Dcp. Contoh
-
Upload
therhey-fahmy -
Category
Documents
-
view
264 -
download
3
Transcript of Dcp. Contoh
-
7/22/2019 Dcp. Contoh
1/69
KEGIATAN :
PROPINSI :NO. LINK :RUAS :
TANGGAL :TEKNISI :SOIL & MATERIAL ENG. :
Tumbukan CP Tumbukan CP Tumbukan CP Tumbukan CP
0 0 0 0 0 0
5 5 5 5
5 5 5 5
5 5 5 5
5 5 5 5
5 5 5 5
Tumbukan CP Tumbukan CP Tumbukan CP Tumbukan CP
0 0 0 0 0 0
5 5 5 5
5 5 5 5
5 5 5 5
5 5 5 5
5 5 5 5
Tumbukan CP Tumbukan CP Tumbukan CP Tumbukan CP
0 0 0 0 0 0
5 5 5 5
5 5 5 5
5 5 5 5
5 5 5 5
5 5 5 5
Catatan:
CP = Penetras i Cummulatif (mm)
STA 0+000
STA 0+000 STA 0+000
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
DATA PENYELIDIKAN CBR LAPANGAN
STA 0+000 STA 0+000 STA 0+000
STA 0+000 STA 0+000
STA 0+000 STA 0+000 STA 0+000 STA 0+000
-
7/22/2019 Dcp. Contoh
2/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : 0+000 Sta :
Elevasi : m 10 Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR
0 0 0 0
5 120 2.4 -2.4 8.4 4.88 ## ## 5 110 2.2 -2.2 9.3 4
5 250 2.6 -5.0 7.7 5.13 ## ## 5 200 1.8 -4.0 11.6 45 310 1.2 -6.2 18.3 3.16 ## ## 5 250 1.0 -5.0 22.5 2
5 320 0.2 -6.4 137.5 1.03 ## ## 5 330 1.6 -6.6 13.3 3
5 340 0.4 -6.8 63.0 1.59 ## ## 5 420 1.8 -8.4 11.6 4
# 0.0
# 0.0
# 0.0
# 0.0
# 0.0
6.8 15.80 8.4 19
12.5 12.3
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
Perhitungan CBR dari Pengujian DCP Perhitungan CBR dari Pengujian DCP
CBR pada titik uji CBR pada titik uji
0+100
-
7/22/2019 Dcp. Contoh
3/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : Sta :
Elevasi : m Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR0 0 0 0
5 80 1.6 -1.6 13.3 3.79 5 100 2.0 -2.0 10
5 260 3.6 -5.2 5.3 6.29 5 200 2.0 -4.0 10
5 370 2.2 -7.4 9.3 4.62 5 250 1.0 -5.0 22
5 460 1.8 -9.2 11.6 4.08 5 330 1.6 -6.6 13
5 540 1.6 -10.8 13.3 3.79 5 450 2.4 -9.0 8
10.8 22.55 9.0
9.1 11
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
Perhitungan CBR dari Pengujian DCP
0+600
Perhitungan CBR dari Pengujian DCP
CBR pada titik uji
0+700
CBR pada titik uji
-
7/22/2019 Dcp. Contoh
4/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : Sta :
Elevasi : m Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR
0 0 0 05 90 1.8 -1.8 11.6 4.08 5 10 0.2 -0.2 137
5 220 2.6 -4.4 7.7 5.13 5 110 2.0 -2.2 10
5 310 1.8 -6.2 11.6 4.08 5 270 3.2 -5.4 6
5 410 2.0 -8.2 10.3 4.35 5 500 4.6 -10.0 4
5 490 1.6 -9.8 13.3 3.79 5 800 6.0 -16.0 3
9.8 21.42 16.0
10.4 4
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji
Perhitungan CBR dari Pengujian DCP
1+300
Perhitungan CBR dari Pengujian DCP
1+200
CBR pada titik uji
-
7/22/2019 Dcp. Contoh
5/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : Sta :
Elevasi : m Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR
0 0 0 0
5 100 2.0 -2.0 10.3 4.35 5 120 2.4 -2.4 8
5 270 3.4 -5.4 5.7 6.07 5 280 3.2 -5.6 6
5 360 1.8 -7.2 11.6 4.08 5 380 2.0 -7.6 10
5 450 1.8 -9.0 11.6 4.08 5 460 1.6 -9.2 13
5 630 3.6 -12.6 5.3 6.29 5 520 1.2 -10.4 18
12.6 24.86 10.4
7.7 9Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
Perhitungan CBR dari Pengujian DCP
1+800
CBR pada titik uji
Perhitungan CBR dari Pengujian DCP
1+900
CBR pada titik uji
-
7/22/2019 Dcp. Contoh
6/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : Sta :
Elevasi : m Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR0 0 0 0
5 90 1.8 -1.8 11.6 4.08 5 50 1.0 -1.0 22
5 240 3.0 -4.8 6.5 5.61 5 130 1.6 -2.6 13
5 380 2.8 -7.6 7.1 5.37 5 200 1.4 -4.0 15
5 540 3.2 -10.8 6.1 5.84 5 220 0.4 -4.4 63
5 710 3.4 -14.2 5.7 6.07 5 350 2.6 -7.0 7
14.2 26.96 7.0
6.8 13
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
Perhitungan CBR dari Pengujian DCP Perhitungan CBR dari Pengujian DCP
2+400 2+500
CBR pada titik uji CBR pada titik uji
-
7/22/2019 Dcp. Contoh
7/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : Sta :
Elevasi : m Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR
0 0 0 05 80 1.6 -1.6 13.3 3.79 5 90 1.8 -1.8 11
5 280 4.0 -5.6 4.7 6.71 5 280 3.8 -5.6 5
5 460 3.6 -9.2 5.3 6.29 5 340 1.2 -6.8 18
5 580 2.4 -11.6 8.4 4.88 5 390 1.0 -7.8 22
5 620 0.8 -12.4 28.9 2.46 5 560 3.4 -11.2 5
12.4 24.12 11.2
7.4 8
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
Perhitungan CBR dari Pengujian DCP Perhitungan CBR dari Pengujian DCP
3+000 3+100
CBR pada titik uji CBR pada titik uji
-
7/22/2019 Dcp. Contoh
8/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : Sta :
Elevasi : m Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR
0 0 0 0
-1.8 5 80 1.6 -1.6 13.3 3.79 # ## 5 90 1.8 -1.8 1
-4.6 5 260 3.6 -5.2 5.3 6.29 # ## 5 270 3.6 -5.4
-7.0 5 320 1.2 -6.4 18.3 3.16 # ## 5 360 1.8 -7.2 1
-10.0 5 440 2.4 -8.8 8.4 4.88 # ## 5 580 4.4 -11.6
-13.0 5 570 2.6 -11.4 7.7 5.13 # ## 5 720 2.8 -14.4
# 0.0
# 0.0
# 0.0
11.4 23.24 14.4
8.5
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
Perhitungan CBR dari Pengujian DCP Perhitungan CBR dari Pengujian DCP
CBR pada titik uji CBR pada titik uji
0+300 0+400
-
7/22/2019 Dcp. Contoh
9/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : Sta :
Elevasi : m Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR0 0 0 0
5 10 0.2 -0.2 137.5 1.03 5 100 2.0 -2.0 1
5 90 1.6 -1.8 13.3 3.79 5 230 2.6 -4.6
5 190 2.0 -3.8 10.3 4.35 5 360 2.6 -7.2
5 270 1.6 -5.4 13.3 3.79 5 500 2.8 -10.0
5 350 1.6 -7.0 13.3 3.79 5 630 2.6 -12.6
7.0 16.75 12.6
13.7
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
Perhitungan CBR dari Pengujian DCP
0+900
Perhitungan CBR dari Pengujian DCP
1+000
CBR pada titik ujiCBR pada titik uji
-
7/22/2019 Dcp. Contoh
10/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : Sta :
Elevasi : m Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR
0 0 0 05 160 3.2 -3.2 6.1 5.84 5 70 1.4 -1.4 1
5 260 2.0 -5.2 10.3 4.35 5 270 4.0 -5.4
5 320 1.2 -6.4 18.3 3.16 5 380 2.2 -7.6
5 450 2.6 -9.0 7.7 5.13 5 560 3.6 -11.2
5 680 4.6 -13.6 4.0 7.33 5 720 3.2 -14.4
13.6 25.81 14.4
6.8
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
Perhitungan CBR dari Pengujian DCP
1+600
Perhitungan CBR dari Pengujian DCP
1+500
CBR pada titik uji CBR pada titik uji
-
7/22/2019 Dcp. Contoh
11/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : Sta :
Elevasi : m Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR
0 0 0 0
5 80 1.6 -1.6 13.3 3.79 5 50 1.0 -1.0 2
5 120 0.8 -2.4 28.9 2.46 5 150 2.0 -3.0 1
5 210 1.8 -4.2 11.6 4.08 5 210 1.2 -4.2 1
5 230 0.4 -4.6 63.0 1.59 5 280 1.4 -5.6 1
5 470 4.8 -9.4 3.9 7.52 5 390 2.2 -7.8
9.4 19.43 7.8
8.8 1Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
Perhitungan CBR dari Pengujian DCP
2+100
CBR pada titik uji
Perhitungan CBR dari Pengujian DCP
2+200
CBR pada titik uji
-
7/22/2019 Dcp. Contoh
12/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : Sta :
Elevasi : m Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR0 0 0 0
5 60 1.2 -1.2 18.3 3.16 5 120 2.4 -2.4
5 170 2.2 -3.4 9.3 4.62 5 280 3.2 -5.6
5 380 4.2 -7.6 4.5 6.92 5 320 0.8 -6.4 2
5 400 0.4 -8.0 63.0 1.59 5 510 3.8 -10.2
5 430 0.6 -8.6 40.0 2.05 5 640 2.6 -12.8
8.6 18.35 12.8
9.7
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
Perhitungan CBR dari Pengujian DCP Perhitungan CBR dari Pengujian DCP
2+700 2+800
CBR pada titik uji CBR pada titik uji
-
7/22/2019 Dcp. Contoh
13/69
Ruas Jalan : Sp. Perhub - Anoe Itam Ruas Jalan : Sp. Perhub - Anoe Itam
Sta : Sta :
Elevasi : m Elevasi : m
Sudut Conus DCP: 30o
Sudut Conus DCP: 30o
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR
0 0 0 05 130 2.6 -2.6 7.7 5.13 5 120 2.4 -2.4
5 240 2.2 -4.8 9.3 4.62 5 220 2.0 -4.4 1
5 340 2.0 -6.8 10.3 4.35 5 360 2.8 -7.2
5 430 1.8 -8.6 11.6 4.08 5 450 1.8 -9.0 1
5 560 2.6 -11.2 7.7 5.13 5 550 2.0 -11.0 1
11.2 23.31 11.0
9.0
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
Perhitungan CBR dari Pengujian DCP Perhitungan CBR dari Pengujian DCP
3+300 3+400
CBR pada titik uji CBR pada titik uji
-
7/22/2019 Dcp. Contoh
14/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : IE MEULEE (SP. PERHUBUNGAN) - ANOE ITAM
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 120 2.4 -2.4 8.4 4.88 5 110 2.2 -2.2 9.3 4.62
5 250 2.6 -5.0 7.7 5.13 5 200 1.8 -4.0 11.6 4.08
5 310 1.2 -6.2 18.3 3.16 5 250 1.0 -5.0 22.5 2.82
5 320 0.2 -6.4 137.5 1.03 5 330 1.6 -6.6 13.3 3.79
5 340 0.4 -6.8 63.0 1.59 5 420 1.8 -8.4 11.6 4.08
6.8 15.80 8.4 19.38
12.53 12.28
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 90 1.8 -1.8 11.6 4.08 # 5 80 1.6 -1.6 13.3 3.79
5 230 2.8 -4.6 7.1 5.37 # 5 260 3.6 -5.2 5.3 6.29
5 350 2.4 -7.0 8.4 4.88 # 5 320 1.2 -6.4 18.3 3.16
5 500 3.0 -10.0 6.5 5.61 # 5 440 2.4 -8.8 8.4 4.88
5 650 3.0 -13.0 6.5 5.61 # 5 570 2.6 -11.4 7.7 5.13
13.0 25.54 11.4 23.24
7.59 8.48
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 90 1.8 -1.8 11.6 4.08 5 110 2.2 -2.2 9.3 4.62
5 270 3.6 -5.4 5.3 6.29 5 270 3.2 -5.4 6.1 5.84
5 360 1.8 -7.2 11.6 4.08 5 390 2.4 -7.8 8.4 4.88
5 580 4.4 -11.6 4.2 7.13 5 530 2.8 -10.6 7.1 5.375 720 2.8 -14.4 7.1 5.37 5 790 5.2 -15.8 3.5 7.91
14.4 26.94 15.8 28.62
6.54 5.94
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
STA 0+400 STA 0+500
CBR pada titik uji CBR pada titik uji
CBR pada titik uji CBR pada titik uji
STA 0+200 STA 0+300
CBR pada titik uji CBR pada titik uji
STA 0+000 STA 0+100
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 3+500
-
7/22/2019 Dcp. Contoh
15/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : IE MEULEE (SP. PERHUBUNGAN) - ANOE ITAM
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 3+500
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 80 1.6 -1.6 13.3 3.79 5 100 2.0 -2.0 10.3 4.35
5 260 3.6 -5.2 5.3 6.29 5 200 2.0 -4.0 10.3 4.35
5 370 2.2 -7.4 9.3 4.62 5 250 1.0 -5.0 22.5 2.82
5 460 1.8 -9.2 11.6 4.08 5 330 1.6 -6.6 13.3 3.79
5 540 1.6 -10.8 13.3 3.79 5 450 2.4 -9.0 8.4 4.88
10.8 22.55 9.0 20.19
9.11 11.30
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 120 2.4 -2.4 8.4 4.88 5 10 0.2 -0.2 137.5 1.03
5 260 2.8 -5.2 7.1 5.37 5 90 1.6 -1.8 13.3 3.79
5 310 1.0 -6.2 22.5 2.82 5 190 2.0 -3.8 10.3 4.35
5 350 0.8 -7.0 28.9 2.46 5 270 1.6 -5.4 13.3 3.79
5 460 2.2 -9.2 9.3 4.62 5 350 1.6 -7.0 13.3 3.79
9.2 20.15 7.0 16.75
10.51 13.69
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 100 2.0 -2.0 10.3 4.35 5 90 1.8 -1.8 11.6 4.08
5 230 2.6 -4.6 7.7 5.13 5 160 1.4 -3.2 15.4 3.48
5 360 2.6 -7.2 7.7 5.13 5 270 2.2 -5.4 9.3 4.62
5 500 2.8 -10.0 7.1 5.37 5 310 0.8 -6.2 28.9 2.465 630 2.6 -12.6 7.7 5.13 5 430 2.4 -8.6 8.4 4.88
12.6 25.11 8.6 19.51
7.92 11.68
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 1+000 STA 1+100
CBR pada titik uji CBR pada titik uji
STA 0+800 STA 0+900
CBR pada titik uji CBR pada titik uji
STA 0+600 STA 0+700
-
7/22/2019 Dcp. Contoh
16/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : IE MEULEE (SP. PERHUBUNGAN) - ANOE ITAM
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 3+500
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 90 1.8 -1.8 11.6 4.08 5 10 0.2 -0.2 137.5 1.03
5 220 2.6 -4.4 7.7 5.13 5 110 2.0 -2.2 10.3 4.35
5 310 1.8 -6.2 11.6 4.08 5 270 3.2 -5.4 6.1 5.84
5 410 2.0 -8.2 10.3 4.35 5 500 4.6 -10.0 4.0 7.33
5 490 1.6 -9.8 13.3 3.79 5 800 6.0 -16.0 3.0 8.65
9.8 21.42 16.0 27.20
10.44 4.91
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 80 1.6 -1.6 13.3 3.79 5 160 3.2 -3.2 6.1 5.84
5 240 3.2 -4.8 6.1 5.84 5 260 2.0 -5.2 10.3 4.35
5 370 2.6 -7.4 7.7 5.13 5 320 1.2 -6.4 18.3 3.16
5 410 0.8 -8.2 28.9 2.46 5 450 2.6 -9.0 7.7 5.13
5 520 2.2 -10.4 9.3 4.62 5 680 4.6 -13.6 4.0 7.33
10.4 21.83 13.6 25.81
9.25 6.84
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 70 1.4 -1.4 15.4 3.48 5 90 1.8 -1.8 11.6 4.08
5 270 4.0 -5.4 4.7 6.71 5 250 3.2 -5.0 6.1 5.84
5 380 2.2 -7.6 9.3 4.62 5 340 1.8 -6.8 11.6 4.08
5 560 3.6 -11.2 5.3 6.29 5 580 4.8 -11.6 3.9 7.525 720 3.2 -14.4 6.1 5.84 5 630 1.0 -12.6 22.5 2.82
14.4 26.94 12.6 24.34
6.55 7.21
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 1+600 STA 1+700
CBR pada titik uji CBR pada titik uji
STA 1+400 STA 1+500
CBR pada titik uji CBR pada titik uji
STA 1+200 STA 1+300
-
7/22/2019 Dcp. Contoh
17/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : IE MEULEE (SP. PERHUBUNGAN) - ANOE ITAM
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 3+500
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 100 2.0 -2.0 10.3 4.35 5 120 2.4 -2.4 8.4 4.88
5 270 3.4 -5.4 5.7 6.07 5 280 3.2 -5.6 6.1 5.84
5 360 1.8 -7.2 11.6 4.08 5 380 2.0 -7.6 10.3 4.35
5 450 1.8 -9.0 11.6 4.08 5 460 1.6 -9.2 13.3 3.79
5 630 3.6 -12.6 5.3 6.29 5 520 1.2 -10.4 18.3 3.16
12.6 24.86 10.4 22.02
7.68 9.49
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 50 1.0 -1.0 22.5 2.82 5 80 1.6 -1.6 13.3 3.79
5 130 1.6 -2.6 13.3 3.79 5 120 0.8 -2.4 28.9 2.46
5 200 1.4 -4.0 15.4 3.48 5 210 1.8 -4.2 11.6 4.08
5 260 1.2 -5.2 18.3 3.16 5 230 0.4 -4.6 63.0 1.59
5 380 2.4 -7.6 8.4 4.88 5 470 4.8 -9.4 3.9 7.52
7.6 18.13 9.4 19.43
13.59 8.84
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 50 1.0 -1.0 22.5 2.82 5 80 1.6 -1.6 13.3 3.79
5 150 2.0 -3.0 10.3 4.35 5 250 3.4 -5.0 5.7 6.075 210 1.2 -4.2 18.3 3.16 5 340 1.8 -6.8 11.6 4.08
5 280 1.4 -5.6 15.4 3.48 5 420 1.6 -8.4 13.3 3.79
5 390 2.2 -7.8 9.3 4.62 5 530 2.2 -10.6 9.3 4.62
7.8 18.44 10.6 22.33
13.22 9.35
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
STA 2+000 STA 2+100
CBR pada titik uji CBR pada titik uji
STA 2+200 STA 2+300
CBR pada titik uji CBR pada titik uji
CBR pada titik uji CBR pada titik uji
STA 1+800 STA 1+900
-
7/22/2019 Dcp. Contoh
18/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : IE MEULEE (SP. PERHUBUNGAN) - ANOE ITAM
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 3+500
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 90 1.8 -1.8 11.6 4.08 5 50 1.0 -1.0 22.5 2.82
5 240 3.0 -4.8 6.5 5.61 5 130 1.6 -2.6 13.3 3.79
5 380 2.8 -7.6 7.1 5.37 5 200 1.4 -4.0 15.4 3.48
5 540 3.2 -10.8 6.1 5.84 5 220 0.4 -4.4 63.0 1.59
5 710 3.4 -14.2 5.7 6.07 5 350 2.6 -7.0 7.7 5.13
14.2 26.96 7.0 16.81
6.84 13.86
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 130 2.6 -2.6 7.7 5.13 5 60 1.2 -1.2 18.3 3.16
5 200 1.4 -4.0 15.4 3.48 5 170 2.2 -3.4 9.3 4.62
5 270 1.4 -5.4 15.4 3.48 5 380 4.2 -7.6 4.5 6.92
5 360 1.8 -7.2 11.6 4.08 5 400 0.4 -8.0 63.0 1.59
5 570 4.2 -11.4 4.5 6.92 5 430 0.6 -8.6 40.0 2.05
11.4 23.09 8.6 18.35
8.31 9.71
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 120 2.4 -2.4 8.4 4.88 5 40 0.8 -0.8 28.9 2.46
5 280 3.2 -5.6 6.1 5.84 5 150 2.2 -3.0 9.3 4.62
5 320 0.8 -6.4 28.9 2.46 5 200 1.0 -4.0 22.5 2.82
5 510 3.8 -10.2 5.0 6.50 5 220 0.4 -4.4 63.0 1.595 640 2.6 -12.8 7.7 5.13 5 340 2.4 -6.8 8.4 4.88
12.8 24.80 6.8 16.37
7.28 13.95
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 2+800 STA 2+900
CBR pada titik uji CBR pada titik uji
STA 2+600 STA 2+700
CBR pada titik uji CBR pada titik uji
STA 2+400 STA 2+500
-
7/22/2019 Dcp. Contoh
19/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : IE MEULEE (SP. PERHUBUNGAN) - ANOE ITAM
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 3+500
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 80 1.6 -1.6 13.3 3.79 5 90 1.8 -1.8 11.6 4.08
5 280 4.0 -5.6 4.7 6.71 5 280 3.8 -5.6 5.0 6.50
5 460 3.6 -9.2 5.3 6.29 5 340 1.2 -6.8 18.3 3.16
5 580 2.4 -11.6 8.4 4.88 5 390 1.0 -7.8 22.5 2.82
5 620 0.8 -12.4 28.9 2.46 5 560 3.4 -11.2 5.7 6.07
12.4 24.12 11.2 22.63
7.36 8.25
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 10 0.2 -0.2 137.5 1.03 5 130 2.6 -2.6 7.7 5.13
5 20 0.2 -0.4 137.5 1.03 5 240 2.2 -4.8 9.3 4.62
5 270 5.0 -5.4 3.7 7.72 5 340 2.0 -6.8 10.3 4.35
5 320 1.0 -6.4 22.5 2.82 5 430 1.8 -8.6 11.6 4.08
5 470 3.0 -9.4 6.5 5.61 5 560 2.6 -11.2 7.7 5.13
9.4 18.21 11.2 23.31
7.28 9.01
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 120 2.4 -2.4 8.4 4.88 5 90 1.8 -1.8 11.6 4.08
5 220 2.0 -4.4 10.3 4.35 5 180 1.8 -3.6 11.6 4.08
5 360 2.8 -7.2 7.1 5.37 5 250 1.4 -5.0 15.4 3.485 450 1.8 -9.0 11.6 4.08 5 300 1.0 -6.0 22.5 2.82
5 550 2.0 -11.0 10.3 4.35 5 450 3.0 -9.0 6.5 5.61
11.0 23.03 9.0 20.07
9.18 11.08
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 3+400 STA 3+500
CBR pada titik uji CBR pada titik uji
STA 3+200 STA 3+300
CBR pada titik uji CBR pada titik uji
STA 3+000 STA 3+100
-
7/22/2019 Dcp. Contoh
20/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan : Sp. Aron - Uj
Sta : 0+000 Sta :
Elevasi : m 10 Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DCP:
Tumbukan CP DN CBR CBR* Tumbukan CP
0 0 0 0
5 90 1.8 -1.8 11.6 4.08 ## ## 5 100
5 120 0.6 -2.4 40.0 2.05 ## ## 5 230
5 250 2.6 -5.0 7.7 5.13 ## ## 5 250
5 470 4.4 -9.4 4.2 7.13 ## ## 5 420
5 540 1.4 -10.8 15.4 3.48 ## ## 5 570
# ##
# ##
# ##
# ##
# ##
10.8 21.86
8.3
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan N
0+100
CBR pada titik uji CBR pada titik u
Perhitungan CBR dari Pengujian DCP Perhi
-
7/22/2019 Dcp. Contoh
21/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan : Sp
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan0 0 0
5 110 2.2 -2.2 9.3 4.62 5
5 170 1.2 -3.4 18.3 3.16 5
5 220 1.0 -4.4 22.5 2.82 5
5 380 3.2 -7.6 6.1 5.84 5
5 450 1.4 -9.0 15.4 3.48 5
9.0 19.93
10.9Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cum
DN = Dynamic Number (cm/blow) DN = Dynamic Num
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah
CBR pada titik uji CB
0+600 0+
Perhitungan CBR dari Pengujian DCP
-
7/22/2019 Dcp. Contoh
22/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan : Sp
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan
0 0 05 130 2.6 -2.6 7.7 5.13 5
5 250 2.4 -5.0 8.4 4.88 5
5 320 1.4 -6.4 15.4 3.48 5
5 400 1.6 -8.0 13.3 3.79 5
5 420 0.4 -8.4 63.0 1.59 5
TETAP
8.4 18.87
11.3
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cum
DN = Dynamic Number (cm/blow) DN = Dynamic Num
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah
CBR pada titik uji CB
1+200 1+
Perhitungan CBR dari Pengujian DCP
-
7/22/2019 Dcp. Contoh
23/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan : Sp
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 80 1.6 -1.6 13.3 3.79 5
5 120 0.8 -2.4 28.9 2.46 5
5 250 2.6 -5.0 7.7 5.13 5
5 340 1.8 -6.8 11.6 4.08 5
5 390 1.0 -7.8 22.5 2.82 5
7.8 18.27
12.8Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cum
DN = Dynamic Number (cm/blow) DN = Dynamic Num
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah
CBR pada titik uji CB
1+800 1+
Perhitungan CBR dari Pengujian DCP
-
7/22/2019 Dcp. Contoh
24/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan : Sp
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan0 0 0
5 50 1.0 -1.0 22.5 2.82 5
5 130 1.6 -2.6 13.3 3.79 5
5 200 1.4 -4.0 15.4 3.48 5
5 220 0.4 -4.4 63.0 1.59 5
5 350 2.6 -7.0 7.7 5.13 5
7.0 16.81
13.9Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cum
DN = Dynamic Number (cm/blow) DN = Dynamic Num
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah
CBR pada titik uji CB
2+400 2+
Perhitungan CBR dari Pengujian DCP
-
7/22/2019 Dcp. Contoh
25/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan : Sp
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 70 1.4 -1.4 15.4 3.48 5
5 240 3.4 -4.8 5.7 6.07 5
5 370 2.6 -7.4 7.7 5.13 5
5 430 1.2 -8.6 18.3 3.16 5
5 450 0.4 -9.0 63.0 1.59 5
9.0 19.43
10.1
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cum
DN = Dynamic Number (cm/blow) DN = Dynamic Num
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah
Ruas Jalan : 0 Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 80 1.6 -1.6 13.3 3.79 5
5 200 2.4 -4.0 8.4 4.88 5
5 280 1.6 -5.6 13.3 3.79 5
5 380 2.0 -7.6 10.3 4.35 55 530 3.0 -10.6 6.5 5.61 5
TETAP
CBR pada titik uji CB
3+000 3+
Perhitungan CBR dari Pengujian DCP
Perhitungan CBR dari Pengujian DCP
3+600 3+
-
7/22/2019 Dcp. Contoh
26/69
Ruas Jalan : 0 Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 60 1.2 -1.2 18.3 3.16 5
5 160 2.0 -3.2 10.3 4.35 5
5 310 3.0 -6.2 6.5 5.61 5
5 380 1.4 -7.6 15.4 3.48 5
5 450 1.4 -9.0 15.4 3.48 5
TETAP
9.0 20.09
11.1
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cum
DN = Dynamic Number (cm/blow) DN = Dynamic Num
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah
Ruas Jalan : 0 Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 90 1.8 -1.8 11.6 4.08 5
5 210 2.4 -4.2 8.4 4.88 5
5 300 1.8 -6.0 11.6 4.08 5
5 410 2.2 -8.2 9.3 4.62 5
5 600 3.8 -12.0 5.0 6.50 5
TETAP
Perhitungan CBR dari Pengujian DCP
4+200 4+
CBR pada titik uji CB
Perhitungan CBR dari Pengujian DCP
4+800 4+
-
7/22/2019 Dcp. Contoh
27/69
Ruas Jalan : 0 Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 50 1.0 -1.0 22.5 2.82 5
5 150 2.0 -3.0 10.3 4.35 5
5 220 1.4 -4.4 15.4 3.48 5
5 340 2.4 -6.8 8.4 4.88 5
5 490 3.0 -9.8 6.5 5.61 5
9.8 21.15
10.0
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cum
DN = Dynamic Number (cm/blow) DN = Dynamic Num
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah
Ruas Jalan : 0 Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 30 0.6 -0.6 40.0 2.05 5
5 190 3.2 -3.8 6.1 5.84 5
5 270 1.6 -5.4 13.3 3.79 5
5 400 2.6 -8.0 7.7 5.13 5
5 510 2.2 -10.2 9.3 4.62 5
TETAP
Perhitungan CBR dari Pengujian DCP
5+500 5
CBR pada titik uji CB
Perhitungan CBR dari Pengujian DCP
6+100 6
-
7/22/2019 Dcp. Contoh
28/69
Ruas Jalan : 0 Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan0 0 0
5 30 0.6 -0.6 40.0 2.05 5
5 120 1.8 -2.4 11.6 4.08 5
5 200 1.6 -4.0 13.3 3.79 5
5 340 2.8 -6.8 7.1 5.37 5
5 390 1.0 -7.8 22.5 2.82 5
7.8 18.11
12.5
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cum
DN = Dynamic Number (cm/blow) DN = Dynamic Num
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah
Perhitungan CBR dari Pengujian DCP
6+700 6
CBR pada titik uji CB
-
7/22/2019 Dcp. Contoh
29/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
-1.2 5 70 1.4 -1.4 15.4 3.48 # ## 5
-3.0 5 270 4.0 -5.4 4.7 6.71 # ## 5
-5.6 5 320 1.0 -6.4 22.5 2.82 # ## 5
-7.4 5 430 2.2 -8.6 9.3 4.62 # ## 5
-8.4 5 580 3.0 -11.6 6.5 5.61 # ## 5
# 0.0
# 0.0
# 0.0
11.6 23.25
8.1
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi C
DN = Dynamic Number (cm/blow) DN = Dynamic N
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.35
CBR* = hi x CBR^(1/3) CBR* = hi x CB
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan ta
0+300
CBR pada titik uji
Perhitungan CBR dari Pengujian DCP
-
7/22/2019 Dcp. Contoh
30/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan
Sta : Sta
Elevasi : m Elevasi
Sudut Conus DCP: 30o
Sudut Con
Tumbukan CP DN CBR CBR* Tumbuk
0 0 0
5 10 0.2 -0.2 137.5 1.03 5
5 110 2.0 -2.2 10.3 4.35 5
5 190 1.6 -3.8 13.3 3.79 5
5 270 1.6 -5.4 13.3 3.79 5
5 380 2.2 -7.6 9.3 4.62 5
7.6 17.5812.4
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetra
DN = Dynamic Number (cm/blow) DN = Dynam
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1
CBR* = hi x CBR^(1/3) CBR* = hi x
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebala
CBR pada titik uji
0+900
Perhitungan CBR dari Pengujian DCP
-
7/22/2019 Dcp. Contoh
31/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus
Tumbukan CP DN CBR CBR* Tumbukan
0 0 05 80 1.6 -1.6 13.3 3.79 5
5 250 3.4 -5.0 5.7 6.07 5
5 310 1.2 -6.2 18.3 3.16 5
5 540 4.6 -10.8 4.0 7.33 5
5 570 0.6 -11.4 40.0 2.05 5
TETAP
11.4 22.39
7.6
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi
DN = Dynamic Number (cm/blow) DN = Dynamic
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.35
CBR* = hi x CBR^(1/3) CBR* = hi x CB
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan t
CBR pada titik uji
1+500
Perhitungan CBR dari Pengujian DCP
-
7/22/2019 Dcp. Contoh
32/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 30 0.6 -0.6 40.0 2.05 5
5 130 2.0 -2.6 10.3 4.35 5
5 320 3.8 -6.4 5.0 6.50 5
5 460 2.8 -9.2 7.1 5.37 5
5 520 1.2 -10.4 18.3 3.16 5
TETAP
10.4 21.44
8.8Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi
DN = Dynamic Number (cm/blow) DN = Dynamic
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.35
CBR* = hi x CBR^(1/3) CBR* = hi x CB
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan t
CBR pada titik uji
2+100
Perhitungan CBR dari Pengujian DCP
-
7/22/2019 Dcp. Contoh
33/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan :
Sta : Sta
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus
Tumbukan CP DN CBR CBR* Tumbukan0 0 0
5 90 1.8 -1.8 11.6 4.08 5
5 120 0.6 -2.4 40.0 2.05 5
5 240 2.4 -4.8 8.4 4.88 5
5 300 1.2 -6.0 18.3 3.16 5
5 370 1.4 -7.4 15.4 3.48 5
7.4 17.65
13.6Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi
DN = Dynamic Number (cm/blow) DN = Dynamic
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.35
CBR* = hi x CBR^(1/3) CBR* = hi x CB
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan t
CBR pada titik uji
2+700
Perhitungan CBR dari Pengujian DCP
-
7/22/2019 Dcp. Contoh
34/69
Ruas Jalan : Sp. Aron - Uj. Seukee Ruas Jalan :
Sta : Sta
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 30 0.6 -0.6 40.0 2.05 5
5 160 2.6 -3.2 7.7 5.13 5
5 340 3.6 -6.8 5.3 6.29 5
5 430 1.8 -8.6 11.6 4.08 5
5 530 2.0 -10.6 10.3 4.35 5
TETAP
10.6 21.89
8.8
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi
DN = Dynamic Number (cm/blow) DN = Dynamic
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.3
CBR* = hi x CBR^(1/3) CBR* = hi x CB
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan
Ruas Jalan : 0 Ruas Jalan :
Sta : Sta
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 40 0.8 -0.8 28.9 2.46 5
5 130 1.8 -2.6 11.6 4.08 5
5 240 2.2 -4.8 9.3 4.62 5
5 370 2.6 -7.4 7.7 5.13 55 390 0.4 -7.8 63.0 1.59 5
CBR pada titik uji
3+300
Perhitungan CBR dari Pengujian DCP
Perhitungan CBR dari Pengujian DCP
3+900
-
7/22/2019 Dcp. Contoh
35/69
Ruas Jalan : 0 Ruas Jalan :
Sta : Sta
Elevasi : m Elevasi
Sudut Conus DCP: 30o
Sudut Conu
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 60 1.2 -1.2 18.3 3.16 5
5 150 1.8 -3.0 11.6 4.08 5
5 260 2.2 -5.2 9.3 4.62 5
5 340 1.6 -6.8 13.3 3.79 5
5 360 0.4 -7.2 63.0 1.59 5
7.2 17.24
13.7
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi
DN = Dynamic Number (cm/blow) DN = Dynamic
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.3
CBR* = hi x CBR^(1/3) CBR* = hi x C
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan
Ruas Jalan : 0 Ruas Jalan :
Sta : Sta
Elevasi : m Elevasi
Sudut Conus DCP: 30o
Sudut Conu
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 60 1.2 -1.2 18.3 3.16 5
5 150 1.8 -3.0 11.6 4.08 5
5 260 2.2 -5.2 9.3 4.62 5
5 340 1.6 -6.8 13.3 3.79 5
5 360 0.4 -7.2 63.0 1.59 5
Perhitungan CBR dari Pengujian DCP
4+500
CBR pada titik uji
Perhitungan CBR dari Pengujian DCP
5+100
-
7/22/2019 Dcp. Contoh
36/69
Ruas Jalan : 0 Ruas Jalan :
Sta : Sta
Elevasi : m Elevasi
Sudut Conus DCP: 30o
Sudut Conus
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 60 1.2 -1.2 18.3 3.16 5
5 140 1.6 -2.8 13.3 3.79 5
5 240 2.0 -4.8 10.3 4.35 5
5 360 2.4 -7.2 8.4 4.88 5
5 370 0.2 -7.4 137.5 1.03 5
7.4 17.21
12.6
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi
DN = Dynamic Number (cm/blow) DN = Dynamic
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.3
CBR* = hi x CBR^(1/3) CBR* = hi x C
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan
Ruas Jalan : 0 Ruas Jalan :
Sta : Sta
Elevasi : m Elevasi
Sudut Conus DCP: 30o
Sudut Conus
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 50 1.0 -1.0 22.5 2.82 5
5 170 2.4 -3.4 8.4 4.88 5
5 280 2.2 -5.6 9.3 4.62 5
5 360 1.6 -7.2 13.3 3.79 5
5 370 0.2 -7.4 137.5 1.03 5
Perhitungan CBR dari Pengujian DCP
5+800
CBR pada titik uji
Perhitungan CBR dari Pengujian DCP
6+400
-
7/22/2019 Dcp. Contoh
37/69
-
7/22/2019 Dcp. Contoh
38/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 90 1.8 -1.8 11.6 4.08 5 100 2.0 -2.0 10.3 4.35
5 120 0.6 -2.4 40.0 2.05 5 230 2.6 -4.6 7.7 5.13
5 250 2.6 -5.0 7.7 5.13 5 250 0.4 -5.0 63.0 1.59
5 470 4.4 -9.4 4.2 7.13 5 420 3.4 -8.4 5.7 6.07
5 540 1.4 -10.8 15.4 3.48 5 570 3.0 -11.4 6.5 5.61
10.8 21.86 11.4 22.75
8.30 7.95
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 60 1.2 -1.2 18.3 3.16 # 5 70 1.4 -1.4 15.4 3.48
5 150 1.8 -3.0 11.6 4.08 # 5 270 4.0 -5.4 4.7 6.71
5 280 2.6 -5.6 7.7 5.13 # 5 320 1.0 -6.4 22.5 2.82
5 370 1.8 -7.4 11.6 4.08 # 5 430 2.2 -8.6 9.3 4.62
5 420 1.0 -8.4 22.5 2.82 # 5 580 3.0 -11.6 6.5 5.61
8.4 19.27 11.6 23.25
12.07 8.05
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 70 1.4 -1.4 15.4 3.48 5 40 0.8 -0.8 28.9 2.46
5 240 3.4 -4.8 5.7 6.07 5 250 4.2 -5.0 4.5 6.92
5 380 2.8 -7.6 7.1 5.37 5 440 3.8 -8.8 5.0 6.50
5 570 3.8 -11.4 5.0 6.50 5 570 2.6 -11.4 7.7 5.135 680 2.2 -13.6 9.3 4.62 5 650 1.6 -13.0 13.3 3.79
13.6 26.04 13.0 24.79
7.02 6.94
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 0+000 STA 0+100
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STA 0+200 STA 0+300
CBR pada titik uji CBR pada titik uji
STA 0+400 STA 0+500
CBR pada titik uji CBR pada titik uji
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
-
7/22/2019 Dcp. Contoh
39/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 110 2.2 -2.2 9.3 4.62 5 140 2.8 -2.8 7.1 5.37
5 170 1.2 -3.4 18.3 3.16 5 350 4.2 -7.0 4.5 6.92
5 220 1.0 -4.4 22.5 2.82 5 460 2.2 -9.2 9.3 4.62
5 380 3.2 -7.6 6.1 5.84 5 610 3.0 -12.2 6.5 5.61
5 450 1.4 -9.0 15.4 3.48 5 650 0.8 -13.0 28.9 2.46
9.0 19.93 13.0 24.98
10.86 7.09
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 70 1.4 -1.4 15.4 3.48 5 10 0.2 -0.2 137.5 1.03
5 230 3.2 -4.6 6.1 5.84 5 110 2.0 -2.2 10.3 4.35
5 260 0.6 -5.2 40.0 2.05 5 190 1.6 -3.8 13.3 3.79
5 380 2.4 -7.6 8.4 4.88 5 270 1.6 -5.4 13.3 3.79
5 450 1.4 -9.0 15.4 3.48 5 380 2.2 -7.6 9.3 4.62
9.0 19.74 7.6 17.58
10.55 12.37
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 10 0.2 -0.2 137.5 1.03
5 90 1.6 -1.8 13.3 3.79
5 190 2.0 -3.8 10.3 4.35
5 250 1.2 -5.0 18.3 3.16
5 350 2.0 -7.0 10.3 4.35
7.0 16.69 0.0 -
13.55
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
STA 0+600 STA 0+700
CBR pada titik uji CBR pada titik uji
CBR pada titik uji CBR pada titik uji
STA 0+800 STA 0+900
CBR pada titik uji CBR pada titik uji
STA 1+000 STA 1+100
-
7/22/2019 Dcp. Contoh
40/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 130 2.6 -2.6 7.7 5.13 5 10 0.2 -0.2 137.5 1.03
5 250 2.4 -5.0 8.4 4.88 5 80 1.4 -1.6 15.4 3.48
5 320 1.4 -6.4 15.4 3.48 5 190 2.2 -3.8 9.3 4.62
5 400 1.6 -8.0 13.3 3.79 5 250 1.2 -5.0 18.3 3.16
5 420 0.4 -8.4 63.0 1.59 5 350 2.0 -7.0 10.3 4.35
8.4 18.87 7.0 16.65
11.34 13.46
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 10 0.2 -0.2 137.5 1.03 5 80 1.6 -1.6 13.3 3.79
5 80 1.4 -1.6 15.4 3.48 5 250 3.4 -5.0 5.7 6.07
5 210 2.6 -4.2 7.7 5.13 5 310 1.2 -6.2 18.3 3.16
5 350 2.8 -7.0 7.1 5.37 5 540 4.6 -10.8 4.0 7.33
5 490 2.8 -9.8 7.1 5.37 5 570 0.6 -11.4 40.0 2.05
9.8 20.39 11.4 22.39
9.01 7.58
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 80 1.6 -1.6 13.3 3.79 5 80 1.6 -1.6 13.3 3.79
5 160 1.6 -3.2 13.3 3.79 5 150 1.4 -3.0 15.4 3.48
5 230 1.4 -4.6 15.4 3.48 5 270 2.4 -5.4 8.4 4.88
5 320 1.8 -6.4 11.6 4.08 5 360 1.8 -7.2 11.6 4.08
5 430 2.2 -8.6 9.3 4.62 5 400 0.8 -8.0 28.9 2.46
8.6 19.75 8.0 18.68
12.12 12.73
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
STA 1+200 STA 1+300
CBR pada titik uji CBR pada titik uji
CBR pada titik uji CBR pada titik uji
STA 1+400 STA 1+500
CBR pada titik uji CBR pada titik uji
STA 1+600 STA 1+700
-
7/22/2019 Dcp. Contoh
41/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 80 1.6 -1.6 13.3 3.79 5 90 1.8 -1.8 11.6 4.08
5 120 0.8 -2.4 28.9 2.46 5 160 1.4 -3.2 15.4 3.48
5 250 2.6 -5.0 7.7 5.13 5 270 2.2 -5.4 9.3 4.62
5 340 1.8 -6.8 11.6 4.08 5 340 1.4 -6.8 15.4 3.48
5 390 1.0 -7.8 22.5 2.82 5 390 1.0 -7.8 22.5 2.82
7.8 18.27 7.8 18.49
12.85 13.31
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 40 0.8 -0.8 28.9 2.46 5 30 0.6 -0.6 40.0 2.05
5 110 1.4 -2.2 15.4 3.48 5 130 2.0 -2.6 10.3 4.35
5 280 3.4 -5.6 5.7 6.07 5 320 3.8 -6.4 5.0 6.50
5 340 1.2 -6.8 18.3 3.16 5 460 2.8 -9.2 7.1 5.37
5 400 1.2 -8.0 18.3 3.16 5 520 1.2 -10.4 18.3 3.16
8.0 18.33 10.4 21.44
12.03 8.76
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 10 0.2 -0.2 137.5 1.03 5 30 0.6 -0.6 40.0 2.05
5 220 4.2 -4.4 4.5 6.92 5 140 2.2 -2.8 9.3 4.62
5 260 0.8 -5.2 28.9 2.46 5 220 1.6 -4.4 13.3 3.79
5 280 0.4 -5.6 63.0 1.59 5 320 2.0 -6.4 10.3 4.35
5 360 1.6 -7.2 13.3 3.79 5 400 1.6 -8.0 13.3 3.79
7.2 15.79 8.0 18.60
10.54 12.56
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
STA 2+200 STA 2+300
CBR pada titik uji CBR pada titik uji
STA 1+800 STA 1+900
STA 2+000 STA 2+100
CBR pada titik uji CBR pada titik uji
CBR pada titik uji CBR pada titik uji
-
7/22/2019 Dcp. Contoh
42/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 50 1.0 -1.0 22.5 2.82 5 120 2.4 -2.4 8.4 4.88
5 130 1.6 -2.6 13.3 3.79 5 240 2.4 -4.8 8.4 4.88
5 200 1.4 -4.0 15.4 3.48 5 300 1.2 -6.0 18.3 3.16
5 220 0.4 -4.4 63.0 1.59 5 340 0.8 -6.8 28.9 2.46
5 350 2.6 -7.0 7.7 5.13 5 360 0.4 -7.2 63.0 1.59
7.0 16.81 7.2 16.97
13.86 13.09
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 90 1.8 -1.8 11.6 4.08 5 90 1.8 -1.8 11.6 4.08
5 210 2.4 -4.2 8.4 4.88 5 120 0.6 -2.4 40.0 2.05
5 310 2.0 -6.2 10.3 4.35 5 240 2.4 -4.8 8.4 4.88
5 400 1.8 -8.0 11.6 4.08 5 300 1.2 -6.0 18.3 3.16
5 500 2.0 -10.0 10.3 4.35 5 370 1.4 -7.4 15.4 3.48
10.0 21.74 7.4 17.65
10.27 13.57
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 70 1.4 -1.4 15.4 3.48 5 90 1.8 -1.8 11.6 4.08
5 160 1.8 -3.2 11.6 4.08 5 190 2.0 -3.8 10.3 4.35
5 250 1.8 -5.0 11.6 4.08 5 300 2.2 -6.0 9.3 4.62
5 350 2.0 -7.0 10.3 4.35 5 400 2.0 -8.0 10.3 4.35
5 410 1.2 -8.2 18.3 3.16 5 490 1.8 -9.8 11.6 4.08
8.2 19.15 9.8 21.48
12.74 10.53
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 2+600 STA 2+700
CBR pada titik uji CBR pada titik uji
STA 2+800 STA 2+900
CBR pada titik uji CBR pada titik uji
STA 2+400 STA 2+500
-
7/22/2019 Dcp. Contoh
43/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 70 1.4 -1.4 15.4 3.48 5 50 1.0 -1.0 22.5 2.82
5 240 3.4 -4.8 5.7 6.07 5 160 2.2 -3.2 9.3 4.62
5 370 2.6 -7.4 7.7 5.13 5 210 1.0 -4.2 22.5 2.82
5 430 1.2 -8.6 18.3 3.16 5 240 0.6 -4.8 40.0 2.05
5 450 0.4 -9.0 63.0 1.59 5 370 2.6 -7.4 7.7 5.13
9.0 19.43 7.4 17.45
10.07 13.10
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 60 1.2 -1.2 18.3 3.16 5 30 0.6 -0.6 40.0 2.05
5 210 3.0 -4.2 6.5 5.61 5 160 2.6 -3.2 7.7 5.13
5 270 1.2 -5.4 18.3 3.16 5 340 3.6 -6.8 5.3 6.29
5 320 1.0 -6.4 22.5 2.82 5 430 1.8 -8.6 11.6 4.08
5 470 3.0 -9.4 6.5 5.61 5 530 2.0 -10.6 10.3 4.35
9.4 20.37 10.6 21.89
10.17 8.81
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 50 1.0 -1.0 22.5 2.82 5 60 1.2 -1.2 18.3 3.16
5 260 4.2 -5.2 4.5 6.92 5 200 2.8 -4.0 7.1 5.37
5 360 2.0 -7.2 10.3 4.35 5 370 3.4 -7.4 5.7 6.07
5 450 1.8 -9.0 11.6 4.08 5 480 2.2 -9.6 9.3 4.62
5 550 2.0 -11.0 10.3 4.35 5 570 1.8 -11.4 11.6 4.08
11.0 22.53 11.4 23.30
8.59 8.53
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji
STA 3+000 STA 3+100
CBR pada titik uji CBR pada titik uji
STA 3+200 STA 3+300
CBR pada titik uji CBR pada titik uji
STA 3+400 STA 3+500
CBR pada titik uji
-
7/22/2019 Dcp. Contoh
44/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 80 1.6 -1.6 13.3 3.79 5 50 1.0 -1.0 22.5 2.82
5 200 2.4 -4.0 8.4 4.88 5 190 2.8 -3.8 7.1 5.37
5 280 1.6 -5.6 13.3 3.79 5 240 1.0 -4.8 22.5 2.82
5 380 2.0 -7.6 10.3 4.35 5 280 0.8 -5.6 28.9 2.46
5 530 3.0 -10.6 6.5 5.61 5 360 1.6 -7.2 13.3 3.79
10.6 22.41 7.2 17.26
9.45 13.77
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 50 1.0 -1.0 22.5 2.82 5 40 0.8 -0.8 28.9 2.46
5 220 3.4 -4.4 5.7 6.07 5 130 1.8 -2.6 11.6 4.08
5 270 1.0 -5.4 22.5 2.82 5 240 2.2 -4.8 9.3 4.62
5 310 0.8 -6.2 28.9 2.46 5 370 2.6 -7.4 7.7 5.13
5 340 0.6 -6.8 40.0 2.05 5 390 0.4 -7.8 63.0 1.59
6.8 16.22 7.8 17.87
13.56 12.03
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 40 0.8 -0.8 28.9 2.46 5 110 2.2 -2.2 9.3 4.62
5 140 2.0 -2.8 10.3 4.35 5 250 2.8 -5.0 7.1 5.37
5 240 2.0 -4.8 10.3 4.35 5 270 0.4 -5.4 63.0 1.59
5 380 2.8 -7.6 7.1 5.37 5 300 0.6 -6.0 40.0 2.05
5 460 1.6 -9.2 13.3 3.79 5 370 1.4 -7.4 15.4 3.48
9.2 20.32 7.4 17.12
10.78 12.38
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 4+000 STA 4+100
CBR pada titik uji CBR pada titik uji
STA 3+800 STA 3+900
CBR pada titik uji CBR pada titik uji
STA 3+600 STA 3+700
-
7/22/2019 Dcp. Contoh
45/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 60 1.2 -1.2 18.3 3.16 5 50 1.0 -1.0 22.5 2.82
5 160 2.0 -3.2 10.3 4.35 5 120 1.4 -2.4 15.4 3.48
5 310 3.0 -6.2 6.5 5.61 5 230 2.2 -4.6 9.3 4.62
5 380 1.4 -7.6 15.4 3.48 5 250 0.4 -5.0 63.0 1.59
5 450 1.4 -9.0 15.4 3.48 5 390 2.8 -7.8 7.1 5.37
9.0 20.09 7.8 17.89
11.13 12.07
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 50 1.0 -1.0 22.5 2.82 5 60 1.2 -1.2 18.3 3.16
5 170 2.4 -3.4 8.4 4.88 5 150 1.8 -3.0 11.6 4.08
5 280 2.2 -5.6 9.3 4.62 5 260 2.2 -5.2 9.3 4.62
5 360 1.6 -7.2 13.3 3.79 5 340 1.6 -6.8 13.3 3.79
5 420 1.2 -8.4 18.3 3.16 5 360 0.4 -7.2 63.0 1.59
8.4 19.27 7.2 17.24
12.08 13.72
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 40 0.8 -0.8 28.9 2.46 5 90 1.8 -1.8 11.6 4.08
5 140 2.0 -2.8 10.3 4.35 5 130 0.8 -2.6 28.9 2.46
5 240 2.0 -4.8 10.3 4.35 5 250 2.4 -5.0 8.4 4.88
5 380 2.8 -7.6 7.1 5.37 5 350 2.0 -7.0 10.3 4.35
5 460 1.6 -9.2 13.3 3.79 5 400 1.0 -8.0 22.5 2.82
9.2 20.32 8.0 18.59
10.78 12.54
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 4+600 STA 4+700
CBR pada titik uji CBR pada titik uji
STA 4+400 STA 4+500
CBR pada titik uji CBR pada titik uji
STA 4+200 STA 4+300
-
7/22/2019 Dcp. Contoh
46/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 90 1.8 -1.8 11.6 4.08 5 90 1.8 -1.8 11.6 4.08
5 210 2.4 -4.2 8.4 4.88 5 160 1.4 -3.2 15.4 3.48
5 300 1.8 -6.0 11.6 4.08 5 220 1.2 -4.4 18.3 3.16
5 410 2.2 -8.2 9.3 4.62 5 310 1.8 -6.2 11.6 4.08
5 600 3.8 -12.0 5.0 6.50 5 400 1.8 -8.0 11.6 4.08
12.0 24.15 8.0 18.87
8.15 13.13
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 90 1.8 -1.8 11.6 4.08 5 60 1.2 -1.2 18.3 3.16
5 150 1.2 -3.0 18.3 3.16 5 150 1.8 -3.0 11.6 4.08
5 210 1.2 -4.2 18.3 3.16 5 260 2.2 -5.2 9.3 4.62
5 370 3.2 -7.4 6.1 5.84 5 340 1.6 -6.8 13.3 3.79
5 420 1.0 -8.4 22.5 2.82 5 360 0.4 -7.2 63.0 1.59
8.4 19.06 7.2 17.24
11.69 13.72
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 50 1.0 -1.0 22.5 2.82 5 90 1.8 -1.8 11.6 4.08
5 140 1.8 -2.8 11.6 4.08 5 130 0.8 -2.6 28.9 2.46
5 240 2.0 -4.8 10.3 4.35 5 250 2.4 -5.0 8.4 4.88
5 380 2.8 -7.6 7.1 5.37 5 350 2.0 -7.0 10.3 4.35
5 460 1.6 -9.2 13.3 3.79 5 400 1.0 -8.0 22.5 2.82
9.2 20.41 8.0 18.59
10.92 12.54
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 5+200 STA 5+300
CBR pada titik uji CBR pada titik uji
STA 5+000 STA 5+100
CBR pada titik uji CBR pada titik uji
STA 4+800 STA 4+900
-
7/22/2019 Dcp. Contoh
47/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 50 1.0 -1.0 22.5 2.82 5 90 1.8 -1.8 11.6 4.08
5 150 2.0 -3.0 10.3 4.35 5 160 1.4 -3.2 15.4 3.48
5 220 1.4 -4.4 15.4 3.48 5 220 1.2 -4.4 18.3 3.16
5 340 2.4 -6.8 8.4 4.88 5 310 1.8 -6.2 11.6 4.08
5 490 3.0 -9.8 6.5 5.61 5 400 1.8 -8.0 11.6 4.08
9.8 21.15 8.0 18.87
10.05 13.13
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 70 1.4 -1.4 15.4 3.48 5 60 1.2 -1.2 18.3 3.16
5 150 1.6 -3.0 13.3 3.79 5 140 1.6 -2.8 13.3 3.79
5 220 1.4 -4.4 15.4 3.48 5 240 2.0 -4.8 10.3 4.35
5 370 3.0 -7.4 6.5 5.61 5 360 2.4 -7.2 8.4 4.88
5 380 0.2 -7.6 137.5 1.03 5 370 0.2 -7.4 137.5 1.03
7.6 17.39 7.4 17.21
11.99 12.59
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 40 0.8 -0.8 28.9 2.46 5 30 0.6 -0.6 40.0 2.05
5 120 1.6 -2.4 13.3 3.79 5 190 3.2 -3.8 6.1 5.84
5 220 2.0 -4.4 10.3 4.35 5 270 1.6 -5.4 13.3 3.79
5 280 1.2 -5.6 18.3 3.16 5 400 2.6 -8.0 7.7 5.13
5 380 2.0 -7.6 10.3 4.35 5 510 2.2 -10.2 9.3 4.62
7.6 18.11 10.2 21.43
13.53 9.27
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 5+900 STA 6+000
CBR pada titik uji CBR pada titik uji
STA 5+700 STA 5+800
CBR pada titik uji CBR pada titik uji
STA 5+500 STA 5+600
-
7/22/2019 Dcp. Contoh
48/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSONSOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 30 0.6 -0.6 40.0 2.05 5 60 1.2 -1.2 18.3 3.16
5 190 3.2 -3.8 6.1 5.84 5 180 2.4 -3.6 8.4 4.88
5 270 1.6 -5.4 13.3 3.79 5 270 1.8 -5.4 11.6 4.08
5 400 2.6 -8.0 7.7 5.13 5 340 1.4 -6.8 15.4 3.48
5 510 2.2 -10.2 9.3 4.62 5 450 2.2 -9.0 9.3 4.62
10.2 21.43 9.0 20.22
9.27 11.34
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 70 1.4 -1.4 15.4 3.48 5 50 1.0 -1.0 22.5 2.82
5 150 1.6 -3.0 13.3 3.79 5 170 2.4 -3.4 8.4 4.88
5 220 1.4 -4.4 15.4 3.48 5 280 2.2 -5.6 9.3 4.62
5 340 2.4 -6.8 8.4 4.88 5 360 1.6 -7.2 13.3 3.79
5 380 0.8 -7.6 28.9 2.46 5 370 0.2 -7.4 137.5 1.03
7.6 18.09 7.4 17.14
13.48 12.43
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 50 1.0 -1.0 22.5 2.82 5 70 1.4 -1.4 15.4 3.48
5 180 2.6 -3.6 7.7 5.13 5 110 0.8 -2.2 28.9 2.46
5 300 2.4 -6.0 8.4 4.88 5 220 2.2 -4.4 9.3 4.62
5 340 0.8 -6.8 28.9 2.46 5 280 1.2 -5.6 18.3 3.16
5 380 0.8 -7.6 28.9 2.46 5 380 2.0 -7.6 10.3 4.35
7.6 17.74 7.6 18.08
12.72 13.45
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 6+500 STA 6+600
CBR pada titik uji CBR pada titik uji
STA 6+300 STA 6+400
CBR pada titik uji CBR pada titik uji
STA 6+100 STA 6+200
-
7/22/2019 Dcp. Contoh
49/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. ARON - UJONG SEUKEE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSON
SOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 6+850
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 30 0.6 -0.6 40.0 2.05 5 40 0.8 -0.8 28.9 2.46
5 120 1.8 -2.4 11.6 4.08 5 130 1.8 -2.6 11.6 4.08
5 200 1.6 -4.0 13.3 3.79 5 260 2.6 -5.2 7.7 5.13
5 340 2.8 -6.8 7.1 5.37 5 290 0.6 -5.8 40.0 2.05
5 390 1.0 -7.8 22.5 2.82 5 360 1.4 -7.2 15.4 3.48
7.8 18.11 7.2 17.19
12.51 13.62
Tumbukan CP DN CBR CBR*
0 0
5 60 1.2 -1.2 18.3 3.16
5 90 0.6 -1.8 40.0 2.05
5 130 0.8 -2.6 28.9 2.46
5 240 2.2 -4.8 9.3 4.62
5 380 2.8 -7.6 7.1 5.37
7.6 17.66
12.55
Catatan:
CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 6+700 STA 6+800
CBR pada titik uji
STA 6+850
-
7/22/2019 Dcp. Contoh
50/69
Ruas Jalan : Sp. Paradiso - Stadion Sbg Meurauke Ruas Jalan : Sp. Paradiso -
Sta : 0+000 Sta :
Elevasi : m 10 Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DCP:
Tumbukan CP DN CBR CBR* Tumbukan CP
0 0 0 0
5 150 3.0 -3.0 6.5 5.61 ## ## 5 90
5 280 2.6 -5.6 7.7 5.13 ## ## 5 170
5 300 0.4 -6.0 63.0 1.59 ## ## 5 240
5 350 1.0 -7.0 22.5 2.82 ## ## 5 360
5 400 1.0 -8.0 22.5 2.82 ## ## 5 460
# ##
tetap # ##
# ##
# ##
# ##
8.0 17.98
11.3
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan N
Perhitungan CBR dari Pengujian DCP Perhi
0+100
CBR pada titik uji CBR pada titik u
-
7/22/2019 Dcp. Contoh
51/69
Ruas Jalan : Sp. Paradiso - Stadion Sbg Meurauke Ruas Jalan : Sp
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan0 0 0
5 50 1.0 -1.0 22.5 2.82 5
5 140 1.8 -2.8 11.6 4.08 5
5 240 2.0 -4.8 10.3 4.35 5
5 320 1.6 -6.4 13.3 3.79 5
5 390 1.4 -7.8 15.4 3.48 5
7.8 18.52
13.4Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cumm
DN = Dynamic Number (cm/blow) DN = Dynamic Numb
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah
Perhitungan CBR dari Pengujian DCP
0+600 0+
CBR pada titik uji CB
-
7/22/2019 Dcp. Contoh
52/69
Ruas Jalan : Sp. Paradiso - Stadion Sbg Meurauke Ruas Jalan : Sp
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DCP
Tumbukan CP DN CBR CBR* Tumbukan
0 0 05 110 2.2 -2.2 9.3 4.62 5
5 170 1.2 -3.4 18.3 3.16 5
5 230 1.2 -4.6 18.3 3.16 5
5 300 1.4 -6.0 15.4 3.48 5
5 390 1.8 -7.8 11.6 4.08 5
TETAP
7.8 18.51
13.4
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cumm
DN = Dynamic Number (cm/blow) DN = Dynamic Numb
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah p
Perhitungan CBR dari Pengujian DCP
1+200 1+
CBR pada titik uji CBR
-
7/22/2019 Dcp. Contoh
53/69
Ruas Jalan : Sp. Paradiso - Stadion Sbg Meurauke Ruas Jalan : Sp
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus DC
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
5 60 1.2 -1.2 18.3 3.16 5
5 120 1.2 -2.4 18.3 3.16 5
5 250 2.6 -5.0 7.7 5.13 5
5 340 1.8 -6.8 11.6 4.08 5
5 390 1.0 -7.8 22.5 2.82 5
7.8 18.35
13.0Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cum
DN = Dynamic Number (cm/blow) DN = Dynamic Numb
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah
Perhitungan CBR dari Pengujian DCP
1+800 1+
CBR pada titik uji CB
-
7/22/2019 Dcp. Contoh
54/69
-
7/22/2019 Dcp. Contoh
55/69
-
7/22/2019 Dcp. Contoh
56/69
-
7/22/2019 Dcp. Contoh
57/69
-
7/22/2019 Dcp. Contoh
58/69
Ruas Jalan : Sp. Paradiso - Stadion Sbg Meurauke Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus
Tumbukan CP DN CBR CBR* Tumbukan
0 0 0
-2.0 5 60 1.2 -1.2 18.3 3.16 # ## 5
-3.2 5 180 2.4 -3.6 8.4 4.88 # ## 5
-4.4 5 220 0.8 -4.4 28.9 2.46 # ## 5
-5.6 5 290 1.4 -5.8 15.4 3.48 # ## 5
-8.2 5 370 1.6 -7.4 13.3 3.79 # ## 5
# 0.0
# 0.0
# 0.0
7.4 17.77
13.8
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi C
DN = Dynamic Number (cm/blow) DN = Dynamic N
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.35
CBR* = hi x CBR^(1/3) CBR* = hi x CB
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan ta
Perhitungan CBR dari Pengujian DCP
0+300
CBR pada titik uji
-
7/22/2019 Dcp. Contoh
59/69
Ruas Jalan : Sp. Paradiso - Stadion Sbg Meurauke Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus
Tumbukan CP DN CBR CBR* Tumbukan0 0 0
5 170 3.4 -3.4 5.7 6.07 5
5 260 1.8 -5.2 11.6 4.08 5
5 300 0.8 -6.0 28.9 2.46 5
5 360 1.2 -7.2 18.3 3.16 5
5 400 0.8 -8.0 28.9 2.46 5
tetap
8.0 18.21
11.8Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi
DN = Dynamic Number (cm/blow) DN = Dynamic N
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.35
CBR* = hi x CBR^(1/3) CBR* = hi x CB
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan t
Perhitungan CBR dari Pengujian DCP
0+900
CBR pada titik uji
-
7/22/2019 Dcp. Contoh
60/69
Ruas Jalan : Sp. Paradiso - Stadion Sbg Meurauke Ruas Jalan :
Sta : Sta :
Elevasi : m Elevasi :
Sudut Conus DCP: 30o
Sudut Conus
Tumbukan CP DN CBR CBR* Tumbukan
0 0 05 60 1.2 -1.2 18.3 3.16 5
5 230 3.4 -4.6 5.7 6.07 5
5 280 1.0 -5.6 22.5 2.82 5
5 350 1.4 -7.0 15.4 3.48 5
5 430 1.6 -8.6 13.3 3.79 5
8.6 19.32
11.3
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi
DN = Dynamic Number (cm/blow) DN = Dynamic
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.35
CBR* = hi x CBR^(1/3) CBR* = hi x CB
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan t
Perhitungan CBR dari Pengujian DCP
1+500
CBR pada titik uji
-
7/22/2019 Dcp. Contoh
61/69
-
7/22/2019 Dcp. Contoh
62/69
-
7/22/2019 Dcp. Contoh
63/69
-
7/22/2019 Dcp. Contoh
64/69
-
7/22/2019 Dcp. Contoh
65/69
-
7/22/2019 Dcp. Contoh
66/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. PARADISO - STADION SABANG MERAUKE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSON
SOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 150 3.0 -3.0 6.5 5.61 5 90 1.8 -1.8 11.6 4.08
5 280 2.6 -5.6 7.7 5.13 5 170 1.6 -3.4 13.3 3.79
5 300 0.4 -6.0 63.0 1.59 5 240 1.4 -4.8 15.4 3.48
5 350 1.0 -7.0 22.5 2.82 5 360 2.4 -7.2 8.4 4.88
5 400 1.0 -8.0 22.5 2.82 5 460 2.0 -9.2 10.3 4.35
8.0 17.98 9.2 20.58
11.34 11.19
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 100 2.0 -2.0 10.3 4.35 # 5 60 1.2 -1.2 18.3 3.16
5 160 1.2 -3.2 18.3 3.16 # 5 180 2.4 -3.6 8.4 4.88
5 220 1.2 -4.4 18.3 3.16 # 5 220 0.8 -4.4 28.9 2.46
5 280 1.2 -5.6 18.3 3.16 # 5 290 1.4 -5.8 15.4 3.48
5 410 2.6 -8.2 7.7 5.13 # 5 370 1.6 -7.4 13.3 3.79
8.2 18.97 7.4 17.77
12.39 13.84
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 50 1.0 -1.0 22.5 2.82 5 50 1.0 -1.0 22.5 2.82
5 160 2.2 -3.2 9.3 4.62 5 170 2.4 -3.4 8.4 4.88
5 210 1.0 -4.2 22.5 2.82 5 210 0.8 -4.2 28.9 2.46
5 280 1.4 -5.6 15.4 3.48 5 320 2.2 -6.4 9.3 4.62
5 380 2.0 -7.6 10.3 4.35 5 380 1.2 -7.6 18.3 3.16
7.6 18.10 7.6 17.94
13.51 13.15
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 0+000 STA 0+100
STA 0+200 STA 0+300
CBR pada titik uji CBR pada titik uji
STA 0+400 STA 0+500
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 1+900
CBR pada titik uji CBR pada titik uji
-
7/22/2019 Dcp. Contoh
67/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. PARADISO - STADION SABANG MERAUKE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSON
SOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 1+900
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 50 1.0 -1.0 22.5 2.82 5 50 1.0 -1.0 22.5 2.82
5 140 1.8 -2.8 11.6 4.08 5 160 2.2 -3.2 9.3 4.62
5 240 2.0 -4.8 10.3 4.35 5 270 2.2 -5.4 9.3 4.62
5 320 1.6 -6.4 13.3 3.79 5 300 0.6 -6.0 40.0 2.05
5 390 1.4 -7.8 15.4 3.48 5 360 1.2 -7.2 18.3 3.16
7.8 18.52 7.2 17.28
13.39 13.82
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 40 0.8 -0.8 28.9 2.46 5 170 3.4 -3.4 5.7 6.07
5 160 2.4 -3.2 8.4 4.88 5 260 1.8 -5.2 11.6 4.08
5 270 2.2 -5.4 9.3 4.62 5 300 0.8 -6.0 28.9 2.46
5 300 0.6 -6.0 40.0 2.05 5 360 1.2 -7.2 18.3 3.16
5 360 1.2 -7.2 18.3 3.16 5 400 0.8 -8.0 28.9 2.46
7.2 17.17 8.0 18.21
13.56 11.80
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 120 2.4 -2.4 8.4 4.88 5 60 1.2 -1.2 18.3 3.16
5 230 2.2 -4.6 9.3 4.62 5 130 1.4 -2.6 15.4 3.48
5 260 0.6 -5.2 40.0 2.05 5 220 1.8 -4.4 11.6 4.08
5 320 1.2 -6.4 18.3 3.16 5 380 3.2 -7.6 6.1 5.84
5 380 1.2 -7.6 18.3 3.16 5 430 1.0 -8.6 22.5 2.82
7.6 17.88 8.6 19.38
13.02 11.45
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
STA 0+600 STA 0+700
CBR pada titik uji CBR pada titik uji
CBR pada titik uji CBR pada titik uji
STA 0+800 STA 0+900
CBR pada titik uji CBR pada titik uji
STA 1+000 STA 1+100
-
7/22/2019 Dcp. Contoh
68/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. PARADISO - STADION SABANG MERAUKE
TANGGAL : 11 AGUSTUS 2011
TEKNISI : WILSON
SOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 1+900
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 110 2.2 -2.2 9.3 4.62 5 230 4.6 -4.6 4.0 7.33
5 170 1.2 -3.4 18.3 3.16 5 400 3.4 -8.0 5.7 6.07
5 230 1.2 -4.6 18.3 3.16 5 500 2.0 -10.0 10.3 4.35
5 300 1.4 -6.0 15.4 3.48 5 560 1.2 -11.2 18.3 3.16
5 390 1.8 -7.8 11.6 4.08 5 680 2.4 -13.6 8.4 4.88
7.8 18.51 13.6 25.79
13.36 6.82
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 10 0.2 -0.2 137.5 1.03 5 60 1.2 -1.2 18.3 3.16
5 210 4.0 -4.2 4.7 6.71 5 230 3.4 -4.6 5.7 6.07
5 270 1.2 -5.4 18.3 3.16 5 280 1.0 -5.6 22.5 2.82
5 310 0.8 -6.2 28.9 2.46 5 350 1.4 -7.0 15.4 3.48
5 380 1.4 -7.6 15.4 3.48 5 430 1.6 -8.6 13.3 3.79
7.6 16.85 8.6 19.32
10.89 11.34
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 60 1.2 -1.2 18.3 3.16 5 20 0.4 -0.4 63.0 1.59
5 150 1.8 -3.0 11.6 4.08 5 110 1.8 -2.2 11.6 4.08
5 250 2.0 -5.0 10.3 4.35 5 210 2.0 -4.2 10.3 4.35
5 820 11.4 -16.4 1.5 12.92 5 310 2.0 -6.2 10.3 4.35
5 860 0.8 -17.2 28.9 2.46 5 360 1.0 -7.2 22.5 2.82
17.2 26.97 7.2 17.20
3.85 13.63
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
STA 1+400 STA 1+500
STA 1+200 STA 1+300
CBR pada titik uji CBR pada titik uji
STA 1+600 STA 1+700
CBR pada titik uji CBR pada titik uji
CBR pada titik uji CBR pada titik uji
-
7/22/2019 Dcp. Contoh
69/69
KEGIATAN : PERENCANAAN TEKNIS JALAN BALOHAN - SABANG Cs. PAKET (PR-JLJB/04/2011)
PROPINSI : ACEH
NO. LINK : -
RUAS : SP. PARADISO - STADION SABANG MERAUKE
TANGGAL : 11 AGUSTUS 2011TEKNISI : WILSON
SOIL & MATERIAL ENG. : WIDIA YULIANTI, ST
DYNAMIC CONE PENETROMETER TEST (30 DEGREE)
STATION PENYELIDIKAN : STA 0 + 000 - STA 1+900
Tumbukan CP DN CBR CBR* Tumbukan CP DN CBR CBR*
0 0 0 0
5 60 1.2 -1.2 18.3 3.16 5 70 1.4 -1.4 15.4 3.48
5 120 1.2 -2.4 18.3 3.16 5 160 1.8 -3.2 11.6 4.08
5 250 2.6 -5.0 7.7 5.13 5 270 2.2 -5.4 9.3 4.62
5 340 1.8 -6.8 11.6 4.08 5 340 1.4 -6.8 15.4 3.48
5 390 1.0 -7.8 22.5 2.82 5 420 1.6 -8.4 13.3 3.79
7.8 18.35 8.4 19.45
13.03 12.41
Catatan: Catatan:
CP = Penetrasi Cummulatif (mm) CP = Penetrasi Cummulatif (mm)
DN = Dynamic Number (cm/blow) DN = Dynamic Number (cm/blow)
CBR = 10^(1.352-(1.125*Log DN)) CBR = 10^(1.352-(1.125*Log DN))
CBR* = hi x CBR^(1/3) CBR* = hi x CBR^(1/3)
hi = Ketebalan tanah pada Lapisan No.1,2,,n hi = Ketebalan tanah pada Lapisan No.1,2,,n
CBR pada titik uji CBR pada titik uji
STA 1+800 STA 1+900