LAMPIRAN 2 PENAWARAN ANALISA HARGA SATUAN MATA PEMBAYARAN Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545) Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545) Contract Package : No. 3 (Three) Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032) Location : KABUPATEN ACEH TENGAH Pay Item Number : 3.1.1 Type Of Work : Common Excavation Type Of Work : Common Excavation Payment unit : M3 PERKIRAAN HARGA JUMLAH PERKIRAAN HARGA JUMLAH NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA (Rp.) (Rp.) (Rp.) (Rp.) A. TENAGA 1. Pekerja (L01) Jam 0.0785 7,150.00 561.28 1. Pekerja (L01) Jam 0.0785 7,150.00 561.28 2. Mandor (L03) Jam 0.0393 9,500.00 373.35 934.63 JUMLAH HARGA TENAGA B. BAHAN 0.00 JUMLAH HARGA BAHAN 0.00 JUMLAH HARGA BAHAN C. PERALATAN 1. Excavator (E10) Jam 0.0204 320,462.53 6,537.44 1. Excavator (E10) Jam 0.0204 320,462.53 6,537.44 2. Dump Truck (E08) Jam 0.0393 241,830.76 9,503.95 3. Alat Bantu Ls 1.0000 100.00 100.00 3. Alat Bantu Ls 1.0000 100.00 100.00 16,141.38 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 17,076.01 JUMLAH HARGA PERALATAN E. KEUNTUNGAN 5.0 % x D 853.80 F. HARGA SATUAN PEKERJAAN ( D + E ) 17,929.81 Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. berat untuk bahan-bahan. 2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. 3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya. Banda Aceh, 20 Juni 2012 PT. Perapen Prima Mandiri Ir. Mawardi Direktur Utama Direktur Utama

Transcript of DIVISI 3. Pekerjaan Tanah.pdf

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : 3.1.1

    Type Of Work : Common Excavation Type Of Work : Common Excavation

    Payment unit : M3

    PERKIRAAN HARGA JUMLAHPERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. TENAGA

    1. Pekerja (L01) Jam 0.0785 7,150.00 561.281. Pekerja (L01) Jam 0.0785 7,150.00 561.28

    2. Mandor (L03) Jam 0.0393 9,500.00 373.35

    934.63JUMLAH HARGA TENAGA

    B. BAHAN

    0.00JUMLAH HARGA BAHAN 0.00JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Excavator (E10) Jam 0.0204 320,462.53 6,537.441. Excavator (E10) Jam 0.0204 320,462.53 6,537.44

    2. Dump Truck (E08) Jam 0.0393 241,830.76 9,503.95

    3. Alat Bantu Ls 1.0000 100.00 100.003. Alat Bantu Ls 1.0000 100.00 100.00

    16,141.38

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 17,076.01

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 17,076.01

    E. KEUNTUNGAN 5.0 % x D 853.80

    F. HARGA SATUAN PEKERJAAN ( D + E ) 17,929.81

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work : Common Excavation Analisa EI-311

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work : Common Excavation Analisa EI-311

    Payment unit : M3

    Pay Item Number : 3.1.1 URAIAN ANALISA HARGA SATUANPay Item Number : 3.1.1

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Menggunakan alat berat (cara mekanik)1 Menggunakan alat berat (cara mekanik)

    2 Lokasi pekerjaan : sepanjang jalan

    3 Kondisi Jalan : sedang / baik

    4 Jam kerja efektif per-hari Tk 7.00 Jam4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Faktor pengembangan bahan Fk 1.20 -

    II. URUTAN KERJAII. URUTAN KERJA

    1 Tanah yang dipotong umumnya berada disisi jalan

    2 Penggalian dilakukan dengan menggunakan Excavator

    3 Selanjutnya Excavator menuangkan material hasil3 Selanjutnya Excavator menuangkan material hasil

    galian kedalam Dump Truck

    4 Dump Truck membuang material hasil galian keluar4 Dump Truck membuang material hasil galian keluar

    lokasi jalan sejauh L 0.50 Km

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    Tidak ada bahan yang diperlukanTidak ada bahan yang diperlukan

    2. ALAT 2. ALAT

    2.a. EXCAVATOR (E10)

    Kapasitas Bucket V 0.80 M3Kapasitas Bucket V 0.80 M3

    Faktor Bucket Fb 0.90 -

    Faktor Efisiensi alat Fa 0.75 -Faktor Efisiensi alat Fa 0.75 -

    Waktu siklus Ts1 menit

    - Menggali / memuat T1 0.45 menit- Menggali / memuat T1 0.45 menit

    - Lain-lain T2 0.10 menit

    Ts1 0.55 menitTs1 0.55 menit

    Kap. Prod. / jam = V x Fb x Fa x 60 Q1 49.09 M3/Jam

    Ts1 x FkTs1 x Fk

    Koefisien Alat / M3 = 1 : Q1 (E10) 0.0204 JamKoefisien Alat / M3 = 1 : Q1 (E10) 0.0204 Jam

    2.b. DUMP TRUCK (E08)

    Kapasitas bak V 15.00 M3Kapasitas bak V 15.00 M3

    Faktor efisiensi alat Fa 0.75 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/JamKecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktu siklus Ts2 menit

    - Waktu tempuh isi = (L : v1) x 60 T1 0.75 menit

    - Waktu tempuh kosong = (L : v2) x 60 T2 0.50 menit

    - Muat = (V : Q1) x 60 T3 18.33 menit- Muat = (V : Q1) x 60 T3 18.33 menit

    - Lain-lain T4 2.50 menit

    Ts2 22.08 menitTs2 22.08 menit

    Berlanjut ke halaman berikut

  • Type Of Work : Common Excavation Analisa EI-311

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work : Common Excavation Analisa EI-311

    Payment unit : M3

    Pay Item Number : 3.1.1Pay Item Number : 3.1.1

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGANNo. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Kapasitas Produksi / Jam = V x Fa x 60 Q2 25.47 M3/Jam

    Fk x Ts2 Fk x Ts2

    Koefisien Alat / M3 = 1 : Q2 (E08) 0.0393 JamKoefisien Alat / M3 = 1 : Q2 (E08) 0.0393 Jam

    2.c. ALAT BANTU

    Diperlukan alat-alat bantu kecil 1.0000 Ls Lump Sump

    - Sekop

    - Keranjang

    3. TENAGA

    Produksi menentukan : Dump Truck Q2 25.47 M3/JamProduksi menentukan : Dump Truck Q2 25.47 M3/Jam

    Produksi Galian / hari = Tk x Q2 x Qt 178.30 M3

    Kebutuhan tenaga :

    - Pekerja P 2.00 orang- Pekerja P 2.00 orang

    - Mandor M 1.00 orang

    Koefisien tenaga / M3 :

    - Pekerja = (Tk x P) : Qt (L01) 0.0785 Jam- Pekerja = (Tk x P) : Qt (L01) 0.0785 Jam

    - Mandor = (Tk x M) : Qt (L03) 0.0393 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :Didapat Harga Satuan Pekerjaan :

    Rp. 17,929.81 / M3Rp. 17,929.81 / M3

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN6. WAKTU PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : 190.00 Hari Memakai

    2 Unit2 Unit

    7. VOLUME PEKERJAAN YANG DIPERLUKAN dump truck

    Volume pekerjaan : 67,712.00 M3

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : 3.1.1.a

    Type Of Work : Common Excavation is higher than 10 m (H > 10 m )Type Of Work : Common Excavation is higher than 10 m (H > 10 m )

    Payment unit : M3

    PERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. TENAGA

    1. Pekerja (L01) Jam 0.1299 7,150.00 928.791. Pekerja (L01) Jam 0.1299 7,150.00 928.79

    2. Mandor (L03) Jam 0.0649 9,500.00 616.55

    1,545.34JUMLAH HARGA TENAGA 1,545.34

    B. BAHAN

    JUMLAH HARGA TENAGA

    0.00JUMLAH HARGA BAHAN 0.00JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Excavator (E10) Jam 0.0389 320,462.53 12,465.991. Excavator (E10) Jam 0.0389 320,462.53 12,465.99

    2. Dump Truck (E08) Jam 0.0649 241,830.76 15,694.82

    3. Alat Bantu Ls 1.0000 500.00 500.003. Alat Bantu Ls 1.0000 500.00 500.00

    28,660.81

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 30,206.14

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 30,206.14

    E. KEUNTUNGAN 5.0 % x D 1,510.31

    F. HARGA SATUAN PEKERJAAN ( D + E ) 31,716.45

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work : Common Excavation is higher than 10 m (H > 10 m ) Analisa EI-311

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work : Common Excavation is higher than 10 m (H > 10 m ) Analisa EI-311

    Payment unit : M3

    Pay Item Number : 3.1.1.a URAIAN ANALISA HARGA SATUANPay Item Number : 3.1.1.a

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Menggunakan alat berat (cara mekanik)1 Menggunakan alat berat (cara mekanik)

    2 Lokasi pekerjaan : sepanjang jalan

    3 Kondisi Jalan : sedang / baik

    4 Jam kerja efektif per-hari Tk 7.00 Jam4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Faktor pengembangan bahan Fk 1.20 -

    II. URUTAN KERJAII. URUTAN KERJA

    1 Tanah yang dipotong umumnya berada disisi jalan

    2 Penggalian dilakukan dengan menggunakan Excavator

    3 Selanjutnya Excavator menuangkan material hasil3 Selanjutnya Excavator menuangkan material hasil

    galian kedalam Dump Truck

    4 Dump Truck membuang material hasil galian keluar4 Dump Truck membuang material hasil galian keluar

    lokasi jalan sejauh L 0.50 Km

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    Tidak ada bahan yang diperlukanTidak ada bahan yang diperlukan

    2. ALAT 2. ALAT

    2.a. EXCAVATOR (E10)

    Kapasitas Bucket V 0.80 M3Kapasitas Bucket V 0.80 M3

    Faktor Bucket Fb 0.90 -

    Faktor Efisiensi alat Fa 0.75 -Faktor Efisiensi alat Fa 0.75 -

    Waktu siklus Ts1 menit

    - Menggali / memuat T1 0.80 menit- Menggali / memuat T1 0.80 menit

    - Lain-lain T2 0.25 menit

    Ts1 1.05 menitTs1 1.05 menit

    Kap. Prod. / jam = V x Fb x Fa x 60 Q1 25.71 M3/Jam

    Ts1 x FhTs1 x Fh

    Koefisien Alat / M3 = 1 : Q1 (E10) 0.0389 JamKoefisien Alat / M3 = 1 : Q1 (E10) 0.0389 Jam

    2.b. DUMP TRUCK (E08)

    Kapasitas bak V 15.00 M3Kapasitas bak V 15.00 M3

    Faktor efisiensi alat Fa 0.75 -

    Kecepatan rata-rata bermuatan v1 50.00 KM/JamKecepatan rata-rata bermuatan v1 50.00 KM/Jam

    Kecepatan rata-rata kosong v2 70.00 KM/Jam

    Waktu siklus Ts2 menitWaktu siklus Ts2 menit

    - Waktu tempuh isi = (L : v1) x 60 T1 0.60 menit

    - Waktu tempuh kosong = (L : v2) x 60 T2 0.43 menit

    - Muat = (V : Q1) x 60 T3 35.00 menit- Muat = (V : Q1) x 60 T3 35.00 menit

    - Lain-lain T4 0.50 menit

    Ts2 36.53 menitTs2 36.53 menit

    Berlanjut ke halaman berikut

  • Type Of Work : Common Excavation is higher than 10 m (H > 10 m ) Analisa EI-311

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work : Common Excavation is higher than 10 m (H > 10 m ) Analisa EI-311

    Payment unit : M3

    Pay Item Number : 3.1.1.aPay Item Number : 3.1.1.a

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGANNo. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Kapasitas Produksi / Jam = V x Fa x 60 Q2 15.40 M3/Jam

    Fk x Ts2 Fk x Ts2

    Koefisien Alat / M3 = 1 : Q2 (E08) 0.0649 JamKoefisien Alat / M3 = 1 : Q2 (E08) 0.0649 Jam

    2.c. ALAT BANTU

    Diperlukan alat-alat bantu kecil 1.0000 Ls Lump Sump

    - Sekop

    - Keranjang

    3. TENAGA

    Produksi menentukan : Dump Truck Q2 15.40 M3/JamProduksi menentukan : Dump Truck Q2 15.40 M3/Jam

    Produksi Galian / hari = Tk x Q2 x Qt 107.79 M3

    Kebutuhan tenaga :

    - Pekerja P 2.00 orang- Pekerja P 2.00 orang

    - Mandor M 1.00 orang

    Koefisien tenaga / M3 :

    - Pekerja = (Tk x P) : Qt (L01) 0.1299 Jam- Pekerja = (Tk x P) : Qt (L01) 0.1299 Jam

    - Mandor = (Tk x M) : Qt (L03) 0.0649 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :Didapat Harga Satuan Pekerjaan :

    Rp. 31,716.45 / M3Rp. 31,716.45 / M3

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN6. WAKTU PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : 8.00 Hari Memakai

    2 Unit2 Unit

    7. VOLUME PEKERJAAN YANG DIPERLUKAN dump truck

    Volume pekerjaan : 1,704.00 M3

  • ANALISA HARGA SATUAN MATA PEMBAYARAN

    LAMPIRAN 2 PENAWARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : Rock Excavation PERKIRAAN VOL. PEK. M3

    Type Of Work : M3 TOTAL HARGA (Rp.) 17,929.81Type Of Work : M3 TOTAL HARGA (Rp.) 17,929.81

    Payment unit : 3.1 (2) % THD. BIAYA PROYEK 0.00

    PERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGANO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)

    A. TENAGAA. TENAGA

    1. Pekerja (L01) Jam 0.3404 7,150.00 2,434.04

    2. Mandor (L03) Jam 0.0426 9,500.00 404.262. Mandor (L03) Jam 0.0426 9,500.00 404.26

    2,838.30JUMLAH HARGA TENAGA

    B. BAHAN

    - JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Compressor (E05) Jam 0.0426 151,777.15 6,458.601. Compressor (E05) Jam 0.0426 151,777.15 6,458.60

    2. Jack Hammer (E26) Jam 0.0426 78,034.98 3,320.64

    3. Wheel Loader (E15) Jam 0.0426 367,291.96 15,629.45

    4. Excavator (E10) Jam 0.0426 320,462.53 13,636.704. Excavator (E10) Jam 0.0426 320,462.53 13,636.70

    5 Dump Truck (E08) Jam 0.0651 241,830.76 15,752.17

    6 Alat bantu Ls 1.0000 100.00 100.006 Alat bantu Ls 1.0000 100.00 100.00

    54,897.55JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 57,735.85

    E. OVERHEAD & PROFIT 5.0 % x D 2,886.79E. OVERHEAD & PROFIT 5.0 % x D 2,886.79

    F. HARGA SATUAN PEKERJAAN ( D + E ) 60,622.64

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri PT. Perapen Prima Mandiri

    Ir. MawardiIr. Mawardi

    Direktur Utama

  • Type Of Work : Rock Excavation Analisa EI-312

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work : Rock Excavation Analisa EI-312

    Payment unit : M3

    Pay Item Number : 3.1 (2) URAIAN ANALISA HARGA SATUANPay Item Number : 3.1 (2)

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Pekerjaan dilakukan secara manual1 Pekerjaan dilakukan secara manual

    2 Lokasi pekerjaan : sepanjang jalan

    3 Kondisi Jalan : sedang / baik

    4 Jam kerja efektif per-hari Tk 7.00 Jam4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Faktor pengembangan bahan Fk 1.20 -

    II. URUTAN KERJAII. URUTAN KERJA

    1 Batu yg dipotong umumnya berada disisi jalan

    2 Penggalian dilakukan dengan Excavator, Compresor

    dan Jack Hammer, dimuat ke dlm Truk dengan Loader.dan Jack Hammer, dimuat ke dlm Truk dengan Loader.

    3 Dump Truck membuang material hasil galian keluar

    lokasi jalan sejauh : L 0.50 Kmlokasi jalan sejauh : L 0.50 Km

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    Tidak ada bahan yang diperlukanTidak ada bahan yang diperlukan

    2. ALAT 2. ALAT

    2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER (E05/26/10/15)

    Produksi per jam Q1 23.50 M3 / Jam 164.5Produksi per jam Q1 23.50 M3 / Jam 164.5

    Koefisien Alat / m3 = 1 : Q1 (E05/26) 0.0426 JamKoefisien Alat / m3 = 1 : Q1 (E05/26) 0.0426 Jam

    2.b. DUMP TRUCK (E08) 2.b. DUMP TRUCK (E08)

    Kapasitas bak V 15.00 M3

    Faktor efisiensi alat Fa 0.83 -Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktu siklus Ts1 menitWaktu siklus Ts1 menit

    - Waktu tempuh isi = (L : v1) x 60 T1 0.75 menit

    - Waktu tempuh kosong = (L : v2) x 60 T2 0.50 menit- Waktu tempuh kosong = (L : v2) x 60 T2 0.50 menit

    - Muat = (V : Q1) x 60 T3 38.30 menit

    - Lain-lain T4 1.00 menit- Lain-lain T4 1.00 menit

    Ts1 40.55 menit

    Kapasitas Produksi / Jam = V x Fa x 60 Q2 15.35 M3 / Jam

    Fk x Ts1 Fk x Ts1

    Koefisien Alat / m3 = 1 : Q2 (E08) 0.0651 Jam

    Berlanjut ke halaman berikut

  • Type Of Work : Rock Excavation Analisa EI-312

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work : Rock Excavation Analisa EI-312

    Payment unit : M3

    Pay Item Number : 3.1 (2) URAIAN ANALISA HARGA SATUANPay Item Number : 3.1 (2)

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    2.d. ALAT BANTU

    Diperlukan alat-alat bantu kecil Lump SumpDiperlukan alat-alat bantu kecil Lump Sump

    - Pahat / Tatah = 2 buah

    - Palu Besar = 2 buah

    3. TENAGA

    Produksi menentukan : JACK HAMMER Q1 23.50 M3/JamProduksi menentukan : JACK HAMMER Q1 23.50 M3/Jam

    Produksi Galian / hari = Tk x Q1 Qt 164.50 M3

    Kebutuhan tenaga :

    - Pekerja P 8.00 orang

    - Mandor M 1.00 orang

    Koefisien tenaga / M3 :

    - Pekerja = (Tk x P) : Qt (L01) 0.3404 Jam- Pekerja = (Tk x P) : Qt (L01) 0.3404 Jam

    - Mandor = (Tk x M) : Qt (L03) 0.0426 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN

    Lihat perhitungan dalam FORMULIR STANDAR UNTUKLihat perhitungan dalam FORMULIR STANDAR UNTUK

    PEREKEMAN ANALISA MASING-MASING HARGA

    SATUAN.

    Didapat Harga Satuan Pekerjaan :Didapat Harga Satuan Pekerjaan :

    Rp. 60,622.64 / M3Rp. 60,622.64 / M3

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN6. WAKTU PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : . . . . . . . . . . . . bulan

    7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : M3 M3Volume pekerjaan : M3 M3

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : 3.1.3

    Type Of Work :Structural excavation 0 - 2 m depthType Of Work :Structural excavation 0 - 2 m depth

    Payment unit : M3

    PERKIRAAN HARGA JUMLAHPERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. TENAGA

    1. Pekerja (L01) Jam 0.1418 7,150.00 1,013.871. Pekerja (L01) Jam 0.1418 7,150.00 1,013.87

    2. Mandor (L03) Jam 0.0709 9,500.00 673.55

    1,687.42JUMLAH HARGA TENAGA

    B. BAHAN

    1. Urugan Pilihan M3 1.2000 25,000.00 30,000.00

    30,000.00 JUMLAH HARGA BAHAN 30,000.00

    C. PERALATAN

    JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Excavator (E10) Jam 0.0461 320,462.53 14,773.32

    2. Dump Truck (E04) Jam 0.0709 241,830.76 17,145.80

    3. Motor Grader jam 0.0033 314,383.12 1,037.463. Motor Grader jam 0.0033 314,383.12 1,037.46

    4. Vibro Roller jam 0.0027 248,268.22 670.32

    5. Water Tank Truck jam 0.0117 170,816.08 1,998.555. Water Tank Truck jam 0.0117 170,816.08 1,998.55

    6. Alat bantu Ls 1.0000 500.00 500.00

    36,125.46

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 67,812.88

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 67,812.88

    E. KEUNTUNGAN 5.0 % x D 3,390.64

    F. HARGA SATUAN PEKERJAAN ( D + E ) 71,203.52

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work :Structural excavation 0 - 2 m depth

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Structural excavation 0 - 2 m depth

    Payment unit : M3

    Pay Item Number : 3.1.3 URAIAN ANALISA HARGA SATUANPay Item Number : 3.1.3

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSII. ASUMSI

    1 Menggunakan alat berat (cara mekanik)

    2 Lokasi pekerjaan : sekitar jembatan2 Lokasi pekerjaan : sekitar jembatan

    3 Kondisi Jalan : sedang / baik

    4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Faktor pengembangan bahan Fk 1.20 -5 Faktor pengembangan bahan Fk 1.20 -

    II. METHODE PELAKSANAAN

    1 Tanah yang digali berada disekitar lokasi Pekerjaan1 Tanah yang digali berada disekitar lokasi Pekerjaan

    2 penggalian dilakukan dengan menggunakan Excavator

    3 Excavator menuangkan material hasil galian kedalam Dump Truck3 Excavator menuangkan material hasil galian kedalam Dump Truck

    4 Dump Truck membuang material hasil galian keluar lokasi jalan sejauh L 0.50 Km

    6 Setelah Bangunan Struktur selesai , Lubang galian akan ditimbun dengan

    Urugan pilihan, dengan menggunakan dump truck, Excavator,Motor grader Urugan pilihan, dengan menggunakan dump truck, Excavator,Motor grader

    7 Material dihampar dengan menggunakan Motor Grader

    8 Hamparan material disiram air dengan Watertank Truck (sebelum8 Hamparan material disiram air dengan Watertank Truck (sebelum

    pelaksanaan pemadatan) dan dipadatkan dengan menggunakan Vibro Roller

    9 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan

    dan level permukaan dengan menggunakan alat bantu

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN 1. BAHAN

    Urugan Pilihan 1.20 M3

    2. ALAT

    2.a. EXCAVATOR (E10) 2.a. EXCAVATOR (E10)

    Kapasitas Bucket V 0.80 M3

    Faktor Bucket Fb 0.90 -Faktor Bucket Fb 0.90 -

    Faktor Efisiensi alat Fa 0.75 -

    Faktor kedalaman Fd 0.85 -Faktor kedalaman Fd 0.85 -

    Berat isi material Bim 0.85 -

    Waktu siklusWaktu siklus

    - Menggali / memuat Te1 0.55 menit

    - Lain-lain Te2 0.35 menit- Lain-lain Te2 0.35 menit

    Te 0.90 menit

    Kap. Prod. / jam = V x Fb x Fa x Fd x Bim x 60 Q1 21.68 M3/JamKap. Prod. / jam = V x Fb x Fa x Fd x Bim x 60 Q1 21.68 M3/Jam

    Te x Fh

    Koefisien Alat / M3 = 1 : Q1 (E10) 0.0461 Jam

    2.b. DUMP TRUCK (E08)

    Kapasitas bak V 10.00 M3

    Faktor efisiensi alat Fa 0.83 -Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/JamKecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktu siklus Ts2 menit

    Waktu Siklus : - Waktu memuat = V : Q1 x 60 T1 27.68 menit

    - Waktu tempuh isi = (L : v1) x 60 menit T2 0.75 menit

    - Waktu tempuh kosong = (L : v2) x 60 menit T3 0.50 menit

    - Dump dan lain-lain T4 0.50 menit Loose- Dump dan lain-lain T4 0.50 menit Loose

    Ts2 29.43 menit

    Berlanjut ke halaman berikut

  • ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Structural excavation 0 - 2 m depth Analisa EI-313

    Payment unit : M3Payment unit : M3

    Pay Item Number : 3.1.3

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Kap. Prod. / jam = V x Fa x 60 Q2 14.10 M3Kap. Prod. / jam = V x Fa x 60 Q2 14.10 M3

    Fk x Ts2

    Koefisien Alat / M3 = 1 : Q2 - 0.0709 jam

    - Lain-lain- Lain-lain

    2.c. MOTOR GRADER (E13) 2.c. MOTOR GRADER (E13)

    Panjang hamparan Lh 50.00 M

    Lebar efektif kerja blade b 2.40 M

    Faktor Efisiensi alat Fa 0.75 -

    Kecepatan rata-rata alat v 4.00 KM/jam

    Jumlah lintasan n 6.00 lintasanJumlah lintasan n 6.00 lintasan

    Waktu Siklus : Ts3

    - Perataan 1 lintasan = Lh : (v x 1000) x 60 T1 2.00 menit- Perataan 1 lintasan = Lh : (v x 1000) x 60 T1 2.00 menit

    - Lain-lain T2 1.00 menit

    Ts3 3.00 menit

    Kap. Prod. / jam = Lh x b x Fa x 60 Q3 300.00 M3

    n x Ts3n x Ts3

    Koefisien Alat / M3 = 1 : Q3 (E13) 0.0033 jam

    2.d. VIBRATOR ROLLER (E19)

    Kecepatan rata-rata alat v 3.00 Km / jamKecepatan rata-rata alat v 3.00 Km / jam

    Lebar efektif pemadatan b 1.20 M

    Jumlah lintasan n 8.00 lintasanJumlah lintasan n 8.00 lintasan

    Faktor efisiensi alat Fa 0.83 -

    Kapasitas Produksi / Jam = (v x 1000) x b x Fa Q2 373.50 M3

    nn

    Koefisien Alat / M3 = 1 : Q2 (E19) 0.0027 JamKoefisien Alat / M3 = 1 : Q2 (E19) 0.0027 Jam

    2.e. WATER TANKER (E23)

    Volume tanki air V 4.00 M3Volume tanki air V 4.00 M3

    Kebutuhan air / M3 agregat padat Wc 0.07 M3

    Pengisian tanki / jam n 2.00 kali

    Faktor Efisiensi alat Fa 0.75 -

    Kap. Prod. / jam = V x n x Fa Q6 85.71 M3Kap. Prod. / jam = V x n x Fa Q6 85.71 M3

    Wc

    Koefisien Alat / M3 = 1 : Q6 (E23) 0.0117 jamKoefisien Alat / M3 = 1 : Q6 (E23) 0.0117 jam

    Berlanjut ke halaman berikutBerlanjut ke halaman berikut

  • Type Of Work :Structural excavation 0 - 2 m depth Analisa EI-313

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Structural excavation 0 - 2 m depth Analisa EI-313

    Payment unit : M3

    Pay Item Number : 3.1.3 URAIAN ANALISA HARGA SATUANPay Item Number : 3.1.3

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    2.c. ALAT BANTU 2.c. ALAT BANTU

    Diperlukan alat-alat bantu kecil 1.0000 Ls Lump Sump

    - Pacul = 2 buah

    - Sekop = 2 buah- Sekop = 2 buah

    3. TENAGA

    Produksi menentukan : Dump Truck Q2 14.10 M3/Jam

    Produksi Timbunan / hari = Tk x Q2 Qt 98.70 M3

    Kebutuhan tenaga :

    - Pekerja P 2.00 orang- Pekerja P 2.00 orang

    - Mandor M 1.00 orang

    Koefisien tenaga / M3 :

    - Pekerja = (Tk x P) : Qt (L01) 0.1418 Jam

    - Mandor = (Tk x M) : Qt (L03) 0.0709 Jam- Mandor = (Tk x M) : Qt (L03) 0.0709 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :Didapat Harga Satuan Pekerjaan :

    Rp. 71,203.52 / M3Rp. 71,203.52 / M3

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN Memakai6. WAKTU PELAKSANAAN YANG DIPERLUKAN Memakai

    Masa Pelaksanaan : 8.00 Hari 2 Unit

    Dump TruckDump Truck

    7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 1,460.00 M3Volume pekerjaan : 1,460.00 M3

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : 3. 1. 4

    Type Of Work :Structural excavation 2 - 4 m depthType Of Work :Structural excavation 2 - 4 m depth

    Payment unit : M3

    PERKIRAAN HARGA JUMLAHPERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. TENAGA

    1. Pekerja (L01) Jam 0.0960 7,150.00 686.401. Pekerja (L01) Jam 0.0960 7,150.00 686.40

    2. Mandor (L03) Jam 0.0480 9,500.00 456.00

    1,142.40

    B. BAHAN

    JUMLAH HARGA TENAGA

    1. Urugan Pilihan M3 1.0000 25,000.00 25,000.00

    2. Bahan Pengaman Tebing Galian Ls 1.0000 45,000.00 45,000.00 2. Bahan Pengaman Tebing Galian Ls 1.0000 45,000.00 45,000.00

    70,000.00

    C. PERALATAN

    JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Excavator (E10) Jam 0.0480 320,462.53 15,382.20

    2. Bulldozer (E04) Jam 0.0518 253,932.03 13,153.68

    3. Alat bantu Jam 1.0000 500.00 500.003. Alat bantu Jam 1.0000 500.00 500.00

    29,035.88

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 100,178.28

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 100,178.28

    E. KEUNTUNGAN 5.0 % x D 5,008.91

    F. HARGA SATUAN PEKERJAAN ( D + E ) 105,187.19

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work :Structural excavation 2 - 4 m depth Analisa EI-314

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Structural excavation 2 - 4 m depth Analisa EI-314

    Payment unit : M3

    Pay Item Number : 3. 1. 4 URAIAN ANALISA HARGA SATUANPay Item Number : 3. 1. 4

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Pekerjaan dilakukan secara manual1 Pekerjaan dilakukan secara manual

    2 Lokasi pekerjaan : sekitar jembatan

    3 Kondisi Jalan : sedang / baik

    4 Jam kerja efektif per-hari Tk 7.00 Jam4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Faktor pengembangan bahan Fh 1.20 -

    6 Pengurugan kembali (backfill ) untuk struktur Uk 77.00 %/M36 Pengurugan kembali (backfill ) untuk struktur Uk 77.00 %/M3

    II. METHODE PELAKSANAANII. METHODE PELAKSANAAN

    1 Tanah yang dipotong berada disekitar jembatan

    2 Penggalian dilakukan dengan menggunakan alat

    ExcavatorExcavator

    3 Bulldozer mengangkut/mengusur hasil galian ke tempat

    pembuangan di sekitar lokasi pekerjaan L 0.20 Kmpembuangan di sekitar lokasi pekerjaan L 0.20 Km

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    - Urugan Pilihan = Uk x 1M3 (EI-322) 1.000 M3- Urugan Pilihan = Uk x 1M3 (EI-322) 1.000 M3

    - Bahan Pengaman Tebing Galian 1.000 Ls

    2. ALAT 2. ALAT

    2.a. EXCAVATOR (E10)

    Kapasitas Bucket V 0.80 M3

    Faktor Bucket Fb 0.90 -Faktor Bucket Fb 0.90 -

    Faktor Efisiensi alat Fa 0.75 -

    Faktor kedalaman Fd 0.90 -Faktor kedalaman Fd 0.90 -

    Berat isi material Bim 0.90 -

    Waktu siklus

    - Menggali / memuat Te1 0.55 menit

    - Lain-lain Te2 0.50 menit- Lain-lain Te2 0.50 menit

    Te 1.05 menit

    Kap. Prod. / jam = V x Fb x Fa x Fd x Bim x 60 Q1 20.83 M3/Jam

    Te x FhTe x Fh

    Koefisien Alat / M3 = 1 : Q1 (E10) 0.0480 JamKoefisien Alat / M3 = 1 : Q1 (E10) 0.0480 Jam

    2.b. BULLDOZER 2.b. BULLDOZER

    Faktor blade Fb 0.90 -

    Faktor efisiensi alat Fa 0.75 -

    Kecepatan maju F 3.00 Km/JamKecepatan maju F 3.00 Km/Jam

    Kecepatan mundur R 4.00 Km/Jam

    Lebar Blade B 3.00 MLebar Blade B 3.00 M

    Tinggi blade H 1.20 M

    Jarak Gusur L 200.00 M

    Volume 1 kali gusur = H^2 x B x Fb V 3.89 M3

    Berlanjut ke halaman berikut

  • Type Of Work :Structural excavation 2 - 4 m depth Analisa EI-314

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Structural excavation 2 - 4 m depth Analisa EI-314

    Payment unit : M3

    Pay Item Number : 3. 1. 4 URAIAN ANALISA HARGA SATUANPay Item Number : 3. 1. 4

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Waktu Siklus Ts2

    - Waktu Angkut isi = (L : F ) x 60 T1 4.00 menit- Waktu Angkut isi = (L : F ) x 60 T1 4.00 menit

    - Mundur = (L : R ) x 60 T2 3.00 menit

    - Lain-lain T3 0.55 menit

    7.55 menit7.55 menit

    Kapasitas Produksi / Jam = V x Fa x 60 Q2 19.31 M3 / Jam Kapasitas Produksi / Jam = V x Fa x 60 Q2 19.31 M3 / Jam

    Fk x Ts2

    Koefisien Alat / M3 = 1 : Q1 (E10) 0.0518 Jam

    2.c. ALAT BANTU

    Diperlukan alat-alat bantu kecil 1.0000 JamDiperlukan alat-alat bantu kecil 1.0000 Jam

    - Pacul = 2 buah

    - Sekop = 2 buah

    3. TENAGA 3. TENAGA

    Produksi menentukan : Excavator Q1 20.83 M3/Jam

    Produksi Galian / hari = Tk x Q1 Qt 145.80 M3Produksi Galian / hari = Tk x Q1 Qt 145.80 M3

    Kebutuhan tenaga :

    - Pekerja P 2.00 orang

    - Mandor M 1.00 orang- Mandor M 1.00 orang

    Koefisien tenaga / M3 :Koefisien tenaga / M3 :

    - Pekerja = (Tk x P) : Qt (L01) 0.0960 Jam

    - Mandor = (Tk x M) : Qt (L03) 0.0480 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :

    Rp. 105,187.19 / M3

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : 10.00 Hari

    7. VOLUME PEKERJAAN YANG DIPERLUKAN7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 1,339.00 M3

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : 3.1 5

    Type Of Work : Structural excavation 4 - 6 m depth

    Payment unit : M3Payment unit : M3

    PERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGANO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)

    A. TENAGAA. TENAGA

    1. Pekerja (L01) Jam 0.4229 7,150.00 3,023.84

    2. Mandor (L03) Jam 0.1410 9,500.00 1,339.232. Mandor (L03) Jam 0.1410 9,500.00 1,339.23

    4,363.07JUMLAH HARGATENAGA

    B. BAHAN

    1. Urugan Pilihan (EI-322) M3 0.5000 25,000.00 12,500.001. Urugan Pilihan (EI-322) M3 0.5000 25,000.00 12,500.00

    2. Bahan Pengaman Tebing Galian Ls 1.0000 45,000.00 45,000.00

    57,500.00JUMLAH HARGA BAHAN 57,500.00

    C. PERALATAN

    1. Excavator (E10) Jam 0.1410 320,462.53 45,176.06

    JUMLAH HARGA BAHAN

    1. Excavator (E10) Jam 0.1410 320,462.53 45,176.06

    2. Bulldozer (E04) Jam 0.0157 253,932.03 3,988.37

    3. Alat bantu Ls 1.0000 500.00 500.00

    49,664.43JUMLAH HARGA PERALATAN 49,664.43

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 111,527.49

    E. KEUNTUNGAN 5.0 % x D 5,576.37

    JUMLAH HARGA PERALATAN

    E. KEUNTUNGAN 5.0 % x D 5,576.37

    F. HARGA SATUAN PEKERJAAN ( D + E ) 117,103.87

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranNote : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. MawardiIr. Mawardi

    Direktur Utama

  • Type Of Work : Structural excavation 4 - 6 m depth Analisa EI-315

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work : Structural excavation 4 - 6 m depth Analisa EI-315

    Payment unit : M3

    Pay Item Number : 3.1 5Pay Item Number : 3.1 5

    No. U R A I A N KODE KOEF. SATUAN KETERANGANNo. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Pekerjaan dilakukan secara manual1 Pekerjaan dilakukan secara manual

    2 Lokasi pekerjaan : sekitar jembatan

    3 Kondisi Jalan : sedang / baik

    4 Jam kerja efektif per-hari Tk 7.00 Jam4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Faktor pengembangan bahan Fh 1.20 -

    6 Pengurugan kembali (backfill ) untuk struktur Uk 50.00 %/M36 Pengurugan kembali (backfill ) untuk struktur Uk 50.00 %/M3

    II. METHODE PELAKSANAANII. METHODE PELAKSANAAN

    1 Tanah / batu yang dipotong berada disekitar jembatan

    2 Penggalian dilakukan dengan mgenggunakan alat

    ExcavatorExcavator

    3 Bulldozer mengankut/mengusur hasil galian ke tempat

    pembuangan dilokasi sekitar jembatan L 0.0500 Kmpembuangan dilokasi sekitar jembatan L 0.0500 Km

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    - Urugan Pilihan (untuk backfill ) = Uk x 1M3 (EI-322) 0.50 M3- Urugan Pilihan (untuk backfill ) = Uk x 1M3 (EI-322) 0.50 M3

    2. ALAT 2. ALAT

    2.a. EXCAVATOR (E10)

    Kapasitas Bucket V 0.80 M3

    Faktor Bucket Fb 0.90 -Faktor Bucket Fb 0.90 -

    Faktor Efisiensi alat Fa 0.75 -

    Faktor kedalaman Fd 0.85 -Faktor kedalaman Fd 0.85 -

    Berat isi material Bim 0.85 -

    Waktu siklus

    - Menggali / memuat Te1 2.00 menit

    - Lain-lain Te2 0.75 menit- Lain-lain Te2 0.75 menit

    Te 2.75 menit

    Kap. Prod. / jam = V x Fb x Fa x Fd x Bim x 60 Q1 7.09 M3/Jam

    Te x FhTe x Fh

    Koefisien Alat / M3 = 1 : Q1 (E10) 0.1410 JamKoefisien Alat / M3 = 1 : Q1 (E10) 0.1410 Jam

    2.b. BULLDOZER (E04)

    Faktor blade Fb 0.90 -

    Faktor efisiensi alat Fa 0.75 -Faktor efisiensi alat Fa 0.75 -

    Kecepatan maju F 3.00 Km/Jam

    Kecepatan mundur R 4.00 Km/JamKecepatan mundur R 4.00 Km/Jam

    Lebar Blade B 3.00 M

    Tinggi blade H 1.20 M

    ` Jarak Gusur L 50.00 M

    Volume 1 kali gusur = H^2 x B x Fb V 3.89 M3 LooseVolume 1 kali gusur = H^2 x B x Fb V 3.89 M3 Loose

    Berlanjut ke halaman berikut

  • Type Of Work : Structural excavation 4 - 6 m depth Analisa EI-315

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work : Structural excavation 4 - 6 m depth Analisa EI-315

    Payment unit : M3

    Pay Item Number : 3.1 5 URAIAN ANALISA HARGA SATUANPay Item Number : 3.1 5

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Waktu Siklus

    - Maju = (L x 60) / (F x 1000) Tb1 1.00 menit- Maju = (L x 60) / (F x 1000) Tb1 1.00 menit

    - Mundur = (L x 60) / (R x 1000) Tb2 0.75 menit

    - Lain-lain Tb3 0.54 menit

    Tb 2.29 menitTb 2.29 menit

    Kapasitas Produksi / Jam = V x Fa x 60 Q2 63.67 M3 / Jam Kapasitas Produksi / Jam = V x Fa x 60 Q2 63.67 M3 / Jam

    Tb x Fh

    Koefisien Alat / M3 = 1 : Q2 (E04) 0.0157 Jam

    2.c. ALAT BANTU

    Diperlukan alat-alat bantu kecil Lump SumpDiperlukan alat-alat bantu kecil Lump Sump

    - Pacul = 2 buah

    - Sekop = 2 buah

    3. TENAGA 3. TENAGA

    Produksi menentukan : EXCAVATOR Q1 7.09 M3/Jam

    Produksi Galian / hari = Tk x Q1 Qt 49.66 M3Produksi Galian / hari = Tk x Q1 Qt 49.66 M3

    Kebutuhan tenaga :

    - Pekerja P 3.00 orang

    - Mandor M 1.00 orang- Mandor M 1.00 orang

    Koefisien tenaga / M3 :Koefisien tenaga / M3 :

    - Pekerja = (Tk x P) : Qt (L01) 0.4229 Jam

    - Mandor = (Tk x M) : Qt (L03) 0.1410 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :

    Rp. 117,103.87 / M3

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : 6.00 Hari

    7. VOLUME PEKERJAAN YANG DIPERLUKAN7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 267.00 M3

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : 3. 1. 7

    Type Of Work :Excavation of Existing Asphalt Pavement Material Without Cold Milling MachineType Of Work :Excavation of Existing Asphalt Pavement Material Without Cold Milling Machine

    Payment unit : M3

    PERKIRAAN HARGA JUMLAHPERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. TENAGA

    1. Pekerja (L01) Jam 0.8889 7,150.00 6,355.641. Pekerja (L01) Jam 0.8889 7,150.00 6,355.64

    2. Mandor (L03) Jam 0.4444 9,500.00 4,221.80

    10,577.44

    B. BAHAN

    JUMLAH HARGA TENAGA

    0.00JUMLAH HARGA BAHAN 0.00

    C. PERALATAN

    1. Jack Hammer (E26) Jam 0.4444 78,034.98 34,678.75

    JUMLAH HARGA BAHAN

    1. Jack Hammer (E26) Jam 0.4444 78,034.98 34,678.75

    2. Compressor (E05) Jam 0.4444 151,777.15 67,449.77

    3. Dump Truck (E08) Jam 0.7483 197,134.70 147,515.90

    214,965.66JUMLAH HARGA PERALATAN 214,965.66

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 225,543.10

    E. KEUNTUNGAN 5.0 % x D 11,277.15

    JUMLAH HARGA PERALATAN

    E. KEUNTUNGAN 5.0 % x D 11,277.15

    F. HARGA SATUAN PEKERJAAN ( D + E ) 236,820.25

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuranNote : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work :Excavation of Existing Asphalt Pavement Material Without Cold Milling Machine

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Excavation of Existing Asphalt Pavement Material Without Cold Milling Machine

    Payment unit : M3 Analisa EI-318

    Pay Item Number : 3. 1. 7 URAIAN ANALISA HARGA SATUANPay Item Number : 3. 1. 7

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Pekerjaan dilakukan secara manual1 Pekerjaan dilakukan secara manual

    2 Lokasi pekerjaan : sepanjang jalan

    3 Kondisi Jalan : sedang / baik

    4 Jam kerja efektif per-hari Tk 7.00 Jam4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Tebal Aspal t 0.05 m

    6 Faktor pengembangan bahan Fk 1.20 -6 Faktor pengembangan bahan Fk 1.20 -

    II. URUTAN KERJAII. URUTAN KERJA

    1 Aspal yg dipotong umumnya berada dibadan jalan

    2 Penggalian dilakukan dengan Compresor

    dan Jack Hammer, dimuat ke dlm Truk dg tenaga manusiadan Jack Hammer, dimuat ke dlm Truk dg tenaga manusia

    3 Dump Truck membuang material hasil galian keluar

    lokasi jalan sejauh : L 0.50 Kmlokasi jalan sejauh : L 0.50 Km

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    Tidak ada bahan yang diperlukanTidak ada bahan yang diperlukan

    2. ALAT 2. ALAT

    2.a. COMPRESSOR, JACK HAMMER (E05/26/10/15)

    Kapasitas bongkar bk 1.00 M3 / JamKapasitas bongkar bk 1.00 M3 / Jam

    Faktor efisiensi alat Fa 0.75

    Kap. Produksi/jam = Fa x t x 60 Q1 2.25Kap. Produksi/jam Q1 2.25

    bk

    Koefisien Alat / m3 = 1 : Q1 (E05/26) 0.4444 JamKoefisien Alat / m3 = 1 : Q1 (E05/26) 0.4444 Jam

    2.b. DUMP TRUCK (E08)

    Kapasitas bak V 2.33 M3

    Faktor efisiensi alat Fa 0.75 -Faktor efisiensi alat Fa 0.75 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/JamKecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktu siklus Ts1 menit

    - Waktu tempuh isi = (L : v1) x 60 T1 0.75 menit- Waktu tempuh isi = (L : v1) x 60 T1 0.75 menit

    - Waktu tempuh kosong = (L : v2) x 60 T2 0.50 menit

    - Muat = (V : Q1) x 60 T3 62.22 menit

    - Lain-lain T4 2.00 menit- Lain-lain T4 2.00 menit

    Ts1 65.47 menit

    Kapasitas Produksi / Jam = V x Fa x 60 Q2 1.3364 M3 / Jam Kapasitas Produksi / Jam = V x Fa x 60 Q2 1.3364 M3 / Jam

    Fk x Ts1

    Koefisien Alat / m3 = 1 : Q2 (E08) 0.7483 JamKoefisien Alat / m3 = 1 : Q2 (E08) 0.7483 Jam

    Berlanjut ke halaman berikutBerlanjut ke halaman berikut

  • Type Of Work :Excavation of Existing Asphalt Pavement Material Without Cold Milling Machine Analisa EI-318

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Excavation of Existing Asphalt Pavement Material Without Cold Milling Machine Analisa EI-318

    Payment unit : M3

    Pay Item Number : 3. 1. 7 URAIAN ANALISA HARGA SATUANPay Item Number : 3. 1. 7

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    3. TENAGA

    Produksi menentukan : COMPRESSOR, JACK HAMMER Q1 2.25 M3/JamProduksi menentukan : COMPRESSOR, JACK HAMMER Q1 2.25 M3/Jam

    Produksi Galian / hari = Tk x Q1 Qt 15.75 M3

    Kebutuhan tenaga :

    - Pekerja P 2.00 orang

    - Mandor M 1.00 orang

    Koefisien tenaga / M3 :

    - Pekerja = (Tk x P) : Qt (L01) 0.8889 Jam- Pekerja = (Tk x P) : Qt (L01) 0.8889 Jam

    - Mandor = (Tk x M) : Qt (L03) 0.4444 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :

    Rp. 236,820.25 / M3Rp. 236,820.25 / M3

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : 2.00 Hari

    7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 27.00 M3Volume pekerjaan : 27.00 M3

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : 3.2 (1)

    Type Of Work :Common EmbankmentType Of Work :Common Embankment

    Payment unit : M3

    PERKIRAAN HARGA JUMLAHPERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. TENAGA

    1. Pekerja (L01) Jam 0.1222 7,150.00 873.731. Pekerja (L01) Jam 0.1222 7,150.00 873.73

    2. Mandor (L02) Jam 0.0407 9,500.00 386.65

    1,260.38JUMLAH HARGA TENAGA

    B. BAHAN

    1. Bahan timbunan M3 1.2000 17,000.00 20,400.00

    20,400.00JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Excavator (E15) Jam 0.0407 320,462.53 13,042.82

    2. Dump Truck (E08) Jam 0.0122 241,830.76 2,950.342. Dump Truck (E08) Jam 0.0122 241,830.76 2,950.34

    3. Motor Grader (E13) Jam 0.0031 314,383.12 974.59

    4. Vibro Roller (E19) Jam 0.0040 248,268.22 993.074. Vibro Roller (E19) Jam 0.0040 248,268.22 993.07

    5. Water Tank Truck (E23) Jam 0.0233 170,816.08 3,980.01

    6. Alat Bantu Ls 1.0000 500.00 500.00

    22,440.84

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 44,101.22

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 44,101.22

    E. KEUNTUNGAN 5.0 % x D 2,205.06

    F. HARGA SATUAN PEKERJAAN ( D + E ) 46,306.28

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work :Common Embankment Analisa EI-322

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Common Embankment Analisa EI-322

    Payment unit : M3

    Pay Item Number : 3.2 (1) URAIAN ANALISA HARGA SATUANPay Item Number : 3.2 (1)

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Pekerjaan dilakukan secara mekanis1 Pekerjaan dilakukan secara mekanis

    2 Lokasi pekerjaan : sepanjang jalan

    3 Kondisi Jalan : sedang / baik

    4 Jam kerja efektif per-hari Tk 7.00 Jam4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Faktor pengembangan bahan Fk 1.20 -

    6 Tebal hamparan padat t 0.30 M6 Tebal hamparan padat t 0.30 M

    II. URUTAN KERJAII. URUTAN KERJA

    1 Excavator memuat ke dalam Dump Truck

    2 Dump Truck mengangkut ke lapangan dengan jarak

    quari ke lapangan L 3.00 Kmquari ke lapangan L 3.00 Km

    3 Material dihampar dengan menggunakan Motor Grader

    4 Hamparan material disiram air dengan Water tank Truck4 Hamparan material disiram air dengan Water tank Truck

    (sebelum pelaksanaan pemadatan) dan dipadatkan

    dengan menggunakan Vibro Roller

    5 Selama pemadatan sekelompok pekerja akan

    merapikan tepi hamparan dan level permukaan

    dengan menggunakan alat bantudengan menggunakan alat bantu

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGAIII. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    1.a. Bahan timbunan = 1 x Fk (M08) 1.20 M3 Borrow Pit

    2. ALAT

    2.a. EXCAVATOR (E15)2.a. EXCAVATOR (E15)

    Kapasitas Bucket V 0.80 M3

    Faktor Bucket Fb 0.90 -Faktor Bucket Fb 0.90 -

    Faktor Efisiensi Alat Fa 0.75 -

    Faktor Konversi Fv 0.90

    Waktu sklus Ts1Waktu sklus Ts1

    - Menggali, memuat T1 0.90 menit

    - Lain lain T2 0.20 menit- Lain lain T2 0.20 menit

    Waktu Siklus = T1 x Fv Ts1 1.10 menit

    Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 24.55 M3Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 24.55 M3

    Fk x Ts1

    Koefisien alat / M3 = 1 : Q1 (E10) 0.0407 Jam

    2.b. DUMP TRUCK (E08) 2.b. DUMP TRUCK (E08)

    Kapasitas bak V 15.00 M3

    Faktor efisiensi alat Fa 0.83 -Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktusiklus : Ts2

    - Waktu tempuh isi = (L : v1) x 60 T1 4.50 menit

    - Waktu tempuh kosong = (L : v2) x 60 T2 3.00 menit- Waktu tempuh kosong = (L : v2) x 60 T2 3.00 menit

    - Lain-lain T3 0.10 menit

    Ts2 7.60 menitTs2 7.60 menit

    Berlanjut ke halaman berikut

  • Type Of Work :Common Embankment Analisa EI-322

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Common Embankment Analisa EI-322

    Payment unit : M3

    Pay Item Number : 3.2 (1) URAIAN ANALISA HARGA SATUANPay Item Number : 3.2 (1)

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Kapasitas Produksi / Jam = V x Fa x 60 Q2 81.91 M3

    Fk x Ts2 Fk x Ts2

    Koefisien Alat / M3 = 1 : Q2 (E08) 0.0122 Jam

    2.c. MOTOR GRADER (E13)

    Panjang hamparan Lh 50.00 MPanjang hamparan Lh 50.00 M

    Lebar Efektif kerja Blade b 2.40 M

    Faktor Efisiensi Alat Fa 0.75 -

    Kecepatan rata-rata alat v 4.00 Km / Jam

    Jumlah lintasan n 4.00 lintasan

    Waktu siklus Ts3Waktu siklus Ts3

    - Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.75 menit

    - Lain-lain T2 0.50 menit- Lain-lain T2 0.50 menit

    Ts3 1.25 menit

    Kapasitas Produksi / Jam = Lh x b x t x Fa x 60 Q3 324.00 M3Kapasitas Produksi / Jam = Lh x b x t x Fa x 60 Q3 324.00 M3

    n x Ts3

    Koefisien Alat / M3 = 1 : Q3 (E13) 0.0031 Jam

    2.d. VIBRO ROLLER (E19)

    Kecepatan rata-rata alat v 5.00 Km / Jam

    Lebar efektif pemadatan b 1.20 MLebar efektif pemadatan b 1.20 M

    Jumlah lintasan n 6.00 lintasan 2 awal & 4 Akhir

    Faktor efisiensi alat Fa 0.83 -Faktor efisiensi alat Fa 0.83 -

    Kapasitas Prod./Jam = (v x 1000) x b x t x Fa Q4 249.00 M3

    nn

    Koefisien Alat / M3 = 1 : Q4 (E19) 0.0040 JamKoefisien Alat / M3 = 1 : Q4 (E19) 0.0040 Jam

    2.e. WATER TANK TRUCK (E23)

    Volume tangki air V 4.00 M3

    Kebutuhan air / M3 material padat Wc 0.07 M3Kebutuhan air / M3 material padat Wc 0.07 M3

    Pengisian Tangki / jam n 1.00 kali

    Faktor efisiensi alat Fa 0.75 - BaikFaktor efisiensi alat Fa 0.75 - Baik

    Kapasitas Produksi / Jam = V x n x Fa Q5 42.86 M3

    Wc

    Koefisien Alat / M3 = 1 : Q5 (E23) 0.0233 JamKoefisien Alat / M3 = 1 : Q5 (E23) 0.0233 Jam

    2.f. ALAT BANTU2.f. ALAT BANTU

    Diperlukan alat-alat bantu kecil 1.0000 Ls Lump Sump

    - Sekop = 3 buah

    Berlanjut ke halaman berikut

  • Type Of Work :Common Embankment Analisa EI-322

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Common Embankment Analisa EI-322

    Payment unit : M3

    Pay Item Number : 3.2 (1) URAIAN ANALISA HARGA SATUANPay Item Number : 3.2 (1)

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    3. TENAGA

    Produksi menentukan : Excavator Q1 24.55 M3/JamProduksi menentukan : Excavator Q1 24.55 M3/Jam

    Produksi Timbunan / hari = Tk x Q1 Qt 171.82 M3

    Kebutuhan tenaga :

    - Pekerja P 3.00 orang- Pekerja P 3.00 orang

    - Mandor M 1.00 orang

    Koefisien tenaga / M3 :

    - Pekerja = (Tk x P) : Qt (L01) 0.1222 Jam

    - Mandor = (Tk x M) : Qt (L02) 0.0407 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :

    Rp. 46,306.28 / M3

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : 230.00 HariMasa Pelaksanaan : 230.00 Hari

    7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 39,494.00 M3Volume pekerjaan : 39,494.00 M3

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : 3. 2 .2

    Type Of Work :Selected EmbankmentType Of Work :Selected Embankment

    Payment unit : M3

    PERKIRAAN HARGA JUMLAHPERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. KERJA

    1. Pekerja (L01) Jam 0.2031 7,150.00 1,452.171. Pekerja (L01) Jam 0.2031 7,150.00 1,452.17

    2. Mandor (L03) Jam 0.0677 9,500.00 643.15

    2,095.32JUMLAH HARGATENAGA

    B. BAHAN

    1. Bahan pilihan (M09) M3 1.2000 25,000.00 30,000.00

    30,000.00JUMLAH HARGA BAHAN 30,000.00

    C. PERALATAN

    JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Whell Loader (E15) Jam 0.0296 367,291.96 10,871.84

    2. Dump Truck (E08) Jam 0.0677 241,830.76 16,371.94

    3. Motor Grader (E13) Jam 0.0056 314,383.12 1,760.553. Motor Grader (E13) Jam 0.0056 314,383.12 1,760.55

    4. Vibro Roller (E17) Jam 0.0040 248,268.22 997.06

    5. Water Tanker (E23) Jam 0.0233 170,816.08 3,980.015. Water Tanker (E23) Jam 0.0233 170,816.08 3,980.01

    6. Alat Bantu Ls 1.0000 500.00 500.00

    34,481.41

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 66,576.72

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 66,576.72

    E. KEUNTUNGAN 5.0 % x D 3,328.84

    F. HARGA SATUAN PEKERJAAN ( D + E ) 69,905.56

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work :Selected Embankment Analisa EI-323

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Selected Embankment Analisa EI-323

    Payment unit : M3

    Pay Item Number : 3. 2 .2 URAIAN ANALISA HARGA SATUANPay Item Number : 3. 2 .2

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Pekerjaan dilakukan secara mekanis1 Pekerjaan dilakukan secara mekanis

    2 Lokasi pekerjaan : sepanjang jalan

    3 Kondisi Jalan : sedang / baik

    4 Jam kerja efektif per-hari Tk 7.00 Jam4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Faktor pengembangan bahan Fk 1.20 -

    6 Tebal hamparan padat t 0.30 M6 Tebal hamparan padat t 0.30 M

    II. URUTAN KERJAII. URUTAN KERJA

    1 Whell Loader memuat ke dalam Dump Truck

    2 Dump Truck mengangkut ke lapangan dengan jarak

    quari ke lapangan L 20.00 Kmquari ke lapangan L 20.00 Km

    3 Material dihampar dengan menggunakan Motor Grader

    4 Hamparan material disiram air dengan Watertank Truck4 Hamparan material disiram air dengan Watertank Truck

    (sebelum pelaksanaan pemadatan) dan dipadatkan

    dengan menggunakan Vibro Roller

    5 Selama pemadatan sekelompok pekerja akan

    merapikan tepi hamparan dan level permukaan

    dengan menggunakan alat bantudengan menggunakan alat bantu

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGAIII. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    1.a. Bahan pilihan = 1 x Fk (M09) 1.20 M3

    2. ALAT

    2.a. WHELL LOADER (E15)2.a. WHELL LOADER (E15)

    Kapasitas Bucket V 1.50 M3

    Faktor Bucket Fb 0.90 -Faktor Bucket Fb 0.90 -

    Faktor Efisiensi Alat Fa 0.75 -

    Waktu sklus Ts1 menit

    - Muat T1 1.00 menit- Muat T1 1.00 menit

    - Lain-lain T2 0.50 menit

    Ts1 1.50 menitTs1 1.50 menit

    Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 33.75 M3

    Fk x Ts1 Fk x Ts1

    Koefisien alat / M3 = 1 / Q1 = 1 : Q1 (E15) 0.0296 JamKoefisien alat / M3 = 1 / Q1 = 1 : Q1 (E15) 0.0296 Jam

    2.b. DUMP TRUCK (E08) 2.b. DUMP TRUCK (E08)

    Kapasitas bak V 15.00 M3

    Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 50.00 Km / JamKecepatan rata-rata bermuatan v1 50.00 Km / Jam

    Kecepatan rata-rata kosong v2 70.00 Km / Jam

    Waktusiklus : Ts2Waktusiklus : Ts2

    - Waktu tempuh isi = (L : v1) x 60 T1 24.00 menit

    - Waktu tempuh kosong = (L : v2) x 60 T2 17.14 menit

    - Lain-lain T3 1.00 menit

    Ts2 42.14 menitTs2 42.14 menit

    Berlanjut ke halaman berikut

  • Type Of Work :Selected Embankment Analisa EI-323

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Selected Embankment Analisa EI-323

    Payment unit : M3

    Pay Item Number : 3. 2 .2 URAIAN ANALISA HARGA SATUANPay Item Number : 3. 2 .2

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    Kapasitas Produksi / Jam = V x Fa x 60 Q2 14.77 M3

    Fk x Ts2 Fk x Ts2

    Koefisien Alat / m3 = 1 : Q2 (E08) 0.0677 Jam

    2.c. MOTOR GRADER (E13)

    Panjang hamparan Lh 50.00 mPanjang hamparan Lh 50.00 m

    Lebar Efektif kerja Blade b 2.40 m

    Faktor Efisiensi Alat Fa 0.75 -

    Kecepatan rata-rata alat v 5.00 Km / Jam

    Jumlah lintasan n 6.00 lintasan

    Waktu siklus Ts3Waktu siklus Ts3

    - Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 1.00 menit

    - Lain-lain T2 0.50 menit- Lain-lain T2 0.50 menit

    Ts3 1.50 menit

    Kapasitas Produksi / Jam = Lh x b x t x Fa x 60 Q3 180.00 M3 / Jam Kapasitas Produksi / Jam = Lh x b x t x Fa x 60 Q3 180.00 M3 / Jam

    n x Ts3

    Koefisien Alat / m3 = 1 : Q3 (E13) 0.0056 Jam

    2.d. VIBRO ROLLER (E19)

    Kecepatan rata-rata alat v 5.00 Km / Jam

    Lebar efektif pemadatan b 1.20 MLebar efektif pemadatan b 1.20 M

    Jumlah lintasan n 6.00 lintasan 2 awal & 4 Akhir

    Faktor efisiensi alat Fa 0.83 -Faktor efisiensi alat Fa 0.83 -

    Kapasitas Prod./Jam = (v x 1000) x b x t x Fa Q4 249.00 M3

    nn

    Koefisien Alat / M3 = 1 : Q4 (E19) 0.0040 JamKoefisien Alat / M3 = 1 : Q4 (E19) 0.0040 Jam

    2.e. WATER TANK (E23)

    Volume tangki air V 4.00 M3

    Kebutuhan air / M3 material padat Wc 0.07 M3Kebutuhan air / M3 material padat Wc 0.07 M3

    Pengisian Tangki / jam n 1.00 kali

    Faktor efisiensi alat Fa 0.75 -Faktor efisiensi alat Fa 0.75 -

    Kapasitas Produksi / Jam = V x n x Fa Q5 42.86 M3

    Wc

    Koefisien Alat / m3 = 1 : Q5 (E23) 0.0233 JamKoefisien Alat / m3 = 1 : Q5 (E23) 0.0233 Jam

    2.f. ALAT BANTU2.f. ALAT BANTU

    Diperlukan alat-alat bantu kecil 1.0000 Ls Lump Sump

    - Sekop = 3 buah

    - Cangkul = 2 Buah- Cangkul = 2 Buah

    Berlanjut ke halaman berikut

  • Type Of Work :Selected Embankment Analisa EI-323

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Selected Embankment Analisa EI-323

    Payment unit : M3

    Pay Item Number : 3. 2 .2 URAIAN ANALISA HARGA SATUANPay Item Number : 3. 2 .2

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    3. TENAGA

    Produksi menentukan : Dump Truck Q2 14.77 M3/JamProduksi menentukan : Dump Truck Q2 14.77 M3/Jam

    Produksi Timbunan / hari = Tk x Q2 Qt 103.40 M3

    Kebutuhan tenaga :

    - Pekerja P 3.00 orang- Pekerja P 3.00 orang

    - Mandor M 1.00 orang

    Koefisien tenaga / M3 :

    - Pekerja = (Tk x P) : Qt (L01) 0.2031 Jam

    - Mandor = (Tk x M) : Qt (L03) 0.0677 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :

    Rp. 69,905.56 / M3.

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN Memakai

    Masa Pelaksanaan : 13.00 Hari 6 UnitMasa Pelaksanaan : 13.00 Hari 6 Unit

    Dump Truck

    7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 7,945.00 M3Volume pekerjaan : 7,945.00 M3

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : M3Pay Item Number : M3

    Type Of Work :Granular Selected Embankment

    Payment unit : 3.2.3Payment unit : 3.2.3

    PERKIRAAN HARGA

    NO. KOMPONEN SATUAN KUANTITAS SATUAN

    JUMLAH

    HARGANO. KOMPONEN SATUAN KUANTITAS SATUAN

    (Rp.)

    HARGA

    (Rp.)

    A. TENAGA

    1. Pekerja Jam 0.3057 7,150.00 2,185.75

    2. Mandor Jam 0.1528 9,500.00 1,451.602. Mandor Jam 0.1528 9,500.00 1,451.60

    3,637.35

    B. BAHAN

    JUMLAH HARGA TENAGA

    B. BAHAN

    1. Bahan pilihan Berbutir M3 1.2000 35,000.00 42,000.001. Bahan pilihan Berbutir M3 1.2000 35,000.00 42,000.00

    42,000.00JUMLAH HARGA BAHAN 42,000.00

    C. PERALATAN

    1. Dump Truck Jam 0.1528 241,830.76 36,951.74

    JUMLAH HARGA BAHAN

    1. Dump Truck Jam 0.1528 241,830.76 36,951.74

    2. Whell Loader Jam 0.0131 367,291.96 4,811.52

    3. Motor Grader Jam 0.0060 314,383.12 1,886.303. Motor Grader Jam 0.0060 314,383.12 1,886.30

    4. Vibratory Roller Jam 0.0048 248,268.22 1,191.69

    5. Water tanker Jam 0.0211 170,816.08 3,604.22

    6 Alat Bantu ls 1.0000 100.00 100.006 Alat Bantu ls 1.0000 100.00 100.00

    48,545.47JUMLAH HARGA PERALATAN

    D. 94,182.82

    E. KEUNTUNGAN 5.0 % x D 4,709.14

    F. 98,891.96HARGA SATUAN PEKERJAAN ( D + E )

    JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

    F. 98,891.96

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.

    HARGA SATUAN PEKERJAAN ( D + E )

    berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work :Granular Selected Embankment 0

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Granular Selected Embankment 0

    Payment unit : 3.2.3

    Pay Item Number : M3 URAIAN ANALISA HARGA SATUANPay Item Number : M3

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Pekerjaan dilakukan secara mekanis1 Pekerjaan dilakukan secara mekanis

    2 Lokasi pekerjaan : di atas tanah rawa

    3 Kondisi Jalan : baik

    4 Jam kerja efektif per-hari Tk 7.00 Jam4 Jam kerja efektif per-hari Tk 7.00 Jam

    5 Faktor pengembangan bahan Fk 1.20 -

    6 Berat volume bahan (lepas) D 1.69 Ton/M36 Berat volume bahan (lepas) D 1.69 Ton/M3

    7 Tebal Hamparan Padat t 0.25 m

    II. URUTAN KERJAII. URUTAN KERJA

    1 Whell Loader memuat ke dalam Dump Truck

    2 Dump Truck mengangkut material pilihan

    ke lapangan dimana : jarak quari ke lapangan L 20.00 Kmke lapangan dimana : jarak quari ke lapangan L 20.00 Km

    3 Dump Truck menuang material pilihan di lokasi rawa

    yang telah ditetapkan mulai dari tepian rawa hinggayang telah ditetapkan mulai dari tepian rawa hingga

    permukaan timbunan mencapai permukaan air rawa.

    4 Sekelompok pekerja merapikan timbunan

    5 Geotekstil atau batangan kayu (bila diperlukan)

    dianggap telah terpasang

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN 1. BAHAN

    1.a. Bahan pilihan Berbutir (M09) 1.20 M3

    2. ALAT 2. ALAT

    2.a. DUMP TRUCK (E09) 2.a. DUMP TRUCK (E09)

    Kapasitas bak V 15.00 M3

    Faktor efisiensi alat Fa 0.83 -Faktor efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 40.00 KM/Jam

    Kecepatan rata-rata kosong v2 60.00 KM/Jam

    Waktusiklus : Ts2Waktusiklus : Ts2

    - Waktu muat = = (V x 60)/(D xFk x Q1) T1 5.80 menit

    - Waktu tempuh isi = (L : v1) x 60 T2 30.00 menit- Waktu tempuh isi = (L : v1) x 60 T2 30.00 menit

    - Waktu tempuh kosong = (L : v2) x 60 T3 20.00 menit

    - Lain-lain T4 0.50 menit

    Ts2 56.30 menitTs2 56.30 menit

    Kapasitas Produksi / Jam = V x Fa x 60 Q2 6.54 M3/JamKapasitas Produksi / Jam = V x Fa x 60 Q2 6.54 M3/Jam

    D x Fk x Ts2

    Koefisien Alat / M3 = 1 : Q2 (E08) 0.1528 Jam

    2.b. ALAT BANTU2.b. ALAT BANTU

    Diperlukan alat-alat bantu kecil Lump Sump

    - Sekop = 3 buah- Sekop = 3 buah

    2.c. WHELL LOADER (E15)

    Kapasitas Bucket V 1.50 M3

    Faktor Bucket Fb 0.85 -

    Faktor Efisiensi Alat Fa 0.75 -Faktor Efisiensi Alat Fa 0.75 -

    Waktu sklus Ts1 menit

    - Muat T1 0.75 menit- Muat T1 0.75 menit

    Ts1 0.75 menit

    Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 76.50 M3Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 76.50 M3

    Ts1

    Koefisienalat / M3 = 1 : Q1 (E15) 0.0131 Jam

    Berlanjut ke halaman berikutBerlanjut ke halaman berikut

  • Type Of Work :Granular Selected Embankment 0

    Payment unit : 3.2.3

    ANALISA TEKNIS SATUAN PEKERJAAN

    Payment unit : 3.2.3

    Pay Item Number : M3

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    2.c. MOTOR GRADER (E13)2.c. MOTOR GRADER (E13)

    Panjang hamparan Lh 50.00 m

    Lebar Efektif kerja Blade b 2.40 mLebar Efektif kerja Blade b 2.40 m

    Faktor Efisiensi Alat Fa 0.83 -

    Kecepatan rata-rata alat v 5.00 Km / Jam

    Jumlah lintasan n 6.00 lintasanJumlah lintasan n 6.00 lintasan

    Waktu siklus Ts3

    - Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 1.00 menit- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 1.00 menit

    - Lain-lain T2 0.50 menit

    Ts3 1.50 menit

    Kapasitas Produksi / Jam = Lh x b x t x Fa x 60 Q3 166.00 M3 / Jam

    n x Ts3 n x Ts3

    Koefisien Alat / m3 = 1 : Q3 (E13) 0.0060 JamKoefisien Alat / m3 = 1 : Q3 (E13) 0.0060 Jam

    2.d. VIBRO ROLLER (E19)

    Kecepatan rata-rata alat v 5.00 Km / JamKecepatan rata-rata alat v 5.00 Km / Jam

    Lebar efektif pemadatan b 1.20 M

    Jumlah lintasan n 6.00 lintasanJumlah lintasan n 6.00 lintasan

    Faktor efisiensi alat Fa 0.83 -

    Kapasitas Prod./Jam = (v x 1000) x b x t x Fa Q4 207.50 M3

    n

    Koefisien Alat / M3 = 1 : Q4 (E19) 0.0048 Jam

    memakai

    2.e. WATER TANK (E23) 10 Unit

    Volume tangki air V 4.00 M3 Dump TruckVolume tangki air V 4.00 M3 Dump Truck

    Kebutuhan air / M3 material padat Wc 0.07 M3

    Pengisian Tangki / jam n 1.00 kaliPengisian Tangki / jam n 1.00 kali

    Faktor efisiensi alat Fa 0.83 -

    Kapasitas Produksi / Jam = V x n x Fa Q5 47.43 M3

    Wc

    Koefisien Alat / m3 = 1 : Q5 (E23) 0.0211 Jam

  • Type Of Work :Granular Selected Embankment 0

    Payment unit : 3.2.3

    ANALISA TEKNIS SATUAN PEKERJAAN

    Payment unit : 3.2.3

    Pay Item Number : M3

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    Lanjutan

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    3. TENAGA 3. TENAGA

    Produksi menentukan : DUMP TRUCK Q1 6.54 M3/Jam

    Produksi Timbunan / hari = Tk x Q1 Qt 45.80 M3Produksi Timbunan / hari = Tk x Q1 Qt 45.80 M3

    Asumsi permukaan hamparan di permukaan rawa :

    Kebutuhan tenaga :Kebutuhan tenaga :

    - Pekerja P 2.00 orang

    - Mandor M 1.00 orang- Mandor M 1.00 orang

    Koefisien tenaga / M3 :

    - Pekerja = (Tk x P) : Qt (L01) 0.3057 Jam

    - Mandor = (Tk x M) : Qt (L02) 0.1528 Jam- Mandor = (Tk x M) : Qt (L02) 0.1528 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN5. ANALISA HARGA SATUAN PEKERJAAN

    Lihat perhitungan dalam FORMULIR STANDAR UNTUK

    PEREKAMAN ANALISA MASING-MASING HARGAPEREKAMAN ANALISA MASING-MASING HARGA

    SATUAN.

    Didapat Harga Satuan Pekerjaan :

    Rp. 98,891.96 / M3

    memakai

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN 10 Unit

    Masa Pelaksanaan : 279.00 Hari Dump TruckMasa Pelaksanaan : 279.00 Hari Dump Truck

    7. VOLUME PEKERJAAN YANG DIPERLUKAN7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 18,231.00 M3

  • LAMPIRAN 2 PENAWARAN

    ANALISA HARGA SATUAN MATA PEMBAYARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : 3.3

    Type Of Work :Grade PreparationType Of Work :Grade Preparation

    Payment unit : M2

    PERKIRAAN HARGA JUMLAHPERKIRAAN HARGA JUMLAH

    NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA

    (Rp.) (Rp.)(Rp.) (Rp.)

    A. KERJA

    1. Pekerja (L01) jam 0.0054 7,150.00 38.611. Pekerja (L01) jam 0.0054 7,150.00 38.61

    2. Mandor (L02) jam 0.0027 9,500.00 25.65

    64.26JUMLAH HARGA TENAGA

    B. BAHAN

    - JUMLAH HARGA BAHAN -

    C. PERALATAN

    JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Motor Grader (E13) jam 0.0022 314,383.12 691.64

    2. Vibratory Roller (E19) jam 0.0027 248,268.22 670.32

    3. Alat Bantu Ls 1.0000 500.00 500.003. Alat Bantu Ls 1.0000 500.00 500.00

    1,861.97

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,926.23

    JUMLAH HARGA PERALATAN

    D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) 1,926.23

    E. KEUNTUNGAN 5.0 % x D 96.31

    F. HARGA SATUAN PEKERJAAN ( D + E ) 2,022.54

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work :Grade Preparation Analisa EI-331

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Grade Preparation Analisa EI-331

    Payment unit : M2

    Pay Item Number : 3.3 URAIAN ANALISA HARGA SATUANPay Item Number : 3.3 URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Pekerjaan dilakukan secara mekanis

    2 Lokasi pekerjaan : sepanjang jalan

    3 Kondisi Jalan : jelek / belum padat3 Kondisi Jalan : jelek / belum padat

    4 Jam kerja efektif per-hari Tk 7.00 Jam

    II. URUTAN KERJAII. URUTAN KERJA

    1 Motor Grader meratakan permukaan

    2 Vibro Roller memadatkan permukaan yang telah

    dipotong/diratakan oleh Motor Graderdipotong/diratakan oleh Motor Grader

    3 Sekelompok pekerja akan membantu meratakan

    badan jalan dengan alat bantubadan jalan dengan alat bantu

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGAIII. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    Tidak diperlukan bahan / material

    2. ALAT

    2.a. MOTOR GRADER (E13)2.a. MOTOR GRADER (E13)

    Panjang operasi grader sekali jalan Lh 50.00 M

    Lebar Efektif kerja Blade b 2.40 MLebar Efektif kerja Blade b 2.40 M

    Faktor Efisiensi Alat Fa 0.75 -

    Kecepatan rata-rata alat v 5.00 Km / Jam

    Jumlah lintasan n 4.00 lintasanJumlah lintasan n 4.00 lintasan

    Waktu siklus Ts1

    - Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 2.00 menit- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 2.00 menit

    - Lain-lain T2 1.00 menit

    Ts1 3.00 menit

    Kapasitas Produksi / Jam = Lh x b x Fa x 60 Q1 450.00 M2

    n x Ts n x Ts

    Koefisien Alat / m2 = 1 : Q1 (E13) 0.0022 JamKoefisien Alat / m2 = 1 : Q1 (E13) 0.0022 Jam

    2.b. VIBRATORY ROLLER (E19)

    Kecepatan rata-rata alat v 3.00 Km / jamKecepatan rata-rata alat v 3.00 Km / jam

    Lebar efektif pemadatan b 1.20 M

    Jumlah lintasan n 8.00 lintasanJumlah lintasan n 8.00 lintasan

    Faktor efisiensi alat Fa 0.83 -

    Kapasitas Produksi / Jam = (v x 1000) x b x Fa Q2 373.50 M2

    nn

    Koefisien Alat / m2 = 1 : Q2 (E19) 0.0027 JamKoefisien Alat / m2 = 1 : Q2 (E19) 0.0027 Jam

    Berlanjut ke halaman berikut

  • Type Of Work :Grade Preparation Analisa EI-331

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Grade Preparation Analisa EI-331

    Payment unit : M2

    Pay Item Number : 3.3 URAIAN ANALISA HARGA SATUANPay Item Number : 3.3

    Lanjutan

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    2.d. ALAT BANTU

    Diperlukan alat-alat bantu kecil 1.000 Ls Lump Sum

    - Sekop = 3 buah

    3. TENAGA

    Produksi menentukan : VIBRATORY ROLLER Q2 373.50 M2/JamProduksi menentukan : VIBRATORY ROLLER Q2 373.50 M2/Jam

    Produksi Pekerjaan / hari = Tk x Q1 Qt 2,614.50 M2

    Kebutuhan tenaga :

    - Pekerja P 2.00 orang- Pekerja P 2.00 orang

    - Mandor M 1.00 orang

    Koefisien tenaga / M2

    - Pekerja = (Tk x P) : Qt (L01) 0.0054 Jam

    - Mandor = (Tk x M) : Qt (L02) 0.0027 Jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

    5. ANALISA HARGA SATUAN PEKERJAAN

    Didapat Harga Satuan Pekerjaan :

    Rp. 2,022.54 / M2

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : 94.00 HariMasa Pelaksanaan : 94.00 Hari

    7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 245,023.00 M2Volume pekerjaan : 245,023.00 M2

  • ANALISA HARGA SATUAN MATA PEMBAYARAN

    LAMPIRAN 2 PENAWARAN

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    Pay Item Number : 3.4.2Pay Item Number : 3.4.2

    Type Of Work :Clearing and grubbing in Jungle vegetation

    Payment unit : M2Payment unit : M2

    PERKIRAAN HARGA

    NO. KOMPONEN SATUAN KUANTITAS SATUAN

    JUMLAH

    HARGANO. KOMPONEN SATUAN KUANTITAS SATUAN

    (Rp.) (Rp.)

    HARGA

    A. TENAGA

    1. Pekerja Jam 0.1434 7,150.00 1,025.31

    2. Mandor Jam 0.0359 9,500.00 341.052. Mandor Jam 0.0359 9,500.00 341.05

    1,366.36JUMLAH HARGA TENAGA

    B. BAHAN

    1. Bahan pilihan M3 1.2000 35,000.00

    - JUMLAH HARGA BAHAN -

    C. PERALATAN

    JUMLAH HARGA BAHAN

    C. PERALATAN

    1. Dump Truck Jam 0.0359 197,134.70 7,077.13

    2. Alat Bantu Ls 1.0000 500.00 500.00

    7,577.13JUMLAH HARGA PERALATAN

    D. 8,943.49

    E. KEUNTUNGAN 5.0 % x D 447.17

    JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

    E. KEUNTUNGAN 5.0 % x D 447.17

    F. 9,390.66

    Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran

    berat untuk bahan-bahan.

    HARGA SATUAN PEKERJAAN ( D + E )

    berat untuk bahan-bahan.

    2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

    3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang

    dibayar dari kontrak) dan biaya-biaya lainnya.

    Banda Aceh, 20 Juni 2012Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur UtamaDirektur Utama

  • Type Of Work :Clearing and grubbing in Jungle vegetation Analisa EI-822

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Clearing and grubbing in Jungle vegetation Analisa EI-822

    Payment unit : M2

    Pay Item Number : 3.4.2 URAIAN ANALISA HARGA SATUANPay Item Number : 3.4.2

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    I. ASUMSI

    1 Menggunakan alat (cara mekanik)1 Menggunakan alat (cara mekanik)

    2 Lokasi pekerjaan : setempat2 di sepanjang jalan

    3 Kondisi existing jalan : sedang/baik

    4 Jarak rata-rata Base Camp ke lokasi pekerjaan l 25.0 KM4 Jarak rata-rata Base Camp ke lokasi pekerjaan l 25.0 KM

    5 Jam kerja efektif per-hari Tk 7.00 jam

    6 Faktor pengembangan bahan Fk 1.20 -6 Faktor pengembangan bahan Fk 1.20 -

    7 Tebal hamparan padat t 0.15 M

    8 Hasil bongkaran per M2 luas area d 0.50 ton8 Hasil bongkaran per M2 luas area d 0.50 ton

    II. URUTAN KERJA

    1 Alat penyapu mekanis atau kompresor atau alat sapu yang lebih kaku1 Alat penyapu mekanis atau kompresor atau alat sapu yang lebih kaku

    membersihkan kotoran di lokasi

    2 Gergaji listrik atau alat tebang manual lainnya digunakan untuk menebang 2 Gergaji listrik atau alat tebang manual lainnya digunakan untuk menebang

    tanaman, dipotong mulai dari atas ke bawah

    3 Pembersihan dan pengangkatan akar tanaman dengan linggis dan sekop

    4 Dump truck membawa tanaman bongkaran ke tempat pembuangan sejauh L 1.00 km

    III. PEMAKAIAN BAHAN, ALAT DAN TENAGAIII. PEMAKAIAN BAHAN, ALAT DAN TENAGA

    1. BAHAN

    1a Bahan timbunan = 1 x Fk 1.20 M3 Borrow Pit1a Bahan timbunan = 1 x Fk 1.20 M3 Borrow Pit

    2. ALAT 2. ALAT

    2.a DUMP TRUCK (E09)

    Kapasitas bak V 3.50 tonKapasitas bak V 3.50 ton

    Faktor Efisiensi alat Fa 0.83 -

    Kecepatan rata-rata bermuatan v1 20.00 KM/jam

    Kecepatan rata-rata kosong v2 30.00 KM/jamKecepatan rata-rata kosong v2 30.00 KM/jam

    Waktu Siklus :

    - Waktu tempuh isi = (L : v1) x 60 menit T1 3.00 menit- Waktu tempuh isi = (L : v1) x 60 menit T1 3.00 menit

    - Waktu tempuh kosong = (L : v2) x 60 menit T2 2.00 menit

    - Lain-lain (termasuk dumping setempat-setempat) T3 7.50 menit

    Ts2 12.50 menitTs2 12.50 menit

    Kap. Prod. / jam = V x Fa x 60 Q2 27.89 M2

    Ts2 x dTs2 x d

    Koefisien Alat / M3 = 1 : Q2 (E09) 0.0359 jam

    2.b ALAT BANTU Lump Sum

    Diperlukan :

    - Linggis = 2 buah- Linggis = 2 buah

    - Sekop = 2 buah

    - Garpu = 2 buah- Garpu = 2 buah

    - Gergaji listrik = 2 buah

    TENAGA

    Produksi pembersihan dan pembongkaran/hari Qt 195.22 M2 asumsi

    Kebutuhan tenaga :

    - Pekerja P 4.00 orang- Pekerja P 4.00 orang

    - Mandor M 1.00 orang

    3. Koefisien tenaga / M3 : 3. Koefisien tenaga / M3 :

    - Pekerja = (Tk x P) : Qt (L01) 0.1434 jam

    - Mandor = (Tk x M) : Qt (L03) 0.0359 jam- Mandor = (Tk x M) : Qt (L03) 0.0359 jam

    4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

    Lihat lampiran.

  • Type Of Work :Clearing and grubbing in Jungle vegetation 0

    ANALISA TEKNIS SATUAN PEKERJAAN

    Type Of Work :Clearing and grubbing in Jungle vegetation 0

    Payment unit : M2

    Pay Item Number : 3.4.2 URAIAN ANALISA HARGA SATUANPay Item Number : 3.4.2

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    URAIAN ANALISA HARGA SATUAN

    No. U R A I A N KODE KOEF. SATUAN KETERANGAN

    5. ANALISA HARGA SATUAN PEKERJAAN5. ANALISA HARGA SATUAN PEKERJAAN

    Lihat perhitungan dalam FORMULIR STANDAR UNTUK

    PEREKAMAN ANALISA MASING-MASING HARGAPEREKAMAN ANALISA MASING-MASING HARGA

    SATUAN.

    Didapat Harga Satuan Pekerjaan :

    Rp. 9,390.66 / M2

    6. WAKTU PELAKSANAAN YANG DIPERLUKAN

    Masa Pelaksanaan : - Hari

    7. VOLUME PEKERJAAN YANG DIPERLUKAN7. VOLUME PEKERJAAN YANG DIPERLUKAN

    Volume pekerjaan : 0.00 M2