SATUAN KERJA : PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN RIAU PAKET : PEMBANGUNAN SALURAN DRAINASE PRIMER PERKOTAAN KOTA PEKANBARU LOKASI : KOTA PEKANBARU TAHUN ANGGARAN : 2012 JUMLAH ( Rp ) 1 3 4 I. JARINGAN DRAINASE JALAN GARUDA MENUJU ANAK SUNGAI KEC. MARPOYAN DAMAI 0.00 II. JARINGAN DRAINASE JALAN DUYUNG MENUJU ANAK SUNGAI KEC. MARPOYAN DAMAI - III. JARINGAN DRAINASE JALAN PAUS MENUJU ANAK SUNGAI KEC. MARPOYAN DAMAI - IV. JARINGAN DRAINASE JALAN SEPAKAT MENUJU ANAK SUNGAI KEC. TENAYAN RAYA - V. JARINGAN DRAINASE INLET DAN OUTLET KOLAM RETENSI JL. CIPTA KARYA - J U M L A H - Terbilang : REKAPITULASI NO. URAIAN PEKERJAAN KET. 2 ......................, ... ................... 20... Dibuat Oleh, PT./CV. ............................... ..................................... Direktur

description

BOQ

Transcript of BOQ Drainase PKU

  • SATUAN KERJA : PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN RIAUPAKET : PEMBANGUNAN SALURAN DRAINASE PRIMER PERKOTAAN KOTA PEKANBARULOKASI : KOTA PEKANBARUTAHUN ANGGARAN : 2012

    JUMLAH( Rp )

    1 3 4I. JARINGAN DRAINASE JALAN GARUDA MENUJU ANAK SUNGAI KEC. MARPOYAN DAMAI 0.00

    II. JARINGAN DRAINASE JALAN DUYUNG MENUJU ANAK SUNGAI KEC. MARPOYAN DAMAI -

    III. JARINGAN DRAINASE JALAN PAUS MENUJU ANAK SUNGAI KEC. MARPOYAN DAMAI -

    IV. JARINGAN DRAINASE JALAN SEPAKAT MENUJU ANAK SUNGAI KEC. TENAYAN RAYA -

    V. JARINGAN DRAINASE INLET DAN OUTLET KOLAM RETENSI JL. CIPTA KARYA -

    J U M L A H -

    Terbilang :

    REKAPITULASI

    NO. URAIAN PEKERJAAN KET.2

    ......................, ... ................... 20...Dibuat Oleh,

    PT./CV. ...............................

    .....................................Direktur

    ......................, ... ................... 20...Dibuat Oleh,

    PT./CV. ...............................

    .....................................Direktur

  • PAKET : PEMBANGUNAN SALURAN DRAINASE PRIMER PERKOTAAN KOTA PEKANBARUPEKERJAAN : PEMBANGUNAN SALURAN DRAINASE DAN GORONG - GORONGLOKASI : JARINGAN DRAINASE JALAN GARUDA MENUJU ANAK SUNGAI KEC. MARPOYAN DAMAITAHUN ANGGARAN : 2012

    HARGA SATUAN JUMLAH( Rp ) ( Rp )

    1 4 5 6I. PEKERJAAN PERSIAPAN -1 Pengukuran, bowplank dan pembersihan 1324.00 M' - -2 Pembuatan papan nama proyek, pagar - 1.00 Bh - -pengaman galian dan rambu lalulintas.

    3 Pek. Kisdam 1.00 Ls - -4 Pek. Dewatering 1.00 Ls - -

    II. PEKERJAAN DRAINASE PRIMER 624 M LBR. 0.8 M DLM. 0.8 M -1 Pek. Bongkaran Beton Bertulang 61.57 M3 - -2 Pek. Galian tanah 546.64 M3 - -3 Pek. Sloof bawah beton bertulang camp. 1:2:3 ( 150 Kg ) 36.07 M3 - -4 Pek. Sloof atas beton bertulang camp. 1:2:3 ( 150 Kg ) 36.07 M3 - -5 Pek. Kolom beton bertulang camp. 1:2:3 ( 150 Kg ) 9.62 M3 - -6 Pek. Dinding beton camp. 1:2:3 160.11 M3 - -7 Pek. Sengkang beton bertulang camp. 1:2:3 ( 150 Kg ) 4.81 M3 - -8 Pek. Pipa rembes DN. 2 " 106.08 M' - -9 Pek. Cerucuk pondasi dari kayu ubar 1,248.00 Btg - -10 Pek. Plat jalan masuk beton bertulang 1:2:3 ( 70 Kg ) T. 12 Cm 14.21 M3 - -11 Pek. Pengacian sloof atas dan dinding dalam 817.44 M2 - -12 Pek. Pengadaan Tanah Timbun 62.40 M3 - -13 Pek. Lantai drainase pasir urug Tebal 5 Cm 24.96 M3 - -14 Pek. Lantai drainase beton cor camp. 1:2:3 Tebal 7 Cm 34.94 M3 - -

    II. PEKERJAAN DRAINASE PRIMER 700 M LBR. 0.8 M DLM. 0.8 M -1 Pek. Bongkaran Beton Bertulang 49.39 M3 - -2 Pek. Galian tanah 632.90 M3 - -3 Pek. Sloof bawah beton bertulang camp. 1:2:3 ( 150 Kg ) 40.46 M3 - -4 Pek. Sloof atas beton bertulang camp. 1:2:3 ( 150 Kg ) 40.46 M3 - -5 Pek. Kolom beton bertulang camp. 1:2:3 ( 150 Kg ) 10.79 M3 - -6 Pek. Dinding beton camp. 1:2:3 179.61 M3 - -7 Pek. Sengkang beton bertulang camp. 1:2:3 ( 150 Kg ) 5.39 M3 - -8 Pek. Pipa rembes DN. 2 " 119.00 M' - -9 Pek. Cerucuk pondasi dari kayu ubar 1,400.00 Btg - -10 Pek. Plat jalan masuk beton bertulang 1:2:3 ( 70 Kg ) T. 12 Cm 14.11 M3 - -

    RENCANA ANGGARAN BIAYA

    NO. URAIAN PEKERJAAN VOLUME KET.2 3

    10 Pek. Plat jalan masuk beton bertulang 1:2:3 ( 70 Kg ) T. 12 Cm 14.11 M3 - -11 Pek. Pengacian sloof atas dan dinding dalam 917.00 M2 - -12 Pek. Pengadaan Tanah Timbun 70.00 M3 - -13 Pek. Lantai drainase pasir urug Tebal 5 Cm 28.00 M3 - -14 Pek. Lantai drainase beton cor camp. 1:2:3 Tebal 7 Cm 39.20 M3 - -

    III. PEKERJAAN BOX CULVERT 6 M 2 UNIT -1 Pek. Galian Tanah 23.66 M3 - -2 Pek. Cerucuk pondasi dari kayu ubar 70.00 Btg - -3 Pek. Pasir urung bawah pondasi tebal 10 Cm 1.12 M3 - -4 Pek. Lantai kerja camp. 1:3:5 tebal 10 Cm 1.12 M3 - -5 Pek. Beton bertulang camp. 1:2:3 ( 160 Kg ) 13.91 M3 - -6 Pek. Loneng box culvert camp. 1:2:3 ( 160 Kg ) 0.23 M3 - -7 Pek. Timbunan Sirtu 6.72 M3 - -8 Pek. Aspal Goreng 17.64 M2 - -

    III. PEKERJAAN PENYELESAIAN -1 Pek. Perapian bekas galian 1.00 Ls - -

    JUMLAH -PPN 10 % -TOTAL -DIBULATKAN -

  • PAKET : PEMBANGUNAN SALURAN DRAINASE PRIMER PERKOTAAN KOTA PEKANBARUPEKERJAAN : PEMBANGUNAN SALURAN DRAINASE DAN GORONG - GORONGLOKASI : JARINGAN DRAINASE JALAN DUYUNG MENUJU ANAK SUNGAI KEC. MARPOYAN DAMAITAHUN ANGGARAN : 2012

    HARGA SATUAN JUMLAH( Rp ) ( Rp )

    1 3 4 5 6I. PEKERJAAN PERSIAPAN -1 Pengukuran, bowplank dan pembersihan 263.00 M' - -2 Pembuatan papan nama proyek, pagar - 1.00 Bh - -pengaman galian dan rambu lalulintas.

    3 Pek. Kisdam 1.00 Ls - -4 Pek. Dewatering 1.00 Ls - -

    II. PEKERJAAN DRAINASE PRIMER 130 M LBR. 1.3 M DLM. 1.3 M -1 Pek. Bongkaran Beton Bertulang 5.28 M3 - -2 Pek. Galian tanah 276.50 M3 - -3 Pek. Sloof bawah beton bertulang camp. 1:2:3 ( 120 Kg ) 10.40 M3 - -4 Pek. Sloof atas beton bertulang camp. 1:2:3 ( 120 Kg ) 10.40 M3 - -5 Pek. Kolom beton bertulang camp. 1:2:3 ( 120 Kg ) 4.51 M3 - -6 Pek. Dinding beton camp. 1:2:3 63.09 M3 - -7 Pek. Sengkang beton bertulang camp. 1:2:3 ( 120 Kg ) 2.25 M3 - -8 Pek. Pipa rembes DN. 2 " 26.00 M' - -9 Pek. Cerucuk pondasi dari kayu ubar 260.00 Btg - -10 Pek. Plat jalan masuk beton bertulang 1:2:3 ( 70 Kg ) T. 12 Cm 2.81 M3 - -11 Pek. Pengacian sloof atas dan dinding dalam 247.00 M2 - -12 Pek. Pengadaan Tanah Timbun 26.00 M3 - -

    III. PEKERJAAN DRAINASE PRIMER 133 M LBR. 1.8 M DLM. 1.3 M -1 Pek. Bongkaran Beton Bertulang 63.84 M3 - -2 Pek. Galian tanah 309.23 M3 - -3 Pek. Sloof bawah beton bertulang camp. 1:2:3 ( 120 Kg ) 10.64 M3 - -4 Pek. Sloof atas beton bertulang camp. 1:2:3 ( 120 Kg ) 10.64 M3 - -5 Pek. Kolom beton bertulang camp. 1:2:3 ( 120 Kg ) 4.61 M3 - -6 Pek. Dinding beton camp. 1:2:3 64.55 M3 - -7 Pek. Sengkang beton bertulang camp. 1:2:3 ( 120 Kg ) 3.19 M3 - -8 Pek. Pipa rembes DN. 2 " 26.60 M' - -9 Pek. Cerucuk pondasi dari kayu ubar 266.00 Btg - -10 Pek. Plat jalan masuk beton bertulang 1:2:3 ( 70 Kg ) T. 12 Cm - M3 - -11 Pek. Pengacian sloof atas dan dinding dalam 252.70 M2 - -12 Pek. Pengadaan Tanah Timbun 26.60 M3 - -

    RENCANA ANGGARAN BIAYA

    NO. URAIAN PEKERJAAN VOLUME KET.2

    12 Pek. Pengadaan Tanah Timbun 26.60 M3 - -

    IV. PEKERJAAN PENYELESAIAN -1 Pek. Perapian bekas galian 1.00 Ls - -

    JUMLAH -PPN 10 % -TOTAL -DIBULATKAN -

  • PAKET : PEMBANGUNAN SALURAN DRAINASE PRIMER PERKOTAAN KOTA PEKANBARUPEKERJAAN : PEMBANGUNAN SALURAN DRAINASE DAN GORONG - GORONGLOKASI : JARINGAN DRAINASE JALAN PAUS MENUJU ANAK SUNGAI KEC. MARPOYAN DAMAITAHUN ANGGARAN : 2012

    HARGA SATUAN JUMLAH( Rp ) ( Rp )

    1 4 5 6I. PEKERJAAN PERSIAPAN -1 Pengukuran, bowplank dan pembersihan 595.00 M' - -2 Pembuatan papan nama proyek, pagar - 1.00 Bh - -pengaman galian dan rambu lalulintas.

    3 Pek. Kisdam 1.00 Ls - -4 Pek. Dewatering 1.00 Ls - -

    II. PEKERJAAN DRAINASE PRIMER 487 M LBR. 1.1 M DLM. 1.0 M -1 Pek. Bongkaran Beton Bertulang 76.80 M3 - -2 Pek. Galian tanah 690.23 M3 - -3 Pek. Sloof bawah beton bertulang camp. 1:2:3 ( 120 Kg ) 38.96 M3 - -4 Pek. Sloof atas beton bertulang camp. 1:2:3 ( 120 Kg ) 38.96 M3 - -5 Pek. Kolom beton bertulang camp. 1:2:3 ( 120 Kg ) 12.99 M3 - -6 Pek. Dinding beton camp. 1:2:3 181.81 M3 - -7 Pek. Sengkang beton bertulang camp. 1:2:3 ( 120 Kg ) 7.14 M3 - -8 Pek. Pipa rembes DN. 2 " 97.40 M' - -9 Pek. Cerucuk pondasi dari kayu ubar 974.00 Btg - -10 Pek. Plat jalan masuk beton bertulang 1:2:3 ( 70 Kg ) T. 12 Cm 16.63 M3 - -11 Pek. Pengacian sloof atas dan dinding dalam 779.20 M2 - -12 Pek. Pengadaan Tanah Timbun 97.40 M3 - -13 Pek. Lantai drainase pasir urug Tebal 5 Cm 26.79 M3 - -14 Pek. Lantai drainase beton cor camp. 1:2:3 Tebal 7 Cm 37.50 M3 - -

    II. PEKERJAAN DRAINASE PRIMER 108 M LBR. 2.0 M DLM. 1.0 M -1 Pek. Bongkaran Beton Bertulang 77.76 M3 - -2 Pek. Galian tanah 194.40 M3 - -3 Pek. Sloof bawah beton bertulang camp. 1:2:3 ( 120 Kg ) 8.64 M3 - -4 Pek. Sloof atas beton bertulang camp. 1:2:3 ( 120 Kg ) 8.64 M3 - -5 Pek. Kolom beton bertulang camp. 1:2:3 ( 120 Kg ) 2.88 M3 - -6 Pek. Dinding beton camp. 1:2:3 40.32 M3 - -7 Pek. Sengkang beton bertulang camp. 1:2:3 ( 120 Kg ) 2.88 M3 - -8 Pek. Pipa rembes DN. 2 " 21.60 M' - -9 Pek. Cerucuk pondasi dari kayu ubar 216.00 Btg - -10 Pek. Plat jalan masuk beton bertulang 1:2:3 ( 70 Kg ) T. 12 Cm 25.92 M3 - -

    RENCANA ANGGARAN BIAYA

    NO. URAIAN PEKERJAAN VOLUME KET.2 3

    10 Pek. Plat jalan masuk beton bertulang 1:2:3 ( 70 Kg ) T. 12 Cm 25.92 M3 - -11 Pek. Pengacian sloof atas dan dinding dalam 172.80 M2 - -12 Pek. Pengadaan Tanah Timbun 21.60 M3 - -13 Pek. Lantai drainase pasir urug Tebal 5 Cm 10.80 M3 - -14 Pek. Lantai drainase beton cor camp. 1:2:3 Tebal 7 Cm 15.12 M3 - -

    III. PEKERJAAN BOX CULVERT 7 M -1 Pek. Galian Tanah 11.83 M3 - -2 Pek. Cerucuk pondasi dari kayu ubar 35.00 Btg - -3 Pek. Pasir urung bawah pondasi tebal 10 Cm 0.56 M3 - -4 Pek. Lantai kerja camp. 1:3:5 tebal 10 Cm 0.56 M3 - -5 Pek. Beton bertulang camp. 1:2:3 ( 160 Kg ) 6.76 M3 - -6 Pek. Loneng box culvert camp. 1:2:3 ( 160 Kg ) 0.12 M3 - -7 Pek. Timbunan Sirtu 3.36 M3 - -8 Pek. Aspal Goreng 8.82 M2 - -

    IV. PEKERJAAN BOX CULVERT 5 M -1 Pek. Galian Tanah 8.45 M3 - -2 Pek. Cerucuk pondasi dari kayu ubar 25.00 Btg - -3 Pek. Pasir urung bawah pondasi tebal 10 Cm 0.40 M3 - -4 Pek. Lantai kerja camp. 1:3:5 tebal 10 Cm 0.40 M3 - -5 Pek. Beton bertulang camp. 1:2:3 ( 160 Kg ) 4.83 M3 - -6 Pek. Loneng box culvert camp. 1:2:3 ( 160 Kg ) 0.12 M3 - -7 Pek. Timbunan Sirtu 2.40 M3 - -8 Pek. Aspal Goreng 6.30 M2 - -

    V. PEKERJAAN PENYELESAIAN -1 Pek. Perapian bekas galian 1.00 Ls - -

    JUMLAH -PPN 10 % -TOTAL -DIBULATKAN -

  • PAKET : PEMBANGUNAN SALURAN DRAINASE PRIMER PERKOTAAN KOTA PEKANBARUPEKERJAAN : PEMBANGUNAN SALURAN DRAINASE DAN GORONG - GORONGLOKASI : JARINGAN DRAINASE JALAN SEPAKAT MENUJU ANAK SUNGAI KEC. TENAYAN RAYATAHUN ANGGARAN : 2012

    HARGA SATUAN JUMLAH( Rp ) ( Rp )

    1 4 5 6I. PEKERJAAN PERSIAPAN -1 Pengukuran, bowplank dan pembersihan 1065.00 M' - -2 Pembuatan papan nama proyek, pagar - 1.00 Bh - -pengaman galian dan rambu lalulintas.

    3 Pek. Kisdam 1.00 Ls - -4 Pek. Dewatering 1.00 Ls - -

    II. PEKERJAAN DRAINASE PRIMER 343 M LBR. 1.8 M DLM. 2.0 M -1 Pek. Bongkaran Beton Bertulang - M3 - -2 Pek. Galian tanah 1358.28 M3 - -3 Pek. Sloof bawah beton bertulang camp. 1:2:3 ( 120 Kg ) 27.44 M3 - -4 Pek. Sloof atas beton bertulang camp. 1:2:3 ( 120 Kg ) 27.44 M3 - -5 Pek. Kolom beton bertulang camp. 1:2:3 ( 120 Kg ) 18.29 M3 - -6 Pek. Dinding beton camp. 1:2:3 256.11 M3 - -7 Pek. Sengkang beton bertulang camp. 1:2:3 ( 120 Kg ) 8.23 M3 - -8 Pek. Pipa rembes DN. 2 " 68.60 M' - -9 Pek. Cerucuk pondasi dari kayu ubar 686.00 Btg - -10 Pek. Pengacian sloof atas dan dinding dalam 891.80 M2 - -11 Pek. Pengadaan Tanah Timbun 68.60 M3 - -

    II. PEKERJAAN DRAINASE PRIMER 722 M LBR. 2.0 M DLM. 2.0 M -1 Pek. Bongkaran Beton Bertulang - M3 - -2 Pek. Galian tanah 3119.04 M3 - -3 Pek. Sloof bawah beton bertulang camp. 1:2:3 ( 120 Kg ) 57.76 M3 - -4 Pek. Sloof atas beton bertulang camp. 1:2:3 ( 120 Kg ) 57.76 M3 - -5 Pek. Kolom beton bertulang camp. 1:2:3 ( 120 Kg ) 38.51 M3 - -6 Pek. Dinding beton camp. 1:2:3 539.09 M3 - -7 Pek. Sengkang beton bertulang camp. 1:2:3 ( 120 Kg ) 19.25 M3 - -8 Pek. Pipa rembes DN. 2 " 144.40 M' - -9 Pek. Cerucuk pondasi dari kayu ubar 1,444.00 Btg - -10 Pek. Pengacian sloof atas dan dinding dalam 1877.20 M2 - -11 Pek. Pengadaan Tanah Timbun 144.40 M3 - -

    RENCANA ANGGARAN BIAYA

    NO. URAIAN PEKERJAAN VOLUME KET.2 3

    III. PEKERJAAN PENYELESAIAN -1 Pek. Perapian bekas galian 1.00 Ls - -

    JUMLAH -PPN 10 % -TOTAL -DIBULATKAN -

  • PAKET PEMBANGUNAN SALURAN DRAINASE PRIMER PERKOTAAN KOTA PEKANBARUPEKERJAAN : PEMBANGUNAN SALURAN DRAINASE DAN GORONG - GORONGLOKASI : JARINGAN DRAINASE INLET DAN OUTLET KOLAM RETENSI JL. CIPTA KARYATAHUN ANGGARAN : 2012

    HARGA SATUAN JUMLAH( Rp ) ( Rp )

    1 4 5 6I. PEKERJAAN PERSIAPAN -1 Pengukuran, bowplank dan pembersihan 300.00 M' - -2 Pembuatan papan nama proyek, pagar - 1.00 Bh - -pengaman galian dan rambu lalulintas.

    3 Pek. Kisdam 1.00 Ls - -4 Pek. Dewatering 1.00 Ls - -

    II. PEKERJAAN DRAINASE INLET 79.6 M LBR. 1.6 M DLM. 0.6 M -1 Pek. Galian tanah 119.40 M3 - -2 Pek. Sloof bawah beton bertulang camp. 1:2:3 ( 150 Kg ) 3.58 M3 - -3 Pek. Sloof atas beton bertulang camp. 1:2:3 ( 150 Kg ) 3.58 M3 - -4 Pek. Tapak pondasi beton bertulang camp. 1:2:3 ( 150 Kg ) 2.39 M3 - -5 Pek. Sengkang pondasi beton bertulang camp. 1:2:3 ( 150 Kg ) 0.45 M3 - -6 Pek. Kolom beton bertulang camp. 1:2:3 ( 150 Kg ) 1.53 M3 - -7 Pek. Dinding beton bertulang camp. 1:2:3 17.58 M3 - -8 Pek. Sengkang beton bertulang camp. 1:2:3 ( 150 Kg ) 2.04 M3 - -9 Pek. Pipa rembes DN. 2 " 15.92 M' - -10 Pek. Cerucuk pondasi dari kayu ubar 160.00 Btg - -10 Pek. Pengacian sloof atas dan dinding dalam 95.52 M2 - -11 Pek. Pengadaan Tanah Timbun 39.80 M3 - -

    II. PEKERJAAN DRAINASE OUTLET 17.4 M LBR. 1.8 M DLM. 0.6 M -1 Pek. Galian tanah 28.71 M3 - -2 Pek. Sloof bawah beton bertulang camp. 1:2:3 ( 150 Kg ) 1.39 M3 - -3 Pek. Sloof atas beton bertulang camp. 1:2:3 ( 150 Kg ) 1.39 M3 - -4 Pek. Tapak pondasi beton bertulang camp. 1:2:3 ( 150 Kg ) 0.70 M3 - -5 Pek. Sengkang pondasi beton bertulang camp. 1:2:3 ( 150 Kg ) 0.20 M3 - -6 Pek. Kolom beton bertulang camp. 1:2:3 ( 150 Kg ) 0.33 M3 - -7 Pek. Dinding beton bertulang camp. 1:2:3 3.84 M3 - -8 Pek. Pelimpah beton bertulang camp. 1:2:3 0.50 M3 - -9 Pek. Sengkang beton bertulang camp. 1:2:3 ( 150 Kg ) 0.38 M3 - -10 Pek. Pipa rembes DN. 2 " 3.48 M' - -11 Pek. Cerucuk pondasi dari kayu ubar 36.00 Btg - -10 Pek. Pengacian sloof atas dan dinding dalam 20.88 M2 - -

    RENCANA ANGGARAN BIAYA

    NO. URAIAN PEKERJAAN VOLUME KET.2 3

    10 Pek. Pengacian sloof atas dan dinding dalam 20.88 M2 - -11 Pek. Pengadaan Tanah Timbun 8.70 M3 - -12 Pek. Pengadaan Pintu Air 1.00 Unit - -

    III. PEKERJAAN PENYELESAIAN -1 Pek. Perapian bekas galian 1.00 Ls - -

    JUMLAH -PPN 10 % -TOTAL -DIBULATKAN -

  • HARGA SATUAN UPAH DAN BAHANTAHUN ANGGARAN 2012

    20101 2 3 4

    I TENAGA KERJA1 MANDOR HARI / ORANG2 KEPALA TUKANG HARI / ORANG3 TUKANG HARI / ORANG4 PEKERJA HARI / ORANG5 PENJAGA MALAM HARI / ORANG

    II BAHANA. BAHAN PASANGAN

    1 PASIR URUG M3.2 PASIR PASANG M3.3 PASIR BETON / COR M3.4 TANAH URUG / TIMBUN M3.5 BATU PECAH M3.6 KERIKIL / KORAL BETON M3.7 BATU KALI M3.8 BATU BATA KULIM 4x7,5x16 BH.9 BATU BATA RUMBAI/PRESS BH.10 BATU BATA PRESS BH.11 PORTLAND CEMENT / SEMEN PADANG TYPE I KG.12 PORTLAND CEMENT PUTIH KG.13 PAVING BLOK TEBAL 6 CM BH.14 GRASS BLOK TEBAL 6 CM BH.15 TANAH HITAM M3.16 RUMPUT M2.17 ASPAL DRUM KG.18 ASPAL CURAH KG.19 SIRTU M3.20 MINYAK BEKISTING LTR.21 RESIDU KG.22 SOLAR LTR.23 PELUMAS LTR.24 BETON PRA CETAK U-DITCH 1.2 x 1 K250 M'25 BETON PRA CETAK BOX CULVERT 1.5 x 1.2 K350 M'26 BETON PRA CETAK BOX CULVERT 1.5 x 1.5 K350 M'27 SEWA ALAT LAS JAM28 ALAT CRAINE JAM29 MOBIL ANGKUT ( TRAILER ) JAM

    NO. JENIS BAHAN SATUAN HARGA SATUANBAHAN/UPAH

  • 20101 2 3 4

    NO. JENIS BAHAN SATUAN HARGA SATUANBAHAN/UPAH

    B. BAHAN KAYU1 KAYU KULIM M3.2 KAYU JATI M3.3 KAYU MERANTI M3.4 KAYU LAMBERZIRING (JELUTUNG) M3.5 PAPAN MERANTI M3.6 KAYU CEROCOK / KAYU UBAR / MAHANG BTG.7 KAYU PERANCAH / BEKISTING DALAM M3.8 KAYU PROFIL M'9 PAPAN LISPLANK UKIR M'10 PAPAN SINGAP UKIR M2.11 SELEMBAYUNG UKIR FIBERGLASS BH.12 KAYU RAMIN LBR.13 PAPAN UKIR BH.14 KAYU BAKAR IKAT15 TRIPLEK 3MM LBR.16 TRIPLEK 3,6 MM LBR.17 TRIPLEK 4 MM LBR.18 TRIPLEK 6 MM LBR.19 TRIPLEK 9 MM LBR.20 TRIPLEK 12 MM LBR.

    C. BAHAN BESI1 BESI BETON KG.2 BESI BETON ULIR KG.3 KAWAT IKAT BETON (BANDRAT) KG.4 KAWAT BRONJONG KG.5 KAWAT HARMONIKA M2.6 BAJA SIKU KG.7 BESI PAGAR BRC M'8 KAWAT NYAMUK M2.9 BESI PROFIL WF KG.10 VERTICAL BLIND M2.11 TERALI BESI M2.12 TEMPAT MASAK ASPAL BH13 KAWAT LAS KG.

    E BAHAN PIPA1 PIPA PVC 1/2 " M'2 PIPA PVC 3/4 " BH.3 PIPA PVC 2" " M'4 PIPA PVC 3 " M'5 PIPA PVC 4 " M'6 ELBOW PVC 4 " BH.7 SOKET 4 " BH.8 PIPA BESI (t = 2.5 mm) 1 " M'9 PIPA BESI (t = 2.5 mm) 3/4 " BH.10 PIPA BESI (t = 2.5 mm) 1/2 " M'11 PIPA BESI (t = 2.5 mm) 2 " M'

  • 20101 2 3 4

    NO. JENIS BAHAN SATUAN HARGA SATUANBAHAN/UPAH

    F BAHAN PAKU1 PAKU ATAP GENTENG METAL KG.3 PAKU SENG KG.4 PAKU ASBES KG.5 PAKU SERI KG.6 PAKU 2" - 5" KG.7 PAKU SKRUP + BAUT + KARET DIA. 8" BH.8 ANGKER BESI BH.9 BESI STRIP 2" KG.10 PAKU GYPSUM KG.11 PAKU TRIPLEKS / TEAKWOOD KG.

  • DAFTAR ANALISA HARGA SATUAN PEKERJAAN(ANALISA SNI 2007)

    NO URAIAN PEKERJAAN VOLUME HARGA JUMLAHUPAH BAHAN

    1 2 3 4 5 6ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

    1 M' PENGUKURAN DAN PEMASANGAN BOWPLANK TENAGA

    Pekerja 0.1000 OH - -Tukang Kayu 0.1000 OH - -Kepala Tukang 0.0100 OH - -Mandor 0.0050 OH - -

    BAHANKayu 5/7 0.0120 M3 - -Paku Biasa 2'-5' 0.0200 Kg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN TENAGA

    Pekerja 0.1000 OH - -Mandor 0.0500 OH - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 BONGKARAN BETON BERTULANG TENAGA

    Pekerja 6.6670 OH - -Mandor 0.3330 OH - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 BONGKARAN DINDING TEMBOK BATA MERAH TENAGA

    Pekerja 6.6670 OH - -Mandor 0.0330 OH - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

    ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH

    1 M3 GALIAN TANAH BIASA SEDALAM 1 M TENAGA

    Pekerja 0.7500 OH - -Mandor 0.0250 OH - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 GALIAN TANAH BIASA SEDALAM 2 M TENAGA

    Pekerja 0.9000 OH - -Mandor 0.0450 OH - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

  • NO URAIAN PEKERJAAN VOLUME HARGA JUMLAHUPAH BAHAN

    1 2 3 4 5 61 M3 GALIAN TANAH BIASA SEDALAM 3 M TENAGA

    Pekerja 1.0500 OH - -Mandor 0.0670 OH - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 GALIAN TANAH KERAS SEDALAM 1 M TENAGA

    Pekerja 1.0000 OH - -Mandor 0.0320 OH - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 GALIAN TANAH CADAS SEDALAM 1 M TENAGA

    Pekerja 1.5000 OH - -Mandor 0.0600 OH - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 GALIAN TANAH LUMPUR SEDALAM 1 M TENAGA

    Pekerja 1.2000 OH - -Mandor 0.0450 OH - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 URUGAN KEMBALI TENAGA

    Pekerja 0.2500 OH - -Mandor 0.0083 OH - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 PEMADATAN TANAH TENAGA

    Pekerja 0.5000 OH - -Mandor 0.0500 OH - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

  • NO URAIAN PEKERJAAN VOLUME HARGA JUMLAHUPAH BAHAN

    1 2 3 4 5 61 M3 URUGAN PASIR TENAGA

    Pekerja 0.3000 OH - -Mandor 0.0100 OH - -

    BAHANPasir urug 1.2000 M3 - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 URUGAN SIRTU TENAGA

    Pekerja 0.2500 OH - -Mandor 0.0250 OH - -

    BAHANSirtu 1.2000 M3 - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 URUGAN TANAH TENAGA

    Pekerja 0.3000 OH - -Mandor 0.0100 OH - -

    BAHANTanah 1.2000 M3 - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

    ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

    1 M2 PENGACIAN TENAGA

    Pekerja 0.2000 OH - -Tukang batu 0.1000 OH - -Kepala Tukang 0.0100 OH - -Mandor 0.0100 OH - -

    BAHANSemen Portland 3.2500 Kg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

  • NO URAIAN PEKERJAAN VOLUME HARGA JUMLAHUPAH BAHAN

    1 2 3 4 5 61 M3 MEMBUAT BETON 1:3:5 TENAGA

    Pekerja 1.6500 OH - -Tukang batu 0.2500 OH - -Kepala Tukang 0.0250 OH - -Mandor 0.0800 OH - -

    BAHANSemen Portland 218.0000 Kg - -Pasir Beton 0.5200 M3 - -Koral Beton 0.8700 M3 - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT BETON BERTULANG 1:2:3 + BEKISTING TENAGA

    Pekerja 2.0000 OH - -Tukang Kayu 0.1000 OH - -Tukang batu 0.3500 OH - -Kepala Tukang 0.0350 OH - -Mandor 1.0000 OH - -

    BAHANKayu Meranti 0.1300 M3 - -Paku Biasa 2'-5' 1.0000 Kg - -Semen Portland 326.0000 Kg - -Pasir Beton 0.5429 M3 - -Koral Beton 0.7622 M3 - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT BETON BERTULANG 1:2:3 TENAGA

    Pekerja 1.6500 OH - -Tukang batu 0.2750 OH - -Kepala Tukang 0.0280 OH - -Mandor 0.0830 OH - -

    BAHANSemen Portland 326.0000 Kg - -Pasir Beton 0.5429 M3 - -Koral Beton 0.7622 M3 - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

  • NO URAIAN PEKERJAAN VOLUME HARGA JUMLAHUPAH BAHAN

    1 2 3 4 5 6

    pek kolom1 M2 PASANG BEKISTING UNTUK BETON BERTULANG TENAGA

    Pekerja 2.0000 OH - -Tukang kayu 0.1000 OH - -Tukang batu 0.3500 OH - -Kepala Tukang 0.0350 OH - -Mandor 1.0000 OH - -

    BAHANKayu 0.1300 M3 - -Paku biasa 0.3000 Kg - -Triplek 9 mm 2.8000 Lbr - -Minyak bekisting 0.1000 Ltr - -

    SUB TOTAL - -BAHAN BEKISTING UNTUK 3 X PAKAI -UPAH DIAMBIL 1/2 DARI JUMLAH -

    JUMLAH -DIBULATKAN UNTUK DRAINASE 0.00DIBULATKAN BOXCULVERT 0.001 M3 MEMBUAT BETON DENGAN K225 TENAGA

    Pekerja 1.6500 OH - -Tukang batu 0.2750 OH - -Kepala Tukang 0.0280 OH - -Mandor 0.0830 OH - -

    BAHANSemen Portland 371.0000 Kg - -Pasir Beton 0.6980 M3 - -Koral Beton 1.0470 M3 - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT BETON DENGAN K275 TENAGA

    Pekerja 1.6500 OH - -Tukang batu 0.2750 OH - -Kepala Tukang 0.0280 OH - -Mandor 0.0830 OH - -

    BAHANSemen Portland 406.0000 Kg - -Pasir Beton 0.6840 M3 - -Koral Beton 1.0260 M3 - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 KG PEMBESIAN TENAGA

    Pekerja 0.0070 OH - -Tukang Besi 0.0070 OH - -Kepala Tukang 0.0007 OH - -Mandor 0.0004 OH - -

    BAHANBesi 1.0500 Kg - -Kawat bendrat 0.0150 Kg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

  • NO URAIAN PEKERJAAN VOLUME HARGA JUMLAHUPAH BAHAN

    1 2 3 4 5 6

    1 M3 MEMBUAT SLOOF ATAS, BAWAH, KOLOM DAN SENGKANG BETON BERTULANG (120 KG) TENAGA

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 120.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT SLOOF ATAS, BAWAH, KOLOM DAN SENGKANG BETON BERTULANG (110 KG) TENAGA

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 110.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT SLOOF ATAS, BAWAH, KOLOM DAN SENGKANG BETON BERTULANG (150 KG) TENAGA

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 150.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT COR BETON BERTULANG (90 KG) UNTUK BOX CUVERT

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 90.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT COR BETON BERTULANG (100 KG) UNTUK BOX CUVERT

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 100.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT COR BETON BERTULANG (110 KG) UNTUK BOX CUVERT

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 110.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT COR BETON BERTULANG (120 KG) UNTUK BOX CUVERT

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 120.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.00

  • NO URAIAN PEKERJAAN VOLUME HARGA JUMLAHUPAH BAHAN

    1 2 3 4 5 6

    1 M3 MEMBUAT COR BETON BERTULANG (150 KG) UNTUK BOX CUVERTCor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 150.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT COR BETON BERTULANG (160 KG) UNTUK BOX CUVERT

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 160.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT COR BETON BERTULANG (170 KG) UNTUK BOX CUVERT

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 170.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT COR BETON BERTULANG (180 KG) UNTUK BOX CUVERT

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 180.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT COR BETON BERTULANG (200 KG) UNTUK BOX CUVERT

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 200.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT BALOK SENGKANG BETON BERTULANG (125 KG+BEKISTING) TENAGA

    Pekerja 5.9600 OH - -Tukang batu 0.3500 OH - -Tukang Kayu 2.8000 OH - -Tukang Besi 1.4000 OH - -Kepala Tukang 0.4550 OH - -Mandor 0.2080 OH - -

    BAHANKayu 0.3200 M3 - -Paku Biasa 3.2000 Kg - -Minyak bekisting 1.6000 Ltr - -Besi beton polos 125.0000 Kg - -Kawat beton 3.0000 Kg - -Semen Portland 326.0000 Kg - -Pasir Beton 0.5429 M3 - -Koral Beton 0.7622 M3 - -Kayu balok 0.1400 M3 - -Triplrk 9 mm 2.8000 Lbr - -Dolken 16.0000 Btg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

  • NO URAIAN PEKERJAAN VOLUME HARGA JUMLAHUPAH BAHAN

    1 2 3 4 5 6

    1 M3 MEMBUAT KOLOM BETON BERTULANG (150 KG+BEKISTING) TENAGA

    Pekerja 7.3000 OH - -Tukang batu 0.3500 OH - -Tukang Kayu 3.3000 OH - -Tukang Besi 2.1000 OH - -Kepala Tukang 0.5700 OH - -Mandor 0.2500 OH - -

    BAHANKayu 0.4000 M3 - -Paku Biasa 4.0000 Kg - -Minyak bekisting 2.0000 Ltr - -Besi beton polos 150.0000 Kg - -Kawat beton 4.5000 Kg - -Semen Portland 326.0000 Kg - -Pasir Beton 0.5429 M3 - -Koral Beton 0.7622 M3 - -Kayu balok 0.1500 M3 - -Triplek 9 mm 3.5000 Lbr - -Dolken 20.0000 Btg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT KOLOM BETON BERTULANG (200 KG+BEKISTING) TENAGA

    Pekerja 7.3000 OH - -Tukang batu 0.3500 OH - -Tukang Kayu 3.3000 OH - -Tukang Besi 2.1000 OH - -Kepala Tukang 0.5700 OH - -Mandor 0.2500 OH - -

    BAHANKayu 0.4000 M3 - -Paku Biasa 4.0000 Kg - -Minyak bekisting 2.0000 Ltr - -Besi beton polos 200.0000 Kg - -Kawat beton 4.5000 Kg - -Semen Portland 326.0000 Kg - -Pasir Beton 0.5429 M3 - -Koral Beton 0.7622 M3 - -Kayu balok 0.1500 M3 - -Triplek 9 mm 3.5000 Lbr - -Dolken 20.0000 Btg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT BALOK BETON BERTULANG (150 KG+BEKISTING) TENAGA

    Pekerja 5.9600 OH - -Tukang batu 0.3500 OH - -Tukang Kayu 2.8000 OH - -Tukang Besi 1.4000 OH - -Kepala Tukang 0.4550 OH - -Mandor 0.2080 OH - -

    BAHANKayu 0.3200 M3 - -Paku Biasa 3.2000 Kg - -Minyak bekisting 1.6000 Ltr - -Besi beton polos 150.0000 Kg - -Kawat beton 3.0000 Kg - -Semen Portland 326.0000 Kg - -Pasir Beton 0.5429 M3 - -Koral Beton 0.7622 M3 - -Kayu balok 0.1400 M3 - -Triplek 9 mm 2.8000 Lbr - -Dolken 16.0000 Btg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

  • NO URAIAN PEKERJAAN VOLUME HARGA JUMLAHUPAH BAHAN

    1 2 3 4 5 6

    1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG+BEKISTING) TENAGA

    Pekerja 6.3500 OH - -Tukang batu 0.2750 OH - -Tukang Kayu 1.6500 OH - -Tukang Besi 1.4000 OH - -Kepala Tukang 0.3330 OH - -Mandor 0.3180 OH - -

    BAHANKayu 0.3200 M3 - -Paku Biasa 3.2000 Kg - -Minyak bekisting 1.6000 Ltr - -Besi beton polos 210.0000 Kg - -Kawat beton 3.0000 Kg - -Semen Portland 326.0000 Kg - -Pasir Beton 0.5429 M3 - -Koral Beton 0.7622 M3 - -Kayu balok 0.1400 M3 - -Triplek 9 mm 2.8000 Lbr - -Dolken 16.0000 Btg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT DINDING BETON DRAINASE

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.001 M3 MEMBUAT DINDING/PELAT BETON BERTULANG (70 KG+BEKISTING) TENAGA

    Pekerja 5.3000 OH - -Tukang batu 0.2750 OH - -Tukang Kayu 1.3000 OH - -Tukang Besi 1.0500 OH - -Kepala Tukang 0.2620 OH - -Mandor 0.2650 OH - -

    BAHANKayu 0.2400 M3 - -Paku Biasa 3.2000 Kg - -Minyak bekisting 1.6000 Ltr - -Besi beton polos 70.0000 Kg - -Kawat beton 2.2500 Kg - -Semen Portland 326.0000 Kg - -Pasir Beton 0.5429 M3 - -Koral Beton 0.7622 M3 - -Kayu balok 0.1600 M3 - -Triplek 9 mm 2.8000 Lbr - -Dolken 24.0000 Btg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

  • NO URAIAN PEKERJAAN VOLUME HARGA JUMLAHUPAH BAHAN

    1 2 3 4 5 61 M3 MEMBUAT DINDING/PELAT BETON BERTULANG (125 KG+BEKISTING) TENAGA

    Pekerja 5.6000 OH - -Tukang batu 0.3500 OH - -Tukang Kayu 2.6400 OH - -Tukang Besi 1.0500 OH - -Kepala Tukang 0.4000 OH - -Mandor 0.1930 OH - -

    BAHANKayu 0.2400 M3 - -Paku Biasa 3.2000 Kg - -Minyak bekisting 1.6000 Ltr - -Besi beton polos 125.0000 Kg - -Kawat beton 2.2500 Kg - -Semen Portland 326.0000 Kg - -Pasir Beton 0.5429 M3 - -Koral Beton 0.7622 M3 - -Kayu balok 0.1400 M3 - -Triplek 9 mm 2.8000 Lbr - -Dolken 24.0000 Btg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M3 LANTAI DRAINASE COR 1 : 2 : 3 TENAGA

    Pekerja 0.6200 OH - -Tukang Batu 1.0000 OH - -Kepala Tukang 0.1000 OH - -Mandor 0.3000 OH - -

    BAHANSemen Portland 326.0000 Kg - -Pasir Beton 0.5429 M3 - -Koral Beton 0.7622 M3 - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M' MEMASANG PIPA PVC TYPE AW DIA.2" TENAGA

    Pekerja 0.0810 OH - -Tukang Batu 0.1350 OH - -Kepala Tukang 0.0135 OH - -Mandor 0.0041 OH - -

    BAHANPipa PVC 1.2000 M' - -Perlengkapan (35%) 1.0000 Ls - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M2 RESIDU KAYU / BEKISTING TENAGA

    Pekerja 0.0400 OH - -Tukang Cat 0.0400 OH - -Kepala Tukang 0.0040 OH - -Mandor 0.0025 OH - -

    BAHANResidu 0.0800 Kg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

  • NO URAIAN PEKERJAAN VOLUME HARGA JUMLAHUPAH BAHAN

    1 2 3 4 5 61 BH PASANG CEROCOK KAYU TENAGA

    Pekerja 0.2500 OH - -Tukang Kayu 0.0300 OH - -Kepala Tukang 0.0040 OH - -Mandor 0.0300 OH - -

    BAHANKayu cerocok 1.0000 Btg - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M2 SOSOTAN ASPALTENAGA

    Mandor 0.001 OH - -Tukang Aspal 0.002 OH - -Pekerja 0.020 OH - -

    BAHANAspal 1.5 Kg - -Tempat Masak Aspal 0.003 Bh - -Kayu Bakar 0.02 Ikat - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M2 TABURAN PASIR CORTENAGA

    Mandor 0.001 OH - -Pekerja 0.020 OH - -

    BAHANPasir Cor 0.01 M3 - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M2 PENGASPALAN DENGAN ASPAL GORENGTENAGA

    Mandor 0.067 OH - -Tukang Masak Aspal 0.067 OH - -Tukang Siram Aspal 0.067 OH - -Sopir 0.067 OH - -Operator 0.067 OH - -Pekerja 0.533 OH - -

    BAHANAspal 7.4800 Kg - -Kerikil / Koral beton 0.3853 M3 - -Kayu Bakar 0.0800 Ikat - -Solar 2.6667 Lt - -Pasir Cor / Beton 0.0440 M3 - -Alat Bantu 0.6667 Bh - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.001 M' PEMASANGAN BETON PRA CETAK PRE CAST " U - DITCH "TENAGA

    Mandor 0.2667 OH - -Pekerja 0.4667 OH - -

    BAHANBeton Pra Cetak 1.0000 M' - -

    ALATPemasangan dgn Alat Berat ( Craine ) 0.1280 Jam - -Trailer 0.4150 Jam - -

    SUB TOTAL - -JUMLAH -DIBULATKAN 0.00

    1 M3 MEMBUAT DINDING BETON BERTULANG (55 KG) TENAGA

    Cor Beton 1 : 2 : 3 1.0000 M3 - -Bekisting 1.0000 M3 - -Pembesian 55.0000 Kg - -

    SUB TOTAL -JUMLAH -DIBULATKAN 0.00