Back Up Data Rsud Sabu Raijua

51
BACK UP DATA INSTANSI : RUMAH SAKIT UMUM DAERAH (RS NAMA PEKERJAAN : PEMBANGUNAN RUANG INSTALAS LOKASI : RUMAH SAKIT UMUM DAERAH TAHUN ANGGARAN : 2011 NAMA ITEM PEKERJAAN : UITSET DAN PASANGAN BOUWPLA VOLUME REALISASI : M 1 MENGETAHUI, RUMAH SAKIT UMUM DAERAH SABU KABUPATEN SABU RAIJUA PEJABAT PEMBUAT KOMITMEN MERRY Ch. MORU, SST Penata Muda III/B Nip. 19741225 199803 2 001

Transcript of Back Up Data Rsud Sabu Raijua

Page 1: Back Up Data Rsud Sabu Raijua

BACK UP DATA

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG INSTALASI UNIT GAWAT DARURAT (UGD)

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : UITSET DAN PASANGAN BOUWPLANK

VOLUME REALISASI : M1

MENGETAHUI,

RUMAH SAKIT UMUM DAERAH SABU

KABUPATEN SABU RAIJUA

PEJABAT PEMBUAT KOMITMEN

MERRY Ch. MORU, SST

Penata Muda III/B

Nip. 19741225 199803 2 001

Page 2: Back Up Data Rsud Sabu Raijua

RUMAH SAKIT UMUM DAERAH (RSUD)

PEMBANGUNAN RUANG INSTALASI UNIT GAWAT DARURAT (UGD)

UITSET DAN PASANGAN BOUWPLANK

DI SETUJUI, DI BUAT OLEH,

KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

CV. PUTRA TIMOR RAYA CV. BAKU SARANA

(Perwakilan Sabu Raijua)

SILVESTER PRIMUS VELYKS DETHAN

Inspector Pelaksana

Page 3: Back Up Data Rsud Sabu Raijua

DI BUAT OLEH,

KONTRAKTOR PELASANA

CV. BAKU SARANA

VELYKS DETHAN

MERRY Ch. MORU, SST

Penata Muda III/B

Nip. 19741225 199803 2 001

Page 4: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : UITSET DAN PASANGAN BOUWPLANK

VOLUME REALISASI : 135,70 M1

PANJANG LEBAR

(M) (M) (M1)

3 4 5=3+4

V = (2 x P + 2 X L) 43,85 24,00 135,70

Keterangan

V = Volume

P = Panjang

L = Lebar

J U M L A H 135,70

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 6

RUMUS

BACK UP DATA

DIMENSIVOLUME

SKETSA

Page 5: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : GALIAN PONDASI DAN GALIAN SALURAN KELILING BANGUNAN

VOLUME REALISASI : 414,00 M3

RUMUS :

V = L x l x H

Keterangan

V = Volume

L = Panjang

l = Lebar

H = Tinggi

PANJANG TINGGI LEBAR

(M) (M) (M) (M3)

1 3 4 5=3+4

1 GALIAN PONDASI JALUR 343,65 1,00 1,20 412,38

2 GALIAN PONDASI ROLAG 10,80 0,30 0,50 1,62

414,00

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 6

DIMENSI GALIAN

J U M L A H

BACK UP DATA

NO URAIAN PEKERJAAN GALIANVOLUME

SKETSA

Page 6: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : URUGAN TANAH BEKAS GALIAN

VOLUME REALISASI : 141,93 M3

RUMUS :

V = 2 sisi timbunan x A x L

A = 0.50 x (a + b) x H

Keterangan

V = Volume a = Lebar penampang atas urugan

A = Luas Penampang b = Lebar penampang Bawah urugan

L = Panjang

H = Tinggi

LUAS

LEBAR ATAS LEBAR BAWAH TINGGGI PANJANG PENAMPANG

(M) (M) (M) (M) (M2) (M

3)

1 3 4 5 6 7

URUGAN BEKAS GALIAN PONDSI MENERUS 0,39 0,20 0,70 343,65 0,21 141,93

141,93

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 8

J U M L A H

DIMENSI TIMBUNAN

BACK UP DATA

NO URAIAN URUGANVOLUME

SKETSA

Page 7: Back Up Data Rsud Sabu Raijua
Page 8: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : URUGAN PASIR BAWAH PONDASI

VOLUME REALISASI : 41,24 M3

RUMUS :

V = L x l x H

Keterangan

V = Volume

L = Panjang

H = Tinggi

l = Lebar

PANJANG LEBAR TINGGI

(M) (M) (M2) (M

3)

1 3 6 7 8

URUGAN PASIR BAWAH PONDASI 343,65 1,20 0,10 41,24

41,24

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 9

J U M L A H

DIMENSI URUNGAN PASIR

BACK UP DATA

NO URAIAN PEKERJAANVOLUME

SKETSA

Page 9: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : URUGAN TANAH PENINGGI PEIL LANTAI

VOLUME REALISASI : 104,92

RUMUS :

V = A Rata2 x H

A Rata2 = 0,50 x (A1 + A2)

Keterangan

V = Volume

A rata2 = Luasan rata-rata

A1 = Lasan sisi atas

A2 = Lusan sisi bawah

H = Tinggi

LUAS LUASAN LUASAN TINGGI

SISI ATAS SISI BAWAH RATA-RATA

(M2) (M2) (M2) (M1) (M3)

1 3 6 8

A 28,37 25,66 27,01 0,32 8,64

B 2,41 3,30 2,85 0,32 0,91

C 20,10 17,47 18,79 0,32 6,01

D 20,48 18,11 19,29 0,32 6,17

E 11,73 10,01 10,87 0,32 3,48

F 15,81 13,71 14,76 0,32 4,72

G 2,15 1,50 1,83 0,32 0,59

H 2,15 1,50 1,83 0,32 0,59

I 15,81 13,71 14,76 0,32 4,72

J 15,16 13,61 14,38 0,32 4,60

K 13,55 11,55 12,55 0,32 4,02

L 23,22 20,87 22,04 0,32 7,05

M 1,50 2,15 1,83 0,32 0,59

N 3,16 32,22 17,69 0,32 5,66

O 15,16 13,61 14,38 0,32 4,60

P 15,81 13,71 14,76 0,32 4,72

Q 2,15 1,50 1,83 0,32 0,59

R 2,15 1,50 1,83 0,32 0,59

S 15,81 13,71 14,76 0,32 4,72

T 2,15 1,50 1,83 0,32 0,58

U 35,12 32,22 33,67 0,32 10,77

V 12,57 11,04 11,80 0,32 3,78

W 35,12 32,22 33,67 0,32 10,77

X 2,15 1,50 1,83 0,32 0,59

Y 5,41 4,60 5,00 0,32 1,60

Z 12,81 11,25 12,03 0,32 3,85

104,92

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 9

J U M L A H

BACK UP DATA

NO KODE POSISI PENEMPATAN URUGANVOLUME

SKETSA

Page 10: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : URUGAN PASIR BAWAH LANTAI

VOLUME REALISASI : 63,32 M3

RUMUS :

V = A x H

Keterangan

V = Volume

A = Luasan

H = Tinggi

LUAS TINGGI VOLUME

URUGAN URUGAN URUGAN

(M2) (M1) (M3)

1 3 8

A 12,05 0,15 1,81

B 23,60 0,15 3,54

C 23,60 0,15 3,54

D 31,15 0,15 4,67

E 31,15 0,15 4,67

F 15,81 0,15 2,37

G 2,15 0,15 0,32

H 2,15 0,15 0,32

I 15,81 0,15 2,37

J 15,16 0,15 2,27

K 13,55 0,15 2,03

L 23,22 0,15 3,48

M 1,50 0,15 0,23

N 3,16 0,15 0,47

O 15,16 0,15 2,27

P 15,81 0,15 2,37

Q 2,15 0,15 0,32

R 2,15 0,15 0,32

S 15,81 0,15 2,37

T 2,15 0,15 0,32

U 35,12 0,15 5,27

V 12,57 0,15 1,89

W 35,12 0,15 5,27

X 2,15 0,15 0,32

Y 5,41 0,15 0,81

Z 12,81 0,15 1,92

SELASAR KELILING BANGUNAN 77,51 0,10 7,75

63,32

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

NO KODE POSISI PENEMPATAN URUGAN SKETSA

2 9

Page 11: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANGAN BATU KOSONG

VOLUME REALISASI : 44,03 M3

RUMUS :

V = L x l x H

Keterangan

V = Volume

L = Panjang

l = Lebar

H = Tinggi

PANJANG LEBAR TINGGI

(M) (M) (M) (M3)

1 3 4 5 6

1 PASANGAN BATU KOSONG 220,16 1,00 0,20 44,03

44,03

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 6

J U M L A H

BACK UP DATA

NO URAIAN PEKERJAAN GALIAN

DIMENSI GALIANVOLUME

SKETSA

Page 12: Back Up Data Rsud Sabu Raijua
Page 13: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANGA PONDASI BATU KARANG

VOLUME REALISASI : 266,32 M3

RUMUS :

V = A x L

A = 0.50 x (a + b) x H

Keterangan

V = Volume a = Lebar penampang atas urugan

A = Luas Penampang b = Lebar penampang Bawah urugan

L = Panjang

H = Tinggi

PANJANG LUAS

LEBAR ATAS LEBAR BAWAH TINGGGI PASANGAN PENAMPANG

(M) (M) (M) (M1) (M2) (M3)

1 3 4 5 6 7

1 PASANGAN PONDSI MENERUS 0,30 0,80 0,70 335,99 0,39 258,71

2 PASANGAN PONDASI ROLAK 0,30 0,30 0,50 7,50 0,15 2,25

3 PASANGAN TERAS 0,30 0,70 0,70 7,66 0,35 5,36

351,15 266,32

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 8

J U M L A H

BACK UP DATA

NO URAIAN PEKERJAAN PASANGAN PONDASIVOLUME

SKETSA

DIMENSI PASANGAN

Page 14: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANGA DINDING BATAKO (1Pc : 5 Prs)

VOLUME REALISASI : 60,88

RUMUS :

V = A x T

A bersih = A pasangan - A lubang kusen

A pasangan = L x H

Keterangan

V = Volume

A = Luas

L = Panjang

H = Tinggi bersi

T = Tebal bersi

PANJANG TINGGI LUAS LUAS LUAS LUAS LUAS TEBAL VOLUME

PASANGAN PASANGAN PASANGAN LUBANG LUBANG LUBANG BERSIH PASANGAN PASANGAN

TEMBOK TEMBOK TEMBOK KUSEN KUSEN KUSEN PASANGAN TEMBOK TEMBOK

(M) (M) (M2) (M

2) (M

2) (M

2) (M

2) (M) (M

3)

1 4 5

1 A 3,55 3,40 12,07 - 1,66 1,66 10,41 0,12 1,25

2 B 4,58 3,40 15,56 - 1,66 1,66 13,90 0,12 1,67

3 C 1,50 1,95 2,93 - 0,45 0,45 2,47 0,12 0,30

4 D 1,63 3,40 5,53 - 1,24 1,24 4,28 0,12 0,51

5 E 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26

6 F 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26

7 G 1,50 3,40 5,10 - 0,45 0,45 4,65 0,12 0,56

8 H 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26

9 I 4,83 3,40 16,41 - 6,35 6,35 10,05 0,12 1,21

10 J 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26

11 K 4,83 3,40 16,41 - 6,35 6,35 10,05 0,12 1,21

12 L 5,80 3,40 19,72 - - - 19,72 0,12 2,37

13 M 1,65 1,95 3,22 - - - 3,22 0,12 0,39

14 N 1,33 1,95 2,58 1,56 2,12 0,56 2,02 0,12 0,24

15 O 1,65 1,95 3,22 - - - 3,22 0,12 0,39

16 P 4,05 3,40 13,77 - - - 13,77 0,12 1,65

17 Q 6,28 3,40 21,34 0,88 7,60 6,72 14,61 0,12 1,75

18 R 1,65 1,95 3,22 - - - 3,22 0,12 0,39

19 S 1,65 1,95 3,22 - - - 3,22 0,12 0,39

20 T 1,33 1,95 2,58 1,56 2,12 0,56 2,02 0,12 0,24

21 U 4,05 3,40 13,77 - - - 13,77 0,12 1,65

22 V 6,30 3,40 21,42 0,88 9,95 9,07 12,35 0,12 1,48

23 W 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32

24 X 1,33 1,95 2,58 - - - 2,58 0,12 0,31

25 Y 4,05 3,40 13,77 - - - 13,77 0,12 1,65

26 Z 1,65 1,95 3,22 - - - 3,22 0,12 0,39

27 1 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32

28 2 1,33 1,95 2,58 - - - 2,58 0,12 0,31

29 3 1,33 3,40 4,51 - - - 4,51 0,12 0,54

30 4 2,10 1,95 4,10 - - - 4,10 0,12 0,49

31 5 2,10 3,40 7,14 - - - 7,14 0,12 0,86

32 6 3,15 3,40 10,71 0,48 4 3,86 6,85 0,12 0,82

33 7 2,10 1,95 4,10 - - - 4,10 0,12 0,49

34 8 1,50 1,95 2,93 1,56 2,12 0,56 2,36 0,12 0,28

35 9 5,30 3,40 18,02 0,88 6,01 5,13 12,89 0,12 1,55

36 10 0,85 3,40 2,89 - - - 2,89 0,12 0,35

37 11 3,63 3,40 12,33 0,88 4,35 3,47 8,85 0,12 1,06

38 12 5,30 3,40 18,02 0,88 6,01 5,13 12,89 0,12 1,55

39 13 0,85 3,40 2,89 - - - 2,89 0,12 0,35

40 14 3,55 3,40 12,07 - 1,66 1,66 10,41 0,12 1,25

41 15 4,58 3,40 15,56 - 1,66 1,66 13,90 0,12 1,67

BACK UP DATA

NO KODE PENEMPATAN PASANG TEMBOK SKETSA

2 8

Page 15: Back Up Data Rsud Sabu Raijua

RUMUS :

V = A x T

A bersih = A pasangan - A lubang kusen

A pasangan = L x H

Keterangan

V = Volume

A = Luas

L = Panjang

H = Tinggi bersi

T = Tebal bersi

PANJANG TINGGI LUAS LUAS LUAS LUAS LUAS TEBAL VOLUME

PASANGAN PASANGAN PASANGAN LUBANG LUBANG LUBANG BERSIH PASANGAN PASANGAN

TEMBOK TEMBOK TEMBOK KUSEN KUSEN KUSEN PASANGAN TEMBOK TEMBOK

(M) (M) (M2) (M

2) (M

2) (M

2) (M

2) (M) (M

3)

1 4 5

NO KODE PENEMPATAN PASANG TEMBOK SKETSA

2 8

42 16 1,50 1,95 2,93 - 0,45 0,45 2,47 0,12 0,30

43 17 2,10 1,95 4,10 - - - 4,10 0,12 0,49

44 18 1,50 1,95 2,93 1,56 2,12 0,56 2,36 0,12 0,28

45 19 2,10 3,40 7,14 - - - 7,14 0,12 0,86

46 20 2,10 1,95 4,10 - - - 4,10 0,12 0,49

47 21 1,33 3,40 4,51 - - - 4,51 0,12 0,54

48 22 6,30 3,40 21,42 - 3,32 3,32 18,10 0,12 2,17

49 23 6,38 3,40 21,68 0,48 6,35 5,86 15,81 0,12 1,90

50 24 6,38 3,40 21,68 0,48 4,34 3,86 17,82 0,12 2,14

51 25 3,15 3,40 10,71 0,48 3,52 3,03 7,68 0,12 0,92

52 26 3,15 3,40 10,71 0,48 3,52 3,03 7,68 0,12 0,92

53 27 6,28 3,40 21,34 0,88 7,60 6,72 14,61 0,12 1,75

54 28 5,80 3,40 19,72 - - - 19,72 0,12 2,37

55 29 4,83 3,40 16,41 - 6,35 6,35 10,05 0,12 1,21

56 30 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26

57 31 1,50 3,40 5,10 - 0,45 0,45 4,65 0,12 0,56

58 32 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26

59 33 1,33 1,95 2,58 - 0,45 0,45 2,13 0,12 0,26

60 34 1,50 3,40 5,10 - 0,45 0,45 4,65 0,12 0,56

61 35 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32

62 36 1,65 1,95 3,22 - - - 3,22 0,12 0,39

63 37 1,65 1,95 3,22 1,56 2,12 0,56 2,66 0,12 0,32

64 38 1,65 1,95 3,22 - - - 3,22 0,12 0,39

65 39 1,65 1,95 3,22 - - - 3,22 0,12 0,39

66 40 1,33 1,95 2,58 1,56 2,12 0,56 2,02 0,12 0,24

67 41 1,33 1,95 2,58 - - - 2,58 0,12 0,31

68 42 1,33 1,95 2,58 - - - 2,58 0,12 0,31

69 43 6,30 3,40 21,42 - - - 21,42 0,12 2,57

70 44 4,05 3,40 13,77 - - - 13,77 0,12 1,65

71 45 4,05 3,40 13,77 - - - 13,77 0,12 1,65

72 46 2,35 3,40 7,99 0,88 4,35 3,47 4,52 0,12 0,54

73 47 (KUDA-KUDA PAS. BATU) 3,17 - 3,17 0,12 0,38

507,35 60,88

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

Page 16: Back Up Data Rsud Sabu Raijua

BACK UP DATA

SKETSA

8

Page 17: Back Up Data Rsud Sabu Raijua

SKETSA

8

Page 18: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANGA DINDING TRASRAM (1Pc : 2 Prs)

VOLUME REALISASI : 18,25

RUMUS :

V = A x T

A bersih = A pasangan - A lubang kusen

A pasangan = L x H

Keterangan

V = Volume

A = Luas

L = Panjang

H = Tinggi bersi

T = Tebal bersi

PANJANG TINGGI LUAS LUAS LUAS TEBAL VOLUME

PASANGAN PASANGAN PASANGAN LUBANG BERSIH PASANGAN PASANGAN

TEMBOK TEMBOK TEMBOK KUSEN PASANGAN TEMBOK TEMBOK

(M) (M) (M2) (M2) (M2) (M) (M3)

1 4 5

1 A 3,55 0,55 1,95 - 1,95 0,11 0,21

2 B 4,58 0,55 2,52 - 2,52 0,11 0,28

3 C 1,50 2,00 3,00 - 3,00 0,11 0,33

4 D 1,63 0,55 0,89 - 0,89 0,11 0,10

5 E 1,33 2,00 2,65 - 2,65 0,11 0,29

6 F 1,33 2,00 2,65 - 2,65 0,11 0,29

7 G 1,50 0,55 0,83 - 0,83 0,11 0,09

8 H 1,33 2,00 2,65 - 2,65 0,11 0,29

9 I 4,83 0,55 2,65 - 2,65 0,11 0,29

10 J 1,33 2,00 2,65 - 2,65 0,11 0,29

11 K 4,83 0,55 2,65 - 2,65 0,11 0,29

12 L 5,80 0,55 3,19 - 3,19 0,11 0,35

13 M 1,65 2,00 3,30 - 3,30 0,11 0,36

14 N 1,33 2,00 2,65 1,56 1,09 0,11 0,12

15 O 1,65 2,00 3,30 - 3,30 0,11 0,36

16 P 4,05 0,55 2,23 - 2,23 0,11 0,25

17 Q 6,28 0,55 3,45 0,88 2,57 0,11 0,28

18 R 1,65 2,00 3,30 - 3,30 0,11 0,36

19 S 1,65 2,00 3,30 - 3,30 0,11 0,36

20 T 1,33 2,00 2,65 1,56 1,09 0,11 0,12

21 U 4,05 0,55 2,23 - 2,23 0,11 0,25

22 V 6,30 0,55 3,47 0,88 2,59 0,11 0,28

23 W 1,65 2,00 3,30 1,56 1,74 0,11 0,19

24 X 1,33 2,00 2,65 - 2,65 0,11 0,29

25 Y 4,05 0,55 2,23 - 2,23 0,11 0,25

26 Z 1,65 2,00 3,30 - 3,30 0,11 0,36

27 1 1,65 2,00 3,30 1,56 1,74 0,11 0,19

28 2 1,33 2,00 2,65 - 2,65 0,11 0,29

29 3 1,33 0,55 0,73 - 0,73 0,11 0,08

30 4 2,10 2,00 4,20 - 4,20 0,11 0,46

31 5 2,10 0,55 1,16 - 1,16 0,11 0,13

32 6 3,15 0,55 1,73 0,48 1,25 0,11 0,14

33 7 2,10 2,00 4,20 - 4,20 0,11 0,46

34 8 1,50 2,00 3,00 1,56 1,44 0,11 0,16

35 9 5,30 0,55 2,92 0,88 2,04 0,11 0,22

36 10 0,85 0,55 0,47 - 0,47 0,11 0,05

37 11 3,63 0,55 1,99 0,88 1,11 0,11 0,12

38 12 5,30 0,55 2,92 0,88 2,04 0,11 0,22

39 13 0,85 0,55 0,47 - 0,47 0,11 0,05

40 14 3,55 0,55 1,95 - 1,95 0,11 0,21

41 15 4,58 0,55 2,52 - 2,52 0,11 0,28

42 16 1,50 2,00 3,00 - 3,00 0,11 0,33

BACK UP DATA

NO SKETSA

2 8

KODE PENEMPATAN PASANG TEMBOK

Page 19: Back Up Data Rsud Sabu Raijua

RUMUS :

V = A x T

A bersih = A pasangan - A lubang kusen

A pasangan = L x H

Keterangan

V = Volume

A = Luas

L = Panjang

H = Tinggi bersi

T = Tebal bersi

PANJANG TINGGI LUAS LUAS LUAS TEBAL VOLUME

PASANGAN PASANGAN PASANGAN LUBANG BERSIH PASANGAN PASANGAN

TEMBOK TEMBOK TEMBOK KUSEN PASANGAN TEMBOK TEMBOK

(M) (M) (M2) (M2) (M2) (M) (M3)

1 4 5

NO SKETSA

2 8

KODE PENEMPATAN PASANG TEMBOK

43 17 2,10 2,00 4,20 - 4,20 0,11 0,46

44 18 1,50 2,00 3,00 1,56 1,44 0,11 0,16

45 19 2,10 0,55 1,16 - 1,16 0,11 0,13

46 20 2,10 2,00 4,20 - 4,20 0,11 0,46

47 21 1,33 2,00 2,65 - 2,65 0,11 0,29

48 22 6,30 0,55 3,47 - 3,47 0,11 0,38

49 23 6,38 0,55 3,51 0,48 3,02 0,11 0,33

50 24 6,38 0,55 3,51 0,48 3,02 0,11 0,33

51 25 3,15 0,55 1,73 0,48 1,25 0,11 0,14

52 26 3,15 0,55 1,73 0,48 1,25 0,11 0,14

53 27 6,28 0,55 3,45 0,88 2,57 0,11 0,28

54 28 5,80 0,55 3,19 - 3,19 0,11 0,35

55 29 4,83 0,55 2,65 - 2,65 0,11 0,29

56 30 1,33 2,00 2,65 - 2,65 0,11 0,29

57 31 1,50 0,55 0,83 - 0,83 0,11 0,09

58 32 1,33 2,00 2,65 - 2,65 0,11 0,29

59 33 1,33 2,00 2,65 - 2,65 0,11 0,29

60 34 1,50 0,55 0,83 - 0,83 0,11 0,09

61 35 1,65 2,00 3,30 1,56 1,74 0,11 0,19

62 36 1,65 2,00 3,30 - 3,30 0,11 0,36

63 37 1,65 2,00 3,30 1,56 1,74 0,11 0,19

64 38 1,65 2,00 3,30 - 3,30 0,11 0,36

65 39 1,65 2,00 3,30 - 3,30 0,11 0,36

66 40 1,33 2,00 2,65 1,56 1,09 0,11 0,12

67 41 1,33 2,00 2,65 - 2,65 0,11 0,29

68 42 1,33 2,00 2,65 - 2,65 0,11 0,29

69 43 6,30 0,55 3,47 - 3,47 0,11 0,38

70 44 4,05 0,55 2,23 - 2,23 0,11 0,25

71 45 4,05 0,55 2,23 - 2,23 0,11 0,25

72 46 2,35 0,55 1,29 0,88 0,41 0,11 0,05

18,25

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

(Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

Page 20: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : SALURAN KELILING BANGUNAN (1Pc : 2 Prs)

VOLUME REALISASI : 12,92 M3

V = A x L

A = A1 + A2 + A3

A1 = H1 x TI

A2 = H2 x T2

A3 = H3 x T3

Keterangan

V = Volume

L = Panjang saluran

A = Jumlah luas penampang

A1 = Luas penampang 1

A2 = Luas penampang 2

A3 = Luas penampang 3

H1 = Tinggi penampang 1

H2 = Tinggi penampang 2

H3 = Tinggi penampang 3

T1 = Tebal penampang 1

T2 = Tebal penampang 2

T3 = Tebal penampang 3

PANJANG LUAS LUAS LUAS LUAS VOLUME

SALURAN TINGGI TEBAL TINGGI TEBAL TINGGI TEBAL PENAMPANG PENAMPANG PENAMPANG PENAMPANG PASANGAN

KESELURUAN PENAMPANG PENAMPANG PENAMPANG PENAMPANG PENAMPANG PENAMPANG 1 2 3 TOTAL SALURAN

(M) (M) (M) (M) (M) (M) (M) (M2) (M2) (M2) (M2) (M3)

4 5

SALURAN KELILING BANGUNAN (1Pc : 2 Prs) 86,10 0,45 0,10 0,10 0,30 0,50 0,15 0,05 0,03 0,08 0,15 12,92

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

BACK UP DATA

2

URAIAN PEKERJAAN

DIMENSI PENAMPANG 1 DIMENSI PENAMPANG 2 DIMENSI PENAMPANG 3

RUMUS SKETSA

Page 21: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PLESTERAN DINDING TRASRAM (1Pc : 2 Prs)

VOLUME REALISASI : 40,98 M2

RUMUS :

V = A. plesteran - A. Lubang Kusen

A plesteran = L x H

Keterangan

V = Volume

A = Luas

L = Panjang

H = Tinggi

PANJANG TINGGI LUAS LUAS VOLUME

PLESTERAN PLESTERAN PLESTERAN LUBANG PLESTERAN

TEMBOK TEMBOK TEMBOK KUSEN TEMBOK

(M) (M) (M2) (M

2) (M

2)

1 4 5

1 A 3,75 0,55 2,06 - 2,06

2 B 6,60 0,55 3,63 - 3,63

3 C 1,50 0,55 0,83 - 0,83

4 D 1,80 0,55 0,99 - 0,99

5 E 1,50 0,55 0,83 - 0,83

6 F 1,50 0,55 0,83 - 0,83

7 G 1,80 0,55 0,99 - 0,99

8 H 1,50 0,55 0,83 - 0,83

9 I 5,10 0,55 2,81 - 2,81

10 J 1,50 0,55 0,83 - 0,83

11 K 5,10 0,55 2,81 - 2,81

12 L 5,80 0,55 3,19 - 3,19

13 10 1,00 0,55 0,55 - 0,55

14 11 4,00 0,55 2,20 0,88 1,32

15 13 1,00 0,55 0,55 - 0,55

16 14 3,55 0,55 1,95 - 1,95

17 15 6,60 0,55 3,63 - 3,63

18 16 1,50 0,55 0,83 - 0,83

19 21 1,50 0,55 0,83 - 0,83

20 28 6,00 0,55 3,30 - 3,30

21 29 5,10 0,55 2,81 - 2,81

22 30 1,50 0,55 0,83 - 0,83

23 31 1,50 0,55 0,83 - 0,83

24 32 1,50 0,55 0,83 - 0,83

25 33 1,50 0,55 0,83 - 0,83

26 34 1,50 0,55 0,83 - 0,83

26 46 2,50 0,55 1,38 0,88 0,50

40,98

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

NO KODE PENEMPATAN PLESTERAN TEMBOK SKETSA

2 8

Page 22: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANGA DINDING BIASA (1Pc : 5 Prs)

VOLUME REALISASI : 913,95 M2

RUMUS :

V = A. plesteran - A. Lubang Kusen

A plesteran = L x H

Keterangan :

V = Volume

A = Luas

L = Panjang

H = Tinggi

PANJANG TINGGI LUAS LUAS VOLUME

PLESTERAN PLESTERAN PLESTERAN LUBANG PLESTERAN

TEMBOK TEMBOK TEMBOK KUSEN TEMBOK

(M) (M) (M2) (M2) (M2)

1 3 4 5 6 7

1 A 3,75 5,64 21,15 1,66 19,49

2 B 6,60 5,64 37,22 1,66 35,57

3 C 1,50 5,64 8,46 0,45 8,01

4 D 1,80 5,64 10,15 2,01 8,15

5 E 1,50 5,64 8,46 0,45 8,01

6 F 1,50 5,64 8,46 0,45 8,01

7 G 1,80 5,64 10,15 2,01 8,15

8 H 1,50 5,64 8,46 0,45 8,01

9 I 5,10 5,64 28,76 6,35 22,41

10 J 1,50 5,64 8,46 0,45 8,01

11 K 5,10 5,64 28,76 6,35 22,41

12 L 5,80 5,64 32,71 - 32,71

13 M 1,80 4,35 7,83 - 7,83

14 N 1,50 4,35 6,53 2,12 4,40

15 O 1,80 4,35 7,83 - 7,83

16 P 4,20 4,38 18,40 - 18,40

17 Q 6,60 4,38 28,91 7,60 21,30

18 R 1,80 4,35 7,83 - 7,83

19 S 1,80 4,35 7,83 - 7,83

20 T 1,50 4,35 6,53 2,12 4,40

21 U 4,20 4,38 18,40 - 18,40

22 V 6,60 4,38 28,91 9,95 18,96

23 W 1,80 4,35 7,83 2,12 5,71

24 X 1,50 4,35 6,53 - 6,53

25 Y 4,20 4,38 18,40 - 18,40

26 Z 1,80 4,32 7,78 - 7,78

27 1 1,80 4,35 7,83 2,12 5,71

28 2 1,50 4,35 6,53 - 6,53

29 3 1,50 4,38 6,57 - 6,57

30 4 2,25 4,35 9,79 - 9,79

31 5 2,25 4,38 9,86 - 9,86

32 6 3,30 4,38 14,45 4 10,11

33 7 2,25 4,35 9,79 - 9,79

34 8 1,65 4,35 7,18 2,12 5,06

35 9 5,60 4,38 24,53 6,01 18,52

36 10 1,00 5,64 5,64 - 5,64

37 11 4,00 5,64 22,56 3,47 19,09

38 12 5,60 4,38 24,53 6,01 18,52

39 13 1,00 4,38 4,38 - 4,38

BACK UP DATA

NO KODE PENEMPATAN PLESTERAN TEMBOK SKETSA

2 8

Page 23: Back Up Data Rsud Sabu Raijua

RUMUS :

V = A. plesteran - A. Lubang Kusen

A plesteran = L x H

Keterangan :

V = Volume

A = Luas

L = Panjang

H = Tinggi

PANJANG TINGGI LUAS LUAS VOLUME

PLESTERAN PLESTERAN PLESTERAN LUBANG PLESTERAN

TEMBOK TEMBOK TEMBOK KUSEN TEMBOK

(M) (M) (M2) (M2) (M2)

1 3 4 5 6 7

NO KODE PENEMPATAN PLESTERAN TEMBOK SKETSA

2 8

40 14 3,55 5,64 20,02 1,66 18,36

41 15 6,60 4,38 28,91 1,66 27,25

42 16 1,50 4,38 6,57 0,45 6,12

43 17 2,25 4,35 9,79 - 9,79

44 18 1,65 4,35 7,18 2,12 5,06

45 19 2,25 4,38 9,86 - 9,86

46 20 2,25 4,35 9,79 - 9,79

47 21 1,50 5,64 8,46 - 8,46

48 22 6,60 5,64 37,22 3,32 33,91

49 23 6,60 4,38 28,91 6,35 22,56

50 24 6,60 4,38 28,91 4,34 24,57

51 25 3,30 4,38 14,45 3,52 10,94

52 26 3,30 4,38 14,45 3,52 10,94

53 27 6,60 4,38 28,91 7,60 21,30

54 28 6,00 5,64 33,84 - 33,84

55 29 5,10 5,64 28,76 6,35 22,41

56 30 1,50 5,64 8,46 0,45 8,01

57 31 1,50 5,64 8,46 0,45 8,01

58 32 1,50 5,64 8,46 0,45 8,01

59 33 1,50 5,64 8,46 0,45 8,01

60 34 1,50 5,64 8,46 0,45 8,01

61 35 1,80 4,35 7,83 2,12 5,71

62 36 1,80 4,32 7,78 - 7,78

63 37 1,80 4,35 7,83 2,12 5,71

64 38 1,80 4,35 7,83 - 7,83

65 39 1,80 4,35 7,83 - 7,83

66 40 1,50 4,35 6,53 2,12 4,40

67 41 1,33 4,35 5,76 - 5,76

68 42 1,50 4,35 6,53 - 6,53

69 43 6,60 4,38 28,91 - 28,91

70 44 4,20 4,38 18,40 - 18,40

71 45 4,20 4,38 18,40 - 18,40

72 46 2,50 4,38 10,95 3,47 7,48

913,95

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

Page 24: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PLESTERAN PONDASI ( 1PC : 5PSR)

VOLUME REALISASI : 28,79 M2

PANJANG PANJANG PANJANG JUMLAH LUAS

PONDASI BIDANG BIDANG PANJANG PENAMPANG

KESELURUAN PLEST. 1 PLEST. 2 PLESTERAN TOTAL

(M) (M) (M) (M) (M2)

2 3 4 5 6

76,76 0,30 0,08 0,38 28,79

V = H x L

H = H1 +H2

Keterangan

V = Volume

L = Panjang plesteran pondasi

H = Jumlah panjang bidang vertikal

H1 = Panjang bidang vertikal 1

H2 = Panjang bidang vertikal 2

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

BACK UP DATA

RUMUS KETERANGAN

71

SKETSA

Page 25: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : ACIAN PONDASI

VOLUME REALISASI : 28,79 M2

PANJANG PANJANG PANJANG JUMLAH LUAS

PONDASI BIDANG BIDANG PANJANG PENAMPANG

KESELURUAN PLEST. 1 PLEST. 2 PLESTERAN TOTAL

(M) (M) (M) (M) (M2)

2 3 4 5 6

76,76 0,30 0,08 0,38 28,79

V = H x L

H = H1 +H2

Keterangan

V = Volume

L = Panjang acian pondasi

H = Jumlah panjang bidang vertikal

H1 = Panjang bidang vertikal 1

H2 = Panjang bidang vertikal 2

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

BACK UP DATA

SKETSA

RUMUS KETERANGAN

1 7

Page 26: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : ACIAN DINDING

VOLUME REALISASI : 954,93 M2

VOLUME VOLUME VOLUME

PLESTRAN PLESTRAN ACIAN

TRASRAM BIASA DINDING

(M) (M) (M2)

1 4 5

1 V = 40,98 913,95 954,93

2

3

4

5

6

7

8

9

10

11

12

58

59

60

61

62

63

64

65

66

67

68

69

72

954,93

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

NO RUMUS SKETSA

2 8

VOLUME PLESTERAN DIDING TRASRAM + VOLUME

PLESTERRAN DINDING BIASA

Page 27: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : SLOOF 20/25

VOLUME REALISASI : 17,56 M3

PANJANG VOLUME

SLOOF TINGGI LEBAR BETON

SLOOF SLOOF SLOOF

(M) (M) (M) (M3)

4 5 6 7

V = L x H x L 351,15 0,25 0,20 17,56

Keterangan

V = Volume

L = Panjang

H Tinggi Penampang

L = Lebar Penampang

17,56

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

DIMENSI SLOOF

BACK UP DATA

RUMUS POTONGAN PENAMPANG

2 8

SKETSA

Page 28: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : KOLOM PRAKTIS 15/15

VOLUME REALISASI : 4,86 M3

JUMLAH PANJANG VOLUME

KOLOM KOLOM TINGGI LEBAR BETON

PRAKTIS PRAKTIS KOLOM KOLOM KOLOM

(BUAH) (M) (M) (M) (M3)

4 5 6 7 8

V = Jumlah kolom x L x H x L 52 4,15 0,15 0,15 4,86

Keterangan

V = Volume

L = Panjang

H Tinggi Penampang

l = Lebar Penampang

4,86

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

RUMUS

DIMENSI KOLOM

POTONGAN PENAMPANG

2 9

SKETSA

Page 29: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : KOLOM STRUKTUR 20/25

VOLUME REALISASI : 4,57 M3

JUMLAH PANJANG VOLUME

KOLOM KOLOM TINGGI LEBAR BETON

STRUKTUR STRUKTUR KOLOM KOLOM KOLOM

(BUAH) (M) (M) (M) (M3)

4 5 6 7 8

V = Jumlah kolom x L x H x L 22 4,15 0,25 0,20 4,57

Keterangan

V = Volume

L = Panjang

H Tinggi Penampang

l = Lebar Penampang

4,57

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

RUMUS

DIMENSI KOLOM

POTONGAN PENAMPANG

2 9

SKETSA

Page 30: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : KOLOM BULAT DIA. 25 CM

VOLUME REALISASI : 0,41 M3

JUMLAH PANJANG DIAMETER LUAS VOLUME

KOLOM KOLOM KOLOM PENAMPANG BETON

BULAT BULAT BULAT KOLOM KOLOM

(BUAH) (M) (M) (M2) (M3)

4 5 6 8

V = Jumlah kolom x L x A 2,00 4,15 0,25 0,05 0,41

A = 1/4 x 22/7 x D2

Keterangan

V = Volume

A = Luas

L = Panjang

D = Diameter

0,41

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

RUMUS POTONGAN PENAMPANG

2 9

SKETSA

Page 31: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : RINGBALOK 15/20

VOLUME REALISASI : 10,53 M3

PANJANG VOLUME

RINGBALOK TINGGI LEBAR BETON

RINGBALOK RINGBALOK RINGBALOK

(M) (M) (M) (M3)

4 5 6 7

V = L x H x L 351,15 0,20 0,15 10,53

Keterangan

V = Volume

L = Panjang

H Tinggi Penampang

L = Lebar Penampang

10,53

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

RUMUS

DIMENSI SLOOF

SKETSA PENAMPANG

2 8

SKETSA

Page 32: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : BALOK LATAI 10/15

VOLUME REALISASI : 5,27 M3

PANJANG VOLUME

BALOK TINGGI LEBAR BETON

LATAI BALOK BALOK BALOK

(M) (M) (M) (M3)

4 5 6 7

V = L x H x L 351,15 0,10 0,15 5,27

Keterangan

V = Volume

L = Panjang

H Tinggi Penampang

L = Lebar Penampang

5,27

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

RUMUS

DIMENSI SLOOF

SKETSA PENAMPANG

2 8

SKETSA

Page 33: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LANTAI RABAT BETON CAMPURAN 1Pc : 3Psr : 5Krl

VOLUME REALISASI : 7,29 M3

RUMUS :

V A x T

A L x l

Keterangan

V = Volume L Panjang

A = Luasan l Lebar

T = Tebal

PANJANG LEBAR LUAS TEBAL VOLUME

RABAT RABAT RABAT RABAT RABAT

(M) (M) (M2) (M) (M3)

3 4 5 6 7

A 4,73 0,98 4,61 0,10 0,46

B 5,63 0,98 5,48 0,10 0,55

C 2,48 0,98 2,41 0,10 0,24

D 19,95 0,98 19,45 0,10 1,95

E 6,98 0,98 6,80 0,10 0,68

F 6,98 0,98 6,80 0,10 0,68

G 19,95 0,98 19,45 0,10 1,95

H 2,48 0,98 2,41 0,10 0,24

I 5,63 0,98 5,48 0,10 0,55

J 4,73 0,98 4,61 0,10 0,46

7,29

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

KODE POSISI PENEMPATAN RABAT BETON SKETSA

2 8

Page 34: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LANTAI TEGEL KERAMIK UKURAN 20 x 20

VOLUME REALISASI : 21,37 M2

VOLUME

NO KERAMIK

(M2)

1 3

1 KM/WC RUANG BERSALIN 1 3,15

2 KM/WC RUANG BERSALIN 2 3,15

3 KM/WC RUANG DOKTER 2,15

4 KM/WC RUANG ADMINISTRASI 2,15

5 KM/WC RUANG RAWAT INAP 1 2,15

6 KM/WC RUANG RAWAT INAP 2 2,15

7 KM/WC RUANG RAWAT INAP 3 2,15

8 KM/WC RUANG ISOLASI 1 2,15

9 2,15

21,37

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

NAMA RUANGAN

2

KM/WC RUANG ISOLASI 2

BACK UP DATA

SKETSA

6

Page 35: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LANTAI TEGEL KERAMIK KM/WC UKURAN 30 x 30

VOLUME REALISASI : 327,82 M2

VOLUME

NO KERAMIK

(M2)

1 3

1 TERAS 13,12

2 RUANG BERSALIN 1 23,60

3 RUANG BERSALIN 1 23,60

4 CORIDOR 56,75

5 RUANG DOKTER 15,81

6 RUANG ADMINISTRASI 15,81

7 RUANG RAWAT INAP 1 35,12

8 RUANG RAWAT INAP 2 35,12

9 TERAS 5,41

10 RUANG RAWAT INAP 2 35,12

11 RUANG ISOLASI 1 15,81

12 RUANG ISOLASI 2 15,81

13 RUANG NEONATUS 23,22

14 NURSE STATION 13,55

327,82

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

NAMA RUANGAN SKETSA

2 6

Page 36: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : DINDING KERAMIK 20/25 CM

VOLUME REALISASI : 505,66 M2

RUMUS :

V = A pas. Keramik - A lubang kusen

A pas.keramik = L x H

Keterangan

V = Volume

A = Luas

L = Panjang

H = Tinggi

PANJANG TINGGI LUAS LUAS VOLUME

NO PASANGAN PASANGAN PASANGAN LUBANG PASANGAN

KERAMIK KERAMIK KERAMIK KUSEN KERAMIK

(M) (M) (M2) (M

2) (M

2)

1 3 4 5 6 7

1 RUANG BERSALIN 1 21,60 1,81 39,10 4,31 34,79

2 KM/WC RUANG BERSALIN 1 7,20 1,84 13,25 1,44 11,81

3 RUANG DOKTER 18,00 1,81 32,58 4,59 27,99

4 KM/WC RUANG DOKTER 5,89 1,84 10,84 1,44 9,40

5 RUANG ADMINISTRASI 15,15 1,81 27,42 2,22 25,20

6 KM/WC RUANG ADMINISTRASI 5,89 1,84 10,84 1,44 9,40

7 RUANG RAWAT INAP 1 24,60 1,81 44,53 9,05 35,47

8 KM/WC RUANG RAWAT INAP 1 5,89 1,84 10,84 1,44 9,40

9 RUANG RAWAT INAP 2 24,60 1,81 44,53 8,11 36,41

10 KM/WC RUANG RAWAT INAP 2 5,89 1,84 10,84 1,44 9,40

11 CORIDOR 53,00 1,81 95,93 29,73 66,20

12 RUANG RAWAT INAP 3 24,60 1,84 45,26 8,19 37,08

13 KM/WC RUANG RAWAT INAP 3 5,89 1,81 10,66 1,41 9,25

14 RUANG ISOLASI 1 18,00 1,84 33,12 4,64 28,48

15 KM/WC RUANG ISOLASI 1 5,89 1,81 10,66 1,41 9,25

16 RUANG ISOLASI 2 18,00 1,84 33,12 4,64 28,48

17 KM/WC RUANG ISOLASI 2 5,89 1,81 10,66 1,41 9,25

18 RUANG NEONATUS 20,10 1,81 36,38 3,18 33,20

19 NURSE STATION 17,10 1,81 30,95 2,37 28,58

20 RUANG BERSALIN 2 21,60 1,81 39,10 4,31 34,79

21 KM/WC RUANG BERSALIN 2 7,20 1,84 13,25 1,44 11,81

505,66

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

NAMA RUANGAN SKETSA

2 8

Page 37: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : KUSEN ALUMUNIUM

VOLUME REALISASI : 515,80 M1

RUMUS :

V = = L x JUMLAH KUSEN

Keterangan :

L = Panjang

PANJANG JUMLAH VOLUME

KUSEN KUSEN KUSEN

(M) (BUAH) (M1)

1 3 4

1 P1 10,74 2 21,48

2 P2 10,74 2 21,48

3 P3 7,70 9 69,3

4 PJ1 15,26 3 45,78

5 PJ2 16,16 2 32,32

6 PJ3 16,16 2 32,32

7 PJ4 12,18 1 12,18

8 PJ5 12,18 1 12,18

9 J1 17,52 4 70,08

10 J2 9,84 10 98,4

11 BV1 8,04 8 64,32

12 BV2 4,38 2 8,76

13 BV3 2,72 10 27,20

515,80

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

NO SKETSA

5

TYPE

KUSEN

2

Page 38: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : DAUN JENDELA+BOVEN PANEL KACA

VOLUME REALISASI : 66,49 M2

RUMUS :

V = = A x JUMLAH DAUN JENDELA & BOVEN x JUMLAH KUSEN

A = L x l

Keterangan :

A = Luasan

L = Panjang

l = Lebar

LUAS JUMLAH JUMLAH VOLUME

PANJANG LEBAR DAUN DAUN KUSEN KUSEN

(M) (M) (M2) (BUAH) (BUAH) (M2)

1 3 4

1 P1 0,75 0,50 0,38 2 2 1,50

2,10 0,76 1,60 2 2 6,38

2 P2 0,75 0,50 0,38 2 2 1,50

3 P3 0,70 0,50 0,35 1 9 3,15

4 PJ1 0,74 0,86 0,64 2 3 3,82

0,74 0,50 0,37 3 3 3,33

5 PJ2 0,60 0,86 0,52 2 1 1,03

0,60 0,50 0,30 2 1 0,60

0,80 0,50 0,40 1 1 0,40

6 PJ3 0,60 0,86 0,52 2 2 2,06

0,60 0,50 0,30 2 2 1,20

0,80 0,50 0,40 1 2 0,80

7 PJ4 0,70 0,86 0,60 1 1 0,60

0,70 0,50 0,35 1 1 0,35

0,80 0,50 0,40 1 1 0,40

8 PJ5 0,70 0,86 0,60 1 1 0,60

0,70 0,50 0,35 1 1 0,35

0,80 0,50 0,40 1 1 0,40

9 J1 0,90 0,86 0,77 2 4 6,19

0,90 0,50 0,45 2 4 3,60

10 J2 0,60 0,86 0,52 2 10 10,32

0,60 0,50 0,30 2 10 6,00

11 BV1 0,90 0,50 0,45 2 8 7,20

12 BV2 0,60 0,50 0,30 2 2 1,20

13 BV3 0,70 0,50 0,35 1 10 3,50

66,49

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

DIMENSI

BACK UP DATA

NO

TYPE

SKETSAKUSEN

2 5

Page 39: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANG JENDELA, BOVEN KACA MATI

VOLUME REALISASI : 8,50 M2

RUMUS :

V = = A x JUMLAH JENDELA & BOVEN KACA MATI x JUMLAH KUSEN

A = L x l

Keterangan :

A = Luasan

L = Panjang

l = Lebar

LUAS JUMLAH JUMLAH VOLUME

PANJANG LEBAR DAUN DAUN KUSEN KUSEN

(M) (M) (M2) (BUAH) (BUAH) (M2)

1 3 4

9 J1 0,90 0,86 0,77 1 4 3,10

0,90 0,50 0,45 1 4 1,80

11 BV1 0,90 0,50 0,45 1 8 3,60

8,50

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 5

J U M L A H

BACK UP DATA

NO

TYPE DIMENSI

SKETSAKUSEN

Page 40: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PASANG KACA PADA PINTU ALUMUNIUM

VOLUME REALISASI : 1,60 M2

RUMUS :

V = = A x JUMLAH DAUN PINTU x JUMLAH KUSEN

A = L x l

Keterangan :

A = Luasan

L = Panjang

l = Lebar

LUAS JUMLAH JUMLAH VOLUME

PANJANG LEBAR DAUN DAUN KUSEN KUSEN

(M) (M) (M2) (BUAH) (BUAH) (M2)

1 3 4

1 P2 0,76 0,15 0,11 2 2 0,46

2 PJ1 0,76 0,15 0,11 2 3 0,68

3 PJ2 0,76 0,15 0,11 1 1 0,11

4 PJ3 0,76 0,15 0,11 1 1 0,11

5 PJ4 0,76 0,15 0,11 1 1 0,11

6 PJ5 0,76 0,15 0,11 1 1 0,11

1,60

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 5

J U M L A H

BACK UP DATA

NO

TYPE DIMENSI

SKETSAKUSEN

Page 41: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : DAUN PINTU ALUMUNIUM

VOLUME REALISASI : 24,36 M2

RUMUS :

V = = A x JUMLAH DAUN PINTU x JUMLAH KUSEN

A = L x l

Keterangan :

A = Luasan

L = Panjang

l = Lebar

LUAS JUMLAH JUMLAH VOLUME

PANJANG LEBAR DAUN DAUN KUSEN KUSEN

(M) (M) (M2) (BUAH) (BUAH) (M2)

1 3 4

1 P2 2,10 0,76 1,60 2 2 6,38

2 PJ1 2,10 1,52 3,19 1 3 9,58

3 PJ2 2,10 0,80 1,68 1 1 1,68

4 PJ3 2,10 0,80 1,68 1 2 3,36

5 PJ4 2,10 0,80 1,68 1 1 1,68

6 PJ5 2,10 0,80 1,68 1 1 1,68

24,36

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 5

J U M L A H

BACK UP DATA

NO

TYPE DIMENSI

SKETSAKUSEN

Page 42: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : DAUN PINTU KM/WC

VOLUME REALISASI : 13,23 M2

RUMUS :

V = = A x JUMLAH DAUN PINTU x JUMLAH KUSEN

A = L x l

Keterangan :

A = Luasan

L = Panjang

l = Lebar

LUAS JUMLAH JUMLAH VOLUME

PANJANG LEBAR DAUN DAUN KUSEN KUSEN

(M) (M) (M2) (BUAH) (BUAH) (M2)

1 3 4

1 P3 2,10 0,70 1,47 1 9 13,23

13,23

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 5

J U M L A H

BACK UP DATA

NO

TYPE DIMENSI

SKETSAKUSEN

Page 43: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : RANGKA ATAP

VOLUME REALISASI : 552,52 M2

RUMUS :

V = 0,50 x (a + b) x H

Keterangan :

V = Volume

a = Panjang sisi atas

b = Panjang sisi bawah

H = Tinggi

TINGGI VOLUME

ATAS BAWAH

(M) (M) (M2) (M2)

1 3

1 PIAS A 5,30 22,20 9,75 134,06

2 PIAS B 5,30 22,20 9,75 134,06

3 PIAS C 16,90 0,00 9,75 82,39

4 PIAS D 12,91 10,61 1,00 11,76

5 PIAS E 12,91 10,61 1,00 11,76

6 PIAS F 10,61 10,61 4,88 51,78

7 PIAS G 10,61 10,61 4,88 51,78

8 PIAS H 10,61 4,88 2,70 20,91

9 PIAS I 6,40 4,88 2,70 15,23

10 PIAS J 5,48 2,28 5,00 19,40

11 PIAS K 5,48 2,28 5,00 19,40

552,52

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 5

J U M L A H

ATAP

BACK UP DATA

NO

KODE PANJANG SISI

SKETSAPIAS

Page 44: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : ATAP GENTENG METAL ROOF 0,30

VOLUME REALISASI : 552,52 M2

RUMUS :

V = 0,50 x (a + b) x H

Keterangan :

V = Volume

a = Panjang sisi atas

b = Panjang sisi bawah

H = Tinggi

TINGGI VOLUME

ATAS BAWAH

(M) (M) (M2) (M2)

1 3

1 PIAS A 5,30 22,20 9,75 134,06

2 PIAS B 5,30 22,20 9,75 134,06

3 PIAS C 16,90 0,00 9,75 82,39

4 PIAS D 12,91 10,61 1,00 11,76

5 PIAS E 12,91 10,61 1,00 11,76

6 PIAS F 10,61 10,61 4,88 51,78

7 PIAS G 10,61 10,61 4,88 51,78

8 PIAS H 10,61 4,88 2,70 20,91

9 PIAS I 6,40 4,88 2,70 15,23

10 PIAS J 5,48 2,28 5,00 19,40

11 PIAS K 5,48 2,28 5,00 19,40

552,52

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

(Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 5

J U M L A H

BACK UP DATA

NO

KODE PANJANG SISI

SKETSAPIAS

ATAP

Page 45: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : BUBUNG METAL ROOF 0,30

VOLUME REALISASI : 83,66 M1

VOLUME

(M1)

1

1 BUBUNGAN A 12,98

2 BUBUNGAN B 12,98

3 BUBUNGAN C 5,30

4 BUBUNGAN D 12,98

5 BUBUNGAN E 12,98

6 BUBUNGAN F 10,35

7 BUBUNGAN G 5,31

8 BUBUNGAN H 5,31

9 BUBUNGAN I 5,48

83,66

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

(Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 5

J U M L A H

BACK UP DATA

NO

KODE

SKETSABUBUNGAN

ATAP

Page 46: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LISTPLANK PAPAN KELAS 2 UKURAN 2 X 2,50/30

VOLUME REALISASI : 108,72 M1

VOLUME

(M1)

1

1 LISTPLANK A 16,90

2 LISTPLANK B 22,20

3 LISTPLANK C 1,50

4 LISTPLANK D 6,60

5 LISTPLANK E 3,75

6 LISTPLANK F 1,83

7 LISTPLANK G 9,24

8 LISTPLANK H 1,83

9 LISTPLANK I 3,75

10 LISTPLANK J 6,60

11 LISTPLANK K 1,50

12 LISTPLANK L 22,20

13 LISTPLANK M 10,82

14

15

108,72

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 5

J U M L A H

BACK UP DATA

NO

KODE

SKETSALISTPLANK

ATAP

Page 47: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : PLAFOND TRIPLEKS 3 MM DAN RANGKA

VOLUME REALISASI : 469,05 M2

VOLUME

NO PLAFOND

(M2)

1 3

1 RUANG BERSALIN 1 23,60

2 KM/WC RUANG BERSALIN 1 3,15

3 RUANG DOKTER 15,81

4 KM/WC RUANG DOKTER 2,15

5 RUANG ADMINISTRASI 15,81

6 KM/WC RUANG ADMINISTRASI 2,15

7 RUANG RAWAT INAP 1 35,12

8 KM/WC RUANG RAWAT INAP 1 2,15

9 RUANG RAWAT INAP 2 35,12

10 KM/WC RUANG RAWAT INAP 2 2,15

11 CORIDOR 56,75

12 RUANG RAWAT INAP 3 35,12

13 KM/WC RUANG RAWAT INAP 3 2,15

14 RUANG ISOLASI 1 15,81

15 KM/WC RUANG ISOLASI 1 2,15

16 RUANG ISOLASI 2 15,81

17 KM/WC RUANG ISOLASI 2 2,15

18 RUANG NEONATUS 23,22

19 NURSE STATION 13,55

20 RUANG BERSALIN 2 23,60

21 KM/WC RUANG BERSALIN 2 3,15

22 TERAS DEPAN 12,51

23 TERAS BELAKANG 5,40

24 SELASAR KELILING GEDUNG 120,48

469,05

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

NAMA RUANGAN SKETSA

2 6

Page 48: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LIST KAYU PROFIL

VOLUME REALISASI : 434,44 M2

PANJANG

NO LIST

PLAFOND

(M)

1 3

1 RUANG BERSALIN 1 21,60

2 KM/WC RUANG BERSALIN 1 7,20

3 RUANG DOKTER 18,00

4 KM/WC RUANG DOKTER 5,89

5 RUANG ADMINISTRASI 15,15

6 KM/WC RUANG ADMINISTRASI 5,89

7 RUANG RAWAT INAP 1 24,60

8 KM/WC RUANG RAWAT INAP 1 5,89

9 RUANG RAWAT INAP 2 24,60

10 KM/WC RUANG RAWAT INAP 2 5,89

11 CORIDOR 49,70

12 RUANG RAWAT INAP 3 24,60

13 KM/WC RUANG RAWAT INAP 3 5,89

14 RUANG ISOLASI 1 18,00

15 KM/WC RUANG ISOLASI 1 5,89

16 RUANG ISOLASI 2 18,00

17 KM/WC RUANG ISOLASI 2 5,89

18 RUANG NEONATUS 20,10

19 NURSE STATION 17,10

20 RUANG BERSALIN 2 21,60

21 KM/WC RUANG BERSALIN 2 7,20

22 TERAS MUKA 14,00

23 TERAS BELAKANG 5,40

24 SELASAR KELILING 86,36

434,44

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

NAMA RUANGAN SKETSA

2 4

Page 49: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : LISTPLANK PAPAN KELAS 2 UKURAN 2 X 2,50/30

VOLUME REALISASI : 57,62 M2

PANJANG LEBAR VOLUME

BIDANG CAT BIDANG CAT

(M) (M) (M2)

1

1 LISTPLANK A 16,90 0,53 8,96

2 LISTPLANK B 22,20 0,53 11,77

3 LISTPLANK C 1,50 0,53 0,80

4 LISTPLANK D 6,60 0,53 3,50

5 LISTPLANK E 3,75 0,53 1,99

6 LISTPLANK F 1,83 0,53 0,97

7 LISTPLANK G 9,24 0,53 4,90

8 LISTPLANK H 1,83 0,53 0,97

9 LISTPLANK I 3,75 0,53 1,99

10 LISTPLANK J 6,60 0,53 3,50

11 LISTPLANK K 1,50 0,53 0,80

12 LISTPLANK L 22,20 0,53 11,77

LISTPLANK M 10,82 0,53 5,73

57,62

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

2 5

J U M L A H

BACK UP DATA

NO

KODE

SKETSALISTPLANK

ATAP

Page 50: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : CAT DINDING

VOLUME REALISASI : 954,93 M2

VOLUME VOLUME VOLUME

CAT DINDING CAT DINDING CAT

TRASRAM BIASA DINDING

(M) (M) (M2)

2 3 4

V = 40,98 913,95 954,93

954,93

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

VOLUME CAT DIDING TRASRAM + VOLUME CAT DINDING

BIASA

J U M L A H

BACK UP DATA

RUMUS SKETSA

1 5

Page 51: Back Up Data Rsud Sabu Raijua

INSTANSI : RUMAH SAKIT UMUM DAERAH (RSUD)

NAMA PEKERJAAN : PEMBANGUNAN RUANG BERSALIN RUMAH SAKIT UMUM DAERAH SABU

LOKASI : RUMAH SAKIT UMUM DAERAH

TAHUN ANGGARAN : 2011

NAMA ITEM PEKERJAAN : CAT PLAFOND DAN LIST PLAFOND

VOLUME REALISASI : 490,77 M2

VOLUME

NO PLAFOND

(M2)

1 3

1 RUANG BERSALIN 1 23,60

2 KM/WC RUANG BERSALIN 1 3,15

3 RUANG DOKTER 15,81

4 KM/WC RUANG DOKTER 2,15

5 RUANG ADMINISTRASI 15,81

6 KM/WC RUANG ADMINISTRASI 2,15

7 RUANG RAWAT INAP 1 35,12

8 KM/WC RUANG RAWAT INAP 1 2,15

9 RUANG RAWAT INAP 2 35,12

10 KM/WC RUANG RAWAT INAP 2 2,15

11 CORIDOR 56,75

12 RUANG RAWAT INAP 3 35,12

13 KM/WC RUANG RAWAT INAP 3 2,15

14 RUANG ISOLASI 1 15,81

15 KM/WC RUANG ISOLASI 1 2,15

16 RUANG ISOLASI 2 15,81

17 KM/WC RUANG ISOLASI 2 2,15

18 RUANG NEONATUS 23,22

19 NURSE STATION 13,55

20 RUANG BERSALIN 2 23,60

21 KM/WC RUANG BERSALIN 2 3,15

22 TERAS DEPAN 12,51

23 TERAS BELAKANG 5,40

24 SELASAR KELILING GEDUNG 120,48

25 LIST PLAFOND 21,72

490,77

MENGETAHUI, DI SETUJUI, DI BUAT OLEH,

RUMAH SAKIT UMUM DAERAH SABU KOMSULTAN PENGAWAS KONTRAKTOR PELASANA

KABUPATEN SABU RAIJUA CV. PUTRA TIMOR RAYA CV. BAKU SARANA

PEJABAT PEMBUAT KOMITMEN (Perwakilan Sabu Raijua)

MERRY Ch. MORU, SST SILVESTER PRIMUS VELYKS DETHAN

Penata Muda III/B Inspector Pelaksana

Nip. 19741225 199803 2 001

J U M L A H

BACK UP DATA

NAMA RUANGAN SKETSA

2 6