Boq

2
  SKPD  : ...................................................... ........................... .................................. .................................................................................  Kegiatan  : ...................................................... ........................... .................................. .................................................................................  Pekerjaan  : .... ...................................................... ............................ .................................. ........................... ........................... ......................  Kecamatan  : ............................................................................................... .................................. ........................... ........................................  Kabupaten  : ...................................................... ........................... .................................. .................................................................................  No. Mata  Uraian Satuan  Perkiraan Harga Jumlah Pembayaran Kuantitas Satuan Harga-Harga (Rupiah) (Rupiah) a b c d e f = (d x e) DIVISI 1. UMUM - Papan Nama Proyek Bh 1,00  Ls Pengukuran dan Pasang Patok Ls 1,00  Ls Mobilisasi Alat Ls 1,00  - Barak Kerja + Gudang M2 30,00  Ls Quality Control Ls 1,00  Ls Asbuilt Drawing Ls 1,00  Ls Pembongkaran Jembatan Lama Ls 1,00  Ls Pembuatan Jembatan Darurat Ls 1,00  Ls Administrasi dan Dokumentasi Ls 1,00  Ls Biaya Jaga Malam Ls 1,00  Ls Demobilisasi Alat Ls 1,00  Ls (Sondir) Beserta Laporan Titik 2,00  Jumlah Harga Pekerjaan Divisi I (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 3. PEKERJAAN TANAH 3.1(3) Galian Struktur kedalaman 0 -2 M Untuk Abutment M 3 40,56  3. 2(2) Ti mbunan Pi li ha n untuk op ri t Je mbatan M 451,83  S NI .B 11 Ur ugan Pa si r Unt uk Abut me n M 3,12  Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 5. PERKERASAN BERBUTIR 5.2 (1) Lapis Pondasi Krokos M 3 31,50  Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 6. PERKERASAN ASPAL 6.2 (3) Bahan Aspal Untuk Pekerjaan Peleburan M 3 168,00  Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 7. STRUKTUR 7.1 (5)a Beton K250 untuk Oprit Jembatan M 42,00  7.1 (5)a Beton K250 untuk Abutment M 3 39,43  7.1 (5)a Beton K.250 untuk Wing Wall M 3 7,44  7.1 (5)a Beton K.250 untuk Plat injak M 1,54  7.1 (5)a M 3 57,97  7.1(8) Beton K125 untuk lantai kerja M 3,12  7.1(8) Beton K125 untuk tembok sedada M 3 2,00  7.1(8) Beton K125 untuk Kerb Trotoar M 3 4,56  7.3(2) Baja Tulangan U.32 Polos untuk Abutment Kg 3.824,42  7.3(2) Baja Tulangan U.32 Polos untuk Wing Wall Kg 729,71  7.3(2) Baja Tulangan U.32 Polos untuk plat injak Kg 328,60  7.3(2) Kg 11.148,50  7,9 Pasangan batu untuk tembok penahan M 60,00  7.6(19)a Tiang Bor Beton, dia 400 mm M 3 400,00  - Exspansion join M 3 14,00  - Elastomer Bh 4,00  - Pek. Pipa dia 3.5" untuk Sandaran (Railing) M' 91,20  - Pek. Besi Kanal U (double L 50. 50.5) untuk Saluran Air M' 45,60  - Pek. Besi Siku L (single L 50. 50.5) untuk trotoar M' 45,60  - Pek. Pipa dia 3.5" untuk Talang Air M' 9,00  Papan Nama Jembatan Bh 1 00 BILL OF QUANTITY ( BOQ ) K OP. PER USAHAAN Beton K.250 untuk Gelagar Induk, Diafragma, Lantai Jembatan dan Tiang Sandaran Baja Tulangan U.32 Polos untuk Gelagar Induk, Balok Diafragma, Lantai Jembatan dan Tiang Sandaran

description

b

Transcript of Boq

  • SKPD : .................................................................................................................................................................................................... Kegiatan : .................................................................................................................................................................................................... Pekerjaan : .................................................................................................................................................................................................... Kecamatan : .................................................................................................................................................................................................... Kabupaten : ....................................................................................................................................................................................................

    No. Mata Uraian Satuan Perkiraan Harga Jumlah

    Pembayaran Kuantitas Satuan Harga-Harga(Rupiah) (Rupiah)a b c d e f = (d x e)

    DIVISI 1. UMUM- Papan Nama Proyek Bh 1,00 Ls Pengukuran dan Pasang Patok Ls 1,00 Ls Mobilisasi Alat Ls 1,00 - Barak Kerja + Gudang M2 30,00 Ls Quality Control Ls 1,00 Ls Asbuilt Drawing Ls 1,00 Ls Pembongkaran Jembatan Lama Ls 1,00 Ls Pembuatan Jembatan Darurat Ls 1,00 Ls Administrasi dan Dokumentasi Ls 1,00 Ls Biaya Jaga Malam Ls 1,00 Ls Demobilisasi Alat Ls 1,00 Ls (Sondir) Beserta Laporan Titik 2,00 Jumlah Harga Pekerjaan Divisi I (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    DIVISI 3. PEKERJAAN TANAH3.1(3) Galian Struktur kedalaman 0 -2 M Untuk Abutment M3 40,56 3.2(2) Timbunan Pilihan untuk oprit Jembatan M3 451,83 SNI.B11 Urugan Pasir Untuk Abutmen M3 3,12 Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    DIVISI 5. PERKERASAN BERBUTIR5.2 (1) Lapis Pondasi Krokos M3 31,50 Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    DIVISI 6. PERKERASAN ASPAL6.2 (3) Bahan Aspal Untuk Pekerjaan Peleburan M3 168,00 Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    DIVISI 7. STRUKTUR7.1 (5)a Beton K250 untuk Oprit Jembatan M3 42,00 7.1 (5)a Beton K250 untuk Abutment M3 39,43 7.1 (5)a Beton K.250 untuk Wing Wall M3 7,44 7.1 (5)a Beton K.250 untuk Plat injak M3 1,54 7.1 (5)a M3 57,97 7.1(8) Beton K125 untuk lantai kerja M3 3,12 7.1(8) Beton K125 untuk tembok sedada M3 2,00 7.1(8) Beton K125 untuk Kerb Trotoar M3 4,56 7.3(2) Baja Tulangan U.32 Polos untuk Abutment Kg 3.824,42 7.3(2) Baja Tulangan U.32 Polos untuk Wing Wall Kg 729,71 7.3(2) Baja Tulangan U.32 Polos untuk plat injak Kg 328,60 7.3(2) Kg 11.148,50 7,9 Pasangan batu untuk tembok penahan M3 60,00 7.6(19)a Tiang Bor Beton, dia 400 mm M3 400,00 - Exspansion join M3 14,00 - Elastomer Bh 4,00 - Pek. Pipa dia 3.5" untuk Sandaran (Railing) M' 91,20 - Pek. Besi Kanal U (double L 50. 50.5) untuk Saluran Air M' 45,60 - Pek. Besi Siku L (single L 50. 50.5) untuk trotoar M' 45,60 - Pek. Pipa dia 3.5" untuk Talang Air M' 9,00 - Papan Nama Jembatan Bh 1,00 Ls Pek. Pengecatan Ls 1,00 - Patok Pengarah Bh 20,00 Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

    BILL OF QUANTITY( BOQ )

    KOP. PERUSAHAAN

    Beton K.250 untuk Gelagar Induk, Diafragma, Lantai Jembatan dan Tiang Sandaran

    Baja Tulangan U.32 Polos untuk Gelagar Induk, Balok Diafragma, Lantai Jembatan dan Tiang Sandaran