BACKUP DATAPekerjaan :
Pembuatan Drainase Jl. Mekar Indah Lr II, Kel. Kadia, Kec. Kadia, Kota KendariLokasi : Kota KendariKontraktor Pelaksana :
SITE DRAINASE
Type A
Type B
Type C
Type D
Type E
Type FType G
Type H
Type I
Type JType K
Type L
Type a
Type b
BACKUP DATAPekerjaan :
Pembangunan Jaringa Air Minum Derah Rawan Air Tersebar Kab. KonselLokasi : Kab, Konawe SelatanKontraktor Pelaksana : CV. PELITA KONSEL
I. PEKERJAAN PERSIAPAN
1. Pembersihan Site = 1.00 Ls2. Administrasi, Dokumen, P3K = 1.00 Ls3. Bangsal Kerja = 1.00 Ls4. Papan Proyek = 1.00 Ls
II. PEMBUATAN TOWER
1.. Pek. Galian TanahV = P x L x T
= 1.21 x 1.21 x 1.02= 1.48 M3 x 4.00 bh= 11.59 M3 x 5.00 Unit= 57.97 M3
2. Pek. Urugan Tanah KembaliV = 0.25 x V galian
1.02 = 0.25 x 57.97= 14.49 M3
0.15 3. Pek. Timbunan Pasir Alas Rabat0.10 V = P x L x T
= 1.21 x 1.21 x 0.101.21 = 0.15 M3 x 4.00 bh
= 2.83 M3 x 5.00 Unit= 14.15 M3
4. Pek. Timbunan TanahV = P x L x T
= 1.21 x 1.21 x 0.49= 0.71 M3 x 4.00 bh= 7.35 M3 x 5.00 Unit= 36.73 M3
0.304
5. Plat Poor Beton BertulangV = P x L x T
= 0.80 x 0.80 x 0.20= 0.13 M3 x 4.00 bh
0.90 = 0.51 M3 x 5.00 Unit= 2.56 M3
6. Pek. Kolom Beton Bertulang
0.15V = P x L x T
= 0.30 x 0.30 x 0.90= 0.08 M3 x 4.00 bh= 0.33 M3 x 5.00 Unit
0.80 = 1.66 M3
7. Pek. Sloef Beton BertulangV = P x L x T
= 14.00 x 0.25 x 0.25= 0.88 M3 x 1.00 bh= 0.88 M3 x 5.00 Unit
3.00= 4.38 M3
8. Pek. Rabat BetonV = P x L x T
= 3.00 x 2.00 x 0.15= 0.90 M3= 0.90 M3 x 5.00 Unit= 4.50 M3
9. Pek. MenaraV = 1.00 x 5 Unit
= 5.00 Buah
10. PlesteranV = 12.80 x 5 Unit
= 64.00 M2
11. Pengad. Bak Air FiberV = 2.00 x 5 Unit
= 10.00 Unit
12. Pipa PVC Dia. 25mmV = 30.00 x 5 Unit
= 150.00 M1
13. Elbow PVC Dia. 40 mmV = 10.00 x 5 Unit
= 50.00 Buah
14. Elbow PVC Dia. 25mmV = 6.00 x 5 Unit
= 30.00 M1
15. Tee Stek. Dia. 40mmV = 2.00 x 5 Unit
= 10.00 Buah
16. Tee Stek Dia. 16s/d 25mmV = 2.00 x 5 Unit
= 10.00 Buah
17. Stop Kran Dia. 25mmV = 2.00 x 5 Unit
= 10.00 Buah
18. Stop Kran Dia. 40mmV = 4.00 x 5 Unit
= 20.00 Buah
19. Pek Tangga TowerV = 1.00 x 5 Unit
Sloef 20/20
= 5.00 Unit
20. Pengad. Mesin PompaV = 1.00 x 5 Unit
= 5.00 Unit
21. Pengad./Pemas. Sumur BorV = 1.00 x 5 Unit
= 5.00 Unit
22. Pengad./Pemas. Pipa Dia. 4", 2,5", 1"V = 1.00 x 4 5
= 4.00 Ls
23. Pengad./Pemas. Pipa Jaringan Dist.V = 31.00 x 5 Unit
= 155.00 M1
III. PEK. RUMAH POMPA
1.Pek. Galian TanahaV = P x L x T
= 4.00 x 0.20 x 0.20= 0.16 M3= 0.16 M3 x 5.00 Unit= 0.80 M3
2. Pek. Pasangan BataV = P x L
= 4.00 x 0.35= 1.40 M3= 1.40 M3 x 5.00 Unit= 7.00 M3
3. Pek. PlesteranV = 2.00 x Pas. Bata
= 2.00 x 7.00= 14.00 M3
4. Pengad/Pemas. Engsel Kupu-KupuV = 2.00 x 5 Unit
= 10.00 Buah
5. Pengad/Pemas. Grendel KunciV = 1.00 x 5 Unit
= 5.00 Buah
6. Pengad/Pemas. Plat PenutupV = 64.80 x 5 Unit
= 324.00 Kg
7. Pek. Pembersihan AkhirV = 1.00 Ls
Mengetahui Konsultan Pengawas Kontraktor Pelaksana
Pengawas Lapangan CV. KAISON KONSULTAN CV. PELITA KONSE
DINAS PU PROV. SULTRA
ASRUL AMRAD A.Md Ir. Bashri AL MIUN
Nip. 19801124 201001 1 010 Koordinator Pengawas Direktur