101
PT. MITRAMETAL PERKASA KARAWANG KAPASITAS PRODUKSI MACHINING JANUARY 2011. DEPARTEMENT MACHINING & PAINTING NAME OF PRODUCT ITEM CAPACITY / MONTH CAPACITY ACTUAL RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) MORISEIKI 2 UNIT BODY FUEL HINO OP1 3,084,480 50,400 3,034,080 70 7,249 507,430 306 306 918 3 3 100% 57% CL-200 BODY FUEL ISUZU OP 1 3,034,080 70 2,730 191,100 306 306 918 BODY FUEL MITSUBISHI OP 1 70 8,349 584,430 306 306 918 BODY FUEL UTM G2 OP 1 150 2,000 300,000 143 143 428 BODY FUEL UTM G3 OP 1 150 1,000 150,000 143 143 428 HUB REAR DRUM OP2 210 0 0 102 102 306 HUB FRONT DRUM OP2 167 0 0 128 128 385 DRUM REAR SPROCKET OP2 88 0 0 243 243 730 Waktu Produksi 21,328 1,732,960 NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) TOYOSK 4 UNIT BODY FUEL ISUZU OP2 (FG) 6,168,960 75,600 6,168,960 68 2,730 185,640 315 315 945 6 6 100% 99% OIL FILTER 6,093,360 102 0 0 210 210 630 BODY FUEL MITSHUBISHI OP2 148 8,349 1,235,652 145 145 435 BODY FUEL MITSHUBISHI OP3 170 5,500 935,000 126 126 378 HOLDER CLUTCH SUZUKI ( OEM ) 118 0 0 182 182 545 HOLDER CLUTCH SUZUKI (OES ) 118 300 35,400 182 182 545 LEVER CLUTCH SUZUKI 35 0 0 612 612 1,836 LEVER CLUTCH KAWASAKI 25 0 0 857 857 2,570 STOPER CASE 66 5,954 392,964 325 325 974 ELBOW SUCTION 22 1,800 39,600 974 974 2,921 BRACKET 240 226 2,000 452,000 95 95 284 HUB FRONT DISC TVS OP3 60 1,300 78,000 357 357 1,071 HOLDER HANDLE KAWASAKI 88 0 0 243 243 730 FRAME NNN 73507 W OP 2 52 0 0 412 412 1,236 BODY FUEL UTM G1 OP 1 155 2,000 310,000 138 138 415 BODY FUEL UTM G1 OP 2 150 0 0 143 143 428 BODY FUEL UTM G2 OP 2 120 2,000 240,000 179 179 536 BODY FUEL UTM G2 OP 3 158 2,000 316,000 136 136 407 BODY FUEL UTM G3 OP 2 160 1,000 160,000 134 134 402 BODY FUEL UTM G3 OP 3 170 1,000 170,000 126 126 378 BODY FUEL UTM G3 OP 4 210 1,000 210,000 102 102 306 BODY FUEL HINO OP 2 (FG) 189 7,249 1,370,061 113 113 340 PANEL REAR 134 0 160 160 480 Waktu Produksi 44,182 6,130,317 NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ROBODRILL 4 UNIT PANEL REAR TVS 6,168,960 50,400 6,118,560 134 1,800 241,200 160 160 480 6 6 100% 98% for TVS part PANEL FRONT OP 2 6,118,560 194 2,000 388,000 110 110 331 PANEL FRONT OP 3 94 2,000 188,000 228 228 684 COVER MAGNET TVS 209 3,600 752,400 102 102 307 HOLDER CLUTCH KAWASAKI 206 2,236 460,616 104 104 312 HUB FRONT DISC OP3 60 0 357 357 1,071 OUTLET WATER 210 1,800 378,000 102 102 306 HOLDER SUZUKI OEM 118 3,400 401,200 182 182 545 B/F MITSUBISHI OP 3 170 2,849 484,330 126 126 378 COVER LOCK 22 0 0 974 974 2,921 LEVER KAWASAKI 25 3,100 77,500 857 857 2,570 STOPER CASE 66 0 0 325 325 974 BRACKET ASSY 318 2,000 636,000 67 67 202 HOLDER-HANDLE 86 0 0 249 530 1,590 ELBOW SUCTION 22 0 0 974 970 2,921 COVER CLUTCH OP 1 278 2,000 556,000 77 77 231 COVER CLUTCH OP 2 290 2,000 580,000 74 74 222 COVER CLUTCH OP 3 282 2,000 564,000 76 76 228 BRACKER P/240 226 0 0 95 95 284 BODY NNN 73507 W 58 0 0 369 369 1,108 BODY FUEL UTM G2 OP3 100 0 0 214 214 643 B/F UTM G 01 OP 2 150 2,000 300,000 143 143 428 32,785 6,007,246 NAME OF MACHINE MACHINE QUANTITY TIME FOR MAINTENANCE Process Cycle Time (1hariX2measinX2 5 sec) (1hariX2measinX2 5 sec)

description

M

Transcript of Copy of Kapasitas & Cycle Time Stamping 2015

Page 1: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MITRAMETAL PERKASA KARAWANG

KAPASITAS PRODUKSI MACHINING JANUARY 2011.DEPARTEMENT MACHINING & PAINTING

NAME OF PRODUCT ITEMRENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS

PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

MORISEIKI

2 UNIT

BODY FUEL HINO OP1 3,084,480 50,400 3,034,080 70 7,249 507,430 306 306 918

3 3 100% 57%

CL-200 BODY FUEL ISUZU OP 1 3,034,080 70 2,730 191,100 306 306 918

BODY FUEL MITSUBISHI OP 1 70 8,349 584,430 306 306 918

BODY FUEL UTM G2 OP 1 150 2,000 300,000 143 143 428

BODY FUEL UTM G3 OP 1 150 1,000 150,000 143 143 428

HUB REAR DRUM OP2 210 0 0 102 102 306

HUB FRONT DRUM OP2 167 0 0 128 128 385

DRUM REAR SPROCKET OP2 88 0 0 243 243 730

Waktu Produksi 21,328 1,732,960

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK 4 UNIT BODY FUEL ISUZU OP2 (FG) 6,168,960 75,600 6,168,960 68 2,730 185,640 315 315 945

6 6 100% 99%

OIL FILTER 6,093,360 102 0 0 210 210 630

BODY FUEL MITSHUBISHI OP2 148 8,349 1,235,652 145 145 435

BODY FUEL MITSHUBISHI OP3 170 5,500 935,000 126 126 378

HOLDER CLUTCH SUZUKI ( OEM ) 118 0 0 182 182 545

HOLDER CLUTCH SUZUKI (OES ) 118 300 35,400 182 182 545

LEVER CLUTCH SUZUKI 35 0 0 612 612 1,836

LEVER CLUTCH KAWASAKI 25 0 0 857 857 2,570

STOPER CASE 66 5,954 392,964 325 325 974

ELBOW SUCTION 22 1,800 39,600 974 974 2,921

BRACKET 240 226 2,000 452,000 95 95 284

HUB FRONT DISC TVS OP3 60 1,300 78,000 357 357 1,071

HOLDER HANDLE KAWASAKI 88 0 0 243 243 730

FRAME NNN 73507 W OP 2 52 0 0 412 412 1,236

BODY FUEL UTM G1 OP 1 155 2,000 310,000 138 138 415

BODY FUEL UTM G1 OP 2 150 0 0 143 143 428

BODY FUEL UTM G2 OP 2 120 2,000 240,000 179 179 536

BODY FUEL UTM G2 OP 3 158 2,000 316,000 136 136 407

BODY FUEL UTM G3 OP 2 160 1,000 160,000 134 134 402

BODY FUEL UTM G3 OP 3 170 1,000 170,000 126 126 378

BODY FUEL UTM G3 OP 4 210 1,000 210,000 102 102 306

BODY FUEL HINO OP 2 (FG) 189 7,249 1,370,061 113 113 340

PANEL REAR 134 0 160 160 480

Waktu Produksi 44,182 6,130,317

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROBODRILL 4 UNIT PANEL REAR TVS 6,168,960 50,400 6,118,560 134 1,800 241,200 160 160 480

6 6 100% 98%

for TVS part PANEL FRONT OP 2 6,118,560 194 2,000 388,000 110 110 331

PANEL FRONT OP 3 94 2,000 188,000 228 228 684

COVER MAGNET TVS 209 3,600 752,400 102 102 307

HOLDER CLUTCH KAWASAKI 206 2,236 460,616 104 104 312

HUB FRONT DISC OP3 60 0 357 357 1,071

OUTLET WATER 210 1,800 378,000 102 102 306

HOLDER SUZUKI OEM 118 3,400 401,200 182 182 545

B/F MITSUBISHI OP 3 170 2,849 484,330 126 126 378

COVER LOCK 22 0 0 974 974 2,921

LEVER KAWASAKI 25 3,100 77,500 857 857 2,570

STOPER CASE 66 0 0 325 325 974

BRACKET ASSY 318 2,000 636,000 67 67 202

HOLDER-HANDLE 86 0 0 249 530 1,590

ELBOW SUCTION 22 0 0 974 970 2,921

COVER CLUTCH OP 1 278 2,000 556,000 77 77 231

COVER CLUTCH OP 2 290 2,000 580,000 74 74 222

COVER CLUTCH OP 3 282 2,000 564,000 76 76 228

BRACKER P/240 226 0 0 95 95 284

BODY NNN 73507 W 58 0 0 369 369 1,108BODY FUEL UTM G2 OP3 100 0 0 214 214 643B/F UTM G 01 OP 2 150 2,000 300,000 143 143 428

32,785 6,007,246

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

CAPACITY ACTUAL

Process Cycle Time

(1hariX2measinX25 sec)

(1hariX2measinX25 sec)

J59
fajar suseno: TOTAL PO 8349 PCS DIBAGI DNGN TOYOSK
L60
fajar suseno: 8 CAVITY DALAM 1 JIG
L64
suci: 2 CAVITY
L65
suci: 4 CAVITY
Page 2: Copy of Kapasitas & Cycle Time Stamping 2015

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

IXION 3 UNIT Bracket KAWASAKI 3LD (FRONT) 4,626,720 75,600 4,551,120 9 2,300 20,700 2,520 2,520 7,560

9 9 100% 85%

BRACKET KEVJ 4,551,120 9 58,800 529,200 2,520 2,520 7,560

BRACKET XD 551 9 15,050 135,450 2,520 2,520 7,560

BRACKET XA 692/XD 541 9 100 900 2,520 2,520 7,560

BRACKET 21D 9 29,700 267,300 2,520 2,520 7,560

BRACKET KWBA 9 58,500 526,500 2,520 2,520 7,560

BRACKET 4003 OP1 9 2,800 25,200 2,520 2,520 7,560

BRACKET 4003 OP2 (FG) 9 2,800 25,200 2,520 2,520 7,560

BRACKET FR R KWS 9692 9 6,100 54,900 2,520 2,520 7,560

BRACKET KVBM 9 210,000 1,890,000 2,520 2,520 7,560

BRACKET 331D OP1 9 400 3,600 2,520 2,520 7,560

BRACKET 331D OP2 9 400 3,600 2,520 2,520 7,560

BRACKET 331D OP3 9 400 3,600 2,520 2,520 7,560

BRACKET KEHR 9 31,720 285,480 2,520 2,520 7,560

BRACKET XC 601 9 12,300 110,700 2,520 2,520 7,560

Waktu Produksi 431,370 3,882,330

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROTARY 3 UNIT : 4,626,720 75,600 4,551,120 0

3 3 100% 73%(BIG) B/S HND STD KPH 4,551,120 9 365,710 3,327,961 2,492 2,492 7,477

B/S HND STD ENERGY 9 0 2,492 2,492 7,477

0 365,710 3,327,961 0 0 0

B/S SPORT NKKC 1,632,960 25,200 #DIV/0! 15 0 0 1,502 1,502 4,506

0 0 #DIV/0! #DIV/0!ROTARY 1 UNIT : (3 jig) B/S HND KVBA 1,607,760 15 0 0 1,502 1,502 4,506

(SMALL) B/S HND SPORT KEHP 15 0 0 1,502 1,502 4,506

B/S KAWASAKI NKK5 15 0 0 1,502 1,502 4,506

0 0

MILLING 24 UNIT B/S YMH 5BP 38,556,000 655,200 37,900,800 19 0 0 1,194 1,194 3,581

33 33 100% 56%

CUTER PIN 2 UNIT B/S YMH STD 5TP (CY 1 FF) 37,900,800 21 141,400 2,969,400 1,080 1,080 3,240

GRINDING B/S YAMAHA STD ENERGI 19 0 0 1,194 1,194 3,581

B/S HONDA STD ENERGI 20 0 0 1,134 1,134 3,402

B/S HONDA KPH STD ENERGI 19 0 0 1,194 1,194 3,581

B/S KWSK STD NKK5 19 5,200 98,800 1,194 1,194 3,581

B/S KWSK STD NKCS 20 0 0 1,134 1,134 3,402

B/S KWSK SPORT CKR NKK5 19 2,500 47,500 1,194 1,194 3,581

B/S SUZUKI SPT NKCS 19 0 0 1,194 1,194 3,581

B/S SUZUKI SPT NKKC 19 16,000 304,000 1,194 1,194 3,581

B/S SUZUKI STD NKK2 19 46,500 883,500 1,194 1,194 3,581

B/S YAMAHA SPORT 1S7 L 20 63,000 1,260,000 1,134 1,134 3,402

B/S YAMAHA SPORT 1S7 R 20 62,500 1,250,000 1,134 1,134 3,402

B/S YAMAHA SPORT 5MX L 20 242,000 4,840,000 1,134 1,134 3,402

B/S YAMAHA SPORT 5MX R 20 263,700 5,274,000 1,134 1,134 3,402

B/S YAMAHA 3P9-L 19 0 0 1,194 1,194 3,581

B/S YAMAHA 3P9-R 19 0 0 1,194 1,194 3,581

B/S HONDA STD KPH 19 100,000 1,900,000 1,194 1,194 3,581

B/S KWSK NKKB CS1FF 16 0 0 1,418 1,418 4,253

B/S HND SPORT KEHP 21 108,000 2,268,000 1,080 1,080 3,240

0

TOTAL 1,050,800 21,095,200

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

PT . Mitrametal TORQUE NUT ALL TYPE 9,253,440 151,200 9,102,240 24 0 0 893 893 2,678

9 9 100% 62%

TAKAMAZ 6 UNIT TORQUE NUT KEHR 9,102,240 24 50,000 1,200,000 893 893 2,678

PIN A Y89 93 0 0 230 230 691

PIN B Y89 60 0 0 357 357 1,071

PIN BOLT A GEEN LEE 10 0 0 2,078 2,078 6,233

PIN BOLT B ALL TYPE 11 0 0 1,889 1,889 5,667

CAP TAPPET AHM 27 18,800 507,600 793 793 2,380

CAP HOLE AHM 30 51,000 1,530,000 714 714 2,142

Keterangan: Cover clutch di januari masih trial

(1hariX3measinX26 sec)

(1hariX2measinX26 sec)

(1hariXJML MX26 sec)

I128
fajar suseno: TOTAL PO 465710 PSC,DIBAGI 3 ROTARY DAN MILLING
Page 3: Copy of Kapasitas & Cycle Time Stamping 2015

CAP TAPPET ASPIRA 27 27,000 729,000 793 793 2,3809 9 100% 62%

CAP HOLE ASPIRA 30 10,900 327,000 714 714 2,142

CAM BRAKE KTMK OP 1 19 25,000 475,000 1,127 1,127 3,382

CAM BRAKE KTMK OP 2 11 25,000 275,000 1,947 1,947 5,842

CAM BRAKE KPHY / AND OP 1 18 20,000 360,000 1,190 1,190 3,570

CAM BRAKE KPHY / AND OP 2 11 20,000 220,000 1,947 1,947 5,842

247,700 5,623,600

3 3 100% 24%PT . Mitrametal PIN BOLT B (KCJS) 3,084,480 151,200 2,933,280 14 0 0 1,530 1,530 4,590

FUJISEIKI PIN BOLT B ALL TYPE 13 55,000 715,000 1,648 1,648 4,943

2 UNIT FRAME LGB OP1 2,933,280 41 0 0 522 522 1,567

Waktu Produksi 55,000 715,000

9 9 100% 20%

PT . Mitrametal

8 UNIT

OIL FILTER 12,337,920 151,200 12,186,720 95 2,730 259,350 225 225 676

LEAK TEST OUTLET WATER 12,186,720 320 1,284 410,880 67 134 201

BODY FULL HINO 88 7,249 637,912 243 243 730

ELBOW SUCTION 84 0 0 255 255 765

BRACKET P240 88 1,000 243 243 730

BRACKET ASSY 420 0 0 51 51 153

BODY FULL ISUZU 97 2,730 264,810 221 221 662

BODY FULL MITSUBISHI 97 8,349 809,853 221 221 662

Waktu Produksi 23,342 2,382,805

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

BROTHER TAP 1 UNIT CASE BT 75 1,542,240 75,600 1,466,640 62 3200 198,400 345 345 1,036

1 1 100% 14%1,466,640 0

3200 198,400

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

TAKISAWA

1 UNIT RING NUT 1,542,240 75,600 #DIV/0! 119 0 180 180 540

0 0 #DIV/0! 0%1,466,640 0

0 0

KARAWANG

(1hariX2mesinX26 sec)

(1hariX2mesinX26 sec)

L161
FAJAR: 2 CAVITY
Page 4: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS PRODUKSI MACHINING JANUARY 2011.

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

FUJI SEIKI 1 UNIT DRUM REAR SPROCKET OP 1 1,542,240 75,600 0 60 3,300 198,000 357 357 1,071

1 0 0% 14%Konvensional 1,466,640

3,300 198,000

FUJI SEIKI 2 UNIT PIN BOLT ALL TYPE 3,084,480 75,600 3,008,880 12 0 1,785 1785 5,355

1 1 100% 0%FRAME LGB 3,008,880 52 0 412 412 1,236

- 0

MAZAK 1 UNIT DRUM REAR SPROCKET OP 2 1,542,240 75,600 0 88 - 0 243 243 730

1 1 100% 25%

PANEL FRONT OP 1 1,466,640 183 2,000 366,000 117 117 351

FRAME NNN 73507 W OP1 38 - 0 564 564 1,691

Waktu Produksi 2,000 366,000

2 UNIT DRUM REAR SPROCKET OP 3 3,265,920 75,600 1,063,440 80 3,300 264,000 284 284 851

3 1 33% 76%

COVER LOCK 3,190,320 22 40,494 890,868 1,031 912 3,093

BODY LGB 146 - 0 155 310 930

BODY NNN 120 2,515 301,800 189 189 567

OIL FILTER 114 2,730 311,220 199 199 597

STOPER CASE 76 - 0 298 298 290

HOLDER HANDLE 86 5,500 473,000 264 264 791

ELBOW SUCTION 22 - 0 1,031 1,031 3,093

HUB FRONT DISC OP 3 150 1,300 195,000 151 151 454

55,839 2,435,888

WINTEK1 UNIT

HUB FRONT DISK OPI 1,542,240 25,200 1,011,360 140 1,300 182,000 162 162 486

1.5 1 67% 12%FRAME NNN 73507 W OP1 1,517,040 56 1,920 107,520 405 405 1,215

WAKTU PRODUKSI

2 UNIT HUB FRONT DISK OP2 3,084,480 50,400 2,022,720 260 1,300 338,000 87 87 262

1.5 1 67% 29%HUB FRONT DRUM OP2 3,034,080 162 1,300 210,600 140 140 420

DRUM REAR SPROCKET OP 2 172 300 51,600 132 132 396

HUB REAR DRUM OP2 0 217 1,300 282,100 105 105 314

Waktu Produksi 4,200 882,300

HITACHI SEIKI 1 UNIT HUB FRONT DRUM OP1 1,632,960 25,200 1,607,760 167 1,900 317,300 136 136 407

1.5 1.5 100% 31%HUB REAR DRUM OP1 1,607,760 140 1,300 182,000 162 162 486

Waktu Produksi 3,200 499,300

BROTHER 1UNIT HUB FRONT DRUM OP3 1,542,240 25,200 1,517,040 162 1,300 210,600 140 140 420

1.5 1.5 100% 34%HUB REAR DRUM OP3 1,517,040 162 1,900 307,800 140 140 420

LEVER KAWASAKI 25 - 0 907 907 2,722

OIL FILTER 102 - 0 222 222 667

SPROCKET OP3 80 - 0 284 284 851

Waktu Produksi 3,200 518,400

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

TAP DRILL 4 UNIT LEVER SUZUKI 6,168,960 75,600 3,046,680 41 2,150 88,150 522 522 1,567

6 3 50% 1%

MANUAL LEVER KAWASAKI 6,093,360 41 - 0 522 522 1,567

FRAME NNN OP2 45 1,920 86,400

FRAME NNN OP3 57 1,920 109,440

FRAME LGB OP 2 44 0 487 487 1,460

FRAME LGB OP 3 48 0 446 446 1,339

2150 88,150

KARAWANG, 3 JANUARY 2011

(1hariX2mesinX26 sec)

MORISEIKI TV-30

MORISEIKI CL-25

(1hariX2mesinX26 sec)

DISETUJUI DIPERIKSA DIBUAT

ARIS SUKOTO RUDI R, FAJAR

L205
fajar suseno: ADA 8 CAVITY DALAM 1 JIG
L206
fajar suseno: 2 cAVITY
Page 5: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MITRAMETAL PERKASA KARAWANG

KAPASITAS PRODUKSI MACHINING FEBRUARY 2011.DEPARTEMENT MACHINING & PAINTING

NAME OF PRODUCT ITEMRENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS

PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

MORISEIKI

2 UNIT

BODY FUEL HINO OP1 1,542,240 50,400 1,491,840 70 9,353 654,710 306 306 918

3 3 100% 68%

CL-200 BODY FUEL ISUZU OP 1 1,491,840 70 2,099 146,930 306 306 918

BODY FUEL MITSUBISHI OP 1 70 0 0 306 306 918

BODY FUEL UTM G2 OP 1 150 876 131,400 143 143 428

BODY FUEL UTM G3 OP 1 150 550 82,500 143 143 428

BRACKET P220 (DNP) OP1 82 261 784

HUB REAR DRUM OP2 210 0 0 102 102 306

HUB FRONT DRUM OP2 167 0 0 128 128 385

DRUM REAR SPROCKET OP2 88 0 0 243 243 730

Waktu Produksi 12,878 1,015,540

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK 4 UNIT BODY FUEL ISUZU OP2 (FG) 4,626,720 75,600 4,626,720 68 0 0 315 315 945

6 6 100% 117%

OIL FILTER 4,551,120 102 0 0 210 210 630

BODY FUEL MITSHUBISHI OP2 148 9,048 1,339,104 145 145 435

BODY FUEL MITSHUBISHI OP3 170 9,048 1,538,160 126 126 378

HOLDER CLUTCH SUZUKI ( OEM ) 118 0 0 182 182 545

HOLDER CLUTCH SUZUKI (OES ) 118 800 94,400 182 182 545

LEVER CLUTCH SUZUKI 35 0 0 612 612 1,836

LEVER CLUTCH KAWASAKI 25 0 0 857 857 2,570

STOPER CASE 66 0 0 325 325 974

ELBOW SUCTION 22 0 0 974 974 2,921

BRACKET P240 226 577 130,402 95 95 284

BRACKET P220 OP2 (DNP) 138 155 155 466

HUB FRONT DISC TVS OP3 60 0 0 357 357 1,071

HOLDER HANDLE KAWASAKI 88 0 0 243 243 730

FRAME NNN 73507 W OP 2 52 0 0 412 412 1,236

BODY FUEL UTM G1 OP 1 155 0 0 138 138 415

BODY FUEL UTM G1 OP 2 150 0 0 143 143 428

BODY FUEL UTM G2 OP 2 120 876 105,120 179 179 536

BODY FUEL UTM G2 OP 3 158 876 138,408 136 136 407

BODY FUEL UTM G3 OP 2 160 550 88,000 134 134 402

BODY FUEL UTM G3 OP 3 170 550 93,500 126 126 378

BODY FUEL UTM G3 OP 4 210 550 115,500 102 102 306

BODY FUEL HINO OP 2 (FG) 189 9,353 1,767,717 113 113 340

PANEL REAR 134 0 0 160 160 480

Waktu Produksi 32,228 5,410,311

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROBODRILL 4 UNIT PANEL REAR TVS 6,168,960 50,400 6,118,560 134 1,800 241,200 160 160 480

6 6 100% 99%

for TVS part PANEL FRONT OP 2 6,118,560 194 2,000 388,000 110 110 331

PANEL FRONT OP 3 94 2,000 188,000 228 228 684

COVER MAGNET TVS 209 3,600 752,400 102 102 307

HOLDER CLUTCH KAWASAKI 206 2,210 455,260 104 104 312

HUB FRONT DISC OP3 60 0 0 357 357 1,071

OUTLET WATER 210 0 0 102 102 306

HOLDER SUZUKI OEM 118 1,400 165,200 182 182 545

B/F MITSUBISHI OP 3 170 0 0 126 126 378

B/F ISUZU OP2 68 2,099 142,732 315 315 945

COVER LOCK 22 48,000 1,056,000 974 974 2,921

LEVER KAWASAKI 25 0 0 857 857 2,570

STOPER CASE 66 8,753 577,698 325 325 974

BRACKET ASSY 318 1,700 540,600 67 67 202

HOLDER-HANDLE 86 3,400 292,400 249 530 1,590

ELBOW SUCTION 22 492 10,824 974 970 2,921

COVER CLUTCH OP 1 228 2,500 570,000 94 94 282

COVER CLUTCH OP 2 181 2,500 452,500 118 118 355

COVER CLUTCH OP 3 98 2,500 245,000 219 219 656

BRACKER P/240 226 0 0 95 95 284

BODY NNN 73507 W 58 0 0 369 369 1,108

BODY FUEL UTM G2 OP3 100 0 0 214 214 643

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

CAPACITY ACTUAL

Process Cycle Time

(1hariX2measinX25 sec)

(1hariX2measinX25 sec)

E10
fajar suseno: 1 MESIUN OFF
J61
fajar suseno: TOTAL PO 8349 PCS DIBAGI DNGN TOYOSK
L63
fajar suseno: 8 CAVITY DALAM 1 JIG
L67
suci: 2 CAVITY
L68
suci: 4 CAVITY
Page 6: Copy of Kapasitas & Cycle Time Stamping 2015

B/F UTM G 01 OP 2 150 0 0 143 143 428

84,954 6,077,814

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

IXION 3 UNIT Bracket KAWASAKI 3LD (FRONT) 4,626,720 75,600 4,551,120 9 2,300 20,700 2,520 2,520 7,560

9 9 100% 66%

BRACKET KEVJ 4,551,120 9 1,120 10,080 2,520 2,520 7,560

BRACKET XD 551 9 8,000 72,000 2,520 2,520 7,560

BRACKET XA 692/XD 541 9 4,030 36,270 2,520 2,520 7,560

BRACKET 21D 9 33,746 303,714 2,520 2,520 7,560

BRACKET KWBA 9 19,450 175,050 2,520 2,520 7,560

BRACKET 4003 OP1 9 0 0 2,520 2,520 7,560

BRACKET 4003 OP2 (FG) 9 0 0 2,520 2,520 7,560

BRACKET FR R KWS 9692 9 2,763 24,867 2,520 2,520 7,560

BRACKET KVBM 9 231,245 2,081,205 2,520 2,520 7,560

BRACKET 331D OP1 9 0 0 2,520 2,520 7,560

BRACKET 331D OP2 9 0 0 2,520 2,520 7,560

BRACKET 331D OP3 9 0 0 2,520 2,520 7,560

BRACKET KEHR 9 22,106 198,954 2,520 2,520 7,560

BRACKET XC 601 9 10,000 90,000 2,520 2,520 7,560

Waktu Produksi 334,760 3,012,840

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROTARY 3 UNIT : 4,626,720 75,600 4,551,120 0

3 3 100% 0%(BIG) B/S HND STD KPH 4,551,120 9 0 0 2,492 2,492 7,477

B/S HND STD ENERGY 9 0 0 2,492 2,492 7,477

0 0 0 0 0 0

B/S SPORT NKKC 1,542,240 25,200 #DIV/0! 15 0 0 1,502 1,502 4,506

0 0 #DIV/0! #DIV/0!ROTARY 1 UNIT : (3 jig) B/S HND KVBA 1,517,040 15 0 0 1,502 1,502 4,506

(SMALL) B/S HND SPORT KEHP 15 0 0 1,502 1,502 4,506

B/S KAWASAKI NKK5 15 0 0 1,502 1,502 4,506

0 0

MILLING 24 UNIT B/S YMH 5BP 37,013,760 655,200 36,358,560 19 0 0 1,194 1,194 3,581

33 33 100% 63%

CUTER PIN 2 UNIT B/S YMH STD 5TP (CY 1 FF) 36,358,560 21 152,000 3,192,000 1,080 1,080 3,240

GRINDING B/S YAMAHA STD ENERGI 19 0 0 1,194 1,194 3,581

B/S HONDA STD ENERGI 20 0 0 1,134 1,134 3,402

B/S HONDA KPH STD ENERGI 19 0 0 1,194 1,194 3,581

B/S KWSK STD NKK5 19 0 0 1,194 1,194 3,581

B/S KWSK STD NKCS 20 0 0 1,134 1,134 3,402

B/S KWSK SPORT CKR NKK5 19 2,000 38,000 1,194 1,194 3,581

B/S SUZUKI SPT NKCS 19 8,900 169,100 1,194 1,194 3,581

B/S SUZUKI SPT NKKC 19 0 0 1,194 1,194 3,581

B/S SUZUKI STD NKK2 19 27,500 522,500 1,194 1,194 3,581

B/S YAMAHA SPORT 1S7 L 20 34,500 690,000 1,134 1,134 3,402

B/S YAMAHA SPORT 1S7 R 20 19,600 392,000 1,134 1,134 3,402

B/S YAMAHA SPORT 5MX L 20 239,800 4,796,000 1,134 1,134 3,402

B/S YAMAHA SPORT 5MX R 20 242,100 4,842,000 1,134 1,134 3,402

B/S YAMAHA 3P9-L 19 0 0 1,194 1,194 3,581

B/S YAMAHA 3P9-R 19 0 0 1,194 1,194 3,581

B/S HONDA STD KPH 19 353,800 6,722,200 1,194 1,194 3,581

B/S KWSK NKKB CS1FF 16 0 0 1,418 1,418 4,253

B/S HND SPORT KEHP 21 78,000 1,638,000 1,080 1,080 3,240

TOTAL 1,158,200 23,001,800

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

PT . Mitrametal TORQUE NUT ALL TYPE 9,253,440 151,200 9,102,240 24 0 0 893 893 2,678

9 9 100% 72%

TAKAMAZ 6 UNIT TORQUE NUT KEHR 9,102,240 24 50,000 1,200,000 893 893 2,678

PIN AVANZA OP 1 97 4,000 388,000 221 221 662

PIN AVANZA OP 2 134 4,000 536,000 160 160 480

PIN BOLT A GEEN LEE 10 0 0 2,078 2,078 6,233

PIN BOLT B ALL TYPE 11 0 0 1,889 1,889 5,667

Keterangan: Cover clutch di januari masih trial

(1hariX3measinX26 sec)

(1hariX2measinX26 sec)

(1hariXJML MX26 sec)

I131
fajar suseno: TOTAL PO 465710 PSC,DIBAGI 3 ROTARY DAN MILLING
Page 7: Copy of Kapasitas & Cycle Time Stamping 2015

CAP TAPPET AHM 27 67,040 1,810,080 793 793 2,380

9 9 100% 72%CAP HOLE AHM 30 13,200 396,000 714 714 2,142

CAP TAPPET ASPIRA 27 33,800 912,600 793 793 2,380

CAP HOLE ASPIRA 30 0 0 714 714 2,142

CAM BRAKE KTMK OP 1 19 23,000 437,000 1,127 1,127 3,382

CAM BRAKE KTMK OP 2 11 23,000 253,000 1,947 1,947 5,842

CAM BRAKE KPHY / AND OP 1 18 20,000 360,000 1,190 1,190 3,570

CAM BRAKE KPHY / AND OP 2 11 20,000 220,000 1,947 1,947 5,842

258,040 6,512,680

3 3 100% 24%PT . Mitrametal PIN BOLT B (KCJS) 3,084,480 151,200 2,933,280 14 0 0 1,530 1,530 4,590

FUJISEIKI PIN BOLT B ALL TYPE 13 55,000 715,000 1,648 1,648 4,943

2 UNIT FRAME LGB OP1 2,933,280 41 0 0 522 522 1,567

Waktu Produksi 55,000 715,000

9 9 100% 29%

PT . Mitrametal

8 UNIT

OIL FILTER 12,337,920 151,200 12,186,720 95 9,095 864,025 225 225 676

LEAK TEST OUTLET WATER 12,186,720 320 0 0 67 134 201

BODY FULL HINO 88 9,353 823,064 243 243 730

ELBOW SUCTION 84 492 41,328 255 255 765

BRACKET P240 88 577 50,776 243 243 730

BRACKET ASSY 420 1,700 714,000 51 51 153

BODY FULL ISUZU 97 2,099 203,603 221 221 662

BODY FULL MITSUBISHI 97 9,048 877,656 221 221 662

Waktu Produksi 32,364 3,574,452

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

BROTHER TAP 1 UNIT CASE BT 1,542,240 75,600 1,466,640 62 6500 403,000 345 345 1,036

1 1 100% 27%1,466,640 0

6500 403,000

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

TAKISAWA

1 UNIT RING NUT 1,542,240 75,600 #DIV/0! 119 0 0 180 180 540

0 0 #DIV/0! 0%1,466,640 0

0 0

KARAWANG

(1hariX2mesinX26 sec)

(1hariX2mesinX26 sec)

L164
FAJAR: 2 CAVITY
I177
fajar suseno: 75 DAN 100
Page 8: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS PRODUKSI MACHINING FEBRUARY 2011.

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

FUJI SEIKI 1 UNIT DRUM REAR SPROCKET OP 1 1,542,240 75,600 0 60 3,300 198,000 357 357 1,071

1 0 0% 14%Konvensional 1,466,640

3,300 198,000

MAZAK 1 UNIT DRUM REAR SPROCKET OP 2 1,542,240 75,600 0 88 3,300 290,400 243 243 730

1 1 100% 78%

PANEL FRONT OP 1 1,466,640 183 1,200 219,600 117 117 351

FRAME NNN 73507 W OP1 38 - 0 564 564 1,691

B/F MITSUBISHI OP 1 70 9,048 633,360 306 306 918

Waktu Produksi 13,548 1,143,360

2 UNIT DRUM REAR SPROCKET OP 3 1,542,240 75,600 1,466,640 80 3,300 264,000 284 284 851

3 3 100% 148%

COVER LOCK 1,466,640 22 - 0 1,031 912 3,093

BODY LGB 146 - 0 155 310 930

BODY NNN 120 5,580 669,600 189 189 567

OIL FILTER 114 9,095 1,036,830 199 199 597

STOPER CASE 76 - 0 298 298 290

HOLDER HANDLE 86 - 0 264 264 791

ELBOW SUCTION 22 - 0 1,031 1,031 3,093

HUB FRONT DISC OP 3 150 1,300 195,000 151 151 454

19,275 2,165,430

WINTEK1 UNIT

HUB FRONT DISK OPI 1,542,240 25,200 1,517,040 140 1,300 182,000 162 162 486

1.5 1.5 100% 12%FRAME NNN 73507 W OP1 1,517,040 56 10,767 602,952 405 405 1,215

WAKTU PRODUKSI

2 UNIT HUB FRONT DISK OP2 1,542,240 50,400 1,491,840 260 1,300 338,000 87 87 262

1.5 1.5 100% 64%HUB FRONT DRUM OP2 1,491,840 162 1,300 210,600 140 140 420

DRUM REAR SPROCKET OP 2 172 - 0 132 132 396

HUB REAR DRUM OP2 0 217 1,900 412,300 105 105 314

Waktu Produksi 4,500 960,900

HITACHI SEIKI 1 UNIT HUB FRONT DRUM OP1 1,542,240 25,200 1,517,040 167 1,300 217,100 136 136 407

1.5 1.5 100% 32%HUB REAR DRUM OP1 1,517,040 140 1,900 266,000 162 162 486

Waktu Produksi 3,200 483,100

BROTHER 1UNIT HUB FRONT DRUM OP3 1,542,240 25,200 1,517,040 162 1,300 210,600 140 140 420

1.5 1.5 100% 39%HUB REAR DRUM OP3 1,517,040 162 1,900 307,800 140 140 420

LEVER KAWASAKI 25 2,950 73,750 907 907 2,722

OIL FILTER 102 - 0 222 222 667

SPROCKET OP3 80 - 0 284 284 851

Waktu Produksi 3,200 592,150

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

TAP DRILL 4 UNIT LEVER SUZUKI 6,168,960 75,600 6,093,360 41 2,150 88,150 522 522 1,567

6 6 100% 1%

MANUAL LEVER KAWASAKI 6,093,360 41 - 0 522 522 1,567

FRAME NNN OP2 45 10,767 484,515

FRAME NNN OP3 57 10,767 613,719

FRAME LGB OP 2 44 - 0 487 487 1,460

FRAME LGB OP 3 48 - 0 446 446 1,339

2150 88,150

KARAWANG, 3 JANUARY 2011

(1hariX2mesinX26 sec)

MORISEIKI TV-30

MORISEIKI CL-25

(1hariX2mesinX26 sec)

DISETUJUI DIPERIKSA DIBUAT

ARIS SUKOTO RUDI R, FAJAR

E204
fajar suseno: Rumus di ubah karena mesin OFF 1 unit
L205
fajar suseno: ADA 8 CAVITY DALAM 1 JIG
L206
fajar suseno: 2 cAVITY
E218
fajar suseno: 1 MESIN OFF
Page 9: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MITRAMETAL PERKASA KARAWANG

KAPASITAS PRODUKSI MACHINING MARET 2011.DEPARTEMENT MACHINING & PAINTING

NAME OF PRODUCT ITEMRENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS

PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

MORISEIKI

2 UNIT

BODY FUEL HINO OP1 1,542,240 50,400 12 1,491,840 70 4,600 322,000 306 306 918

3 3 100% 59%

CL-200 BODY FUEL ISUZU OP 1 1,491,840 14 70 0 0 306 306 918

BODY FUEL MITSUBISHI OP 1 45 70 7,920 554,400 306 306 918

BODY FUEL UTM G2 OP 1 78 150 0 0 143 143 428

BODY FUEL UTM G3 OP 1 789 150 0 0 143 143 428

BRACKET P220 (DNP) OP1 456 82 0 0 261 784

HUB REAR DRUM OP2 456 210 0 0 102 102 306

HUB FRONT DRUM OP2 16 167 0 0 128 128 385

DRUM REAR SPROCKET OP2 6,456 88 0 0 243 243 730

Waktu Produksi 8,322 12,520 876,400

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK 4 UNIT BODY FUEL ISUZU OP2 (FG) 4,626,720 100,800 4,626,720 68 0 0 315 315 945

6 6 100% 79%

OIL FILTER 4,525,920 102 0 0 210 210 630

BODY FUEL MITSHUBISHI OP2 148 7,920 1,172,160 145 145 435

BODY FUEL MITSHUBISHI OP3 170 3,960 673,200 126 126 378

HOLDER CLUTCH SUZUKI ( OEM ) 118 0 0 182 182 545

HOLDER CLUTCH SUZUKI (OES ) 118 550 64,900 182 182 545

LEVER CLUTCH SUZUKI 35 0 0 612 612 1,836

LEVER CLUTCH KAWASAKI 25 0 0 857 857 2,570

STOPER CASE 66 0 0 325 325 974

ELBOW SUCTION 22 0 0 974 974 2,921

BRACKET P240 226 0 0 95 95 284

BRACKET P220 OP2 (DNP) 138 0 0 155 155 466

HUB FRONT DISC TVS OP3 60 0 0 357 357 1,071

HOLDER HANDLE KAWASAKI 88 0 0 243 243 730

FRAME NNN 73507 W OP 2 52 0 0 412 412 1,236

BODY FUEL UTM G1 OP 1 155 0 0 138 138 415

BODY FUEL UTM G1 OP 2 150 0 0 143 143 428

BODY FUEL UTM G2 OP 2 120 0 0 179 179 536

BODY FUEL UTM G2 OP 3 158 0 0 136 136 407

BODY FUEL UTM G3 OP 2 160 1,600 256,000 134 134 402

BODY FUEL UTM G3 OP 3 170 1,600 272,000 126 126 378

BODY FUEL UTM G3 OP 4 210 1,600 336,000 102 102 306

BODY FUEL HINO OP 2 (FG) 189 4,600 869,400 113 113 340

PANEL REAR 134 0 0 160 160 480

Waktu Produksi 21,830 3,643,660

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROBODRILL 4 UNIT PANEL REAR TVS 6,168,960 100,800 6,068,160 134 1,000 134,000 160 160 480

6 6 100% 61%

for TVS part PANEL FRONT OP 2 6,068,160 194 900 174,600 110 110 331

PANEL FRONT OP 3 94 900 84,600 228 228 684

COVER MAGNET TVS 209 2,000 418,000 102 102 307

HOLDER CLUTCH KAWASAKI 206 2,340 482,040 104 104 312

HUB FRONT DISC OP3 60 0 0 357 357 1,071

OUTLET WATER 210 0 0 102 102 306

HOLDER SUZUKI OEM 118 0 0 182 182 545

B/F MITSUBISHI OP 3 170 3,960 673,200 126 126 378

B/F ISUZU OP2 68 0 0 315 315 945

COVER LOCK 22 0 0 974 974 2,921

LEVER KAWASAKI 25 2,900 72,500 857 857 2,570

STOPER CASE 66 0 0 325 325 974

BRACKET ASSY 318 1,610 511,980 67 67 202

HOLDER-HANDLE 86 0 0 249 530 1,590

ELBOW SUCTION 22 0 0 974 970 2,921

COVER CLUTCH OP 1 304 2,000 608,000 70 70 211

COVER CLUTCH OP 2 181 2,000 362,000 118 118 355

COVER CLUTCH OP 3 52 2,000 104,000 412 412 1,236

BRACKER P/240 226 0 0 95 95 284

BODY NNN 73507 W 58 865 50,170 369 369 1,108

BODY FUEL UTM G2 OP3 100 0 0 214 214 643

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING JIG

(MOUNTH)

CAPACITY ACTUAL

Process Cycle Time

TIME FOR SETTING JIG

(MOUNTH)(1hariX2measinX25 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX2measinX25 sec)

E10
fajar suseno: 1 MESIUN OFF
K61
fajar suseno: TOTAL PO 8349 PCS DIBAGI DNGN TOYOSK
M63
fajar suseno: 8 CAVITY DALAM 1 JIG
M67
suci: 2 CAVITY
M68
suci: 4 CAVITY
Page 10: Copy of Kapasitas & Cycle Time Stamping 2015

B/F UTM G 01 OP 2 150 0 0 143 143 428

22,475 3,675,090

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

IXION 3 UNIT Bracket KAWASAKI 3LD (FRONT) 4,626,720 75,600 4,551,120 9 3,865 34,785 2,520 2,520 7,560

9 9 100% 85%

BRACKET KEVJ 4,551,120 9 39,400 354,600 2,520 2,520 7,560

BRACKET XD 551 9 13,000 117,000 2,520 2,520 7,560

BRACKET XA 692/XD 541 9 4,520 40,680 2,520 2,520 7,560

BRACKET 21D 9 26,317 236,853 2,520 2,520 7,560

BRACKET KWBA 9 33,800 304,200 2,520 2,520 7,560

BRACKET 4003 OP1 9 0 0 2,520 2,520 7,560

BRACKET 4003 OP2 (FG) 9 0 0 2,520 2,520 7,560

BRACKET FR R KWS 9692 9 5,623 50,607 2,520 2,520 7,560

BRACKET KVBM 9 285,695 2,571,255 2,520 2,520 7,560

BRACKET 331D OP1 9 0 0 2,520 2,520 7,560

BRACKET 331D OP2 9 0 0 2,520 2,520 7,560

BRACKET 331D OP3 9 0 0 2,520 2,520 7,560

BRACKET KEHR 9 13,180 118,620 2,520 2,520 7,560

BRACKET XC 601 9 4,200 37,800 2,520 2,520 7,560

Waktu Produksi 429,600 3,866,400

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROTARY 3 UNIT : 4,626,720 75,600 4,551,120 0

3 3 100% 36%(BIG) B/S HND STD KPH 4,551,120 9 180,000 1,638,000 2,492 2,492 7,477

B/S HND STD ENERGY 9 0 2,492 2,492 7,477

0 180,000 1,638,000 0 0 0

B/S SPORT NKKC 1,542,240 25,200 #DIV/0! 15 0 0 1,502 1,502 4,506

0 0 #DIV/0! #DIV/0!ROTARY 1 UNIT : (3 jig) B/S HND KVBA 1,517,040 15 0 0 1,502 1,502 4,506

(SMALL) B/S HND SPORT KEHP 15 0 0 1,502 1,502 4,506

B/S KAWASAKI NKK5 15 0 0 1,502 1,502 4,506

0 0

MILLING 24 UNIT B/S YMH 5BP 37,013,760 655,200 36,358,560 19 0 0 1,194 1,194 3,581

33 33 100% 76%

CUTER PIN 2 UNIT B/S YMH STD 5TP (CY 1 FF) 36,358,560 21 198,200 4,162,200 1,080 1,080 3,240

GRINDING B/S YAMAHA STD ENERGI 19 0 0 1,194 1,194 3,581

B/S HONDA STD ENERGI 20 0 0 1,134 1,134 3,402

B/S HONDA KPH STD ENERGI 19 0 0 1,194 1,194 3,581

B/S KWSK STD NKK5 19 0 0 1,194 1,194 3,581

B/S KWSK STD NKCS 20 0 0 1,134 1,134 3,402

B/S KWSK SPORT CKR NKK5 19 0 0 1,194 1,194 3,581

B/S SUZUKI SPT NKCS 19 6,000 114,000 1,194 1,194 3,581

B/S SUZUKI SPT NKKC 19 24,300 461,700 1,194 1,194 3,581

B/S SUZUKI STD NKK2 19 18,000 342,000 1,194 1,194 3,581

B/S YAMAHA SPORT 1S7 L 20 61,000 1,220,000 1,134 1,134 3,402

B/S YAMAHA SPORT 1S7 R 20 60,500 1,210,000 1,134 1,134 3,402

B/S YAMAHA SPORT 5MX L 20 233,000 4,660,000 1,134 1,134 3,402

B/S YAMAHA SPORT 5MX R 20 235,900 4,718,000 1,134 1,134 3,402

B/S YAMAHA 3P9-L 19 0 0 1,194 1,194 3,581

B/S YAMAHA 3P9-R 19 0 0 1,194 1,194 3,581

B/S HONDA STD KPH 19 438,000 8,322,000 1,194 1,194 3,581

B/S KWSK NKKB CS1FF 16 0 0 1,418 1,418 4,253

B/S HND SPORT KEHP 21 120,000 2,520,000 1,080 1,080 3,240

TOTAL 1,394,900 27,729,900

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KEBUTUHAN ACTUAL PERCENTASI KAPASITAS OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR OPERATOR OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

PT . Mitrametal PIN IVOVA OP 1 9,253,440 151,200 9,102,240 2,600 0 #DIV/0! #DIV/0!

9 9 100% 80%

TAKAMAZ 6 UNIT PIN IVOVA OP 2 9,102,240 2,600 0 #DIV/0! #DIV/0! #DIV/0!

PIN AVANZA OP 1 97 0 0 221 221 662

PIN AVANZA OP 2 134 0 0 160 160 480

PIN GRAND MAX OP 1 3,000 0 #DIV/0! #DIV/0! #DIV/0!

PIN GRAND MAX OP 2 3,000 0 #DIV/0! #DIV/0! #DIV/0!

Keterangan: Cover clutch di januari masih trial

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX2measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariXJML MX26 sec)

J131
fajar suseno: TOTAL PO 465710 PSC,DIBAGI 3 ROTARY DAN MILLING
Page 11: Copy of Kapasitas & Cycle Time Stamping 2015

CAP TAPPET AHM 27 115,800 3,126,600 793 793 2,380

9 9 100% 80%CAP HOLE AHM 30 32,600 978,000 714 714 2,142

CAP TAPPET ASPIRA 27 20,400 550,800 793 793 2,380

CAP HOLE ASPIRA 30 400 12,000 714 714 2,142

CAM BRAKE KTMK OP 1 19 57,200 1,086,800 1,127 1,127 3,382

CAM BRAKE KTMK OP 2 11 57,200 629,200 1,947 1,947 5,842

CAM BRAKE KPHY / AND OP 1 18 25,000 450,000 1,190 1,190 3,570

CAM BRAKE KPHY / AND OP 2 11 25,000 275,000 1,947 1,947 5,842

PIN APV OP 1 38 2,568 97,584 564 564 1,691

PIN APV OP 2 44 2,568 112,992 487 487 1,460

349,936 7,318,976 #DIV/0! #DIV/0! #DIV/0!

3 3 100% 0%PT . Mitrametal PIN BOLT B (KCJS) 3,084,480 151,200 2,933,280 14 0 0 1,530 1,530 4,590

FUJISEIKI PIN BOLT B ALL TYPE 13 0 1,648 1,648 4,943

2 UNIT FRAME LGB OP1 2,933,280 41 0 0 522 522 1,567

Waktu Produksi 0 0

9 9 100% 18%

PT . Mitrametal

8 UNIT

OIL FILTER 12,337,920 201,600 12,136,320 95 3,430 325,850 225 225 676

LEAK TEST OUTLET WATER 12,136,320 320 0 0 67 134 201

BODY FULL HINO 88 4,600 404,800 243 243 730

ELBOW SUCTION 84 0 0 255 255 765

BRACKET P240 88 0 0 243 243 730

BRACKET ASSY 420 1,610 676,200 51 51 153

BODY FULL ISUZU 97 0 0 221 221 662

BODY FULL MITSUBISHI 97 7,920 768,240 221 221 662

Waktu Produksi 17,560 2,175,090

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

BROTHER TAP 1 UNIT CASE BT 1,542,240 25,200 1,517,040 62 12640 783,680 345 345 1,036

1 1 100% 52%1,517,040 0

12640 783,680

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

TAKISAWA

1 UNIT RING NUT 1,542,240 25,200 #DIV/0! 119 0 180 180 540

0 0 #DIV/0! 0%1,517,040

0 0

KARAWANG

TIME FOR SETTING JIG

(MOUNTH)(1hariX2mesinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX2mesinX26 sec)

M165
FAJAR: 2 CAVITY
J178
fajar suseno: 75 DAN 100
Page 12: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS PRODUKSI MACHINING FEBRUARY 2011.

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

FUJI SEIKI 1 UNIT DRUM REAR SPROCKET OP 1 1,542,240 25,200 0 60 1,900 114,000 357 357 1,071

1 0 0% 8%Konvensional 1,517,040

1,900 114,000

MAZAK 1 UNIT DRUM REAR SPROCKET OP 2 1,542,240 25,200 0 88 1,900 167,200 243 243 730

1 1 100% 22%

PANEL FRONT OP 1 1,517,040 183 900 164,700 117 117 351

FRAME NNN 73507 W OP1 38 - 0 564 564 1,691

B/F MITSUBISHI OP 1 70 - 0 306 306 918

Waktu Produksi 2,800 331,900

2 UNIT DRUM REAR SPROCKET OP 3 1,542,240 50,400 1,491,840 80 - 0 284 284 851

3 3 100% 73%

COVER LOCK 1,491,840 22 - 0 1,031 912 3,093

BODY LGB 146 - 0 155 310 930

BODY NNN 120 - 0 189 189 567

OIL FILTER 114 3,430 391,020 199 199 597

STOPER CASE 76 - 0 298 298 290

HOLDER HANDLE 86 7,651 657,986 264 264 791

ELBOW SUCTION 22 - 0 1,031 1,031 3,093

HUB FRONT DISC OP 3 150 300 45,000 151 151 454

11,381 1,094,006

WINTEK1 UNIT

HUB FRONT DISK OPI 1,542,240 25,200 1,517,040 140 300 42,000 162 162 486

1.5 1.5 100% 3%FRAME NNN 73507 W OP1 1,517,040 56 3,183 178,248 405 405 1,215

WAKTU PRODUKSI

2 UNIT HUB FRONT DISK OP2 1,542,240 50,400 1,491,840 260 300 78,000 87 87 262

1.5 1.5 100% 30%HUB FRONT DRUM OP2 1,491,840 162 800 129,600 140 140 420

DRUM REAR SPROCKET OP 2 172 - 0 132 132 396

HUB REAR DRUM OP2 0 217 1,100 238,700 105 105 314

Waktu Produksi 2,200 446,300

HITACHI SEIKI 1 UNIT HUB FRONT DRUM OP1 1,542,240 25,200 1,517,040 167 800 133,600 136 136 407

1.5 1.5 100% 19%HUB REAR DRUM OP1 1,517,040 140 1,100 154,000 162 162 486

Waktu Produksi 1,900 287,600

BROTHER 1UNIT HUB FRONT DRUM OP3 1,542,240 25,200 1,517,040 162 800 129,600 140 140 420

1.5 1.5 100% 30%HUB REAR DRUM OP3 1,517,040 162 1,100 178,200 140 140 420

LEVER KAWASAKI 25 - 0 907 907 2,722

OIL FILTER 102 - 0 222 222 667

SPROCKET OP3 80 1,900 152,000 284 284 851

Waktu Produksi 1,900 459,800

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. Kebutuhan Actual Persetase Kapasitas OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OP OP Operator TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (CTXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day) ( HARI )

TAP DRILL 4 UNIT LEVER SUZUKI 6,168,960 75,600 6,093,360 41 1,150 47,150 522 522 1,567

6 6 100% 1%

MANUAL LEVER KAWASAKI 6,093,360 41 - 0 522 522 1,567

FRAME NNN OP2 45 3,183 143,235

FRAME NNN OP3 57 3,183 181,431

FRAME LGB OP 2 44 - 0 487 487 1,460

FRAME LGB OP 3 48 - 0 446 446 1,339

1150 47,150

KARAWANG, 24 FEBRUARY 2011

93

TIME FOR SETTING JIG

(MOUNTH)(1hariX2mesinX26 sec)

MORISEIKI TV-30

MORISEIKI CL-25

TIME FOR SETTING JIG

(MOUNTH)(1hariX2mesinX26 sec)

DISETUJUI DIPERIKSA DIBUAT

ARIS SUKOTO RUDI R, FAJAR

E205
fajar suseno: Rumus di ubah karena mesin OFF 1 unit
M206
fajar suseno: ADA 8 CAVITY DALAM 1 JIG
M207
fajar suseno: 2 cAVITY
E219
fajar suseno: 1 MESIN OFF
Page 13: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MITRAMETAL PERKASA KARAWANG

KAPASITAS PRODUKSI MACHINING NEW 2011.DEPARTEMENT MACHINING & PAINTING

LINE 1

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)MORISEIKI

1 UNIT

B/F HINO OP1 1,542,240 50,400 1,491,840 57 3,592 204,744 376 1,127

99%

CL-200 CLUCTH COVER OP1 1,491,840 57 1,000 57,000 376 1,127

57 3,000 171,000 376 1,127

MOTOR FRAME JA200 OP1 150 7,000 1,050,000 143 428

0 0 #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0!

Waktu Produksi 321 14,592 1,482,744

LINE 1NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK 1 UNIT B/F HINO OP2 1,542,240 100,800 1,542,240 82 3,592 294,544 261 261 784

98%

82 3,000 246,000 261 261 784

LEVER DAN MOTOR 120 1,000 120,000 179 179 536

RETAINER OIL SEAL OP2 150 1,000 150,000 143 143 428

BRACKET GEN 155 1,000 155,000 138 138 415

UPPER CASE 110 5,000 550,000 195 195 584

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

Waktu Produksi 699 14,592 1,515,544

LINE 1NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROBODRILL 2 UNIT BRACKET ASSY OP1 3,084,480 100,800 2,983,680 170 2,700 459,000 126 126 378

96%

BRACKET ASSY OP2 2,983,680 120 2,700 324,000 179 179 536

COVER MAGNET 209 2,900 606,100 102 102 307

HOLDER CLUCTH KWSK 206 3,055 629,330 104 104 312

OUTLET WATER 205 1,710 350,550 104 104 313

BODY P330667 ISUZU NEW 170 3,000 510,000 126 126 378

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 974 #DIV/0!

0 0 #DIV/0! 857 #DIV/0!

0 0 #DIV/0! 325 #DIV/0!

0 0 #DIV/0! 67 #DIV/0!

0 0 #DIV/0! 530 1,590

0 0 #DIV/0! 970 #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

1,080 16,065 2,878,980

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING JIG

(MOUNTH)

CAPACITY ACTUAL

Process Cycle Time

BODY P330670-710A NEW ISUZU OP1

TIME FOR SETTING JIG

(MOUNTH)(1hariX2measinX25 sec)

BODY P330670-710A NEW ISUZU OP2

TIME FOR SETTING JIG

(MOUNTH)(1hariX2measinX25 sec)

E10
fajar suseno: 1 MESIUN OFF
S51
Machining:
K59
fajar suseno: TOTAL PO 8349 PCS DIBAGI DNGN TOYOSK
M61
fajar suseno: 8 CAVITY DALAM 1 JIG
M65
suci: 2 CAVITY
M66
suci: 4 CAVITY
Page 14: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT B/F MITSUBISHI OP 1 1,542,240 75,600 1,466,640 62 4,750 294,500 366 366 1,097

69%

B/F ISUZU OP1 1,466,640 70 1,650 115,500 324 324 972

B/F UTM G2 OP1 150 2,000 300,000 151 151 454

B/F UTM G3 OP1 150 2,000 300,000 151 151 454

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 432 10,400 1,010,000

LINE 2NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK2 UNIT B/F MITSUBISHI OP 2 3,084,480 75,600 3,008,880 68 4,750 323,000 334 334 1,001

96%

B/F MITSUBISHI OP 3 3,008,880 81 4,750 384,750 280 280 840

B/F ISUZU OP2 68 1,650 112,200 334 334 1,001

B/F UTM G2 OP2 151 2,000 302,000 150 150 451

B/F UTM G2 OP3 151 2,000 302,000 150 150 451

B/F UTM G3 OP2 151 2,000 302,000 150 150 451

B/F UTM G3 OP3 151 2,000 302,000 150 150 451

HOLDER CLUCTH SUZUKI 118 600 70,800 192 192 577

LEVER SUZUKI 25 600 15,000 907 907 2,722

LEVER KAWASAKI 25 3,200 80,000 907 907 2,722

B/F G1 UTM OP1 151 2,000 302,000 150 150 451

B/F G1 UTM OP2 151 2,000 302,000 150 150 451

COVER ADC YAMAMOTO 90 1,000 90,000 252 252 756

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 1,381 28,550 2,887,750

LINE 2NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TAKIZAWA1 UNIT BRACKET P220 OP1 1,542,240 75,600 1,466,640 151 1,000 151,200 150 150 450

24%

BRACKET P240 OP1 1,466,640 76 1,000 75,600 300 300 900

RING NUT 119 1,000 119,000 191 191 572

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 346 3,000 345,800

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

MORISEIKI CL-200

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 15: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK1 UNIT BRACKET P220 OP2 1,542,240 75,600 1,466,640 138 1,000 138,000 164 2,520 493

137%

BRACKET P240 OP2 1,466,640 151 1,000 151,000 150 150 451

ELBOW SUCTION 22 316 6,952 1,031 1,031 3,093

LEVER KYE 25 3,000 75,000 907 907 2,722

LEVER KCJ 25 3,000 75,000 907 907 2,722

LEVER GN5 25 3,000 75,000 907 907 2,722

LEVER KPW 25 3,000 75,000 907 907 2,722

BRACKET HANDLE LEVER 151 3,000 453,000 150 150 451

LEVER KPW 25 3,000 75,000 907 907 2,722

HOLDER HANDLE KAWASAKI 88 10,000 880,000 258 258 773

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 675 30,316 2,003,952

LINE 3

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

HITACHI SEIKI1 UNIT HUB FR DRUM TVS OP1 1,542,240 75,600 1,466,640 242 1,600 387,200 94 94 281

42%

HUB RR DRUM TVS OP1 1,466,640 140 1,600 224,000 162 162 486

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 382 3,200 611,200

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 16: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 3

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT HUB FR DRUM TVS OP2 1,542,240 75,600 1,466,640 305 1,600 488,000 74 74 223

58%

HUB RR DRUM TVS OP2 1,466,640 227 1,600 363,200 100 100 300

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 532 3,200 851,200

LINE 3

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT HUB FR DRUM TVS OP3 1,542,240 75,600 1,466,640 162 1,600 259,200 140 2,520 420

95%

HUB RR DRUM TVS OP3 1,466,640 162 1,600 259,200 140 140 420

HUB FR DISC OP3 192 1,400 268,800 118 118 354

CLUCTH COVER 151 1,000 151,000 150 150 451

BRAKE PEDAL 150 1,000 150,000 151 151 454

BRAKE PEDAL SUPORT 150 1,000 150,000 151 151 454

GEAR SLEEVE 151 1,000 151,000 150 150 451

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 1,118 8,600 1,389,200

LINE 3NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROBODRILL2 UNIT COVERCLUCTH TVS OP1 3,084,480 75,600 3,008,880 226 3,600 813,600 100 100 301

103%

COVERCLUCTH TVS OP2 3,008,880 167 3,600 601,200 136 136 407

PANEL RR TVS 134 2,600 348,400 169 169 508

PANEL FR TVS OP2 194 2,100 407,400 117 117 351

PANEL FR TVS OP3 94 2,100 197,400 241 241 724

COVERCLUCTH TVS OP1 tormek 226 500 113,000 100 100 301

COVERCLUCTH TVS OP2 tormek 167 500 83,500 136 136 407

PANEL RR TVS sport 134 1,500 201,000 169 169 508

COVER CYLINDER HEAD TVS 150 1,000 150,000 151 151 454

COVERCLUCTH TVS OP1 R1030480 226 500 113,000 100 100 301

COVERCLUCTH TVS OP2 R103040 167 500 83,500 136 136 407

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 1,885 18,500 3,112,000

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

MORISEIKI CL-25

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

BROTHER TC-225

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

S228
Machining:
Page 17: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

FUJI1 UNIT DRUM RR SPROCKET TVS OP1 1,542,240 75,600 1,466,640 60 2,600 156,000 378 378 1,134

11%

1,466,640 0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 60 2,600 156,000

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

MAZAK1 UNIT DRUM RR SPROCKET TVS OP2 1,542,240 75,600 1,466,640 88 2,600 228,800 258 258 773

60%

PANEL FR TVS OP1 1,466,640 183 2,100 384,300 124 124 372

PANEL RR SPORT TVS OP1 120 1,000 120,000 189 189 567

RETAINER OIL SEAL OP1 151 1,000 151,000 150 150 451

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 542 6,700 884,100

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

MORISEIKI TV301 UNIT DRUM RR SPROCKET TVS OP3 1,542,240 75,600 1,466,640 80 2,600 208,000 284 284 851

140%

COVER LOCK 1,466,640 22 10,000 220,000 1,031 1,031 3,093

OIL FILTER 89 730 64,970 255 255 764

HOLDER HANDLE KWSKI 88 5,000 440,000 258 258 773

MOTOR FRAME JA200 OP2 160 7,000 1,120,000 142 142 425

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 439 25,330 2,052,970

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 18: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

WINTEC1 UNIT HUB FR DISC TVS OP1 1,542,240 75,600 1,466,640 140 1,400 196,000 162 162 486

17%

FRAME NNN OP1 1,466,640 56 850 47,600 405 405 1,215

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 196 2,250 243,600

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT HUB FR DISC OP2 1,542,240 75,600 1,466,640 260 1,400 364,000 87 87 262

25%

1,466,640 0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 260 1,400 364,000

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TAKAMAZ6 UNIT CAP TAPPET AHM 9,253,440 75,600 9,177,840 21 48,000 1,008,000 1,080 1,080 3,240

78%

CAP HOLE AHM 9,177,840 22 5,000 110,000 1,031 1,031 3,093

CAP TAPPET ASPIRA 21 5,000 105,000 1,080 1,080 3,240

CAP HOLE ASPIRA 22 5,000 110,000 1,031 1,031 3,093

PIN APV OP1 38 1,000 38,000 597 597 1,791

PIN APV OP2 44 1,000 44,000 515 515 1,546

PIN AVANZA OP1 97 1,000 97,000 234 234 701

PIN AVANZA OP2 134 1,000 134,000 169 169 508

PIN GRANDMAX OP1 102 1,000 102,000 222 222 667

PIN GRANDMAX OP2 144 1,000 144,000 158 158 473

MOTOR FRAME JA200 OP1 225 5,000 1,125,000 101 100 302

MOTOR FRAME JA200 OP2 150 5,000 750,000 151 151 454

MOTOR FRAME JOG129 OP1 200 5,000 1,000,000 113 113 340

MOTOR FRAME JOG129OP2 150 5,000 750,000 151 151 454

MOTOR COVER JA200 OP1 160 5,000 800,000 142 425

MOTOR COVER JOG129 OP1 160 5,000 800,000 142 425

0 #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 1,690 99,000 7,117,000

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

MORISEIKI CL-25

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 19: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MITRAMETAL PERKASA KARAWANG

KAPASITAS PRODUKSI MACHINING NEW 2011.DEPARTEMENT MACHINING & PAINTING

LINE 1

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)MORISEIKI

1 UNIT

B/F HINO OP1 1,542,240 50,400 1,491,840 57 7,761 442,377 376 1,127

30%

CL-200 CLUCTH COVER OP1 1,491,840 57 0 0 376 1,127

57 0 0 376 1,127

MOTOR FRAME JA200 OP1 150 0 0 143 428

0 0 #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0!

Waktu Produksi 321 7,761 442,377

LINE 1NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK 1 UNIT B/F HINO OP2 1,542,240 100,800 1,542,240 82 7,761 636,402 261 261 784

41%

82 0 0 261 261 784

LEVER DAN MOTOR 120 0 0 179 179 536

RETAINER OIL SEAL OP2 150 0 0 143 143 428

BRACKET GEN 155 0 0 138 138 415

UPPER CASE 110 0 0 195 195 584

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

Waktu Produksi 699 7,761 636,402

LINE 1NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROBODRILL 2 UNIT BRACKET ASSY OP1 3,084,480 100,800 2,983,680 170 2,600 442,000 126 126 378

61%

BRACKET ASSY OP2 2,983,680 120 2,600 312,000 179 179 536

COVER MAGNET 209 2,200 459,800 102 102 307

HOLDER CLUCTH KWSK 206 1,795 369,770 104 104 312

OUTLET WATER 205 1,102 225,910 104 104 313

BODY P330667 ISUZU NEW 170 0 0 126 126 378

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 974 #DIV/0!

0 0 #DIV/0! 857 #DIV/0!

0 0 #DIV/0! 325 #DIV/0!

0 0 #DIV/0! 67 #DIV/0!

0 0 #DIV/0! 530 1,590

0 0 #DIV/0! 970 #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

1,080 10,297 1,809,480

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING JIG

(MOUNTH)

CAPACITY ACTUAL

Process Cycle Time

BODY P330670-710A NEW ISUZU OP1

TIME FOR SETTING JIG

(MOUNTH)(1hariX2measinX25 sec)

BODY P330670-710A NEW ISUZU OP2

TIME FOR SETTING JIG

(MOUNTH)(1hariX2measinX25 sec)

E10
fajar suseno: 1 MESIUN OFF
S51
Machining:
K59
fajar suseno: TOTAL PO 8349 PCS DIBAGI DNGN TOYOSK
M61
fajar suseno: 8 CAVITY DALAM 1 JIG
M65
suci: 2 CAVITY
M66
suci: 4 CAVITY
Page 20: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT B/F MITSUBISHI OP 1 1,542,240 75,600 1,466,640 62 6,890 427,180 366 366 1,097

64%

B/F ISUZU OP1 1,466,640 70 700 49,000 324 324 972

B/F UTM G2 OP1 150 2,100 315,000 151 151 454

B/F UTM G3 OP1 150 1,000 150,000 151 151 454

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 432 10,690 941,180

LINE 2NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK2 UNIT B/F MITSUBISHI OP 2 3,084,480 75,600 3,008,880 68 6,890 468,520 334 334 1,001

84%

B/F MITSUBISHI OP 3 3,008,880 81 6,890 558,090 280 280 840

B/F ISUZU OP2 68 700 47,600 334 334 1,001

B/F UTM G2 OP2 151 2,100 317,100 150 150 451

B/F UTM G2 OP3 151 2,100 317,100 150 150 451

B/F UTM G3 OP2 151 1,000 151,000 150 150 451

B/F UTM G3 OP3 151 1,000 151,000 150 150 451

HOLDER CLUCTH SUZUKI 118 900 106,200 192 192 577

LEVER SUZUKI 25 330 8,250 907 907 2,722

LEVER KAWASAKI 25 3,770 94,250 907 907 2,722

B/F G1 UTM OP1 151 1,000 151,000 150 150 451

B/F G1 UTM OP2 151 1,000 151,000 150 150 451

COVER ADC YAMAMOTO 90 0 0 252 252 756

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 1,381 27,680 2,521,110

LINE 2NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TAKIZAWA1 UNIT BRACKET P220 OP1 1,542,240 75,600 1,466,640 151 680 102,816 150 150 450

44%

BRACKET P240 OP1 1,466,640 76 2,850 215,460 300 300 900

RING NUT 119 2,730 324,870 191 191 572

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 346 6,260 643,146

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

MORISEIKI CL-200

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 21: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK1 UNIT BRACKET P220 OP2 1,542,240 75,600 1,466,640 138 680 93,840 164 2,520 493

97%

BRACKET P240 OP2 1,466,640 151 2,850 430,350 150 150 451

ELBOW SUCTION 22 692 15,224 1,031 1,031 3,093

LEVER KYE 25 0 0 907 907 2,722

LEVER KCJ L 25 5,900 147,500 907 907 2,722

LEVER GN5 25 5,850 146,250 907 907 2,722

LEVER KPW 25 0 0 907 907 2,722

BRACKET HANDLE LEVER 151 0 0 150 150 451

LEVER KPW 25 0 0 907 907 2,722

HOLDER HANDLE KAWASAKI 88 5,034 442,992 258 258 773

LEVER KCJ R 25 5,850 146,250 907 907 2,722

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 700 26,856 1,422,406

LINE 3

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

HITACHI SEIKI1 UNIT HUB FR DRUM TVS OP1 1,542,240 75,600 1,466,640 242 600 145,200 94 94 281

16%

HUB RR DRUM TVS OP1 1,466,640 140 600 84,000 162 162 486

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 382 1,200 229,200

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 22: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 3

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT HUB FR DRUM TVS OP2 1,542,240 75,600 1,466,640 305 600 183,000 74 74 223

22%

HUB RR DRUM TVS OP2 1,466,640 227 600 136,200 100 100 300

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 532 1,200 319,200

LINE 3

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT HUB FR DRUM TVS OP3 1,542,240 75,600 1,466,640 162 600 97,200 140 2,520 420

21%

HUB RR DRUM TVS OP3 1,466,640 162 600 97,200 140 140 420

HUB FR DISC OP3 192 600 115,200 118 118 354

CLUCTH COVER 151 0 0 150 150 451

BRAKE PEDAL 150 0 0 151 151 454

BRAKE PEDAL SUPORT 150 0 0 151 151 454

GEAR SLEEVE 151 0 0 150 150 451

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 1,118 1,800 309,600

LINE 3NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROBODRILL2 UNIT COVERCLUCTH TVS OP1 3,084,480 75,600 3,008,880 226 2,220 501,720 100 100 301

52%

COVERCLUCTH TVS OP2 3,008,880 167 2,220 370,740 136 136 407

PANEL RR TVS 134 1,800 241,200 169 169 508

PANEL FR TVS OP2 194 600 116,400 117 117 351

PANEL FR TVS OP3 94 600 56,400 241 241 724

COVERCLUCTH TVS OP1 tormek 226 500 113,000 100 100 301

COVERCLUCTH TVS OP2 tormek 167 500 83,500 136 136 407

PANEL RR TVS sport 134 500 67,000 169 169 508

COVER CYLINDER HEAD TVS 150 0 0 151 151 454

COVERCLUCTH TVS OP1 R1030480 226 0 0 100 100 301

COVERCLUCTH TVS OP2 R103040 167 0 0 136 136 407

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 1,885 8,940 1,549,960

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

MORISEIKI CL-25

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

BROTHER TC-225

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

S228
Machining:
Page 23: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

FUJI1 UNIT DRUM RR SPROCKET TVS OP1 1,542,240 75,600 1,466,640 60 2,200 132,000 378 378 1,134

9%

1,466,640 0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 60 2,200 132,000

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

MAZAK1 UNIT DRUM RR SPROCKET TVS OP2 1,542,240 75,600 1,466,640 88 2,200 193,600 258 258 773

25%

PANEL FR TVS OP1 1,466,640 183 600 109,800 124 124 372

PANEL RR SPORT TVS OP1 120 500 60,000 189 189 567

RETAINER OIL SEAL OP1 151 0 0 150 150 451

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 542 3,300 363,400

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

MORISEIKI TV301 UNIT DRUM RR SPROCKET TVS OP3 1,542,240 75,600 1,466,640 80 2,200 176,000 284 284 851

147%

COVER LOCK 1,466,640 22 30,000 660,000 1,031 1,031 3,093

OIL FILTER 89 5,980 532,220 255 255 764

HOLDER HANDLE KWSKI 88 0 0 258 258 773

MOTOR FRAME JA200 OP2 160 0 0 142 142 425

BODY NNN 22 2,100 46,200 1,031 1,031 3,093

BODY LGB 146 5,100 744,600 155 155 466

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 607 45,380 2,159,020

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 24: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

WINTEC1 UNIT HUB FR DISC TVS OP1 1,542,240 75,600 1,466,640 140 600 84,000 162 162 486

25%

FRAME NNN OP1 1,466,640 56 5,073 284,088 405 405 1,215

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 196 5,673 368,088

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT HUB FR DISC OP2 1,542,240 75,600 1,466,640 260 600 156,000 87 87 262

11%

1,466,640 0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 260 600 156,000

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TAKAMAZ6 UNIT CAP TAPPET AHM 9,253,440 75,600 9,177,840 21 78,000 1,638,000 1,080 1,080 3,240

22%

CAP HOLE AHM 9,177,840 22 0 0 1,031 1,031 3,093

CAP TAPPET ASPIRA 21 17,550 368,550 1,080 1,080 3,240

CAP HOLE ASPIRA 22 0 0 1,031 1,031 3,093

PIN APV OP1 38 0 0 597 597 1,791

PIN APV OP2 44 0 0 515 515 1,546

PIN AVANZA OP1 97 0 0 234 234 701

PIN AVANZA OP2 134 0 0 169 169 508

PIN GRANDMAX OP1 102 0 0 222 222 667

PIN GRANDMAX OP2 144 0 0 158 158 473

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 645 95,550 2,006,550

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

MORISEIKI CL-25

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 25: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MITRAMETAL PERKASA KARAWANG

KAPASITAS PRODUKSI MACHINING NEW 2011.DEPARTEMENT MACHINING & PAINTING

LINE 1

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)MORISEIKI

1 UNIT

B/F HINO OP1 1,542,240 50,400 1,491,840 57 3,592 204,744 376 1,127

18%

CL-200 1,491,840 0 0 0 #DIV/0! #DIV/0!

57 1,000 57,000 376 1,127

0 0 0 #DIV/0! #DIV/0!

0 0 0 #DIV/0! #DIV/0!

0 0 0 #DIV/0! #DIV/0!

0 0 0 #DIV/0! #DIV/0!

0 0 0 #DIV/0! #DIV/0!

0 #DIV/0!

0 #DIV/0!

0 #DIV/0!

0 0 #DIV/0! #DIV/0!

Waktu Produksi 114 4,592 261,744

LINE 1NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK 1 UNIT B/F HINO OP2 1,542,240 100,800 1,542,240 82 3,592 294,544 261 261 784

110%

82 3,000 246,000 261 261 784

1,000 0 #DIV/0! #DIV/0! #DIV/0!

RETAINER OIL SEAL OP2 150 1,000 150,000 143 143 428

BRACKET GEN 155 1,000 155,000 138 138 415

UPPER CASE 110 5,000 550,000 195 195 584

BODY P220129-710D OP2 150 1,000 150,000 143 143 428

BODY P220129-710D OP3 150 1,000 150,000 143 143 428

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

Waktu Produksi 879 16,592 1,695,544

LINE 1NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROBODRILL 2 UNIT BRACKET ASSY OP1 3,084,480 100,800 2,983,680 170 2,700 459,000 126 126 378

96%

BRACKET ASSY OP2 2,983,680 120 2,700 324,000 179 179 536

COVER MAGNET 209 2,900 606,100 102 102 307

HOLDER CLUCTH KWSK 206 3,055 629,330 104 104 312

OUTLET WATER 205 1,710 350,550 104 104 313

BODY P330667 ISUZU NEW 170 3,000 510,000 126 126 378

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 974 #DIV/0!

0 0 #DIV/0! 857 #DIV/0!

0 0 #DIV/0! 325 #DIV/0!

0 0 #DIV/0! 67 #DIV/0!

0 0 #DIV/0! 530 1,590

0 0 #DIV/0! 970 #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

1,080 16,065 2,878,980

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING JIG

(MOUNTH)

CAPACITY ACTUAL

Process Cycle Time

BODY P330670-710A NEW ISUZU OP1

TIME FOR SETTING JIG

(MOUNTH)(1hariX2measinX25 sec)

BODY P330670-710A NEW ISUZU OP2

TIME FOR SETTING JIG

(MOUNTH)(1hariX2measinX25 sec)

E10
fajar suseno: 1 MESIUN OFF
K63
fajar suseno: TOTAL PO 8349 PCS DIBAGI DNGN TOYOSK
M65
fajar suseno: 8 CAVITY DALAM 1 JIG
M69
suci: 2 CAVITY
M70
suci: 4 CAVITY
Page 26: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT B/F MITSUBISHI OP 1 1,542,240 75,600 1,466,640 62 4,750 294,500 366 366 1,097

69%

B/F ISUZU OP1 1,466,640 70 1,650 115,500 324 324 972

B/F UTM G2 OP1 150 2,000 300,000 151 151 454

B/F UTM G3 OP1 150 2,000 300,000 151 151 454

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 432 10,400 1,010,000

LINE 2NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK2 UNIT B/F MITSUBISHI OP 2 3,084,480 75,600 3,008,880 68 4,750 323,000 334 334 1,001

96%

B/F MITSUBISHI OP 3 3,008,880 81 4,750 384,750 280 280 840

B/F ISUZU OP2 68 1,650 112,200 334 334 1,001

B/F UTM G2 OP2 151 2,000 302,000 150 150 451

B/F UTM G2 OP3 151 2,000 302,000 150 150 451

B/F UTM G3 OP2 151 2,000 302,000 150 150 451

B/F UTM G3 OP3 151 2,000 302,000 150 150 451

HOLDER CLUCTH SUZUKI 118 600 70,800 192 192 577

LEVER SUZUKI 25 600 15,000 907 907 2,722

LEVER KAWASAKI 25 3,200 80,000 907 907 2,722

B/F G1 UTM OP1 151 2,000 302,000 150 150 451

B/F G1 UTM OP2 151 2,000 302,000 150 150 451

COVER ADC YAMAMOTO 90 1,000 90,000 252 252 756

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 1,381 28,550 2,887,750

LINE 2NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TAKIZAWA1 UNIT BRACKET P220 OP1 1,542,240 75,600 1,466,640 151 1,000 151,200 150 150 450

24%

BRACKET P240 OP1 1,466,640 76 1,000 75,600 300 300 900

RING NUT 119 1,000 119,000 191 191 572

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 346 3,000 345,800

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

MORISEIKI CL-200

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 27: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TOYOSK1 UNIT BRACKET P220 OP2 1,542,240 75,600 1,466,640 138 1,000 138,000 164 2,520 493

126%

BRACKET P240 OP2 1,466,640 151 1,000 151,000 150 150 451

ELBOW SUCTION 22 316 6,952 1,031 1,031 3,093

0 0 0 #DIV/0! #DIV/0! #DIV/0!

LEVER KCJ 25 3,000 75,000 907 907 2,722

LEVER GN5 25 3,000 75,000 907 907 2,722

LEVER KPW 25 3,000 75,000 907 907 2,722

BRACKET HANDLE LEVER 151 3,000 453,000 150 150 451

0 0 0 #DIV/0! #DIV/0! #DIV/0!

HOLDER HANDLE KAWASAKI 88 10,000 880,000 258 258 773

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 625 24,316 1,853,952

LINE 3

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

HITACHI SEIKI1 UNIT HUB FR DRUM TVS OP1 1,542,240 75,600 1,466,640 242 1,600 387,200 94 94 281

42%

HUB RR DRUM TVS OP1 1,466,640 140 1,600 224,000 162 162 486

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 382 3,200 611,200

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 28: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 3

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT HUB FR DRUM TVS OP2 1,542,240 75,600 1,466,640 305 1,600 488,000 74 74 223

68%

HUB RR DRUM TVS OP2 1,466,640 227 1,600 363,200 100 100 300

BODY P220129-710D 150 1,000 150,000 151 151 454

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 682 4,200 1,001,200

LINE 3

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT HUB FR DRUM TVS OP3 1,542,240 75,600 1,466,640 162 1,600 259,200 140 2,520 420

66%

HUB RR DRUM TVS OP3 1,466,640 162 1,600 259,200 140 140 420

HUB FR DISC OP3 192 1,400 268,800 118 118 354

OIL FILTER 89 2,000 178,000 255 255 764

0 0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 605 6,600 965,200

LINE 3NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ROBODRILL2 UNIT COVERCLUCTH TVS OP1 3,084,480 75,600 3,008,880 226 3,600 813,600 100 100 301

92%

COVERCLUCTH TVS OP2 3,008,880 167 3,600 601,200 136 136 407

PANEL RR TVS 134 2,600 348,400 169 169 508

PANEL FR TVS OP2 194 2,100 407,400 117 117 351

PANEL FR TVS OP3 94 2,100 197,400 241 241 724

COVERCLUCTH TVS OP1 tormek 226 500 113,000 100 100 301

COVERCLUCTH TVS OP2 tormek 167 500 83,500 136 136 407

PANEL RR TVS sport 134 1,500 201,000 169 169 508

0 1,000 0 #DIV/0! #DIV/0! #DIV/0!

0 500 0 #DIV/0! #DIV/0! #DIV/0!

0 500 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 1,342 18,500 2,765,500

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

MORISEIKI CL-25

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

BROTHER TC-225

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 29: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

FUJI1 UNIT DRUM RR SPROCKET TVS OP1 1,542,240 75,600 1,466,640 60 2,600 156,000 378 378 1,134

11%

1,466,640 0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 60 2,600 156,000

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

MAZAK1 UNIT DRUM RR SPROCKET TVS OP2 1,542,240 75,600 1,466,640 88 2,600 228,800 258 258 773

71%

PANEL FR TVS OP1 1,466,640 183 2,100 384,300 124 124 372

PANEL RR SPORT TVS OP1 120 1,000 120,000 189 189 567

RETAINER OIL SEAL OP1 151 1,000 151,000 150 150 451

BODY ASM OIL FILTER 155 1,000 155,000 146 146 439

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 697 7,700 1,039,100

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

MORISEIKI TV301 UNIT DRUM RR SPROCKET TVS OP3 1,542,240 75,600 1,466,640 80 2,600 208,000 284 284 851

59%

COVER LOCK 1,466,640 22 10,000 220,000 1,031 1,031 3,093

0 0 0 #DIV/0! #DIV/0! #DIV/0!

HOLDER HANDLE KWSKI 88 5,000 440,000 258 258 773

0 0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 190 17,600 868,000

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 30: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

WINTEC1 UNIT HUB FR DISC TVS OP1 1,542,240 75,600 1,466,640 140 1,400 196,000 162 162 486

17%

FRAME NNN OP1 1,466,640 56 850 47,600 405 405 1,215

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 196 2,250 243,600

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

1 UNIT HUB FR DISC OP2 1,542,240 75,600 1,466,640 260 1,400 364,000 87 87 262

25%

1,466,640 0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 260 1,400 364,000

LINE 4NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

TAKAMAZ6 UNIT CAP TAPPET AHM 9,253,440 75,600 9,177,840 21 48,000 1,008,000 1,080 1,080 3,240

21%

CAP HOLE AHM 9,177,840 22 5,000 110,000 1,031 1,031 3,093

CAP TAPPET ASPIRA 21 5,000 105,000 1,080 1,080 3,240

CAP HOLE ASPIRA 22 5,000 110,000 1,031 1,031 3,093

PIN APV OP1 38 1,000 38,000 597 597 1,791

PIN APV OP2 44 1,000 44,000 515 515 1,546

PIN AVANZA OP1 97 1,000 97,000 234 234 701

PIN AVANZA OP2 134 1,000 134,000 169 169 508

PIN GRANDMAX OP1 102 1,000 102,000 222 222 667

PIN GRANDMAX OP2 144 1,000 144,000 158 158 473

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! #DIV/0! #DIV/0!

0 0 #DIV/0! 2,520 #DIV/0!

Waktu Produksi 645 69,000 1,892,000

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

MORISEIKI CL-25

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 31: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG

CYCLE TIME PRODUKSI WELDING NEW 2013DEPARTEMENT WELDING

LINE 1

NAME OF PRODUCT ITEM

( sec. )

SPOT

1 UNIT

BRACKET ASSY A (LH) 16WELDING BRACKET ASSY A (RH) 16(PANASONIC) BRACKET ASSY B (LWR) 15

SLCF 1 5SLCF5 16SLCF 7/8 26

LINE 1NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time ProsesMACHINE ITEM ( sec. )

ARCH WELDING 1 UNIT COLUMN STEERING SL 142

DAIHEN

LINE 1NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time Proses

MACHINE ITEM ( sec. )

ARCH WELDING 1 UNIT HINGE ARM A WELDING OP 1 39

PANASONIC HINGE ARM A WELDING OP 2 (45) 22

HINGE ARM A WELDING OP 2 (46) 22

NAME OF MACHINE

MACHINE QUANTITY

Process Cycle Time

Page 32: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2

NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time Proses

MACHINE ITEM ( sec. )

1 UNIT B/F MITSUBISHI OP 1 62

B/F ISUZU OP1 70

B/F UTM G2 OP1 150

B/F UTM G3 OP1 150

LINE 2NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time Proses

MACHINE ITEM ( sec. )

TOYOSK2 UNIT B/F MITSUBISHI OP 2 68

B/F MITSUBISHI OP 3 81

B/F ISUZU OP2 68

B/F UTM G2 OP2 151

B/F UTM G2 OP3 151

B/F UTM G3 OP2 151

B/F UTM G3 OP3 151

HOLDER CLUCTH SUZUKI 118

LEVER SUZUKI 25

LEVER KAWASAKI 25

B/F G1 UTM OP1 151

B/F G1 UTM OP2 151

COVER ADC YAMAMOTO 90

LINE 2NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time ProsesMACHINE ITEM ( sec. )

TAKIZAWA1 UNIT BRACKET P220 OP1 151

BRACKET P240 OP1 76RING NUT 119

MORISEIKI CL-200

Page 33: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time Proses

MACHINE ITEM ( sec. )

TOYOSK1 UNIT BRACKET P220 OP2 138

BRACKET P240 OP2 151

ELBOW SUCTION 22

LEVER KCJ 25

LEVER GN5 25

LEVER KPW 25

BRACKET HANDLE LEVER 151HOLDER HANDLE KAWASAKI 88

LINE 3

NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time Proses

MACHINE ITEM ( sec. )

HITACHI SEIKI1 UNIT HUB FR DRUM TVS OP1 242

HUB RR DRUM TVS OP1 140

Page 34: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 3

NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time Proses

MACHINE ITEM ( sec. )

1 UNIT HUB FR DRUM TVS OP2 305

HUB RR DRUM TVS OP2 227

BODY P220129-710D 150

LINE 3

NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time Proses

MACHINE ITEM ( sec. )

1 UNIT HUB FR DRUM TVS OP3 162

HUB RR DRUM TVS OP3 162

HUB FR DISC OP3 192

OIL FILTER 89

LINE 3NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time ProsesMACHINE ITEM ( sec. )

ROBODRILL2 UNIT COVERCLUCTH TVS OP1 226

COVERCLUCTH TVS OP2 167PANEL RR TVS 134PANEL FR TVS OP2 194PANEL FR TVS OP3 94COVERCLUCTH TVS OP1 tormek 226COVERCLUCTH TVS OP2 tormek 167PANEL RR TVS sport 134

LINE 4NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time ProsesMACHINE ITEM ( sec. )

FUJI1 UNIT DRUM RR SPROCKET TVS OP1 60

LINE 4NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time ProsesMACHINE ITEM ( sec. )

MAZAK1 UNIT DRUM RR SPROCKET TVS OP2 88

PANEL FR TVS OP1 183PANEL RR SPORT TVS OP1 120RETAINER OIL SEAL OP1 151BODY ASM OIL FILTER 155

LINE 4NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time ProsesMACHINE ITEM ( sec. )

MORISEIKI TV301 UNIT DRUM RR SPROCKET TVS OP3 80

COVER LOCK 220

HOLDER HANDLE KWSKI 880

LINE 4NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time ProsesMACHINE ITEM ( sec. )

WINTEC1 UNIT HUB FR DISC TVS OP1 140

FRAME NNN OP1 56

LINE 4NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time ProsesMACHINE ITEM ( sec. )

1 UNIT HUB FR DISC OP2 260

LINE 4NAME MACHINE NAME OF Cycle

OF QUANTITY PRODUCT Time ProsesMACHINE ITEM ( sec. )

TAKAMAZ6 UNIT CAP TAPPET AHM 21

CAP HOLE AHM 22CAP TAPPET ASPIRA 21CAP HOLE ASPIRA 22PIN APV OP1 38PIN APV OP2 44PIN AVANZA OP1 97PIN AVANZA OP2 134PIN GRANDMAX OP1 102PIN GRANDMAX OP2 144

MORISEIKI CL-25

BROTHER TC-225

MORISEIKI CL-25

Page 35: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG

KAPASITAS PRODUKSI WELDING 2014DEPARTEMENT WELDING

1 SHIFT +LEMBUR 2 JAM

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)SPOT WELDING

1 UNIT

HINGE BRACKET A (LH) 673,200 18,000 9,240 645,960 16 3,780 60,480 1,913 1,913

80%

PANASONIC (MB134045-02K) 645,960 0 0 0

HINGE BRACKET A (RH) 16 3,780 60,480 1,913 1,913

(MB134046-02K)

HINGE BRACKET B (LWR) 16 7,560 120,960 1,913 1,913

(MB134047-02K)

SLCF 1 6 3,300 19,800 5,100 5,100

SLCF 5 16 3,300 52,800 1,913 1,913

SLCF 7/8 26 3,300 85,800 1,177 1,177

MALE HATCH 2CF 8 14,760 118,080 3,825 3,825

MALE R, T/GATE 2MD 12 0 0 2,550 2,550

MALE L, T/GATE 2MD 12 0 0 2,550 2,550

Waktu Produksi 128 39,780 518,400 22,852

LINE 1

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ARCH WELDING 1 UNIT COLUMN STEERING SL 538,560 14,400 524,160 142 2,800 397,600 172 172 172

76%DAIHEN 524,160

Waktu Produksi 142 2,800 397,600

LINE 1

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

ARCH WELDING 1 UNIT HINGE ARM A WELDING OP 1 587,520 14,400 573,120 39 7,560 294,840 628 628 628

80%PANASONIC 573,120

HINGE ARM A WELDING OP 2 (45) 22 3,780 83,160 1,113 1,113 1,113

HINGE ARM A WELDING OP 2 (46) 22 3,780 83,160 1,113 1,113 1,113

83 15,120 461,160

Karawang, 28 NOVEMBER 2013MENGETAHUI DISETUJUI DIBUAT

NAKAGAWA NAKAGAWA HERI W

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING JIG

(MONTH)

CAPACITY ACTUAL

Process Cycle Time

TIME FOR SETTING JIG

(MOUNTH)

TIME FOR SETTING JIG

(MOUNTH)

Page 36: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG PO STOCK TOTAL

KAPASITAS PRODUKSI NOVEMBER 2013PLANING PRODUCTION HPM = 6720 unit 4920 1800 6720

DEPARTEMENT STAMPING

(1 SHIFT)

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

PRODUKSI MESIN PROD PER SHIFT PROD

(Sec) ( Per Month ) ( Per Month ) ( sec. ) ( SHOT) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)FUKUI 300T

1 UNIT

HINGE BRACKET A (LH) 514,080 165,600 97,500 250,980 4 3,780 15,120 6,120 6,120

2 2 100%

(MB134045-02) 250,980 0 0 0

HINGE BRACKET A (RH) 4 3,780 15,120 6,120 6,120

(MB134046-02)

HINGE BRACKET B (LWR) 4 7,560 30,240 6,120 6,120

(MB134047-02)

ARM A 4 7,560 30,240 6,120 6,120

ARM B 4 7,560 30,240 6,120 6,120

0 #DIV/0! #DIV/0!

FEMALE R/L,FR UP(BLANK)(EK450002/3) 3 6,720 20,160 8,160 8,160

MALE R, FR UP(BLANK)(EK450004) 3 6,720 20,160 8,160 8,160

MALE L, FR UP (BLANK)(EK450005) 3 6,720 20,160 8,160 8,160

FEMALE R,FR LWR (BLANK)(EK450008) 3 6,720 20,160 8,160 8,160

FEMALE L,FR LWR (BLANK)(EK450009) 3 6,720 20,160 8,160 8,160

MALE R, FR LWR (BLANK)(EK450010) 3 6,720 20,160 8,160 8,160

MALE L, FR LWR (BLANK)(EK450011) 3 6,720 20,160 8,160 8,160

FEMALE R,RR LWR (BLANK)(EK450020) 3 6,720 20,160 8,160 8,160

FEMALE L,RR LWR (BLANK)(EK450021) 3 6,720 20,160 8,160 8,160

MALE R, RR LWR (BLANK)(EK450022) 3 6,720 20,160 8,160 8,160

MALE L, RR LWR (BLANK)(EK450023) 3 6,720 20,160 8,160 8,160

FEMALE R,RR UP (BLANK)(EK450014) 3 6,720 20,160 8,160 8,160

FEMALE L,RR UP (BLANK)(EK450015) 3 6,720 20,160 8,160 8,160

MALE R, RR UP (BLANK)(EK450016) 3 6,720 20,160 8,160 8,160

MALE L, RR UP (BLANK)(EK450017) 3 6,720 20,160 8,160 8,160

FEMALE R G/HATCH (BLANK) 3 6,720 20,160 8,160 8,160

FEMALE L,G/HATCH (BLANK) 3 6,720 20,160 8,160 8,160

MALE R/L,G/HATCH (BLANK) 3 12,300 36,900 8,160 8,160

74 156,780 500,580

49

1 (SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( SHOT) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110 T 1 UNIT SLCF 1 OP 1 514,080 21,600 64,800 427,680 7 3,700 25,900 3,497 3,497

1 1 100%

427,680

SLCF 1 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 1 7 3,700 25,900 3,497 3,497

SLCF 3 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 3 7 3,700 25,900 3,497 3,497

SLCF 4 OP 1 7 3,700 25,900 3,497 3,497

SLCF 4 OP 2 7 3,700 25,900 3,497 3,497

SLCF 7 OP 1 7 3,700 25,900 3,497 3,497

SLCF 7 OP 2 7 3,700 25,900 3,497 3,497

SLCF 8 OP 1 7 3,700 25,900 3,497 3,497

SLCF 8 OP 2 7 3,700 25,900 3,497 3,497

77 40,700 284,900

(1 SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( SHORT ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 150 T 3 Unit SLCF 7 OP 1 1,615,680 172,800 46,200 1,396,680 7 3,000 21,000 3,497 3,497 3,497

3 3 100%

1,396,680

SLCF 7 OP 2 7 3,000 21,000 3,497 3,497 3,497

FEMALE R/L,FR UP (COINING)(EK450002/3) 10 6,720 67,200 2,448 2,448

MALE R/L, FR UP(COINING)(EK450004/5) 10 6,720 67,200 2,448 2,448

FEMALE R/L,FR LWR (COINING)(EK450008/9) 10 6,720 67,200 2,448 2,448

MALE R/L, FR LWR (COINING)(EK450010/11) 10 6,720 67,200 2,448 2,448

10 6,720 67,200 2,448 2,448

MALE R/L, RR LWR (COINING)(EK450022/23) 10 6,720 67,200 2,448 2,448

FEMALE R/L,RR UP (COINING)(EK450014/15) 10 6,720 67,200 2,448 2,448

MALE R/L, RR UP (COINING)(EK450017/18) 10 6,720 67,200 2,448 2,448

12 6,720 80,640 2,040 2,040

MALE R/L, FR UP(BENDING 1)(EK450004/5) 12 6,720 80,640 2,040 2,040

12 6,720 80,640 2,040 2,040

12 6,720 80,640 2,040 2,040

12 6,720 80,640 2,040 2,040

12 6,720 80,640 2,040 2,040

12 6,720 80,640 2,040 2,040

MALE R/L, RR UP (BENDING 1)(EK450017/18) 12 6,720 80,640 2,040 2,040

MALE R/L, FR UP(BENDING 2) (EK450004/5) 12 6,720 80,640 2,040 2,040

12 6,720 80,640 2,040 2,040

12 6,720 80,640 2,040 2,040

MALE R/L, RR UP (BENDING 2)(EK450017/18) 12 6,720 80,640 2,040 2,040

FEMALE R/L, G/HATCH (FORMING) 12 6,720 80,640 2,040 2,040

FEMALE R/L, G/HATCH (BENDING) 12 6,720 80,640 2,040 2,040

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING

JIG (MONTH)

CAPACITY ACTUAL

Process Cycle Time

KEBUTUHAN

PERCENTASI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

OPERATOR

OPERATOR

OPERATOR

FEMALE R/L,RR LWR (COINING)(EK450020/21)

FEMALE R/L,FR UP (FORMING+BENDING)(EK450002/3)

FEMALE R/L,FR LWR (FORMING+BENDING)(EK450008/9)

MALE R/L, FR LWR (BENDING 1)(EK450010/11)

FEMALE R/L,RR LWR (FORMING+BENDING)(EK450020/21)

MALE R/L, RR LWR (BENDING 1)(EK450021/22)

FEMALE R/L,RR UP (FORMING+BENDING)(EK450014/15)

MALE R/L, FR LWR (BENDING 2)(EK450010/11)

MALE R/L, RR LWR (BENDING 2)(EK450021/22)

Page 37: Copy of Kapasitas & Cycle Time Stamping 2015

3 3 100%

12 6,720 80,640 2,040 2,040

274 160,560 1,789,200

MALE R/L, FR LWR (BENDING 2)(EK450010/11)

Page 38: Copy of Kapasitas & Cycle Time Stamping 2015

30 10

LINE 2 1 SHIFT

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( SHORT ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110T2 UNIT 1,077,120 100,800 46,200 930,120 12 6,720 80,640 1,890 1,890

2 2 100%

MALE R/L, FR UP(PIERC)(EK45004/5) 930,120 12 6,720 80,640 1,890 1,890

12 6,720 80,640 1,890 1,890

MALE R/L, FR LWR (PIERC)(EK450010/11) 12 6,720 80,640 1,890 1,890

12 6,720 80,640 1,890 1,890

MALE R/L, RR LWR (PIERCE)(EK450022/23) 12 6,720 80,640 1,890 1,890

FEMALE R/L,RR UP (PIERCE+CAMPIACE) 12 6,720 80,640 1,890 1,890

MALE R/L, RR UP (PERCE) 12 6,720 80,640 1,890 1,890

0

MALE R/L, FR UP(CAMPIERCE) 12 13,440 161,280 1,890 1,890

MALE R/L, FR LWR (CAMPIERCE) 12 6,720 80,640 1,890 1,890

MALE R/L, RR LWR (CAMPIERCE) 12 6,720 80,640 1,890 1,890

MALE R/L, RR UP (CAMPIERCE) 12 6,720 80,640 1,890 1,890

0

FEMALE R/L, G/HATCH (PIERCE) 12 6,720 80,640 1,890 1,890

FEMALE R/L, G/HATCH (CAMPIERCE) 12 6,720 80,640 1,890 1,890

168 100,800 1,209,600

28

Karawang, 29 oktober 2013DISETUJUI DIBUAT

Nakagawa Heri W

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASIMESIN/

MONTHOPERAT

OROPERAT

OROPERAT

OR

FEMALE R/L,FR UP (PIERC+CAMPIERC)(EK45002/3)

FEMALE R/L,FR LWR (PIERC+CAMPIERCE)(EK45008/9)

FEMALE R/L,RR LWR (PIERCE+CAMPIACE)(EK450020/21)

Waktu Produksi

Page 39: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS PRODUKSI NOVEMBER 2013

DEPARTEMENT STAMPING

KAPASITAS

TERPAKAI

199%

KAPASITAS

TERPAKAI

67%

KAPASITAS

TERPAKAI

128%

Page 40: Copy of Kapasitas & Cycle Time Stamping 2015

128%

Page 41: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS

TERPAKAI

130%

DIBUAT

Heri W

Page 42: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG FORECAST STOCK T0TAL

KAPASITAS PRODUKSI DECEMBER 2013PLANING PRODUCTION HPM = 4575 unit 3000 1575 4575

DEPARTEMENT STAMPING

(1 SHIFT)

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

MESIN PROD PER SHIFT PROD TERPAKAI

(Sec) ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)FUKUI 300T

1 UNIT

1,028,160 21,600 97,500 909,060 3 3,780 11,340 8,160 8,160

2 2 100% 39%

(MB134045-02) 909,060 0 0 0

HINGE BRACKET A (RH) 3 3,780 11,340 8,160 8,160

(MB134046-02)

HINGE BRACKET B (LWR) 3 7,560 22,680 8,160 8,160

(MB134047-02)

ARM A 3 7,560 22,680 8,160 8,160

ARM B 3 7,560 22,680 8,160 8,160

0 #DIV/0! #DIV/0!

FEMALE L,FR UP(BLANK)(EK450003) 3 4,575 13,725 8,160 8,160

MALE R, FR UP(BLANK)(EK450004) 3 4,575 13,725 8,160 8,160

MALE L, FR UP (BLANK)(EK450005) 3 4,575 13,725 8,160 8,160

FEMALE R,FR LWR (BLANK)(EK450008) 3 4,575 13,725 8,160 8,160

FEMALE L,FR LWR (BLANK)(EK450009) 3 4,575 13,725 8,160 8,160

MALE R, FR LWR (BLANK)(EK450010) 3 4,575 13,725 8,160 8,160

MALE L, FR LWR (BLANK)(EK450011) 3 4,575 13,725 8,160 8,160

FEMALE R,RR LWR (BLANK)(EK450020) 3 4,575 13,725 8,160 8,160

FEMALE L,RR LWR (BLANK)(EK450021) 3 4,575 13,725 8,160 8,160

MALE R, RR LWR (BLANK)(EK450022) 3 4,575 13,725 8,160 8,160

MALE L, RR LWR (BLANK)(EK450023) 3 4,575 13,725 8,160 8,160

FEMALE R,RR UP (BLANK)(EK450014) 3 4,575 13,725 8,160 8,160

FEMALE L,RR UP (BLANK)(EK450015) 3 4,575 13,725 8,160 8,160

MALE R, RR UP (BLANK)(EK450016) 3 4,575 13,725 8,160 8,160

MALE L, RR UP (BLANK)(EK450017) 3 4,575 13,725 8,160 8,160

FEMALE R G/HATCH (BLANK) 3 4,575 13,725 8,160 8,160

FEMALE L,G/HATCH (BLANK) 3 4,575 13,725 8,160 8,160

MALE R/L,G/HATCH (BLANK) 3 9,150 27,450 8,160 8,160

69 117,165 351,495

1 (SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110 T 1 UNIT SLCF 1 OP 1 538,560 21,600 64,800 452,160 7 3,700 25,900 3,497 3,497

1 1 100% 63%

452,160

SLCF 1 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 1 7 3,700 25,900 3,497 3,497

SLCF 3 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 3 7 3,700 25,900 3,497 3,497

SLCF 4 OP 1 7 3,700 25,900 3,497 3,497

SLCF 4 OP 2 7 3,700 25,900 3,497 3,497

SLCF 7 OP 1 7 3,700 25,900 3,497 3,497

SLCF 7 OP 2 7 3,700 25,900 3,497 3,497

SLCF 8 OP 1 7 3,700 25,900 3,497 3,497

SLCF 8 OP 2 7 3,700 25,900 3,497 3,497

77 40,700 284,900

(1 SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 150 T 3 Unit SLCF 7 OP 1 1,077,120 43,200 54,000 979,920 4 3,000 12,000 6,120 6,120 6,120

6 6 100% 79%

979,920

SLCF 7 OP 2 4 3,000 12,000 6,120 6,120 6,120

FEMALE R/L,FR UP (COINING)(EK450002/3) 3 9,150 27,450 8,160 8,160

MALE R/L, FR UP(COINING)(EK450004/5) 3 9,150 27,450 8,160 8,160

FEMALE R/L,FR LWR (COINING)(EK450008/9) 3 9,150 27,450 8,160 8,160

MALE R/L, FR LWR (COINING)(EK450010/11) 3 9,150 27,450 8,160 8,160

4 9,150 36,600 6,120 6,120

MALE R/L, RR LWR (COINING)(EK450022/23) 4 9,150 36,600 6,120 6,120

FEMALE R/L,RR UP (COINING)(EK450014/15) 4 9,150 36,600 6,120 6,120

MALE R/L, RR UP (COINING)(EK450017/18) 4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

MALE R/L, FR UP(BENDING 1)(EK450004/5) 4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

MALE R/L, RR UP (BENDING 1)(EK450017/18) 4 9,150 36,600 6,120 6,120

MALE R/L, FR UP(BENDING 2) (EK450004/5) 4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

MALE R/L, RR UP (BENDING 2)(EK450017/18) 4 9,150 36,600 6,120 6,120

FEMALE R/L, G/HATCH (FORMING) 3 9,150 27,450 8,160 8,160

FEMALE R/L, G/HATCH (BENDING) 3 9,150 27,450 8,160 8,160

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING

JIG (MONTH)

CAPACITY ACTUAL

Process Cycle Time

KEBUTUHAN

PERCENTASI

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

FEMALE R/L,RR LWR (COINING)(EK450020/21)

FEMALE R/L,FR UP (FORMING+BENDING)(EK450002/3)

FEMALE R/L,FR LWR (FORMING+BENDING)(EK450008/9)

MALE R/L, FR LWR (BENDING 1)(EK450010/11)

FEMALE R/L,RR LWR (FORMING+BENDING)(EK450020/21)

MALE R/L, RR LWR (BENDING 1)(EK450021/22)

FEMALE R/L,RR UP (FORMING+BENDING)(EK450014/15)

MALE R/L, FR LWR (BENDING 2)(EK450010/11)

MALE R/L, RR LWR (BENDING 2)(EK450021/22)

Page 43: Copy of Kapasitas & Cycle Time Stamping 2015

6 6 100% 79%

90 207,300 774,300

Page 44: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2 2 SHIFT

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110T2 UNIT 1,077,120 43,200 29,700 1,004,220 5 9,150 45,750 4,536 4,536

2 2 100% 80%

MALE R/L, FR UP(PIERC)(EK45004/5) 1,004,220 7 9,150 64,050 3,240 3,240

5 9,150 45,750 4,536 4,536

MALE R/L, FR LWR (PIERC)(EK450010/11) 7 9,150 64,050 3,240 3,240

5 9,150 45,750 4,536 4,536

MALE R/L, RR LWR (PIERCE)(EK450022/23) 7 9,150 64,050 3,240 3,240

FEMALE R/L,RR UP (PIERCE+CAMPIACE) 5 9,150 45,750 4,536 4,536

MALE R/L, RR UP (PERCE) 7 9,150 64,050 3,240 3,240

0

MALE R/L, FR UP(CAMPIERCE) 7 9,150 64,050 3,240 3,240

MALE R/L, FR LWR (CAMPIERCE) 7 9,150 64,050 3,240 3,240

MALE R/L, RR LWR (CAMPIERCE) 7 9,150 64,050 3,240 3,240

MALE R/L, RR UP (CAMPIERCE) 7 9,150 64,050 3,240 3,240

0

FEMALE R/L, G/HATCH (PIERCE) 6 9,150 54,900 3,780 3,780

FEMALE R/L, G/HATCH (CAMPIERCE) 6 9,150 54,900 3,780 3,780

88 128,100 805,200

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASIMESIN/

MONTHPRODUKS

IOPERAT

OROPERAT

OROPERAT

OR

FEMALE R/L,FR UP (PIERC+CAMPIERC)(EK45002/3)

FEMALE R/L,FR LWR (PIERC+CAMPIERCE)(EK45008/9)

FEMALE R/L,RR LWR (PIERCE+CAMPIACE)(EK450020/21)

Waktu Produksi

Page 45: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG PO STOCK TOTAL

KAPASITAS PRODUKSI NOVEMBER 2013PLANING PRODUCTION HPM = 6150 unit 4920 1230 6150

DEPARTEMENT STAMPING

(1 SHIFT)

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

MESIN PROD PER SHIFT PROD TERPAKAI

(Sec) ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)FUKUI 300T

1 UNIT

HINGE BRACKET A (LH) 514,080 21,600 97,500 394,980 3 3,780 11,340 8,160 8,160

1 1 100% 112%

(MB134045-02) 394,980 0 0 0

HINGE BRACKET A (RH) 3 3,780 11,340 8,160 8,160

(MB134046-02)

HINGE BRACKET B (LWR) 3 7,560 22,680 8,160 8,160

(MB134047-02)

ARM A 3 7,560 22,680 8,160 8,160

ARM B 3 7,560 22,680 8,160 8,160

0 #DIV/0! #DIV/0!

FEMALE L,FR UP(BLANK)(EK450003) 3 6,150 18,450 8,160 8,160

MALE R, FR UP(BLANK)(EK450004) 3 6,150 18,450 8,160 8,160

MALE L, FR UP (BLANK)(EK450005) 3 6,150 18,450 8,160 8,160

FEMALE R,FR LWR (BLANK)(EK450008) 3 6,150 18,450 8,160 8,160

FEMALE L,FR LWR (BLANK)(EK450009) 3 6,150 18,450 8,160 8,160

MALE R, FR LWR (BLANK)(EK450010) 3 6,150 18,450 8,160 8,160

MALE L, FR LWR (BLANK)(EK450011) 3 6,150 18,450 8,160 8,160

FEMALE R,RR LWR (BLANK)(EK450020) 3 6,150 18,450 8,160 8,160

FEMALE L,RR LWR (BLANK)(EK450021) 3 6,150 18,450 8,160 8,160

MALE R, RR LWR (BLANK)(EK450022) 3 6,150 18,450 8,160 8,160

MALE L, RR LWR (BLANK)(EK450023) 3 6,150 18,450 8,160 8,160

FEMALE R,RR UP (BLANK)(EK450014) 3 6,150 18,450 8,160 8,160

FEMALE L,RR UP (BLANK)(EK450015) 3 6,150 18,450 8,160 8,160

MALE R, RR UP (BLANK)(EK450016) 3 6,150 18,450 8,160 8,160

MALE L, RR UP (BLANK)(EK450017) 3 6,150 18,450 8,160 8,160

FEMALE R G/HATCH (BLANK) 3 6,150 18,450 8,160 8,160

FEMALE L,G/HATCH (BLANK) 3 6,150 18,450 8,160 8,160

MALE R/L,G/HATCH (BLANK) 3 12,300 36,900 8,160 8,160

69 147,090 441,270

1 (SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110 T 1 UNIT SLCF 1 OP 1 514,080 21,600 64,800 427,680 7 3,700 25,900 3,497 3,497

1 1 100% 67%

427,680

SLCF 1 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 1 7 3,700 25,900 3,497 3,497

SLCF 3 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 3 7 3,700 25,900 3,497 3,497

SLCF 4 OP 1 7 3,700 25,900 3,497 3,497

SLCF 4 OP 2 7 3,700 25,900 3,497 3,497

SLCF 7 OP 1 7 3,700 25,900 3,497 3,497

SLCF 7 OP 2 7 3,700 25,900 3,497 3,497

SLCF 8 OP 1 7 3,700 25,900 3,497 3,497

SLCF 8 OP 2 7 3,700 25,900 3,497 3,497

77 40,700 284,900

(1 SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 150 T 3 Unit SLCF 7 OP 1 514,080 14,400 42,000 457,680 5 3,700 18,500 4,896 4,896 4,896

3 3 100% 228%

457,680

SLCF 7 OP 2 5 3,700 18,500 4,896 4,896 4,896

FEMALE R/L,FR UP (COINING)(EK450002/3) 3 12,300 36,900 8,160 8,160

MALE R/L, FR UP(COINING)(EK450004/5) 3 12,300 36,900 8,160 8,160

FEMALE R/L,FR LWR (COINING)(EK450008/9) 3 12,300 36,900 8,160 8,160

MALE R/L, FR LWR (COINING)(EK450010/11) 3 12,300 36,900 8,160 8,160

4 12,300 49,200 6,120 6,120

MALE R/L, RR LWR (COINING)(EK450022/23) 4 12,300 49,200 6,120 6,120

FEMALE R/L,RR UP (COINING)(EK450014/15) 4 12,300 49,200 6,120 6,120

MALE R/L, RR UP (COINING)(EK450017/18) 4 12,300 49,200 6,120 6,120

4 12,300 49,200 6,120 6,120

MALE R/L, FR UP(BENDING 1)(EK450004/5) 4 12,300 49,200 6,120 6,120

4 12,300 49,200 6,120 6,120

4 12,300 49,200 6,120 6,120

4 12,300 49,200 6,120 6,120

4 12,300 49,200 6,120 6,120

4 12,300 49,200 6,120 6,120

MALE R/L, RR UP (BENDING 1)(EK450017/18) 4 12,300 49,200 6,120 6,120

MALE R/L, FR UP(BENDING 2) (EK450004/5) 4 12,300 49,200 6,120 6,120

4 12,300 49,200 6,120 6,120

4 12,300 49,200 6,120 6,120

MALE R/L, RR UP (BENDING 2)(EK450017/18) 4 12,300 49,200 6,120 6,120

FEMALE R/L, G/HATCH (FORMING) 3 12,300 36,900 8,160 8,160

FEMALE R/L, G/HATCH (BENDING) 3 12,300 36,900 8,160 8,160

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING

JIG (MONTH)

CAPACITY ACTUAL

Process Cycle Time

KEBUTUHAN

PERCENTASI

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

FEMALE R/L,RR LWR (COINING)(EK450020/21)

FEMALE R/L,FR UP (FORMING+BENDING)(EK450002/3)

FEMALE R/L,FR LWR (FORMING+BENDING)(EK450008/9)

MALE R/L, FR LWR (BENDING 1)(EK450010/11)

FEMALE R/L,RR LWR (FORMING+BENDING)(EK450020/21)

MALE R/L, RR LWR (BENDING 1)(EK450021/22)

FEMALE R/L,RR UP (FORMING+BENDING)(EK450014/15)

MALE R/L, FR LWR (BENDING 2)(EK450010/11)

MALE R/L, RR LWR (BENDING 2)(EK450021/22)

Page 46: Copy of Kapasitas & Cycle Time Stamping 2015

3 3 100% 228%

92 278,000 1,045,600

Page 47: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110T2 UNIT 538,560 14,400 23,100 501,060 5 12,300 61,500 4,536 4,536

2 2 100% 216%

MALE R/L, FR UP(PIERC)(EK45004/5) 501,060 7 12,300 86,100 3,240 3,240

5 12,300 61,500 4,536 4,536

MALE R/L, FR LWR (PIERC)(EK450010/11) 7 12,300 86,100 3,240 3,240

5 12,300 61,500 4,536 4,536

MALE R/L, RR LWR (PIERCE)(EK450022/23) 7 12,300 86,100 3,240 3,240

FEMALE R/L,RR UP (PIERCE+CAMPIACE) 5 12,300 61,500 4,536 4,536

MALE R/L, RR UP (PERCE) 7 12,300 86,100 3,240 3,240

0

MALE R/L, FR UP(CAMPIERCE) 7 12,300 86,100 3,240 3,240

MALE R/L, FR LWR (CAMPIERCE) 7 12,300 86,100 3,240 3,240

MALE R/L, RR LWR (CAMPIERCE) 7 12,300 86,100 3,240 3,240

MALE R/L, RR UP (CAMPIERCE) 7 12,300 86,100 3,240 3,240

0

FEMALE R/L, G/HATCH (PIERCE) 6 12,300 73,800 3,780 3,780

FEMALE R/L, G/HATCH (CAMPIERCE) 6 12,300 73,800 3,780 3,780

88 172,200 1,082,400

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASIMESIN/

MONTHPRODUKS

IOPERAT

OROPERAT

OROPERAT

OR

FEMALE R/L,FR UP (PIERC+CAMPIERC)(EK45002/3)

FEMALE R/L,FR LWR (PIERC+CAMPIERCE)(EK45008/9)

FEMALE R/L,RR LWR (PIERCE+CAMPIACE)(EK450020/21)

Waktu Produksi

Page 48: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA

KARAWANG

KAPASITAS PRODUKSI 2013

DEPARTEMENT ASSY

LINE 1 : MITSUBISHI DOOR HINGE ASSY LINE

Operator : 1 Orang

NAME OF LINE NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

(8*3600*0.85*22) ( Per Month ) ( 1 Set/Prod ) ( Per Month ) (SCXForc)

( sec. ) ( Per Month ) ( sec. ) ( sec. ) ( Pcs ) ( sec. ) (Pcs/Shift) ( Pcs ) (Pcs/Day)

SL LINE

1 UNIT

DOOR HINGE LH 538,560 10,800 6,600 521,160 40 3,250 130,000 612 612

75%

MB134045 521,160

DOOR HINGE RH 40 3,250 130,000 612 612

MB134046

DOOR HINGE LWR 20 6,500 130,000 1,224 1,224

MB134047

Waktu Produksi 100 13,000 390,000

LINE 2 : HPM DOOR HINGE ASSY LINE

Operator : 2 Operator (3 Shift)

NAME OF LINE

MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

ITEM (8*3600*0.85*22) ( Per Month ) ( 1 Set/Prod ) ( Per Month ) (SCXForc)

( sec. ) ( Per Month ) ( sec. ) ( sec. ) ( Pcs ) ( sec. ) (Pcs/Shift) ( Pcs ) (Pcs/Day)

2CF LINE

1 UNIT

HINGE R, FR DOOR UP (EK450000) 1,615,680 18,000 6,600 1,591,080 35 4,020 140,700 699 2,098

88%

1,591,080

HINGE L, FR DOOR UP (EK450001) 35 4,020 140,700 699 2,098

HINGE L, FR DOOR LWR (EK450006) 35 4,020 140,700 699 2,098

HINGE R, FR DOOR LWR (EK450007) 35 4,020 140,700 699 2,098

HINGE L, RR DOOR UP (EK4500012) 35 4,020 140,700 699 2,098

HINGE R, RR DOOR UP (EK4500013) 35 4,020 140,700 699 2,098

HINGE L, RR DOOR LWR (EK4500018) 35 4,020 140,700 699 2,098

HINGE R, RR DOOR LWR (EK4500019) 35 4,020 140,700 699 2,098

HINGE COMP L,G/HATCH (EK4500024) 35 4,020 140,700 699 2,098

HINGE COMP R,G/HATCH (EK4500025) 35 4,020 140,700 699 2,098

Waktu Produksi 350 40,200 1,407,000

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING JIG

(MONTH)

CAPACITY ACTUAL

Process Cycle Time

TIME FOR SETTING JIG

(MOUNTH)

Page 49: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG

KAPASITAS PRODUKSI MEI 2013DEPARTEMENT STAMPING

LINE 1

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)cam rivett

1 UNIT

HINGE BRACKET A (LH) 538,560 10,800 527,760 8 3,780 30,240 3,060 3,060

11%

(MB134045-02) 527,760 0 0 0

HINGE BRACKET A (RH) 8 3,780 30,240 3,060 3,060

(MB134046-02)

0

0

0

Waktu Produksi 16 7,560 60,480

LINE 1

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

bush press fit 1 UNIT arm 45 587,520 21,600 565,920 5 3,700 18,500 4,896 4,896

13%

565,920

arm 46 5 3,700 18,500 4,896 4,896

arm b 5 7,400 37,000 4,896 4,896

0

0

0

0

0

0

0

0

Waktu Produksi 15 14,800 74,000

LINE 1

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

hinge pin staking 1 45 587,520 14,400 6,600 566,520 10 3,700 37,000 2,448 2,448 2,448

26%566,520

46 10 3,700 37,000 2,448 2,448 2,448

47 10 7,400 74,000 2,142 2,142 2,142

30 14,800 148,000

LINE 2

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MESIN/MONTH MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

engraving1 UNIT 45 587,520 10,800 13,200 576,720 7 3,700 25,900 3,240 3,240 9,720

18%576,720

46 7 3,700 25,900 3,240 3,240 9,720

47 7 7,400 51,800 3,240 3,240 9,720

0 #DIV/0! #DIV/0! #DIV/0!

Waktu Produksi 21 14,800 103,600

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING JIG

(MONTH)

CAPACITY ACTUAL

Process Cycle Time

TIME FOR SETTING JIG

(MOUNTH)

TIME FOR SETTING JIG

(MOUNTH)

TIME FOR SETTING JIG

(MOUNTH)(1hariX3measinX26 sec)

Page 50: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG FORECAST STOCK T0TAL

KAPASITAS PRODUKSI DECEMBER 2013PLANING PRODUCTION HPM = 4575 unit 3000 1575 4575

DEPARTEMENT STAMPING

(1 SHIFT)

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

MESIN PROD PER SHIFT PROD TERPAKAI

(Sec) ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)FUKUI 300T

1 UNIT

514,080 21,600 97,500 394,980 3 3,780 11,340 8,160 8,160

1 1 100% 89%

(MB134045-02) 394,980 0 0 0

HINGE BRACKET A (RH) 3 3,780 11,340 8,160 8,160

(MB134046-02)

HINGE BRACKET B (LWR) 3 7,560 22,680 8,160 8,160

(MB134047-02)

ARM A 3 7,560 22,680 8,160 8,160

ARM B 3 7,560 22,680 8,160 8,160

0 #DIV/0! #DIV/0!

FEMALE L,FR UP(BLANK)(EK450003) 3 4,575 13,725 8,160 8,160

MALE R, FR UP(BLANK)(EK450004) 3 4,575 13,725 8,160 8,160

MALE L, FR UP (BLANK)(EK450005) 3 4,575 13,725 8,160 8,160

FEMALE R,FR LWR (BLANK)(EK450008) 3 4,575 13,725 8,160 8,160

FEMALE L,FR LWR (BLANK)(EK450009) 3 4,575 13,725 8,160 8,160

MALE R, FR LWR (BLANK)(EK450010) 3 4,575 13,725 8,160 8,160

MALE L, FR LWR (BLANK)(EK450011) 3 4,575 13,725 8,160 8,160

FEMALE R,RR LWR (BLANK)(EK450020) 3 4,575 13,725 8,160 8,160

FEMALE L,RR LWR (BLANK)(EK450021) 3 4,575 13,725 8,160 8,160

MALE R, RR LWR (BLANK)(EK450022) 3 4,575 13,725 8,160 8,160

MALE L, RR LWR (BLANK)(EK450023) 3 4,575 13,725 8,160 8,160

FEMALE R,RR UP (BLANK)(EK450014) 3 4,575 13,725 8,160 8,160

FEMALE L,RR UP (BLANK)(EK450015) 3 4,575 13,725 8,160 8,160

MALE R, RR UP (BLANK)(EK450016) 3 4,575 13,725 8,160 8,160

MALE L, RR UP (BLANK)(EK450017) 3 4,575 13,725 8,160 8,160

FEMALE R G/HATCH (BLANK) 3 4,575 13,725 8,160 8,160

FEMALE L,G/HATCH (BLANK) 3 4,575 13,725 8,160 8,160

MALE R/L,G/HATCH (BLANK) 3 9,150 27,450 8,160 8,160

69 117,165 351,495

1 (SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110 T 1 UNIT SLCF 1 OP 1 538,560 21,600 64,800 452,160 7 3,700 25,900 3,497 3,497

1 1 100% 63%

452,160

SLCF 1 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 1 7 3,700 25,900 3,497 3,497

SLCF 3 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 3 7 3,700 25,900 3,497 3,497

SLCF 4 OP 1 7 3,700 25,900 3,497 3,497

SLCF 4 OP 2 7 3,700 25,900 3,497 3,497

SLCF 7 OP 1 7 3,700 25,900 3,497 3,497

SLCF 7 OP 2 7 3,700 25,900 3,497 3,497

SLCF 8 OP 1 7 3,700 25,900 3,497 3,497

SLCF 8 OP 2 7 3,700 25,900 3,497 3,497

77 40,700 284,900

(1 SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 150 T 3 Unit SLCF 7 OP 1 538,560 43,200 54,000 441,360 5 3,700 18,500 4,896 4,896 4,896

3 3 100% 178%

441,360

SLCF 7 OP 2 5 3,700 18,500 4,896 4,896 4,896

FEMALE R/L,FR UP (COINING)(EK450002/3) 3 9,150 27,450 8,160 8,160

MALE R/L, FR UP(COINING)(EK450004/5) 3 9,150 27,450 8,160 8,160

FEMALE R/L,FR LWR (COINING)(EK450008/9) 3 9,150 27,450 8,160 8,160

MALE R/L, FR LWR (COINING)(EK450010/11) 3 9,150 27,450 8,160 8,160

4 9,150 36,600 6,120 6,120

MALE R/L, RR LWR (COINING)(EK450022/23) 4 9,150 36,600 6,120 6,120

FEMALE R/L,RR UP (COINING)(EK450014/15) 4 9,150 36,600 6,120 6,120

MALE R/L, RR UP (COINING)(EK450017/18) 4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

MALE R/L, FR UP(BENDING 1)(EK450004/5) 4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

MALE R/L, RR UP (BENDING 1)(EK450017/18) 4 9,150 36,600 6,120 6,120

MALE R/L, FR UP(BENDING 2) (EK450004/5) 4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

4 9,150 36,600 6,120 6,120

MALE R/L, RR UP (BENDING 2)(EK450017/18) 4 9,150 36,600 6,120 6,120

FEMALE R/L, G/HATCH (FORMING) 3 9,150 27,450 8,160 8,160

FEMALE R/L, G/HATCH (BENDING) 3 9,150 27,450 8,160 8,160

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING

JIG (MONTH)

CAPACITY ACTUAL

Process Cycle Time

KEBUTUHAN

PERCENTASI

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

FEMALE R/L,RR LWR (COINING)(EK450020/21)

FEMALE R/L,FR UP (FORMING+BENDING)(EK450002/3)

FEMALE R/L,FR LWR (FORMING+BENDING)(EK450008/9)

MALE R/L, FR LWR (BENDING 1)(EK450010/11)

FEMALE R/L,RR LWR (FORMING+BENDING)(EK450020/21)

MALE R/L, RR LWR (BENDING 1)(EK450021/22)

FEMALE R/L,RR UP (FORMING+BENDING)(EK450014/15)

MALE R/L, FR LWR (BENDING 2)(EK450010/11)

MALE R/L, RR LWR (BENDING 2)(EK450021/22)

Page 51: Copy of Kapasitas & Cycle Time Stamping 2015

3 3 100% 178%

92 208,700 787,300

Page 52: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110T2 UNIT 538,560 43,200 29,700 465,660 5 9,150 45,750 4,536 4,536

2 2 100% 173%

MALE R/L, FR UP(PIERC)(EK45004/5) 465,660 7 9,150 64,050 3,240 3,240

5 9,150 45,750 4,536 4,536

MALE R/L, FR LWR (PIERC)(EK450010/11) 7 9,150 64,050 3,240 3,240

5 9,150 45,750 4,536 4,536

MALE R/L, RR LWR (PIERCE)(EK450022/23) 7 9,150 64,050 3,240 3,240

FEMALE R/L,RR UP (PIERCE+CAMPIACE) 5 9,150 45,750 4,536 4,536

MALE R/L, RR UP (PERCE) 7 9,150 64,050 3,240 3,240

0

MALE R/L, FR UP(CAMPIERCE) 7 9,150 64,050 3,240 3,240

MALE R/L, FR LWR (CAMPIERCE) 7 9,150 64,050 3,240 3,240

MALE R/L, RR LWR (CAMPIERCE) 7 9,150 64,050 3,240 3,240

MALE R/L, RR UP (CAMPIERCE) 7 9,150 64,050 3,240 3,240

0

FEMALE R/L, G/HATCH (PIERCE) 6 9,150 54,900 3,780 3,780

FEMALE R/L, G/HATCH (CAMPIERCE) 6 9,150 54,900 3,780 3,780

88 128,100 805,200

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASIMESIN/

MONTHPRODUKS

IOPERAT

OROPERAT

OROPERAT

OR

FEMALE R/L,FR UP (PIERC+CAMPIERC)(EK45002/3)

FEMALE R/L,FR LWR (PIERC+CAMPIERCE)(EK45008/9)

FEMALE R/L,RR LWR (PIERCE+CAMPIACE)(EK450020/21)

Waktu Produksi

Page 53: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG FORE CAST STOCK TOTAL

KAPASITAS PRODUKSI JANUARY 2014PLANNING PRODUCTION HPM = 7056 unit 5880 1176 7056

DEPARTEMENT STAMPING

(1 SHIFT)

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

PRODUKSI MESIN PROD PER SHIFT PROD

(Sec) ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)FUKUI 300T

1 UNIT

514,080 21,600 97,500 394,980 3 3,780 11,340 8,160 8,160

1 1 100%

(MB134045-02) 394,980 0 0 0

HINGE BRACKET A (RH) 3 3,780 11,340 8,160 8,160

(MB134046-02)

HINGE BRACKET B (LWR) 3 7,560 22,680 8,160 8,160

(MB134047-02)

ARM A 3 7,560 22,680 8,160 8,160

ARM B 3 7,560 22,680 8,160 8,160

0 #DIV/0! #DIV/0!

FEMALE L,FR UP(BLANK)(EK450003) 3 7,056 21,168 8,160 8,160

MALE R, FR UP(BLANK)(EK450004) 3 7,056 21,168 8,160 8,160

MALE L, FR UP (BLANK)(EK450005) 3 7,056 21,168 8,160 8,160

FEMALE R,FR LWR (BLANK)(EK450008) 3 7,056 21,168 8,160 8,160

FEMALE L,FR LWR (BLANK)(EK450009) 3 7,056 21,168 8,160 8,160

MALE R, FR LWR (BLANK)(EK450010) 3 7,056 21,168 8,160 8,160

MALE L, FR LWR (BLANK)(EK450011) 3 7,056 21,168 8,160 8,160

FEMALE R,RR LWR (BLANK)(EK450020) 3 7,056 21,168 8,160 8,160

FEMALE L,RR LWR (BLANK)(EK450021) 3 7,056 21,168 8,160 8,160

MALE R, RR LWR (BLANK)(EK450022) 3 7,056 21,168 8,160 8,160

MALE L, RR LWR (BLANK)(EK450023) 3 7,056 21,168 8,160 8,160

FEMALE R,RR UP (BLANK)(EK450014) 3 7,056 21,168 8,160 8,160

FEMALE L,RR UP (BLANK)(EK450015) 3 7,056 21,168 8,160 8,160

MALE R, RR UP (BLANK)(EK450016) 3 7,056 21,168 8,160 8,160

MALE L, RR UP (BLANK)(EK450017) 3 7,056 21,168 8,160 8,160

FEMALE R G/HATCH (BLANK) 3 3,240 9,720 8,160 8,160

FEMALE L,G/HATCH (BLANK) 3 3,240 9,720 8,160 8,160

MALE R/L,G/HATCH (BLANK) 3 6,480 19,440 8,160 8,160

FEMALE R T/GATE (BLANK) 4 3,840 15,360 6,120 6,120

FEMALE L,T/GATE (BLANK) 4 3,240 12,960 6,120 6,120

MALE R/L,T/GATE (PROGRESIV) 4 7,680 30,720 6,120 6,120

81 163,800 506,160

1 (SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110 T 1 UNIT SLCF 1 OP 1 538,560 21,600 64,800 452,160 7 3,700 25,900 3,497 3,497

1 1 100%

452,160

SLCF 1 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 1 7 3,700 25,900 3,497 3,497

SLCF 3 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 3 7 3,700 25,900 3,497 3,497

SLCF 4 OP 1 7 3,700 25,900 3,497 3,497

SLCF 4 OP 2 7 3,700 25,900 3,497 3,497

SLCF 7 OP 1 7 3,700 25,900 3,497 3,497

SLCF 7 OP 2 7 3,700 25,900 3,497 3,497

SLCF 8 OP 1 7 3,700 25,900 3,497 3,497

SLCF 8 OP 2 7 3,700 25,900 3,497 3,497

77 40,700 284,900

(1 SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 150 T 3 Unit SLCF 7 OP 1 538,560 43,200 54,000 441,360 4 3,000 12,000 6,120 6,120 6,120

3 3 100%

441,360

SLCF 7 OP 2 4 3,000 12,000 6,120 6,120 6,120

FEMALE R/L,FR UP (COINING)(EK450002/3) 8 14,112 112,896 3,060 3,060

MALE R/L, FR UP(COINING)(EK450004/5) 8 14,112 112,896 3,060 3,060

FEMALE R/L,FR LWR (COINING)(EK450008/9) 8 14,112 112,896 3,060 3,060

MALE R/L, FR LWR (COINING)(EK450010/11) 8 14,112 112,896 3,060 3,060

8 14,112 112,896 3,060 3,060

MALE R/L, RR LWR (COINING)(EK450022/23) 8 14,112 112,896 3,060 3,060

FEMALE R/L,RR UP (COINING)(EK450014/15) 8 14,112 112,896 3,060 3,060

MALE R/L, RR UP (COINING)(EK450017/18) 8 14,112 112,896 3,060 3,060

8 14,112 112,896 3,060 3,060

MALE R/L, FR UP(BENDING 1)(EK450004/5) 8 14,112 112,896 3,060 3,060

8 14,112 112,896 3,060 3,060

8 14,112 112,896 3,060 3,060

8 14,112 112,896 3,060 3,060

8 14,112 112,896 3,060 3,060

8 14,112 112,896 3,060 3,060

MALE R/L, RR UP (BENDING 1)(EK450017/18) 8 14,112 112,896 3,060 3,060

MALE R/L, FR UP(BENDING 2) (EK450004/5) 8 14,112 112,896 3,060 3,060

8 14,112 112,896 3,060 3,060

8 14,112 112,896 3,060 3,060

MALE R/L, RR UP (BENDING 2)(EK450017/18) 8 14,112 112,896 3,060 3,060

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING

JIG (MONTH)

CAPACITY ACTUAL

Process Cycle Time

KEBUTUHAN

PERCENTASI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

OPERATOR

OPERATOR

OPERATOR

FEMALE R/L,RR LWR (COINING)(EK450020/21)

FEMALE R/L,FR UP (FORMING+BENDING)(EK450002/3)

FEMALE R/L,FR LWR (FORMING+BENDING)(EK450008/9)

MALE R/L, FR LWR (BENDING 1)(EK450010/11)

FEMALE R/L,RR LWR (FORMING+BENDING)(EK450020/21)

MALE R/L, RR LWR (BENDING 1)(EK450021/22)

FEMALE R/L,RR UP (FORMING+BENDING)(EK450014/15)

MALE R/L, FR LWR (BENDING 2)(EK450010/11)

MALE R/L, RR LWR (BENDING 2)(EK450021/22)

Page 54: Copy of Kapasitas & Cycle Time Stamping 2015

3 3 100%

FEMALE R/L, G/HATCH (FORMING) 8 6,480 51,840 3,060 9,180

FEMALE R/L, G/HATCH (BENDING) 8 6,480 51,840 3,060 9,180

FEMALE R/L, T/GATE (COINING) 4 6,360 25,440 6,120 18,360

FEMALE R/L,T/GATE (BENDING) 4 6,360 25,440 6,120 18,360

192 313,920 2,436,480

Page 55: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110T2 UNIT 538,560 43,200 29,700 465,660 8 13,200 105,600 2,835 8,505

2 2 100%

MALE R/L, FR UP(PIERC)(EK45004/5) 465,660 8 13,200 105,600 2,835 8,505

8 13,200 105,600 2,835 8,505

MALE R/L, FR LWR (PIERC)(EK450010/11) 8 13,200 105,600 2,835 8,505

8 13,200 105,600 2,835 8,505

MALE R/L, RR LWR (PIERCE)(EK450022/23) 8 13,200 105,600 2,835 8,505

FEMALE R/L,RR UP (PIERCE+CAMPIACE) 8 13,200 105,600 2,835 8,505

MALE R/L, RR UP (PERCE) 8 13,200 105,600 2,835 8,505

0

MALE R/L, FR UP(CAMPIERCE) 8 13,200 105,600 2,835 8,505

MALE R/L, FR LWR (CAMPIERCE) 8 13,200 105,600 2,835 8,505

MALE R/L, RR LWR (CAMPIERCE) 8 13,200 105,600 2,835 8,505

MALE R/L, RR UP (CAMPIERCE) 8 13,200 105,600 2,835 8,505

0

FEMALE R/L, G/HATCH (PIERCE) 8 7,680 61,440 2,835 8,505

FEMALE R/L, G/HATCH (CAMPIERCE) 8 7,680 61,440 2,835 8,505

112 173,760 1,390,080

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASIMESIN/

MONTHOPERAT

OROPERAT

OROPERAT

OR

FEMALE R/L,FR UP (PIERC+CAMPIERC)(EK45002/3)

FEMALE R/L,FR LWR (PIERC+CAMPIERCE)(EK45008/9)

FEMALE R/L,RR LWR (PIERCE+CAMPIACE)(EK450020/21)

Waktu Produksi

Page 56: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS PRODUKSI JANUARY 2014

DEPARTEMENT STAMPING

KAPASITAS

TERPAKAI

128%

KAPASITAS

TERPAKAI

63%

KAPASITAS

TERPAKAI

552%

Page 57: Copy of Kapasitas & Cycle Time Stamping 2015

552%

Page 58: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS

TERPAKAI

299%

Page 59: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG FORE CAST STOCK TOTAL

KAPASITAS PRODUKSI JANUARY 2014PLANNING PRODUCTION HPM = 7056 unit 5880 1176 7056

DEPARTEMENT STAMPING

(2 SHIFT)

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

PRODUKSI MESIN PROD PER SHIFT PROD

(Sec) ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)FUKUI 300T

1 UNIT

1,028,160 21,600 97,500 909,060 4 3,780 15,120 6,120 6,120

2 2 100%

(MB134045-02) 909,060 0 0 0

HINGE BRACKET A (RH) 4 3,780 15,120 6,120 6,120

(MB134046-02)

HINGE BRACKET B (LWR) 4 7,560 30,240 6,120 6,120

(MB134047-02)

ARM A 4 7,560 30,240 6,120 6,120

ARM B 4 7,560 30,240 6,120 6,120

0 #DIV/0! #DIV/0!

FEMALE L,FR UP(BLANK)(EK450003) 3 7,056 21,168 8,160 8,160

MALE R, FR UP(BLANK)(EK450004) 3 7,056 21,168 8,160 8,160

MALE L, FR UP (BLANK)(EK450005) 3 7,056 21,168 8,160 8,160

FEMALE R,FR LWR (BLANK)(EK450008) 3 7,056 21,168 8,160 8,160

FEMALE L,FR LWR (BLANK)(EK450009) 3 7,056 21,168 8,160 8,160

MALE R, FR LWR (BLANK)(EK450010) 3 7,056 21,168 8,160 8,160

MALE L, FR LWR (BLANK)(EK450011) 3 7,056 21,168 8,160 8,160

FEMALE R,RR LWR (BLANK)(EK450020) 3 7,056 21,168 8,160 8,160

FEMALE L,RR LWR (BLANK)(EK450021) 3 7,056 21,168 8,160 8,160

MALE R, RR LWR (BLANK)(EK450022) 3 7,056 21,168 8,160 8,160

MALE L, RR LWR (BLANK)(EK450023) 3 7,056 21,168 8,160 8,160

FEMALE R,RR UP (BLANK)(EK450014) 3 7,056 21,168 8,160 8,160

FEMALE L,RR UP (BLANK)(EK450015) 3 7,056 21,168 8,160 8,160

MALE R, RR UP (BLANK)(EK450016) 3 7,056 21,168 8,160 8,160

MALE L, RR UP (BLANK)(EK450017) 3 7,056 21,168 8,160 8,160

FEMALE R G/HATCH (BLANK) 3 3,240 9,720 8,160 8,160

FEMALE L,G/HATCH (BLANK) 3 3,240 9,720 8,160 8,160

MALE R/L,G/HATCH (BLANK) 3 6,480 19,440 8,160 8,160

FEMALE R T/GATE (BLANK) 4 3,840 15,360 6,120 6,120

FEMALE L,T/GATE (BLANK) 4 3,240 12,960 6,120 6,120

MALE R/L,T/GATE (PROGRESIV) 4 7,680 30,720 6,120 6,120

86 163,800 536,400

1 (SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110 T 1 UNIT SLCF 1 OP 1 538,560 21,600 64,800 452,160 7 3,700 25,900 3,497 3,497

1 1 100%

452,160

SLCF 1 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 1 7 3,700 25,900 3,497 3,497

SLCF 3 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 3 7 3,700 25,900 3,497 3,497

SLCF 4 OP 1 7 3,700 25,900 3,497 3,497

SLCF 4 OP 2 7 3,700 25,900 3,497 3,497

SLCF 7 OP 1 7 3,700 25,900 3,497 3,497

SLCF 7 OP 2 7 3,700 25,900 3,497 3,497

SLCF 8 OP 1 7 3,700 25,900 3,497 3,497

SLCF 8 OP 2 7 3,700 25,900 3,497 3,497

77 40,700 284,900

(2 SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 150 T 3 Unit SLCF 7 OP 1 1,615,680 43,200 54,000 1,518,480 7 3,000 21,000 3,497 3,497 3,497

6 6 100%

1,518,480

SLCF 7 OP 2 7 3,000 21,000 3,497 3,497 3,497

FEMALE R/L,FR UP (COINING)(EK450002/3) 10 14,112 141,120 2,448 2,448

MALE R/L, FR UP(COINING)(EK450004/5) 10 14,112 141,120 2,448 2,448

FEMALE R/L,FR LWR (COINING)(EK450008/9) 10 14,112 141,120 2,448 2,448

MALE R/L, FR LWR (COINING)(EK450010/11) 10 14,112 141,120 2,448 2,448

12 14,112 169,344 2,040 2,040

MALE R/L, RR LWR (COINING)(EK450022/23) 10 14,112 141,120 2,448 2,448

FEMALE R/L,RR UP (COINING)(EK450014/15) 12 14,112 169,344 2,040 2,040

MALE R/L, RR UP (COINING)(EK450017/18) 12 14,112 169,344 2,040 2,040

12 14,112 169,344 2,040 2,040

MALE R/L, FR UP(BENDING 1)(EK450004/5) 12 14,112 169,344 2,040 2,040

12 14,112 169,344 2,040 2,040

12 14,112 169,344 2,040 2,040

12 14,112 169,344 2,040 2,040

12 14,112 169,344 2,040 2,040

12 14,112 169,344 2,040 2,040

MALE R/L, RR UP (BENDING 1)(EK450017/18) 12 14,112 169,344 2,040 2,040

MALE R/L, FR UP(BENDING 2) (EK450004/5) 12 14,112 169,344 2,040 2,040

12 14,112 169,344 2,040 2,040

12 14,112 169,344 2,040 2,040

MALE R/L, RR UP (BENDING 2)(EK450017/18) 12 14,112 169,344 2,040 2,040

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING

JIG (MONTH)

CAPACITY ACTUAL

Process Cycle Time

KEBUTUHAN

PERCENTASI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

OPERATOR

OPERATOR

OPERATOR

FEMALE R/L,RR LWR (COINING)(EK450020/21)

FEMALE R/L,FR UP (FORMING+BENDING)(EK450002/3)

FEMALE R/L,FR LWR (FORMING+BENDING)(EK450008/9)

MALE R/L, FR LWR (BENDING 1)(EK450010/11)

FEMALE R/L,RR LWR (FORMING+BENDING)(EK450020/21)

MALE R/L, RR LWR (BENDING 1)(EK450021/22)

FEMALE R/L,RR UP (FORMING+BENDING)(EK450014/15)

MALE R/L, FR LWR (BENDING 2)(EK450010/11)

MALE R/L, RR LWR (BENDING 2)(EK450021/22)

Page 60: Copy of Kapasitas & Cycle Time Stamping 2015

6 6 100%

FEMALE R/L, G/HATCH (FORMING) 12 6,480 77,760 2,040 6,120

FEMALE R/L, G/HATCH (BENDING) 12 6,480 77,760 2,040 6,120

FEMALE R/L, T/GATE (COINING) 4 6,360 25,440 6,120 18,360

FEMALE R/L,T/GATE (BENDING) 4 6,360 25,440 6,120 18,360

276 313,920 3,494,160

Page 61: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110T2 UNIT 1,077,120 43,200 29,700 1,004,220 5 13,200 66,000 4,536 13,608

2 2 100%

MALE R/L, FR UP(PIERC)(EK45004/5) 1,004,220 6 13,200 79,200 3,780 11,340

5 13,200 66,000 4,536 13,608

MALE R/L, FR LWR (PIERC)(EK450010/11) 6 13,200 79,200 3,780 11,340

5 13,200 66,000 4,536 13,608

MALE R/L, RR LWR (PIERCE)(EK450022/23) 6 13,200 79,200 3,780 11,340

FEMALE R/L,RR UP (PIERCE+CAMPIACE) 5 13,200 66,000 4,536 13,608

MALE R/L, RR UP (PERCE) 5 13,200 66,000 4,536 13,608

0

MALE R/L, FR UP(CAMPIERCE) 5 13,200 66,000 4,536 13,608

MALE R/L, FR LWR (CAMPIERCE) 5 13,200 66,000 4,536 13,608

MALE R/L, RR LWR (CAMPIERCE) 5 13,200 66,000 4,536 13,608

MALE R/L, RR UP (CAMPIERCE) 5 13,200 66,000 4,536 13,608

0

FEMALE R/L, G/HATCH (PIERCE) 5 7,680 38,400 4,536 13,608

FEMALE R/L, G/HATCH (CAMPIERCE) 5 7,680 38,400 4,536 13,608

73 173,760 908,400

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASIMESIN/

MONTHOPERAT

OROPERAT

OROPERAT

OR

FEMALE R/L,FR UP (PIERC+CAMPIERC)(EK45002/3)

FEMALE R/L,FR LWR (PIERC+CAMPIERCE)(EK45008/9)

FEMALE R/L,RR LWR (PIERCE+CAMPIACE)(EK450020/21)

Waktu Produksi

Page 62: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS PRODUKSI JANUARY 2014

DEPARTEMENT STAMPING

KAPASITAS

TERPAKAI

59%

KAPASITAS

TERPAKAI

63%

KAPASITAS

TERPAKAI

230%

Page 63: Copy of Kapasitas & Cycle Time Stamping 2015

230%

Page 64: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS

TERPAKAI

90%

Page 65: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA 3270

KARAWANG PO STOCK TOTALKAPASITAS PRODUKSI FEBRUARY 2014

PLANNING PRODUCTION HPM = 11160 unit 9300 1860 11160DEPARTEMENT STAMPING

(1 SHIFT)

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

PRODUKSI MESIN PROD PER SHIFT PROD

(Sec) ( Per Month ) ( Per Month ) ( sec. ) ( SHORT ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)FUKUI 300T

1 UNIT

514,080 21,600 97,500 394,980 3 3,780 11,340 8,160 8,160

1 1 100%

(MB134045-02) 394,980 0 0 0

HINGE BRACKET A (RH) 3 3,780 11,340 8,160 8,160

(MB134046-02)

HINGE BRACKET B (LWR) 3 7,560 22,680 8,160 8,160

(MB134047-02)

ARM A 3 7,560 22,680 8,160 8,160

ARM B 3 7,560 22,680 8,160 8,160

0 #DIV/0! #DIV/0!

FEMALE L,FR UP(BLANK)(EK450003) 3 11,160 33,480 8,160 8,160

MALE R, FR UP(BLANK)(EK450004) 3 11,160 33,480 8,160 8,160

MALE L, FR UP (BLANK)(EK450005) 3 11,160 33,480 8,160 8,160

FEMALE R,FR LWR (BLANK)(EK450008) 3 11,160 33,480 8,160 8,160

FEMALE L,FR LWR (BLANK)(EK450009) 3 11,160 33,480 8,160 8,160

MALE R, FR LWR (BLANK)(EK450010) 3 11,160 33,480 8,160 8,160

MALE L, FR LWR (BLANK)(EK450011) 3 11,160 33,480 8,160 8,160

FEMALE R,RR LWR (BLANK)(EK450020) 3 11,160 33,480 8,160 8,160

FEMALE L,RR LWR (BLANK)(EK450021) 3 11,160 33,480 8,160 8,160

MALE R, RR LWR (BLANK)(EK450022) 3 11,160 33,480 8,160 8,160

MALE L, RR LWR (BLANK)(EK450023) 3 11,160 33,480 8,160 8,160

FEMALE R,RR UP (BLANK)(EK450014) 3 11,160 33,480 8,160 8,160

FEMALE L,RR UP (BLANK)(EK450015) 3 11,160 33,480 8,160 8,160

MALE R, RR UP (BLANK)(EK450016) 3 11,160 33,480 8,160 8,160

MALE L, RR UP (BLANK)(EK450017) 3 11,160 33,480 8,160 8,160

FEMALE R G/HATCH (BLANK) 3 3,300 9,900 8,160 8,160

FEMALE L,G/HATCH (BLANK) 3 3,300 9,900 8,160 8,160

MALE R/L,G/HATCH (BLANK) 3 6,600 19,800 8,160 8,160

FEMALE R T/GATE (BLANK) 4 6,720 26,880 6,120 6,120

FEMALE L,T/GATE (BLANK) 4 6,720 26,880 6,120 6,120

MALE R/L,T/GATE (PROGRESIV) 4 13,440 53,760 6,120 6,120

81 237,720 740,040

TOTAL SHORT PER BULAN 237,720

JUMLAH SHOT/HARI 7,300

KEBUTUHAN JAM KERJA (HARI) 33

1 (SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110 T 1 UNIT SLCF 1 OP 1 538,560 21,600 64,800 452,160 7 3,700 25,900 3,497 3,497

1 1 100%

452,160

SLCF 1 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 1 7 3,700 25,900 3,497 3,497

SLCF 3 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 3 7 3,700 25,900 3,497 3,497

SLCF 4 OP 1 7 3,700 25,900 3,497 3,497

SLCF 4 OP 2 7 3,700 25,900 3,497 3,497

SLCF 7 OP 1 7 3,700 25,900 3,497 3,497

SLCF 7 OP 2 7 3,700 25,900 3,497 3,497

SLCF 8 OP 1 7 3,700 25,900 3,497 3,497

SLCF 8 OP 2 7 3,700 25,900 3,497 3,497

77 40,700 284,900

(1 SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( SHORT ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 150 T 3 Unit SLCF 7 OP 1 1,615,680 43,200 54,000 1,518,480 4 3,000 12,000 6,120 6,120 6,120

3 3 100%

1,518,480

SLCF 7 OP 2 4 3,000 12,000 6,120 6,120 6,120

FEMALE R/L,FR UP (COINING)(EK450002/3) 10 22,320 223,200 2,448 2,448

MALE R/L, FR UP(COINING)(EK450004/5) 10 11,160 111,600 2,448 2,448

FEMALE R/L,FR LWR (COINING)(EK450008/9) 10 11,160 111,600 2,448 2,448

MALE R/L, FR LWR (COINING)(EK450010/11) 10 11,160 111,600 2,448 2,448

10 11,160 111,600 2,448 2,448

MALE R/L, RR LWR (COINING)(EK450022/23) 10 11,160 111,600 2,448 2,448

FEMALE R/L,RR UP (COINING)(EK450014/15) 10 11,160 111,600 2,448 2,448

MALE R/L, RR UP (COINING)(EK450017/18) 10 11,160 111,600 2,448 2,448

12 11,160 133,920 2,040 2,040

MALE R/L, FR UP(BENDING 1)(EK450004/5) 12 11,160 133,920 2,040 2,040

12 11,160 133,920 2,040 2,040

12 11,160 133,920 2,040 2,040

12 11,160 133,920 2,040 2,040

12 11,160 133,920 2,040 2,040

12 11,160 133,920 2,040 2,040

MALE R/L, RR UP (BENDING 1)(EK450017/18) 12 11,160 133,920 2,040 2,040

MALE R/L, FR UP(BENDING 2) (EK450004/5) 12 11,160 133,920 2,040 2,040

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING

JIG (MONTH)

CAPACITY ACTUAL

Process Cycle Time

KEBUTUHAN

PERCENTASI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

OPERATOR

OPERATOR

OPERATOR

FEMALE R/L,RR LWR (COINING)(EK450020/21)

FEMALE R/L,FR UP (FORMING+BENDING)(EK450002/3)

FEMALE R/L,FR LWR (FORMING+BENDING)(EK450008/9)

MALE R/L, FR LWR (BENDING 1)(EK450010/11)

FEMALE R/L,RR LWR (FORMING+BENDING)(EK450020/21)

MALE R/L, RR LWR (BENDING 1)(EK450021/22)

FEMALE R/L,RR UP (FORMING+BENDING)(EK450014/15)

Page 66: Copy of Kapasitas & Cycle Time Stamping 2015

12 11,160 133,920 2,040 2,040

3 3 100%

12 11,160 133,920 2,040 2,040

MALE R/L, FR LWR (BENDING 2)(EK450010/11)

MALE R/L, RR LWR (BENDING 2)(EK450021/22)

Page 67: Copy of Kapasitas & Cycle Time Stamping 2015

MALE R/L, RR UP (BENDING 2)(EK450017/18) 12 11,160 133,920 2,040 2,040

3 3 100%

FEMALE R/L, G/HATCH (FORMING) 12 6,300 75,600 2,040 6,120

FEMALE R/L, G/HATCH (BENDING) 12 6,300 75,600 2,040 6,120

FEMALE R/L, T/GATE (COINING) 12 13,200 158,400 2,040 6,120

FEMALE R/L,T/GATE (BENDING) 12 13,200 158,400 2,040 6,120

280 279,360 3,103,440

TOTAL SHORT PER BULAN 279,360

JUMLAH SHOT/HARI 5,850

KEBUTUHAN JAM KERJA (HARI) 48

Page 68: Copy of Kapasitas & Cycle Time Stamping 2015

LINE 2

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( SHORT ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110T2 UNIT 1,077,120 43,200 29,700 1,004,220 12 11,160 133,920 1,890 5,670

2 2 100%

MALE R/L, FR UP(PIERC)(EK45004/5) 1,004,220 12 11,160 133,920 1,890 5,670

12 11,160 133,920 1,890 5,670

MALE R/L, FR LWR (PIERC)(EK450010/11) 12 11,160 133,920 1,890 5,670

12 11,160 133,920 1,890 5,670

MALE R/L, RR LWR (PIERCE)(EK450022/23) 12 11,160 133,920 1,890 5,670

FEMALE R/L,RR UP (PIERCE+CAMPIACE) 12 11,160 133,920 1,890 5,670

MALE R/L, RR UP (PERCE) 12 11,160 133,920 1,890 5,670

0

MALE R/L, FR UP(CAMPIERCE) 12 22,320 267,840 1,890 5,670

MALE R/L, FR LWR (CAMPIERCE) 12 11,160 133,920 1,890 5,670

MALE R/L, RR LWR (CAMPIERCE) 12 11,160 133,920 1,890 5,670

MALE R/L, RR UP (CAMPIERCE) 12 11,160 133,920 1,890 5,670

0

FEMALE R/L, G/HATCH (PIERCE) 12 6,300 75,600 1,890 5,670

FEMALE R/L, G/HATCH (CAMPIERCE) 12 6,300 75,600 1,890 5,670

168 157,680 1,892,160

TOTAL SHORT PER BULAN 157,680

JUMLAH SHOT/HARI 3,900

KEBUTUHAN JAM KERJA (HARI) 40

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASIMESIN/

MONTHOPERAT

OROPERAT

OROPERAT

OR

FEMALE R/L,FR UP (PIERC+CAMPIERC)(EK45002/3)

FEMALE R/L,FR LWR (PIERC+CAMPIERCE)(EK45008/9)

FEMALE R/L,RR LWR (PIERCE+CAMPIACE)(EK450020/21)

Waktu Produksi

Page 69: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS PRODUKSI FEBRUARY 2014

DEPARTEMENT STAMPING

KAPASITAS

TERPAKAI

187%

KAPASITAS

TERPAKAI

63%

KAPASITAS

TERPAKAI

204%

Page 70: Copy of Kapasitas & Cycle Time Stamping 2015

204%

Page 71: Copy of Kapasitas & Cycle Time Stamping 2015

204%

Page 72: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS

TERPAKAI

188%

Page 73: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA 3270

KARAWANG PO STOCK TOTALKAPASITAS PRODUKSI FEBRUARY 2014

PLANNING PRODUCTION HPM = 11160 unit 9300 1860 11160DEPARTEMENT STAMPING

(3 SHIFT) 21 HARI KERJA

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

MESIN PROD PER SHIFT PROD TERPAKAI

(Sec) ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)FUKUI 300T

1 UNIT

1,542,240 21,600 97,500 1,423,140 3 3,780 11,340 8,160 8,160

3 3 100% 52%

(MB134045-02) 1,423,140 0 0 0

HINGE BRACKET A (RH) 3 3,780 11,340 8,160 8,160

(MB134046-02)

HINGE BRACKET B (LWR) 3 7,560 22,680 8,160 8,160

(MB134047-02)

ARM A 3 7,560 22,680 8,160 8,160

ARM B 3 7,560 22,680 8,160 8,160

0 #DIV/0! #DIV/0!

FEMALE L,FR UP(BLANK)(EK450003) 3 11,160 33,480 8,160 8,160

MALE R, FR UP(BLANK)(EK450004) 3 11,160 33,480 8,160 8,160

MALE L, FR UP (BLANK)(EK450005) 3 11,160 33,480 8,160 8,160

FEMALE R,FR LWR (BLANK)(EK450008) 3 11,160 33,480 8,160 8,160

FEMALE L,FR LWR (BLANK)(EK450009) 3 11,160 33,480 8,160 8,160

MALE R, FR LWR (BLANK)(EK450010) 3 11,160 33,480 8,160 8,160

MALE L, FR LWR (BLANK)(EK450011) 3 11,160 33,480 8,160 8,160

FEMALE R,RR LWR (BLANK)(EK450020) 3 11,160 33,480 8,160 8,160

FEMALE L,RR LWR (BLANK)(EK450021) 3 11,160 33,480 8,160 8,160

MALE R, RR LWR (BLANK)(EK450022) 3 11,160 33,480 8,160 8,160

MALE L, RR LWR (BLANK)(EK450023) 3 11,160 33,480 8,160 8,160

FEMALE R,RR UP (BLANK)(EK450014) 3 11,160 33,480 8,160 8,160

FEMALE L,RR UP (BLANK)(EK450015) 3 11,160 33,480 8,160 8,160

MALE R, RR UP (BLANK)(EK450016) 3 11,160 33,480 8,160 8,160

MALE L, RR UP (BLANK)(EK450017) 3 11,160 33,480 8,160 8,160

FEMALE R G/HATCH (BLANK) 3 3,300 9,900 8,160 8,160

FEMALE L,G/HATCH (BLANK) 3 3,300 9,900 8,160 8,160

MALE R/L,G/HATCH (BLANK) 3 6,600 19,800 8,160 8,160

FEMALE R T/GATE (BLANK) 4 6,720 26,880 6,120 6,120

FEMALE L,T/GATE (BLANK) 4 6,720 26,880 6,120 6,120

MALE R/L,T/GATE (PROGRESIV) 4 13,440 53,760 6,120 6,120

81 237,720 740,040

1 (SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110 T 1 UNIT SLCF 1 OP 1 538,560 21,600 64,800 452,160 7 3,700 25,900 3,497 3,497

1 1 100% 63%

452,160

SLCF 1 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 1 7 3,700 25,900 3,497 3,497

SLCF 3 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 3 7 3,700 25,900 3,497 3,497

SLCF 4 OP 1 7 3,700 25,900 3,497 3,497

SLCF 4 OP 2 7 3,700 25,900 3,497 3,497

SLCF 7 OP 1 7 3,700 25,900 3,497 3,497

SLCF 7 OP 2 7 3,700 25,900 3,497 3,497

SLCF 8 OP 1 7 3,700 25,900 3,497 3,497

SLCF 8 OP 2 7 3,700 25,900 3,497 3,497

77 40,700 284,900

(3 SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 150 T 3 Unit SLCF 7 OP 1 1,615,680 14,400 30,000 1,571,280 4 3,000 12,000 6,120 6,120 6,120

9 9 100% 119%

1,571,280

SLCF 7 OP 2 4 3,000 12,000 6,120 6,120 6,120

FEMALE R/L,FR UP (COINING)(EK450002/3) 3 22,320 66,960 8,160 8,160

MALE R/L, FR UP(COINING)(EK450004/5) 3 22,320 66,960 8,160 8,160

FEMALE R/L,FR LWR (COINING)(EK450008/9) 3 22,320 66,960 8,160 8,160

MALE R/L, FR LWR (COINING)(EK450010/11) 3 22,320 66,960 8,160 8,160

4 22,320 89,280 6,120 6,120

MALE R/L, RR LWR (COINING)(EK450022/23) 4 22,320 89,280 6,120 6,120

FEMALE R/L,RR UP (COINING)(EK450014/15) 4 22,320 89,280 6,120 6,120

MALE R/L, RR UP (COINING)(EK450017/18) 4 22,320 89,280 6,120 6,120

4 22,320 89,280 6,120 6,120

MALE R/L, FR UP(BENDING 1)(EK450004/5) 4 22,320 89,280 6,120 6,120

4 22,320 89,280 6,120 6,120

4 22,320 89,280 6,120 6,120

4 22,320 89,280 6,120 6,120

4 22,320 89,280 6,120 6,120

4 22,320 89,280 6,120 6,120

MALE R/L, RR UP (BENDING 1)(EK450017/18) 4 22,320 89,280 6,120 6,120

MALE R/L, FR UP(BENDING 2) (EK450004/5) 4 22,320 89,280 6,120 6,120

4 22,320 89,280 6,120 6,120

4 22,320 89,280 6,120 6,120

MALE R/L, RR UP (BENDING 2)(EK450017/18) 4 22,320 89,280 6,120 6,120

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING

JIG (MONTH)

CAPACITY ACTUAL

Process Cycle Time

KEBUTUHAN

PERCENTASI

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASI

MESIN/MONTH

PRODUKSI

OPERATOR

OPERATOR

OPERATOR

FEMALE R/L,RR LWR (COINING)(EK450020/21)

FEMALE R/L,FR UP (FORMING+BENDING)(EK450002/3)

FEMALE R/L,FR LWR (FORMING+BENDING)(EK450008/9)

MALE R/L, FR LWR (BENDING 1)(EK450010/11)

FEMALE R/L,RR LWR (FORMING+BENDING)(EK450020/21)

MALE R/L, RR LWR (BENDING 1)(EK450021/22)

FEMALE R/L,RR UP (FORMING+BENDING)(EK450014/15)

MALE R/L, FR LWR (BENDING 2)(EK450010/11)

MALE R/L, RR LWR (BENDING 2)(EK450021/22)

Page 74: Copy of Kapasitas & Cycle Time Stamping 2015

9 9 100% 119%

FEMALE R/L, G/HATCH (FORMING) 3 6,300 18,900 8,160 24,480

FEMALE R/L, G/HATCH (BENDING) 3 6,300 18,900 8,160 24,480

FEMALE R/L, T/GATE (COINING) 4 13,200 52,800 6,120 18,360

FEMALE R/L,T/GATE (BENDING) 4 13,200 52,800 6,120 18,360

98 491,400 1,863,720

Page 75: Copy of Kapasitas & Cycle Time Stamping 2015

3 SHIFT

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110T2 UNIT 1,615,680 43,200 29,700 1,542,780 5 22,320 111,600 4,536 13,608

6 6 100% 95%

MALE R/L, FR UP(PIERC)(EK45004/5) 1,542,780 6 22,320 133,920 3,780 11,340

5 22,320 111,600 4,536 13,608

MALE R/L, FR LWR (PIERC)(EK450010/11) 6 22,320 133,920 3,780 11,340

5 22,320 111,600 4,536 13,608

MALE R/L, RR LWR (PIERCE)(EK450022/23) 6 22,320 133,920 3,780 11,340

FEMALE R/L,RR UP (PIERCE+CAMPIACE) 5 22,320 111,600 4,536 13,608

MALE R/L, RR UP (PERCE) 5 22,320 111,600 4,536 13,608

0

MALE R/L, FR UP(CAMPIERCE) 5 22,320 111,600 4,536 13,608

MALE R/L, FR LWR (CAMPIERCE) 5 22,320 111,600 4,536 13,608

MALE R/L, RR LWR (CAMPIERCE) 5 22,320 111,600 4,536 13,608

MALE R/L, RR UP (CAMPIERCE) 5 22,320 111,600 4,536 13,608

0

FEMALE R/L, G/HATCH (PIERCE) 5 6,300 31,500 4,536 13,608

FEMALE R/L, G/HATCH (CAMPIERCE) 5 6,300 31,500 4,536 13,608

73 280,440 1,469,160

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

PERCENTASIMESIN/

MONTHPRODUKS

IOPERAT

OROPERAT

OROPERAT

OR

FEMALE R/L,FR UP (PIERC+CAMPIERC)(EK45002/3)

FEMALE R/L,FR LWR (PIERC+CAMPIERCE)(EK45008/9)

FEMALE R/L,RR LWR (PIERCE+CAMPIACE)(EK450020/21)

Waktu Produksi

Page 76: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG FORECASTSTOCK TOTAL

KAPASITAS PRODUKSI MARCH 2014PLANNING PRODUCTION HPM = 14280 unit 12660 1620 14280

DEPARTEMENT STAMPING

(1 SHIFT)

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL PERCENTASI

PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR

(Sec) ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)FUKUI 300T

1 UNIT

514,080 21,600 97,500 394,980 3 3,780 11,340 8,160 8,160

1 1 100%

(MB134045-02) 394,980 0 0 0

HINGE BRACKET A (RH) 3 3,780 11,340 8,160 8,160

(MB134046-02)

HINGE BRACKET B (LWR) 3 7,560 22,680 8,160 8,160

(MB134047-02)

ARM A 3 7,560 22,680 8,160 8,160

ARM B 3 7,560 22,680 8,160 8,160

0 #DIV/0! #DIV/0!

FEMALE L,FR UP(BLANK)(EK450003) 3 14,280 42,840 8,160 8,160

MALE R, FR UP(BLANK)(EK450004) 3 14,280 42,840 8,160 8,160

MALE L, FR UP (BLANK)(EK450005) 3 14,280 42,840 8,160 8,160

FEMALE R,FR LWR (BLANK)(EK450008) 3 14,280 42,840 8,160 8,160

FEMALE L,FR LWR (BLANK)(EK450009) 3 14,280 42,840 8,160 8,160

MALE R, FR LWR (BLANK)(EK450010) 3 14,280 42,840 8,160 8,160

MALE L, FR LWR (BLANK)(EK450011) 3 14,280 42,840 8,160 8,160

FEMALE R,RR LWR (BLANK)(EK450020) 3 14,280 42,840 8,160 8,160

FEMALE L,RR LWR (BLANK)(EK450021) 3 14,280 42,840 8,160 8,160

MALE R, RR LWR (BLANK)(EK450022) 3 14,280 42,840 8,160 8,160

MALE L, RR LWR (BLANK)(EK450023) 3 14,280 42,840 8,160 8,160

FEMALE R,RR UP (BLANK)(EK450014) 3 14,280 42,840 8,160 8,160

FEMALE L,RR UP (BLANK)(EK450015) 3 14,280 42,840 8,160 8,160

MALE R, RR UP (BLANK)(EK450016) 3 14,280 42,840 8,160 8,160

MALE L, RR UP (BLANK)(EK450017) 3 14,280 42,840 8,160 8,160

FEMALE R G/HATCH (BLANK) 3 3,480 10,440 8,160 8,160

FEMALE L,G/HATCH (BLANK) 3 3,480 10,440 8,160 8,160

MALE R/L,G/HATCH (BLANK) 3 6,960 20,880 8,160 8,160

FEMALE R T/GATE (BLANK) 4 11,580 46,320 6,120 6,120

FEMALE L,T/GATE (BLANK) 4 11,580 46,320 6,120 6,120

MALE R/L,T/GATE (PROGRESIV) 4 23,160 92,640 6,120 6,120

81 304,680 960,360

TOTAL SHORT PER BULAN 304,680

JUMLAH SHOT/HARI 7,300

KEBUTUHAN JAM KERJA (HARI) 42

1 (SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL PERCENTASI

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110 T 1 UNIT SLCF 1 OP 1 538,560 21,600 64,800 452,160 7 3,700 25,900 3,497 3,497

1 1 100%

452,160

SLCF 1 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 1 7 3,700 25,900 3,497 3,497

SLCF 3 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 3 7 3,700 25,900 3,497 3,497

SLCF 4 OP 1 7 3,700 25,900 3,497 3,497

SLCF 4 OP 2 7 3,700 25,900 3,497 3,497

SLCF 7 OP 1 7 3,700 25,900 3,497 3,497

SLCF 7 OP 2 7 3,700 25,900 3,497 3,497

SLCF 8 OP 1 7 3,700 25,900 3,497 3,497

SLCF 8 OP 2 7 3,700 25,900 3,497 3,497

77 40,700 284,900

(1 SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL PERCENTASI

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( SHORT ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 150 T 3 Unit SLCF 7 OP 1 1,615,680 14,400 24,000 1,577,280 4 3,000 12,000 6,120 6,120 6,120

3 3 100%

1,577,280

SLCF 7 OP 2 4 3,000 12,000 6,120 6,120 6,120

FEMALE R/L,FR UP (COINING)(EK450002/3) 10 28,560 285,600 2,448 2,448

MALE R/L, FR UP(COINING)(EK450004/5) 10 14,280 142,800 2,448 2,448

FEMALE R/L,FR LWR (COINING)(EK450008/9) 10 14,280 142,800 2,448 2,448

MALE R/L, FR LWR (COINING)(EK450010/11) 10 14,280 142,800 2,448 2,448

10 14,280 142,800 2,448 2,448

MALE R/L, RR LWR (COINING)(EK450022/23) 12 14,280 171,360 2,040 2,040

FEMALE R/L,RR UP (COINING)(EK450014/15) 12 14,280 171,360 2,040 2,040

MALE R/L, RR UP (COINING)(EK450017/18) 12 14,280 171,360 2,040 2,040

12 14,280 171,360 2,040 2,040

MALE R/L, FR UP(BENDING 1)(EK450004/5) 12 14,280 171,360 2,040 2,040

12 14,280 171,360 2,040 2,040

12 14,280 171,360 2,040 2,040

12 14,280 171,360 2,040 2,040

12 14,280 171,360 2,040 2,040

12 14,280 171,360 2,040 2,040

MALE R/L, RR UP (BENDING 1)(EK450017/18) 12 14,280 171,360 2,040 2,040

MALE R/L, FR UP(BENDING 2) (EK450004/5) 12 14,280 171,360 2,040 2,040

12 14,280 171,360 2,040 2,040

12 14,280 171,360 2,040 2,040

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING

JIG (MONTH)

CAPACITY ACTUAL

Process Cycle Time

KEBUTUHAN

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

MESIN/MONTH

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

MESIN/MONTH

OPERATOR

OPERATOR

FEMALE R/L,RR LWR (COINING)(EK450020/21)

FEMALE R/L,FR UP (FORMING+BENDING)(EK450002/3)

FEMALE R/L,FR LWR (FORMING+BENDING)(EK450008/9)

MALE R/L, FR LWR (BENDING 1)(EK450010/11)

FEMALE R/L,RR LWR (FORMING+BENDING)(EK450020/21)

MALE R/L, RR LWR (BENDING 1)(EK450021/22)

FEMALE R/L,RR UP (FORMING+BENDING)(EK450014/15)

MALE R/L, FR LWR (BENDING 2)(EK450010/11)

MALE R/L, RR LWR (BENDING 2)(EK450021/22)

Page 77: Copy of Kapasitas & Cycle Time Stamping 2015

MALE R/L, RR UP (BENDING 2)(EK450017/18) 12 14,280 171,360 2,040 2,040

3 3 100%

FEMALE R/L, G/HATCH (FORMING) 12 6,960 83,520 2,040 6,120

FEMALE R/L, G/HATCH (BENDING) 12 6,960 83,520 2,040 6,120

FEMALE R/L, T/GATE (COINING) 12 19,920 239,040 2,040 6,120

FEMALE R/L,T/GATE (BENDING) 12 19,920 239,040 2,040 6,120

286 359,640 4,096,320

Page 78: Copy of Kapasitas & Cycle Time Stamping 2015

TOTAL SHORT PER BULAN 359,640

JUMLAH SHOT/HARI 5,850

KEBUTUHAN JAM KERJA (HARI) 61

1 SHIFT

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL PERCENTASI

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( SHORT ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110T2 UNIT 1,077,120 3,600 23,100 1,050,420 12 14,280 171,360 1,890 5,670

2 2 100%

MALE R/L, FR UP(PIERC)(EK45004/5) 1,050,420 12 14,280 171,360 1,890 5,670

12 14,280 171,360 1,890 5,670

MALE R/L, FR LWR (PIERC)(EK450010/11) 12 14,280 171,360 1,890 5,670

12 14,280 171,360 1,890 5,670

MALE R/L, RR LWR (PIERCE)(EK450022/23) 12 14,280 171,360 1,890 5,670

FEMALE R/L,RR UP (PIERCE+CAMPIACE) 12 14,280 171,360 1,890 5,670

MALE R/L, RR UP (PERCE) 12 14,280 171,360 1,890 5,670

14,280 0

MALE R/L, FR UP(CAMPIERCE) 12 14,280 171,360 1,890 5,670

MALE R/L, FR LWR (CAMPIERCE) 12 14,280 171,360 1,890 5,670

MALE R/L, RR LWR (CAMPIERCE) 12 14,280 171,360 1,890 5,670

MALE R/L, RR UP (CAMPIERCE) 12 14,280 171,360 1,890 5,670

0

FEMALE R/L, G/HATCH (PIERCE) 12 6,960 83,520 1,890 5,670

FEMALE R/L, G/HATCH (CAMPIERCE) 12 6,960 83,520 1,890 5,670

168 199,560 2,223,360

TOTAL SHORT PER BULAN 199,560

JUMLAH SHOT/HARI 3,900

KEBUTUHAN JAM KERJA (HARI) 51

Karawang, 14 Juni 2013

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHANMESIN/

MONTHOPERAT

OROPERAT

OR

FEMALE R/L,FR UP (PIERC+CAMPIERC)(EK45002/3)

FEMALE R/L,FR LWR (PIERC+CAMPIERCE)(EK45008/9)

FEMALE R/L,RR LWR (PIERCE+CAMPIACE)(EK450020/21)

Waktu Produksi

Page 79: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS PRODUKSI MARCH 2014

DEPARTEMENT STAMPING

KAPASITAS

TERPAKAI

243%

KAPASITAS

TERPAKAI

63%

KAPASITAS

TERPAKAI

260%

Page 80: Copy of Kapasitas & Cycle Time Stamping 2015

260%

Page 81: Copy of Kapasitas & Cycle Time Stamping 2015

KAPASITAS

TERPAKAI

212%

Page 82: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG FORECAS STOCK

KAPASITAS PRODUKSI MARCH 2014PLANNING PRODUCTION HPM = 12260 unit 11040 1620

DEPARTEMENT STAMPING

(2 SHIFT)

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

(Sec) ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)FUKUI 300T

1 UNIT

1,028,160 21,600 97,500 909,060 3 3,480 10,440 8,160 8,160

3 3 92%

(MB134045-02) 909,060 0 0 0

HINGE BRACKET A (RH) 3 1,095 3,285 8,160 8,160

(MB134046-02)

HINGE BRACKET B (LWR) 3 6,900 20,700 8,160 8,160

(MB134047-02)

ARM A 3 5,800 17,400 8,160 8,160

ARM B 3 4,800 14,400 8,160 8,160

0 #DIV/0! #DIV/0!

FEMALE L,FR UP(BLANK)(EK450003) 3 12,660 37,980 8,160 8,160

MALE R, FR UP(BLANK)(EK450004) 3 12,660 37,980 8,160 8,160

MALE L, FR UP (BLANK)(EK450005) 3 12,660 37,980 8,160 8,160

FEMALE R,FR LWR (BLANK)(EK450008) 3 12,660 37,980 8,160 8,160

FEMALE L,FR LWR (BLANK)(EK450009) 3 12,660 37,980 8,160 8,160

MALE R, FR LWR (BLANK)(EK450010) 3 12,660 37,980 8,160 8,160

MALE L, FR LWR (BLANK)(EK450011) 3 12,660 37,980 8,160 8,160

FEMALE R,RR LWR (BLANK)(EK450020) 3 12,660 37,980 8,160 8,160

FEMALE L,RR LWR (BLANK)(EK450021) 3 12,660 37,980 8,160 8,160

MALE R, RR LWR (BLANK)(EK450022) 3 12,660 37,980 8,160 8,160

MALE L, RR LWR (BLANK)(EK450023) 3 12,660 37,980 8,160 8,160

FEMALE R,RR UP (BLANK)(EK450014) 3 12,660 37,980 8,160 8,160

FEMALE L,RR UP (BLANK)(EK450015) 3 12,660 37,980 8,160 8,160

MALE R, RR UP (BLANK)(EK450016) 3 12,660 37,980 8,160 8,160

MALE L, RR UP (BLANK)(EK450017) 3 12,660 37,980 8,160 8,160

FEMALE R G/HATCH (BLANK) 3 1,590 4,770 8,160 8,160

FEMALE L,G/HATCH (BLANK) 3 1,590 4,770 8,160 8,160

MALE R/L,G/HATCH (BLANK) 3 3,330 9,990 8,160 8,160

FEMALE R T/GATE (BLANK) 4 11,060 44,240 6,120 6,120

FEMALE L,T/GATE (BLANK) 4 11,060 44,240 6,120 6,120

MALE R/L,T/GATE (PROGRESIV) 4 22,120 88,480 6,120 6,120

81 262,725 832,415

1 (SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110 T 1 UNIT SLCF 1 OP 1 514,080 21,600 64,800 427,680 7 3,700 25,900 3,497 3,497

1 1 67%

427,680

SLCF 1 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 1 7 3,700 25,900 3,497 3,497

SLCF 3 OP 2 7 3,700 25,900 3,497 3,497

SLCF 3 OP 3 7 3,700 25,900 3,497 3,497

SLCF 4 OP 1 7 3,700 25,900 3,497 3,497

SLCF 4 OP 2 7 3,700 25,900 3,497 3,497

SLCF 7 OP 1 7 3,700 25,900 3,497 3,497

SLCF 7 OP 2 7 3,700 25,900 3,497 3,497

SLCF 8 OP 1 7 3,700 25,900 3,497 3,497

SLCF 8 OP 2 7 3,700 25,900 3,497 3,497

77 40,700 284,900

(2 SHIFT) 22 HARI KERJA

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 150 T 3 Unit SLCF 7 OP 1 3,084,480 14,400 12,000 3,058,080 4 3,000 12,000 6,120 6,120 6,120

9 9 70%

3,058,080

SLCF 7 OP 2 4 3,000 12,000 6,120 6,120 6,120

FEMALE R/L,FR UP (COINING)(EK450002/3) 4 25,320 101,280 6,120 6,120

MALE R/L, FR UP(COINING)(EK450004/5) 4 25,320 101,280 6,120 6,120

FEMALE R/L,FR LWR (COINING)(EK450008/9) 4 25,320 101,280 6,120 6,120

MALE R/L, FR LWR (COINING)(EK450010/11) 4 25,320 101,280 6,120 6,120

4 25,320 101,280 6,120 6,120

MALE R/L, RR LWR (COINING)(EK450022/23) 4 25,320 101,280 6,120 6,120

FEMALE R/L,RR UP (COINING)(EK450014/15) 4 25,320 101,280 6,120 6,120

MALE R/L, RR UP (COINING)(EK450017/18) 4 25,320 101,280 6,120 6,120

4 25,320 101,280 6,120 6,120

MALE R/L, FR UP(BENDING 1)(EK450004/5) 4 25,320 101,280 6,120 6,120

4 25,320 101,280 6,120 6,120

4 25,320 101,280 6,120 6,120

4 25,320 101,280 6,120 6,120

4 25,320 101,280 6,120 6,120

4 25,320 101,280 6,120 6,120

MALE R/L, RR UP (BENDING 1)(EK450017/18) 4 25,320 101,280 6,120 6,120

MALE R/L, FR UP(BENDING 2) (EK450004/5) 4 25,320 101,280 6,120 6,120

4 25,320 101,280 6,120 6,120

4 25,320 101,280 6,120 6,120

MALE R/L, RR UP (BENDING 2)(EK450017/18) 4 25,320 101,280 6,120 6,120

FEMALE R/L, G/HATCH (FORMING) 4 1,920 7,680 6,120 18,360

FEMALE R/L, G/HATCH (BENDING) 4 1,920 7,680 6,120 18,360

FEMALE R/L, T/GATE (COINING) 4 11,060 44,240 6,120 18,360

FEMALE R/L,T/GATE (BENDING) 4 11,060 44,240 6,120 18,360

104 538,360 2,153,440

2 SHIFT 22 HARI KERJA

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110T2 UNIT 2,056,320 3,600 23,100 2,029,620 5 25,320 126,600 4,536 13,608

6 6 80%

MALE R/L, FR UP(PIERC)(EK45004/5) 2,029,620 6 25,320 151,920 3,780 11,340

5 25,320 126,600 4,536 13,608

MALE R/L, FR LWR (PIERC)(EK450010/11) 6 25,320 151,920 3,780 11,340

5 25,320 126,600 4,536 13,608

MALE R/L, RR LWR (PIERCE)(EK450022/23) 6 25,320 151,920 3,780 11,340

FEMALE R/L,RR UP (PIERCE+CAMPIACE) 5 25,320 126,600 4,536 13,608

MALE R/L, RR UP (PERCE) 5 25,320 126,600 4,536 13,608

0

MALE R/L, FR UP(CAMPIERCE) 5 25,320 126,600 4,536 13,608

MALE R/L, FR LWR (CAMPIERCE) 5 25,320 126,600 4,536 13,608

MALE R/L, RR LWR (CAMPIERCE) 5 25,320 126,600 4,536 13,608

MALE R/L, RR UP (CAMPIERCE) 5 25,320 126,600 4,536 13,608

0

FEMALE R/L, G/HATCH (PIERCE) 5 1,920 9,600 4,536 13,608

FEMALE R/L, G/HATCH (CAMPIERCE) 5 1,920 9,600 4,536 13,608

73 307,680 1,614,360

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING

JIG (MONTH)

CAPACITY ACTUAL

Process Cycle Time

KEBUTUHAN

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

MESIN/MONTH

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

MESIN/MONTH

OPERATOR

OPERATOR

FEMALE R/L,RR LWR (COINING)(EK450020/21)

FEMALE R/L,FR UP (FORMING+BENDING)(EK450002/3)

FEMALE R/L,FR LWR (FORMING+BENDING)(EK450008/9)

MALE R/L, FR LWR (BENDING 1)(EK450010/11)

FEMALE R/L,RR LWR (FORMING+BENDING)(EK450020/21)

MALE R/L, RR LWR (BENDING 1)(EK450021/22)

FEMALE R/L,RR UP (FORMING+BENDING)(EK450014/15)

MALE R/L, FR LWR (BENDING 2)(EK450010/11)

MALE R/L, RR LWR (BENDING 2)(EK450021/22)

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHANMESIN/

MONTHOPERAT

OROPERAT

OR

FEMALE R/L,FR UP (PIERC+CAMPIERC)(EK45002/3)

FEMALE R/L,FR LWR (PIERC+CAMPIERCE)(EK45008/9)

FEMALE R/L,RR LWR (PIERCE+CAMPIACE)(EK450020/21)

Waktu Produksi

Page 83: Copy of Kapasitas & Cycle Time Stamping 2015

PT. MIZUSHIMA METAL WORKS INDONESIA KARAWANG

KAPASITAS PRODUKSI February 2015PLANNING PRODUCTION HPM

DEPARTEMENT STAMPING

(3 SHIFT)

NAME OF PRODUCT ITEM

RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL PERCENTASI KAPASITAS

PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR TERPAKAI

(Sec) ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)FUKUI 300T

1 UNIT

1,413,720 21,600 97,500 1,294,620 5 0 4,896 4,896

3 3 100% 0%

(MB134045-02) 1,294,620 0

HINGE BRACKET A (RH) 5 0 4,896 4,896

(MB134046-02)HINGE BRACKET B (LWR) 5 0 4,896 4,896

(MB134047-02)ARM A 5 0 4,896 4,896

ARM B 5 0 4,896 4,896

FEMALE L,FR UP(BLANK)(EK450002) 5 0 4,896 9,792

FEMALE R,FR UP(BLANK)(EK450003) 5 0 4,896 4,896

MALE L, FR UP(BLANK)(EK450004) 5 0 4,896 4,896

MALE R, FR UP (BLANK)(EK450005) 5 0 4,896 4,896

FEMALE L,FR LWR (BLANK)(EK450008) 5 0 4,896 4,896

FEMALE R,FR LWR (BLANK)(EK450009) 5 0 4,896 4,896

MALE L, FR LWR (BLANK)(EK450010) 5 0 4,896 4,896

MALE R, FR LWR (BLANK)(EK450011) 5 0 4,896 4,896

FEMALE R,RR LWR (BLANK)(EK450021) 5 0 4,896 4,896

FEMALE L,RR LWR (BLANK)(EK450020) 5 0 4,896 4,896

MALE L, RR LWR (BLANK)(EK450022) 5 0 4,896 4,896

MALE R, RR LWR (BLANK)(EK450023) 5 0 4,896 4,896

FEMALE L,RR UP (BLANK)(EK450014) 5 0 4,896 4,896

FEMALE R,RR UP (BLANK)(EK450015) 5 0 4,896 4,896

MALE L, RR UP (BLANK)(EK450016) 5 0 4,896 4,896

MALE R, RR UP (BLANK)(EK450017) 5 0 4,896 4,896

FEMALE R G/HATCH (BLANK)(EK450026) 3 0 8,160 8,160

FEMALE L,G/HATCH (BLANK)(EK450027) 3 0 8,160 8,160

MALE R/L,G/HATCH (BLANK)(EK450029) 5 0 4,896 4,896

FEMALE R T/GATE 2MD (BLANK) 5 0 4,896 4,896

FEMALE L,T/GATE 2MD (BLANK) 5 0 4,896 4,896

MALE R/L,T/GATE 2MD (PROGRESIV) 5 0 4,896 4,896

0 #DIV/0! #DIV/0!

FEMALE R,RR UP (BLANK)(EK450056) 5 0 4,896 4,896

FEMALE L,RR UP (BLANK)(EK450057) 5 0 4,896 4,896

MALE R, RR UP (BLANK)(EK450058) 5 0 4,896 4,896

MALE L, RR UP (BLANK)(EK450059) 5 0 4,896 4,896

0 #DIV/0! #DIV/0!

FEMALE R,RR UP (BLANK)(EK450062) 5 0 4,896 4,896

FEMALE L,RR UP (BLANK)(EK450063) 5 0 4,896 4,896

MALE R, RR UP (BLANK)(EK450064) 5 0 4,896 4,896

MALE L, RR UP (BLANK)(EK450065) 5 0 4,896 4,896

0 #DIV/0! #DIV/0!

FEMALE T/GATE 2WF 5 0 4,896 4,896

MALE T/G 2WF (PROGRESIVE) 5 0 4,896 4,896

0 #DIV/0! #DIV/0!

HINGE MALE EK450078 5 0 4,896 4,896

HINGE MALE EK450079 5 0 4,896 4,896

HINGE FEMALE EK450080 5 0 4,896 4,896

HINGE FEMALE EK450081 5 0 4,896 4,896

0 #DIV/0! #DIV/0!

HINGE R FEMALE HINGE R COMP T/GATE 5 0 4,896 4,896

HINGE L MALE (HINGE L COMP T/GATE MALE) 5 0 4,896 4,896

HOOD R MALE (HINGE UP COMP R HOOD) 5 0 4,896 4,896

HOOD L FEMALE (HINGE UP COMP L HOOD) 5 0 4,896 4,896

221 0 0

1 (SHIFT)

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL PERCENTASI KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110 T 1 UNIT SLCF 1 OP 1 449,820 21,600 64,800 363,420 7 2,160 15,120 3,497 3,497

1 1 100% 49%

363,420

SLCF 1 OP 2 7 2,160 15,120 3,497 3,497

SLCF 3 OP 1 7 2,160 15,120 3,497 3,497

SLCF 3 OP 2 7 2,160 15,120 3,497 3,497

SLCF 3 OP 3 7 2,160 15,120 3,497 3,497

SLCF 4 OP 1 7 2,160 15,120 3,497 3,497

SLCF 4 OP 2 7 2,160 15,120 3,497 3,497

SLCF 7 OP 1 10 2,160 21,600 2,448 2,448

SLCF 7 OP 2 10 2,160 21,600 2,448 2,448

SLCF 8 OP 1 7 2,160 15,120 3,497 3,497

SLCF 8 OP 2 7 2,160 15,120 3,497 3,497

83 23,760 179,280

(2 SHIFT) 22 HARI KERJA

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 150 T 3 Unit SLCF 7 OP 1 3,084,480 14,400 12,000 3,058,080 10 2,160 21,600 2,448 2,448 2,448

9 9 100% 96%

3,058,080

SLCF 7 OP 2 10 2,160 21,600 2,448 2,448 2,448

FEMALE R/L,FR UP (COINING)(EK450002/3) 8 14,400 115,200 3,060 3,060

MALE R/L, FR UP(COINING)(EK450004/5) 8 14,400 115,200 3,060 3,060

FEMALE R/L,FR LWR (COINING)(EK450008/9) 8 14,400 115,200 3,060 3,060

MALE R/L, FR LWR (COINING)(EK450010/11) 8 14,400 115,200 3,060 3,060

FEMALE R/L,RR LWR (COINING)(EK450020/21) 8 17,000 136,000 3,060 3,060

MALE R/L, RR LWR (COINING)(EK450022/23) 8 17,000 136,000 3,060 3,060

FEMALE R/L,RR UP (COINING)(EK450014/15) 8 17,000 136,000 3,060 3,060

MALE R/L, RR UP (COINING)(EK450017/18) 8 17,000 136,000 3,060 3,060

FEMALE R/L,FR UP (FORMING+BENDING)(EK450002/3) 8 14,400 115,200 3,060 3,060

MALE R/L, FR UP(BENDING 1)(EK450004/5) 8 14,400 115,200 3,060 3,060

FEMALE R/L,FR LWR (FORMING+BENDING)(EK450008/9) 8 14,400 115,200 3,060 3,060

MALE R/L, FR LWR (BENDING 1)(EK450010/11) 8 14,400 115,200 3,060 3,060

FEMALE R/L,RR LWR (FORMING+BENDING)(EK450020/21) 8 17,000 136,000 3,060 3,060

MALE R/L, RR LWR (BENDING 1)(EK450021/22) 8 17,000 136,000 3,060 3,060

FEMALE R/L,RR UP (FORMING+BENDING)(EK450014/15) 8 17,000 136,000 3,060 3,060

MALE R/L, RR UP (BENDING 1)(EK450017/18) 8 17,000 136,000 3,060 3,060

MALE R/L, FR UP(BENDING 2) (EK450004/5) 8 14,400 115,200 3,060 3,060

MALE R/L, FR LWR (BENDING 2)(EK450010/11) 8 14,400 115,200 3,060 3,060

MALE R/L, RR LWR (BENDING 2)(EK450021/22) 8 17,000 136,000 3,060 3,060

MALE R/L, RR UP (BENDING 2)(EK450017/18) 8 17,000 136,000 3,060 3,060

FEMALE R/L, G/HATCH (FORMING) 8 1,656 13,248 3,060 9,180

FEMALE R/L, G/HATCH (BENDING) 8 1,656 13,248 3,060 9,180

FEMALE R/L, T/GATE (COINING) 8 13,920 111,360 3,060 9,180

FEMALE R/L,T/GATE (BENDING) 8 13,920 111,360 3,060 9,180

HINGE R FEMALE HINGE R COMP T/GATE 8 4,320 34,560 3,060 9,180

HINGE L MALE (HINGE L COMP T/GATE MALE) 8 4,320 34,560 3,060 9,180

HOOD R MALE (HINGE UP COMP R HOOD) 8 1,520 12,160 3,060 9,180

HOOD L FEMALE (HINGE UP COMP L HOOD) 8 1,520 12,160 3,060 9,180

8 2,160 17,280 3,060 9,180

8 2,160 17,280 3,060 9,180

260 365,472 2,932,416

2 SHIFT 22 HARI KERJA

NAME MACHINE NAME OF CAPASITAS TIME FOR CAPACITY Cycle RENCANA Kebutuhan Cap. TARGET Cap. ACTUAL PERCENTASI KAPASITAS

OF QUANTITY PRODUCT MAINTENANCE ACTUAL Time Proses PRODUKSI MESIN PROD PER SHIFT PROD OPERATOR TERPAKAI

MACHINE ITEM ( Per Month ) ( Per Month ) ( sec. ) ( Pcs ) (SCXForc) (Pcs/Shift) ( Pcs ) (Pcs/Day)

AIDA 110T

2 UNIT FEMALE R/L,FR UP (PIERC+CAMPIERC)(EK45002/3) 2,056,320 3,600 23,100 2,029,620 12 27,840 334,080 1,890 5,670

6 6 100% 156%

MALE R/L, FR UP(PIERC)(EK45004/5) 2,029,620 8 27,840 222,720 2,835 8,505

FEMALE R/L,FR LWR (PIERC+CAMPIERCE)(EK45008/9) 12 27,840 334,080 1,890 5,670

MALE R/L, FR LWR (PIERC)(EK450010/11) 8 27,840 222,720 2,835 8,505

FEMALE R/L,RR LWR (PIERCE+CAMPIACE)(EK450020/21) 12 27,840 334,080 1,890 5,670

MALE R/L, RR LWR (PIERCE)(EK450022/23) 8 27,840 222,720 2,835 8,505

FEMALE R/L,RR UP (PIERCE+CAMPIACE) 12 27,840 334,080 1,890 5,670

MALE R/L, RR UP (PERCE) 8 27,840 222,720 2,835 8,505

27,840 0

MALE R/L, FR UP(CAMPIERCE) 8 27,840 222,720 2,835 8,505

MALE R/L, FR LWR (CAMPIERCE) 8 27,840 222,720 2,835 8,505

MALE R/L, RR LWR (CAMPIERCE) 8 27,840 222,720 2,835 8,505

MALE R/L, RR UP (CAMPIERCE) 8 27,840 222,720 2,835 8,505

0

FEMALE R/L, G/HATCH (PIERCE) 8 1,920 15,360 2,835 8,505

FEMALE R/L, G/HATCH (CAMPIERCE) 12 1,920 23,040 1,890 5,670

132 365,760 3,156,480

Karawang, 29 Februari 2015

MENGETAHUI DIPERIKSA DIBUAT

NAME OF MACHINE

MACHINE QUANTITY

CAPACITY / MONTH

TIME FOR MAINTENANCE

TIME FOR SETTING

JIG (MONTH)

CAPACITY ACTUAL

Process Cycle Time

KEBUTUHAN

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

MESIN/MONTH

OPERATOR

OPERATOR

Waktu Produksi

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

OPRATOR

ACTUAL OPRATOR

PERCENTASI OPRATOR

MESIN/MONTH

HINGE MALE R T/GATE        HINGE FEMALE R T/GATE        

TIME FOR SETTING

JIG (MOUNTH)

KEBUTUHAN

MESIN/MONTH

OPERATOR

OPERATOR

Waktu Produksi

Page 84: Copy of Kapasitas & Cycle Time Stamping 2015

PRODUCTION CAPACITY EVERY DAY ASSY

AUG'13 SEP'13 OCT'13 NOV'13 DEC'13BRIO 2CFOTHERSTDOT

No proces Target Actual1 Proces pemasangan bush 12 112 proses assy hinge pin 12 113 proses clinched 20 204 ceck torque 5 55 packing 3 3

Page 85: Copy of Kapasitas & Cycle Time Stamping 2015

JAN'14 FEB'14 MAR'14 APR'14 MEI'14 JUN'14 JUL'14