LAMPIRAN 2 PENAWARAN DAFTAR HARGA DASAR SATUAN ALAT No. URAIAN SATUAN HARGA SATUAN KETERANGAN (Rp) (Rp) 1 ASPHALT MIXING PLANT JAM 3,466,142.99 Alat Baru 2 ASPHALT FINISHER JAM 454,893.47 Usia 1 th. 2 ASPHALT FINISHER JAM 454,893.47 Usia 1 th. 3 ASPHALT SPRAYER JAM 377,361.16 Usia 2 th. 4 BULLDOZER 100-150 HP JAM 253,932.03 Usia 3 th. 4 BULLDOZER 100-150 HP JAM 253,932.03 Usia 3 th. 5 COMPRESSOR 4000-6500 L\M JAM 151,777.15 Usia 1 th. 6 CONCRETE MIXER 0.3-0.6 M3 JAM 98,123.55 Alat Baru 6 CONCRETE MIXER 0.3-0.6 M3 JAM 98,123.55 Alat Baru 7 CRANE 10-15 TON JAM 302,220.25 Usia 3 th. 8 DUMP TRUCK 3,5 TON JAM 197,134.70 Usia 3 th. 8 DUMP TRUCK 3,5 TON JAM 197,134.70 Usia 3 th. 9 DUMP TRUCK 10,0 TON JAM 241,830.76 Usia 3 th. 10 EXCAVATOR 80-140 HP JAM 320,462.53 Usia 2 th. 10 EXCAVATOR 80-140 HP JAM 320,462.53 Usia 2 th. 11 FLAT BED TRUCK 3-4 M3 JAM 164,585.50 Usia 3 th. 12 GENERATOR SET JAM 262,692.01 Usia 2 th. 12 GENERATOR SET JAM 262,692.01 Usia 2 th. 13 MOTOR GRADER >100 HP JAM 314,383.12 Usia 2 th. 14 TRACK LOADER 75-100 HP JAM 232,082.98 Usia 3 th. 14 TRACK LOADER 75-100 HP JAM 232,082.98 Usia 3 th. 15 WHEEL LOADER 1.0-1.6 M3 JAM 367,291.96 Usia 2 th. 16 THREE WHEEL ROLLER 6-8 T JAM 105,752.60 Usia 3 th. 17 TANDEM ROLLER 6-8 T. JAM 229,528.74 Usia 2 th. 18 TIRE ROLLER 8-10 T. JAM 238,944.28 Usia 2 th. 19 VIBRATORY ROLLER 5-8 T. JAM 248,268.22 Alat Baru 20 CONCRETE VIBRATOR JAM 61,010.10 Usia 1 th. 21 STONE CRUSHER JAM 571,588.25 Usia 3 th. 22 WATER PUMP 70-100 mm JAM 50,727.97 Alat Baru 23 WATER TANKER 3000-4500 L. JAM 170,816.08 Usia 3 th. 24 PEDESTRIAN ROLLER JAM 49,853.35 Usia 2 th. 25 TAMPER JAM 38,223.09 Usia 2 th. 26 JACK HAMMER JAM 78,034.98 Usia 1 th. 27 FULVI MIXER JAM 132,379.74 Usia 3 th. 27 FULVI MIXER JAM 132,379.74 Usia 3 th. 28 CONCRETE PUMP JAM 161,682.06 Usia 2 th. 29 TRAILER 20 TON JAM 224,844.25 Usia 3 th. 29 TRAILER 20 TON JAM 224,844.25 Usia 3 th. 30 PILE DRIVER + HAMMER JAM 281,200.48 Usia 1 th. 31 CRANE ON TRACK 35 TON JAM 331,425.59 Usia 2 th. 31 CRANE ON TRACK 35 TON JAM 331,425.59 Usia 2 th. 32 WELDING SET JAM 155,668.31 Usia 1 th. 33 BORE PILE MACHINE JAM 556,064.08 Alat Baru 33 BORE PILE MACHINE JAM 556,064.08 Alat Baru 34 ASPHALT LIQUID MIXER JAM 37,862.63 Usia 2 th. 35 GRASS CUTTER JAM 25,014.04 Usia 1 th. 35 GRASS CUTTER JAM 25,014.04 Usia 1 th. 36 JUMBO BREAKER 80-140 HP JAM 157,139.92 Usia 3 th. 37 TRUCK MIXER JAM 165,275.88 Usia 3 th. 37 TRUCK MIXER JAM 165,275.88 Usia 3 th. 38 JACK HIDROLIC JAM 15,326.72 Usia 1 th. 39 LIGHTING EQUIPMENT SET JAM 50,000.00 Usia 2 th. 39 LIGHTING EQUIPMENT SET JAM 50,000.00 Usia 2 th. 40 ASPHAL DISTRIBUTOR JAM 377,361.16 Usia 2 th. 41 CONCRETE PAN MIXER JAM 145,172.00 Usia 2 th. 42 BALLE MIXER JAM 65,400.00 43 BORROW MIXER JAM 55,500.00 44 PREHEATER JAM 52,500.00 45 CUTTER MACHINE JAM 75,200.00 46 COMPACTOR JAM 54,500.00 47 VIBRATOR HAMMER JAM 375,000.00 48 PONTON + TUG BOAT JAM 1,650,000.00 49 CRANE ON TRACK 75 - 100 TON JAM 531,425.59 50 MESIN LAS LISTRIK JAM 55,000.00 50 Banda Aceh, 20 Juni 2012 PT. Perapen Prima Mandiri Ir. Mawardi Direktur Utama

Transcript of Daftar Harga Sewa Peralatan.pdf

  • LAMPIRAN 2 PENAWARAN

    DAFTAR HARGA DASAR SATUAN ALAT

    No. URAIAN SATUAN HARGA SATUAN KETERANGAN

    (Rp)(Rp)

    1 ASPHALT MIXING PLANT JAM 3,466,142.99 Alat Baru

    2 ASPHALT FINISHER JAM 454,893.47 Usia 1 th.2 ASPHALT FINISHER JAM 454,893.47 Usia 1 th.

    3 ASPHALT SPRAYER JAM 377,361.16 Usia 2 th.

    4 BULLDOZER 100-150 HP JAM 253,932.03 Usia 3 th.4 BULLDOZER 100-150 HP JAM 253,932.03 Usia 3 th.

    5 COMPRESSOR 4000-6500 L\M JAM 151,777.15 Usia 1 th.

    6 CONCRETE MIXER 0.3-0.6 M3 JAM 98,123.55 Alat Baru6 CONCRETE MIXER 0.3-0.6 M3 JAM 98,123.55 Alat Baru

    7 CRANE 10-15 TON JAM 302,220.25 Usia 3 th.

    8 DUMP TRUCK 3,5 TON JAM 197,134.70 Usia 3 th.8 DUMP TRUCK 3,5 TON JAM 197,134.70 Usia 3 th.

    9 DUMP TRUCK 10,0 TON JAM 241,830.76 Usia 3 th.

    10 EXCAVATOR 80-140 HP JAM 320,462.53 Usia 2 th.10 EXCAVATOR 80-140 HP JAM 320,462.53 Usia 2 th.

    11 FLAT BED TRUCK 3-4 M3 JAM 164,585.50 Usia 3 th.

    12 GENERATOR SET JAM 262,692.01 Usia 2 th.12 GENERATOR SET JAM 262,692.01 Usia 2 th.

    13 MOTOR GRADER >100 HP JAM 314,383.12 Usia 2 th.

    14 TRACK LOADER 75-100 HP JAM 232,082.98 Usia 3 th.14 TRACK LOADER 75-100 HP JAM 232,082.98 Usia 3 th.

    15 WHEEL LOADER 1.0-1.6 M3 JAM 367,291.96 Usia 2 th.

    16 THREE WHEEL ROLLER 6-8 T JAM 105,752.60 Usia 3 th.16 THREE WHEEL ROLLER 6-8 T JAM 105,752.60 Usia 3 th.

    17 TANDEM ROLLER 6-8 T. JAM 229,528.74 Usia 2 th.

    18 TIRE ROLLER 8-10 T. JAM 238,944.28 Usia 2 th.18 TIRE ROLLER 8-10 T. JAM 238,944.28 Usia 2 th.

    19 VIBRATORY ROLLER 5-8 T. JAM 248,268.22 Alat Baru

    20 CONCRETE VIBRATOR JAM 61,010.10 Usia 1 th.

    21 STONE CRUSHER JAM 571,588.25 Usia 3 th.

    22 WATER PUMP 70-100 mm JAM 50,727.97 Alat Baru

    23 WATER TANKER 3000-4500 L. JAM 170,816.08 Usia 3 th.

    24 PEDESTRIAN ROLLER JAM 49,853.35 Usia 2 th.

    25 TAMPER JAM 38,223.09 Usia 2 th.

    26 JACK HAMMER JAM 78,034.98 Usia 1 th.

    27 FULVI MIXER JAM 132,379.74 Usia 3 th.27 FULVI MIXER JAM 132,379.74 Usia 3 th.

    28 CONCRETE PUMP JAM 161,682.06 Usia 2 th.

    29 TRAILER 20 TON JAM 224,844.25 Usia 3 th.29 TRAILER 20 TON JAM 224,844.25 Usia 3 th.

    30 PILE DRIVER + HAMMER JAM 281,200.48 Usia 1 th.

    31 CRANE ON TRACK 35 TON JAM 331,425.59 Usia 2 th.31 CRANE ON TRACK 35 TON JAM 331,425.59 Usia 2 th.

    32 WELDING SET JAM 155,668.31 Usia 1 th.

    33 BORE PILE MACHINE JAM 556,064.08 Alat Baru33 BORE PILE MACHINE JAM 556,064.08 Alat Baru

    34 ASPHALT LIQUID MIXER JAM 37,862.63 Usia 2 th.

    35 GRASS CUTTER JAM 25,014.04 Usia 1 th.35 GRASS CUTTER JAM 25,014.04 Usia 1 th.

    36 JUMBO BREAKER 80-140 HP JAM 157,139.92 Usia 3 th.

    37 TRUCK MIXER JAM 165,275.88 Usia 3 th.37 TRUCK MIXER JAM 165,275.88 Usia 3 th.

    38 JACK HIDROLIC JAM 15,326.72 Usia 1 th.

    39 LIGHTING EQUIPMENT SET JAM 50,000.00 Usia 2 th.39 LIGHTING EQUIPMENT SET JAM 50,000.00 Usia 2 th.

    40 ASPHAL DISTRIBUTOR JAM 377,361.16 Usia 2 th.

    41 CONCRETE PAN MIXER JAM 145,172.00 Usia 2 th.41 CONCRETE PAN MIXER JAM 145,172.00 Usia 2 th.

    42 BALLE MIXER JAM 65,400.00

    43 BORROW MIXER JAM 55,500.00

    44 PREHEATER JAM 52,500.00

    45 CUTTER MACHINE JAM 75,200.00

    46 COMPACTOR JAM 54,500.00

    47 VIBRATOR HAMMER JAM 375,000.00

    48 PONTON + TUG BOAT JAM 1,650,000.00

    49 CRANE ON TRACK 75 - 100 TON JAM 531,425.59

    50 MESIN LAS LISTRIK JAM 55,000.00

    50

    Banda Aceh, 20 Juni 2012

    PT. Perapen Prima Mandiri

    Ir. Mawardi

    Direktur Utama