BILL OF QUANTITY (BQ) PEKERJAAN : PEMBANGUNAN GEDUNG AUDITORIUM FEM LOKASI : KAMPUS IPB DRAMAGA BOGOR TAHUN : 2018 REKAPITULASI No. TOTAL HARGA I PERSIAPAN - - II PEKERJAAN STRUKTUR - A. PEK. TANAH - B. PEK. PONDASI - C. PEK. KONSTRUKSI BETON - D. PEKERJAAN STRUKTUR ATAP (ELEVASI +21.86) - III PEKERJAAN ARSITEKTUR - A. PEK. DINDING - B. PEK. LANTAI - C. PEK. KUSEN LENGKAP - D. PEK. PENUTUP ATAP - E. PEK. PLAFOND - F. PEK. SANITAIR - G. PEK. PENGECATAN - H. PEK. FINISHING KANOPI ENTRANCE - IV PEKERJAAN MEKANIKAL - A SISTEM PLUMBING - B SISTEM TATA UDARA - V PEKERJAAN FIRE FIGHTING - - VI PEKERJAAN ELEKTRIKAL - - VII PEKERJAAN GENSET - - VIII PEKERJAAN ELEKTRONIK - A. FIRE ALARM - B. TATA SUARA (SOUND SYSTEM) - C. SISTEM TELPON - D. SISTEM DATA - E. SISTEM CCTV - IX PRASARANA LINGKUNGAN JALAN DAN PARKIR - A. PEKERJAAN PEMATANGAN LAHAN - B. PEKERJAAN JALAN DAN PARKIR - C. PEKERJAAN SALURAN KELILING BANGUNAN DAN AREA PARKIR - D. PEKERJAAN DINDING PENAHAN TANAH (DPT) BATU KALI - X MEBEULAIR AUDITORIUM - - XI LIFT PENUMPANG 1 UNIT - - - PPN (10%) - TOTAL - DIBULATKAN - Terbilang : Bogor, ..................... 2018 Kontraktor, PT,................................. Cap & Tanda Tangan NAMA Jabatan ITEM PEKERJAAN JUMLAH ...............................................................................................................................................................................................................................

Transcript of BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM...

Page 1: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

BILL OF QUANTITY (BQ)

PEKERJAAN : PEMBANGUNAN GEDUNG AUDITORIUM FEMLOKASI : KAMPUS IPB DRAMAGA BOGORTAHUN : 2018

REKAPITULASI

No. TOTAL HARGA

I PERSIAPAN - -

II PEKERJAAN STRUKTUR - A. PEK. TANAH - B. PEK. PONDASI - C. PEK. KONSTRUKSI BETON - D. PEKERJAAN STRUKTUR ATAP (ELEVASI +21.86) -

III PEKERJAAN ARSITEKTUR - A. PEK. DINDING - B. PEK. LANTAI - C. PEK. KUSEN LENGKAP - D. PEK. PENUTUP ATAP - E. PEK. PLAFOND - F. PEK. SANITAIR - G. PEK. PENGECATAN - H. PEK. FINISHING KANOPI ENTRANCE -

IV PEKERJAAN MEKANIKAL - A SISTEM PLUMBING - B SISTEM TATA UDARA -

V PEKERJAAN FIRE FIGHTING - -

VI PEKERJAAN ELEKTRIKAL - -

VII PEKERJAAN GENSET - -

VIII PEKERJAAN ELEKTRONIK - A. FIRE ALARM - B. TATA SUARA (SOUND SYSTEM) - C. SISTEM TELPON - D. SISTEM DATA - E. SISTEM CCTV -

IX PRASARANA LINGKUNGAN JALAN DAN PARKIR - A. PEKERJAAN PEMATANGAN LAHAN - B. PEKERJAAN JALAN DAN PARKIR - C. PEKERJAAN SALURAN KELILING BANGUNAN DAN AREA PARKIR - D. PEKERJAAN DINDING PENAHAN TANAH (DPT) BATU KALI -

X MEBEULAIR AUDITORIUM - -

XI LIFT PENUMPANG 1 UNIT - -

-

PPN (10%) -

TOTAL -

DIBULATKAN -

Terbilang :

Bogor, ..................... 2018Kontraktor,PT,.................................

Cap & Tanda Tangan

NAMAJabatan

ITEM PEKERJAAN

JUMLAH

...............................................................................................................................................................................................................................

Page 2: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

I PERSIAPAN

No. Satuan Volume Harga Satuan Total Harga

1 Dokumen Proyek eks 7,00 -

2 Kantor Direksi Keet M2 12,96 -

3 Gudang dan Los Kerja M2 50,00 -

4 Penyediaan air untuk MCK dan Pekerja Ls 1,00 -

5 Pagar Pengaman sementara di Pintu Masuk Proyek M1 235,00 -

6 Papan Nama Proyek M2 3,60 -

7 Mobilisasi dan Demobilisasi alat berat Ls 1,00 -

Alat berat Boldozer dan Exavator

8 Penyedian Listrik Ls 1,00 -

9 Pekerjaan Pembersihan Ls 1,00 -

10 Pembuatan Ijin Mendirikan Bangunan (IMB) dibayarkan sesuai bukti pembayaran pemerintah setempat Ls 1,00 -

Luas gedung auditorium luas lantai dasar = 1.318 m2,Luas lantai 2 = 1.294 m2, luas lantai 3 = 256,35 m2, luas lantai 4 ruang mesin = 26,24 m2

11 Alat bantu vertikal (Hoist Crane) lengkap dengan pondasi plat beton Ls 1,00 -

12 Pekerjaan pencegahan rayap (soil treatment) Pra Kontruksi M2 1.318,00 -

-

Keterangan : 2.583,00 Seluruh barang-barang persiapan ini diserahkan kepada pemberi kerjasesuai dengan jumlahnya

Pembersihan hasil pekerjaan dan dilingkungan akibat dari pelaksanaan pekerjaan.

TOTAL

Item Pekerjaan

Pembuatan laporan harian, mingguan dan bulanan, foto-foto berwarna kemajuan pekerjaan dan gambar sesuai pelaksanaan (As Built Drawing) diserahkan kepada pihak-pihak terkait, diserahkan setiap bulan hingga masa penyerahan pertama, laporan-laporan tersebut dibuat sebanyak 7 eksemplar.

Pembuatan bangunan kantor sementara dilokasi proyek yang dilengkapi dengan apar, P3 dan membongkar setelah tidak diperlukan sesuai perintah pemberi kerja serta menyerahkan kepada perintah pemberi pekerjaan (User)

Pembuatan gudang dan barak pekerja dan membongkar setelah tidak diperlukan sesuai perintah pemberi kerja serta menyerahkan kepada perintah pemberi pekerjaan (User)

Pemborong wajib menyediakan sumber air bersih dan alat pendukungnya untuk kebutuhan pekerja

Pagar sementara proyek berikut pintu-pintu masuk dari seng BJLS 30 termasuk rangka/balok/kaso/baja ringan tinggi 180 cm dan membongkar setelah tidak diperlikan sesuai perintah pemberi kerja serta menyerahkan kepada perintah pemberi pekerjaan (User)

Pembuatan dan pemasangan papan nama proyek ukuran sekurang-kurngnya 100 x 150 cm dilokasi pekerjaan

Penyediaan listrik untuk penerangan direksi kit, barak kerja, gudang dan penerangan lingkungan.

Page 3: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

II PEKERJAAN STRUKTUR

No. Satuan Volume Harga Satuan Total Harga

A. PEK. TANAH1 Galian tanah pile cap m3 131,96 - 2 Galian tanah tie beam m3 214,49 - 3 Urugan tanah kembali m3 128,79 - 4 Urug dan pemadatan tanah merah m3 108,43 - 5 Urug pasir bawah lantai t. 5 cm m3 74,31 - 6 Urug pasir bawah pile cap & sloof t. 5 cm m3 40,00 - 7 Galian tanah pondasi batu kali m3 36,61 -

- B. PEK. PONDASI1 Pengadaan dan Pelaksanaan Tiang Pancang uk:25x25; (L rata 12: M')/ttk

- Mini pile M25 ( Segi empat ) m' 2.832,00 - - Biaya Penyambungan ttk 236,00 - - Potong tiang pancang ttk 236,00 -

2 Mobilisasi dan Demob Alat Pancang unit 1,00 - 3 Pek. Loading Test - Pile Driving Analyzer (PDA) Ttk 1,00 - 4 Pondasi Batu Kali m3 71,93 - 5 Rollag Bata Pondasi Tangga m2 12,71 - 6 Lantai Kerja; Beton ad.1:3:5; t=5cm m3 22,77 -

- C. PEK. KONSTRUKSI BETON

C.1. LANTAI 1 (BETON PILE CAP, SLOOP, KOLOM SD ELEVASI +4.50)1 Pek. Beton Pile Cap PC1 dan PC1A m3 56,54 - 2 Pek. Beton Pile Cap PC2 m3 2,04 - 3 Pek. Beton Pile Cap PC4A (PC PITLIFT) m3 3,72 - 4 Pek. Beton Pile Cap PC3 m3 2,18 - 5 Pek. Beton Pile Cap PC4 m3 22,41 - 6 Pek. Tie Beam TB1:400x750 m3 107,58 - 7 Pek. Tie Beam TB2:250x400 m3 18,27 - 8 Pek. Tie Beam TB3:200x400 m3 6,89 - 9 Pek. Kolom 1K1; D600 m3 23,20 -

10 Pek. Kolom 1K2; D600 m3 59,30 - 11 Pek. Kolom 1K3; 300X300 m3 0,43 - 12 Pek. Kolom K2A; 300X400 m3 3,28 - 13 Plat lantai t. 10 cm elv -0.05 m3 148,41 - 14 Pek. Tangga As C, D/5, 6, 7 dan Tangga Entrance m3 10,80 - 15 Pek. Balok Bordes B4K:250x500 m3 0,66 - 16 Pek. Ramp Beton K-300; Ready Mix

- Pek. Pondasi Ramp m3 0,47 - - Pek. Balok Ramp B:250x400 m3 0,95 - - Pek. Pelat Lantai t=12cm m3 3,14 -

17 Pek. Lift - Pek. Dinding Pit Lift : m3 3,22 - - Pek. Kolom Lift : m3 25,77 - - Pek. Balok Separator dan Balok Hosting Hook; B:200x300 m3 1,71 -

-

C.2. LANTAI 2 (ELEVASI +4.50 SD +10.50) A. ELEVASI +4.50 + 10.50

1 Pek. Kolom 2K1; D600 m3 9,60 - 2 Pek. Kolom 2K2; D600 m3 75,70 - 3 Pek. Kolom 2K3; 300X300 m3 1,02 - 4 Pek. Kolom K2A; 300X400 m3 4,19 -

B. ELEVASI +4.50 (LANTAI-2)5 Pek. Balok B1:400x750 m3 88,27 - 6 Pek. Balok B1K:400x750 m3 23,74 - 7 Pek. Balok B2:300x450 m3 17,75 - 8 Pek. Balok B3:300x650 m3 3,40 - 9 Pek. Balok BL:300x450+100X550 m3 24,51 -

10 Pek. Balok B1L:400x750+200X250 m3 6,11 - 11 Pek. Balok B1K:400x750+200X250 m3 1,56 - 12 Pek. Pelat Lantai t=12cm (selasar) m3 22,55 - 13 Pek. Pelat Lantai t=15cm m3 71,24 - 14 Plat beton tangga t=15cm AS-4/E, I; AS-6/D, J m3 2,19 - 15 Balok bordes B:(400x750) m3 0,08 -

C. LANTAI 2 (ELEVASI +4.50 PANGGUNG)16 Pek. Balok B1:400x750 m3 4,54 - 17 Pek. Balok B2:300x450 m3 6,50 - 18 Pek. Balok B3:300x650 m3 9,98 - 19 Pek. Balok B4:250x500 m3 5,41 - 20 Pek. Pelat Lantai t=15cm m3 26,05 - 21 Pek. Plat beton tangga AS-G/1; TANGGA AS-I/2 m3 2,89 - 22 Pek. Balok Bordes B4K:250x500 m3 0,08 -

Item Pekerjaan

Jumlah A

Jumlah B

Jumlah C.1

Page 4: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga Item Pekerjaan

D. LANTAI 2 (ELEVASI +4.50 s/d +6.80 TRIBUN)23 Pek. Balok B1:400x750 m3 31,14 - 24 Pek. Balok B2:300x450 m3 5,75 - 25 Pek. Balok B3:300x650 m3 26,74 - 26 Pek. Pelat Lantai t=15cm m3 60,21 - 27 Pek. Pelat Lantai Trap Tribun m3 21,36 - 28 Pek. Plat beton ; TANGGA AS-E/9; TANGGA AS-D/8 m3 5,34 - 29 Pek. Balok Bordes B4K:250x500 m3 0,11 - 30 Pek. Plat beton ; TANGGA AS-G/10 m3 2,04 - 31 Pek. Balok Bordes B4K:250x500 m3 0,10 -

- C.3. PEKERJAAN BETON LANTAI-3 (ELEV +10.50 SD +12.10)A ELEVASI +10.50 SD +12.101 Pek. Kolom 2K1; D600 m3 1,76 - 2 Pek. Kolom 2K2; D600 m3 17,55 - 3 Pek. Kolom K4; 400X400 m3 0,50 - 4 Pek. Kolom K5; 300X400 m3 1,30 -

B ELEVASI +10.50 (LANTAI-3)5 Pek. Balok B1:400x750 m3 40,09 - 6 Pek. Balok B1K:400x750 m3 21,46 - 7 Pek. Balok B2:300x450 m3 23,74 - 8 Pek. Balok B3:300x650 m3 4,50 - 9 Pek. Balok B4:250x500 m3 0,95 -

10 Pek. Balok BL:300x450+100X550 m3 24,55 - 11 Pek. Balok B1:400x750+200X1250 m3 9,32 - 12 Pek. Balok B1:400x750+200X1250 m3 1,56 - 13 Pek. Pelat Lantai t=12cm (dak) m3 40,68 - 14 Pek. Pelat Lantai t=15cm m3 19,96 -

C ELEVASI +11.30 (TRIBUN VIP)15 Pek. Balok B1:400x750 m3 6,81 - 16 Pek. Balok B1K:400x750 m3 0,87 - 17 Pek. Balok B2:300x450 m3 6,32 - 18 Pek. Balok B3:300x650 m3 2,96 - 19 Pek. Balok BL:150x1000 m3 4,89 - 20 Pek. Pelat Lantai t=15cm m3 9,52 - 21 Pek. Pelat Lantai Trap Tribun m3 1,73 -

- C.4. PEKERJAAN BETON ATAP/RING BALOK (ELEV +12.10 SD +TOP)A KOLOM ELEVASI +12.10 SD TOP1 Pek. Kolom 2K1; D600 m3 2,47 - 2 Pek. Kolom 2K2; D600 m3 39,49 - 3 Pek. Kolom K5; 300X400 m3 3,18 -

B BALOK ELEVASI +10.50 SD. +21.0004 Pek. Balok B1:400x750 m3 13,10 - 5 Pek. Balok B2:300x450 m3 17,00 - 6 Pek. Balok B5:250x400 m3 6,98 - 7 Pek. Balok BR:150x300 m3 9,01 - 8 Pek. Pelat Lantai t=15cm (Ruang Mesin Lift). m3 2,34 -

- -

D. PEKERJAAN STRUKTUR ATAP (ELEVASI +21.86)Spesifikasi sambungan menggunakan Baut, Las sudut dan Las tumpul;Mutu Baja Profil : ST-37Mutu Angkur Baut : ST-41Mutu Baut : ASTM A-325 dan A-307Mutu Bahan Las : AWS; E-70xx

1 Base Plate t=12 kg 489,35 - 2 Angkur Bout dia. 22 bh 216,00 - 3 Kolom; Profil WF 350.175.7.11 (49.58Kg/m') kg 1.874,12 - 4 Balok; Profil WF 350.175.7.11 (49.58Kg/m') kg 18.561,07 - 5 Balok; Profil WF 250.125.6.9 (29.58Kg/m') kg 1.419,84 - 6 Plat Sambungan Profil; Plat Pengaku/Stiffner; t=12; t=10 kg 1.441,31 - 7 Bout Sambungan; dia.19 bh 1.142,00 - 8 Purlin; C-150.65.20.3,2 (7.51Kg/m') kg 11.801,66 - 9 Rangka Penggantung Utilitas; C-125.50.20.2,3 (4.51Kg/m') kg 1.095,93 -

10 Rangka Kaso & Reng Baja Ringan m2 1.587,07 - 11 Pengecatan Profil Baja kg 1.654,00 -

12 Pek. Catwalk- Rangka; C-125.50.20.2,3 (4.51Kg/m') kg 429,80 - - Rangka siku lantai; L-50.50.5 (3.77Kg/m') kg 457,87 - - Rangka Penggantung siku; L-50.50.5 (3.77Kg/m') kg 352,87 - - Rangka Hand Railling siku; L-50.50.5 (3.77Kg/m') kg 718,56 - - Pelat Bordes/Grill kg 47,65 - - Pengecatan Profil Baja kg 222,36 -

-

Jumlah C.3

Jumlah CJumlah C.4

Jumlah C.2

Jumlah D

Page 5: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga Item Pekerjaan

E. PEKERJAAN STRUKTUR KANOPI ENTRANCE

1 Base Plate t=12 kg 66,05 -

2 Angkur Bout dia. 22 bh 20,00 -

3 Kolom; Profil H 300.300.10.15 (94.00Kg/m') kg 1.903,50 -

4 Kolom; Profil H 250.250.9.14 (72.42Kg/m') kg 2.168,40 -

5 Balok; Profil WF 300.150.6,5.9 (36.67Kg/m') kg 1.901,34 -

6 Balok; Profil WF 250.125.6.9 (29.58Kg/m') kg 3.145,09 -

7 Rangka; Hollow 50.100.3,2 (7.54Kg/m') kg 2.210,59 -

8 Plat Sambungan Profil; Plat Pengaku/Stiffner; t=12; t=10; t=6 kg 195,92 -

9 Bout Sambungan; dia.19 bh 60,00 -

10 Bout Dynabolt; dia.12 bh 26,00 -

11 Pengecatan Profil Baja kg 332,52 -

- - SUB TOTAL. II

Jumlah E

Page 6: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

III PEKERJAAN ARSITEKTUR

No. Satuan Volume Harga Satuan Total Harga

A. PEK. DINDINGA.1 LANTAI 1 (elevasi +0.00 s/d +4.50)

1 Dinding hebel t 10 cm + MU 380 m2 1.266,70 -

2 m' 34,44 -

3 m' 37,20 - 4 kolom Praktis 10x10 m' 245,80 - 5 Ring Balok 10x15 m' 41,78 - 6 Balok lintel 10x15 m' 103,56 - 7 Plesteran dinding MU 100 t.10 mm m2 2.533,40 - 8 Acian MU 200 t. 3 mm m2 2.533,40 - 9 Dinding granite homogenous tile 40x40 cm toilet Pria/Wanita, setara Esenza/Granito/Niro Granite m2 469,11 -

10 Border granite homogenous tile 10 x 40 cm toilet Pria/Wanita, setara Esenza/Granito/Niro Granite m2 142,34 - 11 Granite alam tebal 2 cm pada top dinding urinoir dan meja wastafel m2 8,63 - 12 Finishing Kolom ( Acian MU 200 ) m2 421,52 - 13 Finishing Balok dan listplang beton ( Acian MU 200 ) m2 274,13 - 14 Granite alam slab tebal 2 cm ukuran 60/120 cm, dinding entrance lantai 1 s/d 3 m2 282,84 - 15 Finishing ornamen kolom beton 30x40 pada entrance ( Acian MU 200 ) m2 60,73 - 16 Granite alam slab tebal 2 cm ukuran 60/120 cm, dinding LIFT lantai 1 m2 10,86 - 17 Sun screen Panellux unit 56,00 TIDAK DITAWARKAN18 Dudukan sun screen besi hollow 100x50x2,2 finishing cat m' 112,00 TIDAK DITAWARKAN19 Dudukan sun screen besi hollow 40x40x2 finishing cat m' 161,24 TIDAK DITAWARKAN

- A.2. LANTAI 2 (elevasi +4.50 s/d +10.50)

1 Dinding Hebel t. 10 cm + MU 380 m2 1.738,24 - 2 Railing tangga besi pipa stainless steel hendel dia. 2,5", tiang dia. 1,5", ornamen dia. 1" (balkon) m' 23,15 -

3 m' 27,36 -

4 m' 14,88 -

5 Railing tangga besi pipa hitam finishing cat (ruang selver dan ke selasar) m' 25,70 - 6 Railing selasar keliling pipa hitam finishing cat m' 122,28 - 7 Hand railing ruang mesin keselasar pipa hitam finishing cat m' 14,52 - 8 Dinding hebel t 10 cm + MU 380, dinding parapet tangga dan tribun m2 34,09 - 9 Kolom Praktis 10 x 10 m' 229,05 -

10 Ring Balok 10 x 15 m' 39,56 - 11 Balok Lintel 10 x 15 m' 60,36 - 12 Plesteran Dinding MU 100 t. 10 mm m2 3.476,48 - 13 Acian MU 200 t. 3 mm m2 3.476,48 - 14 Dinding granite homogenous tile 40x40 cm toilet Pria/Wanita, setara Esenza/Granito/Niro Granite m2 456,67 - 15 Border granite homogenous tile 10 x 40 cm toilet Pria/Wanita, setara Esenza/Granito/Niro Granite m2 149,53 - 16 Granite alam tebal 2 cm, lebar 60 cm pada toilet m2 8,63 - 17 Finishing Kolom ( Acian MU 200 ) m2 508,92 - 18 Finishing Balok dan listplang beton ( Acian MU 200 ) m2 274,13 -

19 m2 741,01 -

20 m2 104,71 -

21 m2 130,85 -

22 m2 296,15 -

23 m2 207,45 -

24 m2 132,70 -

25 m2 10,93 -

26 m2 154,38 -

27 m2 68,18 -

28 m2 33,11 -

29 unit 1,00 -

30 unit 4,00 -

31 unit 2,00 -

32 Plint kayu solid ukuran 2 x 10 cm, finishing melamik m' 162,14 - 33 Sun screen GRC rangka besi hollou galnanis 2x4/4 tebal 1,2 mm m2 114,20 - 34 Sun screen Panellux unit 112,00 TIDAK DITAWARKAN35 Dudukan sun screen besi hollow 100x50x2,2 finishing cat m' 324,80 TIDAK DITAWARKAN36 Dudukan sun screen besi hollow 40x40x2 finishing cat m' 322,48 TIDAK DITAWARKAN

-

Pelapis kolom pojok depan multiplex 9 mm, triplex 4 mm + HPL, setara WINSTON/GRASMERINO/AICA (pojok depan kanan kiri)

Item Pekerjaan

Railing besi pipa stainless steel hendel dia. 2,5", tiang dia. 1,5", ornamen dia. 1" (entrance dan tangga utama)

Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL + rangka galvanis 4x4 cm, setara WINSTON/GRASMERINO/AICA ( kanan dan kiri atas)

Railing besi pipa stainless steel hendel dia. 2,5", tiang dia. 1,5", ornamen dia. 1" (ram)

Railing tangga besi pipa stainless steel hendel dia. 2,5", tiang dia. 1,5", ornamen dia. 1" (tribun ke balkon)

Hand railing tangga besi pipa stainless steel hendel dia. 2,5", dudukan hand railing dia. 1" (balkon ke selasar)

Rockwool tebal 5 cm dinding samping kanan, kiri dan belakang

Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL + rangka galvanis 4x4 cm, setara WINSTON/GRASMERINO/AICA ( kanan dan kiri bawah bagian luar)

Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL, setara WINSTON/GRASMERINO/AICA (belakang)

Pelapis dinding beton panggung dengan multiplex 9 mm + triplex 4 mm finishing HPL, setara

Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL, setara WINSTON/GRASMERINO/AICA (samping kanan dan kiri bawah bagian dalam)

Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL, setara WINSTON/GRASMERINO/AICA (pojok depan kanan kiri)

Pelapis dinding parapet tribun dengan multiplex 9 mm + triplex 4 mm finishing HPL, setara WINSTON/GRASMERINO/AICA

Ornamen kolom samping (rangka hollou galvanis 4/4, multiplex 12 mm, multiplex 9 mm, triplex 4 mm + HPL) Type 2

Pelapis LIFT, kolom tengah dan belakang dengan walpaper, setara MAESTRO/BELLAGIO/KING

Ornamen kolom samping (rangka hollou galvanis 4/4, multiplex 12 mm, multiplex 9 mm, triplex 4 mm + HPL) Type 1

Beakdrop Auditorium (rangka hollou galvanis 4/4, triplex 12 mm, triplex 4 mm + HPL+ lampu + screen)

Page 7: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga Item Pekerjaan

A.3 LANTAI 3 (elevasi + 10.50 s/d +21.86)1 Dinding Hebel t. 10 cm + MU 380 m2 932,68 - 2 Kolom Praktis 10 x 10 m' 116,12 - 3 Ring Balok 10 x 15 m' 85,84 - 4 Balok Lintel 10 x 15 m' 104,61 - 5 Plesteran Dinding MU 100 t. 10 mm m2 1.865,37 - 6 Acian MU 200 t. 3 mm m2 1.865,37 - 7 Finishing Kolom ( Acian MU 200 ) m2 321,57 -

- -

B. PEK. LANTAIB. 1 LANTAI 1 (elevasi +0.00 s/d +4.50)

1 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, Ruangan m2 536,72 TIDAK DITAWARKAN2 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, coridor dan lobby m2 352,57 -

3 m2 249,08 -

4 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, selasar m2 321,87 TIDAK DITAWARKAN5 Granite homogenous tile 40x40 cm, setara Esenza/Granito/Niro Granite, km/wc m2 118,20 - 6 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, tangga m2 55,20 -

7 m2 40,57 -

8 m2 146,04 -

- B.2 LANTAI 2 (elevasi +4.50 s/d +10.50)

1 m2 891,25 -

2 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, Ruangan m2 155,51 TIDAK DITAWARKAN

3 m2 161,84 -

4 Ganite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, selasar m2 235,06 TIDAK DITAWARKAN5 Ganite homogenous tile 40x40 cm, setara Esenza/Granito/Niro Granite, km/wc m2 118,89 - 6 Ganite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, tangga m2 72,49 -

7 m2 108,26 -

8 Waterproofing MU 600, setara SIKA m2 142,67 - -

B.3 LANTAI 3 (elevasi + 10.50 s/d +21.86)1 Screeding tebal 2 - 4 cm plat dak belakang dan selasar m2 335,40 - 2 Waterproofing membran bakar plat dak entrance, belakang dan selasar, setara SIKA m2 568,41 -

3 m2 82,04 -

4 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, Ruangan m2 143,80 TIDAK DITAWARKAN5 Ganite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, tangga m2 11,545 -

6 m2 22,50 -

- -

C. PEK. KUSEN LENGKAPC.1 LANTAI 1 (elevasi +0.00 s/d +4.50)

1 P1 (PM) unit 5,00 - 2 P2 (PM) unit 4,00 - 3 P3 (PA) unit 4,00 - 4 P4 (PA) unit 14,00 - 5 J1 (JA) unit 12,00 - 6 J2 (JA) unit 4,00 - 7 PS1 (JM) unit 2,00 - 8 PS2 (JM) unit 4,00 - 9 BV1 (JA) unit 6,00 -

10 BV2 (JA) unit 4,00 -

11 m2 24,32 TIDAK DITAWARKAN

- C.2 LANTAI 2 (elevasi +4.50 s/d +10.50)

1 PU1 (PK) unit 1,00 - 2 PU2 (PK) unit 1,00 - 3 PU3 (PT) unit 1,00 - 4 P2 (PM) unit 8,00 - 5 P3 (PA) unit 4,00 - 6 P4 (PA) unit 18,00 - 7 J2 (JA) unit 5,00 - 8 J3 (JA) unit 2,00 - 9 J4 (JA) unit 1,00 -

10 J5 (JA) unit 2,00 - 11 J6 (JA) unit 2,00 - 12 PJ1 (PA) unit 1,00 - 13 PS1 (JM) unit 2,00 -

Stepnosing tangga Granite Homogenous tile 8 x 60 cm, setara Esenza/Granito/Niro Granite, tangga dan entrance

Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, pola pada coridor dan lobby

Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, tangga entrance dan belakang

Stepnosing Granite Homogenous tile 8x60 cm, setara Esenza/Granito/Niro Granite, tangga dan entrance

Ganite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, pola lobby depan dan belakang

Jumlah A

Jumlah B

Pas. Follding Gate Hollow frame 5 x 5, meranti wood inside, multiplek 1,5 mm, glasswoll 50mm/ rokwoll, Accourete sound reduce 3 mm, cotton sheet 3 mm, finishing cosglow/wallpaper/oscar/Hpl dll. (Pabrikasi), setara WINA/LUCKY

Stepnosing Granite Homogenous tile 8x60 cm, setara Esenza/Granito/Niro Granite, tangga dan entrance

Lantai parkit kayu merbau ukuran 9 x 60 cm tebal 1,5 cm, setara AMSTRONG/ GRAHA PARKET/RAJAWALIPARKET

Lantai parkit kayu merbau ukuran 9 x 60 cm tebal 1,5 cm, setara AMSTRONG/ GRAHA PARKET/RAJAWALIPARKET

Page 8: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga Item Pekerjaan

14 PS2 (JM) unit 4,00 - 15 BV1 (JA) unit 6,00 - 16 BV2 (JA) unit 6,00 -

- C.3 LANTAI 3 (elevasi + 10.50 s/d +21.86)

1 P2 (PM) unit 3,00 - 2 J2 (JA) unit 7,00 - 3 PJ1 (PA) unit 1,00 - 4 BV3 (JA) unit 24,00 -

- -

D. PEK. PENUTUP ATAP1 Genteng keramik glazur setara M-Class/Kanmuri/KIA m2 1.587,07 - 2 Bubungan genteng keramik glazur setara M-Class/Kanmuri/KIA m' 48,92 - 3 Alumunium foil satu muka m2 1.587,07 - 4 Lisplang GRC uk 3000x300x12 mm m' 171,24 - 5 Talang Tegak Type 1 (PVC 6" AW + cat) pada plat dak selasar lantai 1 s/d lantai 2 unit 10,00 -

6 unit 6,00 -

7 Roof drain plat dak entrance dan selasar, lantai 3 bh 16,00 - -

E. PEK. PLAFONDE.1 LANTAI 1 (elevasi +0.00 s/d +4.50)

1 m2 1.351,19 -

2 m2 104,59 -

3 List Plafond Gypsum, setara JAYA BOARD/ELEPHANT m' 732,94 - 4 List Plafond GRC, setara JAYA BOARD/ELEPHANT m' 106,93 - 5 Drop ceilling gypsum board t. 9 mm, setara JAYA BOARD/ELEPHANTP m' 160,80 -

- E.2 LANTAI 2 (elevasi +4.50 s/d +10.50)

1 m2 544,73 -

2 m2 159,19 -

3 Drop ceilling gypsum board t. 9 mm, setara JAYA BOARD/ELEPHANT m2 28,30 -

4 m2 86,51 -

5 Penutup listplang balkon bawah multiplex 9 mm + triplex 4 mm finishing HPL m2 37,04 - 6 List plafond gypsum, setara JAYA BOARD/ELEPHANT m' 437,71 - 7 List Plafond GRC, setara JAYA BOARD/ELEPHANT m' 175,41 - 8 List kayu 2x10 cm, balkon m' 56,61 -

- E.3 LANTAI 3 (elevasi + 10.50 s/d +21.86)

1 m2 988,57 -

2 m2 331,08 -

3 List plafond gypsum, setara JAYA BOARD/ELEPHANT m' 161,97 - 4 List kayu 2x10 cm, auditorium dan balkon m' 121,35 - 5 Drop ceilling gypsum board t. 9 mm, setara JAYA BOARD/ELEPHANT m2 160,25 -

6 m2 267,63 -

7 List Plafond GRC overstek, setara JAYA BOARD/ELEPHANTP m' 193,32 - - -

F. PEK. SANITAIRF.1 LANTAI 1

1 Closet Duduk (Flashing) Toilet Pria/Wanita, setara TOTO bh 8,00 - 2 Closet jongkok (Flashing) Toilet Pria/Wanita, setara TOTO bh 4,00 - 3 Washtafel Toilet Pria/Wanita, setara TOTO bh 12,00 - 4 Urinoar U 57 M bh 6,00 - 5 Sekat Urinoar A 100 bh 5,00 - 6 Jet Whoser + stopkran + kran air Lengkap ACC, setara TOTO bh 12,00 - 7 Kran dinding TOTO T23 B13 bh 5,00 - 8 Kran bebek TOTO T30 ARQ 13N bh 4,00 - 9 Kitchen Zink Stainless ( 1 Lobang ) unit 4,00 -

10 Meja beton m' 6,84 - 11 Cermin TOTO TS 119 AS 5 bh 4,00 - 12 Floordrain Stailes Steel, setara SUN-EI bh 20,00 -

-

Plafond multiplex 9 mm + triplex 4 mm finishing HPL, rangka hollou galvanis, auditorium dan balkon

Jumlah D

Jumlah C

Plafond Gypsum board 9 mm + rangka hollow galvalume 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT (balkon)

Plafond GRC board 4 mm + rangka hollow galvanis 2/4+4/4 cm overstek, setara JAYA BOARD/ELEPHANT

Plafond GRC board 4 mm + rangka hollow galvalume 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT

Plafond Gypsum board 9 mm + rangka hollow galvalume 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT

Plafond GRC board 4 mm + rangka hollow galvalume 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT

Plafond Gypsum board 9 mm + rangka hollow galvanis 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT

Jumlah E

Talang Tegak Type 2 (PVC 6" AW + cat) pada shaf lantai 1 s/d 3 plat dak atap entrance dan belakang

Plafond Gypsum board 9 mm + rangka hollow galvalume 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT

Page 9: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga Item Pekerjaan

F.2 LANTAI 21 Closet Duduk (Flashing) Toilet Pria/Wanita, setara TOTO bh 10,00 - 2 Closet jongkok (Flashing) Toilet Pria/Wanita, setara TOTO bh 4,00 - 3 Washtafel Toilet Pria/Wanita, setara TOTO bh 14,00 - 4 Urinoar U 57 M bh 6,00 - 5 Sekat Urinoar A 100 bh 5,00 - 6 Jet Whoser air Lengkap ACC, setara TOTO bh 14,00 - 7 Kran bebek TOTO T30 ARQ 13N bh 4,00 - 8 Kitchen Zink Stainless ( 1 Lobang ) unit 4,00 - 9 Meja beton lapis keramik 20x20 m' 3,72 -

10 Cermin TOTO TS 119 AS 5 bh 6,00 - 11 Floordrain Stailes Steel, setara SUN-EI bh 20,00 - 12 Roof drain plat dak selasar, lantai 2 bh 10,00 -

- -

G. PEK. PENGECATANG.1 LANTAI 1 (elevasi +0.00 s/d +4.50)

1 Cat dinding exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 1.266,70 - 2 Cat dinding interior, setara Dulux/Mowilex/Jotun m2 1.266,70 - 3 Cat kolom exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 210,76 - 4 Cat kolom interior, setara Dulux/Mowilex/Jotun m2 210,76 - 5 Cat balok dan listplang beton exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 274,13 - 6 Cat plafond gypsum interior, setara Dulux/Mowilex/Jotun m2 1.351,19 - 7 Cat plafond GRC interior, setara Dulux/Mowilex/Jotun m2 104,59 - 8 Cat plafond drop ceiling interior, setara Dulux/Mowilex/Jotun m2 80,40 - 9 Cat list plafond gypsum interior, setara Dulux/Mowilex/Jotun m' 732,94 -

10 Cat list plafond GRC interior, setara Dulux/Mowilex/Jotun m' 106,93 - -

G.2 LANTAI 2 (elevasi +4.50 s/d +10.50)1 Cat dinding exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 1.867,09 - 2 Cat dinding interior, setara Dulux/Mowilex/Jotun m2 800,18 - 3 Cat kolom exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 356,24 - 4 Cat kolom interior, setara Dulux/Mowilex/Jotun m2 152,68 - 5 Cat balok dan listplang beton exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 274,13 - 6 Cat plafond gypsum interior, setara Dulux/Mowilex/Jotun m2 631,24 - 7 Cat plafond GRC interior, setara Dulux/Mowilex/Jotun m2 159,19 - 8 Cat plafond drop ceiling interior, setara Dulux/Mowilex/Jotun m2 14,15 - 9 Cat list plafond gypsum interior, setara Dulux/Mowilex/Jotun m' 437,71 -

10 Cat list plafond GRC interior, setara Dulux/Mowilex/Jotun m' 175,41 - 11 Cat list kayu 2x10 cm balkon interior, setara Dulux/Mowilex/Jotun m2 56,61 -

- G.3 LANTAI 3 (elevasi + 10.50 s/d +21.86)

1 Cat dinding exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 1.305,76 - 2 Cat dinding interior, setara Dulux/Mowilex/Jotun m2 559,61 - 3 Cat kolom exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 225,10 - 4 Cat kolom interior, setara Dulux/Mowilex/Jotun m2 96,47 - 5 Cat plafond gypsum interior, setara Dulux/Mowilex/Jotun m2 988,57 - 6 Cat plafond drop ceiling interior, setara Dulux/Mowilex/Jotun (warna gelap) m2 160,25 - 7 Cat list plafond gypsum interior, setara Dulux/Mowilex/Jotun m' 161,97 - 8 Cat list kayu 2x10 cm balkon interior, setara Dulux/Mowilex/Jotun m' 121,35 - 9 Cat plafond GRC overstek exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 267,63 -

10 Cat List plafond GRC overstek exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m' 193,32 - - -

H. PEK. FINISHING KANOPI ENTRANCE1 Pek. ACP Kolom + rangka Hollow 40x40 Galvanis, setara ALCOPAN/MACO/SEVEN m2 90,52 - 2 Pek. ACP Kanopi + rangka Hollow 40x40 Galvanis, ALCOPAN/MACO/SEVEN m2 237,49 - 3 Pek. Finishing Kaca Tempered Penutup Kanopi; t=10mm ASAHI m2 152,53 - 4 Pek. Talang metal 30x30 colour (t= 0,75mm) poudercoating m2 14,40 - 5 Roof drain plat dak selasar, lantai 2 m2 4,00 -

-

Jumlah G

Jumlah F

Page 10: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

IV PEKERJAAN MEKANIKAL

No. Satuan Volume Harga Satuan Total Harga

A SISTEM PLUMBING

I LANTAI SATUA - Pemipaan air bersih

- Polypropylene (PPR-Pipe) PN-16, incl. Supportt- dia. 50 mm (2") m' 6,00 - - dia. 42 mm (1,5") m' 16,00 - - dia. 25 mm (1") m' 28,00 - - dia. 15 mm (1/2") m' 110,00 - - dia. 20 mm (3/4") m' 25,00 - - Fitting & aksessories ls 1,00 - - Gate valve, dia. 40 mm (1,5") bh 3,00 - - Gate valve, dia. 50 mm (2") bh 1,00 -

B Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm² incl. Support- dia.150 mm (6") + pipa tegak m' 206,00 - - dia.100 mm (4") + pipa tegak m' 95,00 - - dia. 75 mm (3") m' 41,00 - - dia. 65 mm (2,5") m' 18,00 - - dia. 50 mm (2") m' 38,00 -

ls 4,00 - - Fitting & aksessories ls 1,00 -

Exhoust Fans bh 12,00 - Jenis : Mini sirocoTipe : centrifugal inline fansKapasitas : 50 m3/hStatic pressure : 1,0 in.wgPower input : 30 W

SEPTIC TANK unit 4,00 - Tipe : Biotech / ConcreteKapasitas : 4 M3C/W Accessories

LANTAI SATU - II LANTAI DUA

A - Pemipaan air bersih- Polypropylene (PPR-Pipe) PN-20, incl. Supportt- dia. 50 mm (2") m' 8,00 - - dia. 42 mm (1,5") m' 19,68 - - dia. 25 mm (1") m' 21,00 - - dia. 15 mm (1/2") m' 110,00 - - dia. 20 mm (3/4") m' 25,00 - - Fitting & aksessories ls 1,00 - - Gate valve, dia. 65 mm (2,5") bh 1,00 -

B Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm² incl. Support- dia.150 mm (6") m' 28,00 - - dia.100 mm (4") m' 27,60 - - dia. 75 mm (3") m' 30,00 - - dia. 65 mm (2,5") m' 18,00 - - dia. 50 mm (2") m' 53,00 - -Clen out dia.4" ls 4,00 - -Clen out dia.3" ls 5,00 - -Clen out dia.2" ls 2,00 - - Fitting & aksessories ls 1,00 -

Exhoust Fans bh 12,00 - Jenis : Mini sirocoTipe : centrifugal inline fansKapasitas : 50 m3/hStatic pressure : 1,0 in.wgPower input : 30 W

LANTAI DUA -

-Clen out dia.3"

Item Pekerjaan

Page 11: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga Item Pekerjaan

III LANTAI ATAP

Sistem plumbing1 Valve & aksessories :

- Gate valve, dia. 65 mm (2 1/2") bh 6,00 - - Gate valve, dia. 65 mm (2") bh 2,00 - - Strainer, dia. 65 mm (2 1/2") bh 1,00 - - WLC bh 2,00 -

2 - Tangki Piber Kap. 2 m3 & assesoris unit 8,00 - - dia. 50 mm (2") m' 76,00 -

LANTAI ATAP -

IV Pekerjaan Pompa & Instalasi Air Bersih 1 Pengadaan dan Pemasangan Pompa Transfer type Centrifugal pump kap.346 l/m unit 2,00 - Head 32 m H2O daya Motor 5,5 kw

- Header unit 1,00 - - Floating Valve dia. 2" unit 1,00 - - Tapping Pipa Suplay ls 1,00 - - Gate Valve dia 4" bh 2,00 -

2 Gate Valve dia 2 " bh 2,00 - 3 Gate Valve dia 2,5 " bh 2,00 - 4 Check Valve dia 2" bh 1,00 - 5 Flexible Joint 2" bh 2,00 - 6 Flexible Joint 2,5" bh 2,00 - 7 Pressure Gauge bh 2,00 - 8 Pressure Switch bh 1,00 - 9 Foot Valve dia.2,5" bh 2,00 - 10 Strainner dia 2,5" bh 2,00 - 11 Elektrode water Level Kontrol WLC unit 1,00 - 12 Panel Pompa Air Bersih unit 1,00 - 13 Penarikan kabel dari Panel Pompa di r. Pompa Ke Panel Pompa Air bersih

NYY 4 x 10 mm m' 15,00 - 14 Penarikan kabel dari Panel Pompa bersih Ke Panel Pompa Transfer

NYY 4 x 10 mm m' 8,00 - 15 Penarikan kabel dari Panel Pompa bersih Ke Pompa Transfer

NYY 2 x 4 x 4 mm m' 20,00 - 16 Penarikan kabel dari Panel Pompa bersih Ke Water Level Control

NYY 4 x 2,5 mm m' 65,00 - Pekerjaan Instalasi Air Bersih dia. 50 mm (2") High density polyethylene, HDPEdiameter 2" - dia. 2" m' 165,00 -

17 Fitting dan Alat bantu ls 1,00 -

TOTAL PEK. POMPA -

V TESTING COMISSIONING lot 1,00 -

TOTAL PEK. PLUMBING -

Page 12: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga

B SISTEM TATA UDARA

I SISTEM TATA UDARA LT. SATU A Pengadaan dan Pemasangan Peralatan Utama

Unit AC VRV System dan Ventilasi1 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 13,00 TIDAK DITAWARKAN

Kap.18.000 BTUH2 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 2,00 TIDAK DITAWARKAN

Kap.13.500 BTUH3 Pengadaan dan Pemasangan OU VRV Lt 1 unit 2,00 TIDAK DITAWARKAN

Kap. 225.000 BTUH (7.500 cfm) (Cadangan 1 unit)4 Pengadaan dan pemasangan pipa Refrigran dari indoor unit m' 105,00 TIDAK DITAWARKAN

ke Out door unit dengan ukuran pipa 5/8 + 11/8 lengkap dengan Isolasi5 Pengadaan dan Pemasangan Refnet bh 12,00 TIDAK DITAWARKAN6 Pengadaan dan pemasangan thermostat control bh 5,00 TIDAK DITAWARKAN7 Instalasi kabel thermostat dengan ukuran 3x2.5mm dalam pipa ttk 5,00 TIDAK DITAWARKAN

conduit high impact8 Pengadaan dan pemasangan kabel Split Control dari ttk 5,00 TIDAK DITAWARKAN

Out door ke In door Unit dengan kabel NYM 3 x 2,5 mm29 Peralatan bantu ls 1,00 TIDAK DITAWARKAN

SISTEM TATA UDARA LT. SATU -

II SISTEM TATA UDARA LT. DUAA Pengadaan dan Pemasangan Peralatan Utama

Unit AC VRV System dan Ventilasi1 Pengadaan dan Pemasangan IU VRV Split Cassette Type unit 10,00 TIDAK DITAWARKAN

Kap.47.000 BTUH2 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 3,00 TIDAK DITAWARKAN

Kap.18.000 BTUH3 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 2,00 TIDAK DITAWARKAN

Kapasitas : 7.200 Btuh4 Pengadaan dan Pemasangan OU VRV Lt 2 unit 2,00 TIDAK DITAWARKAN

Kap. 398.000 BTUH (13.250 cfm) (Cadangan 1 unit)5 Pengadaan dan Pemasangan OU VRV Lt 2 unit 2,00 TIDAK DITAWARKAN

Kap. 141.000 BTUH (4.700 cfm) (Cadangan 1 unit)6 Pengadaan dan pemasangan pipa Refrigran dari indoor unit m' 150,00 TIDAK DITAWARKAN

ke Out door unit dengan ukuran pipa 5/8 + 11/8 lengkap dengan Isolasi7 Pengadaan dan Pemasangan Refnet bh 12,00 TIDAK DITAWARKAN8 Pengadaan dan pemasangan thermostat control bh 6,00 TIDAK DITAWARKAN9 Instalasi kabel thermostat dengan ukuran 3x2.5mm dalam pipa ttk 6,00 TIDAK DITAWARKAN

conduit high impact10 Pengadaan dan pemasangan kabel Split Control dari ttk 15,00 TIDAK DITAWARKAN

Out door ke In door Unit dengan kabel NYM 3 x 2,5 mm2 11 Peralatan bantu ls 1,00 TIDAK DITAWARKAN

SISTEM TATA UDARA LT. DUA -

III SISTEM TATA UDARA LT. TIGAA Pengadaan dan Pemasangan Peralatan Utama

Unit AC VRV System dan Ventilasi1 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 1,00 TIDAK DITAWARKAN

Kap.18.000 BTUH2 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 1,00 TIDAK DITAWARKAN

Kap.10.800 BTUH (R. M. LIFT)3 Pengadaan dan Pemasangan IU VRV Split Cassette Type unit 3,00 TIDAK DITAWARKAN

Kap.47.000 BTUH4 Pengadaan dan Pemasangan OU VRV Lt 2 unit 1,00 TIDAK DITAWARKAN

Kap. 215.000 BTUH (7.250 cfm) (Cadangan 1 unit)5 Pengadaan dan pemasangan pipa Refrigran dari indoor unit m' 42,00 TIDAK DITAWARKAN

ke Out door unit dengan ukuran pipa 5/8 + 11/8 lengkap dengan Isolasi6 Pengadaan dan Pemasangan Refnet bh 3,00 TIDAK DITAWARKAN7 Pengadaan dan pemasangan thermostat control bh 2,00 TIDAK DITAWARKAN8 Instalasi kabel thermostat dengan ukuran 3x2.5mm dalam pipa ttk 2,00 TIDAK DITAWARKAN

conduit high impact9 Pengadaan dan pemasangan kabel Split Control dari ttk 2,00 TIDAK DITAWARKAN

Out door ke In door Unit dengan kabel NYM 3 x 2,5 mm2 10 Peralatan bantu ls 1,00 TIDAK DITAWARKAN

SISTEM TATA UDARA LT. TIGA -

IV TESTING KOMISIONING ls 1,00 TIDAK DITAWARKAN

Total Pekerjaan VAC

Item Pekerjaan

Page 13: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

V PEKERJAAN FIRE FIGHTING

No. Satuan Volume Harga Satuan Total Harga

I A PEKERJAAN INSTALASI HYDRANT LT. SATUPemipaanBlack Steel Pipe (BSP) sch 40, termasuk galian & timbunan- dia.100 mm (4") m' 76,00 TIDAK DITAWARKAN- dia.65 mm (2,5") m' 23,00 TIDAK DITAWARKAN- Fitting & aksessories ls 1,00 TIDAK DITAWARKANValve :

- Gate valve, dia.100 mm (4") bh 1,00 TIDAK DITAWARKAN- Check valve, dia.100 mm (4") bh 1,00 TIDAK DITAWARKAN

- Gate valve, dia.50 mm (2,5") bh 2,00 TIDAK DITAWARKAN- Check valve, dia.50 mm (2,5") bh 2,00 TIDAK DITAWARKANIsolasi Anti karat Pipa Hydrant dengan Wraping Tape ls 1,00 TIDAK DITAWARKANHydrant box (tipe indoor), berikut hose & nozzle unit 2,00 TIDAK DITAWARKANFE, tipe ABC Dry Chemical - Kapasitas : 6 kg bh 3,00 TIDAK DITAWARKANBox valve - Box valve + tutup (cash iron ) unit 3,00 TIDAK DITAWARKANTesting & commissioning ls 1,00 TIDAK DITAWARKAN

LANTAI SATU -

II PEKERJAAN INSTALASI HYDRANT LT. DUAPemipaanBlack Steel Pipe (BSP) sch 40, termasuk galian & timbunan- dia.65 mm (2,5") m' 22,00 TIDAK DITAWARKAN- Fitting & aksessories ls 1,00 TIDAK DITAWARKANValve :

- Gate valve, dia.100 mm (4") bh 1,00 TIDAK DITAWARKAN- Check valve, dia.100 mm (4") bh 1,00 TIDAK DITAWARKAN

- Gate valve, dia.50 mm (2,5") bh 2,00 TIDAK DITAWARKAN- Check valve, dia.50 mm (2,5") bh 2,00 TIDAK DITAWARKANIsolasi Anti karat Pipa Hydrant dengan Wraping Tape ls 1,00 TIDAK DITAWARKANHydrant box (tipe indoor), berikut hose & nozzle unit 2,00 TIDAK DITAWARKANFE, tipe ABC Dry Chemical - Kapasitas : 6 kg bh 3,00 TIDAK DITAWARKANTesting & commissioning ls 1,00 TIDAK DITAWARKAN

LANTAI DUA -

III PEKERJAAN INSTALASI HYDRANT LT. TIGAPemipaanBlack Steel Pipe (BSP) sch 40, termasuk galian & timbunan- dia.65 mm (2,5") m' 14,00 TIDAK DITAWARKAN- Fitting & aksessories ls 1,00 TIDAK DITAWARKANValve :- Gate valve, dia.50 mm (2,5") bh 1,00 TIDAK DITAWARKAN- Check valve, dia.50 mm (2,5") bh 1,00 TIDAK DITAWARKANIsolasi Anti karat Pipa Hydrant dengan Wraping Tape ls 1,00 TIDAK DITAWARKANHydrant box (tipe indoor), berikut hose & nozzle unit 2,00 TIDAK DITAWARKANFE, tipe ABC Dry Chemical - Kapasitas : 6 kg bh 2,00 TIDAK DITAWARKANTesting & commissioning ls 1,00 TIDAK DITAWARKAN

LANTAI TIGA -

TOTAL PEK. HYDRANT -

Item Pekerjaan

Page 14: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

VI PEKERJAAN ELEKTRIKAL

No. Satuan Volume Harga Satuan Total Harga

I PANEL - PANEL

1 Pengadaan dan Pemasangan Panel TR unit 1,00 - 2 P-SDP LT.I unit 1,00 - 3 P-LP/PP.LT.1 unit 1,00 - 4 P-LP/PP.LT.2 unit 1,00 - 5 P-LP/PP.LT.3A unit 1,00 - 6 P-LP/PP.LT.3 unit 1,00 -

7 P-PP.AC.LT.1 unit 1,00 - 8 P-PP.AC.LT.2 unit 1,00 - 9 P-PP.AC.LT.3 unit 1,00 -

10 P-PP.AC.Outdoor Unit unit 1,00 - SUB TOTAL I -

II Feeder KabelPengadaan dan Instalasi kabel feeder lengkap dengan kabel ties, gland serta accessories yang di perlukan

A Dari P.SDP ke :1 P-LVMDP ,Kabel NYFGBY 4 x 300 mm2 m 195,00 -

B Dari P.SDP LT.1 ke :1 P-LP/PP.LT.1 Kabel NYY 4 x 6 mm2 + BC 6 mm2 m 6,00 - 2 P-PP.AC. LT.1 Kabel NYY 4 x 10 mm2 + BC 10 mm2 m 8,00 -

C Dari P.SDP LT.1 ke :1 P-LP/PP.LT.2 , Kabel NYY 4 x 6 mm2 + BC 6 mm2 m 14,00 - 2 P-PP.AC.LT.2, Kabel NYY 4 x 50 mm2 + BC 50 mm2 m 16,00 -

D Dari P.SDP LT.1 ke :1 P-LP/PP LT.3 , Kabel NYY 3 x 4 mm2 + BC 10 mm2 m 22,00 - 2 P-LP/PP.LT.2 , Kabel NYY 4 x 6 mm2 + BC 6 mm2 m 22,00 - 3 P-PP.AC.LT.3, Kabel NYY 4 x 10 mm2 + BC 50 mm2 m 24,00 -

E Dari P.SDP LT.1 ke :P-PP.AC.Outdor unit ,LT.Atap Kabel NYY 4 x 70 mm2 + BC 50 mm2 m 35,00 -

SUB TOTAL -

III Kabel Ladder

- 400 x100 LT.1 m 3,00 - - 400 x100 LT.2 m 3,00 - - 400 x100 LT.3 m 3,00 - SUB TOTAL -

IV Kabel Tray

- 400 x100 Lt.1 m 39,00 - - 400 x100 Lt.2 m 70,00 - - 400 x100 Lt.3 m 23,00 -

SUB TOTAL -

V Instalasi Penerangan dan kotak-kontakLANTAI SATU

1 Downlight COB Natural Lampu LED [10 W] bh 81,00 - 2 Lampu Baret LED16 Watt bh 28,00 - 3 Lampu TL LED 2 x 20 Watt,TKI-Mirror bh 69,00 - 4 Lampu TL T.8 LED 18 Watt, bh 74,00 -

Uraian Pekerjaan

Page 15: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga Uraian Pekerjaan

5 Saklar Tunggal bh 18,00 - 6 Saklar Ganda bh 22,00 - 7 Saklar Hotel bh 2,00 -

8 Kotak Kontak Dinding ± 30 cm 1P (10 A ) bh 32,00 - 9 Instalasi lampu kabel NYM 3 x 2.5 mm2 in PVC HI ttk 252,00 -

conduit Ø 20 mm10 Instalasi saklar kabel NYM 3 x 2.5 mm2 in PVC HI ttk 42,00 -

conduit Ø 20 mm11 Instalasi kotak-kontak 1P kabel NYM 3 x 2.5 mm2 ttk 32,00 -

in PVC HI conduit Ø 20 mm12 Material Bantu lot 1,00 -

SUB TOTAL - VI Instalasi Penerangan dan kotak-kontak

LANTAI DUA

1 Lampu Baret LED16 Watt bh 37,00 - 2 Lampu TL LED 2 x 20 Watt,TKI-Mirror bh 6,00 - 3 Lampu DL -LED 18 Watt bh 62,00 - 4 Saklar Tunggal bh 26,00 - 5 Saklar Ganda bh 13,00 - 6 Saklar Hotel bh 2,00 - 7 Kotak Kontak Dinding ± 30 cm 1P (10 A) bh 36,00 - 8 Instalasi lampu kabel NYM 3 x 2.5 mm2 ttk 105,00 -

in PVC HI conduit Ø 20 mm9 Instalasi saklar dan Grid Switch kabel NYM 3 x 2.5 mm2 ttk 41,00 -

in PVC HI conduit Ø 20 mm10 Instalasi kotak-kontak 1P kabel NYM 3 x 2.5 mm2 ttk 36,00 -

in PVC HI conduit Ø 20 mm11 Material Bantu lot 1,00 - SUB TOTAL -

VII Instalasi Penerangan dan kotak-kontakLANTAI TIGA

1 Lampu DL - LED 18 Watt bh 177,00 - 2 Lampu Spotlight dipanggung -LED 25 Watt bh 39,00 - 3 Lampu TL T.8 LED 18 Watt, di dinding tiang kolom bh 174,00 - 4 Lampu Baret 18 Watt bh 1,00 - 5 Lampu RMI 2 X 36 Watt bh 8,00 - 6 Lampu DL - PLC 18 Watt bh 17,00 - 7 Saklar Tunggal bh 1,00 - 8 Saklar Ganda bh 3,00 - 9 Saklar Hotel bh 1,00 -

10 Saklar Group 10 Group bh 5,00 - 11 Kotak Kontak Dinding ± 30 cm 1P (10 A) bh 3,00 - 12 Instalasi lampu kabel NYM 3 x 2.5 mm2 ttk 416,00 -

in PVC HI conduit Ø 20 mm13 Instalasi saklar dan Grid Switch kabel NYM 3 x 2.5 mm2 ttk 10,00 -

in PVC HI conduit Ø 20 mm14 Instalasi kotak-kontak 1P kabel NYM 3 x 2.5 mm2 ttk 3,00 -

in PVC HI conduit Ø 20 mm15 Material Bantu lot 1,00 -

SUB TOTAL -

Page 16: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga Uraian Pekerjaan

VIII Instalasi Penerangan dan kotak-kontakLANTAI R. MESIN LIFT

1 Lampu Baret 18 Watt bh 3,00 - 2 Saklar Ganda bh 1,00 - 3 Saklar Hotel bh 1,00 - 4 Panel LP/PP. R. M. Lift bh 1,00 - 5 Kotak Kontak Dinding ± 30 cm 1P (10 A) bh 2,00 - 6 Instalasi lampu kabel NYM 3 x 2.5 mm2 ttk 3,00 -

in PVC HI conduit Ø 20 mm7 Instalasi saklar dan Grid Switch kabel NYM 3 x 2.5 mm2 ttk 2,00 -

in PVC HI conduit Ø 20 mm8 Instalasi kotak-kontak 1P kabel NYM 3 x 2.5 mm2 ttk 2,00 -

in PVC HI conduit Ø 20 mm9 Material Bantu lot 1,00 -

SUB TOTAL - IX PeK. Penangkal Petir

-Electrostatic System dengan proteksi radius 110 meter, termasuk pipa galv. Dia. 1 1/4" dengan tinggi 4 Meter dan support, klem dan alat bantu lainnya sesuai gambar dan spesifikasi

Unit 1,00 -

- Obstruction Lamp 100 W bh 1,00 -

- Instalasi Obstruction light 100 W ttk 1,00 -

- NYY 70 mm2 , termasuk klem, pipa PVC dan alat bantu lainnya m 43,00 -

- Bak Kontrol 400 x 300, termasuk pentanahan (Spitz tembaga) maks. 3 ohm unit 1,00 -

- Pentanahan Ls 1,00 -

- Box Test Ls 1,00 -

SUB TOTAL -

SUB TOTAL ELECTRICAL -

Page 17: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

VII PEKERJAAN GENSET

No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga

PEKERJAAN GENERATOR SETI Generator Set (Baru)

1 Unit Diesel Genset unit 1,00 TIDAK DITAWARKAN

- Generator Prime Power 200 KVA- 0,8 pf,380 V,3 Phase,1.500 RPM- Silent Type c/w accessories- Panel AC/DC- Oily Tangki Kap.1000 Litter- Batterai 4 pcs- COC- Manual Book- Tool Kit Standards

II PEKERJAAN DISTRIBUSI/INSTALASI GENSET DAN PANEL

1 Distribusi kabel Genseta Pek. Pengadaan dan Pemasangan Kabel dari Panel PKG 200 kva Ke m' 150,00 TIDAK DITAWARKAN

Panel SDP NYFGBY 2x(4X 150 MM )b Penarikan/gelar kabel kontrol dari Panel ATS ke kontrol panel genset m' 150,00 TIDAK DITAWARKAN

Panel Genset NYY 4 x 2,5 mm

III PEKERJAAN PENUNJANG GENSET

1 Pek.Pengadaan dan Pemasangan Tangki Mingguan 5000 lt berikut dudukan konstruksi sipil ls 1,00 TIDAK DITAWARKAN

2 Pek Pengadaan Hand Pump Solar dia 1" 1 bh lot 1,00 TIDAK DITAWARKAN

3 Pek Pengadaan motor Pump Solar dia 1" 1 bh lot 1,00 TIDAK DITAWARKAN

4 Instalasi pipa bahan bakar lot 1,00 TIDAK DITAWARKAN

5 Saringan Solar pcs 1,00 TIDAK DITAWARKAN

6 Setting, leveling and loading genset 200 KVA pcs 1,00 TIDAK DITAWARKAN

7 Pabrikasi dudukan tangki Harian lot 1,00 TIDAK DITAWARKAN

8 BBM 3000 liter ( untuk Genset ) ltr 3.000,00 TIDAK DITAWARKAN

9 Pembuatan Jalur kabel 10 m' m' 10,00 TIDAK DITAWARKAN

10 Testing & Commissioning lot 1,00 TIDAK DITAWARKAN

SUB TOTAL I -

Page 18: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

VIII PEKERJAAN ELEKTRONIK

No. Satuan Volume Harga Satuan Total Harga

A. FIRE ALARM

CATATAN HARGA (PRICING NOTES)

I Pengadaan, Pemasangan dan Pengetesan Peralatan dan Instalasi

A Peralatan Utama

1 - MCP-FA 1 Loops 20 Points Semi Addressable Unit 1,00 TIDAK DITAWARKAN

2 - Panel Annunciator Unit 1,00 TIDAK DITAWARKAN

3 - Surge Arester + Rectifier + Battery Unit 1,00 TIDAK DITAWARKAN

Peralatan Utama -

B Kabel NYY 2 x 2,5 mm2 in PVC HI Conduit Φ 20 mm dari MCP-FA ke :

1 Alarm Bell (Provisional) m 98,00 TIDAK DITAWARKAN

2 Manual Break Glass Push Button (Provisional) m 98,00 TIDAK DITAWARKAN

3 Sirine (Provisional) m 98,00 TIDAK DITAWARKAN

4 Fire Man Telephone (Provisional) m 98,00 TIDAK DITAWARKAN

5 Sound System m 98,00 TIDAK DITAWARKAN

6 Fire Brigade (Provisional) m 98,00 TIDAK DITAWARKAN

7 Kabel Shield Twisted AWG 1Pairs dari MCP-FA ke TB-FA Lt. 1 m 8,00 TIDAK DITAWARKAN

8 Kabel Shield Twisted AWG 1 Pairs dari MCP-FA ke TB-FA Lt. 2 m 35,00 TIDAK DITAWARKAN

9 Grounding System ls 1,00 TIDAK DITAWARKAN

Kabel NYY 2 x 2,5 mm2 in PVC HI Conduit Φ 20 mm dari MCP-FA ke : -

C EQUIPMENT DAN INSTALASINYA

I LANTAI SATU

1 - TB - FA 10 Pairs Bh 1,00 TIDAK DITAWARKAN

2 - Smoke Detector Bh 1,00 TIDAK DITAWARKAN

3 - ROR Heat Detector c/w LED Bh 14,00 TIDAK DITAWARKAN

4 - Manual Break Glass Push Button Bh 2,00 TIDAK DITAWARKAN

5 - Alarm Bell + Indicator Lamp Bh 2,00 TIDAK DITAWARKAN

6 - Jack Intercom Bh 2,00 TIDAK DITAWARKAN

7 - End of Line Bh 2,00 TIDAK DITAWARKAN

8 - NYA 2 x 1,5 mm2 + PVC HI Con. Φ 20 mm ke Detector Ttk 15,00 TIDAK DITAWARKAN

9 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Mnl P. Btn, I. lamp, Bell Ttk 2,00 TIDAK DITAWARKAN

10 - ITC 2 x 2 x 0.6 mm2 + PVC HI Condt Φ 20 mm keJack Intercom. Ttk 2,00 TIDAK DITAWARKAN

11 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Flow Switch Ttk 2,00 TIDAK DITAWARKAN

LANTAI SATU -

II LANTAI DUA

1 - TB - FA 10 Pairs Bh 1,00 TIDAK DITAWARKAN

2 - Smoke Detector Bh 1,00 TIDAK DITAWARKAN

3 - ROR Heat Detector c/w LED Bh 14,00 TIDAK DITAWARKAN

4 - Manual Break Glass Push Button Bh 2,00 TIDAK DITAWARKAN

5 - Alarm Bell + Indicator Lamp Bh 2,00 TIDAK DITAWARKAN

6 - Jack Intercom Bh 2,00 TIDAK DITAWARKAN

7 - End of Line Bh 2,00 TIDAK DITAWARKAN

8 - NYA 2 x 1,5 mm2 + PVC HI Con. Φ 20 mm ke Detector Ttk 15,00 TIDAK DITAWARKAN

9 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Mnl P. Btn, I. lamp, Bell Ttk 3,00 TIDAK DITAWARKAN

10 - ITC 2 x 2 x 0.6 mm2 + PVC HI Condt Φ 20 mm keJack Intercom. Ttk 3,00 TIDAK DITAWARKAN

11 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Flow Switch Ttk 3,00 TIDAK DITAWARKAN

LANTAI DUA -

Uraian Pekerjaan

Page 19: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga Uraian Pekerjaan

III LANTAI TIGA

1 - TB - FA 10 Pairs Bh 1,00 TIDAK DITAWARKAN

2 - Smoke Detector Bh 3,00 TIDAK DITAWARKAN

3 - ROR Heat Detector c/w LED Bh 2,00 TIDAK DITAWARKAN

4 - Manual Break Glass Push Button Bh 1,00 TIDAK DITAWARKAN

5 - Alarm Bell + Indicator Lamp Bh 1,00 TIDAK DITAWARKAN

6 - Jack Intercom Bh 1,00 TIDAK DITAWARKAN

7 - End of Line Bh 1,00 TIDAK DITAWARKAN

8 - NYA 2 x 1,5 mm2 + PVC HI Con. Φ 20 mm ke Detector Ttk 2,00 TIDAK DITAWARKAN

9 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Mnl P. Btn, I. lamp, Bell Ttk 1,00 TIDAK DITAWARKAN

10 - ITC 2 x 2 x 0.6 mm2 + PVC HI Condt Φ 20 mm keJack Intercom. Ttk 1,00 TIDAK DITAWARKAN

11 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Flow Switch Ttk 1,00 TIDAK DITAWARKAN

LANTAI TIGA -

D - Testing & Commisioning Ls 1,00 TIDAK DITAWARKAN

TOTAL PEK. FIRE ALARM

Page 20: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga

B. TATA SUARA (SOUND SYSTEM)

A PAGING SYSTEM 1 Mic Emergency unit 1,00 TIDAK DITAWARKAN2 Mic Paging unit 1,00 TIDAK DITAWARKAN3 Power Amp 2 x 240 Watt unit 1,00 TIDAK DITAWARKAN4 Mixer Pre - Amp unit 1,00 TIDAK DITAWARKAN5 Equalizer unit 1,00 TIDAK DITAWARKAN6 Zone Selector unit 1,00 TIDAK DITAWARKAN7 Sirene unit 1,00 TIDAK DITAWARKAN8 Radio Tunner AM / FM unit 1,00 TIDAK DITAWARKAN9 CD Player unit 1,00 TIDAK DITAWARKAN

10 Battery Back Up 4 Jam unit 1,00 TIDAK DITAWARKAN11 Rack Kabinet unit 1,00 TIDAK DITAWARKAN12 MDF - SS unit 1,00 TIDAK DITAWARKAN13 Grounding lot 1,00 TIDAK DITAWARKAN

PAGING SYSTEM -

B CAR CALL SYSTEM1 Mic Paging unit 1,00 TIDAK DITAWARKAN2 Mixer Pre - Amp unit 1,00 TIDAK DITAWARKAN3 Power Amplifier 120 W + 60 Watt unit 1,00 TIDAK DITAWARKAN4 Rack Kabinet unit 1,00 TIDAK DITAWARKAN5 TBCC unit 1,00 TIDAK DITAWARKAN6 Horn Speaker 15 Watt bh 6,00 TIDAK DITAWARKAN

CAR CALL SYSTEM -

C LANTAI SATU 1 TBSS-B1 unit 1,00 TIDAK DITAWARKAN2 Ceiling Speaker 3 watt unit 23,00 TIDAK DITAWARKAN3 Volume Control unit 4,00 TIDAK DITAWARKAN4 Coulum Speaker 15 Watt unit 4,00 TIDAK DITAWARKAN

KABEL INSTALASI1 NYMHY 5 x 1,5 mm2 dari MDF - SS Ke TBSS - B1 m 25,00 TIDAK DITAWARKAN2 NYMHY 2 x 1,5 mm2 + Conduit dia 20 mm2 dari TBSS - BS Ke titik 23,00 TIDAK DITAWARKAN

Ceiling Speaker3 NYMHY 3 x 1,5 mm2 + Conduit dia 20 mm2 ke Volume Control titik 4,00 TIDAK DITAWARKAN4 Material Bantu lot 1,00 TIDAK DITAWARKAN

LANTAI SATU - D LANTAI DUA

1 TBSS - 1B unit 1,00 TIDAK DITAWARKAN2 Ceiling Speaker 3 watt unit 5,00 TIDAK DITAWARKAN3 Volume Control unit 5,00 TIDAK DITAWARKAN4 Ceiling Coulum Speaker 25 watt unit 4,00 TIDAK DITAWARKAN

KABEL INSTALASI1 NYMHY 5 x 1,5 mm2 dari MDF - SS Ke TBSS - 1B m 35,00 TIDAK DITAWARKAN4 NYMHY 2 x 1,5 mm2 + Conduit dia 20 mm2 dari titik 5,00 TIDAK DITAWARKAN

TBSS - 1A, Ke Speaker5 NYMHY 3 x 1,5 mm2 + Conduit dia 20 mm2 ke Volume Control titik 5,00 TIDAK DITAWARKAN6 Material Bantu lot 1,00 TIDAK DITAWARKAN

LANTAI DUA -

Uraian Pekerjaan

Page 21: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga Uraian Pekerjaan

E LANTAI TIGA

1 TBSS - 1B unit 1,00 TIDAK DITAWARKAN2 Ceiling Speaker 3 watt unit 2,00 TIDAK DITAWARKAN3 Volume Control unit 1,00 TIDAK DITAWARKAN

KABEL INSTALASI1 NYMHY 5 x 1,5 mm2 dari MDF - SS Ke TBSS - 1B m 45,00 TIDAK DITAWARKAN4 NYMHY 2 x 1,5 mm2 + Conduit dia 20 mm2 dari titik 2,00 TIDAK DITAWARKAN

TBSS - 1A, Ke Speaker5 NYMHY 3 x 1,5 mm2 + Conduit dia 20 mm2 ke Volume Control titik 1,00 TIDAK DITAWARKAN6 Material Bantu lot 1,00 TIDAK DITAWARKAN

LANTAI TIGA -

F Testing & Commisioning lot 1,00 TIDAK DITAWARKAN

TOTAL TATA SUARA (SOUND SYSTEM)

Page 22: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga

C. SISTEM TELPON

I Telepon Lantai 1Peralatan dan Instalasi Telepon

1 Peralatan dan Instalasi Telepon set 1,00 TIDAK DITAWARKANKey Telepon / PBXKapasitas instalasi :- 6 line CO- 4 digital extension- 48 line analog

MDF 40 pairs2 Attendant console

- Headset operator console bh 1,00 TIDAK DITAWARKAN- DSS Console bh 1,00 TIDAK DITAWARKAN

3 Handset telepon analog bh 5,00 TIDAK DITAWARKAN4 Handset telepon digital bh 1,00 TIDAK DITAWARKAN5 Instalasi peralatan ke MDF lot 1,00 TIDAK DITAWARKAN6 Oulet telepon bh 6,00 TIDAK DITAWARKAN7 Instalasi telepon dalam conduit ttk 6,00 TIDAK DITAWARKAN

- Instalasi Kabel ITC 10 Pairs ke luar bangunan m' 50,00 TIDAK DITAWARKANTelepon Lantai 1 -

II Telepon Lantai 2Peralatan dan Instalasi Telepon

1 Handset telepon analog bh 1,00 TIDAK DITAWARKAN2 Oulet telepon bh 1,00 TIDAK DITAWARKAN3 Instalasi telepon + PVC ttk 1,00 TIDAK DITAWARKAN

Telepon Lantai 2 -

III Telepon Lantai 3Peralatan dan Instalasi Telepon

1 Handset telepon analog bh 1,00 TIDAK DITAWARKAN3 Oulet telepon bh 1,00 TIDAK DITAWARKAN4 Instalasi telepon + PVC ttk 1,00 TIDAK DITAWARKAN

Telepon Lantai 2 - IV Telepon R. MESIN LIFT

Peralatan dan Instalasi Telepon1 Handset telepon analog bh 1,00 TIDAK DITAWARKAN3 Oulet telepon bh 1,00 TIDAK DITAWARKAN4 Instalasi telepon + PVC ttk 1,00 TIDAK DITAWARKAN

Telepon R. MESIN LIFT -

V Testing & Commisioning lot 1,00 TIDAK DITAWARKAN

TOTAL SISTEM TELEPON

Uraian Pekerjaan

Page 23: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga

D. SISTEM DATA

I IT Lantai 1 Instalasi IT/Data

1 Outlet data cat 5 bh 5,00 TIDAK DITAWARKAN2 Instalasi cable UTP cat 6 + PVC ttk 5,00 TIDAK DITAWARKAN3 Switch Hub 24 Port Unmanageble bh 1,00 TIDAK DITAWARKAN4 Instalasi Kabel Backbone UTP Cat. 6 m' 36,00 TIDAK DITAWARKAN

IT Lantai 1 -

II IT Lantai 2Instalasi IT/Data

1 Outlet data cat 5 bh 2,00 TIDAK DITAWARKAN2 Instalasi cable UTP cat 6 + PVC ttk 2,00 TIDAK DITAWARKAN3 Instalasi Kabel Backbone UTP Cat. 6 m' 48,00 TIDAK DITAWARKAN

IT Lantai 2 -

III IT Lantai 3Instalasi IT/Data

1 Outlet data cat 5 bh 1,00 TIDAK DITAWARKAN2 Instalasi cable UTP cat 6 + PVC ttk 1,00 TIDAK DITAWARKAN3 Instalasi Kabel Backbone UTP Cat. 6 m' 60,00 TIDAK DITAWARKAN

IT Lantai 3 -

IV Testing & Commisioning lot 1,00 TIDAK DITAWARKAN

TOTAL SISTEM DATA

Uraian Pekerjaan

Page 24: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan Volume Harga Satuan Total Harga

E. SISTEM CCTV

I Peralatan UtamaPeralatan Utama CCTV- DVR 16 Chanel, 2 TB set 1,00 TIDAK DITAWARKAN- LCD Color monitor 20" (Multi screen ) set 1,00 TIDAK DITAWARKAN

SISTEM CCTV -

II CCTV Lantai 1Instalasi CCTV

1 Indoor Dome Camera set 4,00 TIDAK DITAWARKANImage device 1/4" CCD, High resolu-tion, sensitivity 0,33 lux ( day mode )- 360⁰ Pan, -5⁰ ke 90⁰ Tilt- 12x zoom digital- 26x zoom lens optical (3,5mm-91mm)- Speed 120⁰ / detik- 3.9 - 46 mm Varivocal LensInstalasi + PVC :a. Instalasi kabel coaxial RG 59 ttk 4,00 TIDAK DITAWARKANb. Instalasi power NYM 3 x 1,5 mm2 ttk 4,00 TIDAK DITAWARKANc. Instalasi kabel kontrol Twisted ttk 4,00 TIDAK DITAWARKAN

shielded (STP)2 Fixed camera 15" bit set 2,00 TIDAK DITAWARKAN

- 1/3" High Resolution Day/nithHigh Resolution 530 TV Lines

Instalasi + PVC :a. Instalasi kabel coaxial RG 59 ttk 2,00 TIDAK DITAWARKANb. Instalasi power NYMHY 3 x 1,5 mm2 ttk 2,00 TIDAK DITAWARKAN

CCTV Lantai 1 -

III CCTV Lantai 2Instalasi CCTV

1 Indoor Dome Camera set 5,00 TIDAK DITAWARKANImage device 1/4" CCD, High resolution- 360⁰ Pan, -5⁰- 12x zoom digital- 26x zoom lens optical (3,5mm-91mm)- 3.9 - 46 mm Varivocal LensInstalasi + PVC :a. Instalasi kabel coaxial RG 59 ttk 5,00 TIDAK DITAWARKANb. Instalasi power NYMHY 3 x 1,5 mm2 ttk 5,00 TIDAK DITAWARKANc. Instalasi kabel kontrol Twisted ttk 5,00 TIDAK DITAWARKAN

shielded (STP)CCTV Lantai 2 -

IV CCTV Lantai 3Instalasi CCTV

1 Indoor Dome Camera set 1,00 TIDAK DITAWARKANImage device 1/4" CCD, High resolution- 360⁰ Pan, -5⁰- 12x zoom digital- 26x zoom lens optical (3,5mm-91mm)- 3.9 - 46 mm Varivocal LensInstalasi + PVC :a. Instalasi kabel coaxial RG 59 ttk 1,00 TIDAK DITAWARKANb. Instalasi power NYMHY 3 x 1,5 mm2 ttk 1,00 TIDAK DITAWARKANc. Instalasi kabel kontrol Twisted ttk 1,00 TIDAK DITAWARKAN

shielded (STP)CCTV Lantai 3 -

V Testing & Commisioning ls 1,00 TIDAK DITAWARKAN

TOTAL SISTEM CCTV

Uraian Pekerjaan

Page 25: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

IX PRASARANA LINGKUNGAN JALAN DAN PARKIR

No. Satuan Volume Harga Satuan Total Harga

A. PEKERJAAN PEMATANGAN LAHAN1 Penebangan pohon, pembuangan tunggul dan pencabutan akar pohon ls 1,00 -

2 Pematangan lahan Cut and Fill menggunakan alat berat M3 3.366,00 -

-

B. PEKERJAAN JALAN DAN PARKIR

1 Pek. Pembentukan badan jalan t = 20 cm M3 215,64 TIDAK DITAWARKAN

2 Pek. Hamparan sirtu tebal 20 cm padat M3 143,76 TIDAK DITAWARKAN

1 Pek. Penetrasi tebal 4 cm M2 718,79 TIDAK DITAWARKAN

1 Pek. Hotmik tebal 3 cm M2 718,79 TIDAK DITAWARKAN

2 Pek. Pasang kansteen beton M1 107,70 TIDAK DITAWARKAN

-

C. PEKERJAAN SALURAN KELILING BANGUNAN DAN AREA PARKIR

1 Saluran keliling bangunan 60x60 M' 185,02 TIDAK DITAWARKAN

2 Beton decker t.6 cm 0,45x70 m M' 176,02 TIDAK DITAWARKAN

3 Grill galvanis 0,45x0,70 m Bh 18,00 TIDAK DITAWARKAN

-

D. PEKERJAAN DINDING PENAHAN TANAH (DPT) BATU KALI

1 Pek. Galian tanah untuk pondasi M3 94,28 TIDAK DITAWARKAN

2 Pek. Urugan tanah kembali pondasi M3 33,14 TIDAK DITAWARKAN

3 Pek. Urugan pasir dibawah pondasi t=5 cm M3 4,71 TIDAK DITAWARKAN

4 Pek. Pasangan pondasi batu kali 1: 4 DPT M3 70,71 TIDAK DITAWARKAN

5 Pek. Pasangan batu kali 1: 4 Dinding Penahan Tanah (DPT) M3 117,85 TIDAK DITAWARKAN

6 Pek. Pembuatan siaran timbul pada batu muka DPT M2 196,42 TIDAK DITAWARKAN

7 Pek. Plesteran 1 : 4, t=20 mm + aci, ban-banan topian DPT M2 58,93 TIDAK DITAWARKAN

8 Pek. Pasang sulingan air pipa PVC Ø.2" + injuk dan pasir Titik 294,63 TIDAK DITAWARKAN

-

Item Pekerjaan

SUB TOTAL A

SUB TOTAL B

SUB TOTAL C

SUB TOTAL E

Page 26: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

PEKERJAAN : PEMBANGUNAN GEDUNG AUDITORIUM FEM

LOKASI : KAMPUS IPB DRAMAGA BOGOR

TAHUN : 2018

X MEBEULAIR AUDITORIUM

No Type Satuan Volume Harga Satuan Total Harga

RUANG AUDITORIUM LT.2

1 Kursi + meja teater Ruang Auditorium, setara Ex- Archigramma Type NEW CHAIR unit 577,00 TIDAK DITAWARKAN

AMPHITEATER

2 Kursi + meja teater Ruang Balkon VIP, setara Ex- Archigramma Type NEW CHAIR unit 47,00 TIDAK DITAWARKAN

AMPHITEATER

-

Item Pekerjaan

JUMLAH

Page 27: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

XI LIFT PENUMPANG 1 UNIT

No Satuan Volume Harga Satuan Total Harga

I PEKERJAAN PERSIAPAN (PENDAHULUAN)1 Pekerjaan Persiapan lot 1,00 - TIDAK DITAWARKAN

a. Pembuatan Direksi Keetb. Pembuatan Gudang Peralatanc. Pembuatan Gudang Penyimpanan bekas bongkaran LIftd. P3Ke. Pembuatan Shop Drawingf. Setting, Mobilisasi, Demobilisasi

PEKERJAAN PERSIAPAN (PENDAHULUAN) -

II PEKERJAAN PREPARASI HOISTWAY + PEKERJAAN PENUNJANG1 Preparasi Hoistway + Pekerjaan Penunjang (Grouting sill, jamb & sill suport) set 1,00 - TIDAK DITAWARKAN

PEKERJAAN PREPARASI HOISTWAY + PEKERJAAN PENUNJANG -

III PEKERJAAN PENGADAAN LIFT PASSANGER

c.1 Pekerjaan pengadaan & Pemasangan Lift Penumpang Unit 1,00 - TIDAK DITAWARKAN- Kapasitas : 6 Orang (450 kg)- Tipe : Traction Drive AC Geared/Gearless/GETM/GeN2-MR- Pelayanan : Lt. 1 s/d Lt. 3 (2stop/opening)- Kecepatan : 60 mpm- Interior

· Dinding Kiri & Kanan : Mirror Stainless Steel · Dinding Tengah : Mirror Stainless Steel · Pintu Dalam Lift : Mirror Stainless Steel

- Lantai : Granit Tile Motif- Ceiling : Standar Type- Car Door : Mirror Stainless Steel - Front Return Walls : Mirror Stainless Steel - Entrance Coulomn : Mirror Stainless Steel - Jamb : Jamb Stainless Stell Wide Jamb- Hand railling : Stainless Steel- Car Operation Features

a. Regenerative Driveb. Multi Beam Infrared Door Protection c. Fire Service Operation PhaseI d. Attendant Operation e. AES Monitoring System by PCf. Eath quake Operation+1unit Seismic Sensorg. Anaonmenth.Panel Control, Peralatan penunjang, Kabel Kontrol

Sudah Termasuk Testing & Commisioning dan Perijinan Ke Kemnaker.c.2 Automatic Rescue Device (ARD) Unit 1,00 - TIDAK DITAWARKAN

PEKERJAAN PENGADAAN LIFT PASSANGER - IV PEKERJAAN PENGADAAN KABEL TOEVOOR

1 ke Panel kontrol Lift 1, NYY 4 x 1C x 16 mm² + NYA 10 mm² m' 20,00 - TIDAK DITAWARKAN

PEKERJAAN PENGADAAN KABEL TOEVOOR -

V PEKERJAAN PENGADAAN PANEL DAYA1 Pengadaan MCB Panel Daya Lift + Accesoris Unit 1,00 - TIDAK DITAWARKAN

PEKERJAAN PENGADAAN PANEL DAYA -

VI PEKERJAAN INSTALASI UNIT LIFT 1 1 Biaya Pemasangan Lift 1 Unit 1,00 TIDAK DITAWARKAN

PEKERJAAN INSTALASI UNIT LIFT 1 -

VII PEKERJAAN LAIN-LAIN1 Pekerjaan Pengadaan dan Pemasangan AC Splith 1 Pk (Cadangan 1) ls 2,00 - TIDAK DITAWARKAN

PEKERJAAN LAIN-LAIN -

TOTAL PEKERJAAN LIFT -

Uraian Pekerjaan

Page 28: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Harga Satuan

GEDUNG AUDITORIUM

1 1 M1 Pengukuran & bouwplank - 2 1 M1 Pagar Proyek t. 1,8 m - 3 1 M2 Papan Nama Proyek - 4 1 M2 Pembuatan Gudang Semen dan Alat-alat - 5 1 M2 Direksikeet (3,6x3,6) - 6 1 M3 Galian tanah biasa max kedalaman 1 m' - 7 1 M3 Urugan kembali - 8 1 M3 Pemadatan tanah - 9 1 M3 Urugan pasir - 10 1 M3 Urugan Sirtu - 11 1 M3 Urugan tanah merah - 12 1 M3 Aanstamping batu belah - 13 1 M3 Pas. Batu belah 1pc:4ps - 14 1 M3 Lantai kerja/beton tumbuk 1pc : 3ps : 5kr - 15 1 M2 Rabat beton t. 6 cm (M4 1 Lapis) - Beton site mix K-175 - 16 1 M3 Beton site mix K-175 - 17 1 M3 Readymix K-250 - 18 1 M3 Readymix K-300 - 19 1 Kg Besi beton terpasang < d 12 - 20 1 Kg Besi beton terpasang > D 13 - 21 1 M2 Bondex Alkadeck 950 - 22 1 M2 Wire Mesh M-10 (1 lapis) - 23 1 M2 Wire Mesh M-8 (1 lapis) - 24 1 M2 Wire Mesh M-4 (1 lapis) - 25 1 M2 Bekisting multiplex 9 mm - 26 1 M2 Stoot Werk - 27 1 M2 Form work system klm d. 60cm (9.137 m2) 4x - 28 1 M1 Stoot Werk Blk 40x75 (14.2 m') 3x - 29 1 M1 Stoot Werk Blk 35x55 (4.5 m') 3x - 30 1 M1 Stoot Werk Blk 35x75 (3 m') 3x - 31 1 M1 Stoot Werk Blk 30x45 (3 m') 3xpakai - 32 1 M1 Stoot Werk Ring Blk 35x65 (9 m') 3x pakai - 33 1 M1 Stoot Werk Blk 25x65 (9 m') 3x - 34 1 M1 Stoot Werk Blk 35x40 (4.5m') 3x - 35 1 M2 Bekisting Plat beton 2x pakai - 36 1 M2 Bekisting Plat beton - 37 1 M1 Sloof praktis 10/15 -

C.1. LANTAI 1 (BETON PILE CAP, SLOOP, KOLOM SD ELEVASI +4.50)38 1 M3 Pek. Beton Pile Cap PC1 dan PC1A - 39 1 M3 Pek. Beton Pile Cap PC2 - 40 1 M3 Pek. Beton Pile Cap PC4A (PC PITLIFT) - 41 1 M3 Pek. Beton Pile Cap PC3 - 42 1 M3 Pek. Beton Pile Cap PC4 - 43 1 M3 Pek. Tie Beam TB1:400x750 - 44 1 M3 Pek. Tie Beam TB2:250x400 - 45 1 M3 Pek. Tie Beam TB3:200x400 - 46 1 M3 Pek. Kolom 1K1; D600 - 47 1 M3 Pek. Kolom 1K2; D600 - 48 1 M3 Pek. Kolom 1K3; 300X300 - 49 1 M3 Pek. Kolom K2A; 300X400 - 50 1 M3 Plat lantai t. 10 cm elv -0,05 - 51 1 M3 Plat beton tangga t=15 cm - 52 1 M3 Pek. Balok Bordes B4K:250x500 - 53 1 M3 Pek. Pondasi Ramp - 54 1 M3 Pek. Balok Ramp B:250x400 - 55 1 M3 Pek. Pelat Lantai t=12cm - 56 1 M3 Pek. Dinding Pit Lift : - 57 1 M3 Pek. Kolom Lift : - 58 1 M3 Pek. Balok Separator dan Balok Hosting Hook; B:200x300 -

C.2. LANTAI 2 (ELEVASI +4.50 SD +10.50) A. ELEVASI +4.50 + 10.50

DAFTAR HARGA SATUAN PEKERJAAN PERSIAPAN DAN STRUKTUR

Item Pekerjaan

Page 29: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Harga SatuanItem Pekerjaan

59 1 M3 Pek. Kolom 2K1; D600 - 60 1 M3 Pek. Kolom 2K2; D600 - 61 1 M3 Pek. Kolom 2K3; 300X300 - 62 1 M3 Pek. Kolom K2A; 300X400 -

B. ELEVASI +4.50 (LANTAI-2)63 1 M3 Pek. Balok B1:400x750 - 64 1 M3 Pek. Balok B1K:400x750 - 65 1 M3 Pek. Balok B2:300x450 - 66 1 M3 Pek. Balok B3:300x650 - 67 1 M3 Pek. Balok BL:300x450+100X550 - 68 1 M3 Pek. Balok B1L:400x750+200X250 - 69 1 M3 Pek. Balok B1K:400x750+200X250 - 70 1 M3 Pek. Pelat Lantai t=12cm (selasar) - 71 1 M3 Pek. Pelat Lantai t=15cm - 72 1 M3 Plat beton tangga t=15cm AS-4/E, I; AS-6/D, J - 73 1 M3 Pek. Balok Bordes B4K:250x500 -

C. LANTAI 2 (ELEVASI +4.50 PANGGUNG)74 1 M3 Pek. Balok B1:400x750 - 75 1 M3 Pek. Balok B2:300x450 - 76 1 M3 Pek. Balok B3:300x650 - 77 1 M3 Pek. Balok B4:250x500 - 78 1 M3 Pek. Pelat Lantai t=15cm - 79 1 M3 Pek. Plat beton tangga AS-G/1; TANGGA AS-I/2 - 80 1 M3 Pek. Balok Bordes B4K:250x500 -

D. LANTAI 2 (ELEVASI +4.50 s/d +6.80 TRIBUN)81 1 M3 Pek. Balok B1:400x750 - 82 1 M3 Pek. Balok B2:300x450 - 83 1 M3 Pek. Balok B3:300x650 - 84 1 M3 Pek. Pelat Lantai t=15cm - 85 1 M3 Pek. Pelat Lantai Trap Tribun - 86 1 M3 Pek. Plat beton ; TANGGA AS-E/9; TANGGA AS-D/8 - 87 1 M3 Pek. Balok Bordes B4K:250x500 - 88 1 M3 Pek. Plat beton ; TANGGA AS-G/10 - 89 1 M3 Pek. Balok Bordes B4K:250x500 -

C.3. PEKERJAAN BETON LANTAI-3 (ELEV +10.50 SD +12.10)A ELEVASI +10.50 SD +12.10

90 1 M3 Pek. Kolom 2K1; D600 - 91 1 M3 Pek. Kolom 2K2; D600 - 92 1 M3 Pek. Kolom K4; 400X400 - 93 1 M3 Pek. Kolom K5; 300X400 -

B ELEVASI +10.50 (LANTAI-3)94 1 M3 Pek. Balok B1:400x750 - 95 1 M3 Pek. Balok B1K:400x750 - 96 1 M3 Pek. Balok B2:300x450 - 97 1 M3 Pek. Balok B3:300x650 - 98 1 M3 Pek. Balok B4:250x500 - 99 1 M3 Pek. Balok BL:300x450+100X550 - 100 1 M3 Pek. Balok B1:400x750+200X1250 - 101 1 M3 Pek. Balok B1:400x750+200X1250 - 102 1 M3 Pek. Pelat Lantai t=12cm (dak) - 103 1 M3 Pek. Pelat Lantai t=15cm -

C. LANTAI 2 (ELEVASI +4.50 PANGGUNG)104 1 M3 Pek. Balok B1:400x750 - 105 1 M3 Pek. Balok B1K:400x750 - 106 1 M3 Pek. Balok B2:300x450 - 107 1 M3 Pek. Balok B3:300x650 - 108 1 M3 Pek. Balok BL:150x1000 - 109 1 M3 Pek. Pelat Lantai t=15cm - 110 1 M3 Pek. Pelat Lantai Trap Tribun -

C.4. PEKERJAAN BETON ATAP/RING BALOK (ELEV +12.10 SD +TOP)A KOLOM ELEVASI +12.10 SD TOP

Page 30: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Harga SatuanItem Pekerjaan

111 1 M3 Pek. Kolom 2K1; D600 - 112 1 M3 Pek. Kolom 2K2; D600 - 113 1 M3 Pek. Kolom K5; 300X400 - 114 1 M3 Pek. Balok B1:400x750 - 115 1 M3 Pek. Balok B2:300x450 - 116 1 M3 Pek. Balok B5:250x400 - 117 1 M3 Pek. Balok BR:150x300 - 118 1 M3 Cut and Fill menggunakan alat berat -

Bogor, ..................... 2018Kontraktor,PT,.................................

Cap & Tanda Tangan

NAMAJabatan

Page 31: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x5

GEDUNG AUDITORIUM

1 1 M1 Pengukuran & bouwplankKayu Balok Albasia 0,0120 M3 - - Kayu Papan Albasia 0,0070 M3 - - Paku 8 s/d 15 cm 0,0200 Kg - - Pekerja 0,1000 O/H - - Tukang kayu setengah terampil 0,1000 O/H - - Kepala tukang kayu 0,0100 O/H - - Mandor 0,0050 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

2 1 M1 Pagar Proyek t. 1,8 m M'Dolken 7 s/d 10 1,2500 Btg - - PC 2,5000 Kg - - Seng gelombang BJLS T=180 cm 1,2000 Lbr - - Pasir beton 0,0050 M3 - - Koral Beton 0,0090 M3 - - Kayu terentang 0,0648 M3 - - Paku 5 s/d 7 cm 0,0600 Kg - - Meni kayu/besi 0,4500 Kg - - Pekerja 0,4000 O/H - - Tukang kayu terampil 0,2000 O/H - - Kepala tukang kayu 0,0200 O/H - - Mandor 0,0200 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

3 1 M2 Papan Nama ProyekKayu balok borneo super 0,0650 M3 - - Triplek 4 mm 120 x 240 1,0000 Lbr - - Paku 5 s/d 7 cm 0,2500 Kg - - Cat Minyak 1,0000 Kg - - Penulisan 0,1250 Ls - - Ongkos Pasang 0,1250 Ls - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

4 1 M2 Pembuatan Gudang Semen dan Alat-alatDolken Kayu θ 8-10/400 cm 1,7000 Btg - - Kayu Balok Terentang 0,2100 M3 - - Paku Biasa 0,3000 Kg - - Semen Portland 10,5000 kg - - Pasir Beton 0,0300 M3 - - Koral Beton 0,0500 M3 - - Seng Gelombang Besar 80x180x4mm 1,5000 Lbr - - Pekerja 1,0000 Oh - - Tukang Kayu 2,0000 Oh - - Kepala Tukang 0,2000 Oh - - Mandor 0,0500 Oh - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

5 1 M2 Direksikeet (3,6x3,6)Dolken 7 s/d 10 1,2500 Btg - - Kayu terentang 0,1700 M3 - - Paku 5 s/d 7 cm 0,8500 Kg - - Besi Strip/Plat 1,1000 Kg - - PC 35,0000 Kg - - Pasir pasang 0,1500 M3 - - Pasir beton 0,1000 M3 - - Batu koral beton kali (sirtu) 0,1500 M3 - - Bata merah bakar kelas I 30,0000 Bh - - Seng Plat BJLS 30 90 cm ( 100 m1 ) 0,2500 M' - -

Item Pekerjaan

2

ANALISA HARGA SATUAN PEKERJAAN STRUKTUR

Page 32: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

2Kawat harmonika 4 cm 2,0000 Bh - - Kaca Polos 5 mm ( ASAHI ) 0,0800 M2 - - Kunci 2 slaag kuda terbang 0,1500 Bh - - Triplek 4 mm 120 x 240 0,0600 Lbr - - Pekerja 2,0000 O/H - - Tukang kayu terampil 1,0000 O/H - - Tukang batu terampil 2,0000 O/H - - Kepala tukang batu 0,3000 O/H - - Mandor 0,0500 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

6 1 M3 Galian tanah biasa max kedalaman 1 m'Pekerja 0,3750 O/H - - Mandor 0,0375 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

7 1 M3 Urugan kembaliPekerja 0,1720 O/H - - Mandor 0,0172 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

8 1 M3 Pemadatan tanah Pekerja 0,4500 O/H - - Mandor 0,0450 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

9 1 M3 Urugan pasir Pasir urug 1,2000 M3 - - Pekerja 0,3000 O/H - - Mandor 0,0300 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

10 1 M3 Urugan SirtuPasir urug 1,2000 M3 - - Pekerja 0,2500 O/H - - Mandor 0,0250 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

11 1 M3 Urugan tanah merahTanah merah/Tanah Urug Pilihan 1,2000 M3 - - Pekerja 0,2500 O/H - - Mandor 0,0250 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

12 1 M3 Aanstamping batu belahBatu Belah Pondasi 1,2000 M3 - - Pasir urug 0,3000 M3 - - Pekerja 0,7800 O/H - - Tukang batu terampil 0,3900 O/H - - Kepala tukang batu 0,0390 O/H - - Mandor 0,0390 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 33: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

213 1 M3 Pas. Batu belah 1pc:4psBatu Belah Pondasi 1,1000 M3 - - PC 163,0000 Kg - - Pasir pasang 0,5200 M3 - - Pekerja 1,5000 O/H - - Tukang batu terampil 0,6000 O/H - - Kepala tukang batu 0,0600 O/H - - Mandor 0,0750 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

14 1 M3 Lantai kerja/beton tumbuk 1pc : 3ps : 5krPC 200,0000 Kg - - Pasir beton 0,5200 M3 - - Koral Beton 0,8700 M3 - - Pekerja 1,6500 O/H - - Tukang batu terampil 0,2500 O/H - - Kepala tukang batu 0,0250 O/H - - Mandor 0,0800 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

15 1 M2 Rabat beton t. 6 cm (M4 1 Lapis) - Beton site mix K-175Beton site mix K-175 0,0600 M3 - - Wire Mesh M-4 (1 lapis) 1,0000 M2 - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

16 1 M3 Beton site mix K-175PC (50 kg) 6,8000 Zak - - Batu Pecah Mesin 1/2 0,8300 M3 - - Pasir beton 0,5400 M3 - - Pekerja 6,0000 O/H - - Tukang batu terampil 1,0000 O/H - - Kepala tukang batu 0,1000 O/H - - Mandor 0,3000 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

17 1 M3 Readymix K-300Readymix Beton K-300, Tanpa Pompa ( Selang ) 1,0000 M3 - - Pekerja 2,5000 O/H - - Tukang batu terampil 0,2500 O/H - - Kepala tukang batu 0,1000 O/H - - Mandor 0,0100 O/H - - Alat bantu (Concrete pump + Vibrator) 1,0000 Lot - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

18 1 M3 Readymix K-250Readymix Beton K-250, Tanpa Pompa ( Selang ) 1,0000 M3 - - Pekerja 2,5000 O/H - - Kepala Tukang pipa 0,2500 O/H - - Pekerja 0,1000 O/H - - Tukang kayu setengah terampil 0,0100 O/H - - Alat bantu (Concrete pump + Vibrator) 1,0000 Lot - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 34: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

219 1 Kg Besi beton terpasang < d 12Besi Beton U-24 Rata-rata 1,1000 Kg - - Kawat beton 0,0100 Kg - - Pekerja 0,0040 O/H - - Tukang besi beton terampil 0,0040 O/H - - Kepala tukang besi beton 0,0040 O/H - - Mandor 0,0040 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

20 1 Kg Besi beton terpasang > D 13Besi Beton U-40 Rata-rata 1,1000 Kg - - Kawat beton 0,0100 Kg - - Pekerja 0,0040 O/H - - Tukang besi beton terampil 0,0040 O/H - - Kepala tukang besi beton 0,0040 O/H - - Mandor 0,0040 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

21 1 M2 Bondex Alkadeck 950Bondex 1,0100 M2 - - Kawat Las 0,1000 Kg - - Pekerja terampil 0,0500 O/H - - Tukang besi profil terampil 0,0300 O/H - - Mandor 0,0100 O/H - - Shear Connector 0,0500 Ls - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

22 1 M2 Wire Mesh M-10 (1 lapis)MK 10 (2,10 x 5,4 m) 0,0882 Lbr - - Pekerja 0,0596 O/H - - Tukang besi profil terampil 0,0596 O/H - - Kepala tukang besi profil 0,0060 O/H - - Mandor 0,0026 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

23 1 M2 Wire Mesh M-8 (1 lapis)MK 8 (2,10 x 5,4 m) 0,0882 Lbr - - Pekerja 0,0382 O/H - - Tukang besi profil terampil 0,0382 O/H - - Kepala tukang besi profil 0,0038 O/H - - Mandor 0,0016 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

24 1 M2 Wire Mesh M-4 (1 lapis) MK 4 (2,10 x 5,4 m) 0,0882 Lbr - - Pekerja 0,0096 O/H - - Tukang besi beton terampil 0,0096 O/H - - Kepala tukang besi beton 0,0010 O/H - - Mandor 0,0004 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

25 1 M2 Bekisting multiplex 9 mmKayu balok borneo super - 5/7 (2x pakai) 50% 0,0170 M3 - - Multiplek 9 mm 120x240 0,3470 Lbr - - Paku 1 s/d 3 cm 0,4000 Kg - -

Page 35: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

2Pekerja 0,1200 O/H - - Tukang kayu terampil 0,1500 O/H - - Kepala tukang kayu 0,1500 O/H - - Mandor 0,0500 O/H - - Tukang kayu setengah terampil 0,1200 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

26 1 M2 Stoot Werk 13,5000 Dolken 7 s/d 10 (2x pakai) 4,5000 Btg - - Kayu Papan Albasia (2x pakai) 0,0080 M3 - - Paku 5 s/d 7 cm 0,5000 Kg - - Pekerja 0,1500 O/H - - Tukang kayu terampil 0,2000 O/H - - Kepala tukang batu 0,2000 O/H - - Mandor 0,0170 O/H - -

Jumlah/m2 - Overhead + Profit - Jumlah - Dibulatkan -

27 1 M2 Form work system klm d. 60cm (9.137 m2) 4x 9,1370 A Girder GT-24 :

- Girder GT24 390cm 12,0000 sw/unit/2bln - - -

B Column Wale U100 SSRZ 116/151 :- Column Wale U100 SSRZ 116/151 6,0000 sw/unit/2bln - -

- C Accessories :

- Hook Strap HB 24-100/120 36,0000 sw/unit/2bln - - - Wedge KZ, Galv 12,0000 sw/unit/2bln - - - Tie Yoke SKZ 12,0000 sw/unit/2bln - - - Wingnut DW15, Galv 12,0000 sw/unit/2bln - - - Girder Headpiece GT24,Galv 4,0000 sw/unit/2bln - - - Wedge Headpiece 4,0000 sw/unit/2bln - - - Base Plate For RSS 4,0000 sw/unit/2bln - - - Push-Pull Prop RSS1 4,0000 sw/unit/2bln - - - Kicker AV 4,0000 sw/unit/2bln - - - Wedge K, Galv 4,0000 sw/unit/2bln - - - Scaffold Jack GB 80 4,0000 sw/unit/2bln - -

- D Tie Rod Accessories :

- Tie Rod DW15, L=1m 6,0000 sw/unit/2bln - - -

E Pin Accessories :- Pin 16x42, Galv 16,0000 sw/unit/2bln - - - Cotter Pin FS 4/1 Galv. 16,0000 sw/unit/2bln - -

- F Consumable Part :

- TSS-TORX 6x60, galv. 125,0000 bh - - - F.H Bolt M8x70 W.nut 72,0000 bh - - - Bit Point TX30 1,0000 bh - -

- G Upah Kerja 0,1500 lot - -

H Los 0,1500 lot - - Jumlah/unit - Jumlah/m2 1xpakai - Jumlah/m2 4xpakai - Overhead + Profit - Jumlah - Dibulatkan -

28 1 M1 Stoot Werk Blk 40x75 (14.2 m') 3x 14,2000 A Stoot Werk

Kayu balok borneo super - 6/12 0,0486 M3 - - Paku 8 s/d 15 cm 2,4000 Kg - -

- B Girder GT-24 :

- Girder GT24 390cm 4,0000 sw/unit/2bln - - - Girder GT24 150cm 2,0000 sw/unit/2bln - -

-

Page 36: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

2C Main Scaffolding :- Pola Frame 170 Galv 30,0000 sw/unit/2bln - - - Cross Brace 220 Galv 48,0000 sw/unit/2bln - - - Cross Brace 193 Galv 48,0000 sw/unit/2bln - - - Joint Pin 36 Galv 40,0000 sw/unit/2bln - - - Jack Base S60 Galv CPL 60,0000 sw/unit/2bln - - - U-Head Jack S60 Galv CPL 60,0000 sw/unit/2bln - - - Cross Head Jack S.60 CPL 4,0000 sw/unit/2bln - -

-

D Upah Kerja 0,1500 lot - -

E Los 0,1500 lot - - Jumlah/unit - Jumlah/m' - Overhead + Profit - Jumlah - Dibulatkan -

29 1 M1 Stoot Werk Blk 35x55 (4.5 m') 3x 4,5000 A Stoot Werk

Kayu balok borneo super - 6/12 0,0486 M3 - - Paku 8 s/d 15 cm 2,4000 Kg - -

- B Girder GT-24 :

- Girder GT24 300cm 4,0000 sw/unit/2bln - - -

C Main Scaffolding :- Pola Frame 170 Galv 6,0000 sw/unit/2bln - - - Cross Brace 220 Galv 6,0000 sw/unit/2bln - - - Cross Brace 193 Galv 6,0000 sw/unit/2bln - - - Joint Pin 36 Galv 8,0000 sw/unit/2bln - - - Jack Base S60 Galv CPL 4,0000 sw/unit/2bln - - - U-Head Jack S60 Galv CPL 4,0000 sw/unit/2bln - -

- D Upah Kerja 0,1500 Lot - -

E Los 0,1500 Lot - - Jumlah/unit - Jumlah/m' - Overhead + Profit - Jumlah - Dibulatkan -

30 1 M1 Stoot Werk Blk 35x75 (3 m') 3x 3,0000 A Stoot Werk

Kaso 6/12 Borneo 0,0486 M3 - - Paku 8 cm s/d 12 cm 2,4000 Kg - -

- B Girder GT-24 :

- Girder GT24 300cm 2,0000 sw/unit/2bln - - -

C Main Scaffolding :- Pola Frame 170 Galv 6,0000 sw/unit/2bln - - - Cross Brace 220 Galv 4,0000 sw/unit/2bln - - - Cross Brace 193 Galv 4,0000 sw/unit/2bln - - - Joint Pin 36 Galv 8,0000 sw/unit/2bln - - - Jack Base S60 Galv CPL 4,0000 sw/unit/2bln - - - U-Head Jack S60 Galv CPL 4,0000 sw/unit/2bln - -

- D Upah Kerja 0,1500 Lot - -

E Los 0,1500 Lot - - Jumlah/unit - Jumlah/m2 - Overhead + Profit - Jumlah - Dibulatkan -

Page 37: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

231 1 M1 Stoot Werk Blk 30x45 (3 m') 3xpakai 3,0000 A Stoot Werk

Kaso 6/12 Borneo 0,0194 M3 - - Paku 8 cm s/d 12 cm 0,9600 Kg - -

- B Girder GT-24 :

- Girder GT24 300cm 2,0000 sw/unit/2bln - - -

C Main Scaffolding :- Pola Frame 170 Galv 6,0000 sw/unit/2bln - - - Cross Brace 220 Galv 4,0000 sw/unit/2bln - - - Cross Brace 193 Galv 4,0000 sw/unit/2bln - - - Joint Pin 36 Galv 8,0000 sw/unit/2bln - - - Jack Base S60 Galv CPL 4,0000 sw/unit/2bln - - - U-Head Jack S60 Galv CPL 4,0000 sw/unit/2bln - -

- D Upah Kerja 0,1500 Lot - -

E Los 0,1500 Lot - - Jumlah/unit - Jumlah/m2 - Overhead + Profit - Jumlah - Dibulatkan -

32 1 M1 Stoot Werk Ring Blk 35x65 (9 m') 3x pakai 9,0000 A Stoot Werk

Kayu balok borneo super - 6/12 0,0486 M3 - - Paku 8 s/d 15 cm 2,4000 Kg - -

- B Girder GT-24 :

- Girder GT24 390cm 4,0000 sw/unit/2bln - - - Girder GT24 150cm 2,0000 sw/unit/2bln - -

- C Main Scaffolding :

- Pola Frame 170 Galv 30,0000 sw/unit/2bln - - - Cross Brace 220 Galv 48,0000 sw/unit/2bln - - - Cross Brace 193 Galv 48,0000 sw/unit/2bln - - - Joint Pin 36 Galv 40,0000 sw/unit/2bln - - - Jack Base S60 Galv CPL 20,0000 sw/unit/2bln - - - U-Head Jack S60 Galv CPL 20,0000 sw/unit/2bln - - - Cross Head Jack S.60 CPL 4,0000 sw/unit/2bln - -

- D Upah Kerja 0,1500 Lot - -

E Los 0,1500 Lot - - Jumlah/unit - Jumlah/m2 - Overhead + Profit - Jumlah - Dibulatkan -

33 1 M1 Stoot Werk Blk 25x65 (9 m') 3x 9,0000 A Stoot Werk

Kaso 6/12 Borneo 0,0288 M3 - - Paku 8 s/d 15 cm 0,9600 Kg - -

- B Girder GT-24 :

- Girder GT24 390cm 2,0000 sw/unit/2bln - - - Girder GT24 300cm 4,0000 sw/unit/2bln - - - Girder GT24 210cm 2,0000 sw/unit/2bln - -

- C Main Scaffolding :

- Pola Frame 170 Galv 30,0000 sw/unit/2bln - - - Cross Brace 220 Galv 48,0000 sw/unit/2bln - - - Cross Brace 193 Galv 48,0000 sw/unit/2bln - - - Joint Pin 36 Galv 40,0000 sw/unit/2bln - - - Jack Base S60 Galv CPL 20,0000 sw/unit/2bln - - - U-Head Jack S60 Galv CPL 20,0000 sw/unit/2bln - - - Cross Head Jack S.60 CPL 4,0000 sw/unit/2bln - -

- D Upah Kerja 0,1500 Lot - -

Page 38: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

2

E Los 0,1500 Lot - - Jumlah/unit - Jumlah/m' - Overhead + Profit - Jumlah - Dibulatkan -

34 1 M1 Stoot Werk Blk 35x40 (4.5m') 3x 4,5000 A Stoot Werk

Kaso 6/12 Borneo 0,0194 M3 - - Paku 8 s/d 15 cm 0,9600 Kg - -

- B Girder GT-24 :

- Girder GT24 300cm 2,0000 sw/unit/2bln - - -

C Main Scaffolding :- Pola Frame 170 Galv 6,0000 sw/unit/2bln - - - Cross Brace 220 Galv 6,0000 sw/unit/2bln - - - Cross Brace 193 Galv 6,0000 sw/unit/2bln - - - Joint Pin 36 Galv 8,0000 sw/unit/2bln - - - Jack Base S60 Galv CPL 4,0000 sw/unit/2bln - - - U-Head Jack S60 Galv CPL 4,0000 sw/unit/2bln - -

-

D Upah Kerja 0,1500 Lot - - Upah lt. 3 0,1200 Lot - -

E Los 0,1500 Lot 0 - Jumlah/unit - Jumlah/m2 -

35 1 M2 Bekisting Plat beton 2x pakai 17,1175 A Panel

Kayu balok borneo super - 5/7 (2x pakai) 50% 0,1236 M3 - - Multiplek 9 mm 120x240 3,0000 Lbr - - Paku 5 s/d 7 cm 6,8880 Kg - -

- B Stoot Werk

Kayu balok borneo super - 8/12 0,0787 M3 - - Paku 8 s/d 15 cm 0,4923 Kg - -

- C Skafolding (sewa)

Main frame MF-1217 4,0000 sw/unit/2bln - - Main frame MF-1219 4,0000 sw/unit/2bln - - Jack base BJ 60 8,0000 sw/unit/2bln - - Joint pin 42 8,0000 sw/unit/2bln - - Cross brace 1218 4,0000 sw/unit/2bln - - Head Jack 60 Bj-60 8,0000 sw/unit/2bln - -

-

D Upah kerja 0,1500 Lot - - Jumlah/unit - Jumlah/m2 - Overhead + Profit - Jumlah - Dibulatkan -

36 1 M2 Bekisting Plat beton 40,5000 - Hory Beam HB-14 4,0000 sw/unit/2bln - - - Pola Frame 190 Galv 6,0000 sw/unit/2bln - - - Cross Brace 220 Galv 8,0000 sw/unit/2bln - - - Joint Pin 36 Galv 6,0000 sw/unit/2bln - - - Jack Base S60 Galv CPL 6,0000 sw/unit/2bln - - - U-Head Jack S60 Galv CPL 3,0000 sw/unit/2bln - - - Girder GT24 390cm 1,0000 sw/unit/2bln - -

- Upah kerja 0,2000 Lot - - Jumlah/unit - Jumlah/m2 - Overhead + Profit - Jumlah - Dibulatkan -

Page 39: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

237 1 M1 Sloof praktis 10/15Beton site mix K-175 0,0150 M3 - - Besi beton terpasang d. 8 0,9875 Kg - - Besi beton terpasang d. 10 2,4800 Kg - - Bekisting multiplex 9 mm 0,3000 M2 - -

Jumlah - Dibulatkan -

C.1. LANTAI 1 (BETON PILE CAP, SLOOP, KOLOM SD ELEVA SI +4.50)

38 1 M3 Pile cap PC1 dan PC1AReadymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 102,0551 Kg - - Besi beton terpasang D. 16 46,3359 Kg - - Besi beton terpasang D. 13 10,1288 Kg - - Bekisting multiplex 9 mm 2,8924 M2 - -

Jumlah - Dibulatkan -

39 1 M3 Pek. Beton Pile Cap PC2Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 111,5920 Kg - - Besi beton terpasang D. 16 48,3113 Kg - - Besi beton terpasang D. 13 9,4753 Kg - - Bekisting multiplex 9 mm 3,4286 M2 - -

Jumlah - Dibulatkan -

40 1 M3 Pek. Beton Pile Cap PC4A (PC PITLIFT)Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 99,6272 Kg - - Besi beton terpasang D. 16 63,3240 Kg - - Bekisting multiplex 9 mm 1,1787 M2 - -

Jumlah - Dibulatkan -

41 1 M3 Pek. Beton Pile Cap PC3Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 77,5161 Kg - - Besi beton terpasang D. 16 37,0922 Kg - - Besi beton terpasang D. 13 8,2543 Kg - - Bekisting multiplex 9 mm 2,3080 M2 - -

Jumlah - Dibulatkan -

42 1 M3 Pek. Beton Pile Cap PC4Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 95,8097 Kg - - Besi beton terpasang D. 16 42,1043 Kg - - Besi beton terpasang D. 13 10,4349 Kg - - Bekisting multiplex 9 mm 3,2468 M2 - -

Jumlah - Dibulatkan -

43 1 M3 Pek. Tie Beam TB1:400x750Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 138,1130 Kg - - Besi beton terpasang D. 13 6,9056 Kg - - Besi beton terpasang D. 10 24,5309 Kg - - Bekisting multiplex 9 mm 5,0000 M2 - -

Jumlah - Dibulatkan -

44 1 M3 Pek. Tie Beam TB2:250x400Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 16 140,5744 Kg - - Besi beton terpasang D. 13 20,7169 Kg - - Besi beton terpasang D. 10 41,5959 Kg - - Bekisting multiplex 9 mm 8,0000 M2 - -

Jumlah - Dibulatkan -

Page 40: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

245 1 M3 Pek. Tie Beam TB3:200x400Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 16 121,7710 Kg - - Besi beton terpasang D. 13 25,8962 Kg - - Besi beton terpasang D. 10 47,9953 Kg - - Bekisting multiplex 9 mm 10,0000 M2 - -

Jumlah - Dibulatkan -

46 1 M3 Pek. Kolom 1K1; D600Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 290,1149 Kg - - Besi beton terpasang D. 10 34,5261 Kg - - Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -

Jumlah - Dibulatkan -

47 1 M3 Pek. Kolom 1K2; D600Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 243,8466 Kg - - Besi beton terpasang D. 10 34,5261 Kg - - Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -

Jumlah - Dibulatkan -

48 1 M3 Pek. Kolom 1K3; 300X300Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 16 153,9426 Kg - - Besi beton terpasang D. 10 54,8033 Kg - - Bekisting; Multiplek 9mm+stootwerk 13,3333 M2 - -

Jumlah - Dibulatkan -

49 1 M3 Pek. Kolom K2A; 300X400Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 16 115,4569 Kg - - Besi beton terpasang D. 10 47,9529 Kg - - Bekisting; Multiplek 9mm+stootwerk 11,6667 M2 - -

Jumlah - Dibulatkan -

50 1 M3 Plat lantai t. 10 cm elv -0,05Readymix K-250 1,0000 M3 - - Besi beton terpasang D. 10 106,1815 Kg - -

Jumlah - Dibulatkan -

51 1 M3 Plat beton tangga t=15 cmReadymix K-300 1,0000 M3 - - Besi beton terpasang D. 13 100,4726 Kg - - Besi beton terpasang D. 10 51,4320 Kg - - Besi beton terpasang d. 8 86,6156 Kg - - Bekisting multiplex 9 mm 4,9732 M2 - - Stoot Werk 2,4866 M2 - -

Jumlah - Dibulatkan -

52 1 M3 Pek. Balok Bordes B4K:250x500 Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 131,2028 Kg - - Besi beton terpasang D. 13 16,5736 Kg - - Besi beton terpasang D. 10 44,7956 Kg - - Bekisting multiplex 9 mm 10,8571 M2 - - Stoot Werk 5,4286 M2 - -

Jumlah - Dibulatkan -

53 1 M3 Pek. Pondasi Ramp Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 13 160,1006 Kg - - Bekisting multiplex 9 mm 19,1667 M2 - -

Jumlah - Dibulatkan -

Page 41: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

254 1 M3 Pek. Balok Ramp B:250x400 Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 144,9221 Kg - - Besi beton terpasang D. 13 21,3577 Kg - - Besi beton terpasang D. 10 42,8824 Kg - - Bekisting multiplex 9 mm 10,0042 M2 - -

Jumlah - Dibulatkan -

55 1 M3 Pek. Pelat Lantai t=12cmReadymix K-300 1,0000 M3 - - Besi beton terpasang D. 10 116,7996 Kg - - Bekisting multiplex 9 mm 1,6667 M2 - -

Jumlah - Dibulatkan -

56 1 M3 Pek. Dinding Pit Lift :Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 13 132,3498 Kg - - Bekisting multiplex 9 mm 8,0000 M2 - -

Jumlah - Dibulatkan -

57 1 M3 Pek. Kolom Lift :Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 16 173,1854 Kg - - Besi beton terpasang D. 10 41,1025 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,3333 M2 - -

Jumlah - Dibulatkan -

58 1 M3 Pek. Balok Separator dan Balok Hosting Hook; B:200x300Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 16 108,2409 Kg - - Besi beton terpasang d. 8 43,8427 Kg - - Bekisting; Multiplek 9mm+stootwerk 13,3333 M2 - -

Jumlah - Dibulatkan -

C.2. LANTAI 2 (ELEVASI +4.50 SD +10.50) A. ELEVASI +4.50 + 10.50

59 1 M3 Pek. Kolom 2K1; D600Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 250,0991 Kg - - Besi beton terpasang D. 10 34,5261 Kg - - Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -

Jumlah - Dibulatkan -

60 1 M3 Pek. Kolom 2K2; D600Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 203,2055 Kg - - Besi beton terpasang D. 10 34,5261 Kg - - Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -

Jumlah - Dibulatkan -

61 1 M3 Pek. Kolom 2K3; 300X300Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 16 153,9426 Kg - - Besi beton terpasang D. 10 54,8033 Kg - - Bekisting; Multiplek 9mm+stootwerk 13,3333 M2 - -

Jumlah - Dibulatkan -

62 1 M3 Pek. Kolom K2A; 300X400Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 16 115,4569 Kg - - Besi beton terpasang D. 10 47,9529 Kg - - Bekisting; Multiplek 9mm+stootwerk 11,6667 M2 - -

Jumlah - Dibulatkan -

Page 42: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

2

B. ELEVASI +4.50 (LANTAI-2)

63 1 M3 Pek. Balok B1:400x750Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 110,4904 Kg - - Besi beton terpasang D. 13 6,9056 Kg - - Besi beton terpasang D. 10 28,6194 Kg - - Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -

Jumlah - Dibulatkan -

64 1 M3 Pek. Balok B1K:400x750Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 110,4904 Kg - - Besi beton terpasang D. 13 6,9056 Kg - - Besi beton terpasang D. 10 28,6194 Kg - - Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -

Jumlah - Dibulatkan -

65 1 M3 Pek. Balok B2:300x450Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 22 104,1292 Kg - - Besi beton terpasang D. 13 15,3459 Kg - - Besi beton terpasang D. 10 35,5521 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,8889 M2 - - Stoot Werk Blk 30x45 (3 m') 3xpakai 4,4444 M2 - -

Jumlah - Dibulatkan -

66 1 M3 Pek. Balok B3:300x650Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 22 97,3892 Kg - - Besi beton terpasang D. 13 10,6241 Kg - - Besi beton terpasang D. 10 31,1764 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,2051 M2 - - Stoot Werk Blk 30x60 (4.5 m') 3x 4,1026 M2 - -

Jumlah - Dibulatkan -

67 1 M3 Pek. Balok BL:300x450+100X550Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 73,9865 Kg - - Besi beton terpasang D. 13 10,9037 Kg - - Besi beton terpasang D. 10 65,5725 Kg - - Bekisting; Multiplek 9mm+stootwerk 9,0000 M2 - - Stoot Werk Blk 30x45 (3 m') 3xpakai 5,7000 M2 - -

Jumlah - Dibulatkan -

68 1 M3 Pek. Balok B1L:400x750+200X250Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 94,7060 Kg - - Besi beton terpasang D. 13 5,9191 Kg - - Besi beton terpasang D. 10 36,0917 Kg - - Besi beton terpasang D. 16 9,2778 Kg - - Bekisting; Multiplek 9mm+stootwerk 6,8571 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,4286 M2 - -

Jumlah - Dibulatkan -

69 1 M3 Pek. Balok B1K:400x750+200X250Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 94,7060 Kg - - Besi beton terpasang D. 13 5,9191 Kg - - Besi beton terpasang D. 10 36,0917 Kg - - Besi beton terpasang D. 16 9,2778 Kg - - Bekisting; Multiplek 9mm+stootwerk 6,8571 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -

Jumlah - Dibulatkan -

Page 43: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

270 1 M3 Pek. Pelat Lantai t=12cm (selasar)Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 10 155,7328 M2 - - Bekisting Plat beton 2x pakai 8,3333 M2 - -

Jumlah - Dibulatkan -

71 1 M3 Pek. Pelat Lantai t=15cmReadymix K-300 1,0000 M3 - - Besi beton terpasang D. 10 124,5863 Kg - - Bekisting Plat beton 2x pakai 6,6667 M2 - -

Jumlah - Dibulatkan -

72 1 M3 Plat beton tangga t=15cm AS-4/E, I; AS-6/D, JReadymix K-300 1,0000 M3 - - Besi beton terpasang D. 13 100,4726 Kg - - Besi beton terpasang D. 10 51,4320 Kg - - Besi beton terpasang d. 8 86,6156 Kg - - Bekisting multiplex 9 mm 4,9732 M2 - - Stoot Werk 2,4866 M2 - -

Jumlah - Dibulatkan -

73 1 M3 Pek. Balok Bordes B4K:250x500 Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 131,2028 Kg - - Besi beton terpasang D. 13 16,5736 Kg - - Besi beton terpasang D. 10 44,7956 Kg - - Bekisting multiplex 9 mm 10,8571 M2 - - Stoot Werk 5,4286 M2 - -

Jumlah - Dibulatkan -

C. LANTAI 2 (ELEVASI +4.50 PANGGUNG)

74 1 M3 Pek. Balok B1:400x750Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 110,4904 Kg - - Besi beton terpasang D. 13 6,9056 Kg - - Besi beton terpasang D. 10 28,6194 Kg - - Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -

Jumlah - Dibulatkan -

75 1 M3 Pek. Balok B2:300x450Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 22 104,1292 Kg - - Besi beton terpasang D. 13 15,3459 Kg - - Besi beton terpasang D. 10 35,5521 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,8889 M2 - - Stoot Werk Blk 30x45 (3 m') 3xpakai 4,4444 M2 - -

Jumlah - Dibulatkan -

76 1 M3 Pek. Balok B3:300x650Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 22 97,3892 Kg - - Besi beton terpasang D. 13 10,6241 Kg - - Besi beton terpasang D. 10 31,1764 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,2051 M2 - - Stoot Werk Blk 30x60 (4.5 m') 3x 4,1026 M2 - -

Jumlah - Dibulatkan -

77 1 M3 Pek. Balok B4:250x500Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 96,9479 Kg - - Besi beton terpasang D. 13 14,2875 Kg - - Besi beton terpasang D. 10 33,1002 Kg - - Bekisting; Multiplek 9mm+stootwerk 10,0000 M2 - - Stoot Werk Blk 25x50 (4.5m') 3x 5,0000 M2 - -

Jumlah - Dibulatkan -

Page 44: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

278 1 M3 Pek. Pelat Lantai t=15cm Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 10 124,5863 Kg - - Bekisting Plat beton 2x pakai 6,6667 M2 - -

Jumlah - Dibulatkan -

79 1 M3 Pek. Plat beton tangga AS-G/1; TANGGA AS-I/2Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 13 100,4726 Kg - - Besi beton terpasang D. 10 51,4320 Kg - - Besi beton terpasang d. 8 86,6156 Kg - - Bekisting multiplex 9 mm 4,9732 M2 - - Stoot Werk 2,4866 M2 - -

Jumlah - Dibulatkan -

80 1 M3 Pek. Balok Bordes B4K:250x500 Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 131,2028 Kg - - Besi beton terpasang D. 13 16,5736 Kg - - Besi beton terpasang D. 10 44,7956 Kg - - Bekisting multiplex 9 mm 10,8571 M2 - - Stoot Werk 5,4286 M2 - -

Jumlah - Dibulatkan -

D. LANTAI 2 (ELEVASI +4.50 s/d +6.80 TRIBUN)

81 1 M3 Pek. Balok B1:400x750Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 110,4904 Kg - - Besi beton terpasang D. 13 6,9056 Kg - - Besi beton terpasang D. 10 28,6194 Kg - - Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -

Jumlah - Dibulatkan -

82 1 M3 Pek. Balok B2:300x450Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 22 104,1292 Kg - - Besi beton terpasang D. 13 15,3459 Kg - - Besi beton terpasang D. 10 35,5521 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,8889 M2 - - Stoot Werk Blk 30x45 (3 m') 3xpakai 4,4444 M2 - -

Jumlah - Dibulatkan -

83 1 M3 Pek. Balok B3:300x650Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 22 97,3892 Kg - - Besi beton terpasang D. 13 10,6241 Kg - - Besi beton terpasang D. 10 31,1764 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,2051 M2 - - Stoot Werk Ring Blk 30x65 (9 m') 3x pakai 4,1026 M2 - -

Jumlah - Dibulatkan -

84 1 M3 Pek. Pelat Lantai t=15cm Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 10 124,5863 Kg - - Bekisting Plat beton 2x pakai 6,6667 M2 - -

Jumlah - Dibulatkan -

85 1 M3 Pek. Pelat Lantai Trap TribunReadymix K-300 1,00 M3 - - Besi beton terpasang D. 10 126,25 Kg - - Bekisting Plat beton 2x pakai 0,68 M2 - -

Jumlah - Dibulatkan -

Page 45: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

286 1 M3 Pek. Plat beton ; TANGGA AS-E/9; TANGGA AS-D/8Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 13 100,4726 Kg - - Besi beton terpasang D. 10 51,4320 Kg - - Besi beton terpasang d. 8 86,6156 Kg - - Bekisting multiplex 9 mm 6,2414 M2 - - Stoot Werk 3,1207 M2 - -

Jumlah - Dibulatkan -

87 1 M3 Pek. Balok Bordes B4K:250x500 Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 131,2028 Kg - - Besi beton terpasang D. 13 16,5736 Kg - - Besi beton terpasang D. 10 44,7956 Kg - - Bekisting multiplex 9 mm 10,8571 M2 - - Stoot Werk 5,4286 M2 - -

Jumlah - Dibulatkan -

88 1 M3 Pek. Plat beton ; TANGGA AS-G/10Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 13 38,3380 Kg - - Besi beton terpasang D. 10 19,6252 Kg - - Besi beton terpasang d. 8 23,9229 Kg - - Bekisting multiplex 9 mm 2,5209 M2 - - Stoot Werk 1,2605 M2 - -

Jumlah - Dibulatkan -

89 1 M3 Pek. Balok Bordes B4K:250x500 Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 125,9547 Kg - - Besi beton terpasang D. 13 15,9106 Kg - - Besi beton terpasang D. 10 43,0038 Kg - - Bekisting multiplex 9 mm 10,4229 M2 - - Stoot Werk 5,2114 M2 - -

Jumlah - Dibulatkan -

C.3. PEKERJAAN BETON LANTAI-3 (ELEV +10.50 SD +12.10 )A ELEVASI +10.50 SD +12.10

90 1 M3 Pek. Kolom 2K1; D600Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 250,0991 Kg - - Besi beton terpasang D. 10 34,5261 Kg - - Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -

Jumlah - Dibulatkan -

91 1 M3 Pek. Kolom 2K2; D600Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 203,2055 Kg - - Besi beton terpasang D. 10 34,5261 Kg - - Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -

Jumlah - Dibulatkan -

92 1 M3 Pek. Kolom K4; 400X400Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 124,9550 Kg - - Besi beton terpasang D. 10 41,1025 Kg - - Bekisting; Multiplek 9mm+stootwerk 10,0000 M2 - -

Jumlah - Dibulatkan -

93 1 M3 Pek. Kolom K5; 300X400Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 115,4569 Kg - - Besi beton terpasang D. 10 47,9529 Kg - - Bekisting; Multiplek 9mm+stootwerk 11,6667 M2 - -

Jumlah - Dibulatkan -

Page 46: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

2

B ELEVASI +10.50 (LANTAI-3)

94 1 M3 Pek. Balok B1:400x750Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 110,4904 Kg - - Besi beton terpasang D. 13 6,9056 Kg - - Besi beton terpasang D. 10 28,6194 Kg - - Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -

Jumlah - Dibulatkan -

95 1 M3 Pek. Balok B1K:400x750Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 122,3383 Kg - - Besi beton terpasang D. 13 7,6461 Kg - - Besi beton terpasang D. 10 31,6883 Kg - - Bekisting; Multiplek 9mm+stootwerk 7,0125 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,5062 M2 - -

Jumlah - Dibulatkan -

96 1 M3 Pek. Balok B2:300x450Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 102,0104 Kg - - Besi beton terpasang D. 13 15,0336 Kg - - Besi beton terpasang D. 10 34,8286 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,7080 M2 - - Stoot Werk Blk 30x45 (3 m') 3xpakai 4,3540 M2 - -

Jumlah - Dibulatkan -

97 1 M3 Pek. Balok B3:300x650Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 22 97,3892 Kg - - Besi beton terpasang D. 13 10,6241 Kg - - Besi beton terpasang D. 10 31,1764 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,2051 M2 - - Stoot Werk Ring Blk 30x65 (9 m') 3x pakai 4,1026 M2 - -

Jumlah - Dibulatkan -

98 1 M3 Pek. Balok B4:250x500Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 96,9479 Kg - - Besi beton terpasang D. 13 14,2875 Kg - - Besi beton terpasang D. 10 33,1002 Kg - - Bekisting; Multiplek 9mm+stootwerk 10,0000 M2 - - Stoot Werk Blk 25x50 (4.5m') 3x 5,0000 M2 - -

Jumlah - Dibulatkan -

99 1 M3 Pek. Balok BL:300x450+100X550Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 73,9865 Kg - - Besi beton terpasang D. 13 10,9037 Kg - - Besi beton terpasang D. 10 65,5725 Kg - - Bekisting; Multiplek 9mm+stootwerk 9,0000 M2 - - Stoot Werk Blk 30x45 (3 m') 3xpakai 5,7000 M2 - -

Jumlah - Dibulatkan -

100 1 M3 Pek. Balok B1:400x750+200X1250Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 63,1374 Kg - - Besi beton terpasang D. 13 3,9461 Kg - - Besi beton terpasang D. 10 46,2596 Kg - - Besi beton terpasang D. 16 8,3500 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,2857 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 4,1429 M2 - -

Jumlah - Dibulatkan -

Page 47: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

2101 1 M3 Pek. Balok B1:400x750+200X1250Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 94,7060 Kg - - Besi beton terpasang D. 13 5,9191 Kg - - Besi beton terpasang D. 10 36,0917 Kg - - Besi beton terpasang D. 16 9,2778 Kg - - Bekisting; Multiplek 9mm+stootwerk 7,4286 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,7143 M2 - -

Jumlah - Dibulatkan -

102 1 M3 Pek. Pelat Lantai t=12cm (dak)Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 10 155,7328 M2 - - Bekisting Plat beton 2x pakai 8,3333 M2 - -

Jumlah - Dibulatkan -

103 1 M3 Pek. Pelat Lantai t=15cmReadymix K-300 1,0000 M3 - - Besi beton terpasang D. 10 124,5863 Kg - - Bekisting Plat beton 2x pakai 6,6667 M2 - -

Jumlah - Dibulatkan -

C ELEVASI +11.30 (TRIBUN VIP)

104 1 M3 Pek. Balok B1:400x750Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 110,4904 Kg - - Besi beton terpasang D. 13 6,9056 Kg - - Besi beton terpasang D. 10 28,6194 Kg - - Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -

Jumlah - Dibulatkan -

105 1 M3 Pek. Balok B1K:400x750Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 110,4904 Kg - - Besi beton terpasang D. 13 6,9056 Kg - - Besi beton terpasang D. 10 28,6194 Kg - - Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -

Jumlah - Dibulatkan -

106 1 M3 Pek. Balok B2:300x450Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 102,0104 Kg - - Besi beton terpasang D. 13 15,0336 Kg - - Besi beton terpasang D. 10 34,8286 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,7080 M2 - - Stoot Werk Blk 30x45 (3 m') 3xpakai 4,3540 M2 - -

Jumlah - Dibulatkan -

107 1 M3 Pek. Balok B3:300x650Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 22 97,3892 Kg - - Besi beton terpasang D. 13 10,6241 Kg - - Besi beton terpasang D. 10 31,1764 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,2051 M2 - - Stoot Werk Ring Blk 30x65 (9 m') 3x pakai 4,1026 M2 - -

Jumlah - Dibulatkan -

108 1 M3 Pek. Balok BL:150x1000Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 13 41,4339 Kg - - Besi beton terpasang d. 8 139,2590 Kg - - Bekisting; Multiplek 9mm+stootwerk 14,3333 M2 - - Stoot Werk Blk 15x100 (14.2 m') 3x 7,1667 M2 - -

- - Dibulatkan -

Page 48: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

2109 1 M3 Pek. Pelat Lantai t=15cmReadymix K-300 1,0000 M3 - - Besi beton terpasang D. 10 124,5863 Kg - - Bekisting Plat beton 2x pakai 6,6667 M2 - -

Jumlah - Dibulatkan -

110 1 M3 Pek. Pelat Lantai Trap TribunReadymix K-300 1,0000 M3 - - Besi beton terpasang d. 8 126,2474 Kg - - Bekisting Plat beton 2x pakai 1,6866 M2 - -

Jumlah - Dibulatkan -

C.4. PEKERJAAN BETON ATAP/RING BALOK (ELEV +12.10 SD +TOP)A KOLOM ELEVASI +12.10 SD TOP

111 1 M3 Pek. Kolom 2K1; D600Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 250,0991 Kg - - Besi beton terpasang D. 10 34,5261 Kg - - Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -

Jumlah - Dibulatkan -

112 1 M3 Pek. Kolom 2K2; D600Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 203,2055 Kg - - Besi beton terpasang D. 10 34,5261 Kg - - Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -

Jumlah - Dibulatkan -

113 1 M3 Pek. Kolom K5; 300X400Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 115,4569 Kg - - Besi beton terpasang D. 10 47,9529 Kg - - Bekisting; Multiplek 9mm+stootwerk 11,6667 M2 - -

Jumlah - Dibulatkan -

B BALOK ELEVASI +10.50 SD. +21.000

114 1 M3 Pek. Balok B1:400x750Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 25 110,4904 Kg - - Besi beton terpasang D. 13 6,9056 Kg - - Besi beton terpasang D. 10 28,6194 Kg - - Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - - Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -

Jumlah - Dibulatkan -

115 1 M3 Pek. Balok B2:300x450Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 104,1292 Kg - - Besi beton terpasang D. 13 15,3459 Kg - - Besi beton terpasang D. 10 35,5521 Kg - - Bekisting; Multiplek 9mm+stootwerk 8,8889 M2 - - Stoot Werk Blk 30x45 (3 m') 3xpakai 4,4444 M2 - -

Jumlah - Dibulatkan -

116 1 M3 Pek. Balok B5:250x400Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 19 140,5744 Kg - - Besi beton terpasang D. 13 20,7169 Kg - - Besi beton terpasang D. 10 41,5959 Kg - - Bekisting; Multiplek 9mm+stootwerk 10,5000 M2 - - Stoot Werk Blk 25x40 (3 m') 3xpakai 5,2500 M2 - -

Jumlah - Dibulatkan -

Page 49: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

2117 1 M3 Pek. Balok BR:150x300Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 16 69,5834 Kg - - Besi beton terpasang D. 10 34,2823 Kg - - Bekisting; Multiplek 9mm+stootwerk 16,6667 M2 - - Stoot Werk Blk 15x40 (3 m') 3xpakai 8,3333 M2 - -

Jumlah - Dibulatkan -

118 1 M3 Pek. Pelat Lantai t=15cm (Ruang Mesin Lift).Readymix K-300 1,0000 M3 - - Besi beton terpasang D. 10 124,5863 Kg - - Bekisting Plat beton 2x pakai 6,6667 M2 - -

Jumlah - Dibulatkan -

Page 50: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

A PENGGUNAAN ALAT BERAT RENCANA ANGGARAN PEMBUATAN PROYEK

No Armadada jam HARGA MINYAK UANG MAKAN TOTAL

1 DAM TRUK 1 - 2 EXCAVATOR PC 200 1 - 3 BULLDOZER 1 -

-

B PENGGUNAAN ALAT / ITEM PEKERJAAN

No ARMADA UNIT JAM HARGA

Rp MUATAN SAT RIT

1 DAM TRUK 1 1,00 11,00 M3 52 EXCAVATOR PC 200 1 1,00 3 DOZER 1 1,00 4 TOTAL UNIT 35 Vibra/Stoom 5

-

C STRIPING MUATAN/PENDAPAT1 DOZER 1 8,00 - 1.200,00

D

No TOTAL VOLUME PEMBULATAN

1 Pekerjaan Cut and Fill 55 -

-

URAIAN PEKERJAAN TOTAL HARGA

Rp

Jumlah Pekerjaan Cut and Fill/m3

1 M3 PEKERJAAN CUT AND FILL MENGGUNAKAN ALAT BERAT

Page 51: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Harga Satuan

1 M2 Bata Merah tebal 1/2 bata, 1 Pc : 5 Ps - 2 M2 Screeding t. 2 cm (MU 440) - 3 M1 Kolom Praktis 10x10 - 4 M1 Balok lintel 10x15 - 5 M1 Railing selasar besi pipa hitam finishing cat - 6 M1 Railing tangga entrance dan tangga auditorium, satinless steel - 7 M1 Hand Railing tangga entrance dan tangga auditorium, satinless steel - 8 M2 Genteng keramik berglazur, setara M-Class/Kanmuri/KIA - 9 M1 Bubungan Genteng keramik berglazur, setara M-Class/Kanmuri/KIA - 10 M2 Alumunium foil satu muka - 11 Unit Sun screen Panellux (1.11 x 1.9) - 12 M1 Dudukan sun screen C 100x50x2,3 & cat besi - 13 M2 Dinding granite homogenous tile 40x40 cm polished - 14 M2 Dinding granite homogenous tile 60x120 cm polished - 15 M2 Lantai granite homogenous tile 40x40 cm unpolished - 16 M2 Lantai granite homogenous tile 60x60 cm polished - 17 M2 Lantai granite homogenous tile 60x60 cm polished berpola - 18 M1 Border granit ukuran (10 x 60) cm - 19 M1 Step nosing/plint granito ukuran (8 x 60) cm - 20 M2 Granite alam slab tebal 2 cm uk. 60x120 cm (meja washtafel) - 21 M2 Granite alam slab tebal 2 cm uk. 60x120 cm (dinding entrance) - 22 M2 Lantai parkit kayu merbau ukuran 9 x 60 cm tebal 1,5 cm - 23 M2 Pas. Paving Block Natural Tbl. 6 cm - 24 M2 Pas. Batako PC pres 10x20x40 ad 1:4 - 25 M2 Dinding hebel t 10 cm + MU 380 - 26 M2 Plesteran dinding MU 100 t. 10 mm - 27 M2 Acian MU 200 t. 3 mm - 28 M2 Rockwool tebal 5 cm dinding samping kanan, kiri dan belakang 29 M2 Rangka hollou galvanis 40x40 mm, tebal 1,5 mm - 30 M2 Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL - 31 M2 Pelapis dinding multiplek 9 mm, triplex 4 mm + HPL rangka hollou galvanis 4x4 cm - 32 M2 Pelapis dinding walpaper (samping kanan, kiri dan belakang) - 33 M2 Beakdrop Auditorium (rangka hollou galvanis 4/4, triplex 12 mm, triplex 4 mm + HPL+ lampu + screen) - 34 M2 Ornamen dinding (rangka hollou galvanis 4/4, triplex 9 mm, triplex 4 mm + HPL) - 35 Unit Ornamen kolom pintu utama (rangka hollou galvanis 4/4, triplex 9 mm, triplex 4 mm + HPL), Type 1 - 36 Unit Ornamen kolom pintu utama (rangka hollou galvanis 4/4, triplex 9 mm, triplex 4 mm + HPL), Type 2 - 37 M2 Waterproofing MU 600 - 38 M2 Water proofing membran bakar - 39 M2 Plafond GRC 4 mm, rangka hollou galvalume 40x40+20x40 mm - 40 M2 Plafond gypsum board, rangka hollou galvalume 40x40+20x40 mm - 41 M2 Plafond multiplex 9 mm + triplex 4 mm finishing HPL, rangka hollou galvalume 40x40 mm - 42 M2 Listplang multiplex 9 mm + triplex 4 mm finishing HPL, rangka hollou galvalume 40x40 mm - 43 M2 Penutup listplang multiplex 9 mm + triplex 4 mm finishing HPL - 44 M1 Lisplang GRC uk 3000x300x12 mm - 45 M2 Cat dinding exterior dengan Weathersield, setara Dulux/Mowilex/Jotun - 46 M2 Cat dinding interior, setara Dulux/Mowilex/Jotun - 47 M2 Cat plafond gypsum interior, setara Dulux/Mowilex/Jotun - 48 M2 Cat plafond GRC overstek exterior dengan Weathersield, setara Dulux/Mowilex/Jotun - 49 M2 Cat permukaan baja dengan meni besi - 50 M2 Pengecatan permukaan baja - 51 M2 Pengecatan talang - 52 M2 Pengecatan kayu (3x) berikut meni - 53 M2 Pelaburan Bidang Kayu dengan Politur - 54 M1 Listplank + Talang metal 30/30 - 55 Unit Talang Tegak Type 1 (PVC 6" AW + cat) - 56 Unit Talang Tegak Type 2 (PVC 6" AW + cat) - 57 KG Besi profil WF - 58 KG Besi profil C - 59 Unit PU1 (PK) - 60 Unit PU2 (PK) - 61 Unit PU3 (PT) - 62 Unit PJ1 (PA) - 63 Unit P1 (PM) - 64 Unit P2 (PM) - 65 Unit P3 (PA) - 66 Unit P4 (PA) - 67 Unit J1 (JA) - 68 Unit J2 (JA) - 69 Unit J3 (JA) -

Item Pekerjaan

DAFTAR HARGA SATUAN PEKERJAAN ARSITEKTUR

Page 52: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Harga SatuanItem Pekerjaan

70 Unit J4 (JA) - 71 Unit J5 (JA) - 72 Unit J6 (JA) - 73 Unit PS1 (JM) - 74 Unit PS2 (JM) - 75 Unit BV1 (JA) - 76 Unit BV2 (JA) - 77 Unit BV3 (JA) - 78 M2 Pasang kaca tempered 10 mm (ASAHI) - 79 M2 Pasang Allumunium Composite Panel (ACP), setara ALCOPAN/MACO/SEVEN -

80 M2Pas. Follding Gate Hollow frame 5 x 5, meranti wood inside, multiplek 1,5 mm, glasswoll 50mm/ rokwoll, Accourete sound reduce 3 mm, cotton sheet 3 mm, finishing cosglow/wallpaper/oscar/Hpl dll. (Pabrikasi), setara WINA/LUCKY

-

81 M1 Saluran keliling bangunan 60x60 - 82 M1 Beton decker t. 6 cm (45X70) - 83 M3 Beton decker t. 20 cm - 84 M2 Plesteran Siar adk. 1pc : 2ps batu belah - 85 M2 Plesteran adk. 1pc : 4ps - 86 M2 Acian Plesteran - 87 M1 Meja beton - 88 Bh Closet Duduk (Flashing), setara TOTO - 89 Bh Closet jongkok (Flashing), setara TOTO - 90 Bh Washtafel Toilet Pria/Wanita, setara TOTO - 91 Unit Kitchen Zink Stainless ( 1 Lobang ) - 92 Bh Urinoir TOTO U 57M - 93 Bh Sekat urinoir TOTO - 94 Bh Jet Whoser + stopkran + kran air Lengkap ACC, setara TOTO - 95 Bh Kran dinding TOTO T23 B13 - 96 Bh Kran bebek TOTO T30 ARQ 13N - 97 Bh Floordrain Stailes Steel, setara SUN-EI - 98 Bh Roof drain Stailes Steel, setara SUN-EI - 99 Bh Cermin TOTO TS 119 AS 5 - 100 Titik Pasangan Sulingan Pipa PVC type AW 2" WAVIN + Ijuk -

Bogor, ..................... 2018Kontraktor,PT,.................................

Cap & Tanda Tangan

NAMAJabatan

Page 53: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

1 1 M2 Bata Merah tebal 1/2 bata, 1 Pc : 5 PsBata merah bakar kelas I 70,0000 Bh - - PC 9,6800 Kg - - Pasir pasang 0,0450 M3 - - Pekerja 0,3200 O/H - - Tukang batu terampil 0,1000 O/H - - Kepala tukang batu 0,0100 O/H - - Mandor 0,0150 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

2 1 M2 Screeding t. 2 cm (MU 440)MU 440 - perata lantai/1,2 m2 (40 kg) 0,8333 Zak - - Pekerja 0,0495 O/H - - Tukang batu terampil 0,0075 O/H - - Kepala tukang batu 0,0008 O/H - - Mandor 0,0024 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

3 1 M1 Kolom Praktis 10x10Beton site mix K-175 0,0100 M3 - - Besi beton terpasang < d 12 d. 8 0,7900 Kg - - Besi beton terpasang < d 12 d. 10 2,4800 Kg - - Bekisting multiplex 9 mm 0,2000 M2 - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

4 1 M1 Balok lintel 10x15Beton site mix K-175 0,0150 M3 - - Besi beton terpasang < d 12 d. 8 0,9875 Kg - - Besi beton terpasang < d 12 d. 10 2,4800 Kg - - Bekisting multiplex 9 mm 0,3000 M2 - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

5 1 M1 Railing selasar pipa hitam finishing catPipa GIP Medium A d. 2" 0,1100 Btg - - Pipa GIP Medium A d. 1 1/2" 0,3670 Btg - - Cat permukaan baja dengan meni besi 0,3630 M2 - - Cat besi 0,3000 Kg - - Tukang besi profil terampil 0,0250 O/H - - Pekerja 0,2500 O/H - - Kepala tukang besi profil 0,0250 O/H - - Mandor 0,0010 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

6 1 M1 Railing besi pipa stainless steel Besi Pipa Stainless steel 2,5" 1,0000 M1 - - Besi Pipa Stainless steel 1,5" 2,0000 M1 - - Besi Pipa Stainless steel 1" 1,8000 M1 - - Upah Kerja pengelasan dan peralatan bantu 97,4400 CM - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

7 1 M1 Hand railing besi pipa stainless steel Besi Pipa Stainless steel 2,5" 1,0000 M1 - - Besi Pipa Stainless steel 1" 0,5000 M1 - - Upah Kerja pengelasan dan peralatan bantu 33,0400 CM - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

8 1 M2 Genteng keramik berglazur, setara M-Class/Kanmuri/KIAGenteng keramik glazur, setara M-Class/Kanmuri/KIA 13,6000 M2 - - Pekerja 0,1500 Kg - - Tukang Kayu 0,0750 O/H - - Kepala tukang 0,0080 O/H - - Mandor 0,0080 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

9 1 M1 Bubungan Genteng keramik berglazur, setara M-Class/Kanmuri/KIABubungan Genteng keramik berglazur, setara M-Class/Kanmuri/KIA 3,8000 Bh - - Semen Portland 8,0000 Kg - - Pasir pasang 0,0320 M3 - -

Item Pekerjaan

2

ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR

Page 54: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

2Pekerja 0,4000 HO - - Tukang kayu 0,2000 HO - - Kepala tukang 0,0200 HO - - Mandor 0,0020 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

10 1 M2 Alumunium foil satu muka Alumunium foil satu muka 1,1000 M2 - - Pekerja 0,1500 HO - - Tukang kayu terampil 0,0500 HO - - Kepala tukang kayu 0,0050 HO - - Mandor 0,0080 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

11 1 Unit Sun screen Panellux (1.11 x 1.9)Panellux sun screen 26,0000 M1 - - Stringer SL-1 @3m 2,0000 M1 - - Upah pasang 0,1000 M2 - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

12 1 M1 Dudukan sun screen C 100x50x2,3 & cat besiBesi profil canal C 4,4730 Kg - - Plat t. 2 mm 1,6220 Kg - - Meni kayu/besi 0,3250 Kg - - Tukang besi profil terampil 0,0240 O/H - - Pekerja 0,2440 O/H - - Kepala tukang besi profil 0,0240 O/H - - Mandor 0,0010 O/H - - Cat permukaan baja dengan meni besi 0,4000 M2 - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

13 1 M2 Dinding granite homogenous tile 40x40 cm polishGranit homogenous tile ukuran (40 x 40) polish 6,0000 Bh - - Semen Tiga Roda @ 50 kg/zak 9,3000 Kg - - Pasir Pasang 0,0180 M2 - -

Semen Warna 1,3000 Kg - - Pekerja 0,9000 HO - - Tukang batu 0,4500 HO - - Kepala tukang 0,0450 HO - - Mandor 0,0450 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

14 1 M2 Dinding granite homogenous tile 60x120 cm polished setara INDOGRESGranit homogenous tile ukuran (60 x 120) polished setara INDOGRES 1,0000 M2 - Semen Tiga Roda @ 50 kg/zak 9,3000 Kg - Pasir Pasang 0,0180 M2 -

Semen Warna 1,3000 Kg - Material dan peralatan bantu 1,0000 lot - Pekerja 0,9000 HO - Tukang batu 0,4500 HO - Kepala tukang 0,0450 HO - Mandor 0,0450 HO -

- - Overhead + Profit - Jumlah - Dibulatkan -

15 1 M2 Lantai granite homogenous tile 40x40 cm unpolishGranit homogenous tile ukuran (40 x 40) unpolish 6,0000 Bh - - Semen Tiga Roda @ 50 kg/zak 9,3000 Kg - - Pasir Pasang 0,0180 M2 - -

Semen Warna 1,3000 Kg - - Pekerja 0,9000 HO - - Tukang batu 0,4500 HO - - Kepala tukang 0,0450 HO - - Mandor 0,0450 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 55: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

216 1 M2 Lantai granite homogenous tile 60x60 cm polishGranit homogenous tile ukuran (60 x 60) polish 3,0000 Bh - - Semen Tiga Roda @ 50 kg/zak 9,8000 Kg - - Pasir Pasang 0,0450 M2 - -

Semen Warna 1,3000 Kg - - Pekerja 0,2500 HO - - Tukang batu 0,1250 HO - - Kepala tukang 0,0130 HO - - Mandor 0,0130 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

17 1 M2 Lantai granite homogenous tile 60x60 cm polish berpolaGranit homogenous tile ukuran (60 x 60) polish 3,0000 Bh - - Semen Tiga Roda @ 50 kg/zak 9,8000 Kg - - Pasir Pasang 0,0450 M2 - -

Semen Warna 1,3000 Kg - - Pekerja 0,5000 HO - - Tukang batu 0,2500 HO - - Kepala tukang 0,0260 HO - - Mandor 0,0260 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

18 1 M2 Border granit ukuran (10 x 60) cm Border granit ukuran (10 x 60) cm 1,6700 Bh - - Portland Cement 0,9300 Kg - - Pasir Pasang 0,0018 M2 - - Semen Warna 0,1300 Kg - - Pekerja 0,0900 HO - - Tukang batu 0,0450 HO - - Kepala tukang 0,0045 HO - - Mandor 0,0045 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

19 1 M2 Step nosing/plint granito ukuran (8 x 60) cm Step nosing/plint granito ukuran (8 x 60) cm 1,6700 Bh - - Portland Cement 0,9300 Kg - - Pasir Pasang 0,0018 M2 - - Semen Warna 0,1300 Kg - - Pekerja 0,0900 HO - - Tukang batu 0,0450 HO - - Kepala tukang 0,0045 HO - - Mandor 0,0045 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

20 1 M2 Granite alam slab tebal 2 cm uk. 60x120 cm (meja washtafel)Granite alam slab tebal 2 cm uk. 60x120 cm 1,1000 Bh - -

Portland Cement 1,3950 Kg - - Pasir Pasang 0,0027 M2 - - Semen Warna 0,1950 Kg - - Pekerja 1,8000 HO - - Tukang batu 0,9000 HO - - Kepala tukang 0,0900 HO - - Mandor 0,0900 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

21 1 M2 Granite alam slab tebal 2 cm uk. 60x120 cm (dinding entrance)Granite alam slab tebal 2 cm uk. 60x120 cm 1,1000 Bh -

Portland Cement 1,3950 Kg - Pasir Pasang 0,0027 M2 - Semen Warna 0,1950 Kg - Material dan peralatan bantu 1,0000 lot - Pekerja 1,8000 HO - Tukang batu 0,9000 HO - Kepala tukang 0,0900 HO - Mandor 0,0900 HO -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 56: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

222 1 M2 Lantai parkit kayu merbau ukuran 9 x 60 cm tebal 1,5 cm (kayu solid) Lantai parkit kayu merbau ukuran 9 x 60 cm tebal 1,5 cm (kayu solid) 1,1000 M2 - Lem kuning (Aibond) 0,5000 Ltr - Material dan peralatan bantu 1,0000 Lot - Pekerja 1,2000 HO - Tukang kayu 0,6000 HO - Kepala tukang 0,0600 HO - Mandor 0,0600 HO -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

23 1 M2 Pas. Paving Block Natural Tbl. 6 cmPaving block natural 1,0100 M2 - - Pasir pasang 0,1000 Kg - - Pekerja 0,2500 Oh - - Tukang Batu 0,5000 Oh - - Kepala Tukang 0,0250 Oh - - Mandor 0,0025 Oh - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

24 1 M2 Pas. Batako PC pres 10x20x40 ad 1:4PC 10,8500 Kg - - Pasir pasang 0,0279 M3 - - Batako kecil 8x10x20 13,0000 Bh - - Pekerja 0,2720 O/H - - Tukang batu terampil 0,0850 O/H - - Kepala tukang batu 0,0085 O/H - - Mandor 0,0128 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

25 1 M2 Dinding hebel t 10 cm + MU 380Hebel t. 10x20x60 8,5000 Bh - - MU 380 - pas. Bata ringan/10 m2 (40 kg) 0,1000 Zak - - Pekerja 0,3500 O/H - - Tukang batu terampil 0,1500 O/H - - Kepala tukang batu 0,0150 O/H - - Mandor 0,0170 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

26 1 M2 Plesteran dinding MU 100 t. 10 mmMU 100 - plesteran/2,4 m2 (40 kg) 0,4167 Zak - - Pekerja 0,2000 O/H - - Tukang batu terampil 0,1500 O/H - - Kepala tukang batu 0,0150 O/H - - Mandor 0,0100 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

27 1 M2 Acian MU 200 t. 3 mmMU 200 - acian plesteran/20 m2 (40 kg) 0,0500 Zak - - Pekerja 0,1430 O/H - - Tukang batu terampil 0,1070 O/H - - Kepala tukang batu 0,0105 O/H - - Mandor 0,0105 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

28 1 M2 Rockwool tebal 5 cm dinding samping kanan, kiri dan belakang Rockwool tebal 5 cm 1,0000 M2 - Kawat/peralatan 1,0000 Lot - Pekerja 0,1500 HO - Tukang kayu terampil 0,1620 HO - Kepala tukang kayu 0,0162 HO - Mandor 0,0029 HO -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 57: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

229 1 M2 Rangka hollou galvanis 40x40 mm, tebal 1,5 mmBesi hollow galvanis 40x40 mm, tebal 1,5 mm 1,3440 Btg - - Paku Skrup 0,1000 Bks - - Pekerja 0,1500 HO - - Tukang kayu terampil 0,4500 HO - - Kepala tukang kayu 0,0450 HO - - Mandor 0,0080 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

30 1 M2 Pelapis dinding multiplek 9 mm, triplex 4 mm + HPLMultiplek 9 mm 0,3472 M2 - - Triplek 4 mm 0,3472 M2 - - HPL serat kayu 0,3472 M2 - - Edging ex.Taco 34 mm 4,0000 M1 - - Sekrup 0,1000 Bks - - Lem Kuning (Aibond) 1,1200 Ltr - - Pekerja 1,1500 HO - - Tukang kayu 0,4500 HO - - Kepala tukang 0,1000 HO - - Mandor 0,0100 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

31 1 M2 Pelapis dinding multiplek 9 mm, triplex 4 mm + HPL rangka hollou galvanis 4x4 cmBesi hollow galvanis 40x40 mm, tebal 1,5 mm 1,1200 M1 - - Multiplek 18 mm 0,5208 M2 - - Multiplek 9 mm 0,3742 M2 - - HPL serat kayu 0,3819 M2 - - Sekrup 0,2000 Bks - - Lem Kuning (Aibond) 1,1200 Ltr - - Pekerja 1,1500 HO - - Tukang kayu 0,4500 HO - - Kepala tukang 0,1000 HO - - Mandor 0,0100 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

32 1 M2 Pelapis dinding wallpaper, lebar 50 cmWall paper 1,2000 M2 - - Kuas Roll 0,0200 Bh - - Kape set 0,0200 Bh - - Ampelas 0,2500 Lbr - - Lem 0,2500 Kg - - Pekerja 0,2000 HO - - Tukang 0,2000 HO - - Kepala tukang 0,0200 HO - - Mandor 0,0020 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

33 1 M2 Beakdrop Auditorium (rangka hollou galvanis 4/4, triplek 12 mm, triplex 4 mm + HPL + screen lengkap acc)Besi hollow 40x40 mm galvanis 1,3440 Btg - Multiplek 12 mm 0,8400 Lbr - Multiplek 9 mm 0,3335 Lbr - Triplek 4 mm 0,8400 Lbr - Triplek 4 mm lapis melamin 0,1551 Lbr - HPL serat kayu 1,6800 M2 - Kaca 5 mm lengkap dengan dudukan 0,1550 M2 - stainless steel 0,1500 M1 - Sekrup 0,4800 Bks - Lem Kuning (Aibond) 0,5160 Ltr - Alat bantu 1,0000 Lot - Pekerja 2,5000 HO - Tukang kayu 1,5000 HO - Kepala tukang 1,2000 HO - Mandor 0,7500 HO -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

1 Unit Screen 96"x96" Automatis, setara MICROVISION/BRITE/D-LIGHT lengkap dengan acessoriesScreen 96"x96" Automatis, set. MICROVISION/BRITE/D-LIGHT 1,0000 Unit - - Upah Kerja 1,0000 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 58: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

21 Unit Backdrop multiplex 18 mm + 9mm finising HPL lengkap ornamen, acessories dan Screen63,9600 M2 - - 1,0000 Unit - -

Jumlah Total - 34 1 Unit Ornamen pada dinding (rangka hollou galvanis 4/4, multiplek 9 mm, triplek 4 mm + HPL)

Besi hollow 40x40 mm galvanis 1,1200 Btg - - Multiplek 9 mm 0,3472 Lbr - - Triplek 4 mm 0,3472 Lbr - - HPL serat kayu 0,3472 M2 - - Sekrup 0,4800 Bks - - Lem Kuning (Aibond) 0,5160 Ltr - - Alat bantu 1,0000 Lot - - Pekerja 1,1500 HO - - Tukang kayu 0,4500 HO - - Kepala tukang 0,1000 HO - - Mandor 0,0100 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

35 1 Unit ornamen kolompintu utama multiplex 12 mm + 9 mm finising HPL lengkap acessories, Type 121,4820 M2 - - 21,4820 M2 - -

Jumlah Total - 36 1 Unit ornamen kolompintu utama multiplex 12 mm + 9 mm finising HPL lengkap acessories, Type 2

11,5401 M2 - - 11,5401 M2 - -

Jumlah Total - 37 1 M2 Waterproofing MU 600

MU 600 - pelapis kedap air/1,5 m2 (3 kg) 0,6667 Zak - - Pekerja 0,2000 O/H - - Tukang batu terampil 0,1500 O/H - - Kepala tukang batu 0,0150 O/H - - Mandor 0,0100 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

38 1 M2 Water proofing membran bakarMembran Shield 1,0000 m2 - -

Pekerja 0,0200 HO - - Tukang cat terampil 0,0630 HO - - Kepala tukang cat 0,0063 HO - - Mandor 0,0025 HO - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

39 1 M2 Plafond GRC 4 mm, rangka hollow galvalume 40x40+20x40 mmHollow galvalume 40x40 mm 0,4150 Btg - Hollow galvalume 20x40 mm 0,1500 Btg - Gantungan plafond kawat putih dia. 3-4 mm 4,8000 M1 -

GRC (120 x 240 x 4) mm 0,3640 Lbr - Paku GRC 0,1100 Kg - Ramset/Dina Bolt 4,0000 Buah - Cotton Plaster 0,0720 Buah - Compoun 0,1250 Zak - Pekerja 0,1000 M2 - Tukang kayu terampil 0,0500 M2 - Kepala tukang kayu 0,0050 M2 - Mandor 0,0050 M2 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

40 1 M2 Plafond gypsum board, , rangka hollow galvalume 40x40+20x40 mmHollow galvalume 40x40 mm 0,4150 Btg - - Hollow galvalume 20x40 mm 0,1500 Btg - - Gantungan plafond kawat putih dia. 3-4 mm 4,8000 M1 - - Gypsum board (120 x 240 x 9) mm 0,3640 Lbr - - Paku Gypsum 0,1100 Kg - - Ramset/Dina Bolt 4,0000 Buah - - Cotton Plaster 0,0720 Buah - - Compoun 0,1250 Zak - - Pekerja 0,1000 Oh - - Tukang Kayu 0,0500 Oh - - Kepala Tukang 0,0050 Oh - - Mandor 0,0050 Oh - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

1 Unit Backdrop multiplex 18 mm + 9mm finising HPL lengkap ornamen 1 Unit Screen, setara MICROVISION/BRITE/D-LIGHT lengkap acessories

1 M2 Pasang rangka hollou galvanis 4x4

1 M2 Pasang multiplex 9 mm finising HPL lengkap acessories

1 M2 Pasang multiplex 9 mm finising HPL lengkap acessories

1 M2 Pasang rangka hollou galvanis 4x4

Page 59: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

241 1 M2 Plafond multiplex 9 mm + triplex 4 mm finishing HPL, rangka hollou galvalumeHollow 40x40 galvalume 0,4150 Btg - - Hollow 40x40 galvalume 0,4150 Btg - - Gantungan plafond besi galvanis dia. 4 mm 1,2000 M1 - - Paku Biasa 2" - 5" 0,0600 Kg - - Multiplek 120 cm x 240 cm x 9 mm 0,3900 Lbr - - Trplex 4 mm 0,3900 Lbr - - HPL 0,3900 Lbr - - Lem Kuning (Aibond) 0,4500 Lbr - - Pekerja 0,5000 Oh - - Tukang Kayu 0,2500 Oh - - Kepala Tukang 0,0250 Oh - - Mandor 0,0250 Oh - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

42 1 M2 Listplang multiplex 9 mm + triplex 4 mm finishing HPL, rangka hollou galvalumeHollow 40x40 galvalume 0,4150 Btg - - Hollow 40x40 galvalume 0,4150 Btg - - Paku Biasa 2" - 5" 0,0600 Kg - - Multiplek 120 cm x 240 cm x 9 mm 0,3900 Lbr - - Trplex 4 mm 0,3900 Lbr - - HPL 0,3900 Lbr - - Lem Kuning (Aibond) 0,4500 Lbr - - Pekerja 0,6000 Oh - - Tukang Kayu 0,3000 Oh - - Kepala Tukang 0,0300 Oh - - Mandor 0,0300 Oh - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

43 1 M2 Penutup listplang multiplex 9 mm + triplex 4 mm finishing HPLMultiplek 120 cm x 240 cm x 9 mm 0,3900 Lbr - - Trplex 4 mm 0,3900 Lbr - - HPL 0,3900 Lbr - - Lem Kuning (Aibond) 0,4500 Lbr - - Pekerja 0,3000 Oh - - Tukang Kayu 0,1500 Oh - - Kepala Tukang 0,0150 Oh - - Mandor 0,0150 Oh - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

44 1 M1 Lisplang GRC uk 3000x300x12 mmKalsiplank uk. 3000x300x12 mm 0,3400 Lbr - -

Kaso 4/6 0,0030 M3 - - Paku Biasa ½" - 1" 0,3000 Kg - - Pekerja 0,1100 Oh - - Tukang Kayu 0,2200 Oh - - Kepala Tukang 0,0220 Oh - - Mandor 0,0050 Oh - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

45 1 M2 Cat dinding exterior dengan Weathersield, setara Dulux/Mowilex/Jotun Cat tembok ICI weathershield 0,2000 Kg - Plamir tembok 0,1600 Kg - Rol cat tembok 0,0100 Bh - Amplas 0,5000 Lbr - Pekerja setengah terampil 0,1000 O/H - Tukang cat setengah terampil 0,1500 O/H - Kepala tukang cat 0,0150 O/H - Mandor 0,0050 O/H - Steger werk 0,0425 Ls -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 60: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

246 1 M2 Cat dinding interior, setara Dulux/Mowilex/Jotun Cat tembok ICI Interior 0,2000 Kg - - Plamir tembok 0,1600 Kg - - Rol cat tembok 0,0100 Bh - - Amplas 0,5000 Lbr - - Pekerja setengah terampil 0,1000 O/H - - Tukang cat setengah terampil 0,1500 O/H - - Kepala tukang cat 0,0150 O/H - - Mandor 0,0050 O/H - - Steger werk 0,0425 Ls - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

47 1 M2 Cat plafond interior, setara Dulux/Mowilex/JotunPlamir tembok 0,1600 Kg - - Cat tembok ICI Interior 0,2600 Kg - - Rol cat tembok 0,0500 Bh - - Ampelas 0,0200 Lbr - - Pekerja setengah terampil 0,1600 O/H - - Tukang cat setengah terampil 0,0280 O/H - - Kepala tukang cat 0,0300 O/H - - Mandor 0,0100 O/H - - Steger werk 0,0425 Ls - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

48 1 M2 Cat plafond exterior dengan Weathersield, setara Dulux/Mowilex/JotunPlamir tembok 0,1600 Kg - - Cat tembok ICI weathershield 0,2600 Kg - - Rol cat tembok 0,0500 Bh - - Ampelas 0,0200 Lbr - - Pekerja setengah terampil 0,1600 O/H - - Tukang cat setengah terampil 0,0280 O/H - - Kepala tukang cat 0,0300 O/H - - Mandor 0,0100 O/H - - Steger werk 0,0425 Ls - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

49 1 M2 Cat permukaan baja dengan meni besiMeni kayu/besi 0,1000 Kg - - Kuas 3" 0,0100 Bh - - Pekerja 0,0200 O/H - - Tukang cat terampil 0,1800 O/H - - Kepala tukang cat 0,0200 O/H - - Mandor 0,0100 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

50 1 M2 Pengecatan permukaan bajaCat besi 0,3000 Kg - - Pekerja 0,0060 O/H - - Tukang cat terampil 0,0600 O/H - - Kepala tukang kayu 0,0120 O/H - - Mandor 0,0060 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

51 1 M2 Pengecatan talang Cat dasar 0,1700 Kg - - Cat besi 0,3500 Kg - - Pekerja 0,0700 O/H - - Tukang cat terampil 0,1050 O/H - - Kepala tukang cat 0,0040 O/H - - Mandor 0,0025 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 61: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

252 1 M2 Pengecatan kayu (3x) berikut meniMeni kayu/besi 0,2000 Kg - - Plamir kayu 0,1500 Kg - - Cat dasar 0,1700 Kg - - Cat kayu glotex 0,3500 Kg - - Pekerja 0,0700 O/H - - Tukang cat terampil 0,1050 O/H - - Kepala tukang cat 0,0040 O/H - - Mandor 0,0025 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

53 1 M2 Pelaburan Bidang Kayu dengan PoliturPolitur 0,1500 Ltr - - Politur jadi 0,3720 Ltr - - Amplas 2,0000 Lbr - - Tukang cat terampil 0,0600 O/H - - Kepala tukang cat 0,0160 O/H - - Mandor 0,0025 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan - Dibulatkan -

54 1 M1 Listplank + Talang metal 30/30 (Lt. 1)Pekerja terampil 0,1750 O/H - - Tukang kayu setengah terampil 0,5000 O/H - - Kepala tukang kayu 0,0500 O/H - - Mandor 0,0100 O/H - - Listplank dan talang Zam t=0,8mm powdercoating 1,0000 M1 - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

55 1 Unit Talang Tegak Type 1 (PVC 6" AW + cat)Pipa PVC RUCIKA type AW 6" 3,9750 Btg - Pipa PVC RUCIKA type AW 2" 0,5000 Btg - Dop 6" 2,0000 Bh - Klem 6" 5,0000 Bh - Knie 6" 4,0000 Bh - Tee 6" 3,0000 Bh - Knie 2" 1,0000 Bh - Upah kerja 10% dari material 0,1000 Unit - Pengecatan talang 5,5786 M2 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

56 1 Unit Talang Tegak Type 2 (PVC 6" AW + cat)Pipa PVC RUCIKA type AW 6" 3,5000 Btg - - Klem 6" 7,0000 Bh - - Knie 6" 3,0000 Bh - - Upah kerja 10% dari material 0,1000 Unit - - Pengecatan talang 3,1821 M2 - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

57 1 Kg Besi profil WFBesi WF Ex DN SII 1,1000 kg - - Meni besi 0,0800 kg - - Pekerja 0,0600 Oh - - Tukang besi 0,0060 Oh - - Kepala tukang 0,0060 Oh - - Mandor 0,0003 Oh - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

58 1 Kg Besi profil CBesi C 1,1000 kg - - Meni besi 0,0800 kg - - Pekerja 0,0600 Oh - - Tukang besi 0,0060 Oh - - Kepala tukang 0,0060 Oh - - Mandor 0,0003 Oh - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 62: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

259 1 Unit PU1 (PK)Rangka hollou galvanis 4/4 cm 70,1700 M2 -

Rangka penebalan partisi multipleks lebar 10 cm x t=18 mm 70,1700 M2 - Partisi multipleks t=18 mm 70,1700 M2 - Pasang HPL 70,1700 M2 - Lem Kuning 14,0340 Kg - Paku skrup 3" 421,0200 Bh -

Pek. Roter nat 63,5200 M1 - Kusen aluminium 4 " coating 26,2800 M' -

2,0000 bh - Kaca tempered 8 mm (ASAHI) 8,1000 M2 -

Silikone 17,2000 M' - Kunci Solid (lockcase,handle,cylinder) 1,0000 Bh - Stoper 4,0000 Set - Grendel pintu Solid (flush bold) 12" 2,0000 Bh -

Pek. Plin kayu 2/10 cm, finishing melamik 4,7000 M1 - Upah kerja 0,1000 Unit -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

60 1 Unit PU2 (PK)Rangka hollou galvanis 4/4 cm 70,1700 M2 - -

Rangka penebalan partisi multipleks lebar 10 cm x t=18 mm 70,1700 M2 - - Partisi multipleks t=18 mm 70,1700 M2 - - Pasang HPL 70,1700 M2 - - Lem Kuning 14,0340 Kg - - Paku skrup 3" 421,0200 Bh - -

Pek. Roter nat 63,5200 M1 - - Kusen aluminium 4 " coating 26,2800 M' - -

2,0000 bh - - Kaca tempered 8 mm (ASAHI) 8,1000 M2 - - Silikone 17,2000 M' - - Kunci Solid (lockcase,handle,cylinder) 1,0000 Bh - - Stoper 4,0000 Set - - Grendel pintu Solid (flush bold) 12" 2,0000 Bh - -

Pek. Plin kayu 2/10 cm, finishing melamik 4,7000 M1 - - Upah kerja 0,1000 Unit - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

61 1 Unit PU3 (PT)4,4100 M2 -

Handle Pintu Kaca 110 cm - Setara Dorma 2,0000 Psg - Kunci Solid (lockcase,handle,cylinder) 1,0000 Bh -

Rangka penebalan partisi multipleks lebar 10 cm x t=18 mm 7,4980 M2 - Partisi multipleks t=18 mm 13,1200 M2 - Pasang HPL 13,1200 M2 - Lem Kuning 0,2000 Kg - Paku skrup 3" 9,0000 Bh -

Pek. Roter nat 4,8000 M1 - Pek. Plin alumunium plat 4,7000 M1 - Kusen aluminium 4 " coating 57,3300 M' - Jendela sliding besar 4,0000 bh - Kaca Rayband 5 mm ( ASAHI ) 14,4800 M2 - Silikone 69,2400 M' - Springknip solid 4,0000 Set - Casement Solid 8" 4,0000 Bh - Grendel sliding Solid 2,0000 Bh - Upah kerja 0,1000 Unit -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

62 1 Unit PJ1 (PA)Kusen aluminium 4 " coating 12,7000 M1 - - Pintu plat 1,0000 Bh - - Jendela jungkit besar 1,0000 Bh - - Stoper 1,0000 Set - - Kaca Rayband 5 mm ( ASAHI ) 1,4800 M2 - - Silikone 10,5500 M1 - - Engsel solid 4" 3,0000 Bh - - Kunci Solid (lockcase,handle,cylinder) 1,0000 Set - - Grendel pintu Solid (flush bold) 6" 1,0000 Bh - - Grendel pintu Solid (flush bold) 12" 1,0000 Bh - - Casement Solid 8" 3,0000 Set - - Springknip solid 3,0000 Bh - - Upah kerja 0,1000 Unit - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Pintu panel solid kamper samarinda awet oven besar L=1 m, finishing melamik

Pintu Frameless (tempered 12 mm polos) floor hinge dorma BTS 84

Pintu panel solid kamper samarinda awet oven besar L=1 m, finishing melamik

Page 63: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

263 1 Unit P1 (PM)Kusen aluminium 4 " coating 10,5000 M1 - - Jendela jungkit kecil 2,0000 Bh - - Pintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven besar 2,0000 Bh - - Stoper 2,0000 Set - - Kaca Rayband 5 mm ( ASAHI ) 0,9000 M2 - - Kaca Polos 3 mm ( ASAHI ) 0,3200 M2 - - Silikone 8,0000 M1 - - Casement Solid 8" 2,0000 Set - - Springknip solid 2,0000 Bh - - Engsel solid 4" 6,0000 Bh - - Kunci Solid (lockcase,handle,cylinder) 1,0000 Set - - Upah Pasang 0,1000 Unit - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

64 1 Unit P2 (PM)Kusen aluminium 4 " coating 6,8400 M1 - - Jendela jungkit kecil 1,0000 Bh - - Pintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven besar 1,0000 Bh - - Stoper 1,0000 Set - - Kaca Rayband 5 mm ( ASAHI ) 0,4500 M2 - - Kaca Polos 3 mm ( ASAHI ) 0,1600 M2 - - Silikone 4,0000 M1 - - Casement Solid 8" 1,0000 Set - - Springknip solid 1,0000 Bh - - Engsel solid 4" 3,0000 Bh - - Kunci Solid (lockcase,handle,cylinder) 1,0000 Set - - Upah Pasang 0,1000 Unit - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

65 1 Unit P3 (PA)Kusen aluminium 4 " coating 8,7000 M1 - - Pintu plat 1,0000 Bh - - Jendela jungkit kecil 1,0000 Bh - - Casement Solid 8" 1,0000 Set - - Springknip solid 1,0000 Bh - - Stoper 1,0000 Set - - Engsel solid 4" 3,0000 Bh - - Kunci Solid (lockcase,handle,cylinder) 1,0000 Set - - Kaca Rayband 5 mm ( ASAHI ) 0,5604 M2 - - Silikone 4,0000 M1 - - Upah Pasang 0,1000 Unit - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

66 1 Unit P4 (PA)Kusen aluminium 4 " coating 4,9000 M1 - - Pintu Spandrel 1,0000 Bh - - Silikone 9,8000 M1 - - Kunci Solid (lockcase,handle,cylinder) 1,0000 Set - - Engsel solid 4" 3,0000 Bh - - Upah Pasang 0,1000 Unit - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

67 1 Un J1 (JA)Kusen aluminium 4 " coating 16,8500 M' - - Jendela sliding besar 2,0000 bh - - Kaca Rayband 5 mm ( ASAHI ) 4,2600 M2 - - Silikone 26,4200 M' - - Casement Solid 8" 2,0000 Set - - Casement Solid 12" 2,0000 Set - - Springknip solid 2,0000 Bh - - Upah kerja 0,1000 Un - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 64: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

268 1 Un J2 (JA)Kusen aluminium 4 " coating 9,9900 M' - - Jendela sliding besar 2,0000 bh - - Kaca Rayband 5 mm ( ASAHI ) 2,2500 M2 - - Silikone 13,1400 M' - - Casement Solid 8" 2,0000 Set - - Casement Solid 12" 2,0000 Set - - Springknip solid 2,0000 Bh - - Upah kerja 0,1000 Un - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

69 1 Un J3 (JA)Kusen aluminium 4 " coating 19,4800 M' - - Jendela sliding besar 2,0000 bh - - Kaca Rayband 5 mm ( ASAHI ) 5,5000 M2 - - Silikone 28,7000 M' - - Casement Solid 8" 2,0000 Set - - Casement Solid 12" 2,0000 Set - - Springknip solid 2,0000 Bh - - Upah kerja 0,1000 Un - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

70 1 Un J4 (JA)Kusen aluminium 4 " coating 10,3000 M' - - Kaca Rayband 8 mm ( ASAHI ) 6,1000 M2 - - Silikone 9,9000 M' - - Upah kerja 0,1000 Un - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

71 1 Un J5 (JA)Kusen aluminium 4 " coating 25,9600 M' - - Jendela sliding besar 2,0000 bh - - Kaca Rayband 5 mm ( ASAHI ) 11,5000 M2 - - Silikone 58,8400 M' - - Casement Solid 8" 2,0000 Set - - Casement Solid 12" 2,0000 Set - - Springknip solid 2,0000 Bh - - Upah kerja 0,1000 Un - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

72 1 Un J6 (JA)Kusen aluminium 4 " coating 4,8400 M' - - Jendela sliding besar 2,0000 bh - - Kaca Rayband 5 mm ( ASAHI ) 1,0400 M2 - - Silikone 5,9600 M' - - Casement Solid 8" 2,0000 Set - - Casement Solid 12" 2,0000 Set - - Springknip solid 2,0000 Bh - - Upah kerja 0,1000 Un - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

73 1 Unit PS1 (JM)Kusen aluminium 4 " coating 4,8000 M1 - - Pintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven kecil 2,0000 Bh - - Stoper 1,0000 Set - - Silikone 9,6000 M1 - - Upah kerja 0,1000 Unit - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

74 1 Unit PS2 (JM)Kusen aluminium 4 " coating 4,5000 M1 - - Pintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven kecil 2,0000 Bh - - Stoper 1,0000 Set - - Silikone 9,6000 M1 - - Upah kerja 0,1000 Unit - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 65: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

275 1 Un BV1 (JA)Kusen aluminium 4 " coating 3,3600 M' - - Jendela jungkit kecil 1,0000 bh - - Kaca Rayband 5 mm ( ASAHI ) 0,4300 M2 - - Silikone 3,8800 M' - - Casement Solid 8" 1,0000 Set - - Springknip solid 1,0000 Bh - - Upah kerja 0,1000 Un - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

76 1 Un BV2 (JA)Kusen aluminium 4 " coating 12,3000 M' - - Jendela jungkit kecil 4,0000 bh - - Kaca Rayband 5 mm ( ASAHI ) 1,7200 M2 - - Silikone 15,5200 M' - - Casement Solid 8" 4,0000 Set - - Springknip solid 4,0000 Bh - - Upah kerja 0,1000 Un - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

77 1 Un BV3 (JA)Kusen aluminium 4 " coating 10,5000 M' - - Jendela jungkit kecil 2,0000 bh - - Kaca Rayband 5 mm ( ASAHI ) 0,8600 M2 - - Silikone 7,7600 M' - - Casement Solid 8" 2,0000 Set - - Springknip solid 2,0000 Bh - - Upah kerja 0,1000 Un - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

78 1 M2 Pasang kaca tempered 10 mm (ASAHI)Kaca tempered 10 mm (ASAHI) 1,0000 M2 -

Sealend back up 2,0000 M' - Material bantu 1,0000 ls - Upah kerja 0,1000 Un -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

79 1 M2 Pasang Allumunium Composite Panel (ACP), setara ALCOPAN/MACO/SEVEN Allumunium Composite Panel (ACP) 1,0000 M2 - Besi hollow 40/40 8,7225 Kg - Paku ripet 0,1000 dus - Sealend back up 1,0000 ls - Pekerja 0,2564 HO - Tukang besi profil terampil 0,2200 HO - Kepala tukang besi profil 0,0220 HO - Mandor 0,0073 HO -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

80 1 M2 Partisi folding gate kedap suara sliding lengkap acessories (Pabrikasi)

1,0000 M2 - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

81 1 M1 Saluran keliling bangunan 60x60Galian tanah biasa max kedalaman 1 m' 0,6300 M3 - - Urugan pasir 0,0450 M3 - - Rabat beton t. 6 cm (MK-4 1 Lapis) 0,5000 M2 - - Bata Merah tebal 1/2 bata, 1 Pc : 5 Ps 0,8000 M2 - - Acian MU 200 t. 3 mm 2,1000 M2 - - Plesteran dinding MU 100 t. 10 mm 2,1000 M2 - -

Jumlah - Dibulatkan -

82 1 M1 Beton decker t. 6 cm (45X70)Beton site mix K-175 0,0189 M3 - - Wire Mesh M-4 (1 lapis) 0,5000 M2 - - PC (50 kg) 0,1000 Zak - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Pas. Follding Gate Hollow frame 5 x 5, meranti wood inside, multiplek 1,5 mm, glasswoll 50mm/ rokwoll, Accourete sound reduce 3 mm, cotton sheet 3 mm, finishing cosglow/wallpaper/oscar/Hpl dll. (Pabrikasi)

Page 66: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

283 1 M3 Beton decker t. 20 cm Beton site mix K-175 1,0000 M3 - - Wire Mesh M-10 (2 lapis) 10,0000 M2 - - Bekisting multiplex 9 mm 5,0000 M2 - -

Jumlah - Dibulatkan -

84 1 M2 Plesteran Siar adk. 1pc : 2ps batu belahPC 6,3400 Kg - - Pasir pasang 0,0120 M3 - - Pekerja 0,3000 O/H - - Tukang batu terampil 0,1500 O/H - - Kepala tukang batu 0,0150 O/H - - Mandor 0,0150 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

85 1 M2 Plesteran Siar adk. 1pc : 4psPC 6,2400 Kg - - Pasir pasang 0,0240 M3 - - Pekerja 0,3000 O/H - - Tukang batu terampil 0,1500 O/H - - Kepala tukang batu 0,0150 O/H - - Mandor 0,0150 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

86 1 M2 Acian PlesteranPC 4,0000 Kg - - Pekerja 0,1430 O/H - - Tukang batu terampil 0,1070 O/H - - Kepala tukang batu 0,0105 O/H - - Mandor 0,0105 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

87 1 M1 Meja beton Beton site mix K-175 0,0600 M3 - - Wire Mesh M-4 (1 lapis) 0,6000 M2 - - Bekisting multiplex 9 mm 0,6000 M2 - - Bata Merah tebal 1/2 bata, 1 Pc : 5 Ps 0,8000 M2 - - Screeding t. 2 cm (MU 440) 0,8000 M2 - -

Jumlah - Dibulatkan -

88 1 Bh Closet Duduk (Flashing), setara TOTO Closet Duduk (Flashing), setara TOTO 1,0000 Unit - - Pekerja 3,3000 O/H - - Tukang batu terampil 1,1000 O/H - - Kepala tukang batu 0,0010 O/H - - Mandor 0,1600 O/H - - Perlengkapan 6 % harga material 0,0600 Ls - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

89 1 Bh Closet jongkok (Flashing), setara TOTO Closet jongkok (Flashing), setara TOTO 1,0000 Unit - - PC 6,0000 Kg - - Pasir pasang 0,0100 M3 - - Pekerja 1,0000 O/H - - Tukang batu terampil 1,5000 O/H - - Kepala tukang batu 1,5000 O/H - - Mandor 0,1600 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

90 1 Bh Washtafel Toilet Pria/Wanita, setara TOTO Washtafel Toilet Pria/Wanita, setara TOTO 1,0000 Bh - - PC 6,0000 Kg - - Pasir pasang 0,0100 M3 - - Pekerja 1,2000 O/H - - Tukang batu terampil 1,4500 O/H - - Kepala tukang batu 0,1500 O/H - - Mandor 0,1000 O/H - - Perlengkapan 0,1200 Unit - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 67: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

291 1 Unit Kitchen Zink Stainless ( 1 Lobang )Kitchen Zink Stainless Standard Lokal ( 1 Lubang ) 1,0000 Bh - - Pekerja 0,0300 O/H - - Tukang batu terampil 0,3000 O/H - - Kepala tukang batu 0,0300 O/H - - Mandor 0,0015 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

92 1 Bh Urinoir TOTO U 57MUrinoir TOTO U 57M 1,0000 Bh - - Semen Portland 0,1200 Zak - - Pasir Pasang 0,0100 M3 - - Pekerja Setengah Terampil 1,0000 Org - - Tukang Batu Setengah Terampil 1,0000 Org - - Kepala Tukang Batu 0,1000 Org - - Mandor 0,1100 Org - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

93 1 Bh Sekat urinoir TOTOSekat urinoir TOTO 1,0000 Bh - - Pekerja Setengah Terampil 1,0000 Org - - Tukang Batu Setengah Terampil 1,0000 Org - - Kepala Tukang Batu 0,1000 Org - - Mandor 0,1100 Org - - Perlengkapan 0,1200 Unit - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

94 1 Bh Jet Whoser + stopkran + kran air Lengkap ACC, setara TOTOJet Whoser air Lengkap ACC, setara TOTO 1,0000 Bh - Stop kran air Lengkap ACC, setara TOTO 1,0000 Bh - Kran air Lengkap ACC, setara TOTO 1,0000 Bh - Seal tape 0,0250 Bh - Pekerja 0,0100 O/H - Tukang batu terampil 0,1000 O/H - Kepala tukang batu 0,0100 O/H - Mandor 0,0050 O/H -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

95 1 Bh Kran dinding TOTO T23 B13Kran dinding TOTO T23 B13 1,0000 Bh - - Seal tape 0,0250 Bh - - Pekerja 0,0100 O/H - - Tukang batu terampil 0,1000 O/H - - Kepala tukang batu 0,0100 O/H - - Mandor 0,0050 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

96 1 Bh Kran bebek TOTO T30 ARQ 13NKran bebek TOTO T30 ARQ 13N 1,0000 Bh - - Seal tape 0,0250 Bh - - Pekerja 0,0100 O/H - - Tukang batu terampil 0,1000 O/H - - Kepala tukang batu 0,0100 O/H - - Mandor 0,0050 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

97 1 Bh Floordrain Stailes Steel, setara SUN-EI Floordrain Stailes Steel, setara SUN-EI 1,0000 Bh - - Pekerja 0,0100 O/H - - Tukang batu terampil 0,1000 O/H - - Kepala tukang batu 0,0100 O/H - - Mandor 0,0050 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 68: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga Item Pekerjaan

298 1 Bh Roof drain Stailes Steel, setara SUN-EIRoof drain Stailes Steel, setara SUN-EI 1,0000 Bh - - Pekerja 0,0100 O/H - - Tukang batu terampil 0,1000 O/H - - Kepala tukang batu 0,0100 O/H - - Mandor 0,0050 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

99 1 Bh Cermin TOTO TS 119 AS 5 Cermin TOTO TS 119 AS 5 1,0000 Bh - - Pekerja 0,0100 O/H - - Tukang batu terampil 0,1000 O/H - - Kepala tukang batu 0,0100 O/H - - Mandor 0,0050 O/H - -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

100 1 Titik Pasangan Sulingan Pipa PVC type AW 2" WAVIN + IjukSuling-Suling PVC 2" 0,2000 m -

Ijuk 1,1000 Kg - Tenaga Kerja 0,0540 Org -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 69: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Jumlah (Rp.)

1 1 M' Pipa PVC (AW) Rucika dia 1/2" - 2 1 M' PipaPVC (AW) Rucika dia 3/4" - 3 1 M' Pipa PVC (AW) Rucika dia 1" - 4 1 M' Pipa PVC (AW) Rucika dia 1 1/4" - 5 1 M' Pipa PVC (AW) Rucika dia 1 1/2" - 6 1 M' Pipa PVC (AW) Rucika dia 2" - 7 1 M' Pipa PVC (AW) Rucika dia 2 1/2" - 8 1 M' Pipa PVC (AW) Rucika dia 3" - 9 1 M' Pipa PVC (AW) Rucika dia 4" -

10 1 M' Pipa PVC (AW) Rucika dia 6" - 11 1 M' Pipa PVC (AW) Rucika dia 8" - 12 1 M' Pipa Header 4" (100 mm ) - 13 1 bh MEMASANG GATE VALVE DIA 3/4" (20 mm) - 14 1 bh MEMASANG GATE VALVE DIA 1" (25 mm) - 15 1 bh MEMASANG GATE VALVE DIA 1,5" (42 mm) - 16 1 bh MEMASANG GATE VALVE DIA 2" (50 mm) - 17 1 bh MEMASANG GATE VALVE DIA 2 1/2" (65 mm) - 18 1 bh MEMASANG GATE VALVE DIA3" (75 mm) - 19 1 bh MEMASANG GATE VALVE DIA 4" (100 mm) - 20 1 bh MEMASANG Check valve dia 2" (50 mm) - 21 1 bh MEMASANG Check valve dia 3" (75 mm) - 22 1 bh MEMASANG Check valve dia 4" (100 mm) - 23 1 bh MEMASANG FLOATING VALVE DIA. 2" - 24 1 bh Flexible Joint 50 mm - 25 1 bh Flexible Joint 80 mm - 26 1 bh Foot valve dia 3" (80 mm) - 27 1 bh Strainer dia 3" (80 mm) - 28 1 bh WLC - 29 1 bh Pressure switch - 30 1 M' Pipa HPDE diameter 2" - 31 1 M' Pipa Bsp class sch 40 A 53 3/4" - 32 1 M' Pipa Bsp class sch 40 A 53 1" - 33 1 M' Pipa Bsp class sch 40 A 53 40 1 1/4" - 34 1 M' Pipa Bsp class sch 40 A 53 40 1 1/2" - 35 1 M' Pipa Bsp class sch 40 A 53 40 2" - 36 1 M' Pipa Bsp class sch 40 A 53 40 2 1/2" - 37 1 M' Pipa Bsp class sch 40 A 53 3" - 38 1 M' Pipa Bsp class sch 40 A 53 4" - 39 1 M' Pipa Bsp class sch 40 A 53 5" - 40 1 M' Pipa Bsp class sch 40 A 53 6" - 41 1 unit Memasang pompa Booster 2 x 60 LPM - head 20 m - 42 1 bh Panel P Transfer - 43 1 unit MEMASANG POMPA TRANSFER 350 lpm - head 32 m - 44 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :5.400 Btuh - 45 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :7.200 Btuh - 46 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :7.800 Btuh - 47 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :8.500 Btuh - 48 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :10.800 Btuh - 49 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :12.000 Btuh - 50 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :13.500 Btuh - 51 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :18.000 Btuh - 52 1 unit IU VRV Split Cassette Type Kap.24.200 BTUH - 53 1 unit IU VRV Split Cassette Type Kap.30.700 BTUH - 54 1 unit IU VRV Split Cassette Type Kap.47.000 BTUH - 55 1 unit OU VRV Kap.268.000 BTUH (8.900 cfm) - 56 1 unit OU VRV Kap. 398.000 BTUH (13.250 cfm) - 57 1 unit OU VRV Kap. 141.000 BTUH (4.700 cfm) - 58 1 unit OU VRV Kap. 215.000 BTUH (7.250 cfm) - 59 1 m' Inst. Pipa refrigerant AC 1 PK - 60 1 m' Inst. Pipa refrigerant AC 1,5 PK - 2PK - 61 1 m' Inst. Pipa refrigerant AC 2,5 PK - 62 1 m' Drain Pipa pvc aw 3/4" ( 20 mm) - 63 1 m' Duct Inline Fan 450 CFM - 64 1 m' Wall Fan - 65 1 bh Pas. Exhaust Air Grille uk. 150 x 150 - 66 1 bh Pas. Exhaust Air Grille uk. 300 x 150 - 67 1 bh InDoor Hydrant Box - 68 1 bh CO2 kap 6 kg - 69 1 unit Pemasangan STP 8 m3 / day - 70 1 unit Pemasangan STP 4 m3 / day - 71 1 unit Pemasangan STP 1.8 m3 / day -

DAFTAR HARGA SATUAN PEKERJAAN MEKANIKAL

Item Pekerjaan

Page 70: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Jumlah (Rp.) Item Pekerjaan

72 1 M' Pipa Polypropelene PN.16 dia 1/2" - 73 1 M' Pipa PolypropelenePN.16 dia 3/4" - 74 1 M' Pipa Polypropelene PN.16 dia 1" - 75 1 M' Pipa Polypropelene PN.16 dia 1 1/4" - 76 1 M' Pipa Polypropelene dia 1 1/5" - 77 1 M' Pipa Polypropelene PN.16 dia 2" - 78 1 M' Pipa Polypropelene PN.16 dia 2 1/2" - 79 1 M' Pipa Polypropelene dia,3" - 80 1 M' Pipa Polypropelene PN.16 dia,4" - 81 1 M' Pipa Polypropelene PN.20 dia 1/2" - 82 1 M' Pipa PolypropelenePN.20 dia 3/4" - 83 1 M' Pipa Polypropelene PN.20 dia 1" - 84 1 M' Pipa Polypropelene PN.20 dia 1 1/4" - 85 1 M' Pipa Polypropelene PN.20 dia 1 1/5" - 86 1 M' Pipa Polypropelene PN.20 dia 2" - 87 1 M' Pipa Polypropelene PN.20 dia 2 1/2" - 88 1 M' Pipa Polypropelene PN.20 dia,3" - 89 1 M' Pipa Polypropelene PN.20 dia,4" - 90 1 M' Pipa GIP Medium A 1/2" ( 6 m1 ) - 91 1 M' Pipa GIP Medium A 3/4" ( 6 m1 ) - 92 1 M' Pipa GIP Medium A 1" ( 6 m1 ) - 93 1 M' Pipa GIP Medium A 1 1/4" ( 6 m1 ) - 94 1 M' Pipa GIP Medium A 1 1/2" ( 6 m1 ) - 95 1 M' Pipa GIP Medium A 2" ( 6 m1 ) - 96 1 M' Pipa GIP Medium A 2 1/2" ( 6 m1 ) -

97 1 unit PENGADAAN DAN PEMASANGAN LIFT PASSANGER (PENUMPANG)I. PEKERJAAN PERSIAPAN - II. PEKERJAAN PREPARASI HOISTWAY + PEKERJAAN PENUNJANG - III. UNIT LIFT PASSANGER (PENUMPANG) LIFT No. - IV. PEKERJAAN ARD (Auto Rescue Device) - V. PEKERJAAN MEMASANG NYY 4 x 1C x 16 mm² + NYA 10 mm² - VI. PEKERJAAN MEMASANG AES - VII. PEKERJAAN MEMASANG CAR OPERATION PANEL - VIII. PEKERJAAN MEMASANG HALL OPERATION PANEL - IX. PEKERJAAN MEMASANG MCB - X. PEKERJAAN MEMASANG AC SPLITH 1 PK - XI. PEKERJAAN MEMASANG LED 21" -

Bogor, ..................... 2018Kontraktor,PT,.................................

Cap & Tanda Tangan

NAMAJabatan

Page 71: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

1 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 1/2"

Pipa PVC (AW) Rucika dia 1/2" m' 1,20 -

lem pvc kg 0,03 -

seal tape bh 0,10 -

sock pipa pvc 1/2" bh 0,25 -

fiting PVC 1/2" ls 0,25 -

elbow pvc 1/2" bh 0,25 -

Pekerja Oh 0,05 -

Tukang pipa Oh 0,09 -

Kepala tukang Oh 0,01 -

Mandor Oh 0,03 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

2 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika)diameter 3/4"

PipaPVC (AW) Rucika dia 3/4" M¹ 1,20 -

lem pvc kg 0,03 -

seal tape bh 0,10 -

sock pipa pvc 3/4" bh 0,25 -

fiting PVC 3/4" ls 0,25 -

elbow pvc 3/4" bh 0,25 -

Pekerja Oh 0,05 -

Tukang pipa Oh 0,09 -

Kepala tukang Oh 0,01 -

Mandor Oh 0,03 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

3 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 1"

Pipa PVC (AW) Rucika dia 1" M¹ 1,20 -

lem pvc kg 0,03 -

seal tape bh 0,10 -

sock pipa pvc 1" bh 0,25 -

fiting PVC 1" ls 0,25 -

elbow pvc 1" bh 0,25 -

Pekerja Oh 0,05 -

Tukang pipa Oh 0,09 -

Kepala tukang Oh 0,01 -

Mandor Oh 0,03 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

4 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 1 1/4"

Pipa PVC (AW) Rucika dia 1 1/4" M¹ 1,20 -

lem pvc kg 0,03 -

seal tape bh 0,10 -

sock pipa pvc 1 1/4" bh 0,25 -

fiting PVC 1 1/4" ls 0,25 -

elbow pvc 1 1/4" bh 0,25 -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

5 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 1 1/5"

Pipa PVC (AW) Rucika dia 1 1/2" M¹ 1,20 -

lem pvc kg 0,03 -

seal tape bh 0,10 -

sock pipa pvc 1 1/2" bh 0,25 -

fiting PVC 1 1/2" ls 0,25 -

elbow pvc 1 1/2" bh 0,25 -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

2

Item Pekerjaan

ANALISA HARGA SATUAN PEKERJAAN MEKANIKAL

Page 72: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

6 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 2"

Pipa PVC (AW) Rucika dia 2" M¹ 1,20 -

lem pvc kg 0,03 -

seal tape bh 0,10 -

sock pipa pvc 2" bh 0,25 -

fiting PVC 2" ls 0,25 -

elbow pvc 2" bh 0,25 -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

7 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 2 1/2"

Pipa PVC (AW) Rucika dia 2 1/2" M¹ 1,20 -

lem pvc kg 0,03 -

seal tape bh 0,10 -

sock pipa pvc 2 1/2" bh 0,25 -

fiting PVC 2 1/2 " ls 0,25 -

elbow pvc 2 1/2" bh 0,25 -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

8 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 3"

Pipa PVC (AW) Rucika dia 3" M¹ 1,20 -

lem pvc kg 0,03 -

seal tape bh 0,10 -

sock pipa pvc 3" bh 0,25 -

fiting PVC 3 " ls 0,25 -

elbow pvc 3" bh 0,25 -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

9 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 4"

Pipa PVC (AW) Rucika dia 4" M¹ 1,20 -

lem pvc kg 0,03 -

seal tape bh 0,10 -

sock pipa pvc 4" bh 0,25 -

fiting PVC 4 " ls 0,25 -

elbow pvc 4" bh 0,25 -

Pekerja Oh 0,14 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 73: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

10 Memasang 1 M¹ PVC tipe AW diameter 6"

Pipa PVC (AW) Rucika dia 6" M¹ 1,20 -

lem pvc kg 0,03 -

seal tape bh 0,10 -

sock pipa pvc 6" bh 0,25 -

fiting PVC 6 " ls 0,25 -

elbow pvc 6" bh 0,25 -

Pekerja Oh 0,24 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

11 Memasang 1 M¹ PVC tipe AW diameter 8"

Pipa PVC (AW) Rucika dia 8" M¹ 1,20 -

lem pvc kg 0,03 -

seal tape bh 0,10 -

sock pipa pvc 8" bh 0,25 -

fiting PVC 8 " ls 0,25 -

elbow pvc 8" bh 0,25 -

Pekerja Oh 0,24 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

12 Pipa Header 4" (100 mm )

pipa gip medium class 4" btg 1,00 -

Flange 8 " kg 2,00 -

Flange buta 8 " bh 4,00 -

a.b & m.b pas pipa header bh 1,00 -

upah pas pipa header Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

13 MEMASANG GATE VALVE DIA 3/4" (20 mm)

gate valve dia 3/4 " bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas gate valve dia.3/4' Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

14 MEMASANG GATE VALVE DIA 1" (25 mm)

gate valve dia 1 " bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas gate valve dia.2' Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

15 MEMASANG GATE VALVE DIA 1,5" (42 mm)

gate valve dia 1,5 " bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas gate valve dia.2' Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 74: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

16 MEMASANG GATE VALVE DIA 2" (50 mm)

gate valve dia 2 " bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas gate valve dia.2' Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

17 MEMASANG GATE VALVE DIA 2 1/2" (65 mm) bh

gate valve dia 21/2 " bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas gate valve dia.2' Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

18 MEMASANG GATE VALVE DIA3" (75 mm) bh

gate valve dia 3 " bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas gate valve dia.3' Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

19 MEMASANG GATE VALVE DIA 4" (100 mm) bh

gate valve dia 4 " bh 1,00 -

lem pvc kg 1,00 -

Seal tape bh 1,00 -

upah pas gate valve dia 4 " Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

20 MEMASANG Check valve dia 2" (50 mm) bh

Check valve dia 2" bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas Check valve dia 2" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

21 MEMASANG Check valve dia 3" (75 mm) bh

Check valve dia 3" bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas Check valve dia 3" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

22 MEMASANG Check valve dia 4" (100 mm) bh

Check valve dia 4" bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas Check valve dia 3" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 75: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

23 MEMASANG FLOATING VALVE DIA. 2" bh

Floating valve dia. 2" bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas Floating valve dia. 2" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

24 Flexible Joint 50 mm bh

Flexible connection 50 mm bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas Flexible connection 50 mm Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

25 Flexible Joint 80 mm bh

Flexible connection 80 mm bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas Flexible connection 80 mm Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

26 Foot valve dia 3" (80 mm) bh

Foot valve dia 3" (80 mm) bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

Uph Foot valve dia 3" (80 mm) Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

27 Strainer dia 3" (80 mm) bh

Strainer dia 3" bh 1,00 -

lem pvc kg 0,05 -

Seal tape bh 1,00 -

upah pas Strainer dia 3" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

28 WLC bh

Water Level Control bh 1,00 -

kabel NYMHY 2x1,5 mm2 m' 195,00 -

ab & mb pas kabel WLC bh 1,00 -

upah pas Water Level Control Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

29 Pressure switch bh

Pressure switch bh 1,00 -

kabel NYY 3 x 2.5 mm² m' 35,00 -

ab & mb pas kabel WLC bh 1,00 -

upah pas Pressure switch Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 76: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

30 Memasang 1 M¹ Pipa HPDE diameter 2"

Pipa HPDE diameter 2" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) Pkt 0,35 -

Upah Pemasangan Pipa ls 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

31 Memasang 1 M¹ Pipa Sch 40 3/4"

Pipa Bsp class sch 40 A 53 3/4" m' 1,20 -

Lem besi tube 0,05 -

seal tape bh 1,00 -

sock pipa gip 3/4" bh 0,18 -

a.b & m.b pas pipa gip med class 3/4" ls 1,00 -

upah pas pipa gip med class3/4" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

32 Memasang 1 M¹ Pipa Sch 40 1"

Pipa Bsp class sch 40 A 53 1" m' 1,20 -

Lem besi tube 0,05 -

seal tape bh 1,00 -

sock pipa gip 1" bh 0,18 -

a.b & m.b pas pipa gip med class1" ls 1,00 -

upah pas pipa gip med class 1" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

33 Memasang 1 M¹ Pipa Sch 40 1 1/4"

Pipa Bsp class sch 40 A 53 40 1 1/4" m' 1,20 -

Lem besi tube 0,05 -

seal tape bh 1,00 -

sock pipa gip 1 1/4" bh 0,18 -

a.b & m.b pas pipa gip med class 1 1/4" ls 1,00 -

upah pas pipa gip med class 1 1/4" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

34 Memasang 1 M¹ Pipa Sch 40 1 1/2"

Pipa Bsp class sch 40 A 53 40 1 1/2" m' 1,20 -

Lem besi tube 0,05 -

seal tape bh 1,00 -

sock pipa gip 1 1/2" bh 0,18 -

a.b & m.b pas pipa gip med class 1 1/2" ls 1,00 -

upah pas pipa gip med class 1 1/2" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

35 Memasang 1 M¹ Pipa Sch 40 2"

Pipa Bsp class sch 40 A 53 40 2" m' 1,20 -

Lem besi tube 0,05 -

seal tape bh 1,00 -

sock pipa gip 2" bh 0,18 -

a.b & m.b pas pipa gip med class 2" ls 1,00 -

upah pas pipa gip med class 2" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

36 Memasang 1 M¹ Pipa Sch 40 2 1/2"

Pipa Bsp class sch 40 A 53 40 2 1/2" m' 1,20 -

Lem besi tube 0,05 -

seal tape bh 1,00 -

Page 77: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

sock pipa gip 2 1/2" bh 0,18 -

a.b & m.b pas pipa gip med class 2 1/2" ls 1,00 -

upah pas pipa gip med class 2 1/2" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

37 Memasang 1 M¹ Pipa Sch 40 dia 3"

Pipa Bsp class sch 40 A 53 3" m' 1,20 -

Lem besi kg 0,05 -

seal tape bh 1,00 -

sock pipa gip 3" bh 0,18 -

a.b & m.b pas pipa gip med class 3" ls 1,00 -

upah pas pipa gip med class 3" m' 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

38 Memasang 1 M¹ Pipa Sch 40 4"

Pipa Bsp class sch 40 A 53 4" m' 1,20 -

Lem besi kg 0,05 -

seal tape bh 1,00 -

sock pipa gip 4" bh 0,18 -

Fitting pipa gip medium class 4" ls 1,00 -

a.b & m.b pas pipa gip med class 4" ls 1,00 -

upah pas pipa gip med class 4" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

39 Memasang 1 M¹ Pipa Sch 40 5"

Pipa Bsp class sch 40 A 53 5" m' 1,20 -

Lem besi kg 0,05 -

seal tape bh 1,00 -

sock pipa gip 5" bh 0,18 -

Fitting pipa gip medium class 5" ls 1,00 -

a.b & m.b pas pipa gip med class 5" ls 1,00 -

upah pas pipa gip med class5" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

40 Memasang 1 M¹ Pipa Sch 40 6"

Pipa Bsp class sch 40 A 53 6" m' 1,20 -

Lem besi kg 0,05 -

seal tape bh 1,00 -

sock pipa gip 6" bh 0,18 -

Fitting pipa gip medium class 6" ls 1,00 -

a.b & m.b pas pipa gip med class 6" ls 1,00 -

upah pas pipa gip med class b6" Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

41 Memasang pompa Booster 2 x 60 LPM - head 20 m unit

pompa Booster 2 x 60 LPM - head 20 m unit 1,00 -

Material bantu Alat bantu pas pompa Booster ls 1,00 -

Upah pas pompa Booster Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 78: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

42 Panel P Transfer unit

Panel P Transfer unit 1,00 -

Material bantu & Alat bantu pas pompa Transffer ls 1,00 -

Upah pas pompa Transfer Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

43 MEMASANG POMPA TRANSFER 350 lpm - head 32 m unit

unit 1,00 -

Material bantu pas pompa transfer 350 lpm - head 40 m ls 1,00 -

Upah pas pompa Booster Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

44 Pas. IU VRV Wall Mounted Type Kapasitas :5.400 Btuh unit

IU VRV Wall Mounted Type Kapasitas :5.400 Btuh unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang U VRV Wall Mounted Type Kapasitas :5.400 Btuh ls 1,00 -

Upah pasang U VRV Wall Mounted Type Kapasitas :5.400 Btuh Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

45 Pas. IU VRV Wall Mounted Type Kapasitas :7.200 Btuh unit

IU VRV Wall Mounted Type Kapasitas :7.200 Btuh unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :7.200 Btuh ls 1,00 -

Upah pasang IU VRV Wall Mounted Type Kapasitas :7.200 Btuh Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

46 Pas. IU VRV Wall Mounted Type Kapasitas :7.800 Btuh unit

IU VRV Wall Mounted Type Kapasitas :7.800 Btuh unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :7.800 Btuh ls 1,00 -

Upah pasang IU VRV Wall Mounted Type Kapasitas :7.800 Btuh Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

47 Pas. IU VRV Wall Mounted Type Kapasitas :8.500 Btuh unit

IU VRV Wall Mounted Type Kapasitas :8.500 Btuh unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :8.500 Btuh ls 1,00 -

Upah pasang IU VRV Wall Mounted Type Kapasitas :8.500 Btuh Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

48 Pas. IU VRV Wall Mounted Type Kapasitas :10.800 Btuh unit

IU VRV Wall Mounted Type Kapasitas :10.800 Btuh unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :10.800 Btuh ls 1,00 -

Upah pasang IU VRV Wall Mounted Type Kapasitas :10.800 Btuh Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Pengadaan dan Pemasangan Pompa Transfer type Centrifugal pump kap.346 l/m Head 32 m H2O daya Motor 5,5 kw

Page 79: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

49 Pas. IU VRV Wall Mounted Type Kapasitas :12.000 Btuh unit

IU VRV Wall Mounted Type Kapasitas :12.000 Btuh unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :12.000 Btuh ls 1,00 -

Upah pasang IU VRV Wall Mounted Type Kapasitas :12.000 Btuh Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

50 Pas. IU VRV Wall Mounted Type Kapasitas :13.500 Btuh unit

IU VRV Wall Mounted Type Kapasitas :13.500 Btuh unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :12.000 Btuh ls 1,00 -

Upah pasang IU VRV Wall Mounted Type Kapasitas :12.000 Btuh Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

51 Pas. IU VRV Wall Mounted Type Kapasitas :18.000 Btuh unit

IU VRV Wall Mounted Type Kapasitas :18.000 Btuh unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :18.000 Btuh ls 1,00 -

Upah pasang IU VRV Wall Mounted Type Kapasitas :18.000 Btuh Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

52 IU VRV Split Cassette Type Kap.24.200 BTUH unit

IU VRV Split Cassette Type Kap.24.000 BTUH unit 1,00 -

Besi siku 50 x 50 x 5 kg 40,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Split Cassette Type Kap.24.000 BTUH ls 1,00 -

Upah pasang IU VRV Split Cassette Type Kap.24.000 BTUH Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

53 IU VRV Split Cassette Type Kap.30.700 BTUH unit

IU VRV Split Cassette Type Kap.30.700 BTUH unit 1,00 -

Besi siku 50 x 50 x 5 kg 40,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Split Cassette Type Kap.24.000 BTUH ls 1,00 -

Upah pasang IU VRV Split Cassette Type Kap.24.000 BTUH Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

54 IU VRV Split Cassette Type Kap.47.000 BTUH unit

IU VRV Split Cassette Type Kap.47.000 BTUH unit 1,00 -

Besi siku 50 x 50 x 5 kg 40,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

Page 80: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

ab dan mb pasang IU VRV Split Cassette Type Kap.45.000 BTUH ls 1,00 -

Upah pasang IU VRV Split Cassette Type Kap.45.000 BTUH Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

55 OU VRV Kap.268.000 BTUH (8.900 cfm) unit

OU VRV Kap.268.000 BTUH (8.900 cfm) unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Split Cassette Type Kap.45.000 BTUH ls 1,00 -

Upah pasang IU VRV Split Cassette Type Kap.45.000 BTUH Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

56 OU VRV Kap. 398.000 BTUH (13.250 cfm) unit

OU VRV Kap. 398.000 BTUH (13.250 cfm) unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Split Cassette Type Kap.45.000 BTUH ls 1,00 -

Upah pasang IU VRV Split Cassette Type Kap.45.000 BTUH Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

57 OU VRV Kap. 141.000 BTUH (4.700 cfm) unit

OU VRV Kap. 141.000 BTUH (4.700 cfm) unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Split Cassette Type Kap.45.000 BTUH ls 1,00 -

Upah pasang IU VRV Split Cassette Type Kap.45.000 BTUH Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

58 OU VRV Kap. 215.000 BTUH (7.250 cfm) unit

OU VRV Kap. 215.000 BTUH (7.250 cfm) unit 1,00 -

dynabolt 8 mm bh 4,00 -

Bracket AC bh 1,00 -

ab dan mb pasang IU VRV Split Cassette Type Kap.45.000 BTUH ls 1,00 -

Upah pasang IU VRV Split Cassette Type Kap.45.000 BTUH Oh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

59 Inst. Pipa refrigerant AC 1 PK ttk

Pipa refrigerant 1/4" + 3/8 " isolasi m 15,00 -

VINYL TAPE ADHESIVE roll 3,00 -

ab dan mb pasang AC split 1 PK ls 1,00 -

Upah pasang AC Split 1 PK ttk 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

60 Inst. Pipa refrigerant AC 1,5 PK - 2PK ttk

Pipa tembaga dia. 1/2" + 1/4 " isolasi m 15,00 -

VINYL TAPE ADHESIVE roll 3,00 -

ab dan mb pasang AC split 1 PK ls 1,00 -

Upah pasang AC Split 1 PK ttk 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 81: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

61 Inst. Pipa refrigerant AC 2,5 PK ttk

Pipa tembaga dia. 5/8" + 1/4 " isolasi m 22,00 -

VINYL TAPE ADHESIVE roll 2,00 -

ab dan mb pasang AC split 1 PK ls 1,00 -

Upah pasang AC Split 1 PK ttk 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

62 Drain Pipa pvc aw 3/4" ( 20 mm) ttk

pipa pvc aw 3/4" ljr 0,26 -

insuflex 3/4" (19.1 mm) m' 1,00 -

lem pvc kg 0,05 -

seal tape bh 0,05 -

sock pipa pvc 3/4" bh 0,26 -

bobokan & perapihan ls 1,00 -

ab dan mb pasang pipa PVC dia.3/4" + harmaflek ls 1,00 -

Upah pasang AC Split 1 PK ttk 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

63 Duct Inline Fan 450 CFM ttk

Duct In line Fan 450 CFM lot 1,00 -

ab dan mb pasang pipa PVC dia.3/4" + harmaflek ls 1,00 -

Upah pasang AC Split 1 PK ttk 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

64 Wall Fan ttk

wall Fan 1000 CFM lot 1,00 -

ab dan mb pasang pipa PVC dia.3/4" + harmaflek ls 1,00 -

Upah pasang AC Split 1 PK ttk 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

65 Pas. Exhaust Air Grille uk. 150 x 150 bh

Exhaust Air Grille uk. 150 x 150 bh 1,00 -

Duct tape roll 0,10 -

ab&mb pas. grile bh 1,00 -

Upah pasang grile bh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

66 Pas. Exhaust Air Grille uk. 300 x 150 bh

Exhaust Air Grille uk. 300 x 150 bh 1,00 -

Duct tape roll 0,10 -

ab&mb pas. grile bh 1,00 -

Upah pasang grile bh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

67 InDoor Hydrant Box bh

InDoor Hydrant Box bh 1,00 -

alat & material bantu bh 0,10 -

upah Hidrant indoor bh 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 82: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

68 CO2 kap 6 kg bh

Fire extinguisher type ABC- kap 6 kg lot 1,00 -

material & alat bantu Extinguser lot 1,00 -

upah Hidrant indoor lot 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

69 Pemasangan STP 8 m3 / day unit

STP Biotech 8 m3 / hari unit 1,00 -

AB & Material Bantu STP 8 m3 ls 1,00 -

Pemasangan STP 8 m3 / day ls 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

70 Pemasangan STP 4 m3 / day unit

STP Biotech 4 m3 / hari unit 1,00 -

AB & Material Bantu STP 4 m3 ls 1,00 -

Pemasangan STP 4 m3 / day ls 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

71 Pemasangan STP 1.8 m3 / day unit

STP Biotech 1.8 m3 / hari unit 1,00 -

AB & Material Bantu STP 3 m3 ls 1,00 -

Pemasangan STP 3 m3 / day ls 1,00 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

72 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 1/2"

Pipa Polypropelene PN.16 dia 1/2" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) 1,00 -

Pekerja Oh 0,05 -

Tukang pipa Oh 0,09 -

Kepala tukang Oh 0,01 -

Mandor Oh 0,03 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

73 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 3/4"

Pipa PolypropelenePN.16 dia 3/4" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,05 -

Tukang pipa Oh 0,09 -

Kepala tukang Oh 0,01 -

Mandor Oh 0,03 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

74 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 1"

Pipa Polypropelene PN.16 dia 1" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,05 -

Tukang pipa Oh 0,09 -

Kepala tukang Oh 0,01 -

Mandor Oh 0,03 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 83: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

75 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 1 1/4"

Pipa Polypropelene PN.16 dia 1 1/4" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

76 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 1 1/5"

Pipa Polypropelene dia 1 1/5" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

77 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 2"

Pipa Polypropelene PN.16 dia 2" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

78 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 2 1/2"

Pipa Polypropelene PN.16 dia 2 1/2" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

79 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 3"

Pipa Polypropelene dia,3" M¹ 1,20 -

Perlengkapan ( 40% harga pipa ) -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

80 Memasang 1 M¹ pipa Polypropelene diameter 4"

Pipa Polypropelene PN.16 dia,4" M¹ 1,20 -

Perlengkapan ( 40% harga pipa ) -

Pekerja Oh 0,14 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 84: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

81 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 1/2"

Pipa Polypropelene PN.20 dia 1/2" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,05 -

Tukang pipa Oh 0,09 -

Kepala tukang Oh 0,01 -

Mandor Oh 0,03 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

82 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 3/4"

Pipa PolypropelenePN.20 dia 3/4" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,05 -

Tukang pipa Oh 0,09 -

Kepala tukang Oh 0,01 -

Mandor Oh 0,03 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

83 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 1"

Pipa Polypropelene PN.20 dia 1" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,05 -

Tukang pipa Oh 0,09 -

Kepala tukang Oh 0,01 -

Mandor Oh 0,03 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

84 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 1 1/4"

Pipa Polypropelene PN.20 dia 1 1/4" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,11 -

Tukang batu Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

85 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 1 1/5"

Pipa Polypropelene PN.20 dia 1 1/5" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

86 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 2"

Pipa Polypropelene PN.20 dia 2" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 85: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

87 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 2 1/2"

Pipa Polypropelene PN.20 dia 2 1/2" M¹ 1,20 -

Perlengkapan ( 35% harga pipa ) -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

88 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 3"

Pipa Polypropelene PN.20 dia,3" M¹ 1,20 -

Perlengkapan ( 40% harga pipa ) -

Pekerja Oh 0,11 -

Tukang pipa Oh 0,18 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

89 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 4"

Pipa Polypropelene PN.20 dia,4" M¹ 1,20 -

Perlengkapan ( 40% harga pipa ) -

Pekerja Oh 0,14 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

90 Memasang 1 M¹ Pipa GIP Medium A 1/2" ( 6 m1 )

Pipa GIP Medium A 1/2" ( 6 m1 ) M¹ 1,20 -

Perlengkapan ( 40% harga pipa ) -

Pekerja Oh 0,14 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

91 Memasang 1 M¹ Pipa GIP Medium A 3/4" ( 6 m1 )

Pipa GIP Medium A 3/4" ( 6 m1 ) M¹ 1,20 -

Perlengkapan ( 40% harga pipa ) -

Pekerja Oh 0,14 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

92 Memasang 1 M¹ Pipa GIP Medium A 1" ( 6 m1 )

Pipa GIP Medium A 1" ( 6 m1 ) M¹ 1,20 -

Perlengkapan ( 40% harga pipa ) -

Pekerja Oh 0,14 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 86: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x62

Item Pekerjaan

93 Memasang 1 M¹ Pipa GIP Medium A 1 1/4" ( 6 m1 )

Pipa GIP Medium A 1 1/4" ( 6 m1 ) M¹ 1,20 -

Perlengkapan ( 40% harga pipa ) -

Pekerja Oh 0,14 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

94 Memasang 1 M¹ Pipa GIP Medium A 1 1/2" ( 6 m1 )

Pipa GIP Medium A 1 1/2" ( 6 m1 ) M¹ 1,20 -

Perlengkapan ( 40% harga pipa ) -

Pekerja Oh 0,14 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

95 Memasang 1 M¹ Pipa GIP Medium A 2" ( 6 m1 )

Pipa GIP Medium A 2" ( 6 m1 ) M¹ 1,20 -

Perlengkapan ( 40% harga pipa ) -

Pekerja Oh 0,14 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

96 Memasang 1 M¹ Pipa GIP Medium A 2 1/2" ( 6 m1 )

Pipa GIP Medium A 2 1/2" ( 6 m1 ) M¹ 1,20 -

Perlengkapan ( 40% harga pipa ) -

Pekerja Oh 0,14 -

Tukang pipa Oh 0,23 -

Kepala tukang Oh 0,02 -

Mandor Oh 0,01 - Jumlah -

Overhead + Profit -

Jumlah -

Dibulatkan -

Page 87: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Jumlah (Rp.)

A ELEKTRIKAL1 1 Unit Panel TR LT.1 - 2 1 Unit Panel SDP LT.1 - 3 1 Unit Panel LP/PP.LT.1 - 4 1 Unit Panel LP/PP.LT.2 - 5 1 Unit Panel LP/PP.LT.3A - 6 1 Unit Panel LP/PP.LT.3 - 7 1 Unit Panel LP/PP.R.M.LIFT - 8 1 Unit Panel PP. AC . LT.1 - 9 1 Unit Panel PP. AC . A LT.2 -

10 1 Unit Panel PP. AC . OUTDOR UNIT - 11 1 Ttk Tray 300 X 50 mm - 12 1 BH Lampu TL LED 2 x 20 Watt,TKI-Mirror - 13 1 BH Lampu RML (M1) 2 x 18 W - 14 1 BH MEMASANG DOWN LIGHT 18 W - 15 1 BH MEMASANG DOWN LIGHT 15 W - 16 1 BH MEMASANG LAMPU BARET 20 W - 17 1 BH MEMASANG LAMPU INDIRECT T.5 - 18 1 BH MEMASANG LAMPU TL T.8 - 19 1 BH MEMASANG STOP KONTAK - 20 1 BH MEMASANG SAKLAR SERI - 21 1 BH MEMASANG SAKLAR TUNGGAL - 22 1 BH MEMASANG SAKLAR TUKAR - 23 1 BH Grid Switch 10 Gang - 24 1 BH Penangkal petir konvensional - 25 1 BH Beam Clamp + Support - 26 1 BH Pentanahan (grounding system )27 1 BH Down Cable BC 50 - 28 1 Ttk Memasang Titik nyala Lampu - 29 1 Ttk Memasang Titik Nyala Saklar - 30 1 Ttk Memasang Titik nyala Stop Kontak - 31 1 Ttk Instalasi kabel power AC 1 - 1 1/2PK - 32 1 Ttk Instalasi kabel power AC 3 - 4 PK - 33 1 Ttk Instalasi kabel power FAN - 34 1 M' Memasang Penggelaran kabel NYY 4 x 2,5 mm2 - 35 1 M' Memasang Penggelaran kabel NYY 4 x 4 mm2 - 36 1 M' Memasang Penggelaran kabel NYY 4 x 10 mm2 - 37 1 M' Memasang Penggelaran kabel NYY 4 x 6 mm2 - 38 1 M' Memasang Penggelaran kabel NYY 4 x 16 mm2 - 39 1 M' Memasang Penggelaran kabel NYY 4 x 25 mm2 - 40 1 M' Memasang Penggelaran kabel NYY 4 x 50 mm2 - 41 1 M' Memasang Penggelaran kabel NYFGBY 4 x 70 mm2 - 42 1 M' Memasang Penggelaran kabel NYFGBY 4 x 95 mm2 - 43 1 M' Memasang Penggelaran kabel NYFGBY 4 x 120 mm2 - 44 1 M' Memasang Penggelaran kabel NYFGBY 4 x 150 mm2 - 45 1 M' Memasang Penggelaran kabel NYFGBY 4 x 185 mm2 - 46 1 M' Memasang Penggelaran kabel NYFGBY 4 x 240 mm2 - 47 1 M' Memasang Penggelaran kabel NYFGBY 4 x 300 mm2 -

B FIRE ALARM48 1 Ttk Memasang Titik nyala Fire Alarm - 49 1 unit Memasang Master Control Fire Alarm - 50 1 Bh MEMASANG PHOTO ELECTRIC SMOKE DETECTOR - 51 1 Bh Heat Detector - 52 1 Bh MANUAL BREAK GLASS PUSH BUTTON - 53 1 Bh MEMASANG ALARM BELL - 54 1 Bh MEMASANG INDICATOR LAMP - 55 1 Bh MEMASANG END OF LINE - 56 1 Bh JBFA - 57 1 Ttk Instalasi Fire alarm (NYA 16 x 2,5 mm) -

DAFTAR HARGA SATUAN PEKERJAAN ELEKTRIKAL

Item Pekerjaan

Page 88: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Jumlah (Rp.)Item Pekerjaan

C TATA SUARA58 1 Ttk Memasang Titik nyala Tata Suara - 59 1 Bh AM/FM Tuner & CD Player - 60 1 Bh MEMASANG CD PLAYER - 61 1 Bh Paging remote mic - 62 1 Bh Mixer Power Amplifier 250 w - 63 1 Bh Selector Zone - 64 1 Bh MEMASANG RACK CABINET - 65 1 ttk Terminal Box - Tata Suara - 66 1 Bh Ceiling speaker - 67 1 Bh Wall speaker - 68 1 Bh Volume control -

D SISTEM TELEPHON69 1 Bh Instalasi Microphone - 70 1 Bh Instalasi Kabel Microphone - 71 1 Bh Outlet Microphone - 72 1 Ttk Memasang Titik nyala Telephone - 73 1 unit Memasang M-type kx-tda0104x - 74 1 unit Memasang Digital console kx-t7640 - 75 1 unit Memasang D60 DSS Console kx - dt390x - 76 1 Bh MEMASANG TELEPON KX-T2371 - 77 1 Bh MEMASANG Handset Display - 78 1 Bh MEMASANG MDF - Telephone - 79 1 Ttk MEMASANG OUTLET TELEPONE - 80 1 Ttk MEMASANG KABEL OTC 10x2x0,6 MM2 -

E SISTEM DATA81 1 Ttk Memasang Titik nyala Power Data Komputer - 82 1 Ttk Memasang Titik nyala Data Komputer - 83 1 Bh Memasang Outlet Data - 84 1 unit Memasang Wall mount 19"/12 U / ABBA 12 U - 85 1 Bh Memasang Switch Hub. 24 Ch - 86 1 m' Memasang KABEL Data Cat-6 -

F SISTEM CCTV87 1 Ttk Memasang Titik CCTV - 88 1 Ttk Memasang Titik Power CCTV - 89 1 Ttk Memasang Instalasi kabel data Cat 5 CCTV - 90 1 Bh MEMASANG FIXED CAMERA - 91 1 unit Memasang PERALATAN UTAMA CCTV - 92 1 Bh Memasang MONITOR CCTV 32" - 93 1 Bh Memasang DOME CAMERA -

Bogor, ..................... 2018Kontraktor,PT,.................................

Cap & Tanda Tangan

NAMAJabatan

Page 89: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

A ELEKTRIKAL1 Panel TR LT.1

Pengadaan dan Pemasangan Panel TR terdiri dari : - 1 module box panel ukuran 80 x 180 x 60 cm unit 1,00 - Pilot lamp/control fuse/Vss 3 pos bh 3,00 - Amper Meter,Volt Meter, Freqwinsi meter Digital set 1,00 - Trafo Arus CT bh 3,00 - MCCB terdiri dari : - 600A. 3 P bh 1,00 - CU busbar 5 ( 50 x 5 mm) bh 5,00 - Grounding system bh 1,00 - Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

2 Panel SDP LT.1 Pengadaan dan Pemasangan Panel SDP terdiri dari : - 1 module box panel ukuran 90 x 70 x 30 cm unit 1,00 - Pilot lamp/control fuse/Vss 3 pos bh 3,00 - Amper Meter,Volt Meter, Freqwinsi meter Digital set 1,00 - Trafo Arus CT bh 3,00 - MCCB terdiri dari : - 5000-630A. 3P Motoris bh 2,00 - 125A. 3 P bh 2,00 - 50A. 3P bh 2,00 - 32A. 3P bh 5,00 - 125A. 3 P bh 1,00 - 63A. 3P bh 1,00 - Modul ATS set 1,00 - CU busbar 5 ( 50 x 5 mm) bh 5,00 - Grounding system bh 1,00 - Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

3 Panel LP/PP.LT.1 Pengadaan dan Pemasangan Panel LP/PP.LT.1 terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 - Pilot lamp/control fuse/Vss 3 pos bh 3,00 - Trafo Arus CT bh 3,00 - MCCB 3 P terdiri dari : - 40-63 A. bh 1,00 - MCB 1 Ph terdiri dari : - 10 A 1ph bh 17,00 - Grounding system bh 1,00 - Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

4 Panel LP/PP.LT.2 Pengadaan dan Pemasangan Panel LP/PP.LT.2 terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 - Pilot lamp/control fuse/Vss 3 pos bh 3,00 - Trafo Arus CT bh 3,00 - MCCB 3 P terdiri dari : - 40-63 A. bh 1,00 - MCB 1 Ph terdiri dari : - 10 A 1ph bh 31,00 - Grounding system bh 1,00 - Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 -

Item Pekerjaan

2

ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL

Page 90: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

2Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

5 Panel LP/PP.LT.3A Pengadaan dan Pemasangan Panel LP/PP.LT.3

terdiri dari : - 1 module box panel ukuran 40 x 40 x 15 cm unit 1,00 -

MCB 1 Ph terdiri dari : -

6 A 1ph bh 1,00 -

10 A 1ph bh 3,00 -

Grounding system bh 1,00 -

Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

6 Panel LP/PP.LT.3 Pengadaan dan Pemasangan Panel LP/PP.LT.3

terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,0000 -

Pilot lamp/control fuse/Vss 3 pos bh 3,0000 -

Trafo Arus CT bh 3,0000 -

MCB3 P terdiri dari : -

25-32 A. bh 3,0000 -

MCB 1 Ph terdiri dari : -

6 A 1ph bh 27,0000 -

Grounding system bh 1,0000 -

Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,0000 - Pekerja Oh 0,0400 - Tukang Listrik Oh 0,1350 - Kepala tukang Oh 0,0135 - Mandor Oh 0,0050 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

7 Panel LP/PP.R.M.LIFT Pengadaan dan Pemasangan Panel LP/PP.LT.3 terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 - Pilot lamp/control fuse/Vss 3 pos bh 3,00 - Trafo Arus CT bh 3,00 - MCB3 P terdiri dari : - 25-32 A. bh 1,00 - 16 A. bh 1,00 - MCB 1 Ph terdiri dari : - 6 A 1ph bh 4,00 - Grounding system bh 1,00 - Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

8 Panel PP. AC . LT.1 Pengadaan dan Pemasangan Panel PP.AC. LT.1 terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 - Pilot lamp/control fuse/Vss 3 pos bh 3,00 - Trafo Arus CT bh 3,00 - MCCB terdiri dari : - 125A. 3P bh 1,00 - 40-63 A. bh 1,00 - MCB terdiri dari : - 16 A. 1 P bh 32,00 - Grounding system bh 1,00 - Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 -

Page 91: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

2Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

9 Panel PP. AC . A LT.2 Pengadaan dan Pemasangan Panel PP.AC. LT.1 terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 - Pilot lamp/control fuse/Vss 3 pos bh 3,00 - Trafo Arus CT bh 3,00 - MCCB terdiri dari : - 40-63 A. bh 1,00 - 32-40 A. bh 3,00 - MCB terdiri dari : - 16 A. 1 P bh 6,00 - Grounding system bh 1,00 - Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

10 Panel PP. AC . OUTDOR UNIT Pengadaan dan Pemasangan Panel PP.AC. OUTDOR UNIT terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 - Pilot lamp/control fuse/Vss 3 pos bh 3,00 - Trafo Arus CT bh 3,00 - MCCB terdiri dari : - 200-225A. 3P bh 1,00 - 125A. 3P bh 4,00 - 40-63 A. bh 2,00 - MCB terdiri dari : - 16 A. 1 P bh 36,00 - Grounding system bh 1,00 - Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

11 Tray 300 X 50 mmTray U 300 X 50 mm m' 0,33 - Jointing tray 100 bh' 0,33 - Elbow Tray U 300 x 50 bh' 0,10 - Hanger beam bh' 0,50 - Hanger Rood bh' 0,33 - Material bantu Tray ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

12 Lampu TL LED 2 x 20 Watt,TKI-Mirror Lampu TL LED 2 x 20 Watt,TKI-Mirror bh' 1,00 - material bantu pas lampu type 1 ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 92: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

213 Lampu RML (M1) 2 x 18 W

Lampu RML (M1) 2 x 18 W bh' 1,00 - material bantu pas lampu type 1 ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

14 MEMASANG DOWN LIGHT 18 WDL 18 W bh' 1,00 - material bantu pas lampu type 1 ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

15 MEMASANG DOWN LIGHT 15 WDL 15 W bh' 1,00 - material bantu pas lampu type 1 ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

16 MEMASANG LAMPU BARET 20 WLampu Baret 20 W bh' 1,00 - material bantu pas lampu type 1 ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

17 MEMASANG LAMPU INDIRECT T.5Lampu Indirect T.5 16 W bh' 1,00 - material bantu pas lampu type 1 ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

18 MEMASANG LAMPU TL T.8Lampu TL. T.8 18 W bh' 1,00 - material bantu pas lampu type 1 ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

19 MEMASANG STOP KONTAKStop kontak bh' 1,00 - inbouw doos bh' 1,00 - alat bantu pas saklar/stop kontak ls 1,00 - Pekerja Oh 0,04 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

20 MEMASANG SAKLAR SERIsaklar ganda bh' 1,00 -

Page 93: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

2inbouw doos bh' 1,00 - Material & alat bantu pas saklar/stop kontak ls 1,00 - upah pas saklar / stop kontak ls 1,00 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

21 MEMASANG SAKLAR TUNGGALsaklar tunggal bh' 1,00 - inbouw doos bh' 1,00 - Material & alat bantu saklar/stop kontak ls 1,00 - upah pas saklar / stop kontak ls 1,00 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

22 MEMASANG SAKLAR TUKARsaklar tukar bh' 1,00 - inbouw doos bh' 1,00 - Material & alat bantu pas saklar/stop kontak ls 1,00 - upah pas saklar / stop kontak ls 1,00 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

23 Grid Switch 10 GangGrid Switch 10 Gang bh' 1,00 - inbouw doos 12 gang bh' 1,00 - Material & alat bantu pas saklar/stop kontak ls 1,00 - upah pas saklar / stop kontak ls 1,00 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

24 Penangkal petir konvensionalspit tembaga 1 1/4" bh' 1,00 - Material & alat bantu spit tembaga 1 1/4" ls 1,00 - Upah Pasang Penangkal Petir konvensional ls 1,00 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

25 Beam Clamp + SupportBeam Clamp + Support bh' 1,00 - Material & alat bantu Beam Clamp + Support ls 1,00 - Upah Pasang Penangkal Petir konvensional ls 1,00 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

26 Pentanahan (grounding system )Kabel BC 50 mm m' 10,00 - pipa gip medium class 1 1/4" btg 1,00 - sock pipa gip 1" bh 2,00 - spit tembaga 1 1/4" bh 1,00 - material bantu pas grounding ls 1,00 - Upah Pasang Penangkal Petir konvensional ls 1,00

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

27 Down Cable BC 50Kabel BC 50 mm m' 1,10 - material bantu pas inst kabel sedang bh 1,00 - upah pas inst kabel sedang ls 1,00 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

28 Memasang Titik nyala LampuNYM 3 x 2,5 mm2 m' 15,00 - pipa conduit dia 20 mm btg 6,25 - sock dia.20 mm bh 6,25 - t dus dia. 20 mm bh 1,00 - klem dia.20 mm bh 12,50 - Isolasi bh 0,50 - material bantu pas inst ttk lampu ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Page 94: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

2Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

29 Memasang Titik Nyala SaklarNYM 3 x 2,5 mm2 m' 15,00 - pipa conduit dia 20 mm btg 6,25 - sock dia.20 mm bh 6,25 - t dus dia. 20 mm bh 1,00 - klem dia.20 mm bh 12,50 - Isolasi bh 0,50 - material bantu pas inst ttk lampu ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

30 Memasang Titik nyala Stop KontakNYM 3 x 2,5 mm2 m' 19,00 - pipa conduit dia 20 mm btg 7,92 - sock dia.20 mm bh 7,92 - t dus dia. 20 mm bh 1,00 - klem dia.20 mm bh 15,83 - Isolasi bh 0,50 - material bantu pas inst ttk Stop kontak ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

31 Instalasi kabel power AC 1 - 1 1/2PKNYM 3 x 2,5 mm2 m' 30,00 - pipa conduit dia 20 mm m' 17,00 - sock dia.20 mm bh 17,00 - t dus dia. 20 mm bh 1,00 - klem dia.20 mm bh 23,00 - ab dan mb pas kabel power AC ls 0,35 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

32 Instalasi kabel power AC 3 - 4 PKkabel NYY 4 x 4 mm² m' 20,00 - pipa conduit dia 20 mm m' 12,00 - sock dia.20 mm bh 12,00 - t dus dia. 20 mm bh 1,00 - klem dia.20 mm bh 23,00 - ab dan mb pas kabel power AC ls 0,35 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

33 Instalasi kabel power FANNYM 3 x 2,5 mm2 m' 30,00 - pipa conduit dia 20 mm m' 10,34 - sock dia.20 mm bh 10,34 - t dus dia. 20 mm bh 1,00 - klem dia.20 mm bh 20,69 - ab dan mb pas kabel power AC ls 0,35 -

Page 95: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

2Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

34 Memasang Penggelaran kabelNYY 4 x 2,5 mm2 M¹ 1,20 - Perlengkapan ( 35% harga kabel ) Pkt 0,35 - Pekerja Oh 0,02 - Tukang Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

35 Memasang Penggelaran kabelNYY 4 x 4 mm2 M¹ 1,20 - Kabel BC 6 mm m' 1,00 - Isolasi m' 0,07 - material bantu pas inst kabel kecil ls 1,00 - Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

36 Memasang Penggelaran kabelNYY 4 x 10 mm2 m' 1,00 - Kabel BC 6 mm m' 1,00 - Isolasi m' 0,07 - material bantu pas inst kabel kecil ls 1,00 - Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

37 Memasang Penggelaran kabelNYY 4 x 6 mm2 m' 1,00 - Kabel BC 6 mm m' 1,00 - Isolasi m' 0,07 - material bantu pas inst kabel kecil ls 1,00 - Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

38 Memasang Penggelaran kabelNYY 4 x 16 mm2 m' 1,00 - Kabel BC 10 mm m' 1,00 - Isolasi bh 0,07 - material bantu pas inst kabel sedang ls 1,00 - Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

39 Memasang Penggelaran kabelNYY 4 x 25 mm2 m' 1,00 - Kabel BC 10 mm m' 1,00 - Isolasi bh 0,07 - material bantu pas inst kabel sedang ls 1,00 -

Page 96: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

2Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

40 Memasang Penggelaran kabelNYY 4 x 50 mm2 m' 1,00 - Kabel BC 25 mm m' 1,00 - klem dia.20 mm bh 1,00 - Isolasi bh 0,07 - material bantu pas inst kabel besar ls 1,00 - Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

41 Memasang Penggelaran kabelNYFGBY 4 x 70 mm2 m' 1,00 - Kabel BC 25 mm m' 1,00 - klem dia.20 mm bh 1,00 - Isolasi bh 0,07 - material bantu pas inst kabel besar ls 1,00 - Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

42 Memasang Penggelaran kabelNYFGBY 4 x 95 mm2 m' 1,00 - Kabel BC 25 mm m' 1,00 - klem dia.20 mm bh 1,00 - Isolasi bh 0,07 - material bantu pas inst kabel besar ls 1,00 - Pekerja Oh 0,02 - Tukang Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

43 Memasang Penggelaran kabelNYFGBY 4 x 120 mm2 m' 1,00 - Kabel BC 70 mm m' 1,00 - Isolasi bh 0,07 - material bantu pas inst kabel besar ls 1,00 - Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

44 Memasang Penggelaran kabelNYFGBY 4 x 150 mm2 m' 1,00 - Kabel BC 70 mm m' 1,00 - Isolasi bh 0,07 - material bantu pas inst kabel besar ls 1,00 - Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 97: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

245 Memasang Penggelaran kabel

NYFGBY 4 x 185 mm2 m' 1,00 - Kabel BC 70 mm m' 1,00 - Isolasi bh 0,07 - material bantu pas inst kabel besar ls 1,00 - Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

46 Memasang Penggelaran kabelNYFGBY 4 x 240 mm2 m' 1,00 - Kabel BC 70 mm m' 1,00 - Isolasi bh 0,07 - material bantu pas inst kabel besar ls 1,00 - Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

47 Memasang Penggelaran kabelNYFGBY 4 x 300 mm2 m' 1,00 - Kabel BC 70 mm m' 1,00 - Isolasi bh 0,07 - material bantu pas inst kabel besar ls 1,00 - Pekerja Oh 0,02 - Tukang Listrik Oh 0,14 - Kepala tukang Oh 0,01 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

B FIRE ALARM48 Memasang Titik nyala Fire Alarm

NYA 3 x 1,5 mm2 m' 16,00 - pipa conduit dia 20 mm btg 2,76 - t dus dia. 20 mm bh 1,00 - sock dia.20 mm bh 6,00 - klem kabel bh 14,00 - Perlengkapan harga conduit,klem,isolasi Pkt 0,35 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

49 Memasang Master Control Fire AlarmMCFA 25 Zone unit 1,00 - material & alat bantu F.A ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

50 MEMASANG PHOTO ELECTRIC SMOKE DETECTORPhoto electric Smoke Detector bh 1,00 - material & alat bantu Smoke Detector ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 98: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

251 Heat Detector

R.O.R heat detector bh 1,00 - material & alat bantu ROR ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

52 MANUAL BREAK GLASS PUSH BUTTON Manual call point bh 1,00 - material & alat bantu Manual call point ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

53 MEMASANG ALARM BELLAlarm Bell bh 1,00 - material & alat bantu alarm bell ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

54 MEMASANG INDICATOR LAMPIndicator lamp bh 1,00 - material & alat bantu lampu indicator ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

55 MEMASANG END OF LINEEnd of Line bh 1,00 - material & alat bantu End of Line ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

56 JBFATerminal box FA bh 1,00 - material & alat bantu Terminal box FA ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

57 Instalasi Fire alarm (NYA 16 x 2,5 mm)kabel NYA 1 x 2,5 mm² m' 16,00 - pipa conduit dia 20 mm btg 2,76 - t dus dia. 20 mm bh 1,00 - sock dia.20 mm bh 6,00 - klem kabel bh 14,00 - material & alat bantu ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 99: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

2

C TATA SUARA58 Memasang Titik nyala Tata Suara

NYMHY 3 x 1,5 mm2 M¹ 15,00 - pipa conduit dia 20 mm btg 2,76 - t dus dia. 20 mm bh 1,00 - sock dia.20 mm bh 6,00 - klem kabel bh 14,00 - material & alat bantu ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

59 AM/FM Tuner & CD PlayerAM/FM Tuner + CD set 1,00 - kabel RCA ls 1,00 - material & alat bantu AM/FM Tuner & CD Player set 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

60 MEMASANG CD PLAYERCD Player set 1,00 - kabel RCA ls 1,00 - material & alat bantu CD Player set 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

61 Paging remote micPaging Mic TOA 100 EC set 1,00 - kabel RCA ls 1,00 - material & alat bantu Paging Mic TOA 100 EC set 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

62 Mixer Power Amplifier 250 wpower amplifier TOA ZA 2240 set 1,00 - kabel RCA ls 1,00 - material & alat bantu power amplifier TOA ZA 2240 set 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

63 Selector ZoneSelector Zone set 1,00 - kabel RCA ls 1,00 - material & alat bantu r ECP set 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 100: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

264 MEMASANG RACK CABINET

kabel RCA set 1,00 - cabinet rack tata suara ls 1,00 - material & alat bantu rack S system set 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

65 Terminal Box - Tata SuaraTerminal box panel TS set 1,00 - material & alat bantu Terminal box panel TS ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

66 Ceiling speakerCeiling speaker set 1,00 - material & alat bantu speaker / volume control ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

67 Wall speakerWall speaker set 1,00 - material & alat bantu box speaker ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

68 Volume controlVolume control bh 1,00 - inbouw doos Volume control bh 1,00 - material & alat bantu box speaker ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

D SISTEM TELEPHON69 Instalasi Microphone

kabel Mic canare m' 1,00 - pipa conduit EGA dia 20 mm btg 1,00 - sock EGA dia.20 mm bh 1,00 - klem EGA dia.20 mm bh 1,33 - alat & Mat. bantu pas inst ttk horn speaker ls 0,10 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

70 Instalasi Kabel Microphonekabel Mic canare m' 35,00 - pipa conduit EGA dia 20 mm btg 15,22 - sock EGA dia.20 mm bh 15,22 - klem EGA dia.20 mm bh 30,43 - alat & Mat. bantu Mic canare lot 1,00 -

Page 101: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

2Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

71 Outlet MicrophoneOutlet Microphone bh 1,00 - inbouw doos bh 1,00 - alat & Mat. Outlet Microphone ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

72 Memasang Titik nyala TelephoneITC 1 x 2 x 0,6 mm2 M¹ 15,00 - pipa conduit EGA dia 20 mm btg 15,22 - sock EGA dia.20 mm bh 15,22 - klem EGA dia.20 mm bh 30,43 - alat & Mat. bantu ITC 1 x 2 x 0,6 mm2 lot 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

73 Memasang M-type kx-tda0104xM-type kx-tda0104x unit 1,00 - T-box 100 unit 1,00 - alat bantu pasang programing PABX unit 1,00 - UPS 2000 VA unit 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

74 Memasang Digital console kx-t7640Headset RPTCA400 unit 1,00 - KX DT333X unit 1,00 - mat bantu pas Fax / telp bh 1,00 - Perlengkapan harga conduit,klem,isolasi Pkt 1,00 - alat bantu pas Fax / telp ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

75 Memasang D60 DSS Console kx - dt390x60 DSS Console kx - dt390x unit 1,00 - material & alat bantu DSS Console kx - dt390x ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

76 MEMASANG TELEPON KX-T2371Analog Telp KX-T2371 unit 1,00 - material & alat bantu Analog Telp KX-T2371 ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 102: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

277 MEMASANG Handset Display

Digital display KX-T7630 unit 1,00 - material & alat bantu Digital display KX-T7630 ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

78 MEMASANG MDF - TelephoneMDF bh 1,00 - Wire Cord MDF 1 1,00 - material & alat bantu MDF telp ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

79 MEMASANG OUTLET TELEPONEOutlet Telephone bh 1,00 - inbouw doos 1 1,00 - material & alat bantu Outlet Telephone ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

80 MEMASANG KABEL OTC 10x2x0,6 MM2kabel OTC 10 x 2 x 0,6 mm² m' 1,00 - Isolasi bh 0,07 - material & alat bantu OTC 10 x 2 x 0,6 mm² ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

E SISTEM DATA81 Memasang Titik nyala Power Data Komputer

Kabel NYM 3 x 2,5 mm M¹ 15,00 - pipa conduit EGA dia 20 mm btg 15,22 - sock EGA dia.20 mm bh 15,22 - klem EGA dia.20 mm bh 30,43 - alat & Mat. bantu pas inst ttk horn speaker lot 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

82 Memasang Titik nyala Data KomputerKabel Cad 5 M¹ 45,00 - pipa conduit dia 20 mm M¹ 45,00 - t dus dia. 20 mm bh 1,00 - one way doos bh 1,00 - sock dia.20 mm bh 15,52 - klem dia.20 mm bh 31,03 - Perlengkapan harga conduit,klem,isolasi Pkt 0,35 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 103: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

283 Memasang Outlet Data

Face Plate 1 Port bh 1,00 - Modular Jack Cat 5e ls 1,00 - inbouw doos bh 1,00 - alat bantu pas outlet data ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

84 Memasang Wall mount 19"/12 U / ABBA 12 UWall mount 19"/12 U / ABBA 12 U bh 1,00 - material & alat bantu Wall Mount Rack Data ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

85 Memasang Switch Hub. 24 ChSwitchub 24 ch bh 1,00 - material & alat bantu switch hub 16 ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

86 Memasang KABEL Data Cat-6kabel data Cat-6 belden m' 1,00 - pipa conduit dia 20 mm m' 1,00 - sock dia.20 mm bh 1,00 - t dus dia. 20 mm bh 1,00 - klem dia.20 mm bh 0,34 - Isolasi bh 0,70 - material & alat bantu inst ttk data ls 0,40 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

F SISTEM CCTV87 Memasang Titik CCTV ttk

Kabel Coaxial RG 59 m' 85,00 - BNC bh 4,00 - pipa conduit dia 20 mm m' 30,36 - t dus dia. 20 mm bh 1,00 - sock dia.20 mm bh 30,36 - klem kabel bh 60,71 - elbow ega bh 2,00 - material & alat bantu kabel RG 5 ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

88 Memasang Titik Power CCTVkabel NYMHY 3x1,5 mm2 m' 85,00 - pipa conduit dia 20 mm m' 30,00 - t dus dia. 20 mm bh 1,00 - sock dia.20 mm bh 1,00 - klem kabel bh 60,00 - elbow ega bh 4,00 - material & alat bantu kabel RG 5 ls 1,00 -

Page 104: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Volume Satuan Harga Satuan Jumlah Harga

1 3 4 5 6 = 3x6

Item Pekerjaan

2Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

89 Memasang Instalasi kabel data Cat 5 CCTVkabel data Cat-5 belden m' 85,00 - pipa conduit dia 20 mm btg 30,00 - t dus dia. 20 mm bh 1,00 - one way doos bh 1,00 - sock dia.20 mm bh 60,00 - klem dia.20 mm bh 4,00 - material & alat bantu kabel RG 5 ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

90 MEMASANG FIXED CAMERAFixed dome camera unit 1,00 - BNC bh 1,00 - material & alat bantu Fixed dome camera ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

91 Memasang PERALATAN UTAMA CCTVDivar 16 channel bh 1,00 - BNC ls 16,00 - material & alat bantu DVR ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

92 Memasang MONITOR CCTV 32"Monitor LCD 32" bh 1,00 - BNC ls 10,00 - material & alat bantu Camera ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

93 Memasang DOME CAMERADome camera MOVING bh 1,00 - BNC ls 10,00 - material & alat bantu Camera ls 1,00 - Tukang Listrik Oh 0,24 - Kepala tukang Oh 0,02 - Mandor Oh 0,01 -

Jumlah - Overhead + Profit - Jumlah - Dibulatkan -

Page 105: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No.

1

I. PEKERJAAN PERSIAPAN1. Perizinan (Izin Prinsip dan Operasi) dari Instansi terkait

Biaya mobilisasi dan demobilisasi termasuk biaya ijin pemasukan peralatan @ Rp. = Rp. - dan perlengkapan kerja kedalam lokasi proyek dan pemindahan dari satu tempat ke tempat lainnya didalam lokasi pekerjaan serta mengeluarkannya setelah penyelesaian pekerjaan

Jumlah = Rp. -

2. Manajemen dan Asuransi PersonilKontraktor atas nama Pemberi Tugas wajib mengasuransikan, sebagai berikut :a. Asuransi Construction All Risk (CAR), Third Party Liability (TPL) dan @ Rp. = Rp. -

Personal Accident (PA).b. Asuransi Tenaga Kerja (ASTEK) untuk pekerja dan staff kontraktor yang @ Rp. = Rp. -

bekerja pada proyek ini.c. Biaya-biaya yang dikeluarkan untuk pengurusan dan penyelesaian @ Rp. = Rp. -

tuntutan (klaim) termasuk mendapatkan data-data dan dokumen penunjang yang diperlukan sehubungan dengan hal tersebut diatas.

Jumlah = Rp. -

3. Drawinga. Pengadaan gambar pelaksanaan (construction drawing) sebanyak yang @ Rp. = Rp. -

diperlukan untuk keperluan kerja dilapangan termasuk 2 (dua) set keperluan pengawasan.

b. Pembuatan gambar kerja (shop drawing) berikut perhitungan atau @ Rp. = Rp. - kalkulasi yang terinci sebanyak 3 (tiga) set, hingga disetujui Manajemen Konstruksi dan atau Pemberi Tugas.

c. Pembuatan gambar-gambar terlaksana (as built drawing) sebanyak 1 @ Rp. = Rp. - (satu) set kalkir dan 4 (empat) set blue print.

Jumlah = Rp. -

4. 1 M2 Pembuatan Direksi Keet dan GudangBahan : 0,1 m3 Kayu kelas III @ Rp. = Rp. -

0,25 Kg Paku Biasa @ Rp. = Rp. - 5 Kg Semen Portland @ Rp. = Rp. -

0,25 M3 Pasir Pasang @ Rp. = Rp. - 70 bh bata merah @ Rp. = Rp. - 1,1 Lbr Seng Gelombang Bjls 30 @ Rp. = Rp. - 0,5 Lbr Triplek 3 mm @ Rp. = Rp. -

1 Ls Ongkos Pasang @ Rp. = Rp. -

Jumlah = Rp. - 12 m2 -

5. Listrik KerjaSetiap pembangkit tenaga listrik sementara atau penerangan sementara @ Rp. = Rp. - termasuk pemasangan kabel-kabel dan meteran yang dipergunakan untuk pekerjaan atau pengambilan daya dari sumber atau PLN yang sudah ada, maka semua biaya pengadaan dan pemakaian daya selama pelaksanan proyek termasuk izin yang diperlukan serta perapihan setelah pekerjaan selesai sudah harus diperhitungkan oleh Kontraktor.

Jumlah = Rp. -

TOTAL PEKERJAAN PERSIAPAN = Rp. - DIBULATKAN = Rp. -

II. PEKERJAAN PREPARASI HOISTWAY + PEKERJAAN PENUNJANGa. Preparasi Hoistway + Pekerjaan Penunjang (Grouting sill, jamb & sill suport) @ Rp. = Rp. -

1. Pengeboran Angkur dan Pemasangan Braket2. Pemasangan Rel Pemandu (Guide Rail)3. Pemasangan Pintu Pemberhentian (Landing Door)4. Pemasangan hall sill dan jamb.

b. Ongkos Kerja @ Rp. = Rp. -

TOTAL PEKERJAAN PREPARASI HOISTWAY + PEKERJAAN PENUNJANG = Rp. - DIBULATKAN = Rp. -

ANALISA HARGA SATUAN

Harga Satuan Rp. Harga Satuan Rp.

3 4

Item Pekerjaan

2

Page 106: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No.

1

Harga Satuan Rp. Harga Satuan Rp.

3 4

Item Pekerjaan

2

III. UNIT LIFT PASSANGER (PENUMPANG) LIFT No. Kapasitas : 6 Orang (3500 kg) @ Rp. = Rp. - Tipe : Traction Drive AC Geared/Gearless/GETM/GeN2-MRPelayanan : Lt. 1 s/d Lt. 3 (3 stop/opening)Kecepatan : 60 mpmInterior @ Rp. = Rp. - - Dinding Kiri & Kanan : Mirror Stainless Steel - Dinding Tengah : Mirror Stainless Steel - Pintu Dalam Lift : Mirror Stainless Steel Lantai : Granit Tile Motif (by other)Ceiling : Standar TypeCar Door : Mirror Stainless Steel Front Return Walls : Mirror Stainless Steel Entrance Coulomn : Mirror Stainless Steel Jamb : Jamb Stainless Stell Wide Jamb

TOTAL PEKERJAAN UNIT LIFT PASSANGER (PENUMPANG) LIFT = Rp. - DIBULATKAN = Rp. -

IV. PEKERJAAN ARD (Auto Rescue Device)a. Pekerjaan ARD (Auto Rescue Device) @ Rp. = Rp. -

Seluruh Perijinan pada paket pekerjaan dimaksud, dengan instansi terkaitPaket Elevator sudah termasuk resiko-resiko lain yang berkaitandengan pelaksanaan, keamanan sampai dengan Elevator diserahterimakan

b. Ongkos Pasang @ Rp. = Rp. -

TOTAL PEKERJAAN ARD (Auto Rescue Device) = Rp. - DIBULATKAN = Rp. -

V. PEKERJAAN MEMASANG NYY 4 x 1C x 16 mm² + NYA 10 mm²Bahan : 1,2 m' NYY 4 x 1C x 16 mm² + NYA 10 mm² @ Rp. = Rp. -

m' Perlengkapan ( 20% harga conduit,klem,isolasi ) @ Rp. = Rp. -

Tenaga : 1,5 OH Pekerja @ Rp. = Rp. - 1 OH Tukang @ Rp. = Rp. -

0,1 OH Kepala tukang @ Rp. = Rp. - 0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG NYY 4 x 1C x 16 mm² + NYA 10 mm² = Rp. - DIBULATKAN = Rp. -

VI. PEKERJAAN MEMASANG AESBahan : 1 unit AES Monitoring System by PC Panel Control @ Rp. = Rp. -

Perlengkapan ( 20% harga conduit,klem,isolasi ) @ Rp. = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. - 1 OH Tukang @ Rp. = Rp. -

0,1 OH Kepala tukang @ Rp. = Rp. - 0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG AES = Rp. - DIBULATKAN = Rp. -

VII. PEKERJAAN MEMASANG CAR OPERATION PANELBahan : 1 unit Car Operation Panel @ Rp. = Rp. -

Perlengkapan ( 20% harga conduit,klem,isolasi ) @ Rp. = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. - 1 OH Tukang @ Rp. = Rp. -

0,1 OH Kepala tukang @ Rp. = Rp. - 0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG AES = Rp. - DIBULATKAN = Rp. -

VIII. PEKERJAAN MEMASANG HALL OPERATION PANELBahan : 8 set Hall Operation Panel @ Rp. = Rp. -

Perlengkapan ( 20% harga conduit,klem,isolasi ) @ Rp. = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. - 1 OH Tukang @ Rp. = Rp. -

0,1 OH Kepala tukang @ Rp. = Rp. - 0,05 OH Mandor @ Rp. = Rp. -

TOTAL MEMASANG HALL OPERATION PANEL = Rp. - DIBULATKAN = Rp. -

Page 107: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No.

1

Harga Satuan Rp. Harga Satuan Rp.

3 4

Item Pekerjaan

2

IX. PEKERJAAN MEMASANG MCBBahan : 1 bh MCB 60 Amp @ Rp. = Rp. -

Perlengkapan ( 20% harga conduit,klem,isolasi ) @ Rp. = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. - 1 OH Tukang @ Rp. = Rp. -

0,1 OH Kepala tukang @ Rp. = Rp. - 0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG MCB = Rp. - DIBULATKAN = Rp. -

X. PEKERJAAN MEMASANG AC SPLITH 1 PKBahan : 1 unit AC Splith @ Rp. = Rp. -

m' Perlengkapan ( 20% harga conduit,klem,isolasi,Instalasi )@ Rp. = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. - 1 OH Tukang @ Rp. = Rp. -

0,1 OH Kepala tukang @ Rp. = Rp. - 0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG AC SPLITH 2 PK = Rp. - DIBULATKAN = Rp. -

XI. PEKERJAAN MEMASANG LED 21"Bahan : 1 unit LED 21" @ Rp. = Rp. -

m' Perlengkapan ( 20% harga Brecket ) @ Rp. = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. - 1 OH Tukang @ Rp. = Rp. -

0,1 OH Kepala tukang @ Rp. = Rp. - 0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG LED 21" = Rp. - DIBULATKAN = Rp. -

Page 108: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Satuan

1 Mandor O/H

2 Kepala tukang besi beton O/H

3 Tukang besi beton terampil O/H

4 Tukang besi beton setengah terampil O/H

5 Kepala tukang besi profil O/H

6 Tukang besi profil terampil O/H

7 Kepala tukang batu O/H

8 Tukang batu terampil O/H

9 Tukang batu setengah terampil O/H

10 Kepala tukang kayu O/H

11 Tukang kayu terampil O/H

12 Tukang kayu setengah terampil O/H

13 Kepala tukang cat O/H

14 Tukang cat terampil O/H

15 Tukang cat setengah terampil O/H

16 Pekerja terampil O/H

17 Pekerja setengah terampil O/H

18 Pekerja O/H

19 Kepala Tukang pipa O/H

20 Tukang pipa O/H

21 Kepala tukang listrik O/H

22 Tukang listrik O/H

23 Sopir O/H

24 Operator O/H

25 Mekanik O/H

26 Pembantu Sopir O/H

27 Pembantu Operator O/H

28 Pembantu Mekanik O/H

Bogor, ..................... 2018Kontraktor,PT,.................................

Cap & Tanda Tangan

NAMAJabatan

Item Pekerja

DAFTAR HARGA UPAH

Harga Satuan

Page 109: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Harga Satuan Satuan

1 Atap : Genteng Metal ( Rainbow Roof ) M2

Nok Atas Metal ( Rainbow Roof ) M1Wall Flasing ( Rainbow Roof ) M1Genteng keramik glazur, setara M-Class/Kanmuri/KIA BhBubungan Genteng keramik berglazur, setara M-Class/Kanmuri/KIA BhAkrilik tebal 6 mm M2Bubungan Akrilik tebal 6 mm M2Listplank dan talang Zam t=0,8mm powdercoating M1Kalsiplank uk. 3000x300x12 mm LbrPanellux sun screen M'Stringer SL-1 @3m BtgRangka atap baja ringan galvalume M2Rangka atap baja ringan galvanize M2Trusses coating galvalume UK75 t=0.8 ( Smartruss ) M1Trusses coating galvalume UK75 t=0.5 ( Smartruss ) M1Reng 16 - DB Roof Battens t=0.48 mm M1Foot Plate t=1.22 mm M1PLD - Diafragma Plate BhWIND Bracing M1Tensioner (Pengaku Tali Angin) BhBaut Besar PcsBaut Kecil PcsDynabolt Pcs Alumunium foil satu muka M2Allumunium Composite Panel (ACP), tebal 4 mm Lbr

2 Bata, bata ringan, batu & pasir :Bata merah bakar kelas I BhBata merah bakar kelas II BhBatako kecil 8x10x20 Bh

Hebel t. 10x20x60 BhBatu Pecah Mesin 1/2 M3Batu Pecah Mesin 2/3 M3Batu Pecah Mesin 3/5 M3Batu Pecah Mesin 10-15 cm M3Batu Belah Pondasi M3Batu koral beton kali (sirtu) M3Koral Beton M3Pasir beton M3Pasir pasang M3Pasir urug M3Pasir batu M3

Tanah merah/Tanah Urug Pilihan M33 Besi, kawat & paku : Besi Beton U-24 Rata-rata Kg Besi Beton U-40 Rata-rata Kg

Besi Strip/Plat KgPlat Baja t=2.3mm + zinkcromate KgBesi profil canal C KgBaja siku 45x45x5 Kg Baja WF KgKawat beton KgKawat harmonika 4 cm BhPaku 1 s/d 3 cm KgPaku 5 s/d 7 cm KgPaku 8 s/d 15 cm KgPaku skrup 3" BhBaut dia.6mm BhBondex M2Kawat Las KgMetal flashing t=0.8mm M1Delatasi metal t=1.2mm M1Grill galvanis 0,45x0,70 m BhBesi Pipa Stainless steel 2,5" BtgBesi Pipa Stainless steel 1,5" BtgBesi Pipa Stainless steel 1" Btg

4 Cat Btg Cat besi Kg Cat kayu glotex Kg Cat tembok ICI Interior Kg Cat tembok ICI weathershield Kg Cat Vinilex Kg

Cat dasar KgCat Minyak KgCat Marka/Spotlight Kg

Dempul kayu cap kucing Kg Plamir tembok KgPlamir kayu KgPolitur LtrPolitur jadi Ltr

Meni kayu/besi KgKuas 3" Bh

Material

DAFTAR HARGA MATERIAL

Page 110: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Harga Satuan SatuanMaterial

Rol cat tembok Bh Amplas Lbr

Terpentin LtrTiner A Ltr Lem Kuning (Aibond) Ltr Lem Kg Kape set Bh

5 Kayu :Kayu balok borneo super M3Kayu balok kamper medan (kruing) M3Kayu Balok Albasia M3Kayu Papan Albasia M3

Multiplek 9 mm 120x240 Lbr Multiplek 12 mm 120x240 Lbr

Multiplek 18 mm 120x240 Lbr Triplek 4 mm 120 x 240 LbrTriplek 6 mm 120 x 240 Lbr HPL 120 x 240 LbrTriplex 4 mm lapis melamin Lbr Wallpaper Lbr Rockwool tebal 5 cm m2 Membran Shield m2 Edging ex.Taco 34 mm m' Screen 96"x96" Automatis MICROVISION/BRITE/D-LIGHT unit Partisi folding gate kedap suara sliding lengkap acessories (Pabrikasi) m2Dolken 7 s/d 10 BtgKayu terentang M3Kayu 5/7 borneo M3

6 Kaca, kusen & penggantung : Pintu Frameless (tempered 12 mm polos) floor hinge dorma BTS 84 M2Kaca Polos 5 mm ( ASAHI ) M2Kaca Polos 3 mm ( ASAHI ) M2Kaca Rayband 5 mm ( ASAHI ) M2Kaca Rayband 8 mm ( ASAHI ) M2Kaca tempered 8 mm (ASAHI) M2Kaca tempered 10 mm (ASAHI) M2Kaca tempered 12 mm (ASAHI) M2Kunci Solid (lockcase,handle,cylinder) SetKunci sliding PcsKunci 2 slaag kuda terbang BhHandle Pintu Kaca 110 cm - Setara Dorma PsgRoda Sliding PcsRambuncis Gradino RMB 931 AC + AS PcsEngsel solid 4" BhCasement Solid 8" SetCasement Solid 12" SetGrendel sliding Solid BhGrendel jungkit Solid BhGrendel pintu Solid (flush bold) 6" BhGrendel pintu Solid (flush bold) 12" BhSpringknip solid BhStoper SetSilikone M1

7 Kusen aluminium 4 " coating M1Pintu plat BhPintu Spandrel BhPintu panel solid kamper samarinda awet oven besar L=1 m, finishing melamik BhPintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven besar L=1 m BhPintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven besar BhPintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven kecil BhJendela sliding besar BhJendela sliding kecil BhJendela jungkit kecil BhJendela jungkit besar Bh

8 Keramik :Granite homogenous tile ukuran (40 x 40) polish BhGranite homogenous tile ukuran (40 x 40) unpolish BhGranite homogenous tile 60x60 cm polish BhGranite homogenous tile ukuran (60 x 60) polish, warna gelap BhBorder granit ukuran (10 x 60) cm BhStep nosing/plint granito ukuran (8 x 60) cm BhGranite alam slab tebal 2 cm uk. 60x120 cm M2Parkit kayu merbau ukuran 9 x 60 cm tebal 1,5 cm (kayu solid) M2 Step nosing granito 10 x 30 KW I Bh Paving Block natural 6 cm M2

9 Plafond & Partisi :Gyptile/akustik 600 x 1200 x 9 mm LbrGypsum board 120 x 240 x 9 mm LbrGRC 120x240x4 mm LbrRod tekuk/kait galvanized d. 3,5 mm BtgCliper/adjuster BhMain tee @ 3,6 mm galvanized BtgCross tee galvanized BtgWall angle 2020 colour Btg Hollow galvalume 40x40 mm Btg Hollow galvalume 20x40 mm Btg Hollow galvanis 40x40 mm, tebal 1,5 mm Btg

Page 111: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Harga Satuan SatuanMaterial

Hollow galvanis 20x40 mm, tebal 1,2 mm BtgAsbes plat 1m x 1m t. 4 mm M2Paku skrup Bh Paku Skrup 5 cm BksSkrup gypsum BhPaku gypsum KgRamset/dinabolt BhCotton plaster BhCoumpond acimex @ 20 kg ZakTextile tape @ 30 m RolMetal stud 76x35x0,40 mm galvalume BtgMetal runner 76x25x0,35 mm galvalume BtgProfil alumunium T M1Acustic 60x120x15 mm LbrKawat pengikat M1

10 Readymix : Readymix Beton K-250, Tanpa Pompa ( Selang ) M3 Readymix Beton K-300, Tanpa Pompa ( Selang ) M3

11 Semen : PC (50 kg) Zak

PC KgSemen warna KgMU 380 - pas. Bata ringan/10 m2 (40 kg) ZakMU 100 - plesteran/2,4 m2 (40 kg) ZakMU 200 - acian plesteran/20 m2 (40 kg) ZakMU 440 - perata lantai/1,2 m2 (40 kg) ZakMU 450 - perekat keramik/8 m2 (40 kg) ZakMU 400 - perekat keramik dinding/5 m2 (25 kg) ZakMU 600 - pelapis kedap air/1,5 m2 (3 kg) ZakMU 408 - pengisi nad/3 m2 (1 kg) Zak

12 Sanitair :Closet Duduk (Flashing), setara TOTO UnitCloset jongkok (Flashing), setara TOTO UnitCloset jongkok TOTO CE - 7 UnitWashtafel Toilet Pria/Wanita, setara TOTO BhCermin TOTO TS 119 AS 5 BhFloordrain setainless steel SUN-EI BhRoofdrain setainless steel SUN-EI BhFloordrain TOTO TX 1 BN BhKran bebek TOTO T30 ARQ 13N BhKran dinding TOTO T23 B13 BhShower spray TOTO TX 403 SV3 BhKitchen Zink Stainless Standard Lokal ( 1 Lubang ) BhBak KM Fiber 60 x 60 BhUrinoir TOTO U 57M BhSekat urinoir TOTO BhJet Whoser air Lengkap ACC, setara TOTO BhStop kran air Lengkap ACC, setara TOTO BhKran air Lengkap ACC, setara TOTO Bh

13 Seng :Seng Plat BJLS 30 90 cm ( 100 m1 ) M1Seng gelombang BJLS T=180 cm LbrSeng plat Fumira Lbr

14 Tiang pancangMini pile M25 ( Segi empat ) M1Penyambungan dan pengelasan tiang pancang TtkPotong tiang pancang TtkMobilisasi tiang pancang Ls

15 Wire mesh (2,10 x 5,4 m) :MK 10 (2,10 x 5,4 m) LbrMK 8 (2,10 x 5,4 m) LbrMK 7 (2,10 x 5,4 m) LbrMK 6 (2,10 x 5,4 m) LbrMK 5 (2,10 x 5,4 m) LbrMK 4 (2,10 x 5,4 m) Lbr

16 PlastikPlastik sheet M2

17 Material MekanikalPengadaan dan Pemasangan Pompa Transfer type Centrifugal pump Unitkap.346 l/m Head 32 m H2O daya Motor 5,5 kwTangki Air Kap. 2 m3 UnitBiofil (BF-08) UnitBiotech (BS-BF 3000) UnitResapan UnitMeteran Air dia. 2" BhPipa PVC RUCIKA type AW 1/2" M1Pipa PVC RUCIKA type AW 3/4" M1Pipa PVC RUCIKA type AW 1" M1Pipa PVC RUCIKA type AW 1 1/4" M1Pipa PVC RUCIKA type AW 1 1/2" M1Pipa PVC RUCIKA type AW 2" M1Pipa PVC RUCIKA type AW 2 1/2" M1Pipa PVC RUCIKA type AW 3" M1Pipa PVC RUCIKA type AW 4" M1Pipa PVC RUCIKA type AW 5" M1Pipa PVC RUCIKA type AW 6" M1

Page 112: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Harga Satuan SatuanMaterial

Pipa PVC RUCIKA type AW 8" M1

Pipa PVC WAVIN type AW 2" BtgPipa PVC WAVIN type AW 2 1/2" BtgPipa PVC WAVIN type AW 3" BtgPipa PVC WAVIN type AW 4" BtgPipa PVC WAVIN type AW 5" BtgPipa PVC WAVIN type AW 6" BtgPipa PVC WAVIN type AW 8" Btg

Polypropylene (PPR-Pipe) PN-16Pipa PPR PN-16 1/2" BtgPipa PPR PN-16 3/4" BtgPipa PPR PN-16 1" BtgPipa PPR PN-16 1 1/4" BtgPipa PPR PN-16 1 1/2" BtgPipa PPR PN-16 2" BtgPipa PPR PN-16 2,5" BtgPipa PPR PN-16 3" BtgPipa PPR PN-16 4" BtgPipa PPR PN-16 5" BtgPipa PPR PN-16 6" Btg

Polypropylene (PPR-Pipe) PN-20Pipa PPR PN-16 1/2" BtgPipa PPR PN-16 3/4" BtgPipa PPR PN-16 1" BtgPipa PPR PN-16 1 1/4" BtgPipa PPR PN-16 1 1/2" BtgPipa PPR PN-16 2" BtgPipa PPR PN-16 2,5" BtgPipa PPR PN-16 3" BtgPipa PPR PN-16 4" Btg

Pipa GIP Medium A 1/2" ( 6 m1 ) BtgPipa GIP Medium A 3/4" ( 6 m1 ) BtgPipa GIP Medium A 1" ( 6 m1 ) BtgPipa GIP Medium A 1 1/4" ( 6 m1 ) BtgPipa GIP Medium A 1 1/2" ( 6 m1 ) BtgPipa GIP Medium A 2" ( 6 m1 ) BtgPipa GIP Medium A 2 1/2" ( 6 m1 ) BtgPipa GIP Medium A 3" ( 6 m1 ) BtgPipa GIP Medium A 4" ( 6 m1 ) Btg

Pipa BSP ASTM A - 53 A Sch 40Pipa Ǿ 1/2" M1Pipa Ǿ 3/4" M1Pipa Ǿ 1" M1Pipa Ǿ 1 1/4" M1Pipa Ǿ 1 1/2" M1Pipa Ǿ 2" M1Pipa Ǿ 2 1/2" M1Pipa Ǿ 3" M1Pipa Ǿ 4" M1Pipa Ǿ 5" M1Pipa Ǿ 6" M1Pipa Ǿ 8" M1Floating Valve Ø 1 1/2" BhClean Out (CO) 4" BhClean Out (CO) 2" BhClean Out (CO) 1/2" BhDop 6" BhKlem 6" BhKnie 6" Bh

Pek. HydrantHydrant box (tipe indoor) Unit Hose Unit Nozzle UnitGantungan Selang (Sisir) UnitLanding Valve dia 2,5" UnitGate Valve Ø 4" (150 Psi) BhGate Valve Ø 3" (150 Psi) BhGate Valve Ø 2.1/2" (150 Psi) BhGate Valve Ø 2" (150 Psi) BhGate Valve Ø 1 1/2" (150 Psi) BhGate Valve Ø 1" BhGate Valve Ø 3/4" BhCheck Valve Ø 4" (125 Psi) BhCheck Valve Ø 3" (150 Psi) BhCheck Valve Ø 2" (125 Psi) BhStrainer Ø 4" (150 Psi) BhStrainer Ø 2" (150 Psi) BhFleksible Joint Ø 4" (10 K)Fleksible Joint Ø 2" (10 K) BhFoot Valve Ø 4" BhFoot Valve Ø 2" Bh

Page 113: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Harga Satuan SatuanMaterial

Pompa Hydran Elektrikal 750 USGPM, Head 70 m'.65 KW Unit Pompa Jocky Hydran Elektrikal 50 GPM, Head 130 m' , 9,5 KW Unit Pompa diesel Pump 750 USGPM, (110 HP at 2900 rpm) Komplit accesoris Unit Tangki Hydropoor kap. tekanan 10 Atm Unitlem pvc kgseal tape bhsock pipa pvc 1/2" bhfiting PVC 1/2" bhelbow pvc 1/2" bh

Pek. AC IU VRV Wall Mounted Type Kapasitas :5.400 Btuh Unit IU VRV Wall Mounted Type Kapasitas :7.000 Btuh Unit IU VRV Wall Mounted Type Kapasitas :7.200 Btuh Unit IU VRV Wall Mounted Type Kapasitas :7.800 Btuh Unit IU VRV Wall Mounted Type Kapasitas : 8.100 Btuh Unit IU VRV Wall Mounted Type Kapasitas : 8.500 Btuh Unit IU VRV Wall Mounted Type Kapasitas :10.800 Btuh Unit IU VRV Wall Mounted Type Kap.12.000 BTUH Unit IU VRV Wall Mounted Type Kap.13.500 BTUH Unit IU VRV Wall Mounted Type Kap.16.000 Btuh Unit IU VRV Wall Mounted Type Kap.18.000 Btuh Unit IU VRV Wall Mounted Type Kap.19.000 BTUH Unit IU VRV Wall Mounted Type Kap.21.000 BTUH UnitIU VRV Split Cassette Type Kap.24.200 BTUH UnitIU VRV Split Cassette Type Kap.26.000 BTUH UnitIU VRV Split Cassette Type Kap.27.000 BTUH UnitIU VRV Split Cassette Type Kap.30.700 BTUH UnitIU VRV Split Cassette Type Kap.36.000 BTUH UnitIU VRV Split Cassette Type Kap.40.000 BTUH UnitIU VRV Split Cassette Type Kap.45.000 BTUH UnitIU VRV Split Cassette Type Kap.49.500 BTUH UnitOU VRV Lt 1 Kap. 268.000 BTUH (8.900 cfm) UnitOU VRV Lt 1 Kap. 524.000 BTUH (17.500 cfm) UnitOU VRV Lt 2 Kap. 398.000 BTUH (13.250 cfm) UnitOU VRV Lt 2 Kap. 141.000 BTUH (4.700 cfm) UnitOU VRV Lt 3 Kap. 215.000 BTUH (7.250 cfm) Unit

Pek. ElektrikalMCCB 630 A, 3P, 45kA BhMCCB 300-400 A, 3P, 45kA BhMCCB 225-250 A, 3P, 45kA BhMCCB 160-200 A, 3P, 36kA BhMCCB 100-125 A, 3P, 45kA BhMCCB 64-80 A, 3P, 25kA BhMCCB 50-63 A, 3P, 25kA BhMCCB 40-50 A, 3P, 25kA BhMCCB 32-40 A, 3P, 25kA BhMCCB 25-32 A, 3P, 25kA BhMCCB 20-25 A, 3P, 25kA BhMCCB 16-20 A, 3P, 25kA BhMCB 16 A, 1P, 6kA BhMCB 10 A, 1P, 6kA BhMCB 6 A, 1P, 6kA BhPilot Lamp BhKwh meter 3 Phase BhStart delta 3m7 kW BhAmpere Meter 0-200 A + CT 200/5A BhVolt Meter 0-500 V + Selector Switch 7 Posisi BhFrquensi Meter BhKabel NYFGbY 4 x 300 mm2 M1Kabel NYFGbY 4 x 240 mm2 M1Kabel NYFGbY 4 x 185 mm2 M1Kabel NYFGbY 4 x 150 mm2 M1Kabel NYFGbY 4 x 120 mm2 M1Kabel NYFGbY 4 x 95 mm2 M1Kabel NYFGbY 4 x 70 mm2 M1Kabel NYFGbY 4 x 50 mm2 M1Kabel NYFGbY 4 x 35 mm2 M1Kabel NYFGbY 4 x 25 mm2 M1Kabel NYM 3x2,5 mm2 M1Kabel NYM 3x4 mm2 M1Kabel NYY 4 x 50 mm2 M1Kabel NYY 4 x 25 mm2 M1Kabel NYY 4 x 16 mm2 M1Kabel NYY 4 x 10 mm2 M1Kabel NYY 4 x 6 mm2 M1Kabel NYY 4 x 4 mm2 M1Kabel NYY 4 x 2,5 mm2 M1Kabel NYY 3 x 4 mm2 M1Kabel NYY 3 x 6 mm2 M1Kabel NYA 1,5 mm2 M1Kabel NYMHY 3 x 1,5 mm2 M1ITC 1 x 2 x 0,6 mm2 M1Kabel Cad 5 M1Kabel RG 59 M1

Page 114: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

No. Harga Satuan SatuanMaterial

Kabel Coaxial M1BC 50 mm2 M1BC 95 mm2 M1BC 10 mm2 M1BC 16 mm2 M1Conduit dia. 20 mm2 BtgLampu TL 2x36 Watt, TKO + Mirror BhLampu TL 2x18 Watt, TKO + Mirror BhLampu Down Light 18 W, PLC BhLampu Barret 20 W, TLC BhSaklar hotel BhSaklar Tunggal BhSaklar Ganda BhStop kontak BhStop Kontak, 200 W (lantai) set. Panasonic BhKabel Tray ukuran 100 X 100 mm M'Kabel Tray ukuran 300 X 100 mm M'Under Floor Duct ukuran 100 x 80 mm M'pipa conduit EGA dia 20 mm m'sock EGA dia.20 mm Bh t dus dia. 20 mm Bh Isolasi Rollklem EGA dia.20 mm Bh

Bogor, ..................... 2018Kontraktor,PT,.................................

Cap & Tanda Tangan

NAMAJabatan

Page 115: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

Scaffolding:1 Main frame MF-1215 sw/unit/2bln2 Main frame MF-1217 sw/unit/2bln3 Main frame MF-1219 sw/unit/2bln4 Jack base BJ 60 sw/unit/2bln5 Joint pin 42 sw/unit/2bln6 Cross brace 1218 sw/unit/2bln7 Head Jack 60 Bj-60 sw/unit/2bln8 Pipe Suport Ps 2740 sw/unit/2bln9 Form Work Sistem

a. KolomGirder GT-24 :- Girder GT24 390cm sw/unit/2bln

Column Wale U100 SSRZ 116/151 :- Column Wale U100 SSRZ 116/151 sw/unit/2bln

Accessories :- Hook Strap HB 24-100/120 sw/unit/2bln- Wedge KZ, Galv sw/unit/2bln- Tie Yoke SKZ sw/unit/2bln- Wingnut DW15, Galv sw/unit/2bln- Girder Headpiece GT24,Galv sw/unit/2bln- Wedge Headpiece sw/unit/2bln- Base Plate For RSS sw/unit/2bln- Push-Pull Prop RSS1 sw/unit/2bln- Kicker AV sw/unit/2bln- Wedge K, Galv sw/unit/2bln- Scaffold Jack GB 80 sw/unit/2bln

Tie Rod Accessories :- Tie Rod DW15, L=1m sw/unit/2bln

Pin Accessories :- Pin 16x42, Galv sw/unit/2bln- Cotter Pin FS 4/1 Galv. sw/unit/2bln

Consumable Part :- TSS-TORX 6x60, galv. bh- F.H Bolt M8x70 W.nut bh- Bit Point TX30 bh

b. BalokGirder GT-24 :- Girder GT24 390cm sw/unit/2bln- Girder GT24 300cm sw/unit/2bln- Girder GT24 210cm sw/unit/2bln- Girder GT24 150cm sw/unit/2bln

Main Scaffolding :- Pola Frame 190 Galv sw/unit/2bln- Pola Frame 170 Galv sw/unit/2bln- Pola Frame H-90 Galv sw/unit/2bln- Cross Brace 220 Galv sw/unit/2bln- Cross Brace 193 Galv sw/unit/2bln- Joint Pin 36 Galv sw/unit/2bln- Jack Base S60 Galv CPL sw/unit/2bln- U-Head Jack S60 Galv CPL sw/unit/2bln- Cross Head Jack S.60 CPL sw/unit/2bln

c. Plat lantaiHory Beam & Accesories :- Hory Beam HB-14 sw/unit/2bln- Hory Beam SX-14 sw/unit/2bln- Boy Cadet sw/unit/2bln

10 Alat bantu (Concrete pump + Vibrator) Lot

DAFTAR HARGA SEWA ALATNo. SatuanPeralatan Harga Satuan

Page 116: BILL OF QUANTITY (BQ) - web.ipb.ac.idweb.ipb.ac.id/~erizal/manpro/audit-fem/01. BQ AUDITORIUM FEM PDF... · bill of quantity (bq) pekerjaan : pembangunan gedung auditorium fem lokasi

A.4.2.1 Pekerjaan Besi & Aluminium

A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik

Harga Satuan Jumlah Harga(Rp) (Rp)

A TENAGA1 Pekerja L.01 OH 0,0400 - 2 Tukang Besi Konstruksi L.02 OH 0,0200 - 3 Kepala Tukang L.03 OH 0,0020 - 4 Mandor L.04 OH 0,0020 -

- B BAHAN1 Kawat las listrik Kg 0,4000 - 2 Solar Ltr 0,3000 - 3 Minyak pelumas Ltr 0,0400 -

- C PERALATAN1 Sewa alat Jam 0,1700 -

-

D Jumlah ( A + B + C ) - E Overhead & Profit 0,1000 x D - F Harga Satuan Pekerjaan ( D + E ) -

No. Uraian Kode Satuan Koefisien

Jumlah Harga Tenaga Kerja

Jumlah Harga Bahan

Jumlah Harga Alat