Blanko Survey Itts

35
1 CHECK LIST SURVEY Untuk Proyek Persiapan Rehabilitasi Sarana dan Prasarana Satuan Transmisi DALAM RANGKA REHABILITASI PERALATAN TRANSMISI TVRI DI 60 LOKASI ( PROYEK ITTS TAHAP II ) Provinsi : TVRI Satuan Transmisi : Tanggal : Team Survey - TVRI : - Kementerian kominfo : - TVRI Daerah : - Tenaga ahli : Checklist survey tvri 2011 #

Transcript of Blanko Survey Itts

Page 1: Blanko Survey Itts

1

CHECK LIST SURVEY

Untuk

Proyek Persiapan RehabilitasiSarana dan Prasarana Satuan Transmisi

DALAM RANGKA REHABILITASIPERALATAN TRANSMISI TVRI DI 60 LOKASI

( PROYEK ITTS TAHAP II )

Provinsi :

TVRI Satuan Transmisi :

Tanggal :

Team Survey

- TVRI :

- Kementerian kominfo :

- TVRI Daerah :

- Tenaga ahli :

Check list alat survey:

Checklist survey tvri 2011 #

Page 2: Blanko Survey Itts

2

No Alat yang perlu dibawa1 GPS2 Roll meter3 Field Strength Meter4 Kamera digital5 Grounding meter6 Blangko mm block7 Safety belt8 Tang ampere9 Kompas10 Sigmat11 Senter12

Checklist survey tvri 2011 #

Page 3: Blanko Survey Itts

3

I. DATA UMUM

1. Alamat

a. TVRI Stasiun Penyiaran : ………………………………….

………………………………….

Telepon : …………………………………..

b. TVRI Satuan Transmisi : ………………………………….

………………………………….

Telepon : ………………………………….

2. Koordinat Lokasi

Studio Pemancar

Bujur Timur …………………. …………………..

Lintang Selatan/Utara …………………. …………………..

Altitude/Tinggi lokasi …………………. ………………….

3. Daftar Nama Petugas Satuan Transmisi

N a m a Jabatan dan No. Tlp.

1. ………………………… …………………………………….

2. ………………………… …………………………………….

3. ………………………… …………………………………….

4. ………………………… …………………………………….

5. ………………………… …………………………………….

6. ………………………… ……………………………………

4. Siaran televisi yang diterima di wilayah layanan (sesuai KM 76) (A)

No.

Saluran Nama Stasiun Kualitas Gambar Keterangan

RCTI Baik/Cukup baik/Jelek

5. Route Jalan masuk ke lokasi dari jalan raya ( dilengkapi dengan photo jalan masuk)

Checklist survey tvri 2011 #

Page 4: Blanko Survey Itts

4

- Nama Jalan raya :

- Jalan masuk ke lokasi : . . . . . . . . . . . m

- Konstruksi : Aspal, berbatu, Perkerasan.

- Kondisi : Baik/rusak/

- Lebar Jalan : . . . . . m

6. Route Transportasi Orang dari Jakarta ke lokasi pemancar (A)

Dari Ke Sarana Transportasi

Frekuensi / Jadual

Biaya (Rp) Lama perjalanan

7. Route Transportasi barang dari pelabuhan besar ke lokasi pemancar (A)

Dari Ke Sarana Transportasi

Keterangan jarak

8. Penginapan (B) didekat lokasi

Nama Hotel dan No. Telepon

Kota Tarip ( Rp) Jarak ke lokasi pemancar

Sarana Transportasi

9. Rumah makan/Restoran (B)

N a m a Jarak dari lokasi Keterangan

10. Data PLN Setempat (A)

Checklist survey tvri 2011 #

Page 5: Blanko Survey Itts

5

Kapasitas daya tersedia : . . . . . . . . . . . kVA

Kapasitas terpasang : . . . . . . . . . . . kVA

Jam operasional : dari pkl. . . . . . . s/d . . . . . . wib

Alamat : . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

11. Stasiun Pengisian Bahan Bakar untuk Umum (SPBU) /Agen BBM terdekat (B):

- Nama SPBU/Agen BBM : ...........

- Jarak ke lokasi pemancar : ...... km

- Harga Solar/Premium/liter : Rp .................

12. Data Penduduk di wilayah jangkauan (B) – Provinsi : . . . . . . . . . . . . . .

No. Kabupaten/Kecamatan/Desa Jumlah

Penduduk

Arah

(D)

Keterangan

12345678910

13. Fasilitas Lain (B)

No. Fasilitas Nama Jarak ke lokasi

1 Bengkel Mekanik/Las2 Toko bahan bangunan3 Toko elektronik4 Wartel/Warnet5 Tempat foto copy67

Checklist survey tvri 2011 #

Page 6: Blanko Survey Itts

6

14. Telepon selular (B)

Operator telepon seluler yang menjangkau lokasi pemancar: Telkomsel/ Indosat/ XL Axiata/ 3/ Axis/ Flexi/ Esia/ .........

15. Sewa/rental kendaraan – termasuk supir dan BBM (A):

- Nama : . . . . . . . . . .

- Tarif per hari : . . . . . . . . . .

- Tarif ke lokasi TVRI :

16. Lain-lain (B)

- Harga semen : Rp. . . . . . . . . . . /zak

- Upah tukang /tanaga kasar : Rp. . . . . . . . . . . /hari

Rp. . . . . . . . . . . .

II GAMBAR YANG HARUS DIBUAT (A)

1. Gambar sket peta menuju lokasi.2. Gambar denah lokasi pemancar dengan ukuran-ukuran meliputi lahan, gedung,

menara dan prasarana lain, dilengkapi dengan foto digital. ( termasuk arah mata angin )

3. Gambar denah gedung pemancar dengan ukuran-ukuran termasuk ukuran pintu masuk dan tinggi plafon ruang pemancar, dilengkapi dengan foto digital.

4. Gambar denah ruang pemancar dengan ukuran-ukuran, dan letak peralatan eksisting, dilengkapi dengan foto digital.

5. Gambar denah ruang diesel dengan ukuran-ukuran, dan letak peralatan eksisting, dilengkapi dengan foto digital.

6. Gambar denah ruang STL dengan ukuran-ukuran, dan letak peralatan eksisting (bila diperlukan), dilengkapi dengan foto digital.

7. Gambar menara dan antena eksisting dengan ukuran-ukuran, meliputi tinggi menara, orientasi menara, ukuran besi spine antena dan lebar mounting frame, letak antena eksisting. Jika ada foto copy gambar menara dari konsultan perencana/pemborong.

8. Gambar jaringan listrik (single line diagram) eksisting.9. Gambar/layout grounding menara, ruang pemancar, ruang diesel dll serta ukuran

kabel BC type.... (dilengkapi dengan foto digital)

Note: Surveyor dibekali kertas milimeter block, Gambar2 dalam bentuk format A4, Visio

Checklist survey tvri 2011 #

Page 7: Blanko Survey Itts

7

III. DATA SARANA DAN PRASARANA EKSISTING (A)

A. SUMBER DAYA/PERALATAN LISTRIK (eksisting)

1. Listrik PLN- Kapasitas terpasang : . . . . kVA- Teg./frek./ph./wire : . . . . / . . . . / . . . . . Hz/ . . . . . ph./ . . . wire- Kestabilan tegangan : Stabil/ Tidak stabil (fluktuasi : . . . . . V s/d . . . . V)

- Trafo : Ada/ tidak ada - Pemilik trafo : PLN/ TVRI

- Penggunaan listrik untuk : Ops.Tx/Penerangan/Ops.Tx + Penerangan/ . . . . . . . .

2. Diesel Genset :

Data Teknis Diesel Genset 1 Diesel Genset 2Merek/type:-Diesel-Generator

. . . . . . . .. . . . . . . .

. . . . . . . . .. . . . . . . . .

Th. pengadaanKapasitas kVA kVATeg./frek./ph/wire . . . ./ . . . V/ . . . . Hz/. . ph/. . . . . ./ . . . V/ . . . . Hz/. . ph/. . Kondisi

Data Teknis Diesel Genset 3 Diesel Genset 4Merek/type:-Diesel-Generator

. . . . . . . .. . . . . . . .

. . . . . . . .. . . . . . . .

Th. pengadaanKapasitas kVA kVATeg./frek./ph/wire . . . ./ . . . V/ . . . . Hz/. . ph/. . . . . ./ . . . V/ . . . . Hz/. . ph/. . Kondisi

Penggunaan Diesel genset untuk : Ops.Tx/Penerangan/Ops.Tx + Penerangan/ back up . . . . . . . .

3. Main to Standby Power System: Ada/Tidak ada (COS Genset)

- Pengoperasian : Automatic/Manual

4.PDB di Ruang Genset :

Data Teknis PDB 1 PDB 2 Kapasitas . . . ./ . . . V/ . . . . . . A . . . ./ . . . V/ . . . . . . ATeg./frek./ph/wire/ . . . ./ . . . V/ . . . . Hz/. . ph/. . . . . ./ . . . V/ . . . . Hz/. . ph/. . Jumlah MCB . . . bh: . . . A, . . . A, . . . A, . . . . . . bh; . . . A, . . . A, . . . A, . . . Kondisi

5.PDB di Ruang Pemancar :

Data Teknis PDB 1 PDB 2 Kapasitas . . . ./ . . . V/ . . . . . . A . . . ./ . . . V/ . . . . . . A

Checklist survey tvri 2011 #

Page 8: Blanko Survey Itts

8

Teg./frek./phase/wire/ . . . ./ . . . V/ . . . . Hz/. . ph/. . . . . ./ . . . V/ . . . . Hz/. . ph/. . MCB . . . bh: . . . A, . . . A, . . . A, . . . . . . bh; . . . A, . . . A, . . . A, . . Kondisi

6.UPS : Ada/Tidak ada

Merk/buatan/Tahun : . . . . . .. . . . . . .

Kapasitas : . . . . . .. . . . . . .

Kondisi : . . . . . .. . . . . . .

7.Automatic Voltage Regulator (AVR): Ada/Tidak ada

Data Teknis AVR 1 AVR 2Merk/Type/Buatan/ThTeg.input V s/d V/ V s/d V/ Teg.output / V/ Hz/ A / V/ Hz/ APhase/Wire . . . . phase / . . . . . wire . . . . phase / . . . . . wire Kondisi/keterangan

8.Isolation Transformer (IT): Ada/Tidak ada

Data Teknis Merk/Buatan/Th.Kapasitas Tegangan / V/ Hz/ AKondisi

9.Konsumsi Daya Listrik

Peralatan/Gedung Arus Pemancar. . . . . . . APIE/PIM dll . . . . . . A Air Conditioner . . . . . . A Kantor . . . . . . A Penerangan halaman . . . . . . A Rumah operator . . . . . . A Lampu menara . . . . . . A Jumlah total . . . . . . A

10. Pengukuran Konsumsi Daya Listrik (dilakukan di COS pada saat pemancar di udara dan semua lampu menyala) :

Checklist survey tvri 2011 #

Page 9: Blanko Survey Itts

9

Terminal Arus listrik TeganganR . . . . . . A R-S = VS . . . . . . A S –T = VT . . . . . A R – T = V

B. PERALATAN PEMANCAR (eksisting)

1. Pemancar

No. Data Teknis Pemancar 1 Pemancar 2

1 Model/Type 2 Merk/Buatan/Tahun 3 Ch./Band Frequency

Ch. . . . . ./Band . . . .Fv = . . . . . . . MHzFa = . . . . . . . MHz

Ch. . . . . ./Band . . . .Fv = . . . . . . . MHzFa = . . . . . . . MHz

4 Pwr.Opt Tx Nominal: Visual Aural

. . . . W/kW. . . . W/kW

. . . . W/kW. . . . W/kW

5 Pwr.Opt Tx Eksisting:Visual Aural

. . . . W/kW ( . . . %). . . . W/kW ( . . . %)

. . . . W/kW ( . . . %). . . . W/kW ( . . . %)

6 Sistem Pendingin Air Cooling/Water cooling

Air Cooling/Water cooling

7 AC Power Input . . . . /. . . . . V, . . . phase . . . . . /. . . . . .V, . . . phase8 Konsumsi Daya . . . . . . kVA . . . . . . kVA9 Dimensi (h x w x d) . . . cm x . . . cm x . . . cm . . . cm x . . . cm x . . . cm10 Final stage (tube)

VisualAural

11 Kondisi12 Keterangan

2. Rack PIE/PIM :

a. DETAIL ON PIE / PIM RACK (EQUIPPED) (B)

NO PIE / PIM RACK Q’TY KETERANGAN1 Picture Mon. PAL/SECAM + 19” Rack

2 WaveForm Monitor + Kit Rack 19”

3 Demodulator

4 Audio Amplifier + VU meter + In. Speaker

5 Video Distribution Amplifier 1 In / 6 Out

6 Audio Distribution Amplifier 1 In / 6 Out

7 Video /Audio MixedPatch Panel

8 RF Patch Panel for Demodulator

9 Video Test Signal Generator

10 Audio / Tone Generator

Checklist survey tvri 2011 #

Page 10: Blanko Survey Itts

10

11 Video/Audio Switcher Mon. 8 In / 2 Out.

12 Rack 19” + 220 Volt Distribution.

OPTION

b. Gambar sket rack PIE dan PIM ( foto digital)

3. Peralatan parabola/ Satelite receiverDiameter parabola : feetKondisi parabola :

IRD 1 :Merk/ Type :Kondisi IRD :

IRD 2 :Merk/ Type :Kondisi IRD :

4. Alat Ukur ( jika ada)

No. Nama Merk Type/Model Th. Keterangan

123345678

4. Output Coaxial Equipment

a. Dummy Load : Ada/Tidak ada

No. Data Teknis Dummy Load 1 Dummy Load 2 1 Merk/Buatan/Th 2 Frekuensi3 Power Capasity . . . . W/ . . . . . kW . . . . W/ . . . . . kW4 Sistem Pendingin 5 AC Power input . . . / . . . . V/ . . A/ . . Hz . . . / . . . . V/ . . A/ . . Hz

Checklist survey tvri 2011 #

Page 11: Blanko Survey Itts

11

6 Dimensi pxlxt . . . cm x . . . cm x . . . cm . . . cm x . . . cm x . . . cm7 Kondisi

b. Patch Panel (U-Link) : Ada/Tidak ada- Merk/Type/Buatan/Tahun : . . . . . . . . .- Pengoperasian : Manual/Automatis - Kapasitas : . . . . . . W/kW- Ukuran rigid line : . . . . . . . . . . .- Kondisi : . . . . . . . . . . .- Ukuran (p x l x t) : . . . . . . . . . . .

c. Dehydrator : Ada/ Tidak ada

-Merk/Type/Buatan/Tahun : . . . . . . . . .-Kapasitas : . . . . . . . . .-Kondisi : . . . . . . . . .

5. Sistem Antena a. Antenna:

- Merk/Buatan/Th : . . . . . . . . . . . .- Type : . . . . . /. . . . dipole array/ . . . . . . . . . .- Frekuensi : . . . . . . - Tinggi antenna : . . . . . . .- Jumlah/arah panel :

No. Arah Jumlah Keterangan1 . . . . . 0 2 . . . . . 0 3 . . . . . 0 4 . . . . . 0

Catatan : Gambar konfigurasi system antena b. Cable Feeder

- Merk/jenis : . . . . . . . . . . .- Ukuran : . . . . . . . . . . . . . /7/8”/ 15/8”/ 3 1/8”/ - Panjang : . . . . . . . m- Kondisi : baik/cukup baik/ . . . . . . . .

c. Rigid Line - Ukuran : . . . . . . . . . . ./7/8”/ 15/8”/ 3 1/8”/ - Panjang : . . . . . . . . . m- Kondisi : baik/cukup baik/ . . . . . . . .

Checklist survey tvri 2011 #

Page 12: Blanko Survey Itts

12

6. Air Conditioner (AC)

NO.

Data Teknis AC1 AC2 AC3 AC4

1 Model/Type 2 Merk/Tahun 3 Kapasitas . . . . kVA/PK . . . . kVA/PK . . . . kVA/PK . . . . kVA/PK4 Kondisi

B. SISTEM GROUNDING DAN PENANGKAL PETIR (eksisting)

1. Data Sambaran Petir (B)a. Pernah terjadi sambaran petir : Pernah/Tidak pernahb. Jika pernah, berapa kali terjadi sambaran : . . . . . . . . . kali petir sejak bulan januari 2005 dan kapan (sebutkan tanggal kejadian)c. Peralatan pemancar yang pernah rusak : . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

akibat sambaran petir dan tanggal terjadi

2. Grounding peralatan dan bangunan : Terintegrasi/Terpisah

a. Grounding Menara : Sumuran/StickJumlah : . . . . . . . . bh ………Ohm

b. Grounding Peralatan : Sumuran/StickJumlah : . . . . . . . . bh ………Ohm

c. Grounding bangunan/gedung : Sumuran/StickJumlah : . . . . . . . . bh………Ohm

d. Penangkal petir- Type/Jenis : . . . . . . . .- Kondisi : . . . . . . . . ………Ohm

e. Penggunaan Surge Arrester : Ada/Tidak ada- Jenis/Type : . . . . . . . . - Jumlah : . . . . . . . bh- Tempat pemasangan arrester : 1. . . . . . . . . . .

2. . . . . . . . . . .

h. Resistance Sistem Grounding : . . . . . . . Ohm

i. Kondisi tanah setempat : Basah/kering/berbatu/Karang/Padas

C. GEDUNG, MENARA, PRASARANA LINGKUNGAN (eksisting)

1. Ruang Pemancar

Checklist survey tvri 2011 #

Page 13: Blanko Survey Itts

13

a. Ukuran ruangan (p x l x t) : . . . . . cm x . . . . . cm x . . . . . cm

b. Kondisi ruangan - Dinding : . . . . . . . . . . - Lantai : . . . . . . . . . .

- Plafon : . . . . . . . . . .

c. Ukuran pintu masuk : lebar . . . . . . . . . cm, tinggi . . . . . . . cm

2. Ruang Diesel Genset

c. Ukuran ruangan (p x l x t) : . . . . . cm x . . . . . cm x . . . . . cm

b. Kondisi ruangan - Dinding : . . . . . . . . . . - Lantai : . . . . . . . . . .

- Plafon : . . . . . . . . . .

c. Ukuran pintu masuk : lebar . . . . . . . . . cm, tinggi . . . . . . . cm

3. Tower/Menara (Foto)

a. Type/Th. : Self Support/Guy Wire/ . . . . . . . . . . .b. Tinggi : . . . . . . . mc. Orientasi menara/spine : . . .. . . . . 0 ( terhadap utara )d. Tinggi mounting frame antena : . . . . . . . . me. Bentang kaki : . . . . . mf. Pengecatan : Belum pernah/Sudah pernah tahun . . . g. Kondisi : Baik/Berkarat/Keropos - Bagian yang berkarat : . . . . . . . . . . . .. .

- Bagian yang keropos (foto) : . . . . . . . . . . . .

h. Daftar peralatan/antena pihak lain yang terpasang di menara (foto) :

No.: Operator/ Penyewa Ketinggian Keterangan12345

4. Pagar Halaman (b)

a. Panjang. : . . . . . . . . mb. Tinggi : . . . . . . . mc. Jenis : Tembok/Besi C/BRC/ Kawat berduri/. . . . . . .d. Kondisi : Baik/Cukup baik/Rusak/ . . . . . .

Check list foto:

Checklist survey tvri 2011 #

Page 14: Blanko Survey Itts

14

1. Site location (tampak depan, samping, belakang)2. Jalan akses menuju lokasi3. Menara (tampak keseluruhan, spain antena, eksisting antena, bordes, kondisi menara)4. Grounding (foto pengukuran grounding, terminal)5. Cable tray 6. Waveguide 7. Peralatan di ruang pemancar eksisting (AC, PDB, dll)8. Ruang pemancar (kondisi ruangan, feeder hole, cable tray, cable duct, space kosong,

dll.)9. PDB dan KWH meter10. MCB KWH meter11. Ruang genset12. Genset13. Hasil pengukuran voltage dan arus14. Pengukuran grounding15. Petugas transmisi bersama tim survey16. Foto space ruang kosong untuk perangkat

No Alat yang diperlukan TVRI LEN KOMINFO TOTAL1 GPS 1 1 3 52 Roll meter 50 m 3 - -3 Roll meter 5 m 6 64 Field Strength Meter 4 2 - 65 Kamera digital 4 2 1 76 Grounding meter 3 2 -7 Blangko mm block Disiapkan 1

buku per lokasi6

8 Safety belt - 6 - 69 Tang ampere 1 - - 110 Kompas 4 - - 411 Sigmat 2 - - 212 Senter 6 - - 613 Kuitansi/lokasi/cap

lokasi14 P3K 15 ATK16 Sarung Tangan

Kekurangan peralatan yang lainnya akan disediakan oleh Kominfo

Daftar nama personil survey

Checklist survey tvri 2011 #

Page 15: Blanko Survey Itts

15

No TVRI LEN KOMINFO1 Suryo Budi Anggono Arief Rahman Indra Siswoyo2 Mauladi Purwo Suhastono (siap/17 Mei 2011) Zulkifli3 Muhammad Ikhsan Ujang Bunyamin (siap/17 Mei 2011) Syefridal4 Juyanto Ahmad Hidayat (siap/17 Mei 2011) Toriq5 Samsu Sutriadi Uleh (siap/23 Mei 2011) Abdul Khoir6 Amirnan Dedi Suhaedi (siap/23 Mei 2011) Kusmawan7 Heri Subagio8 Umardani9 Lantas Manalu10 Tugiman11 Mulyadi

[email protected]

Checklist survey tvri 2011 #

Page 16: Blanko Survey Itts

16

CHECK LIST PHOTO LOKASI : .Site locatin ( tampak depan, samping dan belakang )

Checklist survey tvri 2011 #

Page 17: Blanko Survey Itts

17

Jalan akses menuju lokasi

Checklist survey tvri 2011 #

Page 18: Blanko Survey Itts

18

Menara (tampak keseluruhan,spine antenna,eksisting antenna,bordes,kondisi menara)

Checklist survey tvri 2011 #

Page 19: Blanko Survey Itts

19

Grouding ( foto pengukuran grounding, terminal )

Checklist survey tvri 2011 #

Page 20: Blanko Survey Itts

20

Cable tray

Checklist survey tvri 2011 #

Page 21: Blanko Survey Itts

21

Peralatan diruang pemancar eksisting ( AC , PDB , dll )

Checklist survey tvri 2011 #

Page 22: Blanko Survey Itts

22

Ruang pemancar ( Kondisi ruangan , feeder hole , cable tray , cable duct , space kosong dll )

Checklist survey tvri 2011 #

Page 23: Blanko Survey Itts

23

PDB dan KWH meter

MCB KWH meter

Checklist survey tvri 2011 #

Page 24: Blanko Survey Itts

24

Ruang Genset , genset

Checklist survey tvri 2011 #

Page 25: Blanko Survey Itts

25

Hasil pengukuran voltage dan arus

Pengukuran grounding

Checklist survey tvri 2011 #

Page 26: Blanko Survey Itts

26

Petugas transmisi bersama tim survey

Checklist survey tvri 2011 #