: leakproof

UPS shall have at least one empty battery module slot available. Any additional battery module slot is optional.

UPS interfaces shall be at least DB9, RS323, and RJ45. Any additional interface support is optional.

UPS shall have a double conversion online technology.

UPS input voltage shall be 220V ‐ 400V

Form Isian Data Teknis.xls503/11/2008