COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline...

25
COMPANY PROFILE Engineering, Procurement, Construction & Installation Oil & Gas PT. REKA SARANA NUSANTARA Head Office : GKM Green Tower Level 20, Jln. TB Simatupang No. KAV.89.G, Kel. Kebagusan, Kec. Pasar Minggu, Kota Adm. Jakarta Selatan, Prov. DKI Jakarta, Telp: 021-508-971-702-3, Email: [email protected] Construction Office : Ruko Buana Raya, No.A35, Jln. Ledjend. Suprapto, Sei Langkai, Sagulung, Batam, KEPRI Telp. 0778- 74332663,Email. [email protected], Website, www.bbtbatam.com 1 of 25

Transcript of COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline...

Page 1: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

COMPANY PROFILE

Engineering, Procurement, Construction & Installation

Oil & Gas

PT. REKA SARANA NUSANTARA

Head Office : GKM Green Tower Level 20, Jln. TB Simatupang No. KAV.89.G, Kel. Kebagusan, Kec. Pasar Minggu, Kota Adm. Jakarta Selatan, Prov. DKI Jakarta, Telp: 021-508-971-702-3, Email: [email protected]

Construction Office : Ruko Buana Raya, No.A35, Jln. Ledjend. Suprapto, Sei Langkai, Sagulung, Batam, KEPRI Telp. 0778-74332663,Email. [email protected], Website, www.bbtbatam.com

1 of 25

Page 2: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

: No. Kav. 89.G, Kel. Kebagusan, Kec. Pasar Minggu,: Kota Adm. Jakarta Selatan, Prov. DKI Jakarta

Name of Company

Established

DirectorHead Office Address

: www.bbtbatam.com

Phone No. : 0778 - 7432663

Email

: PT. REKA SARANA NUSANTARA

: February 13th , 2020

: Mutiara Sakti Hasibuan: GKM Green Tower Level 20 Jln. TB Simatupang

Phone No. / Fax. No.

Email

: 021-5089-7170-23 / 021-5089-7170-XX

: [email protected]

: [email protected]

Website

Construction Office : Ruko Buana Raya, No.A35, Jln. Ledjend. Suprapto,: Kel. Sei Langkai, Kec. Sagulung, Batam, KEPRI

Type Of Business : Oil & Gas (Engineering, Procurement, Construction: & Intallation)

2 of 25

Page 3: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Introduction

Vision

Mission

We Would like to introduce PT. Reka Sarana Nusantara (RSN) a National Company, which was established in February 2020 with Jakarta as its Head Office & Fabrication/Construction Office in Batam.

Construction Batam Office was operated as Engineering , Fabrication & Supplier since May 2009, with Old Company name is PT. Batam of the Best Team (BBT)

Our Company specializes in the Oil & Gas Onshore/Offshore Industry with strengths in Engineering, Procurement, Fabrication & Installation c/w Pre-Commissioning & Commissioning.

We Provide Quality Management, Quality HSE & Quality Productsincluding Quality Equipment with competitive rates.

Our company Software, Equipment & Labor are supporting with experience from the Oil & Gas industry it's, we are optimistic about the prospects. Therefore, we will give our best to ensure that our clients are satisfied.

For further information, please do not hesitate to contacts anytime.

Be a leading company which is able competence in national or international scope, focusing on professionalism, punctuality, quality standard and customer's satisfaction in Oil and Gas Company.

Give services based on the commitment of trust and the customer’s satisfaction and Increases Strong, prosperous and professional human resources.

3 of 25

Page 4: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Our Scope Product Supplies

Engineering Design

Procurement

Engineering Design Procurement Construction Installation (Offshore)

Management Project Design Calculation for all decipline Stress Analyzes for all decipline Project Specification Procedures Engineering Schedule Process Flow Diagram Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported

Procurement Schedule Equipments Specification Materials Specification Equiment List Materials Take off Bill of Materials Approved Vendor List Purchasing Delivery Order Out Standing Delivery Progress Controller & Reported Document Controller & Reported

4 of 25

Page 5: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Construction

Yard Management Yard & Workshop Layout c/w Facility Main Equipment, Tools & Consumable List Fabrication Schedule Fabrication & Testing Procedure for all decipline Blasting & Painting Pocedure for all decipline QHSE Procedure c/w ITP QA/QC Procedure c/w ITP Fabrication & Erection Sequence Engineering Shop Detail Drawing for all decipline NDE/NDT Map Detail Drawing for all decipline Test Block Diagram Drawing for all decipline Materials Receiving & Werehousing Materials Inspection Leak Seat Test (a Specially for Anualy Valve's) Out Standing Delivery (Return Material Rejected) Welding Procedure Specification (WPS) Welding Quality Test (WQT) Fabrication & Assembly (Jig & Support) Blasting & Painting as Premier Coated of Row Materials Prefabrication of all decipline as per Shop Detail Drawing NDT/NDE Report of Prefabration result Erection of all decipline as Shop Datail Drawing NDT/NDE Report of Erection Joint Result Testing for all Decipline Precommissioning Final Painting & Tuch-up Loadout of all Part (Jacket & Top Side and/or Module) Ship-Loose Materials Seafastening & Teidown Shipment Insurance Seal Out Progress Controller & Reported Document Controller & Reported

5 of 25

Page 6: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Installation

Offshore Hook-up Management Crane Barge c/w Facility Crew Barge c/w Facility Main Equipment, Tools & Consumable List Offshore Hoo-up Schedule QHSE Procedure for Offshore Hook-up c/w ITP QA/QC Procedure fro Offshore Hook-up c/w ITP Installation and/or Hook-up Procedure & Sequence Installation Jacket in accordance with Survey Point Installation of Jacket Pile's Flooding & Grouting Activitie's Intallation Tie-In Point of Pipeline and J-Tube Final Painting & Tuch-up of Jacket c/w Accessories Part's Precommissioning & Commissioning Jacket c/w Accessories

Part's Installation of Top Side Platform and/or Module c/w

Accessories Part's Connected of all Hook-up Joint's (Welded, Threaded, Bolted &

Clamp) Connection Point's Testing of all Hook-up Joint's & Tie-In Point Connection's Final Painting & Tuch-up of Top Side Platform and/or Module

c/w Accessories Part's Precommissioning & Commissioning Top Side Platform and/or

Module c/w Accessories Part's Start-up Line Process System & Equipments Installation Offshore Hook-up Completion Progress Controller & Reported Document Controller & Reported

6 of 25

Page 7: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Management Organization Chart

Project Organization Chart

7 of 25

Page 8: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Engineering Capability & Software

Engineering Capability & Software

8 of 25

Page 9: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Jacket Drawing

JACKET 2D DRAWING

JACKET 3D MODELING

9 of 25

Page 10: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Jacket Shop Detail Drawing

Jacket Member Drawing

10 of 25

Page 11: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Jacket Profiling Detail Drawing

Top Side / Module Drawing

TOP SIDE / MODULE 3D MODELING

11 of 25

Page 12: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Top Side / Module Shop Detail Drawing

TOP SIDE / MODULE 2D DRAWING

12 of 25

Page 13: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Top Side / Module NDT Map Drawing

Piping c/w Pipe Support Drawing

13 of 25

Page 14: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Flushing & Test Block Drawing

Fabrication Sequence Drawing

14 of 25

Page 15: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Jacket Fabriation Procedure Drawing

Top Side/Module Fabriation Procedure Drawing

15 of 25

Page 16: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Jacket Load Out Drawing

Jacket Load Out Drawing (With Flooting Crane Methode)

Jacket Load Out Drawing (With Skiding Methode)

16 of 25

Page 17: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Top Side/Module Load Out Drawing

Seafastening, Seal Out & Hook-Up Photo's

17 of 25

Page 18: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Fab. & Install Pressure Vessel & Boiler Photos

Fabrication & Installation Storage Tanks

18 of 25

Page 19: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Soil Investigation Work at PT. NSB Photos

Fabrication New Jetty at PT. NSB Photos

19 of 25

Page 20: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Civil Work at Baiturrahim Batam Photos

Civil Work at Apartement Batam Photos

20 of 25

KR587
Text Box
Civil Work at Baiturrahim Mosque and Facilities Batam Photos
KR587
Text Box
Civil Work at One Residence Apartement Batam Photos
Page 21: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Civil work Sekupang Batam Highway Photos

21 of 25

Page 22: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

Construction Experience List

22 of 25

Page 23: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

23 of 25

Page 24: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

18 Jul - 24 Agus 2018

24 of 25

Page 25: COMPANY PROFILE · 2020. 11. 2. · Piping & Instrument Diagram Standard Drawing for all decipline Design Drawings for all decipline Progress Controller & Reported Procurement Schedule

PT. REKA SARANA NUSANTARA

PT. RSN LEGAL DOCUMENT SUPPORTING

THANK YOU

Agus - Dec 2018

Jan - Jul 2019

25 of 25