1/26 RENCANA ANGGARAN BIAYA (RAB) WISMP KOMPONEN - A DINAS PENGAIRAN ACEH No Kegiatan Volume Harga Dana APBD Jumlah Satuan (Rp) Loan (Rp) (Rp) 1 2 3 4 5 6 7 A. 1.1.3 - 269,515,000 269,515,000 A. 1.1.3.3 - 269,515,000 269,515,000 521119 Belanja Barang Operasional lainnya - 2,870,000 2,870,000 - Biaya konsumsi Rapat Tim Kecil (8 orang x 2 ka 16 pkt 35,000 - 560,000 560,000 - Biaya konsumsi Rapat Dewan SDA (33 org x 2 kal 66 pkt 35,000 - 2,310,000 2,310,000 521213 Honor yang Terkait dengan Output Kegiatan - 125,800,000 125,800,000 Honor Panitia Penyelenggara Sidang - Penanggung jawab (1 Orang x 4 kali) 4 OK 500,000 - 2,000,000 2,000,000 - Ketua Tim (1 orang x 4 kali) 4 OK 400,000 - 1,600,000 1,600,000 - sekretaris(1 orang x 4 kali) 4 OK 300,000 - 1,200,000 1,200,000 - Anggota (5 orang x 4 kali) 20 OK 250,000 - 5,000,000 5,000,000 - Uang sidang/Anggota Dewan SDA (25 Orang 400 OK 240,000 - 96,000,000 96,000,000 x 4 jam x 4 kali) - Nara Sumber (2 Orang x 2 Bulan) 4 OB 5,000,000 - 20,000,000 20,000,000 523129 Belanja Biaya Pemeliharaan Peralatan dan - 2,645,000 2,645,000 Mesin lainnya - Telepon 1 Thn 500,000 - 500,000 500,000 - Komputer Supply 1 Thn 745,000 - 745,000 745,000 - Dokumen, Laporan, penggandaan dan lain-lain 1 Thn 1,000,000 - 1,000,000 1,000,000 - Ac Split 1 Thn 400,000 - 400,000 400,000 524119 Belanja Perjalanan Lainnya - 43,200,000 43,200,000 - Perjalanan dalam daerah Perjalanan anggota dewan utk sidang, Lapangan - 24 pp 200,000 - 4,800,000 4,800,000 - Uang harian(12 orang x 3 hari x 2 kali) 72 oh 300,000 - 21,600,000 21,600,000 - 48 oh 350,000 - 16,800,000 16,800,000 532111 Belanja Modal Peralatan dan Mesin - 95,000,000 95,000,000 - Printer Laser Jet 1 Unit 5,000,000 - 5,000,000 5,000,000 - Scanner A3 1 Unit 30,000,000 - 30,000,000 30,000,000 - Kendaraan Operasional Roda 2 3 Unit 20,000,000 - 60,000,000 60,000,000 Total - 269,515,000 269,515,000 Batam, Agustus 2009 a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH PPK BALAI KRUENG ACEH - TEUNOM AMIR HAMZAH, ST NIP. 19701212 199303 1 003 Paralel Finance (Rp) Wadah Koordinasi Pengelolaan Sumber Daya Air di tingkat Provinsi Dukungan finansial langsung bagi beroperasinya sekretariat dan Wadah Koordinasi Sumber Daya Air Tiket dari Daerah ke Banda Aceh, ke Lapangan(12 org, 2 kali) Biaya Penginapan(12 orang x 2 hari x 2 kali)

Transcript of Copy of RAB

1/14

RENCANA ANGGARAN BIAYA (RAB)

WISMP KOMPONEN - A

DINAS PENGAIRAN ACEH

No Kegiatan Volume Harga Dana APBD Jumlah

Satuan (Rp) Loan (Rp) (Rp)

1 2 3 4 5 6 7

A. 1.1.3 - ### 269,515,000

A. 1.1.3.3 - ### 269,515,000

521119 Belanja Barang Operasional lainnya - 2,870,000 2,870,000 - Biaya konsumsi Rapat Tim Kecil (8 orang x 2 k 16 pkt 35,000 - 560,000 560,000 - Biaya konsumsi Rapat Dewan SDA (33 org x 2 66 pkt 35,000 - 2,310,000 2,310,000

521213 Honor yang Terkait dengan Output Kegiatan - 125,800,000 125,800,000 Honor Panitia Penyelenggara Sidang- Penanggung jawab (1 Orang x 4 kali) 4 OK 500,000 - 2,000,000 2,000,000 - Ketua Tim (1 orang x 4 kali) 4 OK 400,000 - 1,600,000 1,600,000 - sekretaris(1 orang x 4 kali) 4 OK 300,000 - 1,200,000 1,200,000 - Anggota (5 orang x 4 kali) 20 OK 250,000 - 5,000,000 5,000,000 - Uang sidang/Anggota Dewan SDA (25 Orang 400 OK 240,000 - 96,000,000 96,000,000

x 4 jam x 4 kali)- Nara Sumber (2 Orang x 2 Bulan) 4 OB 5,000,000 - 20,000,000 20,000,000

523129 Belanja Biaya Pemeliharaan Peralatan d - 2,645,000 2,645,000 Mesin lainnya- Telepon 1 Thn 500,000 - 500,000 500,000 - Komputer Supply 1 Thn 745,000 - 745,000 745,000 - Dokumen, Laporan, penggandaan dan lain-lai 1 Thn 1,000,000 - 1,000,000 1,000,000 - Ac Split 1 Thn 400,000 - 400,000 400,000

524119 Belanja Perjalanan Lainnya - 43,200,000 43,200,000 - Perjalanan dalam daerahPerjalanan anggota dewan utk sidang, Lapangan

-24 pp 200,000 - 4,800,000 4,800,000

- Uang harian(12 orang x 3 hari x 2 kali) 72 oh 300,000 - 21,600,000 21,600,000 - 48 oh 350,000 - 16,800,000 16,800,000

532111 Belanja Modal Peralatan dan Mesin - 95,000,000 95,000,000 - Printer Laser Jet 1 Unit 5,000,000 - 5,000,000 5,000,000 - Scanner A3 1 Unit 30,000,000 - 30,000,000 30,000,000 - Kendaraan Operasional Roda 2 3 Unit 20,000,000 - 60,000,000 60,000,000

Total - ### 269,515,000

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Paralel Finance (Rp)

Wadah Koordinasi Pengelolaan Sumber Daya Air di tingkat Provinsi

Dukungan finansial langsung bagi beroperasinya sekretariat dan Wadah Koordinasi Sumber Daya Air

Tiket dari Daerah ke Banda Aceh, ke Lapangan(12 org, 2 kali)

Biaya Penginapan(12 orang x 2 hari x 2 kali)

2/14

RENCANA ANGGARAN BIAYA (RAB)

WISMP KOMPONEN - A

DINAS PENGAIRAN ACEH

No Kegiatan Volume Harga Dana APBD Jumlah

Satuan (Rp) Loan (Rp) (Rp)

1 2 3 4 5 6 7

A. 1.1.4 45,300,000 - 45,300,000

A. 1.1.4.2 45,300,000 - 45,300,000

521211 Belanja Bahan 2,500,000 - 2,500,000 - Laporan dll 1 ls 2,500,000 2,500,000 2,500,000

524119 Belanja Perjalanan Lainnya 42,800,000 - 42,800,000 - Perjalanan dalam daerah

Perjalanan ke Provinsi lainnya

[ 2 orang @ 1 kali]Tiket(2 orang x 1 kali) 2 pp 3,800,000 7,600,000 7,600,000

Uang harian(2 orang x 5 hari x 1 kali) 10 oh 450,000 4,500,000 4,500,000 8 oh 470,000 3,760,000 3,760,000

- Perjalanan dalam daerahACEH BESAR (Lanjutan)1 tim(3 orang), 2 kali @ 4 hari- Tiket 3 orang, 2 kali 6 pp 50,000 300,000 300,000 - Uang harian(3 orang x 4 hari x 2 kali) 24 oh 200,000 4,800,000 4,800,000 - 18 oh 365,000 6,570,000 6,570,000

ACEH JAYA (Lanjutan)1 tim(3 orang), 2 kali @ 4 hari- Tiket 3 orang, 2 kali 6 pp 250,000 1,500,000 1,500,000 - Uang harian(3 orang x 4 hari x 2 kali) 24 oh 300,000 7,200,000 7,200,000 - 18 oh 365,000 6,570,000 6,570,000

Total 45,300,000 - 45,300,000

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Paralel Finance (Rp)

Sistim Informasi Manajemen(SIM) Pengelolaan Smber Daya Air Prov. NAD

Pengumpulan data, analisis, transmisi dan evaluasi

Biaya Penginapan(2 orang x 4 hari x 1 kali)

Biaya Penginapan(3 orang x 3 hari x 2 kali)

Biaya Penginapan(3 orang x 3 hari x 2 kali)

3/14

RENCANA ANGGARAN BIAYA (RAB)

WISMP KOMPONEN - A

DINAS PENGAIRAN ACEH

No Kegiatan Volume Harga Dana APBD Jumlah

Satuan (Rp) Loan (Rp) (Rp)

1 2 3 4 5 6 7

A. 2.1.2 79,300,000 34,000,000 113,300,000

A. 2.1.2.4 79,300,000 - 79,300,000

524119 Belanja Perjalanan Lainnya 79,300,000 - 79,300,000

[ 10 orang @ 1 kali]Tiket(10 orang x 1 kali) 10 pp 3,800,000 38,000,000 38,000,000

Uang harian(10 orang x 5 hari x 1 kali) 50 oh 450,000 22,500,000 22,500,000 40 oh 470,000 18,800,000 18,800,000

A. 2.1.2.5 Penyediaan Prasarana bagi organisasi - 34,000,000 34,000,000

535121 - 34,000,000 34,000,000

- Pemeliharaan Kendaraan roda 4 (1 tahun) 2 unit 17,000,000 - 34,000,000 34,000,000

Total 79,300,000 34,000,000 113,300,000

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Paralel Finance (Rp)

Peningkatan Akuntabilitas Kinerja Dinas SDA Provinsi

Melaksanakan pelatihan tentang tugas dan fungsi(manajemen dan teknis) untuk staf Dinas dan Balai PSDA

Mengikuti Pelatihan yang Diadakan oleh NPIU di Provinsi lain

Biaya Penginapan(10 orang x 4 hari x 1 kali)

Belanja Bahan Pemeliharaan Peralatan dan Mesin yang dikapitalisasi

4/14

RENCANA ANGGARAN BIAYA (RAB)

WISMP KOMPONEN - A

DINAS PENGAIRAN ACEH

No Kegiatan Volume Harga Dana APBD Jumlah

Satuan (Rp) Loan (Rp) (Rp)

1 2 3 4 5 6 7

A. 2.1.4 15,860,000 - 15,860,000

A. 2.1.4.2 15,860,000 - 15,860,000

524119 Belanja Perjalanan Lainnya 15,860,000 - 15,860,000

[ 2 orang @ 1 kali]Tiket(2 orang x 1 kali) 2 pp 3,800,000 7,600,000 7,600,000

Uang harian(2 orang x 5 hari x 1 kali) 10 oh 450,000 4,500,000 4,500,000 8 oh 470,000 3,760,000 3,760,000

Total 15,860,000 - 15,860,000

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Paralel Finance (Rp)

Jaminan Mutu(QA) Instansi Pengelola Sumber Daya Air Provinsi

Pelatihan bagi staf Dinas PUP/SDA yang belum pernah mengikuti pelatihan termasuk penggandaan modul yang telah disusun oleh unit Jaminan Mutu Ditjen SDA

Mengikuti Pelatihan yang Diadakan oleh NPIU di Provinsi lain

Biaya Penginapan(2 orang x 4 hari x 1 kali)

Hal. 5/14

RENCANA ANGGARAN BIAYA (RAB)WISMP KOMPONEN - A

BALAI KRUENG PEUSANGAN

NO KEGIATAN VOLUME

HARGA Dana APBD Jumlah

SATUAN (RP) Loan (Rp.) Paralel Finance (Rp.)

(Rp.)

1 2 3 4 5 6 7

A. 2.1 58,450,000 39,000,000 97,450,000

523129Belanja Biaya Pemeliharaan Peralatan dan Mesin lainnya - 39,000,000 39,000,000

- Pemeliharaan Kendaraan Roda Empat (1 tahun) 2 Unit 16,500,000 - 33,000,000 33,000,000

- Pemeliharaan Kendaraan Roda Dua (1 tahun) 3 Unit 2,000,000 - 6,000,000 6,000,000

2.1.4 Pelaksanaan jaminan mutu Hidrologi 58,450,000 - 58,450,000

522113 Honor yang Terkait dengan Output Kegiatan 6,450,000 - 6,450,000

- Penanggung jawab(1 orang x 1 kali) 1 ok 400,000 400,000 - 400,000

- Ketua Tim(1 orang x 1 kali) 1 ok 300,000 300,000 - 300,000

- Sekretaris(1 orang x 1 kali) 1 ok 250,000 250,000 - 250,000

- Anggota(5 orang x 1 kali) 5 ok 200,000 1,000,000 - 1,000,000

- Narasumber(3 hari x 2 jp x 3 orang) 18 oj 250,000 4,500,000 - 4,500,000

521119 Belanja Barang Operasional Lainnya 3,450,000 - 3,450,000

- Dokumentasi, Laporan dan lain-lain 1 kali 1,300,000 1,300,000 - 1,300,000

- Biaya konsumsi(20 orang x 3 hari) 60 oh 27,500 1,650,000 - 1,650,000

- Map peserta(20 orang x 1 buah) 20 bh 25,000 500,000 - 500,000

521211 Belanja Bahan 2,500,000 - 2,500,000

- ATK Sekretariat 1 ls 1,000,000 1,000,000 - 1,000,000

- Komputer supply 1 ls 1,000,000 1,000,000 - 1,000,000

- Modul untuk peserta(20 orang x 1 kali) 20 set 25,000 500,000 - 500,000

524119 Belanja Perjalanan Lainnya 46,050,000 - 46,050,000

- PerjalananLuar Daerah

Nara sumber dari Jakarta(3 orang)- Tiket(3 orang x 1 kali) 3 pp 3,800,000 11,400,000 - 11,400,000

- Uang harian(3 orang x 5 hari x 1 kali) 15 oh 300,000 4,500,000 - 4,500,000

- Biaya Penginapan(3 orang x 4 hari) 12 oh 760,000 9,120,000 - 9,120,000 Konsultasi ke Jakarta(2 orang x 1 kali)

- Tiket(3 orang x 1 kali) 3 pp 3,800,000 11,400,000 - 11,400,000

- Uang harian(3 orang x 4 hari x 1 kali) 12 hari 450,000 5,400,000 - 5,400,000

- Biaya Penginapan(3 orang x 3 hari) 9 oh 470,000 4,230,000 - 4,230,000

TOTAL 58,450,000 39,000,000 97,450,000

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Perbaikan Gedung Kantor Balai PSDA (WISMP), Sewa Kendaraan

Hal. 6/14

RENCANA ANGGARAN BIAYA (RAB)WISMP KOMPONEN - A

BALAI KRUENG PEUSANGAN

NO KEGIATAN VOLUME

HARGA Dana APBD Jumlah

SATUAN (RP) Loan (Rp.) Paralel Finance (Rp.)

(Rp.)

1 2 3 4 5 6 7

A. 2.2 140,587,500 - 140,587,500

2.2.5 140,587,500 - 140,587,500

521213 Honor yang Terkait dengan Output Kegiatan 3,450,000 - 3,450,000

- Penanggung Jawab (1 orang x 3 kali) 3 ok 400,000 1,200,000 - 1,200,000

- Ketua Tim (1 orang x 3 kali) 3 ok 300,000 900,000 - 900,000

- Sekretaris (1 orang x 3 kali) 3 ok 250,000 750,000 - 750,000

- Anggota (1 orang x 3 kali) 3 ok 200,000 600,000 - 600,000

521119 Belanja Barang Operasional Lainnya 200,000 - 200,000

- Tali 1 ls 150,000 150,000 - 150,000

- Cat 1 ls 50,000 50,000 - 50,000

521211 Belanja Bahan 3,817,500 - 3,817,500

- ATK 1 ls 1,000,000 1,000,000 - 1,000,000

- Komputer supply 1 ls 707,500 707,500 - 707,500

- Dokumentasi, Laporan dan lain-lain 1 is 1,000,000 1,000,000 - 1,000,000

- Biaya Pengolahan Data 1 ls 1,000,000 1,000,000 - 1,000,000

- Biaya konsumsi rapat (4 orang x 1 kali) 4 pkt 27,500 110,000 - 110,000

522114 Belanja Sewa 7,200,000 - 7,200,000

- Sewa Perahu (6 hari x 6 kali) 36 hari 200,000 7,200,000 - 7,200,000

524119 Belanja Perjalanan Lainnya 125,920,000 - 125,920,000

- Perjalanan dalam daerah

Perjalanan anggota Tim dalam Kab. Bireuen

- Uang harian (4 orang x 3 hari x 3 kali) 36 oh 300,000 10,800,000 - 10,800,000

- Tenaga Lokal/Pembantu (5 orang x 3 hari x 3 kali) 45 oh 100,000 4,500,000 - 4,500,000

- Transportasi Lokal (5 orang x 3 hari x 3 kali) 45 oh 100,000 4,500,000 - 4,500,000

Perjalanan anggota Tim ke Aceh Tengah, Bener Meriah

- Tiket (4 orang x 3 kali) 12 pp 100,000 1,200,000 - 1,200,000

- Uang harian (4 orang x 3 hari x 3 kali) 36 oh 300,000 10,800,000 - 10,800,000

- Biaya Penginapan (4 orang x 2 hari x 3 kali) 24 oh 365,000 8,760,000 - 8,760,000

- Tenaga Lokal/Pembantu (5 orang x 3 hari x 3 kali) 45 oh 100,000 4,500,000 - 4,500,000

- Transportasi Lokal (5 orang x 3 hari x 3 kali) 45 oh 100,000 4,500,000 - 4,500,000

- Perjalanan luar daerah

Pelatihan keahlian

- Tiket (3 orang x 2 kali) 6 pp 3,800,000 22,800,000 - 22,800,000

- Uang harian (3 orang x 3 hari x 2 kali) 36 hari 450,000 16,200,000 - 16,200,000

- Biaya Penginapan (3 orang x 2 hari x 2 kali) 12 oh 470,000 5,640,000 - 5,640,000

- Tiket(2 orang x 2 kali) 4 pp 3,800,000 15,200,000 - 15,200,000

- Uang harian(2 orang x 5 hari x 2 kali) 20 oh 450,000 9,000,000 - 9,000,000

- Biaya Penginapan(2 orang x 4 hari x 2 kali) 16 oh 470,000 7,520,000 - 7,520,000

TOTAL 140,587,500 - 140,587,500

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Pengembangan Sistem Informasi Manajemen (SIM) Pengelolaan SDA Wil. Sungai dan Irigasi Tingkat Wilayah Sungai

Pengumpulan data (Hidrologi, Kualitas Air, Alokasi Air, GIS, RIM, dll)

Mengikuti Pelatihan yang Diadakan oleh NPIU di Provinsi lain, 2 orang, 2 kali

Hal. 7/14

RENCANA ANGGARAN BIAYA (RAB)WISMP KOMPONEN - A

BALAI KRUENG PEUSANGAN

NO KEGIATAN VOLUME

HARGA Dana APBD Jumlah

SATUAN (RP) Loan (Rp.) Paralel Finance (Rp.)

(Rp.)

1 2 3 4 5 6 7

A 2.3 Pengelolaan dan Prasarana SDA Wilayah Sungai 374,200,000 71,680,000 445,880,000

2.3.1 Pengelolaan Hidrologi 374,200,000 71,680,000 445,880,000

2.3.1.3 374,200,000 71,680,000 445,880,000

523119 Belanja Biaya Pemeliharaan Gedung dan Bangunan Lainnya 222,850,000 - 222,850,000 Perbaikan Bangunan Stasiun- Pembangunan Pos AWRL 1 unit 90,000,000 90,000,000 - 90,000,000 - Rehab Pos Duga AWRL 2 unit 16,425,000 32,850,000 - 32,850,000 - Pembangunan Pos ARR 5 unit 20,000,000 100,000,000 - 100,000,000

532111 Belanja Modal Peralatan dan Mesin 151,350,000 - 151,350,000

- Automatic Water Level Recooder (AWLR) 1 unit 70,000,000 70,000,000 - 70,000,000

- ARR 1 unit 30,000,000 30,000,000 - 30,000,000

- Peich Schall 5 unit 270,000 1,350,000 - 1,350,000

- Alat Ukur Topografi (Theodolte, Waterpass, Statif, Bak Ukur) 1 pkt 50,000,000 50,000,000 - 50,000,000

535121 - 9,400,000 9,400,000

- Kertas Grafik ARR Mingguan @ 54 lbr 10 Pak 125,000 - 1,250,000 1,250,000

- Kertas Grafik ARR Bulanan 10 Roll 150,000 - 1,500,000 1,500,000

- Kertas Grafik AWRL Mingguan @ 54 lbr 10 Pak 250,000 - 2,500,000 2,500,000

- Tinta 10 Btl 150,000 - 1,500,000 1,500,000

- UPS 2 Unit 1,200,000 - 2,400,000 2,400,000

- Hardware 1 Set 250,000 - 250,000 250,000

524119 Belanja Perjalanan Lainnya - 62,280,000 62,280,000

- Perjalanan dalam daerah

Perjalanan anggota Tim ke Aceh Tengah, Bener Meriah

- Tiket (6 orang x 6 kali) 36 pp 100,000 - 3,600,000 3,600,000

- Uang harian (6 orang x 3 hari x 6 kali) 108 oh 300,000 - 32,400,000 32,400,000

- Biaya Penginapan (6 orang x 2 hari x 6 kali) 72 oh 365,000 - 26,280,000 26,280,000

TOTAL 374,200,000 71,680,000 445,880,000

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Pelaksanaan rasionalisasi jaringan hidrologi termasuk perbaikan bangunan stasiun, pergantian dan pembelian peralatan hidrologi

Pengadaan Kertas Grafik ARR, kertas Grafik AWRL, Tinta, UPS & hardware

Hal. 8/14

RENCANA ANGGARAN BIAYA (RAB)WISMP KOMPONEN - A

BALAI KRUENG PEUSANGAN

NO KEGIATAN VOLUME

HARGA Dana APBD Jumlah

SATUAN (RP) Loan (Rp.) Paralel Finance (Rp.)

(Rp.)

1 2 3 4 5 6 7

A 4.1 Pemeliharaan Prasarana Sungai 1,550,000 30,157,500 31,707,500

4.1.3 - 1,550,000 1,550,000

522113 Honor yang Terkait dengan Output Kegiatan - 1,550,000 1,550,000

- Penanggung Jawab (1 orang x 1 kali) 1 ok 400,000 - 400,000 400,000

- Ketua Tim (1 orang x 1 kali) 1 ok 300,000 - 300,000 300,000

- Sekretaris (1 orang x 1 kali) 1 ok 250,000 - 250,000 250,000

- Anggota (3 orang x 1 kali) 3 ok 200,000 - 600,000 600,000

4.1.6 Membuat dan meng Update database aset prasarana sungai 1,550,000 - 1,550,000

522113 Honor yang Terkait dengan Output Kegiatan 1,550,000 - 1,550,000

- Penanggung Jawab (1 orang x 1 kali) 1 ok 400,000 400,000 - 400,000

- Ketua Tim (1 orang x 1 kali) 1 ok 300,000 300,000 - 300,000

- Sekretaris (1 orang x 1 kali) 1 ok 250,000 250,000 - 250,000

- Anggota (3 orang x 1 kali) 3 ok 200,000 600,000 - 600,000

4.1.9 - 28,607,500 28,607,500

521213 Honor yang Terkait dengan Output Kegiatan - 4,650,000 4,650,000

- Penanggung Jawab (1 orang x 3 kali) 3 ok 400,000 - 1,200,000 1,200,000

- Ketua Tim (1 orang x 3 kali) 3 ok 300,000 - 900,000 900,000

- Sekretaris (1 orang x 3 kali) 3 ok 250,000 - 750,000 750,000

- Anggota (3 orang x 3 kali) 9 ok 200,000 - 1,800,000 1,800,000

521211 Belanja Bahan - 2,357,500 2,357,500

- ATK 1 ls 500,000 - 500,000 500,000

- Komputer supply 1 ls 500,000 - 500,000 500,000

- Dokumentasi, Laporan dan lain-lain 1 is 1,000,000 - 1,000,000 1,000,000

- Biaya konsumsi rapat (13 orang x 1 kali) 13 pkt 27,500 - 357,500 357,500

524119 Belanja Perjalanan Lainnya - 21,600,000 21,600,000

- Perjalanan dalam daerah

- Uang harian (4 orang x 3 hari x 6 kali) 72 oh 300,000 - 21,600,000 21,600,000

TOTAL 1,550,000 30,157,500 31,707,500

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Memantau pengambilan pasir dan krikil dari badan sungai sesuai dengan peraturan yang berlaku (dana non WISMP)

Inspeksi waduk, danau untuk kebutuhan perbaikan dan pemeliharaan rutin (dana non WISMP)

9/14

RENCANA ANGGARAN BIAYA (RAB)

WISMP KOMPONEN - A

BALAI KRUENG ACEH - TEUNOM

No Kegiatan Volume Harga Dana APBD Jumlah

Satuan (Rp) Loan (Rp) (Rp)

1 2 3 4 5 6 7

A. 2.1 Pengadaan Peralatan 118,650,000 - 118,650,000

5E+05 Belanja Modal Peralatan dan Mesin 35,000,000 - 35,000,000 - Printer A3 1 unit 5,000,000 5,000,000 5,000,000 - Handy Cam 1 unit 6,000,000 6,000,000 6,000,000 - Meja Rapat 1 Set 5,000,000 5,000,000 5,000,000 - Lemari Pustaka 2 Bh 3,000,000 6,000,000 6,000,000 - Meja Komputer 3 Bh 1,000,000 3,000,000 3,000,000 - Modem Internet 3G 1 Unit 2,000,000 2,000,000 2,000,000 - Kamera Digital 1 Unit 3,000,000 3,000,000 3,000,000 - AC 1 unit 5,000,000 5,000,000 5,000,000

A. 2.1.4 83,650,000 - 83,650,000

5E+05 Honor yang Terkait dengan Output Kegiatan 1,950,000 - 1,950,000 - Penanggung jawab(1 orang x 1 kali) 1.00 ok 400,000 400,000 400,000 - Ketua Tim(1 orang x 1 kali) 1.00 ok 300,000 300,000 300,000 - Sekretaris(1 orang x 1 kali) 1.00 ok 250,000 250,000 250,000 - Anggota(5 orang x 1 kali) 5.00 ok 200,000 1,000,000 1,000,000

5E+05 Belanja Jasa Profesi 4,500,000 - 4,500,000

- Narasumber(3 hari x 2 jp x 3 orang) ### oj 250,000 4,500,000 4,500,000

5E+05 Belanja Bahan 7,670,000 - 7,670,000 - ATK Sekretariat 1 ls 1,570,000 1,570,000 1,570,000 - Komputer supply 1 ls 1,000,000 1,000,000 1,000,000 - Modul untuk peserta(20 orang x 1 kali) 20 set 25,000 500,000 500,000 - Dokumentasi, Laporan dan lain-lain 1 kali 2,000,000 2,000,000 2,000,000 - Biaya konsumsi(20 orang x 3 hari) 60 oh 35,000 2,100,000 2,100,000 - Map peserta(20 orang x 1 buah) 20 bh 25,000 500,000 500,000

5E+05 Belanja Perjalanan Lainnya 69,530,000 - 69,530,000 - Perjalanan luar daerah

Nara sumber dari Jakarta(3 orang)- Tiket(3 orang x 1 kali) 3 pp 3,800,000 11,400,000 11,400,000 - Uang harian(3 orang x 5 hari x 1 kali) 15 oh 450,000 6,750,000 6,750,000 - Biaya Penginapan(3 orang x 4 hari) 12 oh 470,000 5,640,000 5,640,000

Konsultasi ke Jakarta(2 orang x 1 kali)- Tiket(2 orang x 1 kali) 2 pp 3,800,000 7,600,000 7,600,000 - Uang harian(2 orang x 4 hari x 1 kali) 8 hari 450,000 3,600,000 3,600,000

Biaya Penginapan(2 orang x 3 hari) 6 oh 470,000 2,820,000 2,820,000

- Tiket(2 orang x 2 kali) 4 pp 3,800,000 15,200,000 15,200,000 - Uang harian(2 orang x 5 hari x 2 kali) 20 oh 450,000 9,000,000 9,000,000 - 16 oh 470,000 7,520,000 7,520,000

Total 118,650,000 - 118,650,000

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Paralel Finance (Rp)

Pelaksanaan Jaminan Mutu GIS/Database

Mengikuti Pelatihan yang Diadakan oleh NPIU di Provinsi lain, 2 orang, 2 kali

Biaya Penginapan(2 orang x 4 hari x 2 kali)

10/14

RENCANA ANGGARAN BIAYA (RAB)

WISMP KOMPONEN - A

BALAI KRUENG ACEH - TEUNOM

No Kegiatan Volume Harga Dana APBD Jumlah

Satuan (Rp) Loan (Rp) (Rp)

1 2 3 4 5 6 7

A. 2.3 660,710,000 26,900,000 687,610,000

A. 2.3.1 Pengelolaan Hidrologi 660,710,000 26,900,000 687,610,000

2.3.1.3 587,110,000 26,900,000 614,010,000

5E+05 Belanja Bahan 5,250,000 - 5,250,000

- Kertas Grafik ARR Mingguan @ 54 lbr ### Pak 125,000 1,250,000 1,250,000 - Kertas Grafik ARR Bulanan ### Roll 150,000 1,500,000 1,500,000 - Kertas Grafik AWLR Mingguan @ 54 lbr ### Pak 250,000 2,500,000 2,500,000

5E+05 223,360,000 - 223,360,000

- Rehab Kantor Balai Kr. Aceh - Teunom 1 Ls 50,000,000 50,000,000 50,000,000 - Rehab Pos AWLR Balai Kr. Aceh - Teunom 4 Unit 17,090,000 68,360,000 68,360,000 - Rehab Pos ARR Balai Kr. Aceh - Teunom 3 Unit 35,000,000 105,000,000 105,000,000

5E+05 - 26,900,000 26,900,000

- Pemeliharaan Kendaraan Roda Empat (1 tahu 1 Unit 20,000,000 - 20,000,000 20,000,000 - Pemeliharaan Kendaraan Roda Dua (1 tahun) 3 Unit 2,300,000 - 6,900,000 6,900,000

5E+05 Belanja Modal Peralatan dan Mesin 358,500,000 - 358,500,000

Pengadaan Alat Ukur

- Current Meter 1 unit 75,000,000 75,000,000 - 75,000,000 - Automatic Rain Recorder (ARR) 2 unit 30,000,000 60,000,000 - 60,000,000 - Automatic Water Level Recooder (AWLR) 3 unit 70,000,000 210,000,000 - 210,000,000 - Peich Schall 50 unit 270,000 13,500,000 - 13,500,000

A. 2.3.1.5 Pelatihan Tentang Pengelolaan Hidrologi 33,600,000 - 33,600,000

5E+05 Belanja Perjalanan Lainnya 33,600,000 - 33,600,000

- Tiket(2 orang x 2 kali) 4 pp 3,800,000 15,200,000 15,200,000 - Uang harian(2 orang x 5 hari x 2 kali) 20 oh 450,000 9,000,000 9,000,000 - 20 oh 470,000 9,400,000 9,400,000

A. 2.3.1.6 40,000,000 - 40,000,000

- Pengadaan Kendaraan Roda Dua 2 unit 20,000,000 40,000,000 - 40,000,000

Total 660,710,000 26,900,000 687,610,000

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST

Paralel Finance (Rp)

Pengelolaan Prasarana Sumber Daya Air

Pelaksanaan rasionalisasi jaringan hidrologi termasuk perbaikan bangunan stasiun, pergantian dan pembelian peralatan hidrologi

Pengadaan Kertas Grafik ARR,Kertas Grafik AWLR, Tinta , UPS, Kertas Folio, Kertas Kwarto & Kertas A3

Belanja Biaya Pemeliharaan Gedung dan Bangunan Lainnya

Belanja Biaya Pemeliharaan Peralatan dan Mesin lainnya

Mengikuti Pelatihan yang Diadakan oleh NPIU, 1 org Balai Kr,Aceh-Teunom [2 org@2kali] ke Provinsi lainnyaWorkshop pedoman rasionalisasi Pos Hidrologi dan Review Pedoman Pemantauan Kualitas Air

Biaya Penginapan(2 orang x 5 hari x 2 kali)

Pengadaan kendaraan lapangan selama APL- I

11/14

No Kegiatan Volume Harga Dana APBD Jumlah

Satuan (Rp) Loan (Rp) (Rp)

1 2 3 4 5 6 7

Paralel Finance (Rp)

NIP. 19701212 199303 1 003

12/14

RENCANA ANGGARAN BIAYA (RAB)

WISMP KOMPONEN - A

BALAI KRUENG ACEH - TEUNOM

No Kegiatan Volume Harga Dana APBD Jumlah

Satuan (Rp) Loan (Rp) (Rp)

1 2 3 4 5 6 7

9 Kegiatan GIS/Database - 160,030,000 160,030,000

9. 1 Kegiatan GIS/Database Rutin (APBD) - 160,030,000 160,030,000

9. 1.c Pengumpulan data sungai dan irigasi - 151,170,000 151,170,000

5E+05 Belanja Bahan - 96,190,000 96,190,000 - Laporan dll 1 ls 1,500,000 - 1,500,000 1,500,000

5E+05 Belanja Perjalanan Lainnya - 54,980,000 54,980,000 - Perjalanan luar daerah (ke Provinsi lainnya)

Tiket(2 orang x 2 kali) 4 pp 3,800,000 - 15,200,000 15,200,000

Uang harian(2 orang x 4 hari x 2 kali) 16 oh 450,000 - 7,200,000 7,200,000 12 oh 470,000 - 5,640,000 5,640,000

- Perjalanan dalam daerahACEH BESAR1 tim(3 orang), 2 kali @ 4 hari- Tiket 3 orang, 2 kali 6 pp 50,000 - 300,000 300,000 - Uang harian(3 orang x 4 hari x 2 kali) 24 oh 200,000 - 4,800,000 4,800,000 - 18 oh 365,000 - 6,570,000 6,570,000

ACEH JAYA1 tim(3 orang), 2 kali @ 4 hari- Tiket 3 orang, 2 kali 6 pp 250,000 - 1,500,000 1,500,000 - Uang harian(3 orang x 4 hari x 2 kali) 24 oh 300,000 - 7,200,000 7,200,000 - 18 oh 365,000 - 6,570,000 6,570,000

9. 1.f Pelaporan / Publikasi - 8,860,000 8,860,000

5E+05 Honor yang Terkait dengan Output Kegiatan - 1,500,000 1,500,000 - Honor Petugas Entry Data 6 ob 250,000 - 1,500,000 1,500,000

5E+05 Belanja Bahan - 7,360,000 7,360,000 - ATK Sekretariat 1 ls 500,000 - 500,000 500,000 - Komputer supply 1 ls 500,000 - 500,000 500,000 - Penyimpan data kapasitas 160GB(harddisk ex 2 bh 1,000,000 - 2,000,000 2,000,000 - Dokumentasi, Cetak buku dan lain-lain 1 ls 1,000,000 - 1,000,000 1,000,000 - Biaya konsumsi rapat(12 orang x 8 kali) 96 pkt 35,000 - 3,360,000 3,360,000

Total - 160,030,000 160,030,000

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Paralel Finance (Rp)

Biaya Penginapan(2 orang x 3 hari x 2 kali)

Biaya Penginapan(3 orang x 3 hari x 2 kali)

Biaya Penginapan(3 orang x 3 hari x 2 kali)

13/14

RENCANA ANGGARAN BIAYA (RAB)

WISMP KOMPONEN - A

BALAI KRUENG ACEH - TEUNOM

No Kegiatan Volume Harga Dana APBD Jumlah

Satuan (Rp) Loan (Rp) (Rp)

1 2 3 4 5 6 7

A. 4.1 Pemeliharaan Prasarana Sungai 8,250,000 - 8,250,000

A. 4.1.1 8,250,000 - 8,250,000

522113 Honor yang Terkait dengan Output Kegiatan 1,550,000 - 1,550,000

- Penanggung Jawab (1 orang x 1 kali) 1 ok 400,000 400,000 - 400,000 - Ketua Tim (1 orang x 1 kali) 1 ok 300,000 300,000 - 300,000 - Sekretaris (1 orang x 1 kali) 1 ok 250,000 250,000 - 250,000 - Anggota (3 orang x 1 kali) 3 ok 200,000 600,000 - 600,000

522115 Belanja Jasa Profesi 2,000,000 - 2,000,000

- Narasumber (1 hari x 8 jam) 8 oj 250,000 2,000,000 - 2,000,000

521211 Belanja Bahan 4,700,000 - 4,700,000

- ATK Sekretariat 1 ls 500,000 500,000 - 500,000 - Komputer supply 1 ls 500,000 500,000 - 500,000 - Modul untuk peserta (20 orang x 3 kali) 60 set 25,000 1,500,000 - 1,500,000 - Dokumentasi, Laporan dan lain-lain 1 kali 1,000,000 1,000,000 - 1,000,000 - Biaya konsumsi rapat (20 orang x 1 kali) 20 pkt 35,000 700,000 - 700,000 - Map peserta (20 orang x 1 buah) 20 set 25,000 500,000 - 500,000

Total 8,250,000 - 8,250,000

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Paralel Finance (Rp)

Sosialisasi Pemeliharaan Rutin / Periodik Termasuk Inventarisasi dan Inspeksi dan Pendataan Prasarana Sungai Untuk Balai

14/14

RENCANA ANGGARAN BIAYA (RAB)

WISMP KOMPONEN - A

BALAI KRUENG ACEH - TEUNOM

No Kegiatan Volume Harga Dana APBD Jumlah

Satuan (Rp) Loan (Rp) (Rp)

1 2 3 4 5 6 7

A. 4.2 29,310,000 - 29,310,000

A. 4.2.1 RIM - B Sub Project 29,310,000 - 29,310,000

A. 4.2.1.3 29,310,000 - 29,310,000

5E+05 Belanja Bahan 5,360,000 - 5,360,000 - ATK Sekretariat 1 ls 500,000 500,000 500,000 - Komputer supply 1 ls 500,000 500,000 500,000 - Dokumentasi, Laporan dan lain-lain 1 ls 1,000,000 1,000,000 1,000,000 - Biaya konsumsi rapat(12 orang x 8 kali) 96 pkt 35,000 3,360,000 3,360,000

5E+05 Belanja Perjalanan Lainnya 23,950,000 - 23,950,000

- Perjalanan dalam daerahWILAYAH DAS Kr. Aceh - Teunom1 tim(5 orang), 2 lokasi @ 4 hari- Tiket(5 org, 2 kali) 10 pp 100,000 1,000,000 1,000,000 - Uang harian(5 orang x 4 hari x 2 lokasi) 40 oh 300,000 12,000,000 12,000,000 - 30 oh 365,000 10,950,000 10,950,000

Total 29,310,000 - 29,310,000

Batam, Agustus 2009

a.n. KEPALA SATUAN KERJA DINAS PENGAIRAN ACEH

PPK BALAI KRUENG ACEH - TEUNOM

AMIR HAMZAH, ST NIP. 19701212 199303 1 003

Paralel Finance (Rp)

Rehabilitasi Prasarana Utama Sungai yang diprioritaskan

Pelaksanaan Kegiatan Survey, Investigasi dan Desain

Biaya Penginapan(5 orang x 3 hari x 2 kali)