DAFTAR HARGA SATUAN UPA KABUPATEN BANGKA SELTahun 2008HARGA DASAR (Rp)I. UPAH 1 Pekerja 2 Tukang batu/besi/cat/kayu 3 Kepala Tukang 4 Pembantu tukang 5 Mandor Lapangan BAHAN 1 Asbes gelombang kecil 2 Amplas 3 Batu Bata Besar ( 8x8x20 ) cm 4 Batu Bata Kecil ( 5x8x20 ) cm 5 Batu Belah 6 Bak Fiber kap. 0.3 m 7 Besi Beton 8 Besi Strip Plat 9 Batu Pecah 2/3 10 Box Sekering 11 Cat Tembok setara "PLATON" 12 Cat Mengkilap/Minyak 13 Cat Meni Besi/Kayu 14 Cat Kayu 15 Daun Pintu Aluminium 16 Dempul Kayu 17 Engsel Kuningan Untuk Pintu 18 Engsel Kuningan Untuk Jendela 19 Eternit 1,00 x 1,00 cm Harplex 20 Fitting lampu 21 Genteng Beton 22 Genteng Metal Zinkalume 23 Floor Drain Plastik 24 Grendel Kuningan 25 Gipsum board 9 mm 26 Keramik 30 x 30 cm setara "KIA" ( polos ) 27 Keramik 20 x 20 cm setara "MULIA" ( polos ) 28 Keramik 20 x 25 cm setara "MULIA" ( polos ) 29 Kayu cerucuk dia. 8 - 10 cm 30 Kayu klas II 31 Kayu klas III 32 Kayu klas IV 33 Kawat Beton 34 Kaca Polos/Bening 5 mm 35 Kain kasa 36 Kunci Tanam 1 x putar 37 Kunci Tanam 2 x Putar Kuningan 38 Kait Angin 39 Kitcent Zink (stainless) 1 hole 40 Kitcent Zink (stainless) 2 hole 41 Kloset jongkok Sekelas KIA 42 Kran Air dia. 1/2" 43 Kompon 44 List Kayu profil uk. 3 x 3 cm 45 List gypsum 9 cm 46 Lampu SL 18 Watt (Fhillips) 47 Minyak Cat 48 Nok Genteng Beton 49 Nok Genteng Biasa 50 Nok Genteng Metal Zinkalume 51 Pasir Pasang/Beton Hari Hari Hari Hari Hari 45,000.00 63,000.00 90,000.00 54,000.00 85,000.00

NO.

URAIAN

SATUAN

PPN 10% (Rp)4,500.00 6,300.00 9,000.00 5,400.00 8,500.00

II.

M2 Lbr Kp Kp M3 Unit Kg M' M3 Set Kg Kg Kg Kg Unit Kg Set Set M2 Bh Bh m2 Bh Bh M2 M2 M2 M3 M3 M3 M3 Kg M2 lbr Set Set Bh Bh Bh Bh Bh kg M' m1 Bh Ltr Bh Bh m1 M3

25,236.11 3,000.00 1,725.00 1,000.00 258,750.00 200,000.00 14,375.00 10,783.33 402,500.00 24,000.00 12,000.00 43,700.00 34,500.00 28,500.00 175,000.00 23,000.00 13,800.00 7,500.00 20,125.00 12,500.00 5,175.00 46,000.00 15,000.00 7,500.00 55,000.00 46,000.00 51,750.00 54,000.00 8,050.00 2,070,000.00 1,725,000.00 1,380,000.00 23,000.00 102,222.22 2,500.00 57,500.00 143,750.00 11,500.00 862,500.00 1,437,500.00 322,000.00 8,500.00 7,000.00 5,750.00 51,750.00 33,000.00 28,750.00 6,325.00 3,000.00 42,600.00 57,500.00

2,523.61 300.00 172.50 100.00 25,875.00 20,000.00 1,437.50 1,078.33 40,250.00 2,400.00 1,200.00 4,370.00 3,450.00 2,850.00 17,500.00 2,300.00 1,380.00 750.00 2,012.50 1,250.00 517.50 4,600.00 1,500.00 750.00 5,500.00 4,600.00 5,175.00 5,400.00 805.00 207,000.00 172,500.00 138,000.00 2,300.00 10,222.22 250.00 5,750.00 14,375.00 1,150.00 86,250.00 143,750.00 32,200.00 850.00 700.00 575.00 5,175.00 3,300.00 2,875.00 632.50 300.00 4,260.00 5,750.00

NO.

URAIAN

SATUANM3 Kg Kg Kg m2 M' M' Kg m2 Bh Kg

HARGA DASAR (Rp)54,625.00 20,125.00 25,300.00 30,000.00 57,500.00 24,000.00 2,750.00 10,350.00 160,000.00 5,175.00 1,265.00

PPN 10% (Rp)5,462.50 2,012.50 2,530.00 3,000.00 5,750.00 2,400.00 275.00 1,035.00 16,000.00 517.50 126.50

52 Pasir Urug 53 Paku 54 Paku Ulir Asbes 55 Paku gypsum 56 Paving blok T= 6 cm 57 Pipa PVC Wavin dia. 4" x 4 m 58 Pipa PVC Wavin dia. 3/4" x 4 m 59 Plamir Tembok 60 Rangka Atap Baja Ringan UK-75 61 Roster beton uk. 20 X 20 cm 62 Semen PC

NO.

URAIAN

SATUAN

HARGA DASAR (Rp)20,000.00 75,657.89 57,500.00 18,600.00 18,900.00 46,000.00 46,358.51 40,000.00 30,905.67 483,000.00 125,000.00 1,402,500.00 1,618,300.00 2,697,100.00 701,200.00 647,300.00

PPN 10% (Rp)2,000.00 7,565.79 5,750.00 1,860.00 1,890.00 4,600.00 4,635.85 4,000.00 9,200.00 48,300.00 12,500.00 140,250.00 161,830.00 269,710.00 70,120.00 64,730.00

63 Semen Nat Warna Kg 64 Seng Glb uk. 1,00 x 2,00 cm Bjls 30 M2 65 Seng plat 66 Saklar Unit 67 Stop kontak Unit 68 Tanah Puru dari Luar Lokasi proyek M3 69 Teakwood M2 70 Tempat sabun keramik Bh 71 Triplek Uk. 4,0 mm M2 72 Washtafel Biasa Unit III. LAIN - LAIN 1 Biaya Pemasangan Instalasi listrik per titik Ttk 2 Biaya penyambungan Daya Listrik PLN - 900 Watt Ls - 1300 Watt Ls - 2200 Watt Ls 3 Biaya Penyambungan Air Bersih ( PDAM ) + Instalasi lengkap Ls 4 Biaya Penyambungan Telepon Unit ( tidak termasuk pesawat telephone )

Catatan : Harga Satuan Upah dan Bahan sudah termasuk Pajak (PPN), Jasa dan Pajak Galian golongan C ( khusus bahan yang terkena aturan pajak galian golongan C ). Harga satuan Upah dan bahan berdasarkan daftar yang didapat dari Departemen Pekerjaan Umum Provinsi Kepulauan Bangka Belitung, tahun Anggaran 2007 untuk Kota Toboali

Mengetahui / Menyetujui, Kuasa Pengguna Anggaran DINAS KESEHATAN BANGKA SELATAN

Dibuat Oleh, Konsultan Perencana PT. WAHANA PRAKARSA UTAMA

... Nip. .

YULINAR, A.md Wakil Pimpinan Cabang

R HARGA SATUAN UPAH BAHAN BUPATEN BANGKA SELATANTahun 2008HARGA BRUTTO (Rp)54,000.00 75,600.00 108,000.00 64,800.00 102,000.00 7,714.29 10,800.00 15,428.57 9,257.14 14,571.43 /Jam /Jam /Jam /Jam /Jam

ASURANSI 0.5% PAJAK GALIAN C (Rp) (Rp)

JASA 10% (Rp)4,500.00 6,300.00 9,000.00 5,400.00 8,500.00

KET.

2,250.00

2,250.00

2,555.00

2,523.61 300.00 172.50 100.00 25,875.00 20,000.00 1,437.50 1,078.33 40,250.00 2,400.00 1,200.00 4,370.00 3,450.00 2,850.00 17,500.00 2,300.00 1,380.00 750.00 2,012.50 1,250.00 517.50 4,600.00 1,500.00 750.00 5,500.00 4,600.00 5,175.00 5,400.00 805.00 207,000.00 172,500.00 138,000.00 2,300.00 10,222.22 250.00 5,750.00 14,375.00 1,150.00 86,250.00 143,750.00 32,200.00 850.00 700.00 575.00 5,175.00 3,300.00 2,875.00 632.50 300.00 4,260.00 5,750.00

30,283.33 3,600.00 2,070.00 1,200.00 312,750.00 240,000.00 17,250.00 12,940.00 485,250.00 28,800.00 14,400.00 52,440.00 41,400.00 34,200.00 210,000.00 27,600.00 16,560.00 9,000.00 24,150.00 15,000.00 6,210.00 55,200.00 18,000.00 9,000.00 66,000.00 55,200.00 62,100.00 64,800.00 9,660.00 2,484,000.00 2,070,000.00 1,656,000.00 27,600.00 122,666.67 3,000.00 69,000.00 172,500.00 13,800.00 1,035,000.00 1,725,000.00 386,400.00 10,200.00 8,400.00 6,900.00 62,100.00 39,600.00 34,500.00 7,590.00 3,600.00 51,120.00 71,555.00

/Btg

/5kg

/Bh /Bh

ASURANSI 0.5% PAJAK GALIAN C (Rp) (Rp)2,250.00

JASA 10% (Rp)5,462.50 2,012.50 2,530.00 3,000.00 5,750.00 2,400.00 275.00 1,035.00 16,000.00 517.50 126.50

HARGA BRUTTO (Rp)67,800.00 24,150.00 30,360.00 36,000.00 69,000.00 28,800.00 3,300.00 12,420.00 192,000.00 6,210.00 1,518.00

KET.

/bh

/Btg /Btg

/Zak

ASURANSI 0.5% PAJAK GALIAN C (Rp) (Rp)

JASA 10% (Rp)2,000.00 7,565.79 5,750.00 1,860.00 1,890.00 4,600.00 4,635.85 4,000.00 9,200.00 48,300.00 12,500.00 140,250.00 161,830.00 269,710.00 70,120.00 64,730.00

HARGA BRUTTO (Rp)24,000.00 90,789.47 69,000.00 22,320.00 22,680.00 57,614.00 55,630.21 48,000.00 49,305.67 579,600.00 150,000.00 1,683,000.00 1,941,960.00 3,236,520.00 841,440.00 776,760.00

KET.

11,500.00 /Feet

2,414.00

138,000.00 /Lbr 92,000.00 /Lbr

alian golongan C ( khusus bahan

Anggaran 2007 untuk Kota Toboali

#REF!

Dibuat Oleh, Konsultan Perencana HANA PRAKARSA UTAMA

YULINAR, A.md Wakil Pimpinan Cabang

RENCANA ANGGARAN BIAYA (RAB)

NO

URAIAN PEKERJAAN

VOLUME SAT. 3 4

1 2 A BLOK A I PEKERJAAN PENDAHULUAN 1 Pek. Pembersihan lahan 2 Pek. Pengukuran dan pasang Bouwplank II PEKERJAAN TANAH DAN URUGAN 1 Pek. Galian tanah untuk pondasi 2 Pek. Urugan kembali 3 Pek. Urugan pasir bawah pondasi dan lantai 4 Pek. Timbunan tanah peninggian lantai III PEKERJAAN PONDASI DAN BETON 1 Pek. Pondasi Foot Plat 2 Pek. Pondasi batu belah 1 : 5 3 Pek. Sloof S1. uk 15/20 4 Pek. Kolom struktur KS1. Uk 20/20 5 Pek. Kolom praktis uk 10/10 6 Pek. Balok B1. Uk. 15/30 7 Pek. Balok B2. Uk. 15/20 8 Pek. Balok Latei. Uk. 10/20 9 Pek. Ring balok RB1. Uk. 10/15

HARGA SATUAN (Rp) 5

JUMLAH HARGA (Rp) 6

1.00 125.60

ls M Jumlah - I M M M M Jumlah - II M M M M M M M M M Jumlah - III M M M M Jumlah - IV M M Jumlah - V -

-

234.20 70.93 48.44 180.64

-

4.64 52.00 12.00 5.25 0.57 2.97 0.72 2.88 2.28

-

IV PEKERJAAN DINDING, LANTAI DAN KERAMIK 1 Pek. Pasangan 1/2 bata merah 1 : 4 364.16 2 Pek. Pelasteran 1 : 4 + Aci 728.32 3 Pek. Lantai keramik 30 x 30 630.56 4 Pek. Rabat beton keliling bangunan 1 : 3 : 5 + Aci (tebal 5 cm) 46.00 V PEKERJAAN ROLLING DOOR 1 Pek. Rolling Door, R1 Uk. 2,88 X 2,00 tebal 0,5mm 2 Pek. Rolling Door, R1 Uk. 2,38 X 2,00 tebal 0,5mm VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND 1 Pek. Kuda-kuda dan gording kayu kelas II 2 Pek. Rangka atap (kaso dan reng) 3 Pek. Atap genteng Beton 4 Pek. Nok/Bubung genteng Beton 5 Pek. Talang patahan atap 6 Pas. Plafond eternit + rangka 7 Pas. List plafond kayu 8 Pek. List Plank 3/20 VII PEKERJAAN SANITAIR 1 Pek. Saluran dan keliling bangunan VIII PEKERJAAN PENGECATAN 1 Pek. Pengecatan dinding & beton 2 Pek. Pengecatan plafond 3 Pek. Pengecatan kayu 4 Pek. Pengecatan Atap Genteng IX PEKERJAAN ELECTRIKAL 1 Pas. Box Zekering (lengkap) 2 Pas. Box MCB (lengkap) 3 Pek. Instalasi titik lampu 4 Pek. Instalasi titik stop kontak 5 Pek. Pas. Lampu TLD 2 x 36 Watt (lengkap) 6 Pek. Pas. Lampu SL 18 Watt (lengkap) 7 Pek. Pas. Down Light 18 Watt (Lengkap) 8 Pek. Pas. Saklar 9 Pek. Pas. Stop kontak SUB TOTAL A = I s/d IX

-

145.92 88.96

13.15 M ### m ### m 95.49 M 23.83 M 630.50 m 760.20 M 213.00 M Jumlah - VI 117.60 M Jumlah - VII

-

-

728.32 M 630.50 M 140.30 M ### M Jumlah - VIII 1.00 1.00 71.00 32.00 3.00 32.00 36.00 36.00 32.00 Bh Bh Bh Bh Bh Bh Bh Bh Bh Jumlah - IX

-

-

NO

URAIAN PEKERJAAN

VOLUME SAT. 3 4

1 2 B BLOK B I PEKERJAAN PENDAHULUAN 1 Pek. Pembersihan lahan 2 Pek. Pengukuran dan pasang Bouwplank II PEKERJAAN TANAH DAN URUGAN 1 Pek. Galian t