CURRICULUM VITAE FERY CAHYONO PERSONAL PARTICULAR : Gender : Male Place / Birth of date : Bogor / September 10 th , 1980 Religion : Catholic Marital Status : Married Healthy : Excellent Address : Jl. Bukit Dalam III No 8 BNR 16141, Bogor, Jawa Barat. Mobile phone number : 0818184400 E – Mail : [email protected] Educational Background : Trisakti University, Jakarta, Faculty of Industry Technology, Majoring in Mechanical Engineering. PROFESINAL EXPERIENCE : 1. PT.ATLAS RESOUCES Tbk. Head Office Date of employment : 14 February 2011 – Present Line of Business : Coal mining Company Beginning Position : Mechanical Engineering Last Position : Mechanical Engineering Report to : Engineering Department head Key Responsibility : - Preparing back up calculation for new project, especially for material handling, - Preparing material take off for coal handling facility, - Review Drawing from vendor, site inspection to vendor, - Monitoring vendor when construction, - Preparing data specification to procurement, Phone number : (0251) 8311103

Transcript of CV - Fery Cahyono - Completed-1

CURRICULUM VITAE

FERY CAHYONO

PERSONAL PARTICULAR : Gender : Male

Place / Birth of date : Bogor / September 10 th, 1980

Religion : Catholic

Marital Status : Married

Healthy : Excellent

Address : Jl. Bukit Dalam III No 8 BNR 16141,

Bogor, Jawa Barat.

Mobile phone number : 0818184400

E – Mail : [email protected]

Educational Background : Trisakti University, Jakarta, Faculty of Industry

Technology, Majoring in Mechanical Engineering.

PROFESINAL EXPERIENCE : 1. PT.ATLAS RESOUCES Tbk.

Head Office

Date of employment : 14 February 2011 – Present

Line of Business : Coal mining Company

Beginning Position : Mechanical Engineering

Last Position : Mechanical Engineering

Report to : Engineering Department head

Key Responsibility :

- Preparing back up calculation for new project, especially for material handling,

- Preparing material take off for coal handling facility,

- Review Drawing from vendor, site inspection to vendor,

- Monitoring vendor when construction,

- Preparing data specification to procurement,

Phone number : (0251) 8311103

2. PT.CONROMATION ENERGY SERVICES

Head Office

Date of employment : 20 December 2006 – 10 February 2011

Line of Business : Mining Consultant

Beginning Position : Mechanical Engineering

Last Position : Mechanical Engineering

Report to : Engineering Manager

Key Responsibility :

- Preparing back up calculation for new project, especially for material handling,

- Preparing material take off for coal handling facility,

- Review Design Drawing, Optimize design and make shop drawing.

- Preparing data for feasibility study ,

- Preparing data specification,

2. PT.SARANA SOLUSINDO INFORMATIKA

Head Office

Date of employment : 20 May 2005 – 18 December 2006

Line of Business : Software Distributor

Beginning Position : Application Engineering

Last Position : Application Engineering

Report to : Senior Application Engineer

Key Responsibility :

- Support Sales engineer when visit to customer,

- Support customer Troubleshooting,

- Conduct training to Customer.

- Conduct Presentation to customer for update knowledge.

PROJECT INVOLVED

1. Silverstrine (FMCA) – As Design 3D Modeling for cruise interior and prepare

detail drawing for fabricated.

2. Haju Coal Handling (BHP) – As Mechanical Designer for Muara Tuhup & Teluk

Timbau, including make detailing design for Coal Equipment & Plate Work, such as

Head End Chute, Feed Chute, Sizer, Drive Support, etc and prepare fabricated

drawing and prepare material take of.

3. Maruwai Stage I (BHP) – As Mechanical Engineer and Mechanical Designer for

infrastructure building design, such as design Power Station Unit, Weekly Tank,

Pump House Layout, fire water calculation for all facilities, prepare data sheet for

vendor, prepare calculation report and inspection and test plan to vendor.

4. Maruwai Stage II (BHP) As Mechanical Engineer for Material handling in

Lampunut Muara Tuhup & Teluk Timbau,make calculation report and MTO.

5. Bengalon Upgrade Coal Terminal (KPC Lubuk Tutung) As Mechanical Engineer

for material handling including pulley calculation and report, conveyor calculation and

report, chute design and flow analysis, review design drawing etc.

6. Feasibility Study for PT Suprabakti Mapamindo Mandiri - material handling design

and calculation for port site and main site including prepare MTO.

7. Siana Gold Project Philippine (RED) - as mechanical engineer for material

handling and grinding equipment including review drawing and report preparation.

8. Runruno Gold Project Phillipine (FCF Minerals) - as mechanical engineer for

material handling.

9. Muba Project – Port Area (Atlas Resources) - Prepare Design and Calculation for

9MTPA Coal Handling Facility, prepare Technical Bid Evaluation for vendor, Material

Take Off for Coal Handling.

10. DKB Project (Atlas Resources) - Development design for Crushing Area (CPP),

Mess Development Design for Mess Facility and prepare MTO for all facility.

11. KBA Project (Atlas Resources) – Development design for existing plant on mine

and port area, mess facility area.

12.MKM Project (Atlas Resources) – Quarry facility.

13. Muba Project –Port and Mine Area (Atlas Resources) - Prepare Design and

Calculation for 20 MTPA Coal Handling Facility, prepare Technical Bid Evaluation for

vendor, Material Take Off for Coal Handling.

Here are some examples of visualization from Autodesk Inventor softwere,

1. Transfer Station without structure

2. Pump House