Analsia Alat AHSP 2013

8
EXCAVATOR ( E09) Kode I. URAIAN PERALATAN Tenaga PW Kapasitas Cp  Alat Baru a. Umur Ekonomis A b. Jam Kerja dalam 1 Ttahun W c. Harga Alat B II. LAIN-LAIN Tingkat Suku Bunga i Upah Operator / Sopir U1 Upah Pembantu Operator / Pemb. Sopir U2 Bahan Bakar Bensin Mb Bahan Bakar Solar Ms Minyak Pelumas Mp  Asuransi dan lain-lain Ins PPN diperhitungkan pada lembar rekapitulasi Biaya pekerjaan III. BIAYA PASTI PER JAM KERJA Nilai Sisat Alat = 10% x B C Faktor Angsuran Modal : i x (1 + i)  A D ( a + i )  A  - 1 Biaya Pasti per Jam a. Biaya pengembalian modal (B - C ) x D)) : W E b. Asuransi, dll ( Ins x B ) : W F BIAYA PASTI PERJAM = ( E + F ) G IV. BIAYA OPERASIONAL PER JAM KERJA Bahan Bakar (12%-15%) x Pw x Ms H Jika W < 1500 ambil 12% Pelumas (2,5%-3%) x Pw x Mp I ambil 2,5% Biaya Bengkel (6,25% dan 8,75%) x B / W J bila W < 1500 ambil 6,25% Perawatan dan perbaikan 12,5% - 17,5%) x B / W K bila W = 0, ambil 12,5% Operator (1 orang/jam) x U1 L Pembantu Operator (1 orang/jam) x U2 M Uraian Biaya Operasi per Jam H + I + J + K + L + M P TOTAL BIAYA SEWA ALAT EXCAVATOR 80 - 140 HP (E09) / JAM = ( G + P )

Transcript of Analsia Alat AHSP 2013

Page 1: Analsia Alat AHSP 2013

8/12/2019 Analsia Alat AHSP 2013

http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 1/10

EXCAVATOR ( E09)

Kode

I. URAIAN PERALATAN

Tenaga PWKapasitas Cp

 Alat Baru a. Umur Ekonomis A

b. Jam Kerja dalam 1 Ttahun W

c. Harga Alat B

II. LAIN-LAIN

Tingkat Suku Bunga i

Upah Operator / Sopir  U1

Upah Pembantu Operator / Pemb. Sopir  U2

Bahan Bakar Bensin Mb

Bahan Bakar Solar Ms

Minyak Pelumas Mp

 Asuransi dan lain-lain Ins

PPN diperhitungkan pada lembar rekapitulasi Biaya pekerjaan

III. BIAYA PASTI PER JAM KERJA

Nilai Sisat Alat = 10% x B C

Faktor Angsuran Modal :

i x (1 + i) A

D

( a + i ) A

 - 1

Biaya Pasti per Jam

a. Biaya pengembalian modal (B - C ) x D)) : W E

b. Asuransi, dll ( Ins x B ) : W

F

BIAYA PASTI PERJAM = ( E + F ) G

IV. BIAYA OPERASIONAL PER JAM KERJA

Bahan Bakar (12%-15%) x Pw x Ms H

Jika W < 1500 ambil 12%

Pelumas (2,5%-3%) x Pw x Mp I

ambil 2,5%

Biaya Bengkel (6,25% dan 8,75%) x B / W J

bila W < 1500 ambil 6,25%

Perawatan dan perbaikan 12,5% - 17,5%) x B / W K

bila W = 0, ambil 12,5%

Operator  (1 orang/jam) x U1 L

Pembantu Operator  (1 orang/jam) x U2 M

Uraian

Page 2: Analsia Alat AHSP 2013

8/12/2019 Analsia Alat AHSP 2013

http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 2/10

Biaya Operasi per Jam H + I + J + K + L + M P

TOTAL BIAYA SEWA ALAT EXCAVATOR 80 - 140 HP (E09) / JAM = ( G + P )

Page 3: Analsia Alat AHSP 2013

8/12/2019 Analsia Alat AHSP 2013

http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 3/10

Harga Satuan Keterangan

100.00  HP6.00  M3

5.00  Tahun

2,000.00  Jam

322,658,640.00  Rp

15.00  % / Tahun

20,107.00  Rp./Jam

14,393.00  Rp./Jam

16,276.00  Liter 

15,526.00  Liter 

30,000.00  Liter 

0.20  %

48,398,796.00  Rp

0.29832 

40,907.99  Rp

322.66  Rp

41,230.65  Rp

186,312.00  Rp

75,000.00 

14,116.32 

20,166.17 

20,107.00 

14,393.00 

Page 4: Analsia Alat AHSP 2013

8/12/2019 Analsia Alat AHSP 2013

http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 4/10

330,094.48 

371,325.13 

Page 5: Analsia Alat AHSP 2013

8/12/2019 Analsia Alat AHSP 2013

http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 5/10

EXCAVATOR ( E09)

Kode

I. URAIAN PERALATAN

Tenaga PW

Kapasitas Cp

 Alat Baru a. Umur Ekonomis A

b. Jam Kerja dalam 1 Ttahun W

c. Harga Alat B

II. LAIN-LAIN

Tingkat Suku Bunga i

Upah Operator / Sopir  U1

Upah Pembantu Operator / Pemb. Sopir  U2

Bahan Bakar Bensin Mb

Bahan Bakar Solar Ms

Minyak Pelumas Mp

 Asuransi dan lain-lain InsPPN diperhitungkan pada lembar rekapitulasi Biaya pekerjaan

III. BIAYA PASTI PER JAM KERJA

Nilai Sisat Alat = 10% x B C

Faktor Angsuran Modal :

i x (1 + i) A

D

( a + i ) A

 - 1

Biaya Pasti per Jam

a. Biaya pengembalian modal (B - C ) x D)) : W E

b. Asuransi, dll ( Ins x B ) : W

F

BIAYA PASTI PERJAM = ( E + F ) G

IV. BIAYA OPERASIONAL PER JAM KERJA

Bahan Bakar (12%-15%) x Pw x Ms H

Jika W < 1500 ambil 12%

Pelumas (2,5%-3%) x Pw x Mp I

ambil 2,5%

Biaya Bengkel (6,25% dan 8,75%) x B / W J

bila W < 1500 ambil 6,25%

Perawatan dan perbaikan 12,5% - 17,5%) x B / W K

bila W = 0, ambil 12,5%Operator  (1 orang/jam) x U1 L

Pembantu Operator  (1 orang/jam) x U2 M

Biaya Operasi per Jam H + I + J + K + L + M P

TOTAL BIAYA SEWA ALAT EXCAVATOR 80 - 140 HP (E09) / JAM = ( G + P )

Uraian

Page 6: Analsia Alat AHSP 2013

8/12/2019 Analsia Alat AHSP 2013

http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 6/10

Harga Satuan Keterangan

133.00  HP

0.93  M3

5.00  Tahun

2,000.00  Jam

1,577,442,240.00  Rp

15.00  % / Tahun

20,107.00  Rp./Jam

14,393.00  Rp./Jam

16,276.00  Liter 

15,526.00  Liter 

30,000.00  Liter 

0.20  %

236,616,336.00  Rp

0.29832 

199,994.61  Rp

1,577.44  Rp

201,572.05  Rp

247,794.96  Rp

99,750.00 

69,013.10 

98,590.14 

20,107.00 

14,393.00 

549,648.20 

751,220.25 

Page 7: Analsia Alat AHSP 2013

8/12/2019 Analsia Alat AHSP 2013

http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 7/10

TENAGA KAPASITAS HARGA ALAT YANG DIPA

ALAT ALAT ALAT JAM

UMUR KERJA H

ALAT 1 TAHUN A

(HP) - (Tahun) (Tahun) (Jam)

No. JENIS PERALATAN KODE

ALAT  

HP Cp B A W

1 2 2a 3 4 5 6 7

1. ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 5,219,463,066 10.0 1,500.0 5,219

2. ASPHALT FINISHER E02 72.4 10.0 Ton 1,106,752,194 6.0 1,400.0 1,106

3. ASPHALT SPRAYER E03 4.0 850.0 Liter 90,909,072 5.0 2,000.0 90

4. BULLDOZER 100-150 HP E04 155.0 - - 1,571,428,241 5.0 2,000.0 1,571

5. COMPRESSOR 4000-6500 L\M E05 60.0 5,000.0 CPM/(L/m) 233,766,185 5.0 2,000.0 233

6. CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 97,401,681 2.0 1,500.0 97

7. CRANE 10-15 TON E07 138.0 15.0 Ton 627,391,800 5.0 2,000.0 627

8. DUMP TRUCK 3,5 Ton E08 100.0 6.0 Ton 322,658,640 5.0 2,000.0 322

9. DUMP TRUCK 10 TON E09 190.0 10.0 Ton 787,877,427 5.0 2,000.0 787

10. EXCAVATOR 80-140 HP E10 133.0 0.9 M3 1,577,442,240 5.0 2,000.0 1,577

11. FLAT BED TRUCK 3-4 M3 E11 190.0 10.0 ton 401,385,222 5.0 2,000.0 401

12. GENERATOR SET E12 180.0 135.0 KVA 551,947,040 5.0 2,000.0 551

13. MOTOR GRADER >100 HP E13 135.0 10,800.0 - 1,915,785,675 5.0 2,000.0 1,915

14. TRACK LOADER 75-100 HP E14 70.0 0.8 M3 1,130,952,143 5.0 2,000.0 1,130

15. WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 1,277,190,450 5.0 2,000.0 1,277

16. THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 603,636,287 5.0 2,000.0 603

17. TANDEM ROLLER 6-8 T. E17 82.0 8.1 Ton 716,818,091 5.0 2,000.0 716

18. TIRE ROLLER 8-10 T. E18 100.5 9.0 Ton 539,771,904 5.0 2,000.0 539

19. VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 719,696,819 5.0 2,000.0 719

20. CONCRETE VIBRATOR E20 5.5 25.0 - 11,822,526 4.0 1,000.0 11

21. STONE CRUSHER E21 220.0 50.0 T/Jam 1,655,302,683 5.0 2,000.0 1,655

22. WATER PUMP 70-100 mm E22 6.0 - - 6,348,608 3.0 2,000.0 6

23. WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 223,213,305 5.0 2,000.0 223

24. PEDESTRIAN ROLLER E24 8.8 835.0 Ton 60,064,250 3.0 2,000.0 60

25. TAMPER E25 4.7 121.0 Ton 20,166,165 4.0 1,000.0 20

26. JACK HAMMER E26 0.0 1,330.0 - 11,362,962 5.0 2,000.0 11

27. FULVI MIXER E27 345.0 2,005.0 - 194,805,154 4.0 1,000.0 194

28. CONCRETE PUMP E28 100.0 8.00 M3 151,246,238 6.0 2,000.0 151

29. TRAILER 20 TON E29 175.0 20.00 Ton 389,879,190 6.0 2,000.0 389

30 PILE DRIVER + HAMMER E30 25.0 2.50 Ton 485,481,750 5.0 2,000.0 485

31. CRANE ON TRACK 35 TON E31 125.0 35.00 Ton 1,922,799,019 6.0 2,000.0 1,92232. WELDING SET E32 40.0 250.00 Amp 33,983,723 5.0 2,000.0 33

33. BORE PILE MACHINE E33 150.0 2,000.0 Meter 3,024,924,750 6.0 2,000.0 3,024

34. ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 0 4.0 2,000.0

KETERANGAN : 1 Tingkat Suku Bunga =

2 Upah Operator / Sopir / Mekanik =

3 Upah Pembantu Operator/Sopir/Mekanik =

4 Harga Bahan Bakar Bensin =

5 Harga Bahan Bakar Solar =

6 Minyak Pelumas =

7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitula

8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material)

Page 8: Analsia Alat AHSP 2013

8/12/2019 Analsia Alat AHSP 2013

http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 8/10

Page 9: Analsia Alat AHSP 2013

8/12/2019 Analsia Alat AHSP 2013

http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 9/10

TENAGA KAPASITAS HARGA ALAT YANG DIPA

ALAT ALAT ALAT JAM

UMUR KERJA H

ALAT 1 TAHUN A

(HP) - (Tahun) (Tahun) (Jam)

No. JENIS PERALATAN KODE

ALAT  

HP Cp B A W

1 2 2a 3 4 5 6 7

35. TRONTON E35 150.0 15.0 Ton 0 10.0 1,500.0

36. COLD MILLING MACHINE E37 248.0 1,000.0 m 0 5.0 2,000.0

37. ROCK DRILL BREAKER E36 3.0 - - 0 10.0 1,500.0

38. COLD RECYCLER E38 900.0 2,200.0 M 0 5.0 2,000.0

39. HOT RECYCLER E39 400.0 3.0 M 0 5.0 2,000.0 40. AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 0 4.0 1,000.0

41. ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter 0 5.0 2,000.0

42. SLIP FORM PAVER E42 105.0 2.5 M 0 6.0 2,000.0

43. CONCRETE PAN MIXER E43 134.0 600.0 Liter 151,246,238 10.0 1,500.0 151

44. CONCRETE BREAKER E44 290.0 20.0 m3/jam 0 5.0 2,000.0

45. ASPAHLT TANKER E45 190.0 4,000.0 liter 0 6.0 2,000.0

46. CEMENT TANKER E46 190.0 4,000.0 liter 0 6.0 2,000.0

47. CONDRETE MIXER (350) E47 20.0 350.0 liter 73,051,261 2.0 2,000.0 73

48. VIBRATING RAMMER E48 4.2 80.0 KG 0 4.0 1,000.0

49. TRUK MIXER (AGITATOR) E49 220.0 5.0 M3 443,181,053 5.0 2,000.0 443

50. BORE PILE MACHINE E50 125.0 60.0 CM 0 10.0 1,500.0

51. CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 0 5.0 2,000.0

52. BLENDING EQUIPMENT E52 50.0 30.0 Ton 20,000,000 10.0 1,500.0 20

53. ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter 0 4.0 2,000.0

KETERANGAN : 1 Tingkat Suku Bunga =

2 Upah Operator / Sopir / Mekanik =

3 Upah Pembantu Operator/Sopir/Mekanik =

4 Harga Bahan Bakar Bensin =

5 Harga Bahan Bakar Solar =

6 Minyak Pelumas =

7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitula

8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material)

9 AMP , Aspal Sprayer, Aspal Distribusi ditambah bahan bakar untuk pem

Page 10: Analsia Alat AHSP 2013

8/12/2019 Analsia Alat AHSP 2013

http://slidepdf.com/reader/full/analsia-alat-ahsp-2013 10/10