Transcript of Daftar Harga BOW 2010

Sheet1No.URAIAN HARGA UPAHHARGASATUAN12341Pekerja52,500.00Org/Hari2Mandor65,600.00OH3Tukang Batu78,800.00OH4Tukang Kayu78,800.00OH5Tukang besi78,800.00OH6Tukang Keramik78,800.00OH7Tukang Plafond78,800.00OH8Tukang Pasang Pipa78,800.00OH9Tukang Cat78,800.00OH10Kepala Tukang91,900.00OH11Jaga Malam42,000.00OM12Masinis63,000.00OH13Sewa Mesin Gilas50,800.00OH14Pemeliharaan105,000.00No.URAIAN HARGA BAHANHARGASATUAN1234A.TIMBUNAN / GALIAN1Tanah timbun /Merah52,500.00m2Pasir Timbun / Urug70,400.00m3Tanah Timbun68,300.00m4Pasir pasang94,500.00m5Pasir beton94,400.00m6Sirtu96,600.00m7Tanah Humus89,300.00mB.BAHAN PEREKAT1Portland Cement (PC)1,400.00Kg2Portland Cement (PC)56,000.00zak3Cement putih2,700.00Kg4Cement putih108,000.00zak5Lem kayu40,700.00Kg6Lem Vynil / karet48,800.00Kg7Perekat kaca83,000.00Kg8Waterfroof57,200.00Kg9Kapur3,700.00KgC.BATU / BATU CETAKAN1Batu kerikil/koral 3-5 cm215,300.00m2Batu kerikil/koral 5-7 cm199,500.00m3Batu kerikil/koral 7-10 cm181,700m4Batu kerikil (A)199,500.00m5Batu belah/kali 10-15 cm165,900.00m6Batu belah/kali 15-20 cm136,500.00m7Batu pecah 1-2 cm341,300.00m8Batu pecah 2-3 cm283,500.00m9Batu pecah 3-5 cm258,300.00m10Batu pecah 5-7 cm219,500.00m11Batu kacang/jagung 0,5 - 1 cm414,800.00m12Batu splyt404,300.00m13Batu bata biasa 5x10x20 cm650Bh14Batu bata mesin 5x10x20 cm750Bh15Batu bataco 6x12x24 cm4,600.00Bh16Batu krawang 10x10x20 cm3,300.00Bh17Batu krawang 10x15x15 cm3,800.00Bh18Batu krawang 10x20x20 cm4,100.00Bh19Concrete block (CB) 10800Bh20Concrete block (CB) 151,800.00Bh21Concrete block (CB) 203,400.00Bh22Bondbeam 40x20x20 cm33,600.00Bh23Con block warna type holland tb 6 cm1,900.00Bh24Con block warna type uni pave tb 6 cm1,800.00Bh25Con block warna type dosex six tb 6 cm2,000Bh26Con block warna type hexagon tb 6 cm1,900.00Bh27Con block K 1251,900.00Bh28Con block K 1752,900.00BhD.KAYU / LANGIT -LANGIT1Balok Kayu Jati26,000,500.00M2Papan Kayu Jati26,195,500.00M3Balok Kayu Damar Laut10,161,100.00M4Papan Kayu Damar Laut10,487,100.00M5Balok Kayu Meranti Batu9,862,300.00M6Papan Kayu Meranti Batu10,188,300.00M7Balok Kayu Kapur7,053,000.00M8Papan Kayu Kapur7,379,000M9Papan Kayu Meranti kls I5,678,300.00M10Papan Kayu Meranti kls I5,950,000.00M11Kayu Sembarangan /Bokisting4,462,500.00M12Kayu Bakar203,200.00M13Papan Lambersering/Rider244,500.00M214Kayu Lat Asbes 5x30x400 mm8,100.00Btg15Kayu Kaso 5 - 7 /400 cm95,400.00Btg16Kayu Dolken /Kayu Laut 7,5-10/400 cm20,900.00Btg17Bambu 6-8 /600 cm15,000.00Btg18Bilik Bambu17,800.00M219Kayu Profil 1"6,800.00M'20Kayu Profil 2"13,700.00M'21Kayu Profil 3"20,500.00M'22Kayu Profil 4"27,300.00M'23Profil Gypsum 2"5,000M'24Profil Gypsum 3"5,900.00M'25Profil Gypsum 4"7,200.00M'26Profil Gypsum 6"8,600.00M'27Plywood 120x240 tbl. 18 mm253,900.00Lbr28Plywood 120x240 tbl. 12 mm169,300.00Lbr29Plywood 120x240 tbl. 9 mm127,000.00Lbr30Plywood 120x240 tbl. 6 mm84,700.00Lbr31Plywood 120x240 tbl. 4 mm56,400.00Lbr32Teakwood 120x240 tbl. 3 mm59,200.00Lbr33Triplek jati 120x240 tbl. 3 mm86,400.00Lbr34Triplek sungkai 120x240 tbl. 3mm92,900.00Lbr35Formika 120x24080,700.00Lbr36Soft Board 120x240 tbl. 4 mm60,800.00Lbr37Soft Board 120x240 tbl. 6 mm91,500.00Lbr38Soft Board 120x240 tbl. 9 mm137,200.00Lbr39Soft Board 120x240 tbl. 12 mm182,900.00Lbr40Gypsum 120x240 tbl. 6 mm65,300.00Lbr41Gypsum 120x240 tbl. 9 mm77,900.00Lbr42Gypsum 120x240 tbl. 12 mm101,600.00Lbr43Asbes Lokal 100x100 cm10,200.00Lbr44Asbes atrisco 100x100 cm t=4mm12,600.00Lbr45Asbes atrisco 100x100 cm t=5 mm15,700.00Lbr46Asbes atrisco 100x100 cm t=6mm18,800.00Lbr47Akustik 30x30 cm9,300.00Lbr48Akustik 30x60 cm18,600.00Lbr49Akustik 60x120 cm74,200.00Lbr50Rangka furing celling gypsum56,800.00M251Rangka furing dinding gypsum69,500.00M252Wall stud 64 mm7,900.00M'53Wall track mead 648,100.00M'54Wall track bottom7,900.00M'55Tepung dempul11,400.00Kg56Kain Kasa/Paper tape62,800.00Roll57Main runner white10,000.00M'58Cross tee white8,800.00M'59Waal angel white8,100.00M'60Top croos7,900.00M'61Furing chanel17,300.00M'62Waal angel (lokal)6,700.00M'63Conector1,000.00Bh64Suspension rod 3 mm3,800.00M'65Suspension spring clip 5 mm3,700.00Bh66Suspension rod 100 cm 5 mm2,400.00M'67Besi angel bracket (to concrete)7,600.00Bh68Baut ramset900,00BhE.BESI / ALUMINIUM1Besi beton polos15,700.00Kg2Besi beton ulir15,900.00Kg3Besi profil WF/INP17,400.00Kg4Besi siku14,800.00Kg5Besi CNP18,200.00Kg6Besi plat strip14,800.00Kg7Besi plat polos14,900.00Kg8Kawat besi beton18,300.00Kg9Kawat licin / seng polos24,500.00Kg10Kawat duri4,700.00M'11Kawat nyamuk13,100.00M212Kawat kasa15,200.00M213Kawat harmonia25,700.00M214Kawat burug14,200.00M215Pagar kawat BRC 120 polos256,200.00Lbr16Pintu besi887,300.00M217Pintu gulung besi899,900.00M218Pintu lipat besi909,300.00M219Pintu rolling door506,100.00M220Jerajak besi bermotif377,000.00M221Jerajak besi strip339,200.00M222Rangka baja ringan193,200.00M223Rangka atap twin light309,800.00M224Kosen pintu aluminium (80x210 )coklat440,000.00Bh25Kosen pintu aluminium (80x210 )putih403,200.00Bh26Kosen jendela aluminium (120x60)coklat311,900.00Bh27Kosen jendela aluminium (120x60)putih268,800.00Bh28Pintu aluminium (80x210) coklat772,800.00Bh29Pintu aluminium (80x210) putih662,600.00Bh30Jendela aluminium + kaca 5mm (120x60)coklat330,800.00Bh31Jendela aluminium + kaca 5mm (120x60)putih283,500.00Bh32Kosen pintu /jendela aluminium coklat83,000.00M233Kosen pintu /jendela aluminium putih71,400.00M234Daun jendela aluminium coklat58,800.00M235Daun jendela aluminium putih52,500.00M236Profil aluminium T9,500.00M'37Ventions blinds177,500.00M238Verticals blinds190,100.00M239Bingkai naco nikl hitam218,400.00M240Bingkai naco nikl putih131,700.00M241Paku beton 0,5-2"400Bh42Paku beton 2"-5"600Bh43Paku biasa 0,5-2"18,400.00Kg44Paku biasa 2"-5"16,300.00Kg45Sekrup macam ukuran22,100.00Kg46Sekrup 0,5-2"500Bh47Sekrup fisher400Bh48Baut 5/8"-8"21,500.00Bh49Baut angker 3/4"-10"49,400.00Bh50Baut ramset /dina bolt800BhF.PENUTUP LANTAI DAN DINDING1Ubin Granito 30x30 cm24,500.00Bh2Ubin Granito 40x40 cm43,500.00Bh3Ubin Granito 60x60 cm130,400.00Bh4Ubin Roman 20x20 cm3,800.00Bh5Ubin Roman 20x25 cm4,900.00Bh6Ubin Roman 25x25 cm6,100.00Bh7Ubin Roman 30x30 cm9,500.00Bh8Ubin Roman 40x40 cm16,900.00Bh9Ubin Roman 60x60 cm75,800.00Bh10Ubin Platinum 20x25 cm4,100.00Bh11Ubin Platinum 25x25 cm5,100.00Bh12Ubin Platinum 30x30 cm7,300.00Bh13Ubin Platinum 40x40 cm11,700.00Bh14Ubin Ikad 20x20 cm2,400.00Bh15Ubin Ikad 20x25 cm3,200.00Bh16Ubin Ikad 25x25 cm3,200.00Bh17Ubin Ikad 30x30 cm4,600.00Bh18Ubin Ikad 40x40 cm10,000.00Bh19Ubin Garuda 20x20 cm2,100.00Bh20Ubin Garuda 20x25 cm2,800.00Bh21Ubin Garuda 25x25 cm3,500.00Bh22Ubin Garuda 30x30 cm4,300.00Bh23Ubin Garuda 40x40 cm8,900.00Bh24Ubin lcl 60x60 cm53,800.00Bh25Ubin Mosalk 30x30 cm15,200.00Bh26Ubin Marmer Ex.DN284,600.00M227Ubin Teralux Marmer 30x30 cm31,500.00Bh28Ubin Teralux Marmer 40x40 cm68,300.00Bh29Ubin Teralux Marmer 60x60 cm141,800.00Bh30Ubin Keramik 10x20 cm1,400.00Bh31Ubin Keramik 15x15 cm1,500.00Bh32Ubin Keramik 20x20 cm2,700.00Bh33Ubin Keramik 20x25 cm3,500.00Bh34Ubin Keramik 25x25 cm4,300.00Bh35Ubin Keramik 30x30 cm6,100.00Bh36Ubin Keramik 30x30 cm anti slip6,900.00Bh37Ubin Keramik 40x40 cm11,800.00Bh38Ubin Keramik 60x60 cm28,900.00Bh39Ubin Keramik artistik 5x20 cm1,000.00Bh40Ubin Keramik artistik 10x10 cm1,000.00Bh41Ubin Keramik artistik 10x20 cm1,900.00Bh42Ubin Keramik Essenza 30x30 cm26,500.00Bh43Ubin Keramik Essenza 40x40 cm47,000.00Bh44Ubin Keramik Essenza 60x60 cm137,800.00Bh45Porselin 11x11 cm, putih1,400.00Bh46Porselin 11x11 cm, warna1,600.00Bh47Porselin 15x15 cm, putih2,500.00Bh48Porselin 15x15 cm, warna2,800.00Bh49Plint Ubin teralux marmer 10x30 cm15,800.00Bh50Plint Ubin teralux marmer 10x40 cm34,100.00Bh51Plint Ubin teralux marmer 10x60 cm70,900.00Bh52Plint Ubin granito 10x30 cm10,600.00Bh53Plint Ubin granito 15x30 cm14,700.00Bh54Plint Ubin granito 10x40 cm15,800.00Bh55Plint Ubin granito 15x40 cm26,300.00Bh56Plint Ubin granito 10x60 cm34,800.00Bh57Plint Ubin granito 15x60 cm45,700.00Bh58Plint Ubin Essenza10x30 cm10,600.00Bh59Plint Ubin Essenza15x30 cm16,000Bh60Plint Ubin Essenza10x40 cm16,500.00Bh61Plint Ubin Essenza15x40 cm28,200.00Bh62Plint Ubin Essenza10x60 cm36,800.00Bh63Plint Ubin Essenza15x60 cm48,200.00Bh64Plint Ubin Roman 10x30 cm4,100.00Bh65Plint Ubin Roman 15x30 cm5,700.00Bh66Plint Ubin Roman 10x40 cm5,900.00Bh67Plint Ubin Roman 15x40 cm10,100.00Bh68Plint Ubin Roman 10x60 cm20,500.00Bh69Plint Ubin Roman 15x60 cm26,500.00Bh70Plint Ubin Platinum 10x30 cm3,200.00Bh71Plint Ubin Platinum 15x30 cm4,400.00Bh72Plint Ubin Platinum 10x40 cm4,100.00Bh73Plint Ubin Platinum 15x40 cm6,900.00Bh74Plint Ubin Ikad 10x30 cm2,000.00Bh75Plint Ubin Ikad 15x30 cm2,800.00Bh76Plint Ubin Ikad 10x40 cm3,500.00Bh77Plint Ubin Ikad 15x40 cm6,000.00Bh78Plint Ubin Garuda 10x30 cm1,800.00Bh79Plint Ubin Garuda 15x30 cm2,600.00Bh80Plint Ubin Garuda 10x40 cm3,200.00Bh81Plint Ubin Garuda 15x40 cm5,400.00Bh82Plint Ubin lcl10x60 cm9,500.00Bh83Plint Ubin lcl15x60 cm14,000.00Bh84Plint Ubin Keramik 10x30 cm3,200.00Bh85Plint Ubin Keramik 10x40 cm5,900.00Bh86Plint Ubin Keramik 10x60 cm14,400.00Bh87Plint Ubin Keramik 15x30 cm4,700.00Bh88Plint Ubin Keramik 15x40 cm8,900.00Bh89Plint Ubin Keramik 15x60 cm21,700.00Bh90Batu Lapis Dinding 7x3x242,300.00Bh91Batu Tempel Hitam113,600.00m292Batu Poros124,600.00m293Carpet98,700.00m294carpet 80% wool, 20% nylon95,000.00m2/95Feltex carpet 100% wool-T-2192,700.00m296Underlyer tbl.6mm / rubber corrugated113,600.00m297Vynil asbes 30x30 cm9,000.00Bh98Vynil karet 30x30 cm KL I10,700.00Bh99Vynil karet 30x30 cm KL II9,900.00Bh100Vynil motif kembang ex DN 30x30 cm10,300.00Bh101Vynil wall covering lebar 50 cm68,800.00M2102Perquet jati400,500.00M2103Gymfloor86,700.00M2104Paku pancing 60-230800.00Bh105Sekrup 3,5"500.00Bh106Sekrup 3,5"22,200.00Kg107Aspal AC 60/704,600.00Kg108Tempat memasak aspal20,100.00109Alat-alat mengaspal63,700.00G.PENUTUP ATAP1Atap Genteng Palentong1,800.00Bh2Atap Genteng Palentong super4,400.00Bh3Atap Genteng Kodok2,400.00Bh4Atap Genteng Beton6,500.00Bh5Atap Genteng Keramik12,400.00Bh6Atap Genteng Aspal12,300.00Lbr7Atap Genteng Metal/Multi roof 35131,600.00M28Atap Genteng Asbes cement62,100.00M29Atap Genteng Sirap1,300.00Bh10Atap Aluminium gelombang tebal 0,55106,700.00M211Atap seng Alumi Zinc warna 0,3567,700.00M212Atap Genteng Twin Light65,100.00M213Atap Seng Gelombang 3'x6' bjls 3564,800.00M214Atap Seng Super Deck3'x6' bjls 0,3080,000.00M215Rooflight fibreglass gelombang55,100.00M216Atap Asbes gelombang 1,8x1,05 tbl. 4mm64,600.00Lbr17Atap Asbes gelombang 2,1x1,05 tbl. 4mm101,300.00Lbr18Atap Asbes gelombang 2,4x1,05 tbl. 4mm117,500.00Lbr19Atap Asbes gelombang 2,7x1,05 tbl. 4mm123,200.00Lbr20Atap Asbes gelombang 1,8x0,92 tbl. 5mm77,100.00Lbr21Atap Asbes gelombang 2,1x0,92 tbl. 5mm96,500.00Lbr22Atap Asbes gelombang 2,4x0,92 tbl. 5mm105,500.00Lbr23Atap Asbes gelombang 2,7x0,92 tbl. 5mm116,100.00Lbr24Atap Asbes gelombang 1,8x1,08 tbl. 6mm112,600.00Lbr25Atap Asbes gelombang 2,1x1,08 tbl. 6mm130,900.00Lbr26Atap Asbes gelombang 2,4x1,08 tbl. 6mm139,500.00Lbr27Atap Asbes gelombang 2,7x1,08 tbl. 6mm168,900.00Lbr28Atap asbes motif genteng36,800.00Lbr29Genteng Bubung palentong10,200.00Bh30Genteng Bubung palentong super13,900.00Bh31Genteng Bubung kodok10,400.00Bh32Rabung seng BJLS 35 K39,400.00M'33Nok Genteng beton14,600.00Bh34Nok Genteng keramik16,400.00Bh35Nok Genteng aspal31,900.00Bh36Nok Genteng Metal/Multiroof (decra bond)58,800.00Bh37Nok Genteng Asbes cement 0,3536,800.00Lbr38Nok Aluminium standard 40cm 18 swg2252,100.00M239Bubung/Nok stel Gelombang 0,92 m' tbl.5 mm21,300.00Lbr40Bubung/Nok stel Gelombang 1,05 m' tbl.4 mm28,200.00Lbr41Bubung/Nok stel Gelombang 1,08 m' tbl.6 mm31,000.00Lbr42Bubung/Nok Paten 0,92 m' tbl.5 mm40,000.00Lbr43Bubung/Nok Paten 1,05 m' tbl.4 mm33,600.00Lbr44Bubung/Nok Paten 1,08 m' tbl.6 mm46,700.00Lbr45Bubung/Nok Stel Rata 0,92 m' tbl.5 mm39,200.00Lbr46Bubung/Nok Stel Rata 1,05 m' tbl.4 mm32,900.00Lbr47Bubung/Nok Stel Rata 1,08 m' tbl.6 mm44,100.00Lbr48Seng Plat 3" x 6" bjls 35125,500.00Lbr49Seng Plat 3" x 6" bjls 30113,000.00Lbr50Plastic aerator29,900.00Bh51Sisalation / aluminium foil83,900.00M252Paku seng +Ring karet22,200.00Kg53Paku seng +Ring karet500Bh54Paku hak panjang 15 cm33,200.00Kg55Lat Asbes8,100.00BhH.KUNCI DAN KACA1Kunci tanam antik233,100.00Bh2Kunci tanam biasa97,900.00Bh3Kunci tanam kamar mandi59,500.00Bh4Kunci silinder37,500.00Bh5Kunci solot29,600.00Bh6Kunci lemari13,400.00Bh7Engsel pintu 4"16,500.00Bh8Engsel pintu jendela 3"12,200.00Bh9Engsel angin27,200.00Bh10Kait angin20,800.00Bh11Rel pintu dorong174,200.00Bh12Sealeant42,800.00Kg13spring knip9,900.00Bh14Door Closer119,300.00Bh15Door Handle122,900.00Bh16Door Stoop41,500.00Bh17Espanyolet96,100.00Bh18Kaca Block 20x20 cm28,300.00Bh19Kaca Polos tbl. 3mm94,700.00M220Kaca Polos tbl. 5mm157,800.00M221Kaca Polos tbl. 8mm252,500.00M222Kaca Reyben tbl. 5mm209,900.00M223Kaca Reyben tbl. 8mm335,800.00M224Kaca Buram tbl. 3 mm79,000.00M225Kaca Buram tbl. 5 mm121,300.00M226Kaca Buram tbl. 8 mm210,500.00M227Kaca Cermin tbl. 5 mm175,900.00M228Kaca Cermin tbl. 6 mm210,800.00M229Kaca Cermin tbl. 8 mm281,200.00M230Kaca Patri184,300.00M231Kaca Wireglass164,300.00M232Kaca Reyben Naco 30x60 cm tbl. 5mm14,800.00Lbr33Kaca Bening Naco 30x60 cm tbl. 5mm11,700.00LbrICAT / MINYAK1Cat dasar17,100.00Kg2Cat Tembok setara Vinilex (putih)20,500.00Kg3Cat Tembok setara Vinilex (warna)41,500.00Kg4Cat Minyak untuk kayu38,800.00Kg5Cat Minyak untuk besi42,800.00Kg6Cat Menie kayu27,800Kg7Cat Menie besi28,900.00Kg8Cat sending59,200.00Kg9Cat Melamix64,500.00Kg10Cat Vernis jadi52,500.00Kg11Plamir17,100.00Kg12Dempul Gypsum11,300.00Kg13Dempul Cat12,900.00Kg14Tinner12,000.00Ltr15Minyak belkisting6,900.00Ltr16Minyak Solar5,700.00Ltr17Minyak Silinder34,100.00Ltr18Minyak Gerdang29,400.00Ltr19Minyak gemuk34,700.00Ltr20Residu/kolter7,100.00Ltr21Soda Api13,200.00Ltr22Sabun11,200.00Kg23Kuas8,600.00Bh24Ampelas / kertas pasir2,000.00Lbr25Wall paper33,300.00m2J.SANITASI / PIPA1Kloset duduk /menoblok lengkap tangki2,099,200.00Bh2Kloset duduk /menoblok tanpa tangki1,512,300.00Bh3Kloset jongkok porselin244,900.00Bh4Bakkif Porselin3,287,400.00Bh5Wastafel572,000.00Bh6Urinoir605,900.00Bh7Kran air 1/2" - 3/4"29,800.00Bh8Kran air leher angsa 1/2"83,900.00Bh9Kran shower131,300.00Bh10Kran cebok78,500.00Bh11Bak fibreglass 0,3 M3288,800.00Bh12Bak fibreglass 1 M3577,500.00Bh13Bak cuci piring stainless 2 lobang507,200.00Bh14Bak cuci piring teraso 2 lobang295,900.00Bh15Tempat sabun keramik61,200.00Bh16Floor drain 4" stainless16,300.00Bh17Stop Kran 3/4"29,900.00Bh18Tutup bak air 1" kuningan13,600.00Bh19Instalasi air bersih109,000.00Ttk20Instalasi air kotor/limbah135,900.00Ttk21Buls Beton 1/2 15 cm12,200.00M'22Buls Beton 1/2 20 cm19,400.00M'23Buls Beton 1/2 30 cm21,800.00M'24Buls Beton 15 cm20,900.00M'25Buls Beton 20 cm29,800.00M'26Buls Beton 30 cm61,200.00M'27Buls Beton 40 cm68,900.00M'28Buls Beton 50 cm104,300.00M'29Buls Beton 60 cm147,800.00M'30Buls Beton 80 cm218,600.00M'31Buls Beton 100 cm375,800.00M'32Bodeam 30x60 cm27,500.00Bh33Pipa PVC Tipe AW 1/2"6,000.00M'34Pipa PVC Tipe AW 3/4"8,100.00M'35Pipa PVC Tipe AW 1"14,800.00M'36Pipa PVC Tipe AW 1 1/2"21,400.00M'37Pipa PVC Tipe AW 2"25,200.00M'38Pipa PVC Tipe AW 2 1/2"29,000.00M'39Pipa PVC Tipe AW 3"32,400.00M'40Pipa PVC Tipe AW 4"54,300.00M'41Pipa Besi Hitam 1/2"16,100.00M'42Pipa Besi Hitam 3/4"21,900.00M'43Pipa Besi Hitam 1"32,100.00M'44Pipa Besi Hitam 1 1/2"40,800.00M'45Pipa Besi Hitam 2"51,800.00M'46Pipa Besi Hitam 2 1/2"54,600.00M'47Pipa Galvanis 1/2"16,100.00M'48Pipa Galvanis 3/4"21,900.00M'49Pipa Galvanis 1"32,100.00M'50Pipa Galvanis 1 1/4"36,500.00M'51Pipa Galvanis 1 1/2"40,800.00M'52Pipa Galvanis 2"51,800.00M'53Pipa Galvanis 2 1/2"57,000.00M'54Fitting Pipa AW 1" yg terdiri dari :Knee AW 1"5,700.00BhTee AW 1"7,800.00BhSouch AW 1"5,100.00BhBoucht LL-D 1"26,900.00BhUnion Socht 1"8,100.00BhD-Nipple 1"19,700.00BhK.LISTRIK / ACSESORIES1Lampu TL 1x20 W Lengkap Kotak59,300.00Set2Lampu TL 1x40 W Lengkap Kotak65,900.00Set3Lampu TL 2x20 W Lengkap Kotak178,000.00Set4Lampu TL 2x40 W Lengkap Kotak200,000.00Set5Lampu TL Bambu 1x20 W Lengkap118,400.00Set6Lampu TL Bambu 1x40 W Lengkap134,200.00Set7Lampu XL 5 W+Fitting27,800.00Set8Lampu XL 8 W+Fitting29,900.00Set9Lampu XL 10 W+Fitting31,500.00Set10Lampu XL 14 W+Fitting36,200.00Set11Lampu XL 18 W+Fitting36,800.00Set12Lampu XL 24 W+Fitting42,000.00Set13Lampu Downlight 5 W Lengkap59,300.00Set14Lampu Pijar 5w + Fitting9,200.00Set15Lampu Pijar 10w + Fitting9,500.00Set16Lampu Pijar 15w + Fitting10,200.00Set17Lampu Pijar 20w + Fitting11,000.00Set18Lampu Pijar 25w + Fitting11,600.00Set19Lampu Pijar 40w + Fitting12,600.00Set20Stop kontak tanam11,200.00Bh21Saklar tunggal15,800.00Bh22Saklar ganda17,100.00Bh23Saklar Triple19,700.00Bh24Zekring box 1 grup29,000.00Unit25Zekring box 2 grup34,000Unit26Zekring box 3 grup41,800.00Unit27Zekring box 4 grup50,400.00Unit28MCB 2 Ampere38,300.00Unit29MCB 4 Ampere46,700.00Unit30MCB 6 Ampere73,800.00Unit31MCB 8 Ampere107,800.00Unit32Kabel listrik NYA 1,5 mm1,300.00M'33Kabel listrik NYA 2,5 mm2,100.00M'34Kabel listrik NYA 4 mm9,000.00M'35Kabel listrik NYM 2 1,5 mm4,400.00M'36Kabel listrik NYM 2 2,5 mm10,900.00M'37Kabel listrik NYM 2 4 mm17,400.00M'38Instalasi Listrik titik api / lampu nyala110,300.00Ttk

teknik:

Sheet21Anl. A.11 m Galian Tanah Keras :0.7500Pekerja52,500.0039,375.000.0250Mandor65,600.001,640.00Jumlah41,015.00di bulatkan41,015.002Anl.1/4. A.11 m Urugan Kembali Tanah Galian :0.2500Upah Kerja (A.1)41,015.0010,253.75Jumlah10,253.75di bulatkan10,254.003Anl. A.21 m Galian Tanah Keras :1.0000Pekerja52,500.0052,500.000.0330Mandor65,600.002,164.80Jumlah54,664.80di bulatkan54,665.004Anl.A.61 M3 Angkut tanah Max. 30 M' :0.3300Pekerja52,500.0017,325.000.0100Mandor65,600.00656.00Jumlah17,981.00di bulatkan17,981.005Anl. A.181 M3 Urugan Pasir di Bawah Lantai0.3000Pekerja52,500.0015,750.000.0100Mandor65,600.00656.001.2000m3 Pasir urug70,400.0084,480.00Jumlah100,886.00di bulatkan100,886.006Anl.A.18.a1 M3 Urugan Tanah0.3000Pekerja52,500.0015,750.000.0100Mandor65,600.00656.001.2000M3Tanah Timbun68,300.0081,960.00Jumlah98,366.00di bulatkan98,366.007Anl.A.18.b1M3 Urugan Sirtu0.3000Pekerja52,500.0015,750.000.0100Mandor65,600.00656.001.5000m3 Sirtu96,600.00144,900.00Jumlah161,306.00di bulatkan161,306.008Anl.F.1.1 M3 Gantungan/Rangka PlafondUpah :5.0000Pekerja52,500.00262,500.000.2500Mandor65,600.0016,400.0015.0000Tukang78,800.001,182,000.001.5000Kepala Tukang91,900.00137,850.001,598,750.000.5000Upah Kerja1,598,750.00799,375.00Bahan :1.1000M3Broti Kayu Meranti5,678,300.006,246,130.000.2000KgPaku biasa 2"-5"16,300.003,260.006,249,390.00Jumlah7,048,765.00di bulatkan7,048,765.009Anl. F.1.a1 M2 Piyan Papan Rider (STRIP)Upah :0.2800Pekerja52,500.0014,700.000.0140Mandor65,600.00918.400.8000Tukang78,800.0063,040.000.0800Kepala Tukang91,900.007,352.0086,010.401.2000Upah Kerja86,010.40103,212.48Bahan :0.0200M3Kayu Meranti Batu$10,188,300.00203,766.000.2000KgPaku biasa 2"-5"16,300.003,260.00Jumlah310,238.48di bulatkan310,238.0010Anl. F.161 M2 Rangka atap (pasang usuk dan reng untuk atap genteng dan sirap)0.1000Pekerja52,500.005,250.000.0050Mandor65,600.00328.000.1000Tukang78,800.007,880.000.0100Kepala Tukang91,900.00919.000.0147M3Kayu Meranti5,678,300.0083,471.010.2500KgPaku biasa 2"-5"16,300.004,075.00Jumlah101,923.01di bulatkan101,923.0011Anl.F.16.a1 M2 Rangka atap genteng biasa/genteng semen (pasang usuk, reng dan gording)0.1500Pekerja52,500.007,875.000.0075Mandor65,600.00492.000.1000Tukang78,800.007,880.000.0100Kepala Tukang91,900.00919.000.0250M3Kayu Meranti5,678,300.00141,957.500.1000KgPaku biasa 2"-5"16,300.001,630.00Jumlah160,753.50di bulatkan160,754.0012Anl.F.191 M2 Rangka atap seng dan Asbes Gelombang Kayu0.0150Pekerja52,500.00787.500.0075Mandor65,600.00492.000.1000Tukang78,800.007,880.000.0100Kepala Tukang91,900.00919.000.0110M3Kayu Meranti5,678,300.0062,461.300.1000KgPaku biasa 2"-5"16,300.001,630.00Jumlah74,169.80di bulatkan74,170.0013Anl.F.19.a1 M2 Rangka atap Genteng Metal dan Genteng Asbes Kayu0.0150Pekerja52,500.00787.500.0075Mandor65,600.00492.000.1000Tukang78,800.007,880.000.0100Kepala Tukang91,900.00919.000.0125M3Kayu Meranti5,678,300.0070,978.750.1200KgPaku biasa 2"-5"16,300.001,956.00Jumlah83,013.25di bulatkan83,013.0014Anl.F.211 M2 Lystplank0.2800Pekerja52,500.0014,700.000.0140Mandor65,600.00918.400.8000Tukang78,800.0063,040.000.0800Kepala Tukang91,900.007,352.000.0240M3Papan Kayu Damar Laut10,487,100.00251,690.400.1000KgPaku biasa 0,5"-2"18,400.001,840.00Jumlah339,540.80di bulatkan339,541.0015Anl.F.221 M3 Konstruksi Kayu Kuda-KudaUpah :8.0000Pekerja52,500.00420,000.000.4000Mandor65,600.0026,240.0024.0000Tukang78,800.001,891,200.002.4000Kepala Tukang91,900.00220,560.002,558,000.000.5000Upah kerja2,558,000.001,279,000.00Bahan :1.1000M3Kayu damar laut10,161,100.0011,177,210.00Jumlah12,456,210.00di bulatkan12,456,210.0016Anl.F.271 M3 Kozen pintu/jendela tanpa jalusiUpah :12.0000Pekerja52,500.00630,000.000.6000Mandor65,600.0039,360.0036.0000Tukang78,800.002,836,800.003.6000Kepala Tukang91,900.00330,840.003,837,000.000.5000Upah kerja3,837,000.001,918,500.00Bahan :1.1000M3Kayu damar laut10,161,100.0011,177,210.00Jumlah13,095,710.00di bulatkan13,095,710.0017Anl.F.27.a1 M3 Kozen pintu/jendela dengan jalusiUpah :12.0000Pekerja52,500.00630,000.000.6000Mandor65,600.0039,360.0036.0000Tukang78,800.002,836,800.003.6000Kepala Tukang91,900.00330,840.003,837,000.000.5000Upah kerja3,837,000.001,918,500.00Bahan :1.1000M3Kayu damar laut10,161,100.0011,177,210.000.0240M3Papan Kayu meranti batu10,188,300.00244,519.201.0000KgPaku biasa 2"-5"16,300.0016,300.0011,438,029.20Jumlah13,356,529.20di bulatkan13,356,529.0018Anl.F.281 M3 Kozen yang berlobang cahaya berbentuk busurUpah :14.0000Pekerja52,500.00735,000.000.7000Mandor65,600.0045,920.0042.0000Tukang78,800.003,309,600.004.2000Kepala Tukang91,900.00385,980.004,476,500.000.5000Upah kerja4,476,500.002,238,250.00Bahan :1.1000M3Kayu damar laut10,161,100.0011,177,210.00Jumlah13,415,460.00di bulatkan13,415,460.0019Anl.F.331 M2 Pintu/jendela panel :Upah :2.5000Pekerja52,500.00131,250.000.1250Mandor65,600.008,200.007.5000Tukang78,800.00591,000.000.7500Kepala Tukang91,900.0068,925.00799,375.000.5000Upah Kerja799,375.00399,687.50Bahan :0.0440M3Kayu meranti batu10,188,300.00448,285.20Jumlah847,972.70di bulatkan847,973.0020Anl. F.301 M2 Daun Pintu triplek 4mm double rangka kayu merantiUpah :1.3000Pekerja52,500.0068,250.000.0650Mandor65,600.004,264.004.0000Tukang78,800.00315,200.000.4000Kepala Tukang91,900.0036,760.00424,474.000.5000Upah Kerja424,474.00212,237.00Bahan :0.0250M3Kayu meranti5,678,300.00141,957.501.0000LbrTriplek 4mm56,400.0056,400.000.2000KgPaku biasa 0,5"-2"18,400.003,680.00202,037.50Jumlah414,274.50di bulatkan414,275.0021Anl.F.30a1 M2 Daun Pintu Triplek Sungkai Double Rangka Kayu Meranti :Upah :1.3000Pekerja52,500.0068,250.000.0650Mandor65,600.004,264.004.0000Tukang78,800.00315,200.000.4000Kepala Tukang91,900.0036,760.00424,474.000.5500Upah kerja424,474.00233,460.70Bahan :0.0250M3Kayu meranti5,678,300.00141,957.501.0000LbrTriplek sungkai92,900.0092,900.000.2500KgPaku biasa 0.5"-2"18,400.004,600.00239,457.50Jumlah472,918.20di bulatkan472,918.0022Anl. F.341 M2 Pintu/Jendela Jalusi :3.0000Pekerja52,500.00157,500.000.1500Mandor65,600.009,840.009.0000Tukang78,800.00709,200.000.9000Kepala Tukang91,900.0082,710.00959,250.000.5000Upah Kerja959,250.00479,625.000.3187KgPaku biasa 2"-5"16,300.005,194.810.0640M3Kayu meranti batu9,862,300.00631,187.20636,382.01Jumlah1,116,007.01di bulatkan1,116,007.0023Anl.F.361 M2 Pintu/Jendela Kaca bingkai Kayu meranti batu :2.0000Pekerja52,500.00105,000.000.1000Mandor65,600.006,560.006.0000Tukang78,800.00472,800.000.6000Kepala Tukang91,900.0055,140.00639,500.000.5000Upah Kerja639,500.00319,750.001.0000M2Kaca Polos 5mm157,800.00157,800.000.0350M3Kayu meranti batu9,862,300.00345,180.50502,980.50Jumlah822,730.50di bulatkan822,731.0024Anl.F.371 M2 Dinding Papan DilidahUpah :0.2800Pekerja52,500.0014,700.000.0140Mandor65,600.00918.400.8000Tukang78,800.0063,040.000.0800Kepala Tukang91,900.007,352.0086,010.400.7500Upah kerja86,010.4064,507.80Bahan :0.0198M3Papan Kayu Meranti5,950,000.00117,810.000.2000KgPaku biasa 2"-5"16,300.003,260.00121,070.00Jumlah185,577.80di bulatkan185,578.0025Anl.F.37a1 M2 Dinding Papan Susun Sirih :Upah :0.2800Pekerja52,500.0014,700.000.0140Mandor65,600.00918.400.8000Tukang78,800.0063,040.000.0800Kepala Tukang91,900.007,352.0086,010.400.5000Upah kerja86,010.4043,005.20Bahan :0.0187M3Papan Kayu Meranti5,950,000.00111,265.000.2000KgPaku biasa 2"-5"16,300.003,260.00114,525.00Jumlah157,530.20di bulatkan157,530.0026Anl.F.37b1 M2 Dinding triplek 4mm rangka kayu merantiUpah :0.2800Pekerja52,500.0014,700.000.0140Mandor65,600.00918.400.8000Tukang78,800.0063,040.000.0800Kepala Tukang91,900.007,352.0086,010.400.3000Upah kerja86,010.4025,803.12Bahan :0.0138M3Broti Kayu meranti5,678,300.0078,360.540.3500LbrTriplek 4mm56,400.0019,740.000.1500KgPaku biasa 0,5"-2"18,400.002,760.00100,860.54Jumlah126,663.66di bulatkan126,664.0027Anl.F.37c1M2 Dinding double triplek 4mm rangka kayu merantiUpah :0.2800Pekerja52,500.0014,700.000.0140Mandor65,600.00918.400.8000Tukang78,800.0063,040.000.0800Kepala Tukang91,900.007,352.0086,010.400.4000Upah kerja86,010.4034,404.16Bahan :0.0138M3Broti Kayu Meranti5,678,300.0078,360.540.7000LbrTriplek 4mm56,400.0039,480.000.2500KgPaku biasa 0,5"-2"18,400.004,600.00122,440.54Jumlah156,844.70di bulatkan156,845.0028Anl.F.37d.1M2 Dinding double triplek sungkai rangka kayu meranti0.1400Pekerja52,500.007,350.000.0700Mandor65,600.004,592.000.4000Tukang78,800.0031,520.000.0400Kepala Tukang91,900.003,676.000.0150M3Broti Kayu Meranti5,678,300.0085,174.500.8000LbrTriplek sungkai92,900.0074,320.000.2500LbrPaku biasa 0,5"-2"18,400.004,600.00Jumlah211,232.50di bulatkan211,233.0029Anl.F.37e.1M2 Dinding single triplek sungkai rangka kayu merantiUpah :0.1400Pekerja52,500.007,350.000.0700Mandor65,600.004,592.000.4000Tukang78,800.0031,520.000.0400Kepala Tukang91,900.003,676.000.0125M3Broti Kayu Meranti5,678,300.0070,978.750.4000LbrTriplek sungkai92,900.0037,160.000.2500KgPaku biasa 0,5"-2"18,400.004,600.00Jumlah159,876.75di bulatkan159,877.0030Anl.F.601 M' Memasang cerocok kayu laut 1 btg panjang 2,5 MMasuk kedalam tanah 1,5 -2tanah 1,5 - 2 3"-4"1.0000Pekerja52,500.0052,500.000.0500Mandor65,600.003,280.003.0000Tukang78,800.00236400PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja0.3Kepala Tukang91,900.0027570MandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandorMandor7.5000BtgKayu Laut 3" - 4"20,900.00156750TukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukangTukang0.5000KgKawat licin24,500.0012250Kepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangKepala TukangJumlah488,750.00di bulatkan488,750.0031Anl.G.21M3 Lantai kerja batu kosong1.5000Pekerja52,500.0078,750.000.0750Mandor65,600.004,920.001.1000M3Batu koral 3-5 cm215,300.00236,830.00Jumlah320,500.00di bulatkan320,500.0032Anl.G.141M3 Perekat 1:214.6880zakSemen PC56,000.00822,528.000.9500M3Pasir Pasang94,500.0089,775.00Jumlah912,303.00di bulatkan912,303.0033Anl.G.161M3 Perekat 1:311.2490ZakSemen PC56,000.00629,944.001.0800zakPasir Pasang94,500.00102,060.00Jumlah732,004.00di bulatkan732,004.0034Anl.G31.h1M3 Pasangan batu belah atau batu kali 1:43.6000Pekerja52,500.00189,000.000.1800Mandor65,600.0011,808.001.2000Tukang78,800.0094,560.000.1200Kepala Tukang91,900.0011,028.001.2000M3Batu belah/batu kali 10-15cm165,900.00199,080.003.8675ZakSemen PC56,000.00216,580.000.4860M3Pasir pasang94,500.0045,927.00Jumlah767,983.00di bulatkan767,983.0035Anl.G31.m1 M3 Pasangan batu belah atau batu kali 1 : 33.6000Pekerja52,500.00189,000.000.1800Mandor65,600.0011,808.001.2000Tukang78,800.0094,560.000.1200Kepala Tukang91,900.0011,028.001.2000M3Batu belah/batu kali 10-15cm165,900.00199,080.004.0715ZakSemen PC56,000.00228,004.000.5220M3Pasir pasang94,500.0049,329.00Jumlah782,809.00di bulatkan782,809.0036Anl.G32.h1M3 Pasangan batu bata 1 : 44.5000Pekerja52,500.00236,250.000.2250Mandor65,600.0014,760.001.5000Tukang78,800.00118,200.000.1500Kepala Tukang91,900.0013,785.00720.0000BhBatu bata650468,000.003.1663ZakSemen PC56,000.00177,312.800.4060M3Pasir pasang94,500.0038,367.00Jumlah1,066,674.80di bulatkan1,066,675.0037Anl.G32.m1M3 Pasangan batu bata 1 : 2 (Trasraam)4.5000Pekerja52,500.00236,250.000.2250Mandor65,600.0014,760.001.5000Tukang78,800.00118,200.000.1500Kepala Tukang91,900.0013,785.00720.0000BhBatu bata650468,000.005.1467ZakSemen PC56,000.00288,215.200.3330M3Pasir pasang94,500.0031,468.50Jumlah1,170,678.70di bulatkan1,170,679.0038Anl.G.411M3Beton cor 1:2:36.0000Pekerja52,500.00315,000.000.3000Mandor65,600.0019,680.001.0000Tukang78,800.0078,800.000.1000Kepala Tukang91,900.009,190.000.8300M3Batu kerikil (A)199,500.00165,585.000.5400M3Pasir pasang94,500.0051,030.008.5000ZakSemen PC56,000.00476,000.00Jumlah1,115,285.00di bulatkan1,115,285.0039Anl.G.41a1M3 Beton cor 1: 1,5 :2,56.0000Pekerja52,500.00315,000.000.3000Mandor65,600.0019,680.001.0000Tukang78,800.0078,800.000.1000Kepala Tukang91,900.009,190.000.7800M3Batu kerikil (A)199,500.00155,610.000.4650M3Pasir pasang94,500.0043,942.509.6857ZakSemen PC56,000.00542,399.20Jumlah1,164,621.70di bulatkan1,164,622.0040Anl G. 421M3 Beton cor 1:2:4 dipakai untuk lantai ubin,beton yang dicor dibawah air'lapisan turap diatas pasangan-pasangan yang dimiringkan tebal 6 cm6.0000Pekerja52,500.00315,000.000.3000Mandor65,600.0019,680.000.5000Tukang78,800.0039,400.000.0500Kepala Tukang91,900.004,595.000.9600M3Batu kerikil (A)199,500.00191,520.000.4800M3Pasir pasang94,500.0045,360.007.4630ZakSemen PC56,000.00417,928.00Jumlah1,033,483.00di bulatkan1,033,483.0041Anl.G.431M3 Beton Cor 1 :2,5 :56.0000Pekerja52,500.00315,000.000.3000Mandor65,600.0019,680.000.5000Tukang78,800.0039,400.000.0500Kepala Tukang91,900.004,595.001.0000M3Batu kerikil (A)199,500.00199,500.000.5000M3Pasir pasang94,500.0047,250.006.2517ZakSemen PC56,000.00350,095.20Jumlah975,520.20di bulatkan975,520.0042Anl.G.441M3 Beton Cor 1:3:56.0000Pekerja52,500.00315,000.000.3000Mandor65,600.0019,680.000.5000Tukang78,800.0039,400.000.0500Kepala Tukang91,900.004,595.001.0000M3Batu kerikil (A)199,500.00199,500.005.2955ZakSemen PC56,000.00296,548.000.5000M3Pasir pasang94,500.0047,250.00Jumlah921,973.00di bulatkan921,973.0043Anl.G50.h1M2 Plesteran 1 : 2 Tebal 10mm (Trasraam)0.4000Pekerja52,500.0021,000.000.0200Mandor65,600.001,312.000.1500Tukang78,800.0011,820.000.0150Kepala Tukang91,900.001,378.500.1785zakSemen PC56,000.009,996.000.0114M3Pasir pasang94,500.001,077.30Jumlah46,583.80di bulatkan46,584.0044Anl.G50.h11M2 Plesteran 1 : 2 Tebal 15mm (Trasraam)0.4000Pekerja52,500.0021,000.000.0200Mandor65,600.001,312.000.2000Tukang78,800.0015,760.000.0200Kepala Tukang91,900.001,838.000.2678ZakSemen PC56,000.0014,996.800.0171M3Pasir pasang94,500.001,615.95Jumlah56,522.75di bulatkan56,523.0045Anl.G50.i1M2 Plesteran 1 : 3 Tebal 15mm0.4000Pekerja52,500.0021,000.000.0200Mandor65,600.001,312.000.2000Tukang78,800.0015,760.000.0200Kepala Tukang91,900.001,838.000.2040ZakSemen PC56,000.0011,424.000.0194M3Pasir pasang94,500.001,833.30Jumlah53,167.30di bulatkan53,167.0046Anl.G50.k1M2 Plesteran 1 : 3 Tabal 10mm0.4000Pekerja52,500.0021,000.000.0200Mandor65,600.001,312.000.1500Tukang78,800.0011,820.000.0150Kepala Tukang91,900.001,378.500.1347ZakSemen PC56,000.007,543.200.0130M3Pasir pasang94,500.001,228.50Jumlah44,282.20di bulatkan44,282.0047Anl.G50.q1M2 Plesteran 1 : 4 Tebal 10mm0.4000Pekerja52,500.0021,000.000.0200Mandor65,600.001,312.000.1500Tukang78,800.0011,820.000.0150Kepala Tukang91,900.001,378.500.1084ZakSemen PC56,000.006,070.400.0139M3Pasir pasang94,500.001,313.55Jumlah42,894.45di bulatkan42,894.0048Anl.G50.q11M2 Plesteran 1 : 4 Tebal 15mm0.4000Pekerja52,500.0021,000.000.0200Mandor65,600.001,312.000.2000Tukang78,800.0015,760.000.0200Kepala Tukang91,900.001,838.000.1628ZakSemen PC56,000.009,116.800.0209M3Pasir pasang94,500.001,975.05Jumlah51,001.85di bulatkan51,002.0049Anl.G.6O1M2 Memasang Conblock0.4000Pekerja52,500.0021,000.000.1000Tukang78,800.007,880.0046.0000BhConblock1,900.0087,400.000.1200M3Pasir pasang94,500.0011,340.00Jumlah127,620.00di bulatkan127,620.0050Anl.G.671M2 Lantai beton tebal 7 cm camp,1:3:6 diplester tebal 6mm0.7200Pekerja52,500.0037,800.000.0360Mandor65,600.002,361.600.1350Tukang78,800.0010,638.000.0135Kepala Tukang91,900.001,240.650.0700M3Batu kerikil (A)199,500.0013,965.000.0440M3Pasir pasang94,500.004,158.000.4547ZakSemen PC56,000.0025,463.20Jumlah95,626.45di bulatkan95,626.0051Anl.G.681M' Pasang Plint tegel PC. 10x30 cmUpah :0.3000Pekerja52,500.0015,750.000.0150Mandor65,600.00984.000.1000Tukang78,800.007,880.000.0100Kepala Tukang91,900.00919.00Jumlah25,533.00Bahan :3.3330BhPlint tegel 10x30 cm3,200.0010,665.600.0765ZakSemen PC56,000.004,284.000.0070M3Pasir pasang94,500.00661.50Jumlah15,611.10Jumlah U + B41,144.10di bulatkan41,144.0052Anl.G.68a1M' Pasang Plint Keramik 15x30 cm3.3330BhPlint Keramik 15x30 cm4,700.0015,665.100.0765ZakSemen PC56,000.004,284.000.0070M3Pasir pasang94,500.00661.501.1000Upah Kerja25,533.0028,086.30Jumlah48,696.90di bulatkan48,697.0053Anl.G.68b1M' Pasang Plint Keramik 15x40 cm2.5500BhPlint Keramik 15x40cm8,900.0022,695.000.0765ZakSemen PC56,000.004,284.000.0070M3Pasir pasang94,500.00661.501.1000Upah Kerja25,533.0028,086.30Jumlah55,726.80di bulatkan55,727.0054Anl.G.68c1M' Pasang Plint Granito 15x40 cm2.5500BhPlint Granito 15x40 cm26,300.0067,065.000.0765ZakSemen PC56,000.004,284.000.0070M3Pasir pasang94,500.00661.501.2500Upah Kerja25,533.0031,916.25Jumlah103,926.75di bulatkan103,927.0055Anl.G.68d1M' Pasang Plint Keramik Essenza 15x40 cm2.5500BhPlint Essenza 15x40 cm28,200.0071,910.000.0765ZakSemen PC56,000.004,284.000.0070M3Pasir pasang94,500.00661.501.2500Upah Kerja25,533.0031,916.25Jumlah108,771.75di bulatkan108,772.0056Anl.G.721 M2 Lantai Keramik Uk.10x20 cm0.5000Pekerja52,500.0026,250.000.0250Mandor65,600.001,640.000.2500Tukang78,800.0019,700.000.0250Kepala Tukang91,900.002,297.5050.0000BhKeramik 10x20 cm1,400.0070,000.000.1419ZakSemen PC56,000.007,946.400.0020ZakSemen Putih108,000.00216.002.4000KgKapur3,700.008,880.000.0230M3Pasir Pasang94,500.002,173.50Jumlah139,103.40di bulatkan139,103.0057Anl.G.72a1M2 Lantai Keramik Uk.20x20 cm0.5000Pekerja52,500.0026,250.000.0250Mandor65,600.001,640.000.2500Tukang78,800.0019,700.000.0250Kepala Tukang91,900.002,297.5025.0000BhKeramik 20x20 cm2,700.0067,500.000.1419ZakSemen PC56,000.007,946.400.0020ZakSemen Putih108,000.00216.002.4000KgKapur3,700.008,880.000.0230M3Pasir Pasang94,500.002,173.50Jumlah136,603.40di bulatkan136,603.0058Anl.G.72b1M2 Lantai Keramik Uk. 30x30 cm0.5000Pekerja52,500.0026,250.000.0250Mandor65,600.001,640.000.2500Tukang78,800.0019,700.000.0250Kepala Tukang91,900.002,297.5011.1100BhKeramik 30x30 cm6,100.0067,771.000.1419ZakSemen PC56,000.007,946.400.0020ZakSemen Putih108,000.00216.002.4000KgKapur3,700.008,880.000.0230M3Pasir Pasang94,500.002,173.50Jumlah136,874.40di bulatkan136,874.0059Anl.G.72c1M2 Pasang Lantai Keramik 40x40 cm0.5000Pekerja52,500.0026,250.000.0250Mandor65,600.001,640.000.2500Tukang78,800.0019,700.000.0250Kepala Tukang91,900.002,297.506.2500BhKeramik 40x40 cm11,800.0073,750.000.1419ZakSemen PC56,000.007,946.400.0020ZakSemen Putih108,000.00216.002.4000KgKapur3,700.008,880.000.0230M3Pasir Pasang94,500.002,173.50Jumlah142,853.40di bulatkan142,854.0060Anl.G.72d1M2 Pasang Lantai Keramik Essenza 40x40 cmUpah :0.5000Pekerja52,500.0026,250.000.0250Mandor65,600.001,640.000.2500Tukang78,800.0019,700.000.0250Kepala Tukang91,900.002,297.5049,887.501.1250Upah49,887.5056,123.44Bahan :6.2500BhKeramik Essenza 40x40 cm47,000.00293,750.000.1419ZakSemen PC56,000.007,946.400.0020ZakSemen Putih108,000.00216.002.4000KgKapur3,700.008,880.000.0230M3Pasir Pasang94,500.002,173.50312,965.90Jumlah369,089.34di bulatkan369,090.0061Anl.G.72e1M2 Pasang Lantai Keramik Essenza 60x60 cmUpah :0.5000Pekerja52,500.0026,250.000.0250Mandor65,600.001,640.000.2500Tukang78,800.0019,700.000.0250Kepala Tukang91,900.002,297.5049,887.501.2500Upah49,887.5062,359.38Bahan :2.7800BhKeramik Essenza 60x60 cm137,800.00383,084.000.1419ZakSemen PC56,000.007,946.400.0020ZakSemen Putih108,000.00216.002.4000KgKapur3,700.008,880.000.0230M3Pasir Pasang94,500.002,173.50402,299.90Jumlah464,659.28di bulatkan464,660.0062Anl.G.72f1M2 Lantai Granito Uk.30x30 cmUpah :0.5000Pekerja52,500.0026,250.000.0250Mandor65,600.001,640.000.2500Tukang78,800.0019,700.000.0250Kepala Tukang91,900.002,297.5049,887.501.0000Upah49,887.5049,887.50Bahan :11.1100BhGranito 30x30 cm24,500.00272,195.000.1419ZakSemen PC56,000.007,946.400.0020ZakSemen Putih108,000.00216.002.4000KgKapur3,700.008,880.000.0230M3Pasir Pasang94,500.002,173.50291,410.90Jumlah341,298.40di bulatkan341,300.0063Anl.G.72g1M2 Pasang Lantai Granito 40x40 cmUpah :0.5000Pekerja52,500.0026,250.000.0250Mandor65,600.001,640.000.2500Tukang78,800.0019,700.000.0250Kepala Tukang91,900.002,297.5049,887.501.1250Upah49,887.5056,123.44Bahan :6.2500BhGranito 40x40 cm43,500.00271,875.000.1419ZakSemen PC56,000.007,946.400.0020ZakSemen Putih108,000.00216.002.4000KgKapur3,700.008,880.000.0230M3Pasir Pasang94,500.002,173.50291,090.90Jumlah347,214.34di bulatkan347,210.0064Anl.G.72h1M2 Pasang Lantai Granito 60x60 cmUpah :0.5000Pekerja52,500.0026,250.000.0250Mandor65,600.001,640.000.2500Tukang78,800.0019,700.000.0250Kepala Tukang91,900.002,297.5049,887.501.2500Upah49,887.5062,359.38Bahan :2.7800BhKeramik Essenza 60x60 cm130,400.00362,512.000.1419ZakSemen PC56,000.007,946.400.0020ZakSemen Putih108,000.00216.002.4000KgKapur3,700.008,880.000.0230M3Pasir Pasang94,500.002,173.50381,727.90Jumlah444,087.28di bulatkan444,090.0065Anl.Supl.IV1M2 Pas,Keramik dinding Uk. 10x20 cmUpah :1.0000Pekerja52,500.0052,500.000.0500Mandor65,600.003,280.000.5000Tukang78,800.0039,400.000.0500Kepala Tukang91,900.004,595.0099,775.00Bahan :50.0000BhKeramik 10x20 cm1,400.0070,000.000.0150Perekat (G.14)912,303.0013,684.5583,684.55Jumlah183,459.55di bulatkan183,460.0066Anl.Supl.Iva1M2 Pas,Keramik dinding Uk. 20x20 cm1.0000Pekerja52,500.0052,500.000.0500Mandor65,600.003,280.000.5000Tukang78,800.0039,400.000.0500Kepala Tukang91,900.004,595.0025.0000BhKeramik 20x20 cm2,700.0067,500.000.0150Perekat (G.14)912,303.0013,684.55Jumlah180,959.55di bulatkan180,960.0067Anl.Supl.Ivb1M2 Pas,Keramik dinding Uk. 20x25 cm1.0000Pekerja52,500.0052,500.000.0500Mandor65,600.003,280.000.5000Tukang78,800.0039,400.000.0500Kepala Tukang91,900.004,595.0020.0000BhKeramik 20x25 cm3,500.0070,000.000.0150Perekat (G.14)912,303.0013,684.55Jumlah183,459.55di bulatkan183,460.0068Anl.Supl.Ivc1M2 Pas,Keramik dinding Uk. 30x30 cm1.0000Pekerja52,500.0052,500.000.0500Mandor65,600.003,280.000.5000Tukang78,800.0039,400.000.0500Kepala Tukang91,900.004,595.0011.1100BhKeramik 30x30 cm6,100.0067,771.000.0150Perekat (G.14)912,303.0013,684.55Jumlah181,230.55di bulatkan181,231.0069Anl.Supl.Ivd1M2 Pas,Keramik dinding Uk. 40x40 cm1.0000Pekerja52,500.0052,500.000.0500Mandor65,600.003,280.000.5000Tukang78,800.0039,400.000.0500Kepala Tukang91,900.004,595.006.2500BhKeramik 40x40 cm11,800.0073,750.000.0150Perekat (G.14)912,303.0013,684.55Jumlah187,209.55di bulatkan187,210.0070Anl.Supl.Ive1M2 Pas,Keramik dinding Essenza Uk.40x40 cm6.2500BhEssenza 40x40 cm47,000.00293,750.000.0150Perekat (G.14)912,303.0013,684.551.2500Upah Kerja (Supl.IV)99,775.00124,718.75Jumlah432,153.30di bulatkan432,153.0071Anl.Supl.Ivf1M2 Pas,Keramik dinding Essenza Uk.60x60 cm2.7800BhEssenza 60x60 cm137,800.00383,084.000.0150Perekat (G.14)912,303.0013,684.551.5000Upah Kerja (Supl.IV)99,775.00149,662.50Jumlah546,431.05di bulatkan546,431.0072Anl.Supl.Ivg1M2 Pas,Keramik dinding Granito Uk.40x40 cm6.2500BhGranito 40x40 cm43,500.00271,875.000.0150Perekat (G.14)912,303.0013,684.551.2500Upah Kerja (Supl.IV)99,775.00124,718.75Jumlah410,278.30di bulatkan410,278.0073Anl.Supl.Ivh1M2 Pas,Keramik dinding Granito Uk.60x60 cm2.7800BhGranito 60x60 cm130,400.00362,512.000.0150Perekat (G.14)912,303.0013,684.551.5000Upah Kerja (Supl.IV)99,775.00149,662.50Jumlah525,859.05di bulatkan525,859.0074Anl.Supl.V :Untuk Beton Bertulang75Anl.G.411M3 Beton Cor 1:2:36.0000Pekerja52,500.00315,000.000.3000Mandor65,600.0019,680.001.0000Tukang78,800.0078,800.000.1000Kepala Tukang91,900.009,190.000.8300M3Batu Kerikil199,500.00165,585.000.5400M3Pasir Pasang94,500.0051,030.008.5000ZakSemen PC56,000.00476,000.00Jumlah1,115,285.00di bulatkan1,115,285.0076Anl.I.2Mengerjakan (memotong/memasang)110 Kg besi utk beton bertulangUpah :9.0000Pekerja52,500.00472,500.009.0000Tukang78,800.00709,200.003.0000Kepala Tukang91,900.00275,700.001,457,400.00Upah =0.50x1,457,400.00728,700.00Bahan-bahan yang diperlukan :110.0000KgBesi beton15,700.001,727,000.002.0000KgKawat Beton18,300.0036,600.001,763,600.00Jumlah2,492,300.00Tiap-tiap 1M3 Besi bertulang diperlukan 125 Kg besi yaitu :Untuk 1 M31.2500x2,492,300.003,115,375.00di bulatkan3,115,375.0077Anl.F.81 M3 beton bertulang diperlukan 10 M2 papan belkisting1 M2 upah cetakan beton0.2000Pekerja52,500.0010,500.000.0100Mandor65,600.00656.000.5000Tukang78,800.0039,400.000.0500Kepala Tukang91,900.004,595.0055,151.00utk 10 M2 =10x55,151.00551,510.00Bahan-bahan yang diperlukan :4.0000KgPaku biasa18,400.0073,600.000.4000M3kayu sembarangan4,462,500.001,785,000.001,858,600.00Jumlah2,410,110.00di bulatkan2,410,110.00Himpunan Supl.V1.Anl.G.41.1,115,285.002.Anl.I.23,115,375.003.Anl.F.82,410,110.00Jumlah6,640,770.0078Anl. Supl.VIII1 M2 Plafond Asbes 1x1 m0.5000Pekerja52,500.0026,250.000.0250Mandor65,600.001,640.001.0000LbrAsbes 1x1 m atrisco12,600.0012,600.000.0200KgPaku biasa18,400.00368.001.0000BhLat Asbes8,100.008,100.00Jumlah48,958.00di bulatkan48,958.0079Anl. Supl.VIIIa1M2 Plafond triplek 4 mm0.5000Pekerja52,500.0026,250.000.0250Mandor65,600.001,640.001.0500M2Triplek 4mm56,400.0059,220.000.0200KgPaku biasa18,400.00368.00Jumlah87,478.00di bulatkan87,478.0080Anl.Taksir (a)1M2 Gypsum rangka partisi metal sistem0.0350Tukang78,800.002,758.000.3500Kepala Tukang91,900.0032,165.001.9000M'Wall stud 64 mm7,900.0015,010.000.4200M'Wall track mead 648,100.003,402.000.4200M'Wall track bottom7,900.003,318.0012.0000BhSekrup fisher4004,800.00Jumlah61,453.00di bulatkan61,453.0081Anl.Taksir (b)1M2 Gypsum board 6 mm (partisi)0.0500Pekerja52,500.002,625.000.1500Tukang78,800.0011,820.000.0250Kepala Tukang91,900.002,297.500.0600LbrKertas pasir2,000.00120.000.2200KgDempul Gypsum11,300.002,486.0012.0000BhScrew5006,000.000.3500LbrGypsum board 6mm65,300.0022,855.00Jumlah48,203.50di bulatkan48,204.0082Anl.Taksir (c)1M2 Gypsum board 9 mm (partisi)0.0500Pekerja52,500.002,625.000.1500Tukang78,800.0011,820.000.0250Kepala Tukang91,900.002,297.500.0600LbrKertas pasir2,000.00120.000.2200KgDempul Gypsum11,300.002,486.0012.1000BhScrew5006,050.000.3500LbrGypsum board 9mm77,900.0027,265.00Jumlah52,663.50di bulatkan52,664.0083Anl.Taksir (d)1M2 Gypsum board 12 mm (partisi)0.0500Pekerja52,500.002,625.000.1500Tukang78,800.0011,820.000.0250Kepala Tukang91,900.002,297.500.0140RolPaper tape62,800.00879.200.0600LbrKertas pasir2,000.00120.000.2200KgDempul Gypsum11,300.002,486.0012.1000BhScrew500.006,050.001.0000LbrGypsum board 12 mm101,600.00101,600.00Jumlah127,877.70di bulatkan127,878.0084Anl.H.81M2 Pasangan atap asbes gelombang0.1000Pekerja52,500.005,250.000.0050Mandor65,600.00328.000.2000Tukang78,800.0015,760.000.0200Kepala Tukang91,900.001,838.000.8700LbrAtap asbes gelombang64,600.0056,202.006.0000BhPaku atap500.003,000.00Jumlah82,378.00di bulatkan82,378.0085Anl.H.5a1M2 Pasangan atap seng BJLS 35 K0.1000Pekerja52,500.005,250.000.0050Mandor65,600.00328.000.2000Tukang78,800.0015,760.000.0200Kepala Tukang91,900.001,838.000.8700LbrSeng BJLS 35 K64,800.0056,376.006.0000BhPaku seng500.003,000.00Jumlah82,552.00di bulatkan82,552.0086Anl.H.8b1M2 Pasangan atap asbes motif genteng0.1000Pekerja52,500.005,250.000.0050Mandor65,600.00328.000.2000Tukang78,800.0015,760.000.0200Kepala Tukang91,900.001,838.001.1000LbrAtap asbes motif genteng36,800.0040,480.004.0000Bhpaku seng500.002,000.00Jumlah65,656.00di bulatkan65,656.0087Anl.H.8c1M2 Pasangan atap asbes genteng Metal Roof0.1000Pekerja52,500.005,250.000.0050Mandor65,600.00328.000.2000Tukang78,800.0015,760.000.0200Kepala Tukang91,900.001,838.001.1000LbrAtap Metal motif genteng131,600.00144,760.004.0000Bhpaku seng500.002,000.00Jumlah169,936.00di bulatkan169,936.0088Anl.H.101M' Rabung Seng BJLS 35 K0.0250Pekerja52,500.001,312.500.0750Tukang78,800.005,910.000.0075Kepala Tukang91,900.00689.251.1000M'Rabung Seng BJLS 35 K39,400.0043,340.004.0000Bhpaku seng500.002,000.00Jumlah53,251.75di bulatkan53,252.0089Anl.H.10a1M' Rabung Genteng0.0400Pekerja52,500.002,100.000.0020Mandor65,600.00131.200.0200Tukang78,800.001,576.000.0020Kepala Tukang91,900.00183.803.5000BhRabung Genteng14,600.0051,100.000.0030Perekat G.16732,004.002,196.01Jumlah57,287.01di bulatkan57,287.0090Anl.H.151M' Talang Patahan Seng 35 K0.2500Pekerja52,500.0013,125.000.0150Mandor65,600.00984.000.4000Tukang78,800.0031,520.000.0400Kepala Tukang91,900.003,676.000.2500LbrSeng Plat 35 K125,500.0031,375.00Ongkos Patri7,900.007,900.00Jumlah88,580.00di bulatkan88,580.0091Anl.H.171M' Talang Datar Seng 35 K bentuk U atau 1/2 lingkaran0.3000Pekerja52,500.0015,750.000.0150Mandor65,600.00984.000.5000Tukang78,800.0039,400.000.0500Kepala Tukang91,900.004,595.000.3000LbrSeng Plat 35 K125,500.0037,650.00Ongkos Patri7,900.007,900.00Jumlah106,279.00di bulatkan106,279.0092Anl.H.181M' Pipa Talang Seng 35 K 10 cm0.0250Pekerja52,500.001,312.500.0110Mandor65,600.00721.600.3750Tukang78,800.0029,550.000.0375Kepala Tukang91,900.003,446.250.2080LbrSeng Plat 35 K125,500.0026,104.00Ongkos Patri7,900.007,900.00Jumlah69,034.35di bulatkan69,034.0093Anl.K.23100 M2 Upah Mengecat5.0000Pekerja52,500.00262,500.000.2500Mandor65,600.0016,400.007.5000Tukang78,800.00591,000.000.7500Kepala Tukang91,900.0068,925.00Jumlah938,825.00Upah utk 1M20.0100938,825.009,388.25di bulatkan9,388.0094Anl.K.23a1M2 Cat Tembok (3xcat)3.0000Upah cat 3 lapis9,388.0028,164.000.4250KgCat tembok20,500.008,712.50Jumlah36,876.50di bulatkan36,877.0095Anl.K.23a11M2 Cat Tembok (2xcat)2.0000Upah cat 2 lapis9,388.0018,776.000.2830KgCat tembok20,500.005,801.50Jumlah24,577.50di bulatkan24,578.0096Anl.K.23b1M2 Cat Kilat /Cat Minyak (3xcat)3.0000Upah cat 3 lapis9,388.0028,164.000.4250KgCat Kilat38,800.0016,490.000.1000LtrTinner12,000.001,200.00Jumlah45,854.00di bulatkan45,854.0097Anl.K.23b11M2 Cat Kilat /Cat Minyak (2xcat)2.0000Upah cat 2 lapis9,388.0018,776.000.2830KgCat Kilat38,800.0010,980.400.1000LtrTinner12,000.001,200.00Jumlah30,956.40di bulatkan30,956.0098Anl.K.23c1M2 Cat Menie (1xcat)1.0000Upah Mengecat9,388.009,388.000.1416KgCat Menie27,800.003,936.48Jumlah13,324.48di bulatkan13,324.0099Anl.K.23d1M2 Cat Vernis (3xcat)3.0000Upah Cat 3 Lapis9,388.0028,164.000.4250KgCat Vernis52,500.0022,312.50Jumlah50,476.50di bulatkan50,477.00100Anl.K.23d11M2 Cat Vernis (2xcat)2.0000Upah Cat 2 Lapis9,388.0018,776.000.2830KgCat Vernis52,500.0014,857.50Jumlah33,633.50di bulatkan33,634.00101Anl.K.23e1M2 Cat Sending (3xcat)3.0000Upah Cat 3 Lapis9,388.0028,164.000.4250KgCat Sending59,200.0025,160.000.1000LtrTinner12,000.001,200.00Jumlah54,524.00di bulatkan54,524.00102Anl.K.23f1M2 Cat Melamix (3xcat)3.0000Upah Cat 3 Lapis9,388.0028,164.000.4250KgCat Melamix64,500.0027,412.500.1000LtrTinner12,000.001,200.00Jumlah56,776.50di bulatkan56,777.00103Anl.L.4Membongkar 1 M3 dinding tembok yang tipis berikut membersihkan batas-batasnya2.0000Pekerja52,500.001050000.1000Mandor65,600.006,560.00Jumlah111,560.00di bulatkan111,560.00104Anl.L.5Membongkar 1 M2 Lantai lama berikut membersihkannya0.1000Pekerja52,500.0052500.0100Mandor65,600.00656.00Jumlah5,906.00di bulatkan5,906.00105Anl.L.6Mengupas plesteran tiap 1 M20.2000Pekerja52,500.00105000.0025Mandor65,600.00164.00Jumlah10,664.00di bulatkan10,664.00107Anl.L.7Menurunkan 1M2 atap genteng/sirap (jika dipakai kembali)0.2000Pekerja52,500.00105000.0100Mandor65,600.00656.00Jumlah11,156.00di bulatkan11,156.00Jika bongkaran tidak dipakai lagi dihitung 1/2dari analisa L.7108Anl.L.8Menurunkan 1M2 Atap Seng0.0500Pekerja52,500.0026250.0100Mandor65,600.00656.00Jumlah3,281.00di bulatkan3,281.00109Anl.L.9Menurunkan 1M2 Rangka atap dari kayu0.2000Pekerja52,500.0010,500.000.0050Mandor65,600.00328.000.0250Tukang78,800.001,970.000.0025Kepala Tukang91,900.00229.75Jumlah13,027.75di bulatkan13,028.00Jika bongkaran tidak dipakai lagi tukang dan kepala tukang dapat diabaikan110Anl.L.11Membongkar 1 M2 loteng,dinding luar,lantai jembatan(dari kayu)bagian atas,bawah dihitung terpisah0.2000Pekerja52,500.0010,500.000.0100Mandor65,600.00656.000.0600Tukang78,800.004,728.000.0060Kepala Tukang91,900.00551.40Jumlah16,435.40di bulatkan16,435.00111Anl.L.12Membongkar 1 M3 Kuda-kuda,balok loteng,selasar jembatan,dsb(kayu bongkaran dipakai lagi)4.0000Pekerja52,500.00210,000.000.2000Mandor65,600.0013,120.006.0000Tukang78,800.00472,800.000.6000Kepala Tukang91,900.0055,140.00Jumlah751,060.00di bulatkan751,060.00112Anl.W.11 M3 Timbunan pasir timbun untuk dasar badan jalan dan digilas padat0.3750Pekerja52,500.0019,687.500.0190Mandor65,600.001,246.401.2000M3Pasir Urug70,400.0084,480.000.00050.0001Biaya gilas7,862,600.003,931.30Jumlah109,345.20di bulatkan109,345.00113Anl.W.1a1M3 Timbunan Sirtu/kerikil kotor dipadatkan dengan mesin gilas0.3750Pekerja52,500.0019,687.500.0190Mandor65,600.001,246.401.1000M3Pasir Urug70,400.0077,440.000.00050.0001Biaya gilas7,862,600.003,931.30Jumlah102,305.20di bulatkan102,305.00114Anl.W.21M2 Memasang sub base/onderlaag batu kali tebal 15-20 cm padat0.3750Pekerja52,500.0019,687.500.0190Mandor65,600.001,246.400.2000M3Batu kali 15-20 cm136,500.0027,300.000.0500M3Pasir Urug70,400.003,520.000.0001Biaya gilas7,862,600.001,048.35Jumlah52,802.25utk tbl.5 cm0.666752,802.2535,201.50di bulatkan35,201.00115Anl.W.3100 M2 Lapisan Base course/slytlaag batu guli 6 cm dipadatkan7.5000Pekerja52,500.00393,750.000.3750Mandor65,600.0024,600.008.0000M3Batu Kerikil (A)199,500.001,596,000.002.0000M3Pasir Urug70,400.00140,800.000.0267Biaya gilas7,862,600.00209,669.33Jumlah2,364,819.33untuk 1 M20.012,364,819.3323,648.19utk tbl 5 cm0.833323,648.1919,706.83di bulatkan19,707.00116Anl.W.3a100 M2 Lapisan Base course/slytlaag batu pecah tebal 6 cm dipadatkan7.5000Pekerja52,500.00393,750.000.3750Mandor65,600.0024,600.008.0000M3Batu pecah 2-3 cm283,500.002,268,000.002.0000M3Pasir Urug70,400.00140,800.000.0267Biaya gilas7,862,600.00209,669.333,036,819.33untuk 1 M20.01003,036,819.3330,368.19utk tbl 5 cm0.833330,368.1925,306.83di bulatkan25,307.00117Anl.W.4Biaya Menggilas 1 bulan (25)hari25.0000HrSewa mesin gilas50,800.001,270,000.0025.0000HrMasinis63,000.001,575,000.0030.0000HrJaga Malam42,000.001,260,000.00500.0000LtrMinyak Solar5,700.002,850,000.0015.0000LtrMinyak silinder34,100.00511,500.004.0000LtrMinyak Gerdang29,400.00117,600.005.0000KgMinyak Gemuk34,700.00173,500.00Pemeliharaan105,000.00105,000.00Jumlah7,862,600.00di bulatkan7,862,600.00118Anl.W.5100 M2 Mengaspal I jalan dengan aspal 2,5Kg/M2 dan digilas padat10.0000Pekerja52,500.00525,000.000.5000Mandor65,600.0032,800.00250.0000KgAspal AC 60/704,600.001,150,000.004.0000M3Batu pecah 3-5258,300.001,033,200.002.2200M3Batu pecah 2-3283,500.00629,370.001.1100M3Batu pecah 1-2341,300.00378,843.000.7500M3Kayu Api203,200.00152,400.000.5000Tempat memasak aspal20,100.0010,050.000.0013Biaya gilas7,862,600.0010,483.47alat-alat mengaspal63,700.0063,700.00Jumlah3,985,846.47untuk 1M20.0100x3,985,846.4739,858.46di bulatkan39,858.00119Anl.W.7100 M2 Mengaspal II jalan dengan aspal 1,5Kg/M2 dan digilas padat8.0000Pekerja52,500.00420,000.000.4000Mandor65,600.0026,240.00150.0000KgAspal AC 60/704,600.00690,000.001.2000M3Splyt/kepala pasir404,300.00485,160.000.5000M3Kayu Api203,200.00101,600.000.3000Tempat memasak aspal20,100.006,030.000.0013Biaya gilas7,862,600.0010,483.47alat-alat mengaspal63,700.0063,700.00Jumlah1,803,213.47untuk 1 M20.0100x1,803,213.4718,032.13di bulatkan18,032.00120Anl.W5+W.71 M2 Mengaspal Idan II permukaan badan jalan dengan aspal 4 Kg/ M2(2,5 Kg/M2+1,5Kg/M2)2 kali siramW.5Mengaspal I39,858.00W.7Mengaspal II18,032.00Jumlah57,890.00di bulatkan57,890.00Memperbaharui lapisan aspal lama/overpainting121Anl.W.5a100 M2 Mengaspal Ijalan dengan aspal 2 KG/M2 dan digilas padat10.0000Pekerja52,500.00525,000.000.5000Mandor65,600.0032,800.00200.0000KgAspal AC 60/704,600.00920,000.001.2000M3Batu kacang414,800.00497,760.000.6000M3Kayu api203,200.00121,920.000.5000Tempat memasak aspal20,100.0010,050.000.0013Biaya gilas7,862,600.0010,483.47alat-alat mengaspal63,700.0063,700.00Jumlah2,181,713.47untuk 1 M20.0100x2,181,713.4721,817.13di bulatkan21,817.00122Anl.W.7a100 M2 Mengaspal Iijalan dengan aspal 1 Kg/M2 dan digilas padat8.0000Pekerja52,500.00420,000.000.4000Mandor65,600.0026,240.00100.0000KgAspal AC 60/704,600.00460,000.001.2000M3Splyt/kepala pasir404,300.00485,160.000.4000M3Kayu api203,200.0081,280.000.3000Tempat memasak aspal20,100.006,030.000.0013Biaya gilas7,862,600.0010,483.47alat-alat mengaspal63,700.0063,700.00Jumlah1,552,893.47untuk 1 M20.0100x1,552,893.4715,528.93di bulatkan15,529.00123Anl.W5a+W.7aUntuk mengaspal Idan II jalan dengan aspal 3 Kg/M22x siram (memperbaharui lapisan aspal lama/overpainting)W.5aMengaspal I21,817.00W.7aMengaspal II15,529.00Jumlah37,346.00Memperbaharui lapisan aspal lama/overpaintingdi bulatkan37,346.00

Sheet3No.AnalisaPekerjaanHarga1Anl.A.11 M3 Galian tanah41,015.002Anl.1/4.A.11 M3 Urugan kembali galian tanah10,254.003Anl.A.21 M3 Galian tanah keras54,665.004Anl.A.61 M3 Angkut tanah Max.30 M'17,981.005Anl.A.131 M3 Pasir urug100,886.006Anl.A.18.a1 M3 Urugan tanah98,366.007Anl.A.18.b1 M3 Urugan sirtu161,306.008Anl.F.11 M3 Gantungan / Rangka Plafond7,048,765.009Anl.F.1.a1 M2 Piyan Papan Rider (STRIP)310,238.0010Anl.F.161 M2 Rangka atap (pasang usuk dan reng utk atap genteng dan sirap101,923.0011Anl.F.16.a1 M2 Rangka atap genteng biasa /genteng semen (pasang usuk,reng dan gording)160,754.0012Anl.F.191 M2 Rangka atap seng dan Asbes Gelombang Kayu74,170.0013Anl.F.19.a1 M2 Rngja atap genteng metal dan Genteng asbes kayu83,013.0014Anl.F.211 M2 Lypstplank339,541.0015Anl.F.221 M3 Konstruksi kayu kuda - kuda12,456,210.0016Anl.F.271 M3 Kozen pintu / jendela tanpa jalusi13,095,710.0017Anl.F.27a1 M3 Kozen pintu / jendela dengan jalusi13,356,529.0018Anl.F.281 M3 Kozen yang berlobang cahaya berbentuk busur13,415,460.0019Anl.F.331 M2 Pintu / jendela panel847,973.0020Anl.F.301 M2 Daun pintu triplek 4 mm double414,275.0021Anl.F.30a1 M2 Daun pintu triplek sungkai double rangka kayu meranti :472,918.0022Anl.F.341 M2 Pintu / jendela jalusi1,116,007.0023Anl.F.361 M2 Pintu / jendela kaca822,731.0024Anl.F.371 M2 Dinding papan dilidah / alur185,578.0025Anl.F.37a1 M2 Dinding papan susun sirih157,530.0026Anl.F.37b1 M2 Dinding triplek 4 mm rangka kayu meranti126,664.0027Anl.F.37c1 M2 Dinding double triplek 4 mm rangka kayu meranti156,845.0028Anl.F.37d1 M2 Dinding double triplek sungkai rangka kayu meranti211,233.0029Anl.F.37e1 M2 Dinding single triplek sungkai rangka kayu meranti159,877.0030Anl.F.601 M' Memasang cerocok kayu laut 1 btg panjang 2,5 MMasuk ke dalam tanah 1,5 - 2 3"-4"488,750.0031Anl.G.21 M3 Lantai kerja batu kosong320,500.0032Anl.G.141 M3 Perekat 1:2912,303.0033Anl.G.161 M3 Perekat 1:3732,004.0034Anl.G31.h1 M3 Pasangan batu belah atau batu kali 1:4767,983.0035Anl.G31.m1 M3 Pasangan batu belah atau batu kali 1:3782,809.0036Anl.G32.h1 M3 Pasangan batu bata 1:41,066,675.0037Anl.G32.m1 M3 Pasangan batu bata 1:2 (Trasraam)1,170,679.0038Anl.G.411 M3 Beton cor 1:2:31,115,285.0039Anl.G.41a1 M3 Beton cor 1 : 1,5 : 2,51,164,622.0040Anl.G.421 M3 Beton cor 1:2:4 dipakai utk lantai ubin,beton yg dicordibawah air,lapisan turap1,033,483.0041Anl.G.431 M3 Beton cor 1:2,5:5975,520.0042Anl.G.441 M3 Beton cor 1:3:5921,973.0043Anl.G.50.h1 M2 Plesteran 1:2 tebal 10 mm (Trasraam)46,584.0044Anl.G.50.h11 M2 Plesteran 1:2 tebal 15 mm (Trasraam)56,523.0045Anl.G50.i1 M2 Plesteran 1:3 tebal 15 mm53,167.0046Anl.G50.k1 M2 Plesteran 1:3 tebal 10mm44,282.0047Anl.G50.q1 M2 Plesteran 1:4 tebal 10mm42,894.0048Anl.G50.q11 M2 Plesteran 1:4 tebal 15mm51,002.0049Anl.G.601 M2 Memasang Coneblock127,620.0050Anl.G.671 M2 Lantai beton tebal 7 cm.1:3:6 diplester tebal 6 mm95,626.0051Anl.G.681 M' Pasang Plint Tegel PC.10x30 cm41,144.0052Anl.G.68a1 M' Pasang Plint Keramik 15x30 cm48,697.0053Anl.G.68b1 M' Pasang Plint Keramik 15x40 cm55,727.0054Anl.G.68c1 M' Pasang Plint Granito 15x40 cm103,927.0055Anl.G.68d1 M' Pasang Plint Keramik Essenza 15x40 cm108,772.0056Anl.G.721 M2 Lantai Keramik Uk.10x20 cm139,103.0057Anl.G.72a1 M2 Lantai Keramik Uk.20x20 cm136,603.0058Anl.G.72b1 M2 Lantai Keramik Uk.30x30 cm136,874.0059Anl.G.72c1 M2 Pasang Lantai Keramik 40x40 cm142,854.0060Anl.G.72d1 M2 Pasang Lantai Keramik Essenza 40x40 cm369,090.0061Anl.G.72e1 M2 Pasang Lantai Keramik Essenza 60x60 cm464,660.0062Anl.G.72f1 M2 Lantai Granito Uk. 30x30 cm341,300.0063Anl.G.72g1 M2 Pasang Lantai Granito 40x40 cm347,210.0064Anl.G.72h1 M2 Pasang Lantai Granito 60x60 cm444,090.0065Anl.Supl.IV1 M2 Pas.Keramik dinding Uk.10x20 cm183,460.0066Anl.Supl.Iva1 M2 Pas.Keramik dinding Uk.20x20 cm180,960.0067Anl.Supl.Ivb1 M2 Pas.Keramik dinding Uk.20x25 cm183,460.0068Anl.Supl.Ivc1 M2 Pas.Keramik dinding Uk.30x30 cm181,231.0069Anl.Supl.Ivd1 M2 Pas.Keramik dinding Uk.40x40 cm187,210.0070Anl.Supl.Ive1 M2 Pas.Keramik dinding Essenza Uk.40x40 cm432,153.0071Anl.Supl.Ivf1 M2 Pas.Keramik dinding Essenza Uk.60x60 cm546,431.0072Anl.Supl.Ivg1 M2 Pas.Keramik dinding Granito Uk.40x40 cm410,278.0073Anl.Supl.Ivh1 M2 Pas.Keramik dinding Granito Uk.60x60 cm525,859.0074Supl.VUntuk beton bertulang6,640,770.0075Anl.G.411 M3 Beton cor 1:2:31,115,285.0076Anl.I.2Mengerjakan (memotong/memasang)110 kg besi untuk beton bertulang3,115,375.0077Anl.F.81 M3 beton bertulang diperlukan 10 M2 papan bekisting2,410,110.0078Anl.Supl.VIII1 M2 Plafond Asbes 1x1 m48,958.0079Anl.Supl.VIIIa1 M2 Plafond triplek 4 mm87,478.0080Anl.Taksir (a)1 M2 Gypsum Rangka Partisi Metal Sistem61,453.0081Anl.Taksir (b)1 M2 Gypsum board 6 mm (partisi)48,204.0082Anl.Taksir (c)1 M2 Gypsum board 9 mm (partisi)52,664.0083Anl.Taksir (d)1 M2 Gypsum board 12 mm (partisi)127,878.0084Anl.Taksir (e)1 M2 Frame Celling Concealed74,603.0085Anl.Taksir (f)1 M2 Frame Celling Exposed61,304.0086Anl.Taksir (g)1 M2 Celling Gypsum Board 6 mm (standard)55,528.0087Anl.Taksir (h)1 M2 Celling Gypsum Board 9 mm (standard)59,938.0088Anl.H.21 M2 Pasangan Atap Genteng beton warna91,455.0089Anl.H.2a1 M2 Pasangan Atap Genteng Keramik199,755.0090Anl.H.81 M2 Pasangan Atap Asbes Gelombang82,378.0091Anl.H.8a1 M2 Pasangan Atap Seng BJLS 35 K82,552.0092Anl.H.8b1 M2 Pasangan Atap Asbes Motif Genteng65,656.0093Anl.H.8c1 M2 Pasangan Atap Genteng Metal Roof169,936.0094Anl.H.101 M' Rabung seng BJLS 35 K53,252.0095Anl.H.10a1 M' Rabung Genteng57,287.0096Anl.H.151 M' Talang Patahan Seng 35 K88,580.0097Anl.H.171 M' Talang Datar seng 35 K bentuk1/2 lingkaran106,279.0098Anl.H.181 M' Pipa Talang Seng 35 K10 cm69,034.0099Anl.K.23100 M2 Upah Mengecat9,388.00100Anl.K.23a1 M2 Cat Tembok (3 x cat)36,877.00101Anl.K.23a11 M2 Cat Tembok (2 x cat)24,578.00102Anl.K.23b1 M2 Cat Kilat (3 x cat)45,854.00103Anl.K.23b11 M2 Cat Kilat (2 x cat)30,956.00104Anl.K.23c1 M2 Cat Menie (1 x cat)13,324.00105Anl.K.23d1 M2 Cat Vernis (3 x cat)50,477.00106Anl.K.23d11 M2 Cat Vernis (2 x cat)33,634.00107Anl.K.23e1 M2 Cat Sending (3 x cat)54,524.00108Anl.K.23f1 M2 Cat Melamix (3 x cat)56,777.00109Anl.L.4Membongkar 1 M3 Lantai Lama berikut membersihkanbatas - batasnya111,560.00110Anl.L.5Membongkar 1 M2Lantai Lama berikut membersihkannya5,906.00111Anl.L.6Mengupas plesteran tiap 1 M210,664.00112Anl.L.7Menurunkan 1 M2 atap genteng / sirap (jika dipakai kembali)11,156.00113Anl.L.8Menurunkan 1 M2 atap seng3,281.00114Anl.L.9Menurunkan Rangka Atap dari kayu13,028.00115Anl.L.11Membongkar 1M2 loteng,dinding luar,lantai jembatan (dari kayu)bagianatas dihitung terpisah16,435.00116Anl.L.12Maembongkar 1 M3 Kuda - kuda,balok loteng,selasar jembatan dsb(kayubongkaran dipakai lagi)751,060.00117Anl.W.11 M3 Timbunan pasir timbun untuk dasar badan jalan dan digilas padat109,345.00118Anl.W.1a1 M3 Timbunan sirtu / kerikilkotor dipadatkan dengan mesin gilas102,305.00119Anl.W.21 M2 Memasang sub base / onderlaag batu kali tebal 15-20 cm padat35,201.00120Anl.W.3100 M2 Lapisan Base Course / stylaag batu guli 6 cm dipadatkan19,707.00121Anl.W.3a100 M2 Lapisan Base Course / stylaag batu pecah 6 cm dipadatkan25,307.00122Anl.W.4Biaya menggilas 1 bulan (25 hari)7,862,600.00123Anl.W.5100 M2 Mengaspal I jalan dengan aspal 2,5 kg / M2 dan digilas padat39,858.00124Anl.W.7100 M2 Mengaspal II jalan dengan aspal 1,5 kg / M2 dan digilas padat18,032.00125Anl.W5+W.71 M2 Mengaspal I dan II permukaan badan jalan dengan aspal 4 kg / M257,890.00126Anl.W.5a100 M2 Mengaspal I jalan dengan aspal 2 kg / M2 dan digilas padat21,817.00127Anl.W.7a100 M2 Mengaspal II jalan dengan aspal 1 kg / M2 dan digilas padat15,529.00128Anl.W5a+W.7aUntuk 1 M2 mengaspal I dan II jaln dengan aspal 3 kg / M237,346.00