AUX MACH

3
Vesse l Na me : TB AUDAH April 2015 DATE MONTH YEARS Symbol S : Sch edul ed Ma i nt enanc e Date Last Overhoul April 2012 30 4 2015 C : Completed Maintenance Months Hours Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Las t Mo nt h T ot al Runn i ng Ho ur s Las t Mo nth Tot al Runni ng Ho urs This Month Running Hours This Month Running Hours Current Total Running Hours Current Total Running Hours 0 6.1 BILGES & GS PUMP POMPA BILGE DAN GS 6.1.1 MOTOR MOTOR 6.1.1A Check wire terminal and gland tightness. Periksa kabel terminal dan kekencanganna 10/Apr/15 0 2 9-Jun-15 C S 6.1.1B Cl ean f an impell e r and prote cti ve guard venti latio n passage. Bersih kan kipas dan r umah pel indung salu ran udara. 10/Apr/1 5 0 2 9-Jun-15 C S 6.1.1C Cleaning the greasing and re greasing Bersihkan greas lama dan tambahkan greas baru 10/Apr/15 0 6 7-Oct-15 C S 6.1.1D Replace bearing Ganti baru bearing 15/Apr/14 12 60 20-Mar-19 6.1.1E Merger test Laksanakan merger test 6/Feb/15 2 6 5-Aug-15 C S 6.1.1F Cleaning motor Laksanakan cleaning motor 15/Apr/14 12 36 30-Mar-17 6.1.2 PUMP POMPA 6.1.2A Check for big noise Periksa pompa dari suara yang terlalu bising / tidak biasa 14/Apr/15 0 1 14-May-15 C S 6.1.2B Check leakage from the pump casing Periksa kebocoran dari badan pompa 14/Apr/15 0 1 14-May-15 C S 6.1.2C Make sure no abnormal vibration pastikan tidak ada getaran yang tidak normal 14/Apr/15 0 1 14-May-15 C S 6.1.2D Overhaul Pump Laksanakan overhaul pompa 15/Apr/14 12 36 30-Mar-17 6.2 SEA WATER COOLING PUMP POMPA PENDINGIN AIR LAUT 6.2.1 PUMP POMPA 6.2.1A Check for big noise Periksa pompa dari suara yang terlalu bising / tidak biasa 14/Apr/15 0 1 14-May-15 C S 6.2.1B Check leakage from the pump casing Periksa kebocoran dari badan pompa 14/Apr/15 0 1 14-May-15 C S 6.2.1C Make sure no abnormal vibration pastikan tidak ada getaran yang tidak normal 14/Apr/15 0 1 14-May-15 C S 6.2.1D Overhaul Pump Laksanakan overhaul pompa 15/Apr/14 12 36 30-Mar-17 6.3 FUELOILPUMP POMPABAHANBAKAR 6.3.1 MOTOR MOTOR 6.3.1A Check wire terminal and gland tightness. Periksa kabel terminal dan kekencanganna 10/Apr/15 0 2 9-Jun-15 C S 6.3.1B Cl ean f an impell e r and prote cti ve guard venti latio n passage. Bersih kan kipas dan r umah pel indung salu ran udara. 10/Apr/1 5 0 2 9-Jun-15 C S 6.3.1C Cleaning the greasing and re greasing Bersihkan greas lama dan tambahkan greas baru 10/Apr/15 0 6 7-Oct-15 C S 6.3.1D Replace bearing Ganti baru bearing 15/Apr/14 12 60 20-Mar-19 6.3.1E Merger test Laksanakan merger test 11/Mar/15 1 3 9-Jun-15 C S 6.3.1F Cleaning motor Laksanakan cleaning motor 15/Apr/14 12 36 30-Mar-17 6.3.2 PUMP POMPA 6.3.2A Check for big noise Periksa pompa dari suara yang terlalu bising / tidak biasa 10/Apr/15 0 1 10-May-15 C S 6.3.2B Check leakage from the pump casing Periksa kebocoran dari badan pompa 10/Apr/15 0 1 10-May-15 C S 6.3.2C Make sure no abnormal vibration pastikan tidak ada getaran yang tidak normal 10/Apr/15 0 1 10-May-15 C S 6.3.2D Overhaul Pump Laksanakan overhaul pompa 15/Apr/14 12 36 30-Mar-17 6.4 AUXILIARY AIR COMPRESSOR AIR COMPRESSOR 6.4.1 ec and cean coo ing fins of compressor and prime mover. Pe ri k sa da n bers ihka n s ud u-sudu pe nd ingin compr es so r. 14 /J ul / 14 9 3 12-Oct-14 6.4.2 Check Lub oil and fuel of prime mover. Periksa minyak lumas dan bahan bakar 15/Apr/14 12 3 14-Jul-14 6.4.3 Func tio ni ng test of co mpre sso r. (Not e c harging t ime) . Jalankan co mpre sso r ( ca tat ber apa lamap waktu pe ngisian) 15/Apr /14 12 3 14-Jul-14 6.5 OILY WATER SEPARATOR OILY WATER SEPERATOR 6.5.1 Visu all y inspect oily wate r separator casin g for corrosio n. Perik sa rumah oily wate r separator dari karata n. 30/Apr/1 5 0 3 30-Jul-15 C S 6.5.2 Check all piping for leaks Periksa semua pipa dari kebocoran 30/Apr/15 0 3 30-Jul-15 C S 6.5.3 Clean oil sensing probe. Bersihkan oil sensing probe 30/Apr/15 0 3 30-Jul-15 C S 6.5.4 Operation test of solenoid valve. Tes solenoid valve 30/Apr/15 0 3 30-Jul-15 C S 6.5.5 Check slu dge pump fan belt s. Perik sa f an belt dari pompa sl udge 30/Apr/15 0 3 30-Jul-15 C S 6.5.6 Check all wire connections. Periksa hubungan kabel-kabel 30/Apr/15 0 3 30-Jul-15 C S 6. 6 HYDRAULI C POWER PACK AND CONTROL HYDRAULI C POWER PACK DAN KONTROL 6.6.1 Che ck all hos es and piping for de ter ior atio n. Per iksa semua sela ng dan pipa da ri k eusang an 15/Feb/15 2 3 15-May-15 C S 6.6.2 Check hydraulic oil condition, clean or renew oil filter if necessary. Periksa kondisi minyak hydrolik, bersihkan atau ganti saringan jika perlu. 30/Apr/15 0 3 30-Jul-15 C S 6.6.3 Check all control valves and ensure t hey are free, clean and lubricate all joints. Periksa semua konrtol valves, pastikan bebas, bersihkan dan lumasi semua penghubung. 30/Apr/15 0 3 30-Jul-15 C S Est. Next Due LF- E 036 Revision Page 1 Of 6 PMS No. Unit / System AUXILARY MACHINE Form Unit / System 2014 PERIOD OF PMS REPORT P I C Last Main t. Date Runn ing Hour s Interval

Transcript of AUX MACH

Page 1: AUX MACH

7/24/2019 AUX MACH

http://slidepdf.com/reader/full/aux-mach 1/3

Ve ss el Na me : TB A UDA H

April 2015 DATE MONTH YEARS Symbol S : Scheduled Maintenance

Date Last Overhoul April 2012 30 4 2015 C : Completed Maintenance

Months Hours Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15

La st M on th Tot al Runn in g H ou rs La st M ont h Tot al Runn in g H our s

This Month Running Hours This Month Running Hours

Current Total Running Hours Current Total Running Hours 0

6.1 BILGES & GS PUMP POMPA BILGE DAN GS

6.1.1 MOTOR MOTOR

6.1.1A Check wire terminal and gland tightness. Periksa kabel terminal dan kekencanganna 10/Apr/15 0 2 9-Jun-15 C S

6.1.1B Cl ean fan impell er and prot ect ive guard venti lati on passage. Bersi hkan kipas dan rumah pel indung sal uran udara. 10/Apr/ 15 0 2 9-Jun-15 C S

6.1.1C Cleaning the greasing and re greasing Bersihkan greas lama dan tambahkan greas baru 10/Apr/15 0 6 7-Oct-15 C S

6.1.1D Replace bearing Ganti baru bearing 15/Apr/14 12 60 20-Mar-19

6.1.1E Merger test Laksanakan merger test 6/Feb/15 2 6 5-Aug-15 C S

6.1.1F Cleaning motor Laksanakan cleaning motor 15/Apr/14 12 36 30-Mar-17

6.1.2 PUMP POMPA

6.1.2A Check for big noise Periksa pompa dari suara yang terlalu bising / tidak biasa 14/Apr/15 0 1 14-May-15 C S

6.1.2B Check leakage from the pump casing Periksa kebocoran dari badan pompa 14/Apr/15 0 1 14-May-15 C S

6.1.2C Make sure no abnormal vibration pastikan tidak ada getaran yang tidak normal 14/Apr/15 0 1 14-May-15 C S

6.1.2D Overhaul Pump Laksanakan overhaul pompa 15/Apr/14 12 36 30-Mar-17

6.2 SEA WATER COOLING PUMP POMPA PENDINGIN AIR LAUT

6.2.1 PUMP POMPA

6.2.1A Check for big noise Periksa pompa dari suara yang terlalu bising / tidak biasa 14/Apr/15 0 1 14-May-15 C S

6.2.1B Check leakage from the pump casing Periksa kebocoran dari badan pompa 14/Apr/15 0 1 14-May-15 C S

6.2.1C Make sure no abnormal vibration pastikan tidak ada getaran yang tidak normal 14/Apr/15 0 1 14-May-15 C S

6.2.1D Overhaul Pump Laksanakan overhaul pompa 15/Apr/14 12 36 30-Mar-17

6.3 FUEL OIL PUMP POMPA BAHAN BAKAR

6.3.1 MOTOR MOTOR

6.3.1A Check wire terminal and gland tightness. Periksa kabel terminal dan kekencanganna 10/Apr/15 0 2 9-Jun-15 C S

6.3.1B Cl ean fan impell er and prot ect ive guard venti lati on passage. Bersi hkan kipas dan rumah pel indung sal uran udara. 10/Apr/ 15 0 2 9-Jun-15 C S

6.3.1C Cleaning the greasing and re greasing Bersihkan greas lama dan tambahkan greas baru 10/Apr/15 0 6 7-Oct-15 C S

6.3.1D Replace bearing Ganti baru bearing 15/Apr/14 12 60 20-Mar-19

6.3.1E Merger test Laksanakan merger test 11/Mar/15 1 3 9-Jun-15 C S

6.3.1F Cleaning motor Laksanakan cleaning motor 15/Apr/14 12 36 30-Mar-17

6.3.2 PUMP POMPA

6.3.2A Check for big noise Periksa pompa dari suara yang terlalu bising / tidak biasa 10/Apr/15 0 1 10-May-15 C S

6.3.2B Check leakage from the pump casing Periksa kebocoran dari badan pompa 10/Apr/15 0 1 10-May-15 C S

6.3.2C Make sure no abnormal vibration pastikan tidak ada getaran yang tidak normal 10/Apr/15 0 1 10-May-15 C S

6.3.2D Overhaul Pump Laksanakan overhaul pompa 15/Apr/14 12 36 30-Mar-17

6.4 AUXILIARY AIR COMPRESSOR AIR COMPRESSOR

6.4.1ec and cean coo ing fins of compressor and prime

mover.P er ik sa da n b er si hk an su du -s ud u p en di ngi n comp re ss or. 1 4/ Ju l/ 14 9 3 12-Oct-14

6.4.2 Check Lub oil and fuel of prime mover. Periksa minyak lumas dan bahan bakar 15/Apr/14 12 3 14-Jul-14

6.4.3 Funct ioning tes t of com pressor . (Note charging time). Jalankan com pressor (catat be rapa lamap waktu pengisian) 15/Apr/14 12 3 14-Jul-14

6.5 OILY WATER SEPARATOR OILY WATER SEPERATOR

6.5.1 Vis ual ly inspect oil y wat er separator casi ng for corrosi on. Peri ksa rumah oil y wat er separator dari karat an. 30/Apr/ 15 0 3 30-Jul-15 C S

6.5.2 Check all piping for leaks Periksa semua pipa dari kebocoran 30/Apr/15 0 3 30-Jul-15 C S

6.5.3 Clean oil sensing probe. Bersihkan oil sensing probe 30/Apr/15 0 3 30-Jul-15 C S

6.5.4 Operation test of solenoid valve. Tes solenoid valve 30/Apr/15 0 3 30-Jul-15 C S

6.5.5 Check sl udge pump fan bel ts. Peri ksa fan bel t dari pompa s ludge 30/Apr/15 0 3 30-Jul-15 C S

6.5.6 Check all wire connections. Periksa hubungan kabel-kabel 30/Apr/15 0 3 30-Jul-15 C S

6.6 HYDRAULIC POWER PACK AND CONTROL HYDRAULIC POWER PACK DAN KONTROL

6.6.1 Check all hoses and piping for deterioration. Periksa semua selang dan pipa dari keusangan 15/Feb/15 2 3 15-May-15 C S

6.6.2Check hydraulic oil condition, clean or renew oil filter if 

necessary.

Periksa kondisi minyak hydrolik, bersihkan atau ganti

saringan jika perlu.30/Apr/15 0 3 30-Jul-15 C S

6.6.3Check all control valves and ensure t hey are free, clean and

lubricate all joints.

Periksa semua konrtol valves, pastikan bebas, bersihkan dan

lumasi semua penghubung.30/Apr/15 0 3 30-Jul-15 C S

Est. Next Due

LF- E 036

Revision

Page 1 Of 6

PMS No. Unit / System

AUXILARY MACHINE

Form

Unit / System2014

PERIOD OF PMS REPORT

P I C

Last Maint. Date Running HoursInterval

Page 2: AUX MACH

7/24/2019 AUX MACH

http://slidepdf.com/reader/full/aux-mach 2/3

6.6.4 C he ck pu mp s a li gn me nt an d c ou pl in g. P er ik sa al ig nm en t p om pa da n k op li ng 30/Apr/15 0 3 30-Jul-15 C S

6.6.5 C heck for abnorma l noise and vibra tion. Per iksa dar i suara yang t idak norm al/ge ta ran 30/Apr/15 0 3 30-Jul-15 C S

6.6.6 E ns ur e a ll p re ss ur e g au ge s a nd t he rm ome te r a re f un ct io ni ng . P as ti ak n s emu a p en gu ku r t ek an an d an t er mo me te r b er fu ng si . 3 0/ Ap r/ 15 0 3 30-Jul-15 C S

6.6.7 Cl ean cooler and renew zi nc anodes if necessary. Bersi hkan cool er dan perbaharui zi nc anodenya j ika perl u. 30/Apr/ 15 0 3 30-Jul-15 C S

6.6.8 Check all air control line for leakage. Rectify all defects.Periksa semua pipa kontrol udara dari kebocoran, perbaiki

semua kerusakan.30/Apr/15 0 3 30-Jul-15 C S

6.6.9 Check and adjust pressure regulating valves if necessary. Periksa dan atur “regulting Valve” jika perlu. 30/Apr/15 0 3 30-Jul-15 C S

WARNING: PERINGATAN:

Main breaker to the assigned equipment to be in "OFF"position. Tape breaker and display signboard.

Main Breaker dalm posisi “OFF” pada peralatan yangakan di kerjakan. Dan beri tanda di panelnya.

6.7 STEERING GEAR MESIN KEMUDI

6.7.1 Check all joints and glands for leakage. Periksa semua Joints dan Glands dari kebocoran. 30/Apr/15 0 3 30-Jul-15 C S

6.7.2 Check hydraulic pump for noise and vibration.Periksa pompa hydraulic dari suara yang tidak bi asa dan

getaran30/Apr/15 0 3 30-Jul-15 C S

6.7.3 Check pump coupling for wear and damage. Periksa coupling pompa dari keausan dan kerusakan. 30/Apr/15 0 3 30-Jul-15 C S

6.7.4 Check and lubricate linkage. Periksa dan lumasi linkage. 30/Apr/15 0 3 30-Jul-15 C S

6.7.5Test auxiliary or emergency steering. (Record in engine and

deck log)Tes mesin kemudi darurat(catat di Log Book) 30/Apr/15 0 3 30-Jul-15 C S

6.8 BATTERY STARTING SYSTEM BATTERY STARTING SYSTEM C/E

6.8.1 Check All battery electrolyte specific gravity. Periksa berat jenis electrolyte pada semua battery 30/Mar/15 1 2 30-May-15 C S

6.8.2 Top up All bat tery with dist i lled wa te r i f necessary. Tam bah a ir pada semua bat tery dist i lla teya jika dipe rlukan 30/Mar/15 1 2 30-May-15 C S

6.8.3 C heck tightness of al l ba ttery termina l. Per iksa kekencangan te rm inal pada semua bat tery 30/Mar/15 1 2 30-May-15 C S

6.8.4 E ns ur e al l b at ter y cl ean li ne ss . P as ti ka n k eb er si han p ad a s emu a b at ter y 30/Mar/15 1 2 30-May-15 C S

6.8.5 Check wire connection all battery to starter. Periksa kabel penghubung pada semua battery ke starter 30/Mar/15 1 2 30-May-15 C S

6 .9 E NG IN E R OO M G EN ER AL MA IN TE NA NC E P ER AW AT AN UM UM KA MA R M ES IN

6.9.1Bulkheads, long., web frames, other members in good

condition.No heavy corrosion, wastage, holes or cracks.

Bulkheads, longitudinal bulkhead, web frames, dan bagian

lain dalam kondisi yang baik , tidak ada korosi yg parah

berlubang atau crack/retak.

30/Apr/15 0 3 30-Jul-15 C S

6.9.2

Engine room Bilges, should be kept clean and dry, free from

corrosion, wastage and oil. Particular care should be taken to

prevent the escape of hydrocarbon liquids or vapour int o the

engine room.

Bilge/got kamar mesin, harus bersih dan kering, bebas darikarat, endapan lumpur dan minyak. Dan benda2 yang

menutup saluran/lubang pada dasar sekat harus dibersihkan

2/Apr/15 0 1 2-May-15 C S

6.9.3Bulkhead penetrations should be routinely checked to ensure

the effectiveness of seals.

Penetrasi2 pada bulkhead diperiksa rutin untuk memastikan

tidak ada seal yang bocor2/Apr/15 0 1 2-May-15 C S

6.9.4

Emergency escape routes should be checked regularly to

ensure that they are free any object, include emergency

escape dors easy to operated and can l ock it from inside and

properly marked and clear of obstructions.

Jalur / daerah sekit ar untuk rute Emergency escape dicek 

secara regular untuk memastikan bebas dari benda2 yang

menghalangi, termasuk pintu unt uk emergency escape mudah

dioperasikan dan bisa dikunci dari dalam dan diberi tanda

(emergency escape) secara jelas.

2/Apr/15 0 1 2-May-15 C S

6.9.5 All lights in good order.Semua lampu2 di kamar mesin termasuk covernya dalam

kondisi baik dan berfungsi2/Apr/15 0 1 2-May-15 C S

6.9.6Safety functional test prior the release of CO2/ Foam at

regular intervalsTest fungsional safety release CO2 secara reguler 30/Apr/15 0 3 30-Jul-15 C S

NOTE: CATATAN

Ensure that during hosing down or cleaning operation,

no water is allowed to settle on electrical machinery. The

compartment should look clean and tidy after this

operation. This is one of the criteria that indicates the

performance of the Chief Engineer and his subordinates.

Pastikan bahawa saat penyemprotan atau pembersihan,

 jangan sampai air terkena peralatan listrik. Ruangan

harus nampak bersih dan rapih sesuadh itu. Ini adalah

suatu kriteria yang menunjukkan kepribadian KKM dan

anak buahnya

6.10. SEACHEST AND ACESSORIS SEACHEST DAN PERLENGKAPANNYA C/E

6.10.1 Cleaning filter strainer seachest Bersihkan filter strainer seachest 30/Apr/15 0 3 30-Jul-15 C S

6.10.2

open and close all s eachest valve, ensure all valve easy and

ready for operate, add grease at valve stem and change gland

packing if necessary

buka dan tutup semua valve seachest, pastikan semua valve

mudah dan siap untuk dioperasikan, tambahkan grease pada

valve stem dan ganti gland packing jika diperlukan

30/Apr/15 0 3 30-Jul-15 C S

6.10.3Check and Ensure, zinch anode still , replace new zinch

anode if necessary

Pastikan zinch anode untuk seachest masih ada, ganti jika

zinch anode sudah habis30/Apr/15 0 3 30-Jul-15 C S

6.11 SPARE AND INVENTORY SUKU CADANG DAN INVENTARIS

6.11.1

Besides the routine checking of spares and updating of 

inventory, a thorough check must be carried out t o ensure

that spares are properly secured and preserved.

Disamping pemeriksaan rutin pada suku cadang dan

pencatatan daftar barang, juga di lakukan untuk meyakinkan

bahwa suku cadang tersebut aman dan bi sa digunakan.

2/Mar/15 1 3 2-Jun-15 C S

6.11.2

The Chief Engineer must be able to produce an up-to-date

Inventory List indicating machinery, part numbers, stock 

quantity and position of the stores upon request of the Shore

Auditor.

KKM harus mampu membuat daftar terbaru permesinan,

nomor suku cadang, jumlah yang tersedia dan posisi pada

tempat penyimpanan jika ada permintaan dari audit or.

30/Apr/15 0 3 30-Jul-15 C S

ITEM MAINTENANCE FOR

Page 3: AUX MACH

7/24/2019 AUX MACH

http://slidepdf.com/reader/full/aux-mach 3/3

Summary of Overdue Maintenance

PMS No.6,4

FREDERIKUS

Chief Engineer

Date :

AUXILARY AIR COMPRESSOR

April-15

Item Maintenance Reason Remarks

 LF- C 051/DES 2012 Written by :INA Approved by : VP / DPA Retention Period : 1 Year  

Technical Superintendent

Date :

ITEM OVERDUE FOR

3PMS MAIN PROPULSION

PORTSIDE FOR THIS MONTH EXCELLENTApril-15