    KEGIATAN : Pembangunan Jembatan

    PEKERJAAN : Pemb. Jembatan Gantung Desa Omu

    LOKASI : Desa Omu Kec. Gumbasa

    TAHUN ANGGARAN : 2012

    I. PEKERJAAN PERSIAPAN

    II PEKERJAAN TANAH

    III. PEKERJAAN STRUKTUR DAN PASANGAN

    IV. PEKERJAAN KABEL DAN BESI PENGGANTUNG SERTA AKSESORIS

    V. PEKERJAAN KAYU

    VI. PEKERJAAN LAIN-LAIN

    (A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )

    (B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A)

    (C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)

    (D) DIBULATKAN

    Terbilang :

    Sigi Biromaru, 2012

    JOHANSYAH HALMAN, STNip. 19830427 201001 1 007

    Disetujui :KEPALA BIDANG BINA MARGA

    DINAS PU KAB. SIGI

    MOHAMAD RIZAL, ST.M.siNip. 19691027 200012 1 003

    KUASA PENGGUNAN ANGGARAN

    BILL OF QUANTITY (BOQ)

    No URAIAN PEKERJAAN JUMLAH HARGA

    PEJABAT PELAKSANA TEKNIS KEGIATAN

  • 8/10/2019 BOQ Jembatan Gantung Omu.pdf

    2/12

    KEGIATAN : Pembangunan Jembatan

    PEKERJAAN : Pemb. Jembatan Gantung Desa Omu

    LOKASI : Desa Omu Kec. GumbasaTAHUN ANGGARAN : 2012

    I.

    1 Pek. Pembersihan Lokasi Ls 1.000

    2 Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.000

    II.

    1 Pek. Galian Tanah M 39.864 2 Pek. Urugan Pasir Dibawah Lantai/Pondasi M 1.320

    3 Pekerjaan Timbunan Tanah Pilihan M 60.000

    III.

    1 Pek. Beton Bertulang K250 Untuk Tiang Phylon M 12.376

    2 Pek. Beton Bertulang K250 Untuk Balok Phylon M 2.520

    3 Pek. Beton Bertulang K250 Untuk Telapak Phylon M 4.284

    4 Pek. Beton Cycloop Pondasi Phylon M 23.776

    5 Pek. Beton Bertulang U/ Angkur Block Kabel Utama M 21.120

    6 Pek. Beton Tak Bertulang K175 Untuk Lantai Kerja M 1.320

    6 Pek. Beton Tak Bertulang K175 Untuk Rabat Oprit M 5.400

    7 Pek. Pasangan Batu Kali Pada Oprit M 25.500

    8 Pek. Acian Pada Pylon dan Angkur M2 115.720

    9 Pek. Plesteran Pada Oprit M2 60.000

    IV.

    1 Pek. Kabel Utama 1 1/2" M1 237.000

    2 Pek. Kabel Utama Bawah 1 " M1 199.000

    3 Pek. Besi Penggantung 14 mm M1 488.800

    4 Pas. Klem Besi Penggantung Bag. Atas set 94.000

    5 Pas. Klem Besi Penggantung Bag. Bawah set 94.000

    6 Pas. Klem Pada Angkur set 8.000

    7 Pas. Reling Kawat Harmonika M2 63.000

    PEKERJAAN STRUKTUR DAN PASANGAN

    PEKERJAAN TANAH

    PEKERJAAN PERSIAPAN

    PEKERJAAN KABEL DAN BESI PENGGANTUNG SERTA AKSESORIS

    HARGA PERKIRAAN SENDIRI (HPS)

    No VOLUMEURAIAN PEKERJAAN JUMLAH HARGAHARGA SATUANSATUAN

  • 8/10/2019 BOQ Jembatan Gantung Omu.pdf

    3/12

    V.

    1 Pek. Balok Gelagar Melintang 10/15 M 1.931

    2 Pek. Balok Gelagar Memanjang 8/12 M 3.360

    3 Pek. Lantai Papan 4/20 M2 3.150

    4 Pek. Tiang Sandaran 6/10 M 0.629

    5 Pek. Balok Sandaran 6/10 M 2.520

    6 Pek. Balok Gapit 2 x 6/10 M 1.087

    7 Pek. Mur, Baut dan Beugel Ls 1.000

    VI.

    1 Finishing Akhir ( Pembersihan & Pengecatan ) Ls 1.000

    2 Dokumentasi dan Pelaporan Ls 1.000

    PEKERJAAN LAIN-LAIN

    PEKERJAAN KAYU

    REAL COST

  • 8/10/2019 BOQ Jembatan Gantung Omu.pdf

    4/12

    KEGIATAN : Pembangunan Jembatan

    PEKERJAAN : Pemb. Jembatan Gantung Desa Omu

    LOKASI : Desa Omu Kec. Gumbasa

    TAHUN ANGGARAN : 2012

    1 M 3 Galian Tanah

    0.900 Oh Pekerja @ =

    0.045 Oh Mandor @ =

    1 M 3 Urugan Kembali

    0.192 Oh Pekerja @ =

    0.019 Oh Mandor @ =

    1 M 3 Urugan Pasir Dibawah Pondasi dan Lantai

    1.200 M3 Pasir Urug @ =

    0.300 Oh Pekerja @ =0.010 Oh Mandor @ =

    1 M 3 Urugan Sirtu/Tanah Pilihan

    1.200 M3 Sirtu/ Tanah Pilihan @ =

    0.250 Oh Pekerja @ =

    0.025 Oh Mandor @ =

    ANALISA HARGA SATUAN PEKERJAAN

  • 8/10/2019 BOQ Jembatan Gantung Omu.pdf

    5/12

    1 M 3 Pasangan Batu Kali 1 : 4

    1.200 M3 Batu Kali / Batu Belah @ =

    163.000 Kg Semen @ =

    0.520 M3 Pasir Pasang @ =

    0.600 Oh Tukang @ =0.060 Oh Kepala Tukang @ =

    1.500 Oh Pekerja @ =

    0.075 Oh Mandor @ =

    1 M 3 Pasangan beton Siklop

    0.480 M3 Batu Kali / Batu Belah @ =

    194.000 Kg Semen @ =

    0.312 M3 Pasir Pasang @ =

    0.468 M3

    Kerikil @ =0.850 Oh Tukang @ =

    0.085 Oh Kepala Tukang @ =

    3.000 Oh Pekerja @ =

    0.150 Oh Mandor @ =

    1 M 3 Cor Beton Tumbuk K 175

    0.870 M3 Kerikil @ =

    326.000 Kg Semen @ =

    0.520 M3 Pasir Beton @ =

    0.044 M3 Koral Beton @ =

    0.250 Oh Tukang @ =

    0.025 Oh Kepala Tukang @ =

    1.650 Oh Pekerja @ =

    0.080 Oh Mandor @ =

  • 8/10/2019 BOQ Jembatan Gantung Omu.pdf

    6/12

    1 M 3 Cor Beton Tumbuk K250

    0.780 M3 Kerikil @ =

    384.000 Kg Semen @ =

    0.520 m3 Pasir Beton @ =

    0.780 M3 Koral Beton @ =

    0.275 Oh Tukang @ =0.028 Oh Kepala Tukang @ =

    1.650 Oh Pekerja @ =

    0.083 Oh Mandor @ =

    1 Kg Pembesian dengan Besi Polos1.100 Kg Besi beton (polos/ulir) @ =0.020 Kg Kawat beton @ =0.025 Org Pekerja @ =0.005 Org Tukang besi @ =

    0.0007 Org Kepala tukang @ =0.0050 Org Mandor @ =

    1 M 2 Pasang Bekesting 0.040 M3 Kayu Klas III @ =

    0.400 Kg Paku Biasa @ =

    0.330 Oh Tukang @ =

    0.033 Oh Kepala Tukang @ =

    0.660 Oh Pekerja @ =

    0.033 Oh Mandor @ =

    1 M 3 Cor Beton Bertulang 1 : 2 : 3 Untuk pylon1 M3 Cor Beton Bertulang 1 : 2 : 3 @

    115 Besi Beton @

    7.86 Pasang Bekesting @

  • 8/10/2019 BOQ Jembatan Gantung Omu.pdf

    7/12

    1 M 3 Cor Beton Bertulang 1 : 2 : 3 Untuk balok1 M3 Cor Beton Bertulang 1 : 2 : 3 @

    135 Besi Beton @

    7.86 Pasang Bekesting @

    1 M 3 Cor Beton Bertulang 1 : 2 : 3 Untuk tapak1 M3 Cor Beton Bertulang 1 : 2 : 3 @

    100 Besi Beton @

    2.6 Pasang Bekesting @

    1 M 3 Cor Beton Bertulang 1 : 2 : 3 Untuk angkur1 M3 Cor Beton Bertulang 1 : 2 : 3 @

    75 Besi Beton @

    1.54 Pasang Bekesting @

    1 M 2 Plesteran Dinding Camp. 1 : 4

    0.020 M3 Pasir Pasang @ =

    5.200 Kg Semen @ =0.150 Oh Tukang @ =

    0.015 Oh Kepala Tukang @ =

    0.200 Oh Pekerja @ =

    0.010 Oh Mandor @ =

  • 8/10/2019 BOQ Jembatan Gantung Omu.pdf

    8/12

    1 M 2 Acian

    3.250 Kg Semen @ =

    0.100 Oh Tukang @ =

    0.010 Oh Kepala Tukang @ =

    0.150 Oh Pekerja @ =

    0.075 Oh Mandor @ =

    1 M 3 Pekerjaan Gelagar Kayu

    4.0000 Oh Pekerja @ =0.2000 Oh Mandor @ =

    12.0000 Oh Tukang Kayu @ =1.2000 Oh Kepala Tukang Kayu =1.1000 M3 Kayu Kelas I @ =0.8000 Kg Paku Biasa @ =

    1 M 2 Pekerjaan Lantai Kayu

    0.0440 M3 Papan Kayu Klas I =0.100 Kg Paku biasa 2" - 5" @ =0.150 Oh Pekerja @ =0.450 Oh Tukang kayu @ =0.045 Oh Kepala tukang =0.075 Oh Mandor @ =

    1 M 3 Pekerjaan Gapit, Tiang dan Balok Sandaran2.0000 Oh Pekerja @ =0.1000 Oh Mandor @ =3.0000 Oh Tukang Kayu @ =1.1000 Oh Kepala Tukang Kayu @ =1.1000 M3 Kayu Kelas I @ =0.8000 Kg Paku Biasa @ =

  • 8/10/2019 BOQ Jembatan Gantung Omu.pdf

    9/12

    1 Buah Pasang Klem Penggantung Atas

    1.000 Buah Klem Besi 3 mm @ =3.000 Buah Baut 12 @ =

    0.150 Oh Tukang @ =

    0.015 Oh Kepala Tukang @ =

    0.015 Oh Pekerja @ =0.005 Oh Mandor @ =

    1 Buah Pasang Klem Penggantung Bawah

    1.000 Buah Klem Besi 3 mm @ =3.000 Buah Baut 12 @ =

    0.150 Oh Tukang @ =

    0.015 Oh Kepala Tukang @ =

    0.015 Oh Pekerja @ =

    0.005 Oh Mandor @ =

    1 M 1 Pekerjaan Besi Kabel/Sling Utama 1 1/2"1.000 M1 Besi Kabel/Sling 1 1/2" @ =0.250 Oh Tukang @ =0.070 Oh Kepala Tukang @ =0.500 Oh Pekerja @ =

    0.070 Oh Mandor @ =

    1 M 1 Pekerjaan Besi Kabel/Sling Angin 1"1.000 M1 Besi Kabel/Sling 1" @ =0.250 Oh Tukang @ =0.070 Oh Kepala Tukang @ =0.500 Oh Pekerja @ =0.070 Oh Mandor @ =

  • 8/10/2019 BOQ Jembatan Gantung Omu.pdf

    10/12

    1 M 1 Pekerjaan Besi Penggantung Dia 14 mm1.000 M1 Besi Beton Dia 14 mm @ =0.050 Oh Tukang @ =0.025 Oh Kepala Tukang @ =0.100 Oh Pekerja @ =

    0.013 Oh Mandor @ =

  • 8/10/2019 BOQ Jembatan Gantung Omu.pdf

    11/12

    KEGIATAN : Pembangunan Jembatan

    PEKERJAAN : Pemb. Jembatan Gantung Desa Omu

    LOKASI : Desa Omu Kec. GumbasaTAHUN ANGGARAN :

    A. BAHAN

    1 Pasir Pasang m

    2 Pasir Beton/Cor m

    3 Pasir Urug m

    4 Tanah Urug m

    5 batu pecah m

    6 Semen Portland Zak

    Kg

    7 Batu Kali / Batu Batu Belah m

    8 Kayu Klas II m

    9 Paku Biasa Kg

    10 Besi Beton Kg

    11 Kawat Beton Kg12 Kayu Klas III m

    13 Batu Bata Buah

    14 Besi Penggantung 14 mm m'

    15 Warfel Mur Set

    16 Buldog Grip Buah

    17 Besi Strip/Klem Buah

    18 Besi Kabel/Sling Utama 1 1/2" m'

    19 Besi Kabel/Sling 1" m'

    20 Besi Strip/Klem Penggantung Bawah 3 mm Buah

    21 Besi Strip/Klem Penggantung Atas 3 mm Buah

    22 Baut Mur 12 Buah

    23 Kawat Harmonika m2

    DAFTAR HARGA BAHAN & UPAH

    HARGA SATUANNo JENIS BAHAN & UPAH

    2012

  • 8/10/2019 BOQ Jembatan Gantung Omu.pdf

    12/12

    B. UPAH

    1 Pekerja Org / Hari

    2 Tukang Org / Hari

    3 Kepala Tukang Org / Hari

    4 Mandor Org / Hari

    Palu, Juni 2009PT. TOTAL PRAKASA UTAMA

    Engineering Consultant

    MARTIG SEVON, ST. IAITeam Leader