Harga Upah&BahanI. DAFTAR HARGA SATUAN UPAHNo.PEKERJASATHARGA UPAHTOTAL HARGAUPAH(Rp)852,352,074.59(1)(2)(3)(4)(5)1MandorHari25000.0033,135,530.802Kepala Tukang KayuHari27500.009,539,630.433Kepala Tukang BatuHari25000.0012,448,247.234Kepala Tukang BesiHari20000.0034,538,796.505Kepala Tukang CatHari18500.002,591,182.816Kepala Tukang Style BaliHari27500.000.07Tukang KayuHari25000.0086,257,596.608Tukang BatuHari20000.0098,112,795.589Tukang BesiHari18500.0095,845,484.0410Tukang CatHari17000.0023,810,869.0411Tukang GaliHari17000.0027,952,574.0612Tukang Style BaliHari27000.000.013Tukang Bongkar BegestingHari16000.0030,103,756.8014PekerjaHari16000.00398,015,610.70II. DAFTAR SATUAN BAHAN BANGUNANNo.JENIS BAHAN BANGUNANSATHARGA SATUANVOLUME BAHANTOTAL HARGA BAHAN(Rp)(Rp)1,372,058,681.94(1)(2)(3)(4)(5)(6)1Kayu Kamper BalokM31975000.0015.2730,157,858.952Kayu Kamper PapanM32350000.004.079,566,967.503Kayu Begesting PapanM3875000.00193.72169,509,270.004Kayu Kruing BalokM31200000.0047.4656,948,051.405Kayu Kruing PapanM31250000.000.00.06Kayu Meranti BalokM3850000.005.584,739,940.007Kayu Meranti PapanM3875000.000.00.08Keramik 30/30 Diamond Kw II MudaM231000.001,126.4234,919,020.009Keramik 20/20 Diamond Kw II MudaM228500.0067.721,930,020.0010Plint Keramik 10 / 30Bh1500.003,200.684,801,020.0011Tegel PC Polos 20 x 20M217500.00694.2012,148,500.0012Tegel Plin PC Polos 15 x 20Bh500.0063.0031,500.0013Paving Block Kelas IM225000.003,019.4875,487,000.0014Batu KaliM354000.00870.3847,000,415.9515Kerikil BetonM342000.00683.5728,710,067.6116Pasir BetonM350000.00443.6922,184,418.2417Pasir UrugM350000.00702.0535,102,689.5018Pasir PasangM355000.00645.3235,492,344.1919Tanah UrugM340000.00165.686,627,120.0020LimestoneM330000.003,373.13101,194,042.5021Semen Gresik 50 kgZak22500.007,838.29176,361,584.2422Bata merah Kelas IBiji450.00183,948.2182,776,692.7023Bata Gosok ex BelayuBiji650.000.00.024Bataco kelas IBh1200.000.00.025Glass BlockBh13000.000.00.026Genteng Karang PilangBh2500.0015,711.3039,278,250.0027Genteng PresBh460.007,476.363,439,124.2228Genteng BubunganBh2800.00745.762,088,128.0029Paku UsukKg5000.002,275.4111,377,053.5030Paku RengKg5000.00169.57847,836.2531Paku SengKg5000.000.00.032Eternit Kelas ILbr8250.001,324.1610,924,320.0033Paku ListKg8000.00103.22825,753.6034Kaca Bening 5 mmM230000.008.22246,480.0035Besi BetonKg3750.0084,428.05316,605,176.2536Kawat Ikat BetonKg6000.001,535.069,210,332.4037Cat DasarKg7500.000.00.038Cat MeniKg11000.0026.61292,657.8839Cat Tembok ParagonKg6625.002,092.0613,859,864.6140Cat Kayu EmcoKg25000.0053.211,330,263.1041Plamur KayuKg11250.0046.84526,952.8142Plamur TembokKg3715.001,413.555,251,340.8543Paras Silakarang 50 x 20 x 12Bh8000.000.00.044KuasBh4000.00284.581,138,335.0045AmplasLbr2000.002,920.785,841,563.8046Pagar BRC p = 2.4 , t = 0.9 mBh115000.000.5057,500.0047Tiang Pgr d = 1.5" , t = 0.9 mBh55000.000.5027,500.0048Plywood 4 mm ( 0.9 x 2 )m2Lbr47500.0015.98758,812.5049Multipleks 6 mmLbr37000.0015.84586,080.0050Plywood AluminiumLbr58505.004.38255,959.3851Ultran PolituranLtr20625.000.00.052Water Proof Aqua ProofLtr27500.00421.8511,600,875.0053Impra DasarKg22500.000.00.054Minyak ThinnerLtr7500.000.00.055Lbr. Asbes Glm ( 1.8x1.05 ) m2Lbr25000.000.00.056Lbr. Asbes BubunganLbr5000.000.00.057Loster 20 x 20Bh10000.00

Analisa harga satuanIII. TABEL ANALISA HARGA SATUANNo.URAIANKOEFHARGAHARGA UPAHHARGA BAHANJUM HARGAVOLSATSATUAN(Rp)(Rp)(Rp)(Rp)123456789APEKERJAAN PERSIAPAN AWAL11M2Pek. Pembersihan awal lokasi345.00345.004667.90Pekerja0.0216000.00320.00320.0093.36Mandor0.00125000.0025.0025.004.672M'Pasangan Bouwplank2,525.257,000.009,525.251394.10Kayu Begesting Papan0.004875000.003,500.003,500.005.58Kayu Meranti Balok0.004850000.003,400.003,400.005.58Paku Usuk0.025000.00100.00100.0027.88Tukang Kayu0.06325000.001,575.001,575.0087.83Kepala Tukang Kayu0.006327500.00173.25173.258.78Pekerja0.04216000.00672.00672.0058.55Mandor0.004225000.00105.00105.005.86BPEK. TANAH DAN PASIR11M3Pek. Galian tanah biasa13,375.0013,375.002192.36Tukang Gali0.7517000.0012,750.0012,750.001644.27Mandor0.02525000.00625.00625.0054.8131M3Pek. Urugan tanah kembali5,050.005,050.00446.79Pekerja0.316000.004,800.004,800.00134.04Mandor0.0125000.00250.00250.004.4741M3Pek. Urugan tanah5,050.0048,000.0053,050.00138.07Tanah Urug1.240000.0048,000.0048,000.00165.68Pekerja0.316000.004,800.004,800.0041.42Mandor0.0125000.00250.00250.001.3851M3Pek. Urugan limestone5,050.0036,000.0041,050.002810.95Limestone1.230000.0036,000.0036,000.003373.13Pekerja0.316000.004,800.004,800.00843.28Mandor0.0125000.00250.00250.0028.1161M3Pek. Pemadatan dan perataan4,250.004,250.002812.99Pekerja0.2516000.004,000.004,000.00703.25Mandor0.0125000.00250.00250.0028.1371M3Pek. Urugan pasir5,050.0060,000.0065,050.00585.04Pasir Urug1.250000.0060,000.0060,000.00702.05Pekerja0.316000.004,800.004,800.00175.51Mandor0.0125000.00250.00250.005.85CPEK. PASANGAN DAN PLESTERAN11M3Pek. Pasangan batu kosong25,875.0081,300.00107,175.00384.29Batu Kali1.254000.0064,800.0064,800.00461.15Pasir Pasang0.355000.0016,500.0016,500.00115.29Pekerja1.516000.0024,000.0024,000.00576.44Mandor0.07525000.001,875.001,875.0028.8221M3Pek. Pasangan Loster81,375.00253,375.00364,750.0010.00Loster 20 x 202510000.00250,000.00250,000.00250.00Semen Gresik 50 kg0.1522500.003,375.003,375.001.50Tukang Batu1.520000.0030,000.0030,000.0015.00Kepala Tukang Batu0.1525000.003,750.003,750.001.50Pekerja4.516000.0072,000.0072,000.0045.00Mandor0.22525000.005,625.005,625.002.2521M3Pek. Pasangan Batu kali (1:4)89,100.00158,392.50247,492.50100.00Batu Kali1.254000.0064,800.0064,800.00120.00Semen Gresik 50 kg2.84722500.0064,057.5064,057.50284.70Pasir Pasang0.53755000.0029,535.0029,535.0053.70Tukang Batu1.220000.0024,000.0024,000.00120.00Kepala Tukang Batu0.1225000.003,000.003,000.0012.00Pekerja3.616000.0057,600.0057,600.00360.00Mandor0.1825000.004,500.004,500.0018.0031M3Pek. Pasangan Batu kali (1:5)89,100.00155,920.00245,020.00127.46Batu Kali1.254000.0064,800.0064,800.00152.96Semen Gresik 50 kg2.7222500.0061,200.0061,200.00346.70Pasir Pasang0.54455000.0029,920.0029,920.0069.34Tukang Batu1.220000.0024,000.0024,000.00152.96Kepala Tukang Batu0.1225000.003,000.003,000.0015.30Pekerja3.616000.0057,600.0057,600.00458.87Mandor0.1825000.004,500.004,500.0022.9441M3Pek. PasanganBatu kali (1:6)89,100.00141,540.00230,640.0011.01Batu Kali1.254000.0064,800.0064,800.0013.21Semen Gresik 50 kg1.94422500.0043,740.0043,740.0021.40Pasir Pasang0.655000.0033,000.0033,000.006.60Tukang Batu1.220000.0024,000.0024,000.0013.21Kepala Tukang Batu0.1225000.003,000.003,000.001.32Pekerja3.616000.0057,600.0057,600.0039.63Mandor0.1825000.004,500.004,500.001.9851M3Pek. Pas Trasram bata merah (1:2)111,375.00384,921.00496,296.0020.87Bata merah Kelas I650450.00292,500.00292,500.0013567.84Semen Gresik 50 kg3.293622500.0074,106.0074,106.0068.75Pasir Pasang0.33355000.0018,315.0018,315.006.95Tukang Batu1.520000.0030,000.0030,000.0031.31Kepala Tukang Batu0.1525000.003,750.003,750.003.13Pekerja4.516000.0072,000.0072,000.0093.93Mandor0.22525000.005,625.005,625.004.7061M3Pek. Pas Bata merah (1:5)111,375.00352,497.00463,872.00262.12Bata merah Kelas I650450.00292,500.00292,500.00170380.37Semen Gresik 50 kg1.647222500.0037,062.0037,062.00431.77Pasir Pasang0.41755000.0022,935.0022,935.00109.31Tukang Batu1.520000.0030,000.0030,000.00393.19Kepala Tukang Batu0.1525000.003,750.003,750.0039.32Pekerja4.516000.0072,000.0072,000.001179.56Mandor0.22525000.005,625.005,625.0058.9871M2Pek. Plesteran (1:3)11,400.004,001.0015,401.00112.02Semen Gresik 50 kg0.130422500.002,934.002,934.0014.61Pasir Pasang0.019455000.001,067.001,067.002.17Tukang Batu0.220000.004,000.004,000.0022.40Kepala Tukang Batu0.0225000.00500.00500.002.24Pekerja0.416000.006,400.006,400.0044.81Mandor0.0225000.00500.00500.002.2481M2Pek. Plesteran (1:5)11,400.003,067.0014,467.005295.00Semen Gresik 50 kg0.08422500.001,890.001,890.00444.78Pasir Pasang0.021455000.001,177.001,177.00113.31Tukang Batu0.220000.004,000.004,000.001059.00Kepala Tukang Batu0.0225000.00500.00500.00105.90Pekerja0.416000.006,400.006,400.002118.00Mandor0.0225000.00500.00500.00105.9091M2Pek. Plesteran (1:6)11,400.002,830.0014,230.00791.15Semen Gresik 50 kg0.07222500.001,620.001,620.0056.96Pasir Pasang0.02255000.001,210.001,210.0017.41Tukang Batu0.220000.004,000.004,000.00158.23Kepala Tukang Batu0.0225000.00500.00500.0015.82Pekerja0.416000.006,400.006,400.00316.46Mandor0.0225000.00500.00500.0015.82101M2Pek. Pepalihan (1:6)15,375.002,830.0018,205.00545.47Semen Gresik 50 kg0.07222500.001,620.001,620.0039.27Pasir Pasang0.02255000.001,210.001,210.0012.00Tukang Batu0.320000.006,000.006,000.00163.64Kepala Tukang Batu0.0325000.00750.00750.0016.36Pekerja0.516000.008,000.008,000.00272.74Mandor0.02525000.00625.00625.0013.64111M2Pek. Acian4,445.001,420.005,865.005407.02Semen Gresik 50 kg0.04622500.001,035.001,035.00248.72Pasir Pasang0.00755000.00385.00385.0037.85Tukang Batu0.04520000.00900.00900.00243.32Kepala Tukang Batu0.00525000.00125.00125.0027.04Pekerja0.1216000.001,920.001,920.00648.84Mandor0.0625000.001,500.001,500.00324.42121M2Pek. Waterprofing3,003.7534,075.0037,078.75383.50Water Proof Aqua Proof1.127500.0030,250.0030,250.00421.85Tukang Cat0.22517000.003,825.003,825.0086.29Kepala Tukang Cat0.022518500.00416.25416.258.63Pekerja0.1516000.002,400.002,400.0057.53Mandor0.007525000.00187.50187.502.88DPEK. BETON11 M3M3 Pekerjaan Beton126,000.00207,960.00333,960.0030.25Semen Gresik 50 kg6.51222500.00146,520.00146,520.00196.99Pasir Beton0.5450000.0027,000.0027,000.0016.34Kerikil Beton0.8242000.0034,440.0034,440.0024.81Pekerja616000.0096,000.0096,000.00181.50Mandor0.325000.007,500.007,500.009.08Tukang Batu120000.0020,000.0020,000.0030.25Kepala Tukang Batu0.125000.002,500.002,500.003.0321 M3Pek. Beton Cycloof317,985.60213.64M3 Pekerjaan Beton0.6333,960.00Semen Gresik 50 kg6.51222500.00146,520.00146,520.00834.75Pasir Beton0.5450000.0027,000.0027,000.0069.22Kerikil Beton0.8242000.0034,440.0034,440.00105.11Pekerja616000.0096,000.0096,000.00769.12Mandor0.325000.007,500.007,500.