DAFTAR HARGA SRIMAYA RESIDENCE - SUMMARECON … · TUNAI KERAS BERTAHAP 18X KPR BERTAHAP via SFK...
Transcript of DAFTAR HARGA SRIMAYA RESIDENCE - SUMMARECON … · TUNAI KERAS BERTAHAP 18X KPR BERTAHAP via SFK...
DAFTAR HARGA
SRIMAYA RESIDENCE - SUMMARECONCLUSTER ARKANA18 November 2019
Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe
(M2) (M
2) (M
2) (M
2) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
BLOK ZAA - JL. ARKANA 1
1 ZAA 021 Laksmi B 6 x 10 60 Badan 30 - 412,500,000 - 419,512,500 - 441,787,500 - 421,162,500 - 488,812,500 -
2 ZAA 031 Padmarini H 7 x 10 90 Hoek - 38 - 562,100,000 - 571,655,700 - 602,009,100 - 573,904,100 - 666,088,500
3 ZAA 053 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 457,102,800 - 435,762,800 - 505,758,000
BLOK ZAB - JL. ARKANA RAYA
4 ZAB 037 Padmarini B 7 x 10 70 Badan 35 - 484,000,000 - 492,228,000 - 518,364,000 - 494,164,000 - 573,540,000 -
BLOK ZAB - JL. ARKANA 1
5 ZAB 056 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 457,102,800 - 435,762,800 - 505,758,000
BLOK ZAC - JL. ARKANA 2
6 ZAC 067 Laksmi B 6 x 10 60 Badan - 33 - 425,700,000 - 432,936,900 - 455,924,700 - 434,639,700 - 504,454,500
BLOK ZAD - JL. ARKANA 3
7 ZAD 031 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 457,102,800 - 435,762,800 - 505,758,000
BLOK ZAD - JL. ARKANA 2
8 ZAD 050 Laksmi B 6 x 10 60 Badan - 33 - 425,700,000 - 432,936,900 - 455,924,700 - 434,639,700 - 504,454,500
BLOK ZAE - JL. ARKANA 5
9 ZAE 023 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 457,102,800 - 435,762,800 - 505,758,000
10 ZAE 025 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 457,102,800 - 435,762,800 - 505,758,000
11 ZAE 037 Laksmi H 6 x 10 101 Hoek - 33 - 562,100,000 - 571,655,700 - 602,009,100 - 573,904,100 - 666,088,500
BLOK ZAF - JL. ARKANA 5
12 ZAF 020 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 531,323,100 - 506,518,100 - 587,878,500
13 ZAF 036 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 457,102,800 - 435,762,800 - 505,758,000
BLOK ZAG - JL. ARKANA 6262 ZAG 010 Laksmi B 6 x 10 60 Badan 30 33 348,700,000 360,800,000 354,627,900 366,933,600 373,457,700 386,416,800 356,022,700 368,376,800 413,209,500 427,548,000 14 ZAG 012 Laksmi B 6 x 10 60 Badan - 33 - 424,600,000 - 431,818,200 - 454,746,600 - 433,516,600 - 503,151,000
Pengembang :
PT. Summarecon Agung, Tbk
Jl. Bulevard A. Yani Kav.001 - Kota Summarecon Bekasi
Telp. (021) 8866666, Fax. (021) 88966373 Arkana Residence - 01 of 02
DP 15% Cicil 8X
HARGA JUAL (Incl. PPN)
BERTAHAP 18X KPR TUNAI KERAS BERTAHAP via SFK
(24X, 36X, 48X, 60X)UKURAN
LUAS
TANAH TYPE
KAV
LUAS
BANGUNANTIPENO BLOK
NO.
UNIT
Tunai Keras DP 15% Cicil 8X (Promo Program Subsidi DP 10%)
Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1 Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1
Uang Muka (DP) ke-1 35% - TJ Hari ke-15 Cicilan ke 1 - 8 (5% - TJ) / 8 bulan Hari ke-15 dan seterusnya setiap bulan
Uang Muka ke-2 35% Hari ke-30 Sisa DP 10% (Subsidi Developer) 10% 2 minggu setelah cicilan ke-8
Pelunasan 30% Hari ke-45 Pelunasan (Tunai/KPR) 85% Pelunasan / Akad kredit, 2 minggu setelah
cicilan ke-8
KPP Pertama Bertahap Via SFK
Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1 Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1
Uang Muka (DP) ke-1 7.5% - TJ Hari ke-15 Cicilan ke 1 - 3 ke Developer 15% - TJ / 3 bulan Hari ke-15 dan seterusnya setiap bulan
Uang Muka (DP) ke-2 7.5% Hari ke-45
Pelunasan (Akad Kredit) 85% Hari ke-75
Bertahap 18X
Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1
Cicilan ke 1 - 18 (100% - TJ) / 18 bulan Hari ke-15 dan seterusnya setiap bulan
Note:- Harga tidak mengikat dan dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu- Harga tidak termasuk biaya balik nama, pajak balik nama sertifikat, Pajak Bumi dan Bangunan (PBB), Iuran Pengelolaan Lingkungan (IPL) dan biaya-biaya lain diluar PPN- Apabila terjadi Peraturan Pemerintah yang menyebabkan tarif PPN berubah, maka selisihnya di tanggung dan wajib dibayarkan pembeli pada saat pembayaran angsuran- Cara pelunasan pembayaran DP 15% Cicil 8X dapat melalui proses KPR Bank atau pelunasan Tunai Keras- Cara pembayaran KPR Pertama harus melalui proses KPR Bank - Cara pelunasan pembayaran Bertahap via SFK hanya melalui akad kredit dengan SFK- Hasil pengajuan KPR tersebut merupakan kewenangan penuh dari pihak Bank yang ditunjuk dan harga belum termasuk biaya KPR dan biaya appraisal- Sejak tanggal cetak PPJB, biaya PBB menjadi tanggung jawab Pihak Pembeli- Nama, blok, nomor yang tercantum pada saat tanda jadi sudah pasti dan tidak dapat diganti- Selanjutnya syarat dan ketentuan pembelian ini akan dituangkan dalam Perjanjian Pengikatan Jual Beli sesuai perjanjian standar yang dimiliki oleh PT Summarecon Agung Tbk- Apabila Pemesan telah melakukan pembayaran uang Tanda Jadi, uang muka dan angsuran pembayaran, dan Pemesan melakukan pembatalan atau pengunduran diri sebagai Pembeli termasuk tetapi tidak terbatas pada proses Kredit Kepemilikan Properti (KPP) yang ditolak, maupun pula dikarenakan Pembeli tidak memenuhi kewajiban pembayaran yang telah disepakati dan atau ketentuan-ketentuan yang diatur dalam PPJB, maka seluruh uang tanda jadi menjadi milik Pengembang, sedangkan uang muka dan angsuran dipotong 50% dari seluruh uang yang telah dibayarkan dan dipotong pula dengan pajak-pajak yang telah dibayarkan oleh Pengembang- Apabila pemesan telah melakukan pembayaran Uang Tanda Jadi dan pemesan tidak melakukan / melunasi pembayaran DP1 selambat-lambatnya 14 hari (empat belas) hari dari tanggal yang telah ditentukan, maka transaksi akan Batal dengan sendirinya dan Uang Tanda Jadi tidak dapat dikembalikan- Nama, unit, nomor yang tercantum pada saat tanda jadi sudah pasti dan tidak dapat diganti- Tidak dapat mengalihkan haknya kepada pihak lain sebelum 6 bulan sejak tanggal PPJB dan sebelum pembayaran lunas- Segala jenis pembayaran hanya ditujukan ke rekening atas nama PT Summarecon Agung Tbk atau no rekening yang tertera di dalam surat pemesanan, apabila terdapat pembayaran di luar rekening atas nama PT Summarecon Agung Tbk ataupun diluar no rekening yang tertera di dalam surat pemesanan PT Summarecon Agung Tbk tidak bertanggung jawab
Bank Kerjasama :
Bank Permata, Bank OCBC NISP, Bank BCA, Bank Mandiri, Bank CIMB Niaga, dan SFK
Pengembang :
PT. Summarecon Agung, Tbk
Jl. Bulevard A. Yani Kav.001 - Kota Summarecon Bekasi
Telp. (021) 8866666, Fax. (021) 88966373 Arkana Residence - 02 of 02
Pelunasan (Akad kredit dengan SFK) 85% Pelunasan/Akad kredit di bulan ke-4
TERM OF PAYMENT
Arkana - Srimaya Residence
DAFTAR HARGA
SRIMAYA RESIDENCE - SUMMARECONCLUSTER BASWARA9 DESEMBER 2019
Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe
(M2) (M2) (M2) (M2) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
BLOK ZBA - JL. Baswara Barat 1
1 ZBA 018 Laksmi B 6 x 10 60 Badan - 33 - 434,500,000 - 441,886,500 - 455,790,500 - 465,349,500 - 514,882,500
2 ZBA 020 Laksmi B 6 x 10 60 Badan - 33 - 432,300,000 - 439,649,100 - 453,482,700 - 462,993,300 - 512,275,500
3 ZBA 022 Laksmi B 6 x 10 60 Badan - 33 - 432,300,000 - 439,649,100 - 453,482,700 - 462,993,300 - 512,275,500
4 ZBA 026 Laksmi B 6 x 10 60 Badan - 33 - 432,300,000 - 439,649,100 - 453,482,700 - 462,993,300 - 512,275,500
5 ZBA 028 Padmarini B 7 x 10 70 Badan - 38 - 507,100,000 - 515,720,700 - 531,947,900 - 543,104,100 - 600,913,500
6 ZBA 030 Padmarini B 7 x 10 70 Badan - 38 - 507,100,000 - 515,720,700 - 531,947,900 - 543,104,100 - 600,913,500
7 ZBA 070 Laksmi B 6 x 10 60 Badan - 33 - 430,100,000 - 437,411,700 - 451,174,900 - 460,637,100 - 509,668,500
8 ZBA 072 Laksmi B 6 x 10 60 Badan - 33 - 430,100,000 - 437,411,700 - 451,174,900 - 460,637,100 - 509,668,500
9 ZBA 076 Laksmi B 6 x 10 60 Badan - 33 - 430,100,000 - 437,411,700 - 451,174,900 - 460,637,100 - 509,668,500
10 ZBA 078 Laksmi B 6 x 10 60 Badan - 33 - 430,100,000 - 437,411,700 - 451,174,900 - 460,637,100 - 509,668,500
11 ZBA 080 Laksmi B 6 x 10 60 Badan - 33 - 436,700,000 - 444,123,900 - 458,098,300 - 467,705,700 - 517,489,500
12 ZBA 082 Laksmi B 6 x 10 60 Badan - 33 - 434,500,000 - 441,886,500 - 455,790,500 - 465,349,500 - 514,882,500
BLOK ZBB - JL. Taman Baswara
13 ZBB 011 Padmarini B 7 x 10 70 Badan - 38 - 507,100,000 - 515,720,700 - 531,947,900 - 543,104,100 - 600,913,500
BLOK ZBC - JL. Baswara Barat 1
14 ZBC 011 Padmarini B 7 x 10 70 Badan - 38 - 507,100,000 - 515,720,700 - 531,947,900 - 543,104,100 - 600,913,500
15 ZBC 015 Padmarini B 7 x 10 70 Badan - 38 - 507,100,000 - 515,720,700 - 531,947,900 - 543,104,100 - 600,913,500
BLOK ZBC - JL. Baswara Barat 2
16 ZBC 010 Padmarini B 7 x 10 70 Badan - 38 - 499,400,000 - 507,889,800 - 523,870,600 - 534,857,400 - 591,789,000
17 ZBC 016 Padmarini B 7 x 10 70 Badan - 38 - 499,400,000 - 507,889,800 - 523,870,600 - 534,857,400 - 591,789,000
BLOK ZBD - JL. Baswara Timur 1
18 ZBD 003 Padmarini B 7 x 10 70 Badan - 38 - 507,100,000 - 515,720,700 - 531,947,900 - 543,104,100 - 600,913,500
19 ZBD 005 Padmarini B 7 x 10 70 Badan - 38 - 507,100,000 - 515,720,700 - 531,947,900 - 543,104,100 - 600,913,500
20 ZBD 009 Padmarini B 7 x 10 70 Badan - 38 - 509,300,000 - 517,958,100 - 534,255,700 - 545,460,300 - 603,520,500
21 ZBD 015 Padmarini B 7 x 10 70 Badan - 38 - 507,100,000 - 515,720,700 - 531,947,900 - 543,104,100 - 600,913,500
22 ZBD 017 Padmarini B 7 x 10 70 Badan - 38 - 507,100,000 - 515,720,700 - 531,947,900 - 543,104,100 - 600,913,500
Baswara Residence - 01 of 04
DP 15% Cicil 8X BERTAHAP 18XKPRTUNAI KERAS BERTAHAP via SFK
(24X, 36X, 48X, 60X)
HARGA JUAL (Incl. PPN)
UKURANLUAS
TANAH TYPE KAV
LUAS BANGUNAN
NO. BLOKNO.
UNITTIPE
DAFTAR HARGA
SRIMAYA RESIDENCE - SUMMARECONCLUSTER BASWARA9 DESEMBER 2019
Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe
(M2) (M2) (M2) (M2) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
BLOK ZBD - JL. Baswara Timur 2
23 ZBD 020 Padmarini B 7 x 10 70 Badan - 38 - 499,400,000 - 507,889,800 - 523,870,600 - 534,857,400 - 591,789,000
24 ZBD 028 Laksmi B 6 x 10 60 Badan - 33 - 430,100,000 - 437,411,700 - 451,174,900 - 460,637,100 - 509,668,500
25 ZBD 030 Laksmi B 6 x 10 60 Badan - 33 - 430,100,000 - 437,411,700 - 451,174,900 - 460,637,100 - 509,668,500
26 ZBD 032 Laksmi B 6 x 10 60 Badan - 33 - 430,100,000 - 437,411,700 - 451,174,900 - 460,637,100 - 509,668,500
BLOK ZBE - JL. Baswara Barat 2
27 ZBE 011 Padmarini B 7 x 10 70 Badan - 38 - 499,400,000 - 507,889,800 - 523,870,600 - 534,857,400 - 591,789,000
28 ZBE 015 Laksmi B 6 x 10 60 Badan - 33 - 430,100,000 - 437,411,700 - 451,174,900 - 460,637,100 - 509,668,500
BLOK ZBE - JL. Baswara Barat 3
29 ZBE 012 Padmarini B 7 x 10 70 Badan - 38 - 499,400,000 - 507,889,800 - 523,870,600 - 534,857,400 - 591,789,000
30 ZBE 016 Padmarini B 7 x 10 70 Badan - 38 - 499,400,000 - 507,889,800 - 523,870,600 - 534,857,400 - 591,789,000
BLOK ZBF - JL. Baswara Timur 2
31 ZBF 009 Padmarini B 7 x 10 70 Badan - 38 - 500,500,000 - 509,008,500 - 525,024,500 - 536,035,500 - 593,092,500
32 ZBF 015 Padmarini B 7 x 10 70 Badan - 38 - 498,300,000 - 506,771,100 - 522,716,700 - 533,679,300 - 590,485,500
33 ZBF 017 Padmarini B 7 x 10 70 Badan - 38 - 498,300,000 - 506,771,100 - 522,716,700 - 533,679,300 - 590,485,500
34 ZBF 019 Padmarini B 7 x 10 70 Badan - 38 - 498,300,000 - 506,771,100 - 522,716,700 - 533,679,300 - 590,485,500
35 ZBF 021 Padmarini B 7 x 10 70 Badan - 38 - 498,300,000 - 506,771,100 - 522,716,700 - 533,679,300 - 590,485,500
36 ZBF 023 Padmarini B 7 x 10 70 Badan - 38 - 498,300,000 - 506,771,100 - 522,716,700 - 533,679,300 - 590,485,500
37 ZBF 025 Padmarini B 7 x 10 70 Badan - 38 - 498,300,000 - 506,771,100 - 522,716,700 - 533,679,300 - 590,485,500
38 ZBF 027 Laksmi B 6 x 10 60 Badan - 33 - 429,000,000 - 436,293,000 - 450,021,000 - 459,459,000 - 508,365,000
39 ZBF 029 Laksmi B 6 x 10 60 Badan - 33 - 429,000,000 - 436,293,000 - 450,021,000 - 459,459,000 - 508,365,000
BLOK ZBF - JL. Baswara Timur 3
40 ZBF 012 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
41 ZBF 016 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
42 ZBF 018 Padmarini B 7 x 10 70 Badan - 38 - 498,300,000 - 506,771,100 - 522,716,700 - 533,679,300 - 590,485,500
43 ZBF 020 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
44 ZBF 022 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
45 ZBF 026 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
Baswara Residence - 02 of 04
HARGA JUAL (Incl. PPN)
DP 15% Cicil 8X BERTAHAP 18XKPRUKURANLUAS
TANAH TYPE KAV
LUAS BANGUNAN
NO. BLOKNO.
UNITTIPE
TUNAI KERAS BERTAHAP via SFK
(24X, 36X, 48X, 60X)
DAFTAR HARGA
SRIMAYA RESIDENCE - SUMMARECONCLUSTER BASWARA9 DESEMBER 2019
Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe
(M2) (M2) (M2) (M2) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
BLOK ZBF - JL. Baswara Timur 3
46 ZBF 028 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 447,713,200 - 457,102,800 - 505,758,000
47 ZBF 030 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 447,713,200 - 457,102,800 - 505,758,000
48 ZBF 032 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 447,713,200 - 457,102,800 - 505,758,000
49 ZBF 036 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 447,713,200 - 457,102,800 - 505,758,000
50 ZBF 038 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 447,713,200 - 457,102,800 - 505,758,000
BLOK ZBH - JL. Baswara Barat 5
51 ZBH 010 Laksmi B 6 x 10 60 Badan - 33 - 427,900,000 - 435,174,300 - 448,867,100 - 458,280,900 - 507,061,500
52 ZBH 012 Laksmi B 6 x 10 60 Badan - 33 - 427,900,000 - 435,174,300 - 448,867,100 - 458,280,900 - 507,061,500
53 ZBH 022 Laksmi B 6 x 10 60 Badan - 33 - 427,900,000 - 435,174,300 - 448,867,100 - 458,280,900 - 507,061,500
BLOK ZBI - JL. Baswara Timur 3
54 ZBI 011 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
55 ZBI 015 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
56 ZBI 017 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
57 ZBI 019 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
58 ZBI 021 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
59 ZBI 023 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
60 ZBI 025 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 447,713,200 - 457,102,800 - 505,758,000
61 ZBI 027 Laksmi B 6 x 10 60 Badan - 33 - 426,800,000 - 434,055,600 - 447,713,200 - 457,102,800 - 505,758,000
BLOK ZBI - JL. Baswara Timur 5
62 ZBI 008 Padmarini B 7 x 10 70 Badan 35 - 481,800,000 - 489,990,600 - 505,408,200 - 516,007,800 - 570,933,000 -
63 ZBI 012 Padmarini B 7 x 10 70 Badan - 38 - 496,100,000 - 504,533,700 - 520,408,900 - 531,323,100 - 587,878,500
BLOK ZBK - JL. Baswara Timur 5
64 ZBK 003 Padmarini B 7 x 10 70 Badan - 38 - 495,000,000 - 503,415,000 - 519,255,000 - 530,145,000 - 586,575,000
BLOK ZBK - JL. Baswara Timur 6
65 ZBK 006 Padmarini B 7 x 10 70 Badan - 38 - 498,300,000 - 506,771,100 - 522,716,700 - 533,679,300 - 590,485,500
66 ZBK 012 Laksmi B 6 x 10 60 Badan - 33 - 433,400,000 - 440,767,800 - 454,636,600 - 464,171,400 - 513,579,000
67 ZBK 032 Laksmi B 6 x 10 60 Badan - 33 - 433,400,000 - 440,767,800 - 454,636,600 - 464,171,400 - 513,579,000
BLOK ZBM - JL. Baswara Barat 7
68 ZBM 037 Laksmi B 6 x 10 60 Badan - 33 - 424,600,000 - 431,818,200 - 445,405,400 - 454,746,600 - 503,151,000
Baswara Residence - 03 of 04
HARGA JUAL (Incl. PPN)
DP 15% Cicil 8X TUNAI KERAS BERTAHAP via SFK
(24X, 36X, 48X, 60X)KPR BERTAHAP 18X
NO. BLOKNO.
UNITTIPE
UKURANLUAS
TANAH TYPE KAV
LUAS BANGUNAN
Tunai Keras Bertahap 18X
Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1
Uang Muka (DP) ke-1 35% - TJ Hari ke-15
Uang Muka ke-2 35% Hari ke-30
Pelunasan 30% Hari ke-45
KPR DP 15% Cicil 8X (Promo Program Subsidi DP 10%)
Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1 Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1
Uang Muka (DP) ke-1 7.5% - TJ Hari ke-15 Cicilan ke 1 - 8 (5% - TJ) / 8 bulan Hari ke-15 dan seterusnya setiap bulan
Uang Muka (DP) ke-2 7.5% Hari ke-45 Sisa DP 10% (Subsidi Developer) 10% 2 minggu setelah cicilan ke-8
Pelunasan (Akad Kredit) 85% Hari ke-75
BERTAHAP VIA SFK
Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1
Cicilan ke 1 - 3 ke Developer (15% - TJ) / 3 bulan Hari ke-15 dan seterusnya setiap bulan
Pelunasan (Akad kredit dengan SFK) 85% Pelunasan/Akad kredit di bulan ke-4
Note:
- Harga tidak mengikat dan dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu
- Harga tidak termasuk biaya balik nama, pajak balik nama sertifikat, Pajak Bumi dan Bangunan (PBB), Iuran Pengelolaan Lingkungan (IPL) dan biaya-biaya lain diluar PPN
- Apabila terjadi Peraturan Pemerintah yang menyebabkan tarif PPN berubah, maka selisihnya di tanggung dan wajib dibayarkan pembeli pada saat pembayaran angsuran
- Cara pelunasan pembayaran DP 15% Cicil 8X dapat melalui proses KPR Bank atau pelunasan Tunai Keras
- Cara pembayaran KPR Pertama harus melalui proses KPR Bank
- Hasil pengajuan KPR tersebut merupakan kewenangan penuh dari pihak Bank yang ditunjuk dan harga belum termasuk biaya KPR dan biaya appraisal
- Cara pelunasan pembayaran Bertahap via SFK hanya melalui akad kredit dengan SFK
- Sejak tanggal cetak PPJB, biaya PBB menjadi tanggung jawab Pihak Pembeli
- Nama, blok, nomor yang tercantum pada saat tanda jadi sudah pasti dan tidak dapat diganti
- Selanjutnya syarat dan ketentuan pembelian ini akan dituangkan dalam Perjanjian Pengikatan Jual Beli sesuai perjanjian standar yang dimiliki oleh PT Summarecon Agung Tbk
- Apabila Pemesan telah melakukan pembayaran uang Tanda Jadi, uang muka dan angsuran pembayaran, dan Pemesan melakukan pembatalan atau pengunduran diri sebagai Pembeli
termasuk tetapi tidak terbatas pada proses Kredit Kepemilikan Properti (KPP) yang ditolak, maupun pula dikarenakan Pembeli tidak memenuhi kewajiban pembayaran yang telah disepakati
dan atau ketentuan-ketentuan yang diatur dalam PPJB, maka seluruh uang tanda jadi menjadi milik Pengembang, sedangkan uang muka dan angsuran dipotong 50% dari seluruh
uang yang telah dibayarkan dan dipotong pula dengan pajak-pajak yang telah dibayarkan oleh Pengembang
- Apabila pemesan telah melakukan pembayaran Uang Tanda Jadi dan pemesan tidak melakukan / melunasi pembayaran DP1 selambat-lambatnya 14 hari (empat belas) hari dari tanggal
yang telah ditentukan, maka transaksi akan Batal dengan sendirinya dan Uang Tanda Jadi tidak dapat dikembalikan
- Tidak dapat mengalihkan haknya kepada pihak lain sebelum 6 bulan sejak tanggal PPJB dan sebelum pembayaran lunas
- Segala jenis pembayaran hanya ditujukan ke rekening atas nama PT Summarecon Agung Tbk atau no rekening yang tertera di dalam surat pemesanan, apabila terdapat pembayaran di luar rekening
atas nama PT Summarecon Agung Tbk ataupun diluar no rekening yang tertera di dalam surat pemesanan PT Summarecon Agung Tbk tidak bertanggung jawab
Bank Kerjasama : Bank Permata, Bank OCBC NISP, Bank BCA, Bank Mandiri, Bank CIMB Niaga, dan SFK
Pengembang :
PT. Summarecon Agung, Tbk
Jl. Bulevard A. Yani Kav.001 - Kota Summarecon Bekasi
Telp. (021) 8866666, Fax. (021) 88966373 Baswara Residence - 04 of 04
TERM OF PAYMENT
Baswara - Srimaya Residence
Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1
Cicilan ke 1 - 18 (100% - TJ) / 18 bulan Hari ke-15 dan seterusnya setiap bulan
Pelunasan (Tunai/KPR) 85%Pelunasan / Akad kredit, 2 minggu setelah
cicilan ke-8
DAFTAR HARGA REV-1
SRIMAYA RESIDENCE - SUMMARECONCLUSTER CANDANI16 Maret 2019
Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe
(M2) (M2) (M2) (M2) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
BLOK ZCD - JL. Candani 6
1 ZCD 002 Padmarini H 7 x 10 109 Hoek 38 - 620,400,000 - 645,216,000 - 670,032,000 - 735,174,000
2 ZCD 006 Padmarini B 7 x 10 70 Badan 35 38 477,400,000 491,700,000 496,496,000 511,368,000 515,592,000 531,036,000 565,719,000 582,664,500
3 ZCD 008 Padmarini B 7 x 10 70 Badan 35 38 480,700,000 496,100,000 499,928,000 515,944,000 519,156,000 535,788,000 569,629,500 587,878,500
4 ZCD 010 Laksmi B 6 x 10 60 Badan 30 33 413,600,000 427,900,000 430,144,000 445,016,000 446,688,000 462,132,000 490,116,000 507,061,500
5 ZCD 012 Laksmi B 6 x 10 60 Badan 30 33 412,500,000 427,900,000 429,000,000 445,016,000 445,500,000 462,132,000 488,812,500 507,061,500
6 ZCD 016 Laksmi B 6 x 10 60 Badan 30 33 412,500,000 426,800,000 429,000,000 443,872,000 445,500,000 460,944,000 488,812,500 505,758,000
7 ZCD 018 Laksmi B 6 x 10 60 Badan 30 33 415,800,000 431,200,000 432,432,000 448,448,000 449,064,000 465,696,000 492,723,000 510,972,000
8 ZCD 020 Laksmi B 6 x 10 60 Badan 30 33 411,400,000 425,700,000 427,856,000 442,728,000 444,312,000 459,756,000 487,509,000 504,454,500
9 ZCD 022 Laksmi B 6 x 10 60 Badan 30 33 411,400,000 425,700,000 427,856,000 442,728,000 444,312,000 459,756,000 487,509,000 504,454,500
10 ZCD 026 Padmarini H 7 x 10 100 Hoek 38 - 586,300,000 - 609,752,000 - 633,204,000 - 694,765,500
BLOK ZCE - JL. Candani 6
11 ZCE 001 Padmarini H 7 x 10 108 Hoek 38 - 617,100,000 - 641,784,000 - 666,468,000 - 731,263,500
12 ZCE 003 Padmarini B 7 x 10 70 Badan 35 38 473,000,000 487,300,000 491,920,000 506,792,000 510,840,000 526,284,000 560,505,000 577,450,500
13 ZCE 005 Padmarini B 7 x 10 70 Badan 35 38 471,900,000 486,200,000 490,776,000 505,648,000 509,652,000 525,096,000 559,201,500 576,147,000
14 ZCE 007 Padmarini B 7 x 10 70 Badan 35 38 471,900,000 486,200,000 490,776,000 505,648,000 509,652,000 525,096,000 559,201,500 576,147,000
15 ZCE 009 Padmarini B 7 x 10 70 Badan 35 38 476,300,000 490,600,000 495,352,000 510,224,000 514,404,000 529,848,000 564,415,500 581,361,000
16 ZCE 011 Padmarini B 7 x 10 70 Badan 35 38 470,800,000 485,100,000 489,632,000 504,504,000 508,464,000 523,908,000 557,898,000 574,843,500
17 ZCE 015 Padmarini B 7 x 10 70 Badan 35 38 470,800,000 485,100,000 489,632,000 504,504,000 508,464,000 523,908,000 557,898,000 574,843,500
18 ZCE 017 Padmarini B 7 x 10 70 Badan 35 38 469,700,000 484,000,000 488,488,000 503,360,000 507,276,000 522,720,000 556,594,500 573,540,000
19 ZCE 019 Padmarini B 7 x 10 70 Badan 35 38 469,700,000 484,000,000 488,488,000 503,360,000 507,276,000 522,720,000 556,594,500 573,540,000
20 ZCE 021 Padmarini B 7 x 10 70 Badan 35 38 468,600,000 482,900,000 487,344,000 502,216,000 506,088,000 521,532,000 555,291,000 572,236,500
BLOK ZCE - JL. Candani 7
21 ZCE 002 Padmarini H 7 x 10 99 Hoek 38 - 586,300,000 - 609,752,000 - 633,204,000 - 694,765,500
22 ZCE 006 Padmarini B 7 x 10 70 Badan 35 38 471,900,000 486,200,000 490,776,000 505,648,000 509,652,000 525,096,000 559,201,500 576,147,000
23 ZCE 008 Padmarini B 7 x 10 70 Badan 35 38 475,200,000 490,600,000 494,208,000 510,224,000 513,216,000 529,848,000 563,112,000 581,361,000
24 ZCE 010 Padmarini B 7 x 10 70 Badan 35 38 470,800,000 485,100,000 489,632,000 504,504,000 508,464,000 523,908,000 557,898,000 574,843,500
25 ZCE 012 Padmarini B 7 x 10 70 Badan 35 38 469,700,000 484,000,000 488,488,000 503,360,000 507,276,000 522,720,000 556,594,500 573,540,000
26 ZCE 016 Padmarini B 7 x 10 70 Badan 35 38 474,100,000 488,400,000 493,064,000 507,936,000 512,028,000 527,472,000 561,808,500 578,754,000
27 ZCE 018 Padmarini B 7 x 10 70 Badan 35 38 482,900,000 497,200,000 502,216,000 517,088,000 521,532,000 536,976,000 572,236,500 589,182,000
28 ZCE 020 Padmarini B 7 x 10 70 Badan 35 38 478,500,000 492,800,000 497,640,000 512,512,000 516,780,000 532,224,000 567,022,500 583,968,000
29 ZCE 022 Padmarini B 7 x 10 70 Badan 35 38 477,400,000 491,700,000 496,496,000 511,368,000 515,592,000 531,036,000 565,719,000 582,664,500
30 ZCE 026 Padmarini B 7 x 10 70 Badan 35 38 475,200,000 489,500,000 494,208,000 509,080,000 513,216,000 528,660,000 563,112,000 580,057,500
BLOK ZCF - JL. Candani 7
31 ZCF 001 Padmarini H 7 x 10 100 Hoek 38 - 589,600,000 - 613,184,000 - 636,768,000 - 698,676,000
Candani Residence - 01 of 06
BERTAHAP 20X DP 15% Cicil 20X TUNAI KERAS KPR PERTAMA UKURANLUAS
TANAH TYPE KAV
LUAS BANGUNAN
HARGA JUAL (Incl. PPN)
TIPENO BLOKNO.
UNIT
DAFTAR HARGA REV-1
SRIMAYA RESIDENCE - SUMMARECONCLUSTER CANDANI16 Maret 2019
Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe
(M2) (M2) (M2) (M2) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
BLOK ZCF - JL. Candani 7
32 ZCF 003 Laksmi B 6 x 10 60 Badan 30 33 410,300,000 424,600,000 426,712,000 441,584,000 443,124,000 458,568,000 486,205,500 503,151,000
33 ZCF 005 Laksmi B 6 x 10 60 Badan 30 33 410,300,000 424,600,000 426,712,000 441,584,000 443,124,000 458,568,000 486,205,500 503,151,000
34 ZCF 007 Laksmi B 6 x 10 60 Badan 30 33 409,200,000 423,500,000 425,568,000 440,440,000 441,936,000 457,380,000 484,902,000 501,847,500
35 ZCF 009 Laksmi H 6 x 10 86 Hoek 33 - 507,100,000 - 527,384,000 - 547,668,000 - 600,913,500
36 ZCF 011 Laksmi H 6 x 10 92 Hoek 33 - 521,400,000 - 542,256,000 - 563,112,000 - 617,859,000
37 ZCF 015 Laksmi B 6 x 10 60 Badan 30 33 415,800,000 430,100,000 432,432,000 447,304,000 449,064,000 464,508,000 492,723,000 509,668,500
38 ZCF 017 Laksmi B 6 x 10 60 Badan 30 33 414,700,000 430,100,000 431,288,000 447,304,000 447,876,000 464,508,000 491,419,500 509,668,500
39 ZCF 019 Laksmi B 6 x 10 60 Badan 30 33 414,700,000 429,000,000 431,288,000 446,160,000 447,876,000 463,320,000 491,419,500 508,365,000
BLOK ZCF - JL. Candani 8
40 ZCF 002 Laksmi H 6 x 10 91 Hoek 33 - 509,300,000 - 529,672,000 - 550,044,000 - 603,520,500
41 ZCF 006 Laksmi B 6 x 10 60 Badan 30 33 388,300,000 402,600,000 403,832,000 418,704,000 419,364,000 434,808,000 460,135,500 477,081,000
42 ZCF 008 Laksmi B 6 x 10 60 Badan 30 33 388,300,000 402,600,000 403,832,000 418,704,000 419,364,000 434,808,000 460,135,500 477,081,000
43 ZCF 010 Laksmi B 6 x 10 60 Badan 30 33 400,400,000 414,700,000 416,416,000 431,288,000 432,432,000 447,876,000 474,474,000 491,419,500
44 ZCF 012 Laksmi H 6 x 10 88 Hoek 33 - 504,900,000 - 525,096,000 - 545,292,000 - 598,306,500
BLOK ZCG - JL. Candani 8
45 ZCG 001 Padmarini H 7 x 10 98 Hoek 38 - 568,700,000 - 591,448,000 - 614,196,000 - 673,909,500
46 ZCG 003 Padmarini B 7 x 10 70 Badan 35 38 474,100,000 488,400,000 493,064,000 507,936,000 512,028,000 527,472,000 561,808,500 578,754,000
47 ZCG 005 Padmarini B 7 x 10 70 Badan 35 38 473,000,000 487,300,000 491,920,000 506,792,000 510,840,000 526,284,000 560,505,000 577,450,500
48 ZCG 007 Padmarini B 7 x 10 70 Badan 35 38 473,000,000 487,300,000 491,920,000 506,792,000 510,840,000 526,284,000 560,505,000 577,450,500
49 ZCG 009 Padmarini B 7 x 10 70 Badan 35 38 476,300,000 490,600,000 495,352,000 510,224,000 514,404,000 529,848,000 564,415,500 581,361,000
50 ZCG 011 Padmarini B 7 x 10 70 Badan 35 38 470,800,000 485,100,000 489,632,000 504,504,000 508,464,000 523,908,000 557,898,000 574,843,500
51 ZCG 015 Padmarini B 7 x 10 70 Badan 35 38 470,800,000 485,100,000 489,632,000 504,504,000 508,464,000 523,908,000 557,898,000 574,843,500
52 ZCG 017 Padmarini B 7 x 10 70 Badan 35 38 469,700,000 484,000,000 488,488,000 503,360,000 507,276,000 522,720,000 556,594,500 573,540,000
53 ZCG 019 Padmarini B 7 x 10 70 Badan 35 38 468,600,000 482,900,000 487,344,000 502,216,000 506,088,000 521,532,000 555,291,000 572,236,500
54 ZCG 021 Padmarini B 7 x 10 70 Badan 35 38 468,600,000 482,900,000 487,344,000 502,216,000 506,088,000 521,532,000 555,291,000 572,236,500
55 ZCG 023 Padmarini B 7 x 10 70 Badan 35 38 467,500,000 481,800,000 486,200,000 501,072,000 504,900,000 520,344,000 553,987,500 570,933,000
56 ZCG 025 Padmarini B 7 x 10 70 Badan 35 38 466,400,000 480,700,000 485,056,000 499,928,000 503,712,000 519,156,000 552,684,000 569,629,500
57 ZCG 027 Padmarini B 7 x 10 70 Badan 35 38 466,400,000 480,700,000 485,056,000 499,928,000 503,712,000 519,156,000 552,684,000 569,629,500
58 ZCG 029 Laksmi H 6 x 10 79 Hoek 33 - 498,300,000 - 518,232,000 - 538,164,000 - 590,485,500
BLOK ZCH - JL. Candani 8
59 ZCH 002 Padmarini H 7 x 10 97 Hoek 38 - 565,400,000 - 588,016,000 - 610,632,000 - 669,999,000
60 ZCH 006 Padmarini B 7 x 10 70 Badan 35 38 474,100,000 488,400,000 493,064,000 507,936,000 512,028,000 527,472,000 561,808,500 578,754,000
61 ZCH 008 Padmarini B 7 x 10 70 Badan 35 38 477,400,000 492,800,000 496,496,000 512,512,000 515,592,000 532,224,000 565,719,000 583,968,000
62 ZCH 010 Padmarini B 7 x 10 70 Badan 35 38 473,000,000 487,300,000 491,920,000 506,792,000 510,840,000 526,284,000 560,505,000 577,450,500
Candani Residence - 02 of 06
NO BLOKNO.
UNITTIPE
UKURANLUAS
TANAH TYPE KAV
LUAS BANGUNAN TUNAI KERAS KPR PERTAMA BERTAHAP 20X DP 15% Cicil 20X
HARGA JUAL (Incl. PPN)
DAFTAR HARGA REV-1
SRIMAYA RESIDENCE - SUMMARECONCLUSTER CANDANI16 Maret 2019
Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe
(M2) (M2) (M2) (M2) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
BLOK ZCH - JL. Candani 8
63 ZCH 012 Padmarini B 7 x 10 70 Badan 35 38 471,900,000 486,200,000 490,776,000 505,648,000 509,652,000 525,096,000 559,201,500 576,147,000
64 ZCH 016 Padmarini B 7 x 10 70 Badan 35 38 470,800,000 485,100,000 489,632,000 504,504,000 508,464,000 523,908,000 557,898,000 574,843,500
65 ZCH 018 Padmarini B 7 x 10 70 Badan 35 38 475,200,000 489,500,000 494,208,000 509,080,000 513,216,000 528,660,000 563,112,000 580,057,500
66 ZCH 020 Padmarini B 7 x 10 70 Badan 35 38 469,700,000 484,000,000 488,488,000 503,360,000 507,276,000 522,720,000 556,594,500 573,540,000
67 ZCH 022 Padmarini B 7 x 10 70 Badan 35 38 468,600,000 482,900,000 487,344,000 502,216,000 506,088,000 521,532,000 555,291,000 572,236,500
68 ZCH 026 Padmarini B 7 x 10 70 Badan 35 38 468,600,000 482,900,000 487,344,000 502,216,000 506,088,000 521,532,000 555,291,000 572,236,500
69 ZCH 028 Padmarini B 7 x 10 70 Badan 35 38 467,500,000 481,800,000 486,200,000 501,072,000 504,900,000 520,344,000 553,987,500 570,933,000
70 ZCH 030 Padmarini B 7 x 10 70 Badan 35 38 466,400,000 480,700,000 485,056,000 499,928,000 503,712,000 519,156,000 552,684,000 569,629,500
71 ZCH 032 Padmarini B 7 x 10 70 Badan 35 38 466,400,000 480,700,000 485,056,000 499,928,000 503,712,000 519,156,000 552,684,000 569,629,500
72 ZCH 036 Laksmi H 6 x 10 80 Hoek 33 - 477,400,000 - 496,496,000 - 515,592,000 - 565,719,000
BLOK ZCI - JL. Candani 9
73 ZCI 002 Laksmi H 6 x 10 98 Hoek 33 - 544,500,000 - 566,280,000 - 588,060,000 - 645,232,500
74 ZCI 006 Laksmi B 6 x 10 60 Badan 30 33 399,300,000 413,600,000 415,272,000 430,144,000 431,244,000 446,688,000 473,170,500 490,116,000
75 ZCI 008 Laksmi B 6 x 10 60 Badan 30 33 402,600,000 416,900,000 418,704,000 433,576,000 434,808,000 450,252,000 477,081,000 494,026,500
76 ZCI 010 Laksmi B 6 x 10 60 Badan 30 33 400,400,000 414,700,000 416,416,000 431,288,000 432,432,000 447,876,000 474,474,000 491,419,500
77 ZCI 012 Laksmi B 6 x 10 60 Badan 30 33 402,600,000 416,900,000 418,704,000 433,576,000 434,808,000 450,252,000 477,081,000 494,026,500
78 ZCI 016 Laksmi B 6 x 10 60 Badan 30 33 405,900,000 420,200,000 422,136,000 437,008,000 438,372,000 453,816,000 480,991,500 497,937,000
79 ZCI 018 Laksmi B 6 x 10 60 Badan 30 33 413,600,000 427,900,000 430,144,000 445,016,000 446,688,000 462,132,000 490,116,000 507,061,500
BLOK ZCJ - JL. Candani 9
80 ZCJ 001 Laksmi H 6 x 10 91 Hoek 33 - 484,000,000 - 503,360,000 - 522,720,000 - 573,540,000
81 ZCJ 003 Laksmi B 6 x 10 60 Badan 30 33 399,300,000 413,600,000 415,272,000 430,144,000 431,244,000 446,688,000 473,170,500 490,116,000
82 ZCJ 005 Laksmi B 6 x 10 60 Badan 30 33 399,300,000 413,600,000 415,272,000 430,144,000 431,244,000 446,688,000 473,170,500 490,116,000
83 ZCJ 007 Laksmi B 6 x 10 60 Badan 30 33 399,300,000 413,600,000 415,272,000 430,144,000 431,244,000 446,688,000 473,170,500 490,116,000
84 ZCJ 009 Laksmi B 6 x 10 60 Badan 30 33 404,800,000 419,100,000 420,992,000 435,864,000 437,184,000 452,628,000 479,688,000 496,633,500
85 ZCJ 011 Laksmi B 6 x 10 60 Badan 30 33 402,600,000 416,900,000 418,704,000 433,576,000 434,808,000 450,252,000 477,081,000 494,026,500
86 ZCJ 015 Laksmi B 6 x 10 60 Badan 30 33 405,900,000 420,200,000 422,136,000 437,008,000 438,372,000 453,816,000 480,991,500 497,937,000
87 ZCJ 017 Laksmi B 6 x 10 60 Badan 30 33 410,300,000 424,600,000 426,712,000 441,584,000 443,124,000 458,568,000 486,205,500 503,151,000
BLOK ZCJ - JL. Candani 10
88 ZCJ 002 Laksmi H 6 x 10 102 Hoek 33 - 545,600,000 - 567,424,000 - 589,248,000 - 646,536,000
89 ZCJ 006 Laksmi B 6 x 10 60 Badan 30 33 399,300,000 413,600,000 415,272,000 430,144,000 431,244,000 446,688,000 473,170,500 490,116,000
90 ZCJ 008 Laksmi B 6 x 10 60 Badan 30 33 402,600,000 416,900,000 418,704,000 433,576,000 434,808,000 450,252,000 477,081,000 494,026,500
91 ZCJ 010 Laksmi B 6 x 10 60 Badan 30 33 398,200,000 412,500,000 414,128,000 429,000,000 430,056,000 445,500,000 471,867,000 488,812,500
92 ZCJ 012 Laksmi B 6 x 10 60 Badan 30 33 398,200,000 412,500,000 414,128,000 429,000,000 430,056,000 445,500,000 471,867,000 488,812,500
93 ZCJ 016 Laksmi B 6 x 10 60 Badan 30 33 398,200,000 411,400,000 414,128,000 427,856,000 430,056,000 444,312,000 471,867,000 487,509,000
Candani Residence - 03 of 06
BLOKNO.
UNIT
HARGA JUAL (Incl. PPN)
LUAS BANGUNAN TUNAI KERAS KPR PERTAMA BERTAHAP 20X DP 15% Cicil 20X
TIPEUKURAN
LUAS
TANAH TYPE KAVNO
DAFTAR HARGA REV-1
SRIMAYA RESIDENCE - SUMMARECONCLUSTER CANDANI16 Maret 2019
Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe
(M2) (M2) (M2) (M2) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
BLOK ZCJ - JL. Candani 10
94 ZCJ 018 Laksmi B 6 x 10 60 Badan 30 33 401,500,000 415,800,000 417,560,000 432,432,000 433,620,000 449,064,000 475,777,500 492,723,000
95 ZCJ 020 Laksmi B 6 x 10 60 Badan 30 33 397,100,000 411,400,000 412,984,000 427,856,000 428,868,000 444,312,000 470,563,500 487,509,000
BLOK ZCK - JL. Candani 10
96 ZCK 001 Laksmi H 6 x 10 101 Hoek 33 - 542,300,000 - 563,992,000 - 585,684,000 - 642,625,500
97 ZCK 003 Laksmi B 6 x 10 60 Badan 30 33 399,300,000 413,600,000 415,272,000 430,144,000 431,244,000 446,688,000 473,170,500 490,116,000
98 ZCK 005 Laksmi B 6 x 10 60 Badan 30 33 399,300,000 413,600,000 415,272,000 430,144,000 431,244,000 446,688,000 473,170,500 490,116,000
99 ZCK 007 Laksmi B 6 x 10 60 Badan 30 33 398,200,000 412,500,000 414,128,000 429,000,000 430,056,000 445,500,000 471,867,000 488,812,500
100 ZCK 009 Laksmi B 6 x 10 60 Badan 30 33 402,600,000 416,900,000 418,704,000 433,576,000 434,808,000 450,252,000 477,081,000 494,026,500
101 ZCK 011 Laksmi B 6 x 10 60 Badan 30 33 398,200,000 412,500,000 414,128,000 429,000,000 430,056,000 445,500,000 471,867,000 488,812,500
102 ZCK 015 Laksmi B 6 x 10 60 Badan 30 33 398,200,000 411,400,000 414,128,000 427,856,000 430,056,000 444,312,000 471,867,000 487,509,000
103 ZCK 017 Laksmi B 6 x 10 60 Badan 30 33 397,100,000 411,400,000 412,984,000 427,856,000 428,868,000 444,312,000 470,563,500 487,509,000
104 ZCK 019 Laksmi B 6 x 10 60 Badan 30 33 397,100,000 411,400,000 412,984,000 427,856,000 428,868,000 444,312,000 470,563,500 487,509,000
BLOK ZCK - JL. Candani 11
105 ZCK 002 Laksmi H 6 x 10 99 Hoek 33 - 533,500,000 - 554,840,000 - 576,180,000 - 632,197,500
106 ZCK 006 Laksmi B 6 x 10 60 Badan 30 33 399,300,000 412,500,000 415,272,000 429,000,000 431,244,000 445,500,000 473,170,500 488,812,500
107 ZCK 008 Laksmi B 6 x 10 60 Badan 30 33 402,600,000 416,900,000 418,704,000 433,576,000 434,808,000 450,252,000 477,081,000 494,026,500
108 ZCK 010 Laksmi B 6 x 10 60 Badan 30 33 398,200,000 412,500,000 414,128,000 429,000,000 430,056,000 445,500,000 471,867,000 488,812,500
109 ZCK 012 Laksmi B 6 x 10 60 Badan 30 33 398,200,000 412,500,000 414,128,000 429,000,000 430,056,000 445,500,000 471,867,000 488,812,500
110 ZCK 016 Laksmi B 6 x 10 60 Badan 30 33 397,100,000 411,400,000 412,984,000 427,856,000 428,868,000 444,312,000 470,563,500 487,509,000
111 ZCK 018 Laksmi B 6 x 10 60 Badan 30 33 401,500,000 415,800,000 417,560,000 432,432,000 433,620,000 449,064,000 475,777,500 492,723,000
112 ZCK 020 Laksmi B 6 x 10 60 Badan 30 33 397,100,000 411,400,000 412,984,000 427,856,000 428,868,000 444,312,000 470,563,500 487,509,000
113 ZCK 022 Laksmi B 6 x 10 60 Badan 30 33 397,100,000 410,300,000 412,984,000 426,712,000 428,868,000 443,124,000 470,563,500 486,205,500
114 ZCK 026 Laksmi B 6 x 10 60 Badan 30 33 396,000,000 410,300,000 411,840,000 426,712,000 427,680,000 443,124,000 469,260,000 486,205,500
BLOK ZCL - JL. Candani 11
115 ZCL 001 Laksmi H 6 x 10 96 Hoek 33 - 525,800,000 - 546,832,000 - 567,864,000 - 623,073,000
116 ZCL 003 Laksmi B 6 x 10 60 Badan 30 33 399,300,000 413,600,000 415,272,000 430,144,000 431,244,000 446,688,000 473,170,500 490,116,000
117 ZCL 005 Laksmi B 6 x 10 60 Badan 30 33 399,300,000 413,600,000 415,272,000 430,144,000 431,244,000 446,688,000 473,170,500 490,116,000
118 ZCL 007 Laksmi B 6 x 10 60 Badan 30 33 399,300,000 412,500,000 415,272,000 429,000,000 431,244,000 445,500,000 473,170,500 488,812,500
119 ZCL 009 Laksmi B 6 x 10 60 Badan 30 33 402,600,000 416,900,000 418,704,000 433,576,000 434,808,000 450,252,000 477,081,000 494,026,500
120 ZCL 011 Laksmi B 6 x 10 60 Badan 30 33 398,200,000 412,500,000 414,128,000 429,000,000 430,056,000 445,500,000 471,867,000 488,812,500
121 ZCL 015 Laksmi B 6 x 10 60 Badan 30 33 398,200,000 412,500,000 414,128,000 429,000,000 430,056,000 445,500,000 471,867,000 488,812,500
122 ZCL 017 Laksmi B 6 x 10 60 Badan 30 33 397,100,000 411,400,000 412,984,000 427,856,000 428,868,000 444,312,000 470,563,500 487,509,000
123 ZCL 019 Laksmi B 6 x 10 60 Badan 30 33 397,100,000 411,400,000 412,984,000 427,856,000 428,868,000 444,312,000 470,563,500 487,509,000
124 ZCL 021 Laksmi B 6 x 10 60 Badan 30 33 397,100,000 411,400,000 412,984,000 427,856,000 428,868,000 444,312,000 470,563,500 487,509,000
Candani Residence - 04 of 06
NO BLOKNO.
UNITTIPE
UKURANLUAS
TANAH TYPE KAV
LUAS BANGUNAN TUNAI KERAS KPR PERTAMA BERTAHAP 20X DP 15% Cicil 20X
HARGA JUAL (Incl. PPN)
DAFTAR HARGA REV-1
SRIMAYA RESIDENCE - SUMMARECONCLUSTER CANDANI16 Maret 2019
Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe Basic Deluxe
(M2) (M2) (M2) (M2) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
BLOK ZCL - JL. Candani 11
125 ZCL 023 Laksmi B 6 x 10 60 Badan 30 33 397,100,000 410,300,000 412,984,000 426,712,000 428,868,000 443,124,000 470,563,500 486,205,500
BLOK ZCL - JL. Candani 12
126 ZCL 002 Laksmi H 6 x 10 97 Hoek 33 - 526,900,000 - 547,976,000 - 569,052,000 - 624,376,500
127 ZCL 006 Laksmi B 6 x 10 60 Badan 30 33 396,000,000 410,300,000 411,840,000 426,712,000 427,680,000 443,124,000 469,260,000 486,205,500
128 ZCL 008 Laksmi B 6 x 10 60 Badan 30 33 397,100,000 411,400,000 412,984,000 427,856,000 428,868,000 444,312,000 470,563,500 487,509,000
129 ZCL 010 Laksmi B 6 x 10 60 Badan 30 33 394,900,000 409,200,000 410,696,000 425,568,000 426,492,000 441,936,000 467,956,500 484,902,000
130 ZCL 012 Laksmi B 6 x 10 60 Badan 30 33 394,900,000 409,200,000 410,696,000 425,568,000 426,492,000 441,936,000 467,956,500 484,902,000
131 ZCL 016 Laksmi B 6 x 10 60 Badan 30 33 394,900,000 408,100,000 410,696,000 424,424,000 426,492,000 440,748,000 467,956,500 483,598,500
132 ZCL 018 Laksmi B 6 x 10 60 Badan 30 33 396,000,000 410,300,000 411,840,000 426,712,000 427,680,000 443,124,000 469,260,000 486,205,500
133 ZCL 020 Laksmi B 6 x 10 60 Badan 30 33 393,800,000 407,000,000 409,552,000 423,280,000 425,304,000 439,560,000 466,653,000 482,295,000
134 ZCL 022 Laksmi B 6 x 10 60 Badan 30 33 392,700,000 407,000,000 408,408,000 423,280,000 424,116,000 439,560,000 465,349,500 482,295,000
135 ZCL 026 Laksmi B 6 x 10 60 Badan 30 33 392,700,000 407,000,000 408,408,000 423,280,000 424,116,000 439,560,000 465,349,500 482,295,000
136 ZCL 028 Laksmi B 6 x 10 60 Badan 30 33 392,700,000 405,900,000 408,408,000 422,136,000 424,116,000 438,372,000 465,349,500 480,991,500
137 ZCL 030 Laksmi B 6 x 10 60 Badan 30 33 391,600,000 405,900,000 407,264,000 422,136,000 422,928,000 438,372,000 464,046,000 480,991,500
138 ZCL 032 Laksmi B 6 x 10 60 Badan 30 33 391,600,000 405,900,000 407,264,000 422,136,000 422,928,000 438,372,000 464,046,000 480,991,500
139 ZCL 036 Laksmi B 6 x 10 60 Badan 30 33 391,600,000 404,800,000 407,264,000 420,992,000 422,928,000 437,184,000 464,046,000 479,688,000
140 ZCL 038 Laksmi B 6 x 10 60 Badan 30 33 390,500,000 404,800,000 406,120,000 420,992,000 421,740,000 437,184,000 462,742,500 479,688,000
141 ZCL 050 Laksmi B 6 x 10 60 Badan 30 33 390,500,000 404,800,000 406,120,000 420,992,000 421,740,000 437,184,000 462,742,500 479,688,000
142 ZCL 052 Laksmi B 6 x 10 60 Badan 30 33 390,500,000 403,700,000 406,120,000 419,848,000 421,740,000 435,996,000 462,742,500 478,384,500
143 ZCL 056 Laksmi B 6 x 10 60 Badan 30 33 389,400,000 403,700,000 404,976,000 419,848,000 420,552,000 435,996,000 461,439,000 478,384,500
Pengembang :
PT. Summarecon Agung, Tbk
Jl. Bulevard A. Yani Kav.001 - Kota Summarecon Bekasi
Telp. (021) 8866666, Fax. (021) 88966373 Candani Residence - 05 of 06
NO BLOKNO.
UNITTIPE
UKURANLUAS
TANAH TYPE KAV
LUAS BANGUNAN TUNAI KERAS KPR PERTAMA BERTAHAP 20X DP 15% Cicil 20X
HARGA JUAL (Incl. PPN)
Tunai Keras DP 15% Cicil 20X
Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1 Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1
Uang Muka (DP) ke-1 35% - TJ Hari ke-15 Cicilan ke 1 - 20 (15% - TJ) / 20 bulan Hari ke-15 dan seterusnya setiap bulan
Uang Muka ke-2 35% Hari ke-30
Pelunasan 30% Hari ke-45
KPR Bertahap 20X
Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1 Tanda Jadi (TJ) Rp 10.000.000,- Hari ke-1
Uang Muka (DP) ke-1 7.5% - TJ Hari ke-15 Cicilan ke 1 - 20 (100% - TJ) / 20 bulan Hari ke-15 dan seterusnya setiap bulan
Uang Muka (DP) ke-2 7.5% Hari ke-45
Pelunasan (Akad Kredit) 85% Hari ke-75
Bank Kerjasama :
Bank BCA, Bank Permata, Bank Mandiri, Bank CIMB Niaga, Bank OCBC NISP
Pengembang :
PT. Summarecon Agung, Tbk
Jl. Bulevard A. Yani Kav.001 - Kota Summarecon Bekasi
Telp. (021) 8866666, Fax. (021) 88966373 Candani Residence - 06 of 06
TERM OF PAYMENT
Candani - Srimaya Residence
Pelunasan (KPR/Tunai) 85% Pelunasan/Akad kredit dibulan ke-21