Contoh File Sampel File 22.RAB TALUDAA DRAINASE 476m

download Contoh File Sampel File 22.RAB TALUDAA DRAINASE 476m

of 13

Transcript of Contoh File Sampel File 22.RAB TALUDAA DRAINASE 476m

Renc.Krj Pelaksa.RENCANA KERJA PELAKSANAANDesaKecamatanJenis Pekerjaan: Saluran AirNoU R A I A NBobotJADWAL WAKTU PELAKSANAANVolumeSatuanSeptemberOktoberNovemberDesemberJanuariKet.( % )IIIIVIIIIIIIVIIIIIIIVIIIIIIIPekerjaan Pendahuluan1Pembersihan Lokasi1.00Ls0.070.020.020.022Pengadaan Tenaga,Alat1.00Ls0.070.0050.0050.0050.0050.0050.0050.0050.0050.0050.0050.0050.0050.0050.005& BahanIIPekerjaan Tanah1Galian Tanah342.72M323.184.644.644.644.644.642Timbunan0.0M30.00.00.00.00.00.03Urugan Pasir19.04M31.290.320.320.320.32IIIPekerjaan Pasangan1Pekerjaan Batu Kali152.32M310.300.860.860.860.860.860.860.860.860.860.860.860.862Pekerjaan Siar Pas.Batu0.0M20.00.00.00.00.00.00.03Pek. Plesteran + Aci T = 1 cm952.00M264.3910.7310.7310.7310.7310.7310.73IVPekerjaan Beton1Beton Tidak Bertulang 1:3:59.52M30.640.110.110.110.110.110.11VMDST1.00Ls0.070.07Jumlah1,478.60100.00Rencana Kemajuan Pek. Mingguan0.04.665.525.505.825.820.861.191.1911.5911.7011.7011.7011.7010.840.130.07Kumulatif Rencana Kemajuan Pek.Mingguan0.04.6610.1815.6821.5027.3328.1929.3730.5642.1553.8665.5677.2688.9699.8099.93100.00Realisasi Kemajuan Pek. MingguanKumulatif Realisasi Kemajuan Pek.MingguanMenyetujui,Dibuat Oleh,

Renc.Krj Pelaksa.

RekapitulasiREKAPITULASI ANGGARAN BIAYAProvinsiKabupatenDesaNoU R A I A NKegiatan: Saluran AirUkuran: 476 x 0.80 MJUMLAH TOTALBOBOTJumlah: 1 Unit( Rp )( % )No.Rab: 1DANA LAINDANAIBAHAN( Tidak perlu dirinci )$1,875,000$78,821,500$80,696,50074.47IIPERALATAN( Tidak perlu dirinci )$705,0000.0$705,0000.65IIIUPAH( Tidak perlu dirinci )0.0$26,955,000$26,955,00024.88JUMLAH$2,580,000$105,776,500$108,356,500100IVOperasional TPK 3 %0.0$3,340,300$3,340,300$3,340,311VOperasional UPK 2 %0.0$2,226,900$2,226,900$2,226,874IJUMLAH$2,580,000$111,343,700$113,923,700$113,923,700

501000FILE CONTOH, TIDAK DAPAT DI EDIThttp://kumpulan-rab.blogspot.comFILE CONTOH, TIDAK DAPAT DI EDIThttp://kumpulan-rab.blogspot.com

RABRENCANA ANGGARAN BIAYA ( RAB )Provinsi:No. RAB: 1Kabupaten:Jenis Kegiatan: Saluran AirDesa:Volume: 1 UnitLokasi: DusunUkuran: 476 x 0.80 MNoU R A I A NVolumeSatuanHarga Satuan ( Rp )B I A Y A ( Rp )TotalDari Dana LainDari DanaUpah angkutBahanTotalDana LainDanaTotalIBAHAN1Pasir Urug21.005.0016.00m3$125,000$125,000$625,000$2,000,000$2,625,00020.9442Pasir Pasang103.005.0098.00m3$125,000$125,000$625,000$12,250,000$12,875,000102.8163Batu Kali/Gunung152.005.00147.00m3$125,000$125,000$625,000$18,375,000$19,000,000152.3204Kerikil7.000.07.00m3$125,000$125,0000.0$875,000$875,0007.1405Semen @ 50 Kg563.000.0563.00Zak$18,000$62,500$80,5000.0$45,321,500$45,321,500563.584760,000Sub Total 1 )$1,875,00078,821,50080,696,500IIALAT1Cangkul5.005.000.0bh0.0$40,000$40,000$200,0000.0$200,0002Sekop6.006.000.0bh0.0$40,000$40,000$240,0000.0$240,0003Palu-palu2.002.000.0bh0.0$15,000$15,000$30,0000.0$30,0004Linggis3.003.000.0bh0.0$35,000$35,000$105,0000.0$105,0005Ember4.004.000.0bh0.0$20,000$20,000$80,0000.0$80,0006Benang Nilon1.001.000.0Roll0.0$50,000$50,000$50,0000.0$50,000Sub Total 2 )$705,0000.0$705,000IIIUPAH1Pekerja383.000.0383.00hok0.0$35,000$35,0000.0$13,405,000$13,405,000383.082Tukang271.000.0271.00hok0.0$50,000$50,0000.0$13,550,000$13,550,000271.32Sub Total 3 )0.0$26,955,000$26,955,000TOTAL I ( 1 + 2 + 3 )$2,580,000$105,776,500$108,356,500$108,356,500$71,985,000$45,030,000

FILE CONTOH, TIDAK DAPAT DI EDIThttp://kumpulan-rab.blogspot.com

AnalisaDAFTAR ANALISA HARGA SATUANPropinsi:DesaKabupaten:Kecamatan: BoneJenis Kegiatan: Saluran AirUkuran: 476 x 0,80 mNOPEKERJAANVOL.SAT.SUB TOTALJumlahBAHANALATUPAHDana LainDanaDana LainDanaDana LainDanaIPekerjaan Tanah & Pasir1Galian Tanah342.72MUpah :0.0300MandorHOK10.280.2500PekerjaHOK85.68$2,570,4002Timbunan0.0MUpah :0.1250PekerjaHOK0.03Urugan pasir bawah pondasi19.04MUpah :0.0100MandorHOK0.190.2200PekerjaHOK4.19Bahan :1.1000Pasir urugM20.94IIPek.Pasangan1Pek. Batu kali 1 : 5152.32MUpah :1.1000PekerjaHOK167.551.0000Tukang batuHOK152.320.1600MandorHOK24.37Bahan :1.0000Batu kaliM152.322.7000Semen @ 50 kgZak411.260.5000Pasir pasangM76.162Pek. Siar Pas. Batu Kali Perb. 1 : 30.0M2Upah :0.1500Tukang batuHOK0.00.2000PekerjaHOK0.00.0200MandorHOK0.0Bahan :0.1000Semen @ 50 kgZak0.00.0230Pasir pasangM0.03Pek. Pelesteran + Aci T = 1 cm, 1 : 4952.00M2Upah :0.1150Tukang batuHOK109.480.0200MandorHOK19.040.1200PekerjaHOK114.24Bahan :0.1300Semen @ 50 kgZak123.760.0230Pasir pasangM21.904Beton Tak bertulang perb. 1 : 3 : 59.520MUpah :1.2000PekerjaHOK11.421.0000Tukang batuHOK9.520.0100MandorHOK0.10Bahan :3.0000Semen @ 50 kgZak28.560.7500KerikilM7.140.5000Pasir pasangM4.76

FILE CONTOH, TIDAK DAPAT DI EDIThttp://kumpulan-rab.blogspot.com

Harga SatuanDAFTAR HARGA SATUAN JADIDESA: TALUDAANOURAIANSATUANHARGAKET.( Rp )A. BAHAN NON LOKAL1SemenZak$62,500B. BAHAN LOKAL1Pasir PasangM3$125,0002Tanah TimbunanM3$70,0003Pasir UrugM3$125,0004KerikilM3$125,0005Batu KaliM3$125,00067C. ALAT1Cangkulbh$40,0002Sekopbh$40,0003Gergajibh$20,0004Palu-Palubh$15,0005Linggisbh$35,0006Emberbh$20,000D. UPAH1PekerjaHOK$35,0002TukangHOK$50,000

FILE CONTOH, TIDAK DAPAT DI EDIThttp://kumpulan-rab.blogspot.com

PerhitunganTABEL PERHITUNGANNO.GAMBAR TYPICALPERHITUNGANVOLUME1Galian Tanah1.00+0.80x0.80x$476m342.72M31.10022Timbunan$476xx0.0M33Pasir Urug$476x0.80x0.0519.04M34Pasangan Batu Kali 1 : 5$476x0.80x0.20x2.00sisi152.32M30.655Pekerjaan Siar Pas.Batu Kali$476xx0.0M21 : 36Pek. Pelesteran + Aci$476x0.20x2.00190.40M2T = 1 cm : 1 : 4$476x0.80x2.00761.60M2Total Pek.Plesteran + Acian = 190,40 + 761,60952.00M27Pek.Beton Tak Bertulang 1 : 3 :5$476x0.40x0.059.52M3

0.80.801.00.050.801.00.20.05FILE CONTOH, TIDAK DAPAT DI EDIThttp://kumpulan-rab.blogspot.com

GambarDENAH SALURANSKALA 1 : 100PROPINSIKABUPATENKECAMATANUDESAPOTONGAN MELINTANGPOTONGAN MEMANJANGSALURANSALURANJENIS PRASARANASALURAN AIR/DRAINASELOKASIDUSUNJUDUL GAMBAR- DENAH SALURAN- POTONGANDibuat OlehDiperiksa OlehDiketahui Oleh,Lembar Ke 1.. Dari 1.

476 m0,4m0,6 m0,40 m0,05 m0,15 m0.8 mMiringan Saluran ( Pas. Batu 1 : 4 )Lantai Saluran ( Cor beton 1 :3 : 5 )476 m0,60 m476 m0,2 mFILE CONTOH, TIDAK DAPAT DI EDIThttp://kumpulan-rab.blogspot.com

Analisa (2)DAFTAR ANALISA HARGA SATUAN JADI UPAH BORONGANPropinsi:DesaKabupaten:Kecamatan:Jenis Kegiatan: Saluran AirUkuran: 476 x 0,80 mNOPEKERJAANVOL.SAT.TotalUpah1 M/ M1 Item PeKerjaanUpahIPekerjaan Tanah & Pasir1Galian Tanah342.72MUpah :0.0300MandorHOK10.280.2500PekerjaHOK85.68$35,000$8,750$2,998,800Total Upah Yang Harus Dibayar$2,998,8002Timbunan0.0MUpah :0.1250PekerjaHOK0.03Urugan pasir bawah pondasi19.04MUpah :0.0100MandorHOK0.190.2200PekerjaHOK4.19$35,000$7,700$146,608Total Upah Yang Harus Dibayar$146,608IIPek.Pasangan1Pek. Batu kali 1 : 5152.32MUpah :1.1000PekerjaHOK167.55$35,000$38,500$5,864,3201.0000Tukang batuHOK152.32$50,000$50,000$7,616,0000.1600MandorHOK24.37Total Upah Yang Harus Dibayar$13,480,3202Pek. Siar Pas. Batu Kali Perb. 1 : 30.0M2Upah :0.1500Tukang batuHOK0.0$50,000$7,5000.00.2000PekerjaHOK0.0$35,000$7,0000.00.0200MandorHOK0.0Total Upah Yang Harus Dibayar0.03Pek. Pelesteran + Aci T = 1 cm, 1 : 4952.00M2Upah :0.1150Tukang batuHOK109.48$50,000$5,750$5,474,0000.0200MandorHOK19.040.1200PekerjaHOK114.24$35,000$4,200$3,998,400Total Upah Yang Harus Dibayar$9,472,4004Beton Tak bertulang perb. 1 : 3 : 59.520MUpah :1.2000PekerjaHOK11.42$35,000$42,000$399,8401.0000Tukang batuHOK9.52$50,000$50,000$476,0000.0100MandorHOK0.10Total Upah Yang Harus Dibayar$875,840

Ketua TPK Desa Taludaa

( .....................)Fasilitator Kecamatan,

( Ridwan, ST )FTFILE CONTOH, TIDAK DAPAT DI EDIThttp://kumpulan-rab.blogspot.com