1 Construction Tender No. : 037C/PT.REKI/DE/Tend.Sanitasi/IV/2015 Nama Proyek :Proyek Sanitasi – Hutan Harapan Lokasi : Jambi, Sumatra Selatan Indonesia Nomor Proyek : 037C/PT.REKI/DE/Tend.Sanitasi/IV/2015 Nomor Kontrak : 040C/PT.REKI/DE/Tend.Sanitasi/IV/2015 Tender Advertisement Notice of Tender Instructions to Bidders 1. Instructions 2. Receipt of Bids 3. Amendments to Bids 4. Business Incentive 5. Documents and Information provided by PT REKI 6. Schedule of Work and Unit Prices 7. Equipment List 8. Options & Substitutions Specified by PT REKI 9. Options Proposed to the Bidder 10. Tendering Documents 11. Bid Security 12. Insurance Requirements 13. Signatures 14. Goods and Services Tax 15. Accomodations 16. Acceptance 17. Tender/ Contract Inconsistency 18. Enquiries during the solicitation period Bid Form 1. Project Information 2. Offer 3. General Agreement 4. Contract Price 5. Declarations 6. Signatures Penawaran Reklame Pemberitahuan Penawaran Instruksi kepada Penawar 1. Instruksi 2. Penerimaan Tawaran 3. Perubahan Tawaran 4. Insentif Bisnis 5. Dokumen dan Informasi yang disediakan oleh PT REKI 6. Jadwal Kerja dan Satuan Harga 7. Daftar Peralatan 8. Pilihan & Substitusi Ditentukan oleh PT REKI 9. Pilihan penawaran kepada penawar 10. Dokumen Penawaran 11. Jaminan Penawaran 12.Persyaratan Asuransi 13. Tanda Tangan 14. Pajak Barang dan Jasa 15. Akomodasi 16. Penerimaan 17. Penawaran/ Kontrak Inkonsistensi 18. Pemeriksaan selama periode permohonan Formulir penawaran 1. Informasi Proyek 2. Penawaran 3. Persetujuan Utama 4. Kontrak Harga 5. Deklarasi 6. Lampiran Tanda Tangan

description

reference

Transcript of Construction Tender

Page 1: Construction Tender

1

Construction Tender

No. : 037C/PT.REKI/DE/Tend.Sanitasi/IV/2015 Nama Proyek :Proyek Sanitasi – Hutan Harapan Lokasi : Jambi, Sumatra Selatan Indonesia Nomor Proyek : 037C/PT.REKI/DE/Tend.Sanitasi/IV/2015 Nomor Kontrak : 040C/PT.REKI/DE/Tend.Sanitasi/IV/2015

Tender Advertisement

Notice of Tender

Instructions to Bidders

1. Instructions

2. Receipt of Bids

3. Amendments to Bids

4. Business Incentive

5. Documents and Information provided by PT

REKI

6. Schedule of Work and Unit Prices

7. Equipment List

8. Options & Substitutions Specified by PT

REKI

9. Options Proposed to the Bidder

10. Tendering Documents

11. Bid Security

12. Insurance Requirements

13. Signatures

14. Goods and Services Tax

15. Accomodations

16. Acceptance

17. Tender/ Contract Inconsistency

18. Enquiries during the solicitation period

Bid Form

1. Project Information

2. Offer

3. General Agreement

4. Contract Price

5. Declarations

6. Signatures

Penawaran Reklame

Pemberitahuan Penawaran

Instruksi kepada Penawar

1. Instruksi

2. Penerimaan Tawaran

3. Perubahan Tawaran

4. Insentif Bisnis

5. Dokumen dan Informasi yang disediakan oleh

PT REKI

6. Jadwal Kerja dan Satuan Harga

7. Daftar Peralatan

8. Pilihan & Substitusi Ditentukan oleh PT REKI

9. Pilihan penawaran kepada penawar

10. Dokumen Penawaran

11. Jaminan Penawaran

12.Persyaratan Asuransi

13. Tanda Tangan

14. Pajak Barang dan Jasa

15. Akomodasi

16. Penerimaan

17. Penawaran/ Kontrak Inkonsistensi

18. Pemeriksaan selama periode permohonan

Formulir penawaran

1. Informasi Proyek

2. Penawaran

3. Persetujuan Utama

4. Kontrak Harga

5. Deklarasi

6. Lampiran Tanda Tangan

Page 2: Construction Tender

2

Appendices

CONDITIONS OF TENDER

SCHEDULE OF WARRANTIES– APPENDIX

A

FORM OF TENDER– SUMMARY-

APPENDIX B

INFORMATION TO BE SUPPLIED BY

BIDDERS – APPENDIX C

EVALUATION CRITERIA- APPENDIX D

HUTAN HARAPAN TENDERS WORK

SUMMARY – APPENDIX E

Lampiran

KONDISI TENDER

JADWAL WARRANTIES- LAMPIRAN A

BENTUK TENDER- RINGKASAN -

LAMPIRAN B

INFORMASI UNTUK DISEDIAKAN OLEH

PESERTA - LAMPIRAN C

EVALUASI KRITERIA- LAMPIRAN D

HUTAN HARAPAN PENAWAR KERJA -

LAMPIRAN E

Page 3: Construction Tender

3

Notice of Tender To :

Contact Person: Project Manager Ms.

Catherine Hartmann

Purchasing Asst.Manager Adi Hidayat

Department of PT Reki Phone:

Ms. Catherine - +6287861996647

Adi Hidayat - +6285764879910

Email: Ms. Catherine –

[email protected]

Adi Hidayat

[email protected]

INSTRUCTIONS TO BIDDERS

1. Bids should be submitted by email.

2. Bid should show the Project Name,

Contract Number, Closing Date, and the

Name and Address of the Bidder.

3. Bids must be submitted on the forms

provided.

4. Failure by the Bidder to comply with these

Instructions to Bidders may result in the

Bid submitted being disqualified.

Disqualification shall be at the sole

discretion of the Owner.

5. PT REKI shall not be liable for any costs of

preparation or presentation of Bids.

RECEIPT OF BIDS

1. Bids must be received at the Tender

Submission Address(s) / email by PT REKI

prior to the specified deadline.

Notificatsi penwaran

INSTRUKSI UNTUK PENAWAR

1. Tawaran harus diserahkan melalui email .

2. Penawar harus menunjukkan Nama Proyek,

Nomor Kontrak, Tanggal Penutupan, Nama dan

Alamat Peserta penawar.

3. Tawaran harus diserahkan melalui formulir

yang disediakan .

4. Kegagalan Penawar untuk mematuhi

Instruksi ini dapat mengakibatkan penawar

didiskualifikasi . Diskualifikasi ini harus atas

kebijaksanaan dari pemilik.

5. PT REKI tidak bertanggung jawab atas biaya

persiapan atau presentasi Tawaran .

PENERIMAAN PENAWARAN

1. Tawaran harus diterima sesuai dengan Alamat

/ email yang diberikan oleh PT REKI sebelum

batas waktu yang ditentukan .

2. Setiap Tawaran yang diterima setelah batas

waktu yang ditentukan akan ditolak dan

dikembalikan kepada penawar.

3. Tawaran online yang ditransmisikan akan

diterima seperti yang telah diuraikan, fax dan

email perubahan pun akan diterima .

4. Tawaran dan dokumentasi yang disertai

dengan pengecualian dari jaminan penawaran

yang disampaikan oleh Penawar adalah milik

PT REKI dan tidak akan dikembalikan.

AMANDEMEN PENAWARAN

1. Perubahan penawaran melalui surat,

faksimili, tertulis atau melalui email akan

diterima asalkan perubahan disertai :

a) Telah diterima pada atau sebelum batas waktu

yang telah ditentukan, untuk penerimaan

penawaran ; dan

b ) Referensi yang berisi penawaran, nama

kontraktor dan tanda tangan .

Page 4: Construction Tender

4

2. Any Bids received after the specified

deadline will be rejected and returned to the

Bidder.

3. Online transmitted Bids will be accepted, as

outlined ,faxed and emailed amendments

will be accepted.

4. Bids and accompanying documentation,

with the exception of the bid security,

submitted by the Bidder are the property of

PT REKI and will not be returned.

AMENDMENTS TO BIDS

1. Amendments to a Bid by letter, facsimile,

written or via email means are acceptable

provided that the amendment:

a) Is received on or before the specified

deadline, for the receipt of the Bid; and

b) Contains the tender reference, name of the

contractor and signature.

Transmitted to the Project Manager’s email

[email protected]

2. Amendments to Bids received by facsimile

will be accepted by PT REKI provided that

the conditions include in Clause 3.1 are met

and in addition:

a) Amendments to Bids are transmitted via PT

REKI’s email,

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

b) PT REKI shall not be held liable for any

claim, demand or other action should a

facsimile transmission or email be

interrupted, not received in its entirety,

received after the stated closing time and

date, revived by another facsimile unit other

than stated herein, or for any other reason

over which the PT REKI does not have

• Dikirimkan ke email Proyek Manajer

[email protected]

2. Perubahan penawaran yang diterima lewat

faksimili atau email akan diterima oleh PT

REKI termasuk kondisi didalam klausul 3.1

terpenuhi dan disamping itu :

a) Perubahan Tawaran dikirimkan melalui email

ke panitia tender PT REKI ini :

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

b ) PT REKI tidak bertanggung jawab atas

klaim. tuntutan atau tindakan lain yang

membuat transmisi faksimili atau email

terganggu, tidak diterima secara keseluruhan,

diterima setelah dinyatakan penutupan waktu

dan tanggal, dihidupkan kembali oleh unit

faksimili lain selain yang dinyatakan di sini,

atau karena alasan lain dimana PT REKI tidak

memiliki kontrol.

c ) Perubahan seharusnya hanya diindikasi oleh

perubahan yang berlaku dan sedemikian rupa

sehingga tawaran total tidak terungkap .

3. Instruksi verbal tidak akan dianggap sebagai

instruksi yang sah untuk tujuan Penawaran, dan

mereka tidak akan dianggap memiliki apapun

hubungan pada pengajuan Penawaran .

INSENTIF USAHA

1. Salah satu prioritas PT REKI adalah untuk

memastikan bahwa bahan-bahan lokal dan

impor, peralatan, tenaga kerja dan jasa lainnya

digunakan untuk sepenuhnya pada proyek ini.

2. Untuk tujuan tender ini, lokal harus dianggap

sebagai komunitas di mana pekerjaan ini akan

dilakukan kecuali ada permintaan lain dalam

Page 5: Construction Tender

5

control.

c) The amendment should indicate only the

applicable changes and in such a manner

that the total bid is not revealed.

3. Verbal instructions will not be considered

as a valid instruction for Tender purpose,

nor shall they be considered as having any

bearing upon the Bid submission.

BUSINESS INCENTIVE

1. One of the priorities of PT REKI is to

ensure that Local and imported materials,

equipment, labour and other services are used

to the fullest extent practical on this project.

2. For purpose of this tender, local shall be

considered to be the community in which the

work is undertaken unless noted otherwise in

this Tender Document.

3. Tender Close

The Contractor shall complete the Bids

Form and all required appendices and shall

submit them prior to the specified deadline for

the closing of Bids.

4. Monitoring the Level of Local Labour

The Contractor is responsible to ensure that

every worker identified as Local or Foreigner

in Appendix “C” meets the qualifying

requirements. The Contractor may be required

to provide proof at any time throughout the

project. Reasonable proof of Local or

Foreigner status is noted as follows:

a) Health insurance to start of employment

on the project, or

b) Approved Local or Foreigner residents

verified by Local KTP or Foreigner Passport.

DOCUMENTS AND INFORMATION

Dokumen penawaran ini.

3. Tutup Penawaran

• Kontraktor harus mengisi Formulir Tawaran

dan semua lampiran yang diperlukan dan akan

menyerahkan semuanya sebelum batas waktu

yang ditentukan untuk penutupan Tawaran.

4. Memantau Tingkat Buruh Lokal

Kontraktor bertanggung jawab untuk

memastikan bahwa setiap pekerja yang

diidentifikasi sebagai penduduk setempat atau

warga asing dalam Lampiran "C" memenuhi

persyaratan kualifikasi. Kontraktor mungkin

diperlukan untuk memberikan bukti setiap saat

selama proyek. Bukti wajar status Lokal atau

Asing tercatat sebagai berikut:

a) Asuransi Kesehatan untuk memulai sebagain

pekerja pada proyek, atau

b) Persetujuan Penduduk setempat atau warga

Asing diverifikasi oleh KTP penduduk setempat

atau Paspor warga asing.

DOKUMEN DAN INFORMASI YANG

DISEDIAKAN OLEH PT REKI

1. Tagihan Kuantitas Sementara ( tidak ada

Kewajiban ) yang berkaitan dengan Sanitasi –

Proyek Pembangunan memasukkan sebagai

bagian dari Informasi penawaran. Tagihan

Kuantitas Sementara( ada kewajiban ) termasuk

untuk bantuan penawaran. Penawaran harus

melakukan penilaian sendiri bagaimana

mengandalkan Tagihan Kuantitas Sementara (

No kewajiban )

2. Penawar harap memperhatikan ketentuan

Perpres No 70 Tahun 2012

dari ketentuan penawaran dan mengeluarkan

yang terkandung dalam peraturan itu. Perhatian

penawaran' juga ditujukan dalam Jadwal

Jaminan dan garansi yang diberikan oleh

penawar dalam hal tersebut .

Page 6: Construction Tender

6

PROVIDED BY PT REKI

1. There are Provisional Bills of quantities (no

Liability) relating to the Sanitation –

Construction Project included as part of the

Tender Information. The Provisional Bills of

Quantities (No liability) are included for the

assistance of Tenderers. Tenders must

exercise their own judgment about relying

upon the Provisional Bills of Quantities (No

liability)

2. Tenders’ attention is drawn to clause

Perpress No.70 tahun 2012, of these

Conditions of Tender and the release

contained in that clause. Tenders’ attention is

also drawn in the item of the Schedule of

Warranties and the warranty given by

Tenders in that item.

SCHEDULE OF WORK AND UNIT

PRICES

1. The Bidder shall submit on Appendix “D” or

Appendix “E” as appropriate, a schedule of

unit and work prices. Unit prices shall

include the cost to supply and install as

appropriate, and include all statutory charges,

overhead, profit, and the Contractor’s

contingency allowance

EQUIPMENT LIST

1. The Bidder shall, if applicable, complete and

submit Appendix “H” listing equipment

proposed being used in the performance of

the Contract.

OPTIONS & SUBSTITUTIONS

SPECIFIED BY PT REKI

1. Bids shall be based on the materials,

methods, firms and equipment named in the

Contract Documents and this shall constitute

JADWAL KERJA DAN UNIT HARGA

1. Peserta Lelang harus mengisi dan

menyerahkan Lampiran "D" dan atau

Lampiran "E" yang sesuai, jadwal unit dan

ongkos kerja. Harga satuan meliputi biaya

untuk memasok dan memasang sesuai, dan

mencakup semua biaya hukum, biaya

overhead, keuntungan, dan tunjangan

kontingensi Kontraktor.

DAFTAR PERALATAN

1. Penawar harus, jika ada, mengirimkan

Lampiran “H” daftar lengkap peralatan yang

diusulkan akan digunakan untuk mendukung

kinerja Kontraktor.

PILIHAN & SUBSTITUSI DITENTUKAN

OLEH PT REKI

1. Tawaran didasarkan pada bahan, metode,

perusahaan dan peralatan yang disebutkan

dalam Dokumen Kontrak dan ini merupakan

tawaran dasar. Dimana lebih dari satu bahan

atau pabrikan ditentukan, salah satu dari mereka

yang telah ditentukan mungkin akan dipilih dan

termasuk dalam upaya dasar.

2. PT REKI mungkin akan mempertimbangkan

atau substitusi ke tawaran dasar. Ketika daftar

barang PT REKI dalam Lampiran "F",

Kontraktor harus menunjukkan efek pada harga

yang telah ditetapkan bahwa setiap barang

dibuat berdasarkan penawaran. Penambahan

atau pengurangan salah satu atau semua barang

ini ke tawaran dasar dapat menentukan

diterimanya penawaran terendah. Kegagalan

untuk menyelesaikan Lampiran "F" ketika

diminta dapat mengakibatkan Penawaran

Page 7: Construction Tender

7

the base bid. Where more then one material

or manufacturer is specified, any of those

specified might be selected and included in

base bid.

2. PT REKI may wish to consider or

substitutions to the base bid. When the PT

REKI lists items in Appendix “F”,

Contractors should indicate the effect on the

stipulated price that each item makes to the

base bid. Adding or deducting any or all of

these items to the base bid may determine the

lowest acceptable Bid. Failure to complete

Appendix “F” when requested may result in

the Bid being disqualified at the sole

discretion of PT REKI.

OPTIONS PROPOSED BY THE BIDDER

1. Bidders may propose their own options in

Appendix contract price To be considered the

following requirements shall be met.

a) Tenders must complete the Lump Sum

Breakdown Schedules for Parts A and B of

the Tender attached to Appendix B.

b) In completing the Lump Sum Breakdown

Schedules Tenders must:

i. Insert an amount against each item where

considered appropriate by the Tender,

ii. Fully describe the elements which are

included in the item described as “other” and,

iii. Ensure that the total of the Schedules equals

the lump sum price for Parts A and B

respectively tendered by the Tenderer.

iv. The Lump Sum Breakdown schedules may

be used by the project manager to assist in

the evaluation of tenders. No claim may be

brought by the successful Tenderer by reason

of the actual cost of completing any item in a

schedule being greater or lesser than the

amount nominated for that item in that

schedule.

didiskualifikasikan oleh kebijaksanaan PT

REKI.

PILIHAN YANG DIAJUKAN PENAWAR

1. Penawar dapat mengusulkan pilihan mereka

sendiri dalam Lampiran kontrak harga Untuk

pertimbangkan persyaratan yang harus di penuhi

sebagai berikut.

a) tender harus menyelesaikan jadwal Lump

Sum Breakdown untuk Bagian A dan B.

Penawaran terlampir B.

b) Dalam menyelesaikan Lump Sum Jadwal

Breakdown tender harus:

i. Memasukkan jumlah terhadap setiap item

yang dianggap tepat untuk Penawaran,

ii. Sepenuhnya menggambarkan unsur-unsur

yang termasuk dalam hal yang telah

digambarkan sebagai "lain lain" dan,

iii. Pastikan bahwa total Jadwal setara dengan

lump sum harga untuk Bagian A dan B yang

masing-masing ditawarkan oleh penawar

tersebut.

iv. Jadwal Breakdown Lump Sum dapat

digunakan oleh manajer proyek untuk

membantu dalam evaluasi tender. Tidak ada

klaim yang diajukan oleh penawaran yang

sukses dengan alasan biaya yang sebenarnya

setiap hal dapat diselesaikan dalam jangka

waktu yang lebih besar atau lebih kecil dari

jumlah yang dinominasikan dalam jangka waktu

tersebut.

c) Pilihan yang diusulkan harus memungkinkan

untuk semua perubahan dan penyesuaian dalam

pekerjaan lain yang mungkin diperlukan untuk

penyelesain pekerjaan. Tidak ada klaim

tambahan yang akan dipertimbangkan di

kemudian hari.

d) Setiap pengajuan harus berisi informasi yang

cukup untuk memungkinkan PT REKI

menentukan penerimaan opsi yang diajukan

tersebut. Sertakan informasi seperti alasan

Page 8: Construction Tender

8

c) Options proposed must allow for all

changes and adjustments in other work as

may be necessary to form a complete

finished job. No additional claims will be

considered at a later date.

d) Submissions must contain sufficient

information to enable PT REKI to determine

the acceptability of such proposed options.

Include such information as reasons for

submission, manufacturing details,

performance data, dimensions and

clearances, effects on other work and other

pertinent facts.

e) PT REKI reserves the right to accept or

reject any option proposed to the Bidder.

f) By submitting an option on Appendix “G”

the Bidder relinquishes any proprietary

right to such option. PT REKI reserves the

right to release the Option to other Bidders

in order to obtain competitive prices.

BIDDING DOCUMENTS

1. Bids shall be based on the documents listed

in Appendix “A”.

BIDDING SECURITY

1. When Tendering:

a) For Bids Less than $ 90.000 USD: No bid

security accompanies the Bid.

b) For Bids $ 90.000 USD and Over:

c) The Bidder shall enclose bid security in

accordance with either:

i. a bid security deposit in an amount of at

least 5% of the Bid. The deposit must be a

certified cheque, bank draft, a letter of

irrevocable guarantee, or such other bid

security, as PT REKI considers acceptable.

The bid security deposit must be payable to

pengajuan, rincian manufaktur, data kinerja,

dimensi dan jarak, efek pada pekerjaan lain dan

fakta terkait lainnya.

e) PT REKI berhak untuk menerima atau

menolak opsi yang diusulkan untuk Penawar.

f) Dengan mengirimkan pilihan pada Lampiran

"G" Penawar yang mengklain memiliki hak opsi

tersebut. PT REKI berhak untuk melepaskan

pilihan kepada Penawar lain untuk mendapatkan

harga yang kompetitif.

DOKUMEN PENAWARAN

1. Tawaran harus didasarkan pada dokumen

yang tercantum dalam Lampiran "A".

PENAWARAN KEAMANAN

1. Ketika pengajuan Penawaran:

a) Untuk Tawaran Kurang dari $ 90,000 USD:

Tidak ada jaminan penawaran yang menyertai

Penawar.

b) Untuk Tawaran $ 90,000 USD dan

selebihnya: c)Penawar harus melampirkan

Jaminan Penawaran yang sesuai dengan salah

satunya:

i. uang jaminan penawaran dalam jumlah

minimal 5% dari penawar. Deposit harus cek

bersertifikat, bank draft, surat jaminan yang

tidak dapat dibatalkan, atau jaminan penawaran

lainnya, sebagaimana yang diterima oleh PT

REKI. Tawaran uang jaminan harus dibayarkan

ke PT REKI.

d) Tawaran jaminan, seperti yang ditunjukkan di

atas akan dibatalkan pada kebijaksanaan PT

REKI jika Penawar menolak untuk masuk ke

dalam kontrak ketika dipanggil untuk

melakukannya.

e) Penawar memahami bahwa jika Jaminan

Penawaran yang dilengkapi tidak dalam bentuk

yang disetujui, seperti yang dijelaskan di sini,

Penawar akan dikenakan diskualifikasi langsung

Page 9: Construction Tender

9

PT REKI.

d) The bid security deposit, as indicated above

may be forfeited at the discretion of PT

REKI if the Bidder refuses to enter into a

contract when called upon to do so.

e) The Bidder understands that if the bid

security furnished is not in the approved

form, as described herein, the Bid is subject

to disqualification at the sole direction of

PT REKI.

2. Upon Award of Contract

a) Upon notification of acceptance of a Bid,

the successful Bidder shall furnish within

14days of the date of the notification of

acceptance the security

INSURANCE REQUIREMENTS

1. Upon notification of the acceptance of the

Bid, the successful Bidder shall furnish

within 14 days of the date of notification of

acceptance proof of insurance.

SIGNATURES

1. Bids are to be properly signed and

executed.

2. The Bidder, or the person or persons duly

authorized to sign on his behalf, should

initial and date each and every correction,

change, erasure or alteration contained in

this completed Bid document.

3. At the sole discretion of PT REKI, the

failure by the Bidder to properly sign and

execute the Bid may result in the

disqualification of the Bid.

GOODS AND SERVICES TAX

1. The Bidder shall include all applicable

Good Taxes and Services Tax in his bid.

COMMERCIAL ACCOMODATIONS

oleh PT REKI.

2. Setelah Pemberian kontrak

a) Setelah pemberitahuan penerimaan

Penawaran, maka setiap Penawar yang berhasil

harus diberikan pemberitahuan dalam jangka

waktu 14 hari kerja untuk keamanan penerimaan

PERSYARATAN ASURANSI

1. Setelah pemberitahuan penerimaan

Penawaran, Penawar yang berhasil harus

diberikan pemberitahuan dalam jangka waktu 14

hari kerja dari tanggal pemberitahuan

penerimaan bukti asuransi.

TANDA TANGAN

1. Tawaran harus ditandatangani dengan baik

dan benar.

2. Penawar, atau pihak atau orang yang

berwenang untuk menandatangani atas

namanya, harus paraf dan mengisi tanggal pada

setiap koreksi, perubahan, penghapusan atau

perubahan yang terkandung dalam

menyelesaikan dokumen Penawaran.

3. Pada kebijaksanaan PT REKI, kegagalan oleh

Penawar untuk menandatangi Tawaran dengan

baik dan benar dapat mengakibatkan

diskualifikasi Penawaran.

BARANG DAN JASA PAJAK

1. Penawar harus memasukkan semua Pajak

yang berlaku dan Pajak Jasa di dalam

Penawarannya.

AKOMODASI KOMERSIAL

1. PT REKI mendukung dan mendorong

penggunaan perusahaan komersial yang

menyediakan akomodasi dan makan di mana

tersedia di lokasi Camp 35. Kontraktor dan

Subkontraktor dan semua pekerjanya dapat

Page 10: Construction Tender

10

1. PT REKI supports and encourages the use

of commercial establishments providing

accommodation and meals where available

on side at Camp 35. The Contractor and all

his Subcontractors and workers are able to

use these facilities at current rates of IDR

80.000 per night such as 3 meals per day at

current rate IDR 80.000 per day.

ACCEPTANCE

1. Bids containing qualifications other than in

the manner prescribed may be disqualified

at the sole discretion of PT REKI

2. The submission of the lowest or any Bid

will not necessarily result in the award of a

contract. PT REKI reserves the right to

cancel this Tender, in whole or in part at

any time and to re- tender the same for any

reason whatsoever, without incurring any

liability and no Bidder will have any claim

against PT REKI as a consequence.

3. PT REKI reserves the right to negotiate the

tenders price solely with the low Bidder

after adjustment in accordance with the

Tender evaluation Team, or re- invite Bids

from the low Bidders without going to

public tender.

4. If a contract is to be awarded as a result of

this Tender, it shall be made to a Bidder

who is responsive and responsible and who

has submitted a Bid that, after the

application of any tender adjustment

permitted is lower than that submitted by

any other responsive and responsible

Bidder.

5. If only one Bid is received, PT REKI may

waive any non – compliance with the Bid

Documents, specifications or any other

conditions and may at its sole discretions

elect to retain for consideration a Bid,

which may be non- conforming.

menggunakan fasilitas ini seharga Rp 80.000 per

malam dan 3 kali sehari untuk makan seharga

Rp 80.000 per hari.

PENERIMAAN

1. Tawaran mengandung kualifikasi selain

dengan cara yang ditentukan dapat

didiskualifikasi pada kebijakannya sendiri dari

PT REKI

2. Pengajuan terendah atau Penawaran tidak

akan selalu menghasilkan penghargaan untuk

kontrak tersebut. PT REKI berhak untuk

membatalkan Penawaran ini, secara keseluruhan

atau sebagian, setiap saat dan untuk mengulang

penawaran yang sama dengan alasan apapun,

tanpa menimbulkan kewajiban apapun dan tidak

ada Penawar yang akan memiliki klaim terhadap

PT REKI sebagai konsekuensinya.

3. PT REKI berhak untuk menegosiasikan harga

penawaran dengan Penawar terendah setelah

disesuaikan dengan Tim evaluasi Penawaran,

atau Tawaran ulang dari Penawar rendah tanpa

pergi ke penawaran umum.

4. Jika kontrak harus diberikan sebagai hasil

dari Penawaran, maka itu harus dilakukan oleh

Penawar yang responsif dan bertanggung jawab

dan yang telah mengajukan penawaran itu,

setelah permohonan dari setiap penawaran

diijinkan lebih rendah dari yang diajukan oleh

setiap responsif dan Penawar yang bertanggung

jawab.

5. Jika hanya satu Penawaran diterima, PT

REKI dapat mengabaikan tidak - sesuai dengan

Dokumen Penawaran, spesifikasi atau kondisi

lain dan kebijaksanaan memilih untuk

mempertahankan pertimbangan Penawaran,

yang mungkin tidak dapat di konfirmasikan.

PENAWARAN KONTRAK

1. Jika terjadi ketidaksesuaian antara

Penawaran ini dan Penawaran berikutnya, maka

Page 11: Construction Tender

11

TENDER CONTRACT

1. In the event of any inconsistency between

this Tender and the ensuing contract, the

contract shall govern.

ENQUIRIES DURING THE

SOLICITATION PERIOD:

1. Any enquiries regarding these Conditions of

Tender must be directed to the Project

Manager Ms. Catherine Hartmann in the first

instance at this project

Telephone +6287861996647 or email:

[email protected]

And can also contact Adi Hidayat Telp.

+6285764879910 or email

[email protected]

2. All questions and enquiries relating to this

Sanitation- Construction Tender during the

solicitation period are to be directed ONLY

to the Contact Person listed on the Notice of

Tender page, Failure to comply with this may

result in the bid being declared non –

responsive.

CONDITIONS OF TENDER

APPENDIX A

SCHEDULE OF WARRANTIES

SUMMARY

1. The warranties contained in the Schedule of

Warranties are intended to achieve two goals:

a) To protect PT REKI from exposure to claims

arising from the information contained in the

tender documents being incorrect; and

b) To give comfort that the Tenders have

understood the Project and have the expertise

to carry out the Project.

2. The warranties are triggered in a number of

kontrak yang akan mengatur.

KETERANGAN SELAMA PERIODE

PERMOHONAN:

1. Setiap pertanyaan mengenai Ketentuan

Penawaran harus ditujukan Langsung ke

Project Manager Ms. Catherine Hartmann

sebagai orang pertama di Proyek ini Telepon

+6287861996647 atau email:

[email protected]

Adi Hidayat +6285764879910 atau email

[email protected]

2. Semua pertanyaan dan hal-hal yang berkaitan

dengan Penawaran Sanitasi dan Konstruksi

selama periode permohonan harus diarahkan

hanya kepada Contact Person tercantum pada

Pemberitahuan halaman Penawaran, Kegagalan

untuk mematuhi hal ini dapat mengakibatkan

tawaran dinyatakan tidak- responsif.

KETENTUAN DARI PENAWARAN

LAMPIRAN A

JADWAL JAMINAN

RINGKASAN

1. jaminan yang terkandung dalam Jadwal

Jaminan dimaksudkan untuk mencapai dua

tujuan:

a) Untuk melindungi PT REKI dari paparan

klaim yang timbul dari informasi yang

terkandung dalam dokumen penawaran yang

tidak benar; dan

b) Untuk memberikan kenyamanan bahwa

Penawar telah memahami Proyek dan memiliki

keahlian untuk melaksanakan proyek.

2. jaminan dapat dipicu dengan beberapa cara:

a) Dengan pengajuan penawaran

Page 12: Construction Tender

12

ways:

a) By submission of a tender;

b) By the execution of the Form of Tender

(Appendix B to the Conditions of Tender);

and

c) By the entering into the Sanitation project -

Contractor Agreement.

SCHEDULE OF WARRANTIES

1. The Tenderer has made proper allowance for

all matters contained in or capable of

inference from this Invitation Tender

document and any further Tender

information.

2. The Tenderer has made proper allowance for

all matters, which might impact upon the

Tenders’ ability to provide the design, and

construction services and undertake the

works for which it has tendered.

3. The Tenderer has, and will maintain, the

necessary skill, qualification and experience

to enable it to provide the services and

complete the works in accordance with the

Agreement.

4. The Tenderer has not relied upon the

Initiation documents and any further tender

information in preparing and submitting this

Tender.

5. The Tenderer has carefully perused the

documents forming the Invitation and the

Contract. There are no ambiguities or

discrepancies in any document forming part

of this invitation and the contract between

any one such document and and other such

documents.

6. In respect of the Lump Sum Prices which are

nominated as the unconditional tender price,

that price is given on the basis that there are

no exclusions, exceptions or variations to the

conditions of the Tender or the Contract.

7. In respect of a lump sum price, which is an

alternative conditional lump sum price, the

b) Dengan pelaksanaan Formulir Penawaran

(Lampiran B untuk Kondisi Tender); dan

c) Dengan memasuki proyek Sanitasi-

Perjanjian Kontraktor.

JADWAL JAMINAN

1. Penawar telah membuat tunjangan yang benar

untuk semua hal yang terkandung dalam

kesimpulan dari Penawaran dokumen ini dan

informasi Penawaran lebih lanjut.

2. Penawar telah membuat tunjangan yang benar

untuk semua hal, yang mungkin berdampak

pada kemampuan penawar untuk menyediakan

desain, dan jasa konstruksi dan melakukan

karya-karya yang telah ditawarkan.

3. Penawar memiliki, dan akan

mempertahankan, keterampilan yang

diperlukan, kualifikasi dan pengalaman agar

dapat memberikan layanan dan menyelesaikan

pekerjaan sesuai dengan Perjanjian.

4. Penawar belum mempergantungi dokumen

Inisiasi dan informasi penawaran apapun lebih

lanjut dalam menyiapkan dan menyerahkan

Penawaran ini.

5. Penawar secara hati-hati meneliti dokumen

dalam bentuk Undangan dan Kontrak. Tidak ada

ambiguitas atau perbedaan dalam dokumen yang

merupakan bagian dari undangan ini dan

kontrak antara salah satu dokumen tersebut

dengan dokumen lainnya.

6. Sehubungan dengan harga Lump Sum yang

dinominasikan sebagai harga penawaran tanpa

syarat, harga yang diberikan atas dasar bahwa

tidak ada pengecualian atau variasi dengan

kondisi Penawaran atau Kontrak.

7. Dalam hal harga lump sum, yang merupakan

syarat alternatif harga lump sum, satu-satunya

pengecualian atau variasi Ketentuan Penawaran

atau Kontrak yang ditetapkan dalam Jadwal

Pengecualian. 8. Informasi yang terkandung

dalam Jadwal Pengecualian akurat dan lengkap.

9. Penawar membawa asuransi yang diperlukan.

Page 13: Construction Tender

13

only exclusion, exceptions or variations to

the Conditions of Tender or the Contract or

those set out in the Schedule of Exceptions.

8. The information contained in the Schedule of

Exceptions is accurate and complete.

9. The Tenderer carries the insurance required.

CONDITIONS OF TENDER

APPENDIX B

FORM OF TENDER

SUMMARY

1. Bidders are to complete all forms and

provide the information requested as

follows:

Part A (of the Tender)

Lump sum price for the sanitation project is

including overheads, project margin,

accommodation and transportation;

Complete relevant attachments to Part A of

the tender as follows:

- Attachment 2 to the Form of Tender being

the priced summary of the provisional bills

of quantities for the sanitation project

- Attachment 3 to the Form of Tender being a

summary of prices and other information

for side works. Tenders should note that PT

REKI reserves the right to request detailed

pricing and technical information in relation

to measures from shortlisted or selected

Tenders.

Part B (of the Tender)

Lump sum price for preliminaries for

execution of elements 1-9 of the works;

KONDISI PENAWARAN

LAMPIRAN B

BENTUK PENAWARAN

RINGKASAN

1. Penawar harus melengkapi semua formulir

dan memberikan informasi yang diminta sebagai

berikut:

Bagian A (PENAWARAN)

• Harga Lump sum untuk proyek sanitasi

termasuk pengeluaran tambahan, kelebihan

proyek, akomodasi dan transportasi;

• Lengkapi lampiran yang relevan dengan

bagian penawaran sebagai berikut:

- Lampiran 2 ke Formulir Penawaran menjadi

ringkasan harga dari tagihan sementara kuantitas

untuk proyek sanitasi

- Lampiran 3 ke Formulir Penawaran menjadi

ringkasan harga dan informasi lainnya untuk

pekerjaan sampingan. Penawar harus mencatat

bahwa PT REKI berhak untuk meminta harga

rinci dan informasi teknis terkait dengan

langkah-langkah dari terpilih atau dipilihnya

penawar.

Bagian B (PENAWARAN)

• Harga Lump sum untuk persiapan pelaksanaan

elemen 1-9 dari pekerjaan;

• Lampiran yang relevan Lengkap menjadi:

- Lampiran 4 menjadi rincian pendahuluan

untuk semua elemen kerja (1-9). Penawar harus

mencatat bahwa mereka tidak diharuskan untuk

memberi harga pada setiap kerusakan barang.

Barang dapat dikombinasikan atau tidak diberi

harga tergantung pada pendekatan pendahuluan

yang diambil oleh Penawar. Penawar juga harus

mengetahui bahwa PT REKI berhak meminta

Page 14: Construction Tender

14

Complete relevant attachments being:

- Attachment 4 being a breakdown of the

preliminaries for all work elements (1-9).

Tenders should note that they are not

required to price every item in the

preliminaries breakdown. Items may be

combined or left unpriced depending on the

approach to the preliminaries taken by the

Tendered. Tenders should also note that the

PT REKI reserves the right to request

detailed pricing for each item of the

preliminaries breakdown from shortlisted or

selected Tenders.

Part C (of the Tender)

Lump sum price for Tenders fees, overhead

and margin in respect of the provision of

design and construction services and proposals

outlined in Part D of the Tender.

Part D (of the Tender)

This is a description of the Tenderer’s

design and construction service proposals and

construction delivery strategies. Attachment 1

of the Form of Tender provides the structure

and information requirements for the part of

this Tender.

2. The Form of Tender states that the offer

contained in the tender is made upon the terms

set out in the Conditions of Tender. Through

this provision, it is intended that by the

execution and submission of the Form of

Tender, the tenderers will become bound by

the conditions of the Tender. The Bidders by

reason of being bound by the Conditions of

Tender provide the warranties contained in the

Schedule of Warranties which is in Appendix

A to the Conditions of Tender

FORM OF TENDER

APPENDIX C

harga rinci untuk setiap kerusakan barang di

awal dari yang terpilih atau dipilih penawar.

Bagian C ( PENAWARAN )

• Harga Lump sum untuk biaya penawar,

pengeluaran tambahan dan kelebihan

sehubungan dengan penyediaan desain dan

konstruksi dan proposal diuraikan pada

Penawaran Bagian D.

Bagian D ( PENAWARAN )

• Ini adalah deskripsi dari desain dan jasa

konstruksi proposal Penawar dan strategi

pengiriman konstruksi . Lampiran 1 Formulir

Tender menyediakan struktur dan informasi

persyaratan untuk bagian dari Penawaran .

2. Formulir Penawaran menyatakan bahwa

tawaran yang terkandung dibuat pada jangka

waktu yang ditetapkan dalam Ketentuan

Penawaran. Melalui ketentuan ini , dimaksudkan

bahwa dengan pelaksanaan dan penyerahan

Formulir Penawaran, para penawar akan

menjadi terikat oleh kondisi Penawaran .

Penawar dengan alasan menjadi terikat dengan

Ketentuan Penawaran memberikan jaminan

yang terkandung dalam Jadwal Jaminan yang di

Lampiran A untuk Kondisi Penawaran.

FORMULIR PENAWARAN

Page 15: Construction Tender

15

INFORMATION TO BE SUPPLIED BY

BIDDERS

Preface

The pre – qualification process for the selection

of candidates for this tender required the

provision of information on the capability of the

candidate to be pre- qualified as a bidder for the

position of Sanitation – Contractor.

This annexure sets out more detail the

information required to support the pre-

qualification response. The information supplied

by Bidders will be used in the evaluation and

award of the position Sanitation – Contractor

and the successful Bidder will be required to

provide the people, services and broadly

implement the strategies so described in its

tender.

A. 1.0 Management of Design and Sanitation

construction

Bidders are to provide a concise description of

the strategy and approach they will use to

manage the following issues, using the

numbering and order which follows.

A 1.1. The Contractor will be required to

provide PT REKI and the Project Manager the

costs, construction and program management

advice during the period up to the completion of

schematics. Bidders are to provide a statement

as to how this obligation will be met.

A 1.2 The Contractor will take over the

management of the project design on completion

of the schematic design by Catherine Hartmann.

Bidders are to provide a statement clearly

outlining the strategy for the ongoing design

management so that the project can be

completed within the time and cost requirements

of PT REKI.

LAMPIRAN C

INFORMASI UNTUK DIBERIKAN OLEH

PENAWAR

Kata Pengantar

Pra - proses kualifikasi untuk pemilihan calon

tender ini diperlukan penyediaan informasi

tentang kemampuan calon untuk menjadi pra-

kualifikasi sebagai penawar untuk posisi Sanitasi -

Kontraktor.

Lampiran ini menetapkan lebih detail informasi

yang diperlukan untuk mendukung respon

prakualifikasi. Informasi yang diberikan oleh

Penawar akan digunakan dalam evaluasi dan

penghargaan dari Sanitasi posisi - Kontraktor dan

Penawar yang berhasil akan diminta untuk

menyediakan pekerja, jasa dan menerapkan

strategi yang dijelaskan dalam penawaran ini.

A. 1.0 Manajemen Desain dan konstruksi

Sanitasi

Penawar memberikan penjelasan singkat

mengenai strategi dan pendekatan yang akan

mereka gunakan untuk mengatur masalah-

masalah berikutnya, dengan menggunakan

penomoran dan mengikuti ketertiban.

A 1.1. Kontraktor akan diminta untuk

menyediakan biaya untuk PT REKI dan Project

Manager, konstruksi dan saran program

manajemen selama periode sampai dengan

penyelesaian skema. Penawar harus memberikan

pernyataan tentang bagaimana kewajiban ini akan

dipenuhi.

A1.2 Kontraktor akan mengambil alih desain

proyek manajemen pada saat desain skematik

diselesai oleh Catherine Hartmann. Penawar harus

memberikan pernyataan secara jelas menguraikan

strategi untuk manajemen desain yang sedang

berlangsung sehingga proyek dapat diselesaikan

Page 16: Construction Tender

16

A 1.3 the project site is situated in the area Desa

Bungku Kec. Bajubang Kab. Batanghari of

Jambi. (± 120 Km from Jambi City) In addition

the access to site is limited, initially and during

the construction time a pick up or meeting point

in Jambi Kota can be arranged. During the

construction time the Contractor has the right to

stay on site accommodation and offices, at a

current rate of IDR 200.000 per night such as 3

meals per day at current rate IDR 80.000 per

day.

Tenders are to describe how it will provide and

manage the following:

A 1.3.1 Site establishment and temporary

accommodation and foods services

A 1.3.2 Site access for deliveries and

workforce including traffic management

during construction

A 1.3.3 Emergency / disaster

management

A 1.4 The Contractor will be responsible for the

construction and supply of all mentioned items

under a lump sum price and will also be

responsible for managing the rest of the work.

Bidders are to provide statements for each of the

following:

A1.4.1 Construction Phase 1 including

a) Material delivery and storage on site (where

not covered in A 1.3.2)

b) Any special construction – distribution

strategies

c) Modifications to the current design

documentation to enhance constructability

and cost effectiveness

A 1.4.2 Construction Phase including:

a) Installing and supply of a Bore Hole and a

dalam waktu dan biaya yang ditetapkan oleh PT

REKI.

A 1.3 proyek terletak di daerah Jambi - Desa

Bungku Kec. Bajubang Kab. Batanghari (±120

km dari kota jambi), Dikarenakan akses ke lokasi

terbatas, maka pada permulaan dan selama waktu

pengerjaan penjemputan atau pertemuan diskusi

dapat diatur di kantor Jambi. Selama

pembangunan Kontraktor memiliki hak untuk

tinggal di lokasi, akomodasi dan kantor, dengan

harga Rp 200.000 per malam dan makan 3 kali

per hari dengan harga Rp 80.000. Penawar akan

menjelaskan bagaimana hal itu akan disediakan

dan diatur sebagai berikut:

• A1.3.1 Pembangunan lokasi dan akomodasi

sementara serta makanan

• A 1.3.2 Lokasi untuk pengiriman dan tenaga

kerja termasuk manajemen lalu lintas selama

konstruksi

• A 1.3.3 Keadaan darurat/Penanggulangan

bencana

A1.4 Kontraktor akan bertanggung jawab untuk

pembangunan dan penyediaan semua bahan yang

telah disebutkan dalam jumlah bulat dan juga

akan bertanggung jawab untuk pelaksanaan sisa

pekerjaan. Masing-masing Penawar harus

memberikan pernyataan sebagai berikut:

•A1.4.1 1 Tahap kontruksi termasuk

a) pengiriman Material dan penyimpanan di lokasi

(di mana tidak tercakup dalam A 1.3.2)

b) Setiap konstruksi khusus - strategi distribusi

c) Modifikasi dokumentasi dari desain yang saat

ini ada untuk meningkatkan Konstruksi gedung

dan efektivitas biaya

• A 1.4.2 Tahap kontruksi termasuk:

Page 17: Construction Tender

17

Submersible Pump at the Hutan Harapan

Camp

b) Installation and supply of a water filtration

including reverse osmosis for drinkable

water access

c) Installation of a distribution pump / or

pumps which is able to distribute the

water from the bore whole to the Mitra

Zone and Camp 35

d) Installation and supply of BIO Septic

tanks and grease traps in the Hutan

Harapan Camp, Mitra Zone and Camp 35

e) Water distribution from main bore hole to

the Mitra Zone

f) Plumbing and piping works from the main

Bore hole to the Mitra Zone

g) Plumbing and piping works including

digging from the main bore hole to Camp

35

h) Installation and supply of a bore hole and

submersible pump at the Simpang Area

i) Installation and supply of water from the

bore hole to the school area until the

Simpang Macan Dalam area

j) Installation and supply of a bio septic tank

in the school area

k) Installation and supply of a genset which

can cover the distribution pumps inside

the Simpang Area and the submersible

pump

A 1.5 The works are to be completed by July

15th

2015and the Project Manager Ms. Catherine

Hartmann has prepared a program for the design

and construction which achieves this objective

inclusive of a 60 day float. This program

incorporates a number of activities, which are

currently under construction and also recognizes

the issues in staged construction in the Hutan

Harapan that works can be achieved as planned.

Bidders are invited to review the program, and

suggest any improvements to assist completion.

a) Instalasi dan pasokan Lubang Bor dan sumber

air Pompa di camp Hutan Harapan

b ) Instalasi dan pasokan dari penyaringan air

termasuk reverse osmosis untuk akses air minum

c ) Pemasangan pompa distribusi / atau pompa

yang mampu menyalurkan air dari seluruh lubang

bor ke Zona Mitra dan Camp 35

d ) Instalasi dan pasokan BIO Septic tank dan

Grease trap di Hutan Harapan Camp , Mitra

Zone dan Camp 35

e ) distribusi air dari lubang bor utama ke Zona

Mitra f ) Plumbing dan pipa bekerja dari lubang

Bor utama ke Zona Mitra

g ) Plumbing dan instalasi pipa termasuk

menggali dari lubang bor utama Camp 35

h ) Instalasi dan pasokan dari lubang bor dan

sumber air pompa di Simpang area

i ) Instalasi dan pasokan air dari lubang bor ke

daerah sekolah sampai daerah Simpang Macan

Dalam

j ) Instalasi dan pasokan bio septic tank di area

sekolah

k ) Instalasi dan pasokan genset yang dapat

melindungi pompa distribusi di dalam area

Simpang dan sumber air pompa

A 1.5 Pekerjaan akan selesai pada 15 juli 2015

dan Project Manager Ms. Catherine Hartmann

telah menyiapkan program untuk desain dan

konstruksi yang mencapai tujuan ini dalam jangka

waktu 60 hari . Program ini menggabungkan

sejumlah kegiatan , yang sedang dalam konstruksi

dan juga mengetahui masalah dalam tahap

konstruksi di Hutan Harapan sehingga pekerjaan

dapat dicapai sesuai rencana . Penawar diundang

untuk meninjau program, dan menyarankan

perbaikan untuk membantu penyelesaian .

Page 18: Construction Tender

18

A 2.0 Project Team

Bidders are to provide the project organization

and staff details for the project as follows

A 2.1 Project team organization chart for all

functions including project management,

construction management, construction,

electrical works, quality etc.

A 2.2 Nomination of key personnel including

provision of

Outline responsibilities and levels of

authority

Statement of specific qualifications and

experience for the role and names of

stuff, including contact numbers

The key personnel covered by this detail will

include contractor, project engineer, quality

manager, construction manager ,site manager.

A 2.3 Details of technical and administrative

support available to the project team.

A 3.0 Construction reporting procedures

The role of the contractor requires the

establishment of, planning and reporting to

provide details of the systems and installations

including:

A 3.1 Cost planning, control and reporting

A 3.2 Design and documentation of installation

A 3.3 Safety management and reporting

A 3.4 Technical Specifications

A 3.5 Efficiency – Economical Installations

A 2.0 Team Proyek

Penawar menyediakan organisasi proyek dan

rincian kepada staf proyek sebagai berikut

A 2.1 Bagan organisasi tim proyek untuk semua

fungsi termasuk manajemen proyek, manajemen

konstruksi, pembangunan, pekerjaan listrik,

kualitas dll

A 2.2 Nominasi personil kunci termasuk

penyediaan

• Menguraikan tanggung jawab dan tingkat

kewenangan

• Pernyataan kualifikasi tertentu dan pengalaman

untuk peran dan nama barang, termasuk nomor

kontak

Para personil kunci yang tercakup dalam rincian

ini akan mencakup kontraktor, insinyur proyek,

quality manajer, manajer konstruksi, area

manajer.

A 2.3 Rincian teknis dan administrasi mendukung

yang tersedia untuk tim proyek.

A 3.0 prosedur pelaporan Konstruksi

Peran kontraktor mengharuskan dibentuknya,

perencanaan dan pelaporan untuk memberikan

rincian tentang sistem dan instalasi termasuk:

A 3.1 Perencanaan biaya, kontrol dan pelaporan

A 3.2 Desain dan dokumentasi instalasi

A 3.3 Manajemen keselamatan dan pelaporan

A 3.4 Spesifikasi Teknis

A 3.5 Efisiensi - Instalasi Ekonomis

Page 19: Construction Tender

19

FORM OF TENDER

APPENDIX D

EVALUATION CRITERIA

Award will be made to the [economically most

advantageous Tender OR: Tender with the

lowest total price]. Tenders will be evaluated

taking both the technical part and the price part

of the Tender into consideration giving the

technical part a weight of [normally 10-20%]

and the price part a weight of [normally 80-

90%].

(i) The criteria and sub-criteria shall

comprise

Criterion/sub-

criterion

WEIGHT

S %

Technical quality. adequacy of proposed

construction method,

work plan and time

schedule

description of the

proposed company

including the detailed

measures to ensure

quality and business

integrity in carrying out

this assignment

availability of

maintenance

programmes, service

and spare parts

related training and

transfer of know-how

safety and

environmental benefits

operation and

maintenance benefits

BENTUK PENAWARAN

LAMPIRAN D

KRITERIA EVALUASI

Penghargaan akan dilakukan pada [ ekonomi yang

paling menguntungkan Tawaran ATAU Tawaran

dengan total harga termurah ] . Tawaran akan

dievaluasi dengan mengambil kedua bagian teknis

dan bagian harga Penawaran juga akan

mempertimbangkan bagian teknis berat yang

diberikan [ biasanya 10-20 % ] dan bagian harga

berat [ biasanya 80-90 % ] .

( i ) Kriteria dan kriteria cadangan harus meliputi

Kriteria / Kriteria

cadangan

BERAT %

Kualitas teknis. Kecukupan metode

konstruksi yang

diuajukan, rencana

kerja dan jadwal

waktu

Deskripsi perusahan

yang diajukan

termasuk tahap

rincian untuk

memastikan kualitas

dan integritas bisnis

dalam

melaksanakan tugas

ini

Ketersediaan

program perawatan,

layanan dan suku

cadang

Pelatihan terkait dan

transfer

pengetahuan

Keselamatan dan

manfaat lingkungan

Operasi dan manfaat

pemeliharaan

Kualifikasi

personil

Page 20: Construction Tender

20

Qualifications of the

Contractor's key

personnel (e.g. site

manager and five

other key personnel)

each to be specified

with weights

general qualifications:

general education and

training, length of

experience, positions

held, time with the

contractor as staff,

experience in

developing countries,

etc.

specific qualifications:

education, training, and

experience in the

specific sector, field,

subject, etc., relevant to

the particular

assignment

experience in the

region: knowledge of

the local language,

culture, administrative

system, government

organisation etc.

Weighted technical part Weighted price part

The weights of the main criteria should be

adjusted within the ranges indicated

and the sub-criteria and the weights

depending on the type of supplies, the

character and size of the contract and

the relative importance for success.

Kontraktor kunci

(misalnya area

manager dan lima

personil utama

lainnya) masing-

masing akan

ditentukan dengan

pertimbangan

Kualifikasi umum:

pendidikan umum

dan pelatihan,

lamanya

pengalaman, jabatan

yang dipegang,

waktu dengan

kontraktor sebagai

staf, pengalaman di

negara-negara

berkembang, dll

Kualifikasi khusus:

pendidikan,

pelatihan, dan

pengalaman di

sektor tertentu,

bidang, subjek, dll,

yang relevan dengan

tugas tertentu

Pengalaman di

wilayah:

pengetahuan tentang

bahasa lokal,

budaya, sistem

administrasi,

organisasi

pemerintah dll

Pertimbangan

bagian teknis

Pertimbagan bagian

harga

Pertimbangan kriteria utama harus disesuaikan

dalam rentang yang ditunjukkan dan

pertimbangan kriteria cadangan tergantung pada

jenis persediaan, karakter dan ukuran kontrak dan

kepentingan terkait untuk sukses.

(ii) Tingkat respon untuk setiap kriteria teknis dan

kriteria cadangan harus dinilai pada skala 0-100

poin menggunakan nilai berikut

Page 21: Construction Tender

21

(ii) The level of responsiveness for each

technical criterion and sub-criterion

shall be rated on a scale of 0-100

points using the following grades

- poor: 40 points

- satisfactory: 70 points

- good: 90 points

- very good: 100 points

The rating of each criterion and sub-criterion

shall then be weighted and added to

give the total score. A Tender shall be

considered unsuitable if the technical

part does not comply with the

Specifications or fails to achieve a

technical score of 80% out of the

maximum score.

(iii) The Evaluated Price and the other

capitalised costs shall be added and

the Tender with the lowest cost will be

given a score of 100 points and other

Tenders' scores inversely proportional

to their costs.

(iv) The total score shall be obtained by

weighting the technical and price

scores and adding them.

The Tenderer obtaining the highest total score

shall be invited to finalise a contract.

HUTAN HARAPAN TENDERS WORK

-Buruk : 40 poin

- Memuaskan: 70 poin

- Baik: 90 poin

- Sangat baik: 100 poin

Peringkat masing-masing kriteria dan kriteria

cadangan kemudian harus dipertimbangkan dan

ditambahkan untuk memberikan skor total.

Sebuah Tender akan dianggap tidak cocok jika

bagian teknis tidak sesuai dengan Spesifikasi atau

gagal untuk mencapai nilai teknis 80% dari nilai

maksimum.

(iii) Evaluasi Harga dan kapitalisasi biaya lainnya

akan ditambahkan dan Penawaran dengan biaya

terendah akan diberikan nilai 100 poin dan nilai

Penawar lain akan berbalik sebanding dengan

biaya mereka.

(iv) Total nilai harus diperoleh dengan

mempertimbangkan nilai teknis dan harga dan

penjumlahan keseluruhan

Penawar memperoleh total skor tertinggi akan

diundang untuk penyelesaian akhir kontrak.

PENAWARAN KERJA HUTAN HARAPAN

Page 22: Construction Tender

22

APPENDIX E

SUMMARY

Drill 1 Borehole about 80- 100 – 150 meters

deep which is enough for supply of the

camp, mitra zone and Camp 35

Install one good pump

Filter system needs to be able for a

production of 2500l drinking water per day

There is a need inside the camp of min. 20 –

2000L tanks stainless steel max. 40 – 2000l

Tanks built on an equal grounded

foundation for a water reservoir of 50.000 L

per day which will be distributed from the

camp to mitra zone (1 km distance) and

camp 35 (1,5km distance)

Distribution pipes needs to be provided by

the Bidder and properly installed

Water Consumption camp: 16.750 l/day

Water Consumption Camp 35: 18.425 l/day

Water Consumption Mitra Zone: 16.080

l/day

Existing tanks will need to be cleaned,

painted black and moved to other areas

Replace all existing piping’s and

connections

Improve constructions which are existing or

build a new foundation on the ground which

is on one level for new storage tanks

Develop a new distribution plan trough

project sanitation

Drill a new borehole at simpang macan luar

/ POS and distribute it until Simpang macan

dalam in total 3,5 km of distribution .Note

hereby there is no electricity available , a

genset must be installed and supplied by the

Bidders to distribute the water and cover the

electricity for the pumps.

Use existing solar panels (1500Watt) and

LAMPIRAN E

RINGKASAN

➢ Menggali 1 Lubang bor kira-kira sedalam 80-

100 - 150 meter sehingga cukup untuk pasokan

Camp, Zone Mitra dan Camp 35

➢ Pasang satu pompa yang baik

➢ Sistem Filter harus mampu untuk produksi air

minum 2500L per hari

➢ Kebutuhan tangki air minimun di Camp adalah

20 - 2000L dan tangki air maksimum adalah 40 -

2000L Tank dibangun di atas landasan beralasan

sama untuk penampungan air 50.000 L per hari

yang akan didistribusikan dari Camp ke Mitra

zone (jarak 1 km) dan camp 35 (1,5 km jarak)

➢ Distribusi pipa harus disediakan oleh Penawar

dan harus dipasang dengan baik

➢ Konsumsi Air di Camp : 16,750 l / hari

➢ Konsumsi Air di Camp 35: 18,425 l / hari

➢ Konsumsi Air di Mitra Zone: 16,080 l / hari

➢ Tank yang ada perlu dibersihkan, dicat hitam

dan dipindahkan ke lokasi lain

➢ Mengganti semua pipa beserta sambungannya

➢ Meningkatkan konstruksi yang telah ada atau

membangun landasan baru diatas tanah pada satu

tingkat untuk tangki penyimpanan baru

➢ Menyediakan rencana distribusi proyek yang

baru melalui sanitasi

➢ Menggali lubang bor baru di simpang macan-

luar / POS dan mendistribusikannya sampai

Simpang Macan Dalam dengan jumlah jarak 3,5

km dari catatan distribusi. Harap diketahui bahwa

tidak ada listrik yang tersedia, sehingga genset

harus diinstal dan ini disediakan oleh Penawar

untuk mendistribusikan air dan memenuhi

penggunaan daya listrik untuk mesin pompa air

➢ Gunakan panel surya (1500Watt) dan Inverter

yang telah ada yang ditempatkan di Simpang

Macan Luar dan pindahkan panel untuk

dioperasikan dengan genset kecil sehingga dapat

Page 23: Construction Tender

23

inverter currently placed at Simpang Macan

Luar and move the panels in cooperation

with the genset to cover the needs of the

pump and distribution pump

Water needs in Simpang Macan Luar 6.700

L /day

Water needs in the school are about 4200 L

/day

Water needs in Simpang Macan Dalam

10.000 l/day

In the main camp The connections of grey

water will be cut and a Bio Septic tank in

addition with an extra grease trap for the

kitchen will be installed .Furthermore the

water can be reused for washing the cars

etc.

At the Mitra Zone there will be placed

another bio septic tank which will be

connected to all sanitation facilities and can

be reused for cleaning/ laundry or washing

motorbikes

At camp 35 another Bio Septic System will

be installed for water reusage (washing cars

et.)

School area will get another Bio Septic tank

system for plant a garden e.g. at the school

area

During the Project Sanitation there will be

an improvement of a complete filtration

system (pre filtration capable to filter 50.000 l

per day and reverse osmosis plus UV

filtration for drinking water quality 2500l per

day).

The existing manual filter will move to the

school area

memenuhi kebutuhan pompa dan distribusi pompa

➢ Air yang dibutuhkan si Simpang macan Luar

adalah 6.700 L /hari

➢ Air yang dibutuhkan di sekolah sekitar 4200 L /

hari

➢ Air yang dibutuhkan di Simpang Macan Dalam

adalah10.000 L /hari

➢ Di Camp utama sambungan air limbah akan

dipotong dan tangki Bio Septic akan disertai

dengan penambahan Grease Trap untuk

pemasangan dapur. Selanjutnya air dapat

digunakan kembali untuk mencuci mobil, dll

➢ Di Mitra Zone akan ditempatkan bio septic tank

yang akan terhubung ke seluruh fasilitas sanitasi

dan dapat digunakan kembali untuk

membersihkan / mencuci baju atau mencuci

sepeda motor

➢ Di kamp 35 Bio Septic Sistem yang lain akan

dipasang untuk air yang telah digunakan

(mencuci mobil et.)

➢ Wilayah Sekolah akan mendapatkan sistem Bio

Septic Tank lainnya untuk penanaman taman

seperti contohnya di lokasi sekolah

➢ Selama Sanitasi Proyek akan ada perbaikan dari

sistem filterasi yang lengkap (pra filtrasi mampu

menyaring 50.000 L per hari dan reverse osmosis

ditambah UV filterasi untuk air minum

berkualitas 2500L perhari).

➢ Filter yang sudah ada akan dipindah ke area

sekolah

BID FORM 1 / FORMULIR PENAWARAN 1

Page 24: Construction Tender

24

1. PROJECT INFORMATION / INFORMASI PROYEK

PROJECT OWNER: PT REKI

Project Name/Nama Proyek: Sanitation Project Hutan Harapn

Project Location/Lokasi Proyek: Jambi- Sumatra - Indonesia

Project Number/Nomor Proyek:

Contract Number/Nomor Kontrak:

2. OFFER / PENAWARAN

Company Name/ Nama Perusahaan

(Herein the “Bidder”) offers to PT Reki to furnish all necessary tools, plant, services, materials and

labour to execute and complete in a careful and workmanlike manner the Work described in the Plans

and Specifications for the prices as set out in this Bid Form. The Bidder hereby acknowledges, and

hereby agrees they form part of this Tender.

( Disini para " Penawar " ) menawarkan kepada PT Reki untuk memberikan semua yang diperlukan alat,

pabrik, jasa, bahan dan tenaga kerja untuk melaksanakan dan melengkapinya secara baik dan bekerja

dengan cekatan sesuai yang dijelaskan dalam Rencana dan Spesifikasi harga sebagaimana tercantum

dalam Formulir Penawaran. Peserta dengan ini mengakui , dan dengan ini setuju bahwa mereka

merupakan bagian dari Penawaran ini .

3. GENERAL AGREEMENT (information to be completed by Bidder)

PERJANJIAN UMUM (informasi yang akan dipenuhi oleh Penawar)

The Bidder agrees: / Persetujuan Penawar:

a) To substantially perform the Work in compliance with the required completion schedule stated in the

Tender Documents, to substantially perform the Work within 60 Days from the date of notification of

acceptance of the Bid, or within a reasonable period of time after award.

Untuk melakukan substansial kerja sesuai dengan jadwal penyelesaian yang dibutuhkan seperti

dinyatakan dalam Dokumen Penawaran, agar substansial dapat melakukan pekerjaan dalam waktu 60

hari sejak tanggal pemberitahuan penerimaan Tawaran, atau dalam jangka waktu yang sewajarnya

setelah penentuan keputusan.

Tenderer/Penawar: ___________________________ Signed/Tanda Tangan:

_______________________________

Date/Tanggal: ____________________________ Submitted with Tender/Diserahkan dengan

Tawaran

b) That he has carefully examined the Work described herein: has become familiar with local conditions

and conditions on site and the character, has carefully examined every part of the proposed contract and

Page 25: Construction Tender

25

thoroughly understands its terms and conditions: has determined the sources of supply of materials

required; has investigated labour conditions and has arranged for the continuous performance of the

work described in the Tender Documents.

Bahwa ia telah memeriksa dengan hati-hati Pekerjaannya seperti dijelaskan di sini : tidak asing dengan

kondisi lokal dan kondisi di lokasi juga karakter, secara hati-hati memeriksa setiap bagian dari kontrak

yang diusulkan dan benar-benar memahami persyaratan dan segala kondisi : telah menetapkan sumber

pasokan bahan yang diperlukan ; telah menyelediki kondisi tenaga kerja dan telah dipersiapkan untuk

kinerja yang berkesinambungan dari pekerjaan yang telah dijelaskan dalam Dokumen Penawaran

c) That the list of Bid Documents shall be and is the complete Bid and this offer is made subject to all

provisions and contained therein.

Harus disertai daftar Dokumen Penawaran dan Penawaran yang lengkap dan Penawaran ini dibuat

sesuai dengan semua ketentuan yang terkandung di dalamnya .

d) That this Tender supersedes and cancels all communications, negotiations, and agreements relating to

the Work other than contained in the completed Bid.

Penawaran ini akan menolak dan membatalkan semua komunikasi, negosiasi, dan kesepakatan yang

berkaitan dengan pekerjaan lain selain yang terkandung dalam penyelesaian Penawaran .

Tenderer/Penawar: ___________________________ Signed/Tanda Tangan:

_______________________________

Date/Tanggal: ____________________________ Submitted with Tender/Diserahkan dengan

Tawaran

BID FORM 2

Page 26: Construction Tender

26

3. CONTRACT PRICE (Bidder to complete)

HARGA KONTRAK (Dilengkapi oleh Penawar)

a) BASED ON LUMP SUM (information is to be completed by the Bidder)

The Bidder agrees that the following is the lump sum referred to in clause 2.0 of this Tender Form and

that this is the Bidder’s total Tender price:

BERDASARKAN DALAM JUMLAH BULAT (informasi akan diselesaikan oleh Penawar)

Bahwa Penawar menyetujui untuk mengikuti jumlah bulat yang dimaksud dalam ayat 2.0 dari Formulir

Penawaran ini dan bahwa ini adalah total Penawaran harga dari Tawaran ini:

______________________DOLLARS ($___________________________________)

An illegible submission may be disqualified at the sole discretion of PT REKI. When there is a

discrepancy between the written and numerical amount, the lowest value will govern.

Sebuah Pengajuan yang tidak terbaca dapat didiskualifikasi berdasarkan kebijaksanaan PT REKI. Ketika

ada perbedaan antara jumlah tertulis dan numerik, nilai yang terendah yang akan menentukan.

i. The Total Estimated Contract Price is based on estimated quantities. The final Contract amount owing to

the Contractor shall be determined by taking the actual quantities that are incorporated in, or made

necessary by Work as confirmed by count and measurement.

Total Perkiraan Harga Kontrak berdasarkan pada perkiraan jumlah barang. Jumlah kontrak akhir dari

Kontraktor harus ditentukan dengan mengambil jumlah sebenarnya yang tergabung didalamnya, atau

dibuat sesuai keperluan oleh Pekerja seperti yang telah ditegaskan dalam jumlah dan pengukuran.

Tenderer/Penawar: ___________________________ Signed/Tanda Tangan:

_______________________________

Date/Tanggal: ____________________________ Submitted with Tender/Diserahkan dengan

Tawaran

BID FORM 3

Page 27: Construction Tender

27

A. DESIGN & CONSTRUCTION SERVICES / DESAIN & JASA KONSTRUKSI

To perform the Design & Construction Services Strategies as set out in Attachment 1

Untuk menjalakan Strategi Desain & Layanan Konstruksi sebagaimana tercantum dalam Lampiran 1

The offer is made upon terms set out in the Conditions of Tender.

Penawaran dibuat sesuai dengan syarat yang ditetapkan dalam Ketentuan Penawaran.

EXECUTION/ PELAKSANAAN

Company: _____________________________________________________________________

(Full Legal Business Name)

(Street Address)

_____________________________________________________________________

(Mailing Address)

(City, Province, Postal Code)

(Hand phone number/ office number)

Signature _____________________________________________________________

Name & Title _________________________________________________________

Dated at _________________________this_____________day of____________2015

Refer to the following BID FORM Attachments 1-5 for details of the tender offer:

1. Design & Construction Strategy Proposal.

2. Priced Summary Provisional Bills of Quantities for Construction in all Subscribed areas

3. Schedule and Timeline (Fixed on 60 days)

Mengacu pada Lampiran FORMULIR PENAWARAN 1-5 untuk rincian penawaran tawaran:

1. Proposal Desain & Konstruksi Strategi.

2. Ringkasan tagihan harga Sementara dari jumlah barang untuk Pembangunan disemua wilayah yang

telah disetujui.

3. Jadwal dan Jangka Waktu (Tepat dalam 60 hari)

Tenderer/Penawar: ___________________________ Signed/Tanda Tangan:

_______________________________

Date/Tanggal: ____________________________ Submitted with Tender/Diserahkan dengan Tawara

BID FORM 4/FORMULIR PENAWARAN 4

Page 28: Construction Tender

28

TENDER SCHEDULE/JADWAL PENAWARAN

Lead Time (from finalization of the load schedule to delivery to site):

Menempuh Waktu (finalisasi dari muatan yang telah dijadwalkan untuk pengiriman kelokasi):

___________Weeks/Minggu.

Time of supply and Installation: limitation of 60 days.

Waktu dari Persediaan and Pemasangan: Dalam jangka waktu 60 hari

Schedules of running tests & commissioning per Cluster A-M (below):

Jadwal dalam menjalankan tes & pelaksanaan sebagaimana dikelompokkan dalam A-M (dibawah ini):

A WEEKS B WEEKS C WEEKS D WEEKS E WEEKS F WEEKS G WEEKS H WEEKS I WEEKS J WEEKS K WEEKS L WEEKS M WEEKS

BID FORM 5/FORMULIR PENAWARAN 5

Page 29: Construction Tender

29

LUMP SUM PRICE/HARGA DALAM JUMLAH BULAT

(Information to be completed by the Bidder and Submitted with Bid)

(Informasi yang harus dilengkapi oleh Penawar dan diserahkan dengan Penawaran)

Project

Number

037C/PT.REKI/DE/Tend.Sanitasi/IV/2015 Contract

Number

040C/PT.REKI/DE/Tend.Sanitasi/IV/2015

The following are our unit Prices for the units of work listed hereunder. The base price for the work is

included in our Bid; these unit prices apply only to variances of the quantity.

Berikut ini adalah Harga unit kami untuk unit kerja yang terdaftar di bawah ini. Harga dasar untuk

pekerjaan termasuk dalam penawaran kami; harga satuan ini hanya berlaku untuk variasi jumlah barang.

1 2 3 4 5 6

Item Description Quantity Unit Unit Price Total Price

1 2 3 4 5 6

Item Description Quantity Unit Unit Price Total Price

Page 30: Construction Tender

30

TOTAL CONTRACT PRICE (transfer the Total Price to Clause 3 on Bid Form 2)

HARGA JUMLAH KONTRAK (diisi Jumlah Harga sesuai dengan pasal 3 dalam

Formulir Penawaran 2)

Tenderer/Penawar: ___________________________ Signed/Tanda Tangan:

_______________________________

Date/Tanggal: ____________________________ Submitted with Tender/Diserahkan dengan

Tawaran

BID FORM 6/FORMULIR PENAWARAN 6

QUALIFICATION OF THE CONTRACTOR/KUALIFIKASI DARI KONTRAKTOR

Page 31: Construction Tender

31

In accordance to Appendix D , the Bidder may fill out the Form below in detail for the review of the

Contractors key personnel – minimum five (e.g. Contractor, Sub Contractor, Project Engineer, Quality

manager, etc.)

Sesuai dengan Lampiran D, Penawar diharuskan mengisi formulir dibawah ini secara rinci untuk

pemeriksaan personil utama Kontraktor – paling sedikit 5 (seperti contoh : Kontraktor, Kontraktor

Cadangan, Engineering Proyek, Quality Manager dll)

Project Name/Nama Proyek Project Location/Lokasi Proyek

Contractor/Kontraktor Project Number/Nomor Proyek

Reporting Period/Jangka waktu laporan

Employee’s Name/Nama

karyawan

Employees Email

Address/Alamat Email

Karyawan

Job Description/Jenis Pekerjaan

Tenderer/Penawar: ___________________________ Signed/Tanda Tangan:

_______________________________

Date/Tanggal: ____________________________ Submitted with Tender/Diserahkan dengan

Tawaran

Project : Installation Pump, Booster Pump, piping system, Septic, Bore

To : Hutan Harapan Location : Jambi ( Sumatra )

Page 32: Construction Tender

32

NO DESCRIPTION QTY UNIT RATE AMOUNT

Camp Harapan Plumbing work

A Bore Hole and Submercible Pump

1 Bore Hole 6" 1 unit -

2 Accesoriess and Fitting plumbing 1 lot -

3 Control panel D WLC Pump and etc 1 lot

Sub total -

B WTRO and Water Filter

1 Water Filter cap maks 60m3 /D 1 unit

2 Reverse Osmosis cap. Maks 2500 /H 1 set

Sub total

C Distribution Pump & etc 1

Esybox Pump Dab ( inverter pump ) 4 unit

-

2

Control panel WLC 2 set

-

3

Acc plumbing 1 lot

-

4

Fiting plumbing 1 lot

-

5 Commissioning & running test 1 lot

Sub total -

D Installation

1 PVC aw ex maspion 40mm 80 mtr

2 PVC aw ex maspion 32mm 15 mtr

3 PVC aw ex maspion 25mm 12 mtr

4 Acc & Fiting plumbing 1 lot -

5 Power Outlet ( incl cable ) 5 ttk

6 Socket water proof 5 pc

Sub Total -

E Septic and Grease trap

Bio Septic tank 2 unit

Grease trap 1 unit -

Sub Total -

Page 33: Construction Tender

33

Total IDR -

Total $ -

NO DESCRIPTION QTY UNIT RATE AMOUNT

F Mitra Zone Plumbing work

1 Bio Septic tank 1 unit

2 Fitting dan Acc 1 lot

3 Installation Pipa HDPE 32mm pn 16 black 1000 mt

4 Acc plumbing ( HDPE ) 1 lot -

5 Fiting plumbing ( HDPE ) 1 lot

6 Esybox Pump Dab ( inverter pump ) 1 unit

-

7 Control panel 1 set

8 Acc plumbing ( Pump Dist ) 1 lot

9 Fiting plumbing ( Pump Dist ) 1 lot -

10 Commissioning & running test 1 lot

11 Power Outlet ( incl cable ) 1 ttk -

12 Socket water proof 1 pc

Sub total -

G Camp 35 Plumbing work 1 Bio Septic tank 1 unit

2 Esybox Pump Dab ( inverter pump ) 1 unit 3 Acc plumbing ( Pump Dist ) 1 lot 4 Fiting plumbing ( Pump Dist ) 1 lot 5 Commissioning & running test 1 lot 6 Control panel 1 set

7 Installation Pipa HDPE 32mm pn 16 black 1500 mtr

8 Acc plumbing ( HDPE ) 1 lot

9 Fiting plumbing ( HDPE ) 1 lot 10 Commissioning & running test 1 lot

11 Power Outlet ( incl cable ) 1 ttk

12 Socket water proof 1 pc

-

Sub total -

Total -

Grand Total IDR -

Grand Total $ -

Page 34: Construction Tender

34

NO DESCRIPTION QTY UNIT RATE AMOUNT

Simpang Macan Luar

H Bore Hole and Submercible Pump

1 Bore Hole 6" 1 unit

2 Accesoriess and Fitting plumbing 1 lot

3 Control panel D WLC Pump and etc 1 lot

Sub total -

I Simpang Macan Luar Plumbing work 1 Booster Pump CR 5-16 5m3 ( supply water tank ) 1 unit 2 Preesure tank aquasystem 80 lt 1 unit 3 Control panel WLC 1 set 4

Installation Pipa Pvc 40mm 60 mtr

-

5

Acc plumbing 1 lot

-

6

Fiting plumbing 1 lot

-

7

Commissioning & running test 1 lot

-

8 Bio Septic tank 1 unit

Sub total -

J Simpang Macan dalam Plumbing work

1 Booster pump PBMH 90-4ea (ws ) cap 40lt/m 1 unit

2 PVC aw ex maspion 40mm 80 mtr

3 PVC aw ex maspion 32mm 15 mtr

4 PVC aw ex maspion 25mm 12 mtr -

5 Acc & Fiting plumbing 1 lot -

6 Bio Septic tank 1 unit

Sub Total -

K School Plumbing work

Bio Septic & Installation Piping system

1 Booster pump pw 251-ea ( Ws ) 1 unit

2 PVC aw ex maspion 40mm 60 mtr

3 PVC aw ex maspion 32mm 15 mtr

4 PVC aw ex maspion 25mm 12 mtr -

5 Acc & Fiting plumbing 1 lot

Page 35: Construction Tender

35

6 Power Outlet ( incl cable ) 1 ttk -

7 Socket water proof 1 pc -

8 Bio Septic tank 1 unit

Sub Total -

Camp Harapan Electrical work

L Genset RYU 5000va 2 unit

Installation fee 2 unit

Sub Total -

M Cable Twisted 2 x 16mm 2500 mt

Installation fee 2500 mt

Sub Total -

OVER HEADS, MARGING PROJECT, SUPERVISION 1 1

SSUB

TRANSPORT, Accomodation , DLL

Grand Total IDR -

Grand Total $ -

TOTAL PRICE CONSTRUCTION

NOTE: THE ABOVE PRICE INCLUDES PROFITS, OVERHEADS, AND EXPENSES

Tenderer: ___________________________ Signed: _______________________________

Date: ____________________________ Submitted with Tender