BACKUP DATA Pekerjaan : Pembuatan Drainase Jl. Mekar Indah Lr II, Kel. K Lokasi : Kota Kendari Kontraktor Pelaksana : SITE DRAINASE Type C Type D Type E Type F Type G Type H Type I Type J Type K Type L Type a Type b

Transcript of Back Up Data

Page 1: Back Up Data

BACKUP DATAPekerjaan :

Pembuatan Drainase Jl. Mekar Indah Lr II, Kel. Kadia, Kec. Kadia, Kota KendariLokasi : Kota KendariKontraktor Pelaksana :

SITE DRAINASE

Type A

Type B

Type C

Type D

Type E

Type FType G

Type H

Type I

Type JType K

Type L

Type a

Type b

Page 2: Back Up Data
Page 3: Back Up Data

BACKUP DATAPekerjaan :

Pembangunan Jaringa Air Minum Derah Rawan Air Tersebar Kab. KonselLokasi : Kab, Konawe SelatanKontraktor Pelaksana : CV. PELITA KONSEL

I. PEKERJAAN PERSIAPAN

1. Pembersihan Site = 1.00 Ls2. Administrasi, Dokumen, P3K = 1.00 Ls3. Bangsal Kerja = 1.00 Ls4. Papan Proyek = 1.00 Ls

II. PEMBUATAN TOWER

1.. Pek. Galian TanahV = P x L x T

= 1.21 x 1.21 x 1.02= 1.48 M3 x 4.00 bh= 11.59 M3 x 5.00 Unit= 57.97 M3

2. Pek. Urugan Tanah KembaliV = 0.25 x V galian

1.02 = 0.25 x 57.97= 14.49 M3

0.15 3. Pek. Timbunan Pasir Alas Rabat0.10 V = P x L x T

= 1.21 x 1.21 x 0.101.21 = 0.15 M3 x 4.00 bh

= 2.83 M3 x 5.00 Unit= 14.15 M3

4. Pek. Timbunan TanahV = P x L x T

= 1.21 x 1.21 x 0.49= 0.71 M3 x 4.00 bh= 7.35 M3 x 5.00 Unit= 36.73 M3

0.304

5. Plat Poor Beton BertulangV = P x L x T

= 0.80 x 0.80 x 0.20= 0.13 M3 x 4.00 bh

0.90 = 0.51 M3 x 5.00 Unit= 2.56 M3

6. Pek. Kolom Beton Bertulang

0.15V = P x L x T

= 0.30 x 0.30 x 0.90= 0.08 M3 x 4.00 bh= 0.33 M3 x 5.00 Unit

0.80 = 1.66 M3

Page 4: Back Up Data

7. Pek. Sloef Beton BertulangV = P x L x T

= 14.00 x 0.25 x 0.25= 0.88 M3 x 1.00 bh= 0.88 M3 x 5.00 Unit

3.00= 4.38 M3

8. Pek. Rabat BetonV = P x L x T

= 3.00 x 2.00 x 0.15= 0.90 M3= 0.90 M3 x 5.00 Unit= 4.50 M3

9. Pek. MenaraV = 1.00 x 5 Unit

= 5.00 Buah

10. PlesteranV = 12.80 x 5 Unit

= 64.00 M2

11. Pengad. Bak Air FiberV = 2.00 x 5 Unit

= 10.00 Unit

12. Pipa PVC Dia. 25mmV = 30.00 x 5 Unit

= 150.00 M1

13. Elbow PVC Dia. 40 mmV = 10.00 x 5 Unit

= 50.00 Buah

14. Elbow PVC Dia. 25mmV = 6.00 x 5 Unit

= 30.00 M1

15. Tee Stek. Dia. 40mmV = 2.00 x 5 Unit

= 10.00 Buah

16. Tee Stek Dia. 16s/d 25mmV = 2.00 x 5 Unit

= 10.00 Buah

17. Stop Kran Dia. 25mmV = 2.00 x 5 Unit

= 10.00 Buah

18. Stop Kran Dia. 40mmV = 4.00 x 5 Unit

= 20.00 Buah

19. Pek Tangga TowerV = 1.00 x 5 Unit

Sloef 20/20

Page 5: Back Up Data

= 5.00 Unit

20. Pengad. Mesin PompaV = 1.00 x 5 Unit

= 5.00 Unit

21. Pengad./Pemas. Sumur BorV = 1.00 x 5 Unit

= 5.00 Unit

22. Pengad./Pemas. Pipa Dia. 4", 2,5", 1"V = 1.00 x 4 5

= 4.00 Ls

23. Pengad./Pemas. Pipa Jaringan Dist.V = 31.00 x 5 Unit

= 155.00 M1

III. PEK. RUMAH POMPA

1.Pek. Galian TanahaV = P x L x T

= 4.00 x 0.20 x 0.20= 0.16 M3= 0.16 M3 x 5.00 Unit= 0.80 M3

2. Pek. Pasangan BataV = P x L

= 4.00 x 0.35= 1.40 M3= 1.40 M3 x 5.00 Unit= 7.00 M3

3. Pek. PlesteranV = 2.00 x Pas. Bata

= 2.00 x 7.00= 14.00 M3

4. Pengad/Pemas. Engsel Kupu-KupuV = 2.00 x 5 Unit

= 10.00 Buah

5. Pengad/Pemas. Grendel KunciV = 1.00 x 5 Unit

= 5.00 Buah

6. Pengad/Pemas. Plat PenutupV = 64.80 x 5 Unit

= 324.00 Kg

7. Pek. Pembersihan AkhirV = 1.00 Ls

Mengetahui Konsultan Pengawas Kontraktor Pelaksana

Page 6: Back Up Data

Pengawas Lapangan CV. KAISON KONSULTAN CV. PELITA KONSE

DINAS PU PROV. SULTRA

ASRUL AMRAD A.Md Ir. Bashri AL MIUN

Nip. 19801124 201001 1 010 Koordinator Pengawas Direktur