UNIVERSITAS PEMBANGUNAN NASIONAL “VETERAN” JAKARTA ANALISIS METODE FABRIKASI DAN PEMASANGAN PIPA PADA KAMAR MESIN KAPAL COASTER 1200 DWT SKRIPSI MOH HIDAYATUS SHOLIHIN 1210316002 FAKULTAS TEKNIK PROGRAM STUDI TEKNIK PERKAPALAN 2014

Transcript of ANALISIS METODE FABRIKASI DAN PEMASANGAN PIPA PADA …repository.upnvj.ac.id/3455/2/AWAL.pdf ·...

UNIVERSITAS PEMBANGUNAN NASIONAL “VETERAN” JAKARTA

ANALISIS METODE FABRIKASI DAN PEMASANGAN

PIPA PADA KAMAR MESIN KAPAL COASTER 1200 DWT

SKRIPSI

MOH HIDAYATUS SHOLIHIN

1210316002

FAKULTAS TEKNIK

PROGRAM STUDI TEKNIK PERKAPALAN

2014

UNIVERSITAS PEMBANGUNAN NASIONAL “VETERAN” JAKARTA

ANALISIS METODE FABRIKASI DAN PEMASANGAN

PIPA PADA KAMAR MESIN KAPAL COASTER 1200 DWT

SKRIPSI

Diajukan Sebagai Salah Satu Syarat Untuk Memperoleh Gelar

Sarjana Teknik

MOH HIDAYATUS SHOLIHIN

1210316002

FAKULTAS TEKNIK

PROGRAM STUDI TEKNIK PERKAPALAN

2014

ABSTRAK

Sistem pipa merupakan bagian utama dari suatu sistem yang

menghubungkan titik dimana fluida disimpan ke titik pengeluaran semua

pipa, baik untuk memindahkan tenaga atau pemompaan, hal tersebut harus

dipertimbangkan secara teliti, karena keamanan dari sebuah kapal akan

tergantung pada susunan perpipaan seperti halnya pada perlengkapan kapal

lainnya. Pada proyek pembangunan kapal baru khususnya coaster 1200

DWT sistem pipa harus dilaksanakan sebaik mungkin dengan

penyambungan flange yang simetris dan pengelasan pipa yang bagus

sehingga terhindar dari kebocoran. Disamping itu semua pipa harus

dipasang klem sehingga terlindung dari kerusakan mekanis dan untuk

menghindari getaran.

Untuk mendapatkan hasil pekerjaan pipa sesuai dengan ketentuan

diatas perlu adanya pemilihan SDM yang bagus dan metode fabrikasi pipa

yang baik.

Adapun beberapa cara yang biasa dipakai untuk fabrikasi pipa

dikapal yaitu ;

1.fabrikasi pipa didarat (workshop)

2.fabrikasi pipa dilaut (didalam kapal)

Diharapkan dengan menganalisa metode fabrikasi pipa diatas,

untuk pekerjaan pipa kapal coaster 1200 DWT akan mendapatkan hasil

yang bagus dengan waktu penyelesaian yang lebih singkat dan efisien.

Kata kunci : Efisiensi,Pemasangan Pipa, Kapal Coaster 1200 DWT,

ABSTRACT

Pipeline system is the main part of a system that connects the point where

the fluid is stored to the point of spending all the pipes, either to move or pumping

power, it should be considered carefully, because the security of a ship will

depend on the arrangement of piping as well as on any other ship equipment . In

the new ship construction project in particular coaster 1200 DWT pipe system

should be implemented as possible with a symmetric connection flange and pipe

welding good so avoid leakage. Besides, all pipes must be installed clamps that

protect it from mechanical damage and to avoid vibration.

To get the pipe work in accordance with the provisions of the

above there is need for a great selection of human resources and a good

pipe fabrication methods

As for some of the ways commonly used to ship the pipe fabrication;

1.fabrikasi pipeline on land (workshop)

2.fabrikasi pipe at sea (the vessel)

Expected to analyze the pipe fabrication method above, for pipe work ship

1200 dwt coaster will get great results with a shorter turnaround time and

efficient.

Key words: Efficiency, Pipe Fitting, Coaster Ship 1200 DWT,

KATA PENGANTAR

Puji syukur alhamdulillah penulis panjatkan kehadirat Allah SWT atas berkat,

rahmat, taufik dan hidayah-Nya, penyusunan skripsi yang berjudul “Analisis Metode Fabrikasi Dan Pemasangan Pipa Pada Kamar Mesin Kapal Coaster 1200 DWT” dapat diselesaikan dengan baik.

Penulisan skripsi ini bertujuan untuk memenuhi sebagian syarat

memperoleh gelar Sarjana Teknik bagi mahasiswa program S1, Fakultas Teknik,

Program Studi Teknik Perkapalan, Universitas Pembangunan Nasional “Veteran”

Jakarta. Penulis menyadari bahwa skripsi ini masih jauh dari kesempurnaan, oleh

sebab itu penulis mengharapkan kritik dan saran yang bersifat membangun dari

semua pihak demi kesempurnaan skripsi ini.

Selesainya skripsi ini tidak terlepas dari bantuan berbagai pihak, sehingga

pada kesempatan ini penulis dengan segala kerendahan hati dan penuh rasa

hormat mengucapkan terima kasih yang sebesar-besarnya kepada semua pihak

yang telah memberikan bantuan moril maupun materil secara langsung maupun

tidak langsung kepada penulis dalam penyusunan skripsi ini hingga selesai,

terutama kepada yang saya hormati :

1. Bapak Ir. B.B. Sulistiyono, S.Sos, MAP selaku Dekan Fakultas Teknik

Universitas Pembangunan Nasional “Veteran” Jakarta.

2. Bapak Drs. Ir. Bambang Sudjasta, MT selaku ketua Program Studi Teknik

Perkapalan Universitas Pembangunan Nasional “Veteran” Jakarta yang telah

memberikan dorongan dan semangat untuk segera menyelesaikan penyusunan

skripsi ini.

3. Bapak Bambang Prasoma, ST, MM dan Ir. M.Rusdy hatuwae, MT selaku

dosen pembimbing yang telah dengan sabar, tekun, tulus dan ikhlas

meluangkan waktu, tenaga dan pikiran memberikan bimbingan, motivasi,

arahan, dan saran-saran yang sangat berharga kepada penulis selama

menyusun skripsi.

4. Kedua orang tua penulis, Bapak sholihin amd dan Ibu Nur afifah yang sangat

banyak memberikan bantuan moril, material, arahan, dan selalu mendoakan

keberhasilan dan keselamatan selama menempuh pendidikan.

5. Seluruh Bapak dan Ibu dosen, serta karyawan Fakultas Teknik Universitas

Pembangunan Nasional “Veteran” Jakarta.

6. Rekan – rekan mahasiswa seperjuangan Teknik Perkapalan Universitas

Pembangunan Nasional “Veteran” Jakarta yang telah saling membantu dalam

menjalankan perkuliahan.

7. Semua pihak yang tidak dapat penulis sebut satu persatu yang telah

membantu dalam penyelesaian penulisan skripsi ini.

Akhirnya, dengan segala kerendahan hati penulis menyadari masih banyak

terdapat kekurangan-kekurangan, sehingga penulis mengharapkan adanya saran

dan kritikyang bersifat membangun demi kesempurnaan skripsi ini.

Jakarta, 24 Mei 2014

Moh hidayatus Sholihin

DAFTAR ISI

BAB I PENDAHULUAN

A. Latar Belakang .................................................................................................... 1

B. Tujuan Penelitian ................................................................................................. 2

C. Rumusan Masalah ............................................................................................... 2

D. Batasan Masalah .................................................................................................. 2

E. Manfaat Penelitian..............................................................................................3

F. Sistematika Penulisan..........................................................................................3

BAB II Tinjauan Pustaka

A. Defenisi Kapal Coaster........................................................................................ 4

B. Spesifikasi Teknis Kapal Perintis 1200 GT......................................................... 4

C. Sistem Pipa .......................................................................................................... 7

1. SistemPipa F.W dan S.W Sanitary .................................................................. 7

2. System Bilga (Clean Bilge system and Oily Bilge System) .......................... 8

3. Sistem Pemadam Kebakaran .......................................................................... 9

4. Sistem bahan bakar ........................................................................................ 10

a. Jenis bahan bakar ...................................................................................... 10

5. Lubricating Oil System ................................................................................. 11

6. Cooling Water System ................................................................................... 11

a. Sistem Pendingin Air Laut ........................................................................ 12

b. Sistem Pendinginan Terpusat (central cooling system) ............................ 12

D. Pipa .................................................................................................................... 13

1. Pipa ditinjau dari materialnya ........................................................................ 13

a. Seamless drawn Steel Pipe........................................................................ 13

b. Pipa Welded (Pipa dengan sambungan) .................................................. 14

c. Pipa Galvanis ............................................................................................ 14

d. Pipa dari Tembaga atau kuningan............................................................. 15

e. Pipa dari kuningan....................................................................................15

f. Pipa Plastik ( PVC ) .................................................................................. 16

g. Pipa Stainless Steel ................................................................................... 16

2. Pipa ditinjau dari Diameter, Ketebalan, Schedule ......................................... 17

3. Pipa ditinjau dari material pipa dan fitting .................................................... 19

1. Flens ( Flanges ) ....................................................................................... 19

a. Flans Pada Pipa Baja ............................................................................ 19

b. Flans Untuk Pipa yang lebih kecil ....................................................... 19

2. Elbow ........................................................................................................ 21

a. Elbow 90o ( Long Ellbow) .................................................................... 21

b. Ellbow 45o (Short Ellbow) ................................................................... 21

3. Gasket (Packing) Pipa .............................................................................. 22

a. Macam-macam gasket / packing dari segi material ............................. 22

b. Macam-macam gasket / packing dari segi ukuran .............................. 22

4. Reducer Pipa ............................................................................................. 23

5. Valve (Klep, Katup).................................................................................. 23

a. Fungsi valve ......................................................................................... 23

b. Jenis-jenis Valve .................................................................................. 24

6. Saringan .................................................................................................... 28

7. Klem Pipa ................................................................................................. 29

BAB III METODE PENELITIAN

A. Identifikasi Masalah .......................................................................................... 30

B. Pengumpulan data ............................................................................................. 32

C. Analisis Data ..................................................................................................... 33

BAB IV PROSES PEMBAHASAN

A.Pembahasan........................................................................................................35

B.Diagram System Pipa.........................................................................................38

a. Diagram System bilge ballast & General service..................................38

b. Diagram System fresh water cooling....................................................39

c. Diagram System F.O transfer ................................................................40

d. Diagram System Lubrication oil............................................................41

e. Diagram System Sea Water Coolling.....................................................42

f. Diagram System F.O Service..................................................................43

g. Arrangement pipe in engine room..........................................................44

h. Isometri pipe in engine room................................................................45

C. Proses Fabrikasi................................................................................................46

a. Pekerjaan Pipa kapal coaster 1200 GT type A di Workshop.................46

b. Pekerjaan pipa kapal coaster 1200 GT type B di laut/diatas kapal......49

D. Penyambungan Pipa..........................................................................................52

a. Cara penyambungan pipa.......................................................................52

b. Kontruksi sambungan.............................................................................52

E. Cara Pengukuran Posisi Sambungan Pipa.........................................................55

F. Perencana Dan Pengambaran Spool..................................................................57

a. Simbol Untuk Gambar Spool.................................................................58

G. Gambar Baut......................................................................................................58

H. Pikling...............................................................................................................59

I. Flushing..............................................................................................................60

BAB V PENUTUP

A.Kesimpulan.........................................................................................................61

B. Saran..................................................................................................................61

DAFTAR PUSTAKA ........................................................................................... 62

DAFTAR GAMBAR

Gambar 1 : kapal coaster ...................................................................................... 4

Gambar 2 : detail principal dimension ................................................................. 5

Gambar 3 : Seamless Drawn Steel Pipe (pipa seamless tanpa sambungan) ...... 14

Gambar 4 : Lap Welded Steel Pipe .................................................................... 14

Gambar 5 : Pipa Galvanis .................................................................................. 15

Gambar 6 : Pipa Tembaga .................................................................................. 15

Gambar 7 : Pipa Kuningan ................................................................................. 16

Gambar 8 : Pipa Plastik (PVC) .......................................................................... 16

Gambar 9 : Pipa Stainless steel ......................................................................... 17

Gambar 10 : diameter Flens ( Flanges) .............................................................. 20

Gambar 11 : Cara pemasangan flange dengan pipa ........................................... 21

Gambar 12 : Elbow pipa .................................................................................... 22

Gambar 13 : reducer pipa .................................................................................. 23

Gambar 14 : globe valve .................................................................................... 25

Gambar 15 : gate valve ...................................................................................... 25

Gambar 16 : ball valve ....................................................................................... 26

Gambar 17 : Butterfly valve .............................................................................. 26

Gambar 18 : check valve .................................................................................. 27

Gambar 19 : relief valve ................................................................................... 28

Gambar 20 : saringan ......................................................................................... 28

Gambar 21 : klem pipa ....................................................................................... 29

Gambar 22 : flow chart ................................................................................. .....31

Gambar 23 : Pengelasan........................................................................................36

Gambar 24 ; Diagram system bilge ballast & general service..............................37

Gambar 25 ;diagram system fresh water cooling.................................................39

Gambar 26 ;Diagram system f.o transfer..............................................................40

Gambar 27 ; Diagram system lubrication oil........................................................41

Gambar 28 ; Diagram System Sea Water Coolling..............................................42

Gambar 29; Diagram f.o service...........................................................................43

Gambar 30; Arragementpipe in engine room........................................................44

Gambar 31 ; isometri pipe in engine room............................................................45

Gambar 32 ; Pemotongan pipa dengan gerinda potong.........................................46

Gambar 33 ; Penyambungan tee Pipa dengan flange...........................................47

Gambar 34 ; pengelasan.........................................................................................47

Gambar 35; penyetelan dan pengelasan penetrasi..................................................48

Gambar 36; Pemotongan pipa................................................................................49

Gambar 37 ; Penyambungan Pipa..........................................................................50

Gambar 38 ; pengelasan diatas kapal.....................................................................50

Gambar 39 ; penyetelan dan pengelasan penetrasi.................................................51

Gambar 40 ; Pipa sambungan langsung.................................................................53

Gambar 41 ; sambungan pipa dengan penguat.......................................................53

Gambar 42 ; sambungan pipa dengan elbow.........................................................54

Gambar 43 ; sambungan pipa dengan tee..............................................................54

Gambar 44 ;sambungan pipa dengan reducer........................................................55

Gambar 45 ; sambunga pipa dengan kap...............................................................55

Gambar 46 ; cara pengukuran posisi sambungan pipa...........................................56

Gambar 47 ; penyambungan pipa...........................................................................57

Gambar 48 ; gambar spool.....................................................................................58

Gambar 49 ; Panjang baut......................................................................................58

Gambar 50 ; cairan kimia HN03&HF untuk pickling............................................60

DAFTAR TABEL

Tabel 1 pipa utama sesuai standart ANS.............................................................. 9

Tabel 2 pipa cabang sesuai standart ANS ............................................................ 9

Tabel 3. Standart Ukuran Pipa Baja ( Menurut BKI 2001 Sec. 11 N 31) ......... 18

Tabel 4 Ukuran Pipa Berdasarkan Kapasitas Tangki (BKI 2001 Sec 11 N 31) 18

Tabel 5 Ketentuan Sambungan Pipa Dengan Flens ( BKI 2001 Sec 10 ) ......... 19

Tabel 6. Ketentuan Pemakaian klem pipa U-bolt ( JIS Standart ) ..................... 29