Biaya Membuat Dan Mengelola Warnet Yang Baik
-
Upload
babeganteng -
Category
Documents
-
view
160 -
download
4
Transcript of Biaya Membuat Dan Mengelola Warnet Yang Baik
Sheet1
Capex Warnet No Item Qty 1 Sewa Tempat 3 2 Meja Client 12 3 Kursi Client 12 4 Kursi extra 10 5 Meja Kasir 1 6 Kursi Kasir 1 7 PC Client 12 8 PC Billing 1 9 Printer Billing 1 10 Printer Client 1 11 Scanner 1 12 LAN (perangkat + Instalasi) 1 13 WAN ( modem / wireless ) 1 14 Interior 1 15 Kelistrikan 1 16 Legal Formal (Ijin,bdn hukum) 1 unit tahun Buah Buah Buah Buah Buah unit unit Buah Buah Buah unit unit unit unit unit Harga Rp10,000,000.00 Rp350,000.00 Rp200,000.00 Rp80,000.00 Rp700,000.00 Rp200,000.00 Rp4,000,000.00 Rp5,000,000.00 Rp1,500,000.00 Rp2,000,000.00 Rp600,000.00 Rp4,000,000.00 Rp4,000,000.00 Rp5,000,000.00 Rp3,000,000.00 Rp2,000,000.00 Total Investasi
Opex Warnet No Item 1 ISP 2 SDM 3 PLN 4 Perawatan 5 Telepon 6 ATK 7 Amortisasi 8 Promosi
Qty 1 3 1 1 1 1 1 1
unit unit orang unti unit unit unit unit unit
Harga Rp1,750,000.00 Rp800,000.00 Rp1,250,000.00 Rp150,000.00 Rp100,000.00 Rp200,000.00 Rp3,150,000.00 Rp200,000.00 Biaya Operasional
Penentuan harga Minimum Variabel Perhitungan 1 Total Investasi / Capex 2 Biaya Operasional / Opex 3 Masa Sewa 4 Hari Operasional / bln 5 Efisiensi 6 Jumlah PC
Rp113,400,000.00 Rp9,200,000.00 36 28 7 12Page 1
Sheet1
Minimum Harga
Rp5,250.85
Rumus Min Harga= (( Investasi/Masa Sewa )+ Biaya Operasi)/(Masa Op
Page 2
Sheet1
Total Rp30,000,000.00 Rp4,200,000.00 Rp2,400,000.00 Rp800,000.00 Rp700,000.00 Rp200,000.00 Rp48,000,000.00 Rp5,000,000.00 Rp1,500,000.00 Rp2,000,000.00 Rp600,000.00 Rp4,000,000.00 Rp4,000,000.00 Rp5,000,000.00 Rp3,000,000.00 Rp2,000,000.00 Rp113,400,000.00
Total Rp1,750,000.00 Rp2,400,000.00 Rp1,250,000.00 Rp150,000.00 Rp100,000.00 Rp200,000.00 Rp3,150,000.00 Rp200,000.00 Rp9,200,000.00
Keterangan Speedy Warnet UMR Jakarta 4400 VA
invest/masa kontrak
Page 3
Sheet1
aya Operasi)/(Masa Operasi*Efisiensi*jumlah PC)
Page 4
Sheet2
Penentuan harga Minimum Variabel Perhitungan 1 Total Investasi / Capex 2 Biaya Operasional / Opex 3 Masa Sewa 4 Hari Operasional / bln 5 Efisiensi 6 Jumlah PC Minimum Harga
Rp100,000,000.00 Rp10,000,000.00 36 25 7 16 Rp4,563.49
Rumus Min Harga= (( Investasi/Masa Sewa )+ Biaya Operasi)/(Masa Operasi*Efisiensi*jumlah PC)
Page 5
Sheet2
asi*Efisiensi*jumlah PC)
Page 6