bq gudang pupuk

download bq gudang pupuk

of 29

Transcript of bq gudang pupuk

Daftar Harga Upah dan BahanNo. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Uraian 2 MATERIAL Amplas Air Alat bantu Aspal Bensin/Premiun Batu Bata Bataco Baja profil IWF Besi Beton Baja Prof il Siku Besi Bendrat Baut / besi strip Batu gunung / batu belah Cat Dasar Kayu Cat Dasar Tembok Cat Menie besi Cat kilap Cat Tembok Dempul Kayu Dempul Besi Espanolet Tanam Engsel pintu 5' Engsel jendela 3 ' Atap Zincalume tbl. 4 mm Pemuung Zincalume Glasblock Kunci Tanam 2 sllag Kait angin Koral / Kerikil Kaca Bening 5 mm Kaca Rayben 5 mm Kayu Bekesting Kayu Papan lanan Kayu lanan Balok Kayu Balok Ulin Kelas I Kayu Papan Ulin kelas I Kayu bakar Kayu galam dia 8-10 Keramik Polos Putih 30 x 30 Keramik Lantai KM 20 x 20 Keramik Dinding KM Polos 20 x 20 Kloset Jongkok Kalsiboard 3.6 mm Kuda Baja ringan Laston Ac - AMP Kerosene Nako Jendela Minyak Cat Harga Satuan 3 Rp5,000.00 Rp10.00 Rp50,000.00 Rp5,000.00 Rp5,000.00 Rp450.00 Rp1,500.00 Rp9,000.00 Rp9,000.00 Rp9,000.00 Rp10,000.00 Rp10,000.00 Rp200,000.00 Rp37,500.00 Rp37,500.00 Rp37,500.00 Rp37,500.00 Rp37,500.00 Rp35,000.00 Rp35,000.00 Rp75,000.00 Rp50,000.00 Rp35,000.00 Rp65,000.00 Rp30,000.00 Rp50,000.00 Rp250,000.00 Rp25,000.00 Rp200,000.00 Rp85,000.00 Rp100,000.00 Rp900,000.00 Rp1,250,000.00 Rp1,000,000.00 Rp6,500,000.00 Rp7,000,000.00 Rp600,000.00 Rp5,000.00 Rp65,000.00 Rp60,000.00 Rp60,000.00 Rp450,000.00 Rp57,500.00 Rp200,000.00 Rp1,150,000.00 Rp7,000.00 Rp16,500.00 Rp5,000.00 lbr ltr set kg ltr bh bh kg kg kg kg kg m3 kg kg kg kg kg kg kg bh bh bh m2 m1 bh bh bh m2 m2 m2 m3 m3 m3 m3 m3 m3 btg m2 m2 m2 bh lbr m2 m3 ltr bf ltr

Minyak Bekisting Minyak pelumas playwood/multiplek 9 mm Playwood 4 mm Pemuung type U Paku Paku anti karat Pasir Beton Pasir Pasang Pintu besi Lipat Pasir Urug Batu belah 10/15 Batu belah 5/7 Batu belah 3/5 Batu belah 2/3 Batu BaseCourse Tanah laterit Porland Cement Porland Cement (Putih) Plamir Pipa PVC 3" Pintu PVC Pemeliharaan Bahan Bakar Roster kerawang Solar/Diesel Seng gelombang Saklar Tunggal Saklar Ganda Stop Kontak SEWA ALAT 77 Dumptruck No. 1 1 Operator Terlatih 2 Pembantu Operator 3 Supir truck 4 Pembantu Supir 5 Mandor 6 Kepala Tukang 7 Tukang kayu 8 Tukang Batu 9 Tukang Besi 10 Tukang Cat 11 Jaga Pekerja 12 Pekerja

49 50 51 52 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76

Rp5,000.00 Rp25,000.00 Rp100,000.00 Rp60,000.00 Rp27,500.00 Rp12,500.00 Rp22,500.00 Rp90,000.00 Rp90,000.00 Rp200,000.00 Rp75,000.00 Rp250,000.00 Rp225,000.00 Rp200,000.00 Rp200,000.00 Rp200,000.00 Rp75,000.00 Rp1,150.00 Rp1,850.00 Rp27,500.00 Rp50,000.00 Rp350,000.00 Rp500,000.00 Rp1,850.00 Rp7,000.00 Rp50,000.00 Rp30,000.00 Rp35,000.00 Rp30,000.00 Rp150,000.00 UPAH 2 Harga Satuan 3 Rp75,000.00 Rp45,000.00 Rp75,000.00 Rp45,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp50,000.00 Rp50,000.00 Rp50,000.00 Rp30,000.00 Rp35,000.00

ltr ltr lbr lbr m' kg kg m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 kg kg kg m' unit Ls Bh ltr m bh bh bh Jam

/hari /hari /hari /hari /hari /hari /hari /hari /hari /hari /hari /hari

ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN : PEMBANGUNAN GUDANG PUPUK KABUPATEN TANAH LAUT LOKASI : DESA AMBUNGAN KECAMATAN PELAIHARI, KAB. TANAH LAUT TAHUN ANGGARAN : 2011 No URAIAN PEKERJAAN HARGA SATUAN (Rp.) UPAH KERJA (Rp.) HARGA BAHAN JUMLAH (RP.) (Rp.)

I. PEKERJAAN PERSIAPAN 1 1 M Pengukuran dan pemasangan Bouwplank 0.0120 m3 Balok Kayu lanan 5/7 0.0200 Kg Paku kayu 0.0070 m3 Papan Lanan 0.0050 org Mandor 0.0100 org Kep. Tukang 0.1000 org Tukang batu 0.1000 org Pekerja

### Rp12,500.00 ### Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp12,000.00 Rp250.00 Rp8,750.00 Rp250.00 Rp700.00 Rp5,000.00 Rp3,500.00 Rp9,450.00

Rp21,000.00 Rp6,250.00 ### Rp10,625.00 Rp11,000.00 Rp40,250.00 Rp13,500.00 Rp9,000.00 Rp30,000.00 Rp13,500.00 Rp50,000.00 Rp33,000.00 Rp6,800.00 Rp37,500.00 Rp3,600.00

Rp12,000.00 Rp250.00 Rp8,750.00 Rp250.00 Rp700.00 Rp5,000.00 Rp3,500.00 Rp30,450.00 Rp6,250.00 ### Rp10,625.00 Rp11,000.00 Rp40,250.00 Rp13,500.00 Rp9,000.00 Rp30,000.00 Rp13,500.00 Rp50,000.00 Rp33,000.00 Rp6,800.00 Rp37,500.00 Rp3,600.00 Rp1,000.00 Rp1,400.00 Rp10,000.00 Rp14,000.00 ###

2

1 m2 Pembuatan kantor sementara dengan lantai plesteran 1.2500 Btg galam dia. 8-10/400 cm Rp5,000.00 ### 0.1800 m3 Kayu Begisting Rp12,500.00 0.8500 kg Paku Kayu 1.1000 kg Besi Strip Rp10,000.00 ### kg Semen portland Rp1,150.00 0.1500 m3 Pasir Pasang Rp90,000.00 Rp90,000.00 0.1000 m3 Pasir Beton ### 0.1500 m3 koral ### bh Bata Merah Rp450.00 1.0000 m2 Seng Gelombang 3"-5" Rp50,000.00 Rp16,500.00 2.0000 bh Jendela Nako 0.0800 m2 Kaca Polos Rp85,000.00 0.1500 bh Kunci Tanam ### Rp60,000.00 0.0600 lbr Playwood 4 mm Rp50,000.00 0.0200 org Mandor 0.0200 org Kep. Tukang Rp70,000.00 Rp50,000.00 0.2000 org Tukang Kayu Rp35,000.00 0.4000 org Pekerja

Rp1,000.00 Rp1,400.00 Rp10,000.00 Rp14,000.00 Rp26,400.00

###

II. PEKERJAAN TANAH 3 1 m3 Galian tanah biasa sedalam 1 m 0.0400 org Mandor 0.4000 org Pekerja 4 1 m3 Urugan Tanah Kembali 0.0190 org Mandor 0.1900 org Pekerja 1 m3 Pemadatan Tanah 0.0500 org Mandor 0.5000 org Pekerja 1 m3 Urugan tanah 1.2000 m3 Tanah urug 0.0250 org Mandor 0.2500 org Pekerja 1 m3 Urugan Pasir 1.2000 m3 Pasir Urug 0.0100 org Mandor 0.3000 org Pekerja

Rp50,000.00 Rp35,000.00

Rp2,000.00 Rp14,000.00 Rp16,000.00 Rp950.00 Rp6,650.00 Rp7,600.00 Rp2,500.00 Rp17,500.00 Rp20,000.00 Rp90,000.00 Rp1,250.00 Rp8,750.00 Rp10,000.00

Rp2,000.00 Rp14,000.00 Rp16,000.00 Rp950.00 Rp6,650.00 Rp7,600.00 Rp2,500.00 Rp17,500.00 Rp20,000.00 Rp90,000.00 Rp1,250.00 Rp8,750.00 ### Rp90,000.00 Rp500.00 Rp10,500.00 ###

Rp50,000.00 Rp35,000.00

5

Rp50,000.00 Rp35,000.00

6

Rp75,000.00 Rp50,000.00 Rp35,000.00

Rp90,000.00 Rp90,000.00

7

Rp75,000.00 Rp50,000.00 Rp35,000.00

Rp500.00 Rp10,500.00 Rp11,000.00

Rp90,000.00

8

III. PEKERJAAN PONDASI 1 m3 Pasangan batu belah 1 : 4 ### 1.1000 m3 Batu gunung Rp1,150.00 ### kg Semen PC Rp90,000.00 0.5200 m3 Pasir pasang Rp50,000.00 0.0750 org Mandor Rp70,000.00 0.0600 org Kep. Tukang Rp50,000.00 0.6000 org Tukang batu Rp35,000.00 1.5000 org Pekerja

### ### Rp46,800.00 Rp3,750.00 Rp4,200.00 Rp30,000.00 Rp52,500.00 Rp90,450.00

###

### ### Rp46,800.00 Rp3,750.00 Rp4,200.00 Rp30,000.00 Rp52,500.00 ###

IV. PEKERJAAN DIN DING 9 ### ### 0.0930 0.0300 0.0200 0.2000 0.6500 10 1 m2 Pasangan batu bata 1 : 4 tebal : 1 bata bh Bata kg Semen PC m3 Pasir pasang org Mandor org Kep. Tukang org Tukang batu org Pekerja

Rp450.00 Rp1,150.00 Rp90,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp63,000.00 Rp30,532.50 Rp8,370.00 Rp1,500.00 Rp1,400.00 Rp10,000.00 Rp22,750.00 Rp35,650.00

1 m2 Pasangan batu bata camp. 1 : 4 tebal 1/2 bata ### bh Bata ### kg Semen PC 0.0430 m3 Pasir pasang 0.0150 org Mandor 0.0100 org Kep. Tukang 0.1000 org Tukang batu 0.3200 org Pekerja 1 m2 Pasangan batu bata camp. 1 : 2 tebal 1/2 bata ### bh Bata ### kg Semen PC 0.0380 m3 Pasir pasang 0.0150 org Mandor 0.0100 org Kep. Tukang 0.1000 org Tukang batu 0.3200 org Pekerja 1 m2 Pasang dinding roster/terawang (20 x 20) ### bh Roster/terawang kg Semen PC ### 0.0350 m3 Pasir pasang 0.0150 org Mandor 0.0100 org Kep. Tukang 0.1000 org Tukang batu 0.3000 org Pekerja 1 m2 Pasang dinding Bataco bh Bataco ### 9.0000 kg Semen PC 0.0180 m3 Pasir pasang 0.0480 org Mandor 0.0160 org Kep. Tukang 0.1600 org Tukang batu 0.4800 org Pekerja

### Rp31,500.00 Rp13,225.00 Rp3,870.00

Rp63,000.00 Rp30,532.50 Rp8,370.00 Rp1,500.00 Rp1,400.00 Rp10,000.00 Rp22,750.00 ### Rp31,500.00 Rp13,225.00 Rp3,870.00 Rp750.00 Rp700.00 Rp5,000.00 Rp11,200.00 Rp66,245.00 Rp31,500.00 Rp21,792.50 Rp3,420.00 Rp750.00 Rp700.00 Rp5,000.00 Rp11,200.00 Rp74,362.50 Rp46,250.00 Rp14,720.00 Rp3,150.00 Rp750.00 Rp700.00 Rp5,000.00 Rp10,500.00 Rp81,070.00 Rp19,500.00 Rp10,350.00 Rp1,620.00 Rp2,400.00 Rp1,120.00 Rp8,000.00 Rp16,800.00 Rp59,790.00

Rp450.00 Rp1,150.00 Rp90,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp750.00 Rp700.00 Rp5,000.00 Rp11,200.00 Rp17,650.00

Rp48,595.00 Rp31,500.00 Rp21,792.50 Rp3,420.00

11

Rp450.00 Rp1,150.00 Rp90,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp750.00 Rp700.00 Rp5,000.00 Rp11,200.00 Rp17,650.00

Rp56,712.50 Rp46,250.00 Rp14,720.00 Rp3,150.00

12

Rp1,850.00 Rp1,150.00 Rp90,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp750.00 Rp700.00 Rp5,000.00 Rp10,500.00 Rp16,950.00

Rp64,120.00 Rp19,500.00 Rp10,350.00 Rp1,620.00

13

Rp1,500.00 Rp1,150.00 Rp90,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp2,400.00 Rp1,120.00 Rp8,000.00 Rp16,800.00 Rp28,320.00

Rp31,470.00

V. PEKERJAAN PLESTERAN 14 1 m2 Plesteran tebal 15 mm dengan campuran 1:4 5.2000 5.2000 kg Semen PC 0.0200 0.0200 m3 Pasir pasang 0.0100 0.0100 org Mandor 0.0150 0.0150 org Kep.Tukang 0.1500 0.1500 org Tukang batu 0.2000 0.2000 org Pekerja

Rp1,150.00 Rp90,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp5,980.00 Rp1,800.00 Rp500.00 Rp1,050.00 Rp7,500.00 Rp7,000.00 Rp16,050.00

15

1 m2 Plesteran tebal 15 mm dengan campuran 1 PC : 2 PS Rp1,150.00 8.5200 kg Semen PC Rp90,000.00 0.0180 m3 Pasir pasang Rp50,000.00 0.0130 org Mandor Rp70,000.00 0.0200 org Kepala Tukang Rp50,000.00 0.2000 org Tukang Batu Rp35,000.00 0.2600 org Pekerja 1 m2 Pekerjaan siar dengan camp. 1 PC : 2 PS Rp1,150.00 4.3200 kg Semen PC Rp90,000.00 0.0160 m3 Pasir pasang 0.0080 org Mandor Rp50,000.00 Rp70,000.00 0.0070 org Kep.Tukang Rp50,000.00 0.0700 org Tukang Batu Rp35,000.00 0.1500 org Pekerja

Rp7,780.00 Rp9,798.00 Rp1,620.00

Rp5,980.00 Rp1,800.00 Rp500.00 Rp1,050.00 Rp7,500.00 Rp7,000.00 Rp23,830.00 Rp9,798.00 Rp1,620.00 Rp650.00 Rp1,400.00 Rp10,000.00 Rp9,100.00 Rp32,568.00 Rp4,968.00 Rp1,440.00 Rp400.00 Rp490.00 Rp3,500.00 Rp5,250.00 Rp16,048.00

Rp650.00 Rp1,400.00 Rp10,000.00 Rp9,100.00 Rp21,150.00

Rp11,418.00 Rp4,968.00 Rp1,440.00

16

Rp400.00 Rp490.00 Rp3,500.00 Rp5,250.00 Rp9,640.00

Rp6,408.00

VI. PEKERJAAAN KAYU 15 1 m2 Pekerjaan Lantai ulin 0.0200 M3 papan ulin 0.1000 Kg Paku 0.0180 Oh Kepala Tukang 0.1800 Oh Tukang 0.0900 Oh Pekerja 0.0045 Oh Mandor

### Rp12,500.00 Rp70,000.00 Rp50,000.00 Rp35,000.00 Rp50,000.00

### Rp1,250.00 Rp1,260.00 Rp9,000.00 Rp3,150.00 Rp225.00 Rp13,635.00

### Rp7,875.00 Rp1,250.00

### Rp1,250.00 Rp1,260.00 Rp9,000.00 Rp3,150.00 Rp225.00 ### Rp7,875.00 Rp1,250.00 Rp50.00 Rp140.00 Rp1,050.00 Rp735.00 Rp11,100.00

16

1 m1 Pasang list plafond kayu profil 5 cm Rp7,500.00 1.0500 m1 Kayu profil Rp12,500.00 0.1000 kg Paku Rp50,000.00 0.0010 org Mandor Rp70,000.00 0.0020 org Kep.Tukang Rp50,000.00 0.0210 org Tukang kayu Rp35,000.00 0.0210 org Pekerja

Rp50.00 Rp140.00 Rp1,050.00 Rp735.00 Rp1,975.00

Rp9,125.00

VII. PEKERJAAN BETON 17 1 m3 Pekerjan beton K-125 ### kg Semen PC 0.8700 m3 koral 0.5200 m3 Pasir beton Ltr Air ### 0.0830 org Mandor 0.2750 org Kep. Tukang 0.2750 org Tukang batu 1.6500 org Pekerja 1 m3 Pekerjan beton K-225 kg Semen PC ### 0.7760 m3 koral 0.4990 m3 Pasir beton ### Ltr Air 0.0830 org Mandor 0.0275 org Kep. Tukang 0.2750 org Tukang batu 1.6500 org Pekerja 1 kg Pekerjan Tulangan besi polos / ulir 1.0500 Kg Besi Beton Polos 0.0150 Kg kawat beton 0.0003 org Mandor 0.0007 org Kep.Tukang 0.0070 org Tukang besi 0.0070 org Pekerja 1 m2 Pasang Bekisting untuk pondasi M3 Kayu Bekisting Kg Paku Ltr Minyak Bekisting org Mandor org Kep.Tukang org Tukang Kayu org Pekerja

Rp1,150.00 ### Rp90,000.00 Rp10.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

### ### Rp46,800.00 Rp2,150.00 Rp4,150.00 Rp19,250.00 Rp13,750.00 Rp57,750.00 Rp94,900.00

### ### ### Rp44,910.00 Rp2,150.00

### ### Rp46,800.00 Rp2,150.00 Rp4,150.00 Rp19,250.00 Rp13,750.00 Rp57,750.00 ### ### ### Rp44,910.00 Rp2,150.00 Rp4,150.00 Rp1,925.00 Rp13,750.00 Rp57,750.00 ### Rp9,450.00 Rp150.00 Rp15.00 Rp49.00 Rp350.00 Rp245.00 Rp10,259.00 Rp36,000.00 Rp3,750.00 Rp500.00 Rp250.00 Rp1,820.00 Rp13,000.00 Rp10,500.00 Rp65,820.00 Rp40,500.00 Rp3,750.00 Rp500.00 Rp250.00 Rp1,820.00 Rp13,000.00 Rp10,500.00 Rp70,320.00 Rp36,000.00 Rp5,000.00 Rp1,000.00 Rp13,500.00 Rp35,000.00 Rp10,000.00 Rp300.00 Rp2,310.00 Rp16,500.00 Rp10,500.00 ### Rp36,000.00 Rp5,000.00 Rp1,000.00 Rp16,200.00 Rp35,000.00 Rp10,000.00 Rp300.00 Rp2,310.00 Rp16,500.00 Rp11,200.00 ### Rp36,000.00 Rp5,000.00 Rp1,000.00 Rp13,500.00 Rp35,000.00 Rp30,000.00 Rp300.00 Rp2,310.00 Rp16,500.00 Rp11,200.00 ###

18

Rp1,150.00 ### Rp90,000.00 Rp10.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp4,150.00 Rp1,925.00 Rp13,750.00 Rp57,750.00 Rp77,575.00

### Rp9,450.00 Rp150.00

19

Rp9,000.00 Rp10,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp15.00 Rp49.00 Rp350.00 Rp245.00 Rp659.00

Rp9,600.00 Rp36,000.00 Rp3,750.00 Rp500.00

20 0.0400 0.3000 0.1000 0.0050 0.0260 0.2600 0.3000 21

### Rp12,500.00 Rp5,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp250.00 Rp1,820.00 Rp13,000.00 Rp10,500.00 Rp25,570.00

Rp40,250.00 Rp40,500.00 Rp3,750.00 Rp500.00

1 m2 Pasang Bekisting untuk Sloof 0.0450 M3 Kayu Bekisting 0.3000 Kg Paku 0.1000 Ltr Minyak Bekisting 0.0050 org Mandor 0.0260 org Kep.Tukang 0.2600 org Tukang Kayu 0.3000 org Pekerja 1 m2 Pasang Bekisting untuk Kolom M3 Kayu Bekisting Kg Paku Ltr Minyak Bekisting M3 Kayu bekisting Lbr Plywood tbl 9 mm Btg Dolken Ky. Galam dia. 8-10 / 4 M org Mandor org Kep.Tukang org Tukang Kayu org Pekerja 1 m2 Pasang Bekisting untuk Balok M3 Kayu Bekisting Kg Paku Ltr Minyak Bekisting M3 Kayu bekisting Lbr Plywood tbl 9 mm Btg Dolken Ky. Galam dia. 8-10 / 4 M org Mandor org Kep.Tukang org Tukang Kayu org Pekerja 1 m2 Pasang Bekisting untuk Lantai M3 Kayu Bekisting Kg Paku Ltr Minyak Bekisting m3 Kayu Bekisting lbr Plywood tbl 9 mm btg Dolken Ky. Galam dia. 8-10 / 4 M org Mandor org Kep.Tukang org Tukang Kayu org Pekerja

### Rp12,500.00 Rp5,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp250.00 Rp1,820.00 Rp13,000.00 Rp10,500.00 Rp25,570.00

Rp44,750.00 Rp36,000.00 Rp5,000.00 Rp1,000.00 Rp13,500.00 Rp35,000.00 Rp10,000.00

22 0.0400 0.4000 0.2000 0.0150 0.3500 2.0000 0.0060 0.0330 0.3300 0.3000 23 0.0400 0.4000 0.2000 0.0180 0.3500 2.0000 0.0060 0.0330 0.3300 0.3200 24 0.0400 0.4000 0.2000 0.0150 0.3500 6.0000 0.0060 0.0330 0.3300 0.3200

### Rp12,500.00 Rp5,000.00 ### ### Rp5,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp300.00 Rp2,310.00 Rp16,500.00 Rp10,500.00 Rp29,610.00

### Rp36,000.00 Rp5,000.00 Rp1,000.00 Rp16,200.00 Rp35,000.00 Rp10,000.00

### Rp12,500.00 Rp5,000.00 ### ### Rp5,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp300.00 Rp2,310.00 Rp16,500.00 Rp11,200.00 Rp30,310.00

### Rp36,000.00 Rp5,000.00 Rp1,000.00 Rp13,500.00 Rp35,000.00 Rp30,000.00

### Rp12,500.00 Rp5,000.00 ### ### Rp5,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp300.00 Rp2,310.00 Rp16,500.00 Rp11,200.00 Rp30,310.00

###

VIII. PEKERJAAN PENUTUP ATAP 25 1 m2 Pasang atap Zincalume 1.0200 m2 Atap Zincalume 0.2000 Kg Paku anti karat 0.0010 org Mandor 0.0100 org Kep. tukang 0.1000 org Tukang kayu 0.2000 org Pekerja 26 Pasang pemuung Zincalume per m' 1.0000 m' Pemuung 0.0400 kg Paku ulir 0.0100 org Mandor 0.0100 org Kep. tukang 0.0750 org Tukang kayu 0.1000 org Pekerja

Rp65,000.00 Rp22,500.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp66,300.00 Rp4,500.00 Rp50.00 Rp700.00 Rp5,000.00 Rp7,000.00 Rp12,750.00

Rp70,800.00 Rp27,500.00 Rp900.00

Rp66,300.00 Rp4,500.00 Rp50.00 Rp700.00 Rp5,000.00 Rp7,000.00 Rp83,550.00 Rp27,500.00 Rp900.00 Rp500.00 Rp700.00 Rp3,750.00 Rp3,500.00 Rp36,850.00

Rp500.00 Rp700.00 Rp3,750.00 Rp3,500.00 Rp8,450.00 IX. PEKERJAAN LANGIT-LANGIT Langit-langit Kalsiboard 3.6 mm + rangka kayu lanan per 27 m2 ### 0.0230 m3 Kayu balok lanan Rp12,500.00 0.0600 kg Paku Rp57,500.00 0.3900 lbr Kalsiboard Rp50,000.00 Rp675.00 0.0135 org Mandor Rp70,000.00 Rp2,800.00 0.0400 org Kep.Tukang Rp50,000.00 Rp20,000.00 0.4000 org Tukang kayu Rp35,000.00 Rp9,450.00 0.2700 org Pekerja Rp32,925.00 X. PEKERJAAN SAN ITASI 28 Memasang 1 buah kloset jongkok 1.0000 bh Kloset jongkok porselen 6.0000 kg Semen PC 0.0100 m3 Pasir pasang 0.1100 org Mandor 0.3000 org Kep.Tukang 1.5000 org Tukang batu 1.0000 org Pekerja Memasang pipa PVC tipe AW 3" per m1 Ljr Pipa PVC 35% harga pipa Perlengkapan 0.0041 org Mandor 0.0135 org Kep.Tukang 0.1350 org Tukang batu 0.0810 org Pekerja 0.3000 XI. PEKERJAAN BESI DAN ALUM UNIUM 30 1 kg Pekerjaan Konstruksi/rangka (Besi IWF) 1.1000 kg Besi profil IWF 0.0800 kg Meni besi 0.0003 org Mandor 0.0060 org Kep.Tukang 0.0060 org Tukang besi 0.0060 org Pekerja 1 kg Pekerjaan Konstuksi/rangka ( Besi siku ) 1.1000 kg Besi profil siku 0.0800 kg Meni besi 0.0003 org Mandor 0.0060 org Kep.Tukang 0.0060 org Tukang besi 0.0060 org Pekerja 1 kg Pekerjaan Konstuksi/rangka ( Besi beton ) 1.1000 kg Besi beton 0.0800 kg Meni besi 0.0003 org Mandor 0.0060 org Kep.Tukang 0.0060 org Tukang besi 0.0060 org Pekerja

Rp27,500.00 Rp22,500.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp28,400.00

Rp23,000.00 Rp750.00 Rp22,425.00

Rp46,175.00

Rp23,000.00 Rp750.00 Rp22,425.00 Rp675.00 Rp2,800.00 Rp20,000.00 Rp9,450.00 Rp79,100.00

### Rp1,150.00 Rp90,000.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

### Rp6,900.00 Rp900.00 Rp5,500.00 Rp21,000.00 Rp75,000.00 Rp35,000.00 ###

### Rp15,000.00 Rp17,500.00

### Rp6,900.00 Rp900.00 Rp5,500.00 Rp21,000.00 Rp75,000.00 Rp35,000.00 ### Rp15,000.00 Rp17,500.00 Rp205.00 Rp945.00 Rp6,750.00 Rp2,835.00 Rp43,235.00

29

Rp50,000.00 Rp17,500.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp205.00 Rp945.00 Rp6,750.00 Rp2,835.00 Rp10,735.00

Rp32,500.00

Rp9,000.00 Rp37,500.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp9,900.00 Rp3,000.00 Rp15.00 Rp420.00 Rp300.00 Rp210.00 Rp945.00

Rp12,900.00 Rp9,900.00 Rp3,000.00

Rp9,900.00 Rp3,000.00 Rp15.00 Rp420.00 Rp300.00 Rp210.00 Rp13,845.00 Rp9,900.00 Rp3,000.00 Rp15.00 Rp420.00 Rp300.00 Rp210.00 Rp13,845.00 Rp9,900.00 Rp3,000.00 Rp15.00 Rp420.00 Rp300.00 Rp210.00 Rp13,845.00 ### ###

31

Rp9,000.00 Rp37,500.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

Rp15.00 Rp420.00 Rp300.00 Rp210.00 Rp945.00

Rp12,900.00 Rp9,900.00 Rp3,000.00

32

Rp9,000.00 Rp37,500.00 Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

33

1 m2 Pekerjaan Konstruksi/rangka (Baja ringan) SmartTruss ### 1.0000 M2 Konstruksi Baja Ringan A Pasang pintu besi baja per m2 / Type lipat 1.0000 m2 Pintu besi baja 0.0320 org Mandor 0.0650 org Kep.Tukang 0.6500 org Tukang besi konstruksi 0.6500 org Pekerja Pasang pintu Kamar Mandi PVC 1.0000 Unit Pintu PVC 0.0052 org Mandor 0.1050 org Kep.Tukang 1.0500 org Tukang kayu 1.0500 org Pekerja

Rp15.00 Rp420.00 Rp300.00 Rp210.00 Rp945.00

Rp12,900.00

34

### Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

### Rp1,600.00 Rp4,550.00 Rp32,500.00 Rp22,750.00 Rp61,400.00

### ###

### Rp1,600.00 Rp4,550.00 Rp32,500.00 Rp22,750.00 ### ### Rp260.00 Rp7,350.00 Rp52,500.00 Rp36,750.00 ###

35

36 0.2000 0.1500 0.1700 0.3500 0.0025 0.0040 0.1050 0.0700 37 0.1000 0.1000 0.2600 0.0025 0.0063 0.0630 0.0200 38 0.1000 0.0100 0.0100 0.0200 0.2000 0.0200 39

40

41

42

43

44

45

Rp260.00 Rp7,350.00 Rp52,500.00 Rp36,750.00 Rp96,860.00 XII PEKERJAAN PEN GECATAN Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup per m2 Rp37,500.00 kg Cat meni kg Plamir Rp27,500.00 kg Cat dasar Rp37,500.00 Kg Cat penutup 3 kali Rp37,500.00 Rp50,000.00 Rp125.00 org Mandor org Kep.Tukang Rp70,000.00 Rp280.00 org Tukang cat Rp50,000.00 Rp5,250.00 org Pekerja Rp35,000.00 Rp2,450.00 Rp8,105.00 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) per m2 kg Plamir Rp27,500.00 kg Cat dasar Rp37,500.00 Rp37,500.00 kg Cat pen utup 2 x Rp50,000.00 Rp125.00 org Mandor org Kep.Tukang Rp70,000.00 Rp441.00 org Tukang cat Rp50,000.00 Rp3,150.00 Rp35,000.00 Rp700.00 org Pekerja Rp4,416.00 Pengecatan permukaan baja dengan meni besi per m2 kg Meni besi Rp37,500.00 Rp15,000.00 bh Kuas org Mandor Rp50,000.00 Rp500.00 org Kep.Tukang Rp70,000.00 Rp1,400.00 org Tukang cat Rp50,000.00 Rp10,000.00 Rp35,000.00 Rp700.00 org Pekerja Rp12,600.00 Beton bertulang ( POER / PLAT ) type a 1.5 x1.5 Beton K-225 Rp77,575.00 Besi Tulangan (Kg) 125 Rp82,375.00 Bekisting Pondasi (M2) 3.73 Rp95,376.10 Rp255,326.10 Beton bertulang ( Sloof 20 x 30 ) Beton K-225 Rp77,575.00 Besi Tulangan (Kg) 235.37 Rp155,108.83 Bekisting sloof 2 x pakai (M2) 3.33 Rp85,148.10 Rp317,831.93 Beton bertulang ( Sloof 30 x 35 ) Beton K-225 Rp77,575.00 Besi Tulangan (Kg) 184.27 Rp121,433.93 Bekisting sloof 2 x pakai (M2) 2.5 Rp63,925.00 Rp262,933.93 Beton bertulang ( Kolom 30 x 30 ) Beton K-225 Rp77,575.00 Besi Tulangan (Kg) 173.99 Rp114,659.41 Bekisting kolom 2 x pakai (M2) 6.67 Rp197,498.70 Rp389,733.11 Beton bertulang ( Kolom 40 x 40 ) Beton K-225 Rp77,575.00 Besi Tulangan (Kg) 174.62 Rp115,074.58 Bekisting kolom 2 x pakai (M2) 5 Rp148,050.00 Rp340,699.58 Beton bertulang ( Balok 15 x 15 ) Beton K-225 Rp77,575.00 Besi Tulangan (Kg) 175.07 Rp115,371.13 Bekisting balok 2 x pakai (M2) 6.67 Rp202,167.70 Rp395,113.83 Beton bertulang ( Plat lantai ) Beton K-225 Rp77,575.00 Besi Tulangan (Kg) 153.44 Rp101,116.96 Bekseting plat lantai 8.33 ### Rp431,274.28

### Rp50,000.00 Rp70,000.00 Rp50,000.00 Rp35,000.00

###

Rp7,500.00 Rp4,125.00 Rp6,375.00 Rp13,125.00

Rp31,125.00 Rp2,750.00 Rp3,750.00 Rp9,750.00

Rp7,500.00 Rp4,125.00 Rp6,375.00 Rp13,125.00 Rp125.00 Rp280.00 Rp5,250.00 Rp2,450.00 Rp39,230.00 Rp2,750.00 Rp3,750.00 Rp9,750.00 Rp125.00 Rp441.00 Rp3,150.00 Rp700.00 Rp20,666.00

Rp16,250.00

Rp3,750.00 Rp150.00

Rp3,900.00 Rp628,910.00 Rp1,200,000.0 0 Rp150,132.50 Rp1,979,042.5 0 Rp628,910.00 Rp2,259,552.0 0 Rp149,017.50 Rp3,037,479.5 0 Rp628,910.00 Rp1,768,992.0 0 Rp111,875.00 Rp2,509,777.0 0 Rp628,910.00 Rp1,670,304.0 0 Rp670,335.00 Rp2,969,549.0 0 Rp628,910.00 Rp1,676,352.0 0 Rp502,500.00 Rp2,807,762.0 0 Rp628,910.00 Rp1,680,672.0 0 Rp688,344.00 Rp2,997,926.0 0 Rp628,910.00 Rp1,473,024.0 0 ### Rp3,106,096.6 5

Rp3,750.00 Rp150.00 Rp500.00 Rp1,400.00 Rp10,000.00 Rp700.00 Rp16,500.00 Rp706,485.00 Rp1,282,375.0 0 Rp245,508.60 Rp2,234,368.6 0 Rp706,485.00 Rp2,414,660.8 3 Rp234,165.60 Rp3,355,311.4 3 Rp706,485.00 Rp1,890,425.9 3 Rp175,800.00 Rp2,772,710.9 3 Rp706,485.00 Rp1,784,963.4 1 Rp867,833.70 Rp3,359,282.1 1 Rp706,485.00 Rp1,791,426.5 8 Rp650,550.00 Rp3,148,461.5 8 Rp706,485.00 Rp1,796,043.1 3 Rp890,511.70 Rp3,393,039.8 3 Rp706,485.00 Rp1,574,140.9 6 ### Rp3,537,370.9 3

RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN : PEMBANGUNAN GUDANG PUPUK KABUPATEN TANAH LAUT LOKASI : DESA AMBUNGAN KECAMATAN PELAIHARI, KAB. TANAH LAUT TAHUN ANGGARAN : 2011 NO. A. I. 1 2 3 4 II 1 2 3 4 5 6 III 1 2 3 4 IV 1 2 3 4 5 6 7 8 9 PEKERJAAN PEMBANGUNAN GUDANG PUPUK PEKERJAAN PERSIAPAN Pek. Pembersihan lokasi Pek. Pengukuran/pas.Bouwplank Pek. Papan Nama Proyek Pek. Ijin Mendirikan Bangunan (IMB) PEKERJAAN TANAH Pek. Galian Tanah Pondasi Pek. Urugan Tanah Kembali Pek. Urugan Tanah Bawah lantai Pek. Pemadatan tanah Pek. Urugan Pasir Bawah Pondasi 10 cm Pek. Urugan Pasir Bawah Lantai 10 cm PEKERJAAN PASANGAN & PLESTERAN Pas. Batu bata dinding 1/2 Bt camp 1 : 4 Pas. Dinding Zincalume 4 mm Pek. Plesteran tb. 15 mm camp 1 : 4 Pek. Batu gunung camp 1;4 PEKERJAAN BETON Pek. Plat Pondasi 1.5 x 1.5 m tbl. 25 cm beton bertulang Pek. Sloof 25 x 30 cm beton bertulang Pek. Sloof 30 x 35 cm beton bertulang Pek. Neut Kolom 40 x 40 cm beton bertulang Pek. Kolom 40 x 40 cm beton bertulang Pek. Cor Plat lantai dalam beton bertulang tebal 15 cm Pek. Cor Plat lantai luar beton bertulang tebal 10 cm Pek. Pembuatan Saluran air hujan Keliling bangunan gudang Pek. Lantai Kerja bwh pondasi & lantai tbl. 5 cm camp.1:3 :5 URAIAN PEKERJAAN VOLUME

1.000 152.00 1.00 880.00

658.08 658.08 1,636.80 1,636.80 73.12 105.60

828.00 254.40 1,656.00 678.72

18.00 13.50 52.92 7.94 6.14 132.00 32.00 138.00 34.88

V PEKERJAAN BAJA, RANGKA ATAP, DAN PENUTUP ATAP 1 Pek. Kuda-kuda WF 250x125x6x9

6,400.00

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

Pek. Kuda-kuda WF.150x75x5x7 overstek Pek. Tiang Baja WF 300x150x6,5x9 Pek. Pengaku Tiang Baja WF 150x75x5x7 Pek. Plat Landas tebal 10 mm Pek. Plat pengaku tbl 9 mm tiang Pek. Plat pengaku kuda tbl 10 mm jarak 100 cm Pek. Treck stang kuda-kuda besi beton dia. 12 mm Pek. Dudukan Gording Besi L.70.70.7 Pek. Kuda - Kuda Baja siku L 70.70.7 Pek. Plat tbl 6 mm pada kuda- kuda baja siku Pek. Gording & rangka dinding zincalumne baja kanal C 124 x 50 x 2.3 mm Pek. Tutup Atap Zincalume 4mm Pek. Bubungan nok + tepi Zincalume 4mm Pek. Angkur baut 19 mm pj. 0.75 m Pek Mur dan baut serta Pengelasan sambungan Pek Talang air setara Dura Gutter lengkap klam Pek Pipa PVC 3" lengkap klam Pek. Ventilasi / angin - angin a Besi kanal C 124 x 50 x 2.3 mm b Besi beton dia.12 c Kawat nyamuk stainless steel 20 Pek. Pintu besi type lipat tebal 5 mm +Kunci +Accesorinya 21 Pek. Penangkal petir 3 speed 2 arde 22 Pek. Siklon 60 X 60 CM Aluminium VI 1 2 3 4 5 6 7 PEKERJAAN INSTALASI LISTRIK Pek Instalasi listrik Pek Saklar Tunggal Pek Saklar Ganda Pek Stop Kontak Pek Lampu SL 23 Watt lengkap (armatur+pipa penggantung) Pek Sekring Box panel / Mcb lengkap panel Penyambungan listrik kebangunan lama

560.00 7,633.60 2,389.33 401.28 610.31 112.86 559.20 185.17 954.84 192.33 4,382.24 1,281.57 48.00 384.00 1.00 96.00 288.00 455.47 215.56 28.00 54.00 1.00 8.00

36.00 1.00 6.00 3.00 33.00 1.00 1.00

VII PEKERJAAN CAT- CATAN 1 Pek Cat menie Besi utk pintu lipat 2 Pek. Cat Dinding

108.00 1,656.00

B. PEKERJAAN PALET

I. PEKERJAAN KAYU 1 Pek. Rangka Fallet 8/16 Kayu Ulin 2 Pek. Lantai Fallet 3/15 Kayu papan ulin

14.98 351.00 156 Unit ( Dal

C. I. 1 2 II 1 2 3 4

PEKERJAAN PERKERASAN JALAN LINGKUNGAN PEKERJAAN PERSIAPAN Pengukuran dan pemasangan patok Mobilisasi/Demobilisasi Alat PEK. PERKERASAN JALAN LINGKUNGAN Pengupasan Tanah asal Tb. 20 cm dgn alat Paklag batu belah 10/15 tebal 15 cm Urugan tanah tb.10 cm Membuat Lapis Kulit Penahan tebal 6 cm

138.100 1.000

2,322.675 2,322.675 232.268 2,322.675

N BIAYA (RAB)

SATUAN

ANALIS HARGA SATUAN A (Rp.)

JUM LAH BIAYA (Rp.)

ls m' Unit m

1 -

Rp2,500,000.00 Rp30,450.00 Rp350,000.00 Rp12,500.00 Sub Total I Rp16,000.00 Rp7,600.00 Rp100,000.00 Rp5,786.86 Rp101,000.00 Rp101,000.00 Sub Total II Rp66,245.00 Rp83,550.00 Rp23,830.00 Rp544,700.00 Sub Total III Rp2,234,368.60 Rp3,355,311.43 Rp2,772,710.93 Rp3,148,461.58 Rp3,148,461.58 Rp3,537,370.93 Rp3,537,370.93 Rp75,000.00 Rp568,550.00 Sub Total IV Rp13,845.00

Rp2,500,000.00 Rp4,628,400.00 Rp350,000.00 Rp11,000,000.00 Rp18,478,400.00 Rp10,529,280.00 Rp5,001,408.00 Rp163,680,000.00 Rp9,471,934.67 Rp7,385,120.00 Rp10,665,600.00 Rp206,733,342.67 Rp54,850,860.00 Rp21,255,120.00 Rp39,462,480.00 Rp369,698,784.00 Rp485,267,244.00 Rp40,218,634.80 Rp45,296,704.31 Rp146,731,862.42 Rp24,998,784.95 Rp19,331,554.10 Rp466,932,963.16 Rp113,195,869.86 Rp10,350,000.00 Rp19,831,024.00 Rp886,887,397.58 Rp88,608,000.00

m m m m m m

3 4 6 K-342 7 7

m m m m

10 25 14 8

m m m m m m m m' m

39 40 41 43 43 45 45 17

kg

30

kg kg kg kg kg kg kg kg kg kg kg m m' bh ls m' m' kg kg m m unit unit

30 30 30 30 30 30 32 31 31 30 30 25 26 29 30 32 34 -

Rp13,845.00 Rp13,845.00 Rp13,845.00 Rp13,845.00 Rp13,845.00 Rp13,845.00 Rp13,845.00 Rp13,845.00 Rp13,845.00 Rp13,845.00 Rp13,845.00 Rp83,550.00 Rp36,850.00 Rp25,000.00 Rp5,000,000.00 Rp75,000.00 Rp43,235.00 Rp13,845.00 Rp13,845.00 Rp75,000.00 Rp261,400.00 Rp5,000,000.00 Rp1,250,000.00 Sub Total V Rp200,000.00 Rp30,000.00 Rp35,000.00 Rp30,000.00 Rp175,000.00 Rp250,000.00 Rp500,000.00 Sub Total VI

Rp7,753,200.00 Rp105,687,192.00 Rp33,080,273.85 Rp5,555,721.60 Rp8,449,741.95 Rp1,562,546.70 Rp7,742,124.00 Rp2,563,678.65 Rp13,219,759.80 Rp2,662,808.85 Rp60,672,112.80 Rp107,075,173.50 Rp1,768,800.00 Rp9,600,000.00 Rp5,000,000.00 Rp7,200,000.00 Rp12,451,680.00 Rp6,305,982.15 Rp2,984,428.20 Rp2,100,000.00 Rp14,115,600.00 Rp5,000,000.00 Rp10,000,000.00 Rp521,158,824.05 Rp7,200,000.00 Rp30,000.00 Rp210,000.00 Rp90,000.00 Rp5,775,000.00 Rp250,000.00 Rp500,000.00 Rp14,055,000.00 Rp1,782,000.00 Rp34,222,896.00 Rp36,004,896.00 Rp2,168,585,104.30

titik bh bh bh bh unit Ls

-

m m

Rp16,500.00 Rp20,666.00 Sub Total VII Sub Total A ( I S/D VII )

38 37

m Rp6,500,000.00 m 15 Rp32,568.00 156 Unit ( Dalam Ukuran 1.5 x 1.5 m2 ) Sub Total B ( I )

Rp97,370,000.00 Rp11,431,368.00 Rp108,801,368.00 Rp108,801,368.00

m' Ls

-

Rp10,000.00 Rp1,381,000.00 Rp2,000,000.00 Rp2,000,000.00 Sub Total I Rp3,381,000.00 Rp916.52 Rp69,816.67 Rp101,000.00 Rp34,170.33 Rp2,128,770.10 Rp162,161,426.25 Rp23,459,068.00 Rp79,366,578.98 Rp267,115,843.32

m m m m

K-211 I 7 V

Sub Total II Rp267,115,843.32 Sub Total C ( I s/d II ) Rp270,496,843.32

REKAPITU LASI REN CANA AN GGARAN BIAYA (RAB) PEKERJAAN : PEMBANGUNAN GUDANG PUPUK KABUPATEN TANAH LAUT LOKASI : DESA AMBUNGAN KECAMATAN PELAIHARI, KAB. TANAH LAUT TAHUN ANGGARAN : 2011 NO . A. I. II III IV V VI VII B. I. C. I. II. URAIAN PEKERJAAN PEKERJAAN PEMBANGUNAN GUDANG PUPUK PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PASANGAN & PLESTERAN PEKERJAAN BETON PEKERJAAN BAJA, RANGKA ATAP, DAN PENUTUP ATAP PEKERJAAN INSTALASI LISTRIK PEKERJAAN CAT- CATAN PEKERJAAN PALET PEKERJAAN KAYU PEKERJAAN PERKERASAN JALAN LINGKUNGAN PEKERJAAN PERSIAPAN PEK. PERKERASAN JALAN LINGKUNGAN JUMLAH BIAYA (Rp.)

Rp18,478,400.00 Rp206,733,342.67 Rp485,267,244.00 Rp886,887,397.58 Rp521,158,824.05 Rp14,055,000.00 Rp36,004,896.00 Rp108,801,368.00 Rp3,381,000.00 Rp267,115,843.32

JUMLAH Rp2,547,883,315.63 Rp254,788,331.56 PPN 10 % Rp2,802,671,647.19 Total Keseluruhan Rp2,802,671,000.00 Jumlah Dibulatkan Terbilang : Dua milyar delapan ratus dua juta enam ratus tujuh puluh satu ribu rupiah CATATAN Jumlah harga diatas sudah termasuk biaya persiapan, mobilisasi demobilisasi, keuntungan, pajak-pajak, dan pungutan resmi lainnya Pelaihari, 24 Juni 2011 PT. TRIASA PUTRA ABADI

Hj. Ainun Jariah Direktur

ANALISA HARGA SATUAN PEKERJAAN JALAN No I I II Harga Sat. (Rp) IV Upah (Rp) V

Pekerjaan Lapis Paglak Bt. Belah Tb.15 Cm Padat A.2/m2 0.200 M3 Batu Belah 10/15 250,000.00 0.050 M3 Pasir Pasang 90,000.00 0.370 Pekerja 35,000.00 12,950.00 0.020 Mandor 50,000.00 1,000.00 13,950.00 Biaya Menggilas 1/7500 x W4 1,300.00 15,250.00 Biaya Menggilas sebulan W.4 30.000 Operator terlatih / bulan 30.000 Pembantu Operator / bulan 150.000 Pekerja 30.000 Jaga Pekerja 1.000 Pemeliharaan Bahan Bakar

II

75,000.00 45,000.00 35,000.00 30,000.00 500,000.00

2,250,000.00 1,350,000.00 5,250,000.00 900,000.00 9,750,000.00

III

IV

V

Mengaspal Muka Jalan dengan Laston AC Tb 3 Cm W.6 /100m2 3.000 M3 Laston AC 1,150,000.00 1.000 Alat-Alat 50,000.00 12.000 Pekerja 35,000.00 420,000.00 0.010 Mandor 50,000.00 500.00 420,500.00 1 m2 4,205.00 Biaya Menggilas 2/7500 x W4 2,600.00 6,805.00 Menaruh batu Pecah diatas Jalan W.1 / m3 1.200 m3 Batu Pecah 5/7 225,000.00 0.380 Pekerja 35,000.00 13,300.00 0.190 Mandor 50,000.00 9,500.00 22,800.00 Membuat Lapisan Kulit Penahan tebal 6 cm W.5a Sub / 100m2 2.000 m3 Split 2/3 200,000.00 8.000 m3 Split 5/7 225,000.00 7.500 Pekerja 35,000.00 262,500.00 0.380 Mandor 50,000.00 19,000.00 100m2 281,500.00 1 m2 2,815.00 1.000 ltr Prime coat Biaya Menggilas 2/7500 x W4 2,600.00 5,415.00

ALAN Bahan (Rp) VI Jumlah (Rp) VII

50,000.00 4,500.00

54,500.00 68,450.00 66.67 1,366.67 54,566.67 69,816.67

500,000.00 500,000.00 3,450,000.00 50,000.00

10,250,000.00

3,500,000.00 35,000.00 133.33 35,133.33 270,000.00

3,920,500.00 39,205.00 2,733.33 41,938.33

270,000.00 400,000.00 1,800,000.00

292,800.00

2,200,000.00 22,000.00 133.33 22,133.33

2,481,500.00 24,815.00 6,622.00 2,733.33 34,170.33

ANALISA HARGA SATUAN PEMADATAN TANAH DASAR (MENGGUNAKAN ALAT)

PROPINSI : KALIMANTAN SELATAN KABUPATEN : TANAH LAUT URAIAN : 1.Pembentukan Badan Jalan 2.Dipadatkan dengan mesin gilas

DISIAPKAN OLEH : CV. RISCON SULTARINDO KECAMATAN DESA Konsultan Perencana N ANGGAPAN / ASUMSI : 1.Menggunakan Alat Berat 2.Damija dibersihkan dari semak 3. Menyiapkan dasar jalan 100m/hari

PEKERJA Mandor Pekerja

JUMLAH ORANG 1.00 4.00 2.00

HARI 1.00 1.00 1.00

KODE L.061 L.061 L.061

TOTAL VOL. (org/hari) 1.00 4.00 2.00

UPAH (Rp/org/hari) 50,000.00 35,000.00 75,000.00

BIAYA (Rp) 50,000.00 140,000.00 150,000.00

P E K E R J A

Operator Terlatih

Jumlah Biaya Untuk Pekerja OMS ( 1 ) PEKERJA (1) ( 2 ) KONTRAKTOR

Jumlah Biaya Untuk Pekerja Kontraktor ( 2 ) Jumlah Biaya Untuk Pekerja MATERIAL JUMLAH MATERIAL 0 SATUAN Set KODE M170 TOTAL HARGA VOL. (Rp/unit) 0 50,000.00

PEKERJA (1) PEKERJA BIAYA (Rp) 0

M A T E R I A L

Alat Bantu

Jumlah Biaya Untuk Material OMS ( 1 ) MATERIAL (1) ( 2 ) KONTRAKTOR

Jumlah Biaya Untuk Material Kontraktor ( 2 ) Jumlah Biaya Untuk Material PERALATAN Mesin Gilas 4 Ton PE RA LA TA N JUMLAH ALAT 1.00 HARI KERJA 1.00 KODE E080 HARGA JAM KERJA (Rp/unit) 6.00 184,452.56

MATERIAL (2) MATERIAL BIAYA (Rp) 1,106,715.34

Jumlah Biaya Untuk Peralatan OMS ( 1 ) PERALATAN (1) ( 2 ) KONTRAKTOR Jumlah Biaya Untuk Peralatan Kontraktor (2) Jumlah Biaya Untuk Peralatan PERALATAN (1) PERALATAN TOTAL (Rp...) VOLUME : 250.00 SATUAN ; M2 HARGA SATUAN : 5,786.86 PER'

KODE : K-342 TGL :

an 100m/hari

SUB TOTAL (Rp)

340,000.00

0 340,000.00 SUB TOTAL (Rp)

0

0 0 SUB TOTAL (Rp)

1,106,715.34

0 1,106,715.34 1,446,715.34 M3

URAIAN ANALISA ALATNo. URAIAN KODE KOEF.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

THREE WHEEL ROLLER 6-8 T Pw 55.0 Cp 8.0 A 5.0 W 2,000.0 B 350,000,000

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W 0 x B W = (E+F)

C D

35,000,000 0.29832

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

E

46,984.70

b. Asuransi, dll =

F

0.00

Biaya Pasti per Jam C. 1. 2.

G

46,984.70

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 46,200.00 37,812.50 15,313

3.

Perawatan dan perbaikan

K

21,000.00

=

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

10,714.29 6,428.57 137,467.86 184,452.56

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1.

LAIN - LAIN Tingkat Suku Bunga

i

15.00

2. 3. 4. 5. 6. 7.

Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

U1 U2 Mb Ms Mp

10,714.29 6,428.57 5,000.00 7,000.00 25,000.00

SATUAN

KET.

EL ROLLER 6-8 T HP Ton Tahun Jam Rupiah

E16

Rupiah -

Rupiah

Rupiah

Rupiah

Rupiah Rupiah Rupiah

Rupiah

Rupiah Rupiah Rupiah Rupiah

% / Tahun

Rp./Jam Rp./Jam Liter Liter Liter

JENIS PEKERJAAN : LAPIS RESAP PENGIKAT SATUAN PEKERJAAN : Liter PERKIRAAN KUANTITAS HARGA SATUAN ( Rp. )

NO.

K O M P O N E N SATUAN

A TENAGA 1 Pekerja ( L01 ) 2 Mandor ( L03 ) B BAHAN 1 Aspal ( M09 ) 2 Kerosene ( M10 ) Kg Liter 0.6468 0.4840 5,000.00 7,000.00 Jam Jam 0.0333 0.0067 35,000.00 50,000.00

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN 0.00 C JUMLAH HARGA TENAGA DAN BAHAN ( A + B )

AT

JUMLAH HARGA ( Rp. )

1,165.50 335.00 1,500.50 3,234.00 3,388.00 6,622.00

DIREKTORAT JENDERAL BINA MARGA DIREKTORAT BINA PROGRAM JALAN SUB DIT. PERENCANAAN JALAN LOKAL & KABUPATEN PROPINSI KODE KALIMANTAN SELATAN 63 URAIAN : 1. Pengupasan dgn menggunakan alat greder membentuk badan jalan dan membuang semak dari daerah milik jalan

ANALISBIAYAPEKERJAAN PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK PADA DAMIJA ( MENGGUNAKAN ALAT )

KABUPATEN KODE TANAH LAUT 01 ANGGAPAN / ASUMSI : 1.Menggunakan alat berat 2.Lebar Daerah Milik Jalan 12 m 3.Pembersihan damija 200 m perhari 4.Membentuk badan jalan 5. Penggunaan alat bantu

DISIAPKAN OLEH TANGGAL KONSULTAN PERENCANA

PEKERJA Mandor P Operator terlatih E K Buruh / Pekerja E R J A M A T E R Alat bantu I A L

JUMLAH ORANG 1.00 1.00 2.00

HARI

KODE 1 L.061 1 L.081 1 L.101

JUMLAH ORANG-HARI 1.00 1.00 2.00

UPAH Rp. / org / hari 50,000.00 75,000.00 35,000.00

Jumlah Biaya Untuk Pekerja MATERIAL JUMLAH VOLUME SATUAN 1.50 Jumlah Biaya Untuk Material PERALATAN P E R Grader A L A T A N JUMLAH HARI KERJA 1.00 1 KODE JAM KERJA HARGA ( Rp. / jam ) 5.00 385,927.95 KODE UPAH Rp. / org / har 50,000.00

set M 170

E.10

Jumlah Biaya Untuk Peralatan VOLUME / QUALITY : 2400 SATUAN m2 HARGA SAT

AAN MAK PADA DAMIJA

KODE K-211

APKAN OLEH TANGGAL SULTAN PERENCANA

BIAYA ( Rp ) 50,000.00 75,000.00 70,000.00

SUB TOTAL ( Rp )

195,000.00 BIAYA ( Rp ) 75,000.00 75,000.00 BIAYA ( Rp ) 1,929,639.74 SUB TOTAL ( Rp ) SUB TOTAL ( Rp )

T O T A L ( Rp 0.00 916.52 per m2

1,929,639.74 2,199,639.74

URAIAN ANALISA ALATNo. URAIAN KODE

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

MOTOR GRADER >100 HP Pw Cp A W B

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W 0 x B W = (E+F)

C D

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

E

b. Asuransi, dll =

F

Biaya Pasti per Jam C. 1. 2.

G

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W = ( 1 Orang / Jam ) x U1 = ( 1 Orang / Jam ) x U2 = (H+I+K+L+M) H I J

3.

Perawatan dan perbaikan

K

=

4. 5.

Operator Pembantu Operator

L M P S

Biaya Operasi per Jam D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1.

LAIN - LAIN Tingkat Suku Bunga

i

2. 3. 4. 5. 6. 7.

Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

U1 U2 Mb Ms Mp

A ALATKOEF. SATUAN KET.

MOTOR GRADER >100 HP 135.0 10,800.0 5.0 2,000.0 676,000,000

E-13 HP Tahun Jam Rupiah

67,600,000 0.29832

Rupiah -

90,747.59

Rupiah

0.00

Rupiah

90,747.59

Rupiah

113,400.00 92,812.50 29,575

Rupiah Rupiah Rupiah

42,250.00

Rupiah

10,714.29 6,428.57 295,180.36 385,927.95

Rupiah Rupiah Rupiah Rupiah

15.00 % / Tahun

10,714.29 Rp./Jam 6,428.57 Rp./Jam 5,000.00 Liter 7,000.00 Liter 25,000.00 Liter

URAIAN ANALISA HARGA SATUANAnalisa EI - 611 JENIS PEKERJAAN : LAPIS RESAP PENGIKAT SATUAN PEMBAYARAN : LITER NO. I ASUMSI1 Menggunakan alat berat ( cara mekanik ) 2 Lokasi pekerjaan : sepanjang jalan 3 Jarak rata-rata Base Camp ke lokasi pekerjaan 4 Jam kerja efektif per-hari 5 Faktor kehilangan bahan 6 Komposisi campuran : - Aspal AC - 10 atau AC - 20 - Minyak Flux / Pencair 7 Berat Jenis bahan : - Aspal AC - 10 atau AC - 20 - Minyak Flux / Pencair 8 Bahan dasar ( Aspal & Minyak Pencair ) semuanya diterima di lokasi pekerjaan D1 D2 1.05 0.80 Kg/Liter Kg/Liter As K 56 44 % % 100 bagian 80 bagian L Tk Fh 0.00 7.00 1.10 Km Jam -

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

II URUTAN KERJA1 Aspal dan Minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair 2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran 3 Campuran aspal cair diampar dengan tenaga buruh ke atas permukaan yang akan dilapis 4 Angkutan Aspal & Minyak Flux menggunakan Dump Truck

III PEMAKAIAN BAHAN, ALAT DAN TENAGA1 BAHAN Untuk mendapatkan 1 liter Lapis Resap Pengikat diperlukan : ( 1 liter x Fh ) 1.a Aspal = As x PC x D1 1.b Karosen = K x Pc 2ALAT 2.a ASPHALT SPRAYER Kapasitas alat Faktor efisiensi alat Waktu siklus ( termasuk proses pemanasan ) V x Fa = Kap. Prod./Jam Ts Q1 300.00 Liter PC 1.10 Liter Campuran

( M10 ) ( M11 ) 0.00E+00V Fa Ts

0.6468 0.4840

Kg Liter

800.00 0.75 2.00

Liter Jam

Koefisien Alat ! Liter = 1 : Q13 TENAGA Produksi menentukan : ASPHALT SPRAYER Produksi lapis Resap Pengikat / Hari = Tk x Q4 Kebutuhan Tenaga : - Pekerja - Mandor

0.00E+00Q4 Qt

0.0033300.00 2,100.00

JamLiter Liter

P M

10.00 2.00

Orang Orang

Koefisien Tenaga ! Liter :- Pekerja = ( Tk x P ) : - Mandor = ( Tk x M ) : t( L01 ) t( L03 )

0.0333 0.0067

Jam Jam

4 HARGA DASAR SATUAN UPAH , BAHAN

DAN ALATLihat Lampiran

TIME SCHEDULE PEKERJAAN : PEMBANGUNAN GUDANG PUPUK KABUPATEN TANAH LAUT LOKASI : DESA AMBUNGAN KECAMATAN PELAIHARI, KAB. TANAH LAUT TAHUN ANGGARAN : 2011 NO . A. I. II III IV V VI VII B. I. C. I. II.Bulan I Bulan II 4 5 6 7 8 9 Bulan III Minggu Ke 1 2 3 10 11 12 13 14 15 16 17 18 19 20 1002.7% 2.7% 2.7% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 3.2% 3.2% 3.2% 3.2% 3.2% 3.2% 3.2% 3.2% 3.2% 3.2% 3.2% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 1.9% 0.6% 0.7% 0.7%

Bulan IV

Bulan V Keterangan

URAIAN PEKERJAAN PEKERJAAN PEMBANGUNAN GUDANG PUPUK PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PASANGAN & PLESTERAN PEKERJAAN BETON PEKERJAAN BAJA, RANGKA ATAP, DAN PENUTUP ATAP PEKERJAAN INSTALASI LISTRIK PEKERJAAN CAT- CATAN PEKERJAAN PALET PEKERJAAN KAYU PEKERJAAN PERKERASAN JALAN LINGKUNGAN PEKERJAAN PERSIAPAN PEK. PERKERASAN JALAN LINGKUNGAN JUMLAHKomulatif

Bobot

0.73% 0.7% 8.11% 19.05% 34.81% 20.45% 0.55% 1.41%

50

4.27%

2.1%

2.1%

0.13% 10.48%

0.1% 1.7% 1.7% 1.7% 1.7% 1.7% 1.7%

0

100.00% 0.7% 2.7% 2.7% 5.1% 2.4% 5.5% 5.5% 5.5% 7.4% 7.4% 7.4% 5.0% 5.0% 5.2% 6.8% 6.8% 3.6% 3.6% 6.4% 1% 3% 6% 11% 14% 19% 25% 30% 38% 45% 52% 57% 62% 68% 74% 81% 85% 88%

5.1%

95% 100%

Banjarmasin, 24 Juni 2011 PT. TRIASA PUTRA ABADI

Hj. Ainun Jariah Direktur