Boq Biogas

2
 HARGA SATUAN JUMLAH HARGA TOTAL HARGA (Rp) (Rp ) (Rp ) 1 MATERIAL KONSTRUKSI Batu Merah (Bricks) Pc Pasir Pasang (Sand) M 3 Kerikil Pecah (Aggregate) ø 1-2 cm M 3 Semen PC (Cement) 50 Kg Zak Besi Beton (MS Rod) 8 mm Kg Cat Acrylic Emulsion (Emulsion Paint) Kaleng Papan Proyek Set Mobilisasi Material da n Pe ralatan Ls 0 2 PERALATAN / BAHAN Pipa Gas Utama (Main Gas Pipe) Pc Nipple manometer 1/2 - 5/6 Pc Fitting Pipa T drat Kuningan Pc Fitting PVC Ls Gas Pipe (PVC) 1/2 Inchi / Pipa PVC AW Lonjor Lem Pipa PVC Pc Pengu ras Air +Samb. T PVC (Water Grain) Pc Pengatur Gas (Gas Tap) Pc Kompor Biogas (Biogas Stove) Pc  Alat Pencampur (Mix er) Pc Slang Kompor (Hose Pipe) Meter Selotif Teflon (Taflon Tape) Pc Inlet pipe (PVC AW) 4 inchi @ 4 m length Pc  Alat Ukur Tekana n Gas (Manomete r) Pc Begisting (papan) Lembar Begisting (Balok 4/6) Batang Paku 5/7 Kg Kawat Beton Kg Besi As 1/2" Galvanish Batang 0 0 0 0 SATUAN NAMA BARANG SUB TOTAL A SUB TOTAL B JUMLAH SUB TOTAL A + B : PPn (10%) : JUMLAH TOTAL : BILL OF QUANTITY (BOQ) PENGADAAN MATERIAL KONSTRUKSI/PERALATAN PEKERJAAN PEMBANGUNAN INSTALASI BIOGAS DINAS PERTAMBANGAN DAN ENERGI KABUPATEN BARRU TAHUN ANGGARAN 2015 No. JUMLAH BARANG

description

-

Transcript of Boq Biogas

  • HARGA SATUAN

    JUMLAH HARGA

    TOTAL HARGA

    (Rp) (Rp) (Rp)

    1 MATERIAL KONSTRUKSIBatu Merah (Bricks) PcPasir Pasang (Sand) M3

    Kerikil Pecah (Aggregate) 1-2 cm M3

    Semen PC (Cement) 50 Kg ZakBesi Beton (MS Rod) 8 mm KgCat Acrylic Emulsion (Emulsion Paint) KalengPapan Proyek SetMobilisasi Material dan Peralatan Ls

    02 PERALATAN / BAHAN

    Pipa Gas Utama (Main Gas Pipe) PcNipple manometer 1/2 - 5/6 PcFitting Pipa T drat Kuningan PcFitting PVC LsGas Pipe (PVC) 1/2 Inchi / Pipa PVC AW LonjorLem Pipa PVC PcPenguras Air +Samb. T PVC (Water Grain) PcPengatur Gas (Gas Tap) PcKompor Biogas (Biogas Stove) PcAlat Pencampur (Mixer) PcSlang Kompor (Hose Pipe) MeterSelotif Teflon (Taflon Tape) PcInlet pipe (PVC AW) 4 inchi @ 4 m length PcAlat Ukur Tekanan Gas (Manometer) PcBegisting (papan) LembarBegisting (Balok 4/6) Batang Paku 5/7 KgKawat Beton KgBesi As 1/2" Galvanish Batang

    0000

    SATUANNAMA BARANG

    SUB TOTAL A

    SUB TOTAL BJUMLAH SUB TOTAL A + B :

    PPn (10%) :JUMLAH TOTAL :

    BILL OF QUANTITY (BOQ)PENGADAAN MATERIAL KONSTRUKSI/PERALATAN PEKERJAAN PEMBANGUNAN INSTALASI BIOGAS

    DINAS PERTAMBANGAN DAN ENERGI KABUPATEN BARRU TAHUN ANGGARAN 2015

    No. JUMLAH BARANG