Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

download Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

of 36

Transcript of Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    1/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    2/36

    Maintenance policiesMaintenance Policies(1)

    Failure-Based 

    Reactive (ReM):- RTF

    - CM

    - BD

    ::(2)

    (3)

    Condition-Based 

    Predictive (PdM):

    - Oil analysis

     

    ( 5)

    Total-Based 

    Global (GM):- Optimization Approach

    - TPM

    ::

    ME!"#" Maintenance Mana$ement

    Preventive (PM):- Calendar:

    %ee&ly

    Monthly

    ::

    - Running:" R'('

    " )'M'

    ::

    -

    - Temperat*re analysis

    - Press*re analysis

    - %ear analysis

    - E++iciency analysis

    ::

    ()Ris!-Based 

    Proactive (PaM):

    - RCFA

    - FMEA , FMECA

    - (AOP- RCM \ RCM2

    - RB. ::

    Classi"ication o" maintenance #olicies$

    %&en!ates' 23 *ae+enber, and Pintelon 2 and Gomaa et al$ 25 

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    3/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    4/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    5/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    6/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    7/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    8/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    9/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    10/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    11/36

    Ob/ecti0e o+ maintenance policiesTop 5 Objectives

    To

    pre0ent

    +ail*res6

    (azar7s

    To

    7isco0er

    hi77en

    +ail*res6(azar7s

    To

    7etect

    early

    Fail*res6(azar7s

    To

    Minimize

    the ris& o+

    +ail*res6(azar7s

    To

    correct

    +ail*res6

    (azar7s

    Reacti0e

    Policy 859

    Pre0enti0e Policy ;Proacti0e

    Policy "5

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    12/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    13/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    14/36

    Ob/ecti0e o+ PM

    • To minimize the n*mber o+ brea&7o>ns on criticale@*ipment

    • To re7*ce the loss o+ pro7*ction that occ*rs >hene@*ipment +ail*res ta&e place

    • To increase the pro7*cti0e li+e o+ all capital e@*ipment 

    • To ac@*ire meanin$+*l 7ata relati0e to the history o+ allcapital e@*ipment'

    • To permit better plannin$ an7 sche7*lin$ o+ re@*ire7maintenance >or&

    • To promote better sa+ety an7 health o+ >or& +orce• To ma?imize the ret*rn on capital in0estment

    "4

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    15/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    16/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    17/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    18/36

    Maintenance policiesMaintenance Policies(1)

    Failure-Based 

    Reactive (ReM):- RTF

    - CM

    - BD

    ::(2)

    (3)Condition-Based 

    Predictive (PdM):

    - Oil analysis

     

    ( 5)

    Total-Based 

    Global (GM):

    - Optimization Approach

    - TPM

    ::

    Preventive (PM):- Calendar:

    %ee&ly

    Monthly

    ::

    - Running:" R'('

    " )'M'

    ::

    -

    - Temperat*re analysis- Press*re analysis

    - %ear analysis

    - E++iciency analysis

    ::

    ()Ris!-Based 

    Proactive (PaM):

    - RCFA

    - FMEA , FMECA

    - (AOP- RCM \ RCM2

    - RB. ::

    Classification of maintenance policies

    !"en#ates$ 2%%&' (ae)enberg and Pintelon 2%%*' and +omaa et al 2%%5,

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    19/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    20/36

    %hat .s Reliability-Centere7 Maintenance

    One definition:

    • Reliability Centere7 Maintenance is a maintenance strate$y that

    lo$ically incorporates the optim*m mi? o+ reactive' preventive'

    condition based and proactive maintenance practices'

    Reliability-Centere7

    Reacti0e

    Maintenance

    Pre0enti0e

    Maintenance

    Con7ition-Base7

    Maintenance

    Proacti0e

    Maintenance

    =mall items

    on-critical

    nli&ely to +ail

    Re7*n7ant

    =*b/ect to >ear-o*t

    Cons*mable replacement

    )no>n +ail*re pattern

    Ran7om +ail*re Pattern

    ot s*b/ect to >ear

    PM in7*ce7 +ail*re

    RCFA

    FMEA FMECA

    RB.

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    21/36

    Other 7e+initions

    • Reliability-Centere7 Maintenance is a process

    *se7 to 7etermine >hat m*st be 7one toens*re that any physical asset contin*o*s to7o >hat its *sers to 7o in its present operatin$

    conte?t' 1ohn Mo*bray RCM3

    • Reliability-centere7 Maintenance as a process

    to establish the sa+e minim*m le0els o+maintenance' 1ohn Mo*bray RCM ..3

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    22/36

    %hat is =AE A """ sai7 abo*t RCM

    • Reliability-Centere7 Maintenance 1RCM3Any RCM process shallens*re that all o+ the +ollo>in$ se0en @*estions are ans>ere7

    satis+actorily an7 are ans>ere7 in the se@*ence sho>n as +ollo>s:"' %hat are the +*nctions an7 associate7 7esire7 stan7ar7s o+

    per+ormance o+ the asset in its present operatin$ conte?t1+*nctions3

     '

    #' %hat ca*ses each +*nctional +ail*re 1+ail*re mo7es34' %hat happens >hen each +ail*re occ*rs 1+ail*re e++ects3

    5' .n >hat >ay 7oes each +ail*re matter 1+ail*re conse@*ences3

    G' %hat sho*l7 be 7one to pre7ict or pre0ent each +ail*re 1proacti0etas&s an7 tas& inter0als3

    H' %hat sho*l7 be 7one i+ a s*itable proacti0e tas& cannot be +o*n717e+a*lt actions3

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    23/36

    RCM $oals an7 lo$ic

    I Determine the +*nction o+the system6component

    Ens*re realization o+ inherent sa+ety an7reliability o+ the e@*ipment

     

    RCM Joals RCM Ko$ic

    I e ne > a s a *nc ona

    +ail*re

    Restore e@*ipment to re@*ire7 le0els >hen

    7eterioration occ*rs

    I E0al*ate the conse@*enceso+ +ail*re

    Obtain the in+ormation necessary +or 7esi$nimpro0ements >here inherent reliability is

    ins*++icient

    I Assi$n a maintenance tas&to pre0ent the +ail*re

    Accomplish these $oals at a minim*m totalli+e cycle cost

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    24/36

    RCM (istory"!G - FAA an7 airline tas& +orce

    "!G5 - nite7 Airline 7ecision 7ia$ram

    "!G; L 1Maintenance =teerin$ Jro*p3 M=J-"

    "!Hs - Military .nterest

    "!;s - .n7*stry .nterest

    "!!s - A=A Facilities

    2 - Accepte7 as a Best Practice by Fe7eralFacilities Co*ncil

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    25/36

    %hy Per+orm RCM• Financial bene+its are 7eri0e7 +rom the +ollo>in$:

     –  Re7*ce7 maintenance e?penses 7*e to elimination o+ maintenance

    tas&s –  Application o+ A$e E?ploration techni@*es to e?pan7 time bet>een

    tas&s

     –  Re7*ction in the amo*nt o+ reacti0e maintenance per+orme7 by: 

    • .7enti+yin$ systems +or con7ition monitorin$ by *sin$ RCM analysis• De0elopment o+ an acceptance criteria an7 commissionin$

    • .n7irect bene+its –  Re7*ction in 7o>ntime

     –  MRO 1maintenance repair operation3 re7*ction –  Fe>er compliance iss*es

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    26/36

    Fail*re Mo7es An7 E++ects Analysis 1FMEA3

    • A +ail*re analysis con7*cte7 in the 7esi$n phaseo+ an e@*ipment or systemN also *se7 as a tool +oranalysis in Reliability Centere7 Maintenance1RCM3'

    • T$e M./ contains: – Description o+ Fail*re Mo7es – Ca*se an7 E++ects o+ +ail*re

     – Probability o+ Fail*re – Criticality o+ Fail*re – Correcti0e6Pre0enti0e Meas*res

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    27/36

    =electin$ maintenance approach• One o+ the main $oal o+ RCM analysis is to select most

    appropriate maintenance techni@*e +or any set o+

    e@*ipment or systems' Each maintenance action may beclassi+ie7 into +ollo>in$ cate$ory:

     –   

     –  Pre0enti0e maintenance• =che7*le7 7iscar7s• =che7*le7 restoration• Re7*n7ancy• Chec&o*ts

     –  Con7ition base7 maintenance• .nspections• Monitorin$

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    28/36

    =electin$ maintenance approach

    Mac$ine01)stem

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    29/36

    R*n-to-+ail*re applications

    • se RT if ne3pected ailure is /cceptable

    in Terms of 4mpact on: – =a+ety6=ec*rity

     – 

     – Ki+e Cycle Cost

     – Re$*latory

     – Probability o+ Fail*re is Ko>

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    30/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    31/36

    Con7ition Base7 Maintenance 1CBM3

    • CBM is the *se o+ a70ance7 technolo$y to sense machineryoperatin$ characteristics s*ch as:

     –  0ibration –  temperat*re

     –  press*re etc'

    an7 to compare the meas*re7 0al*es o+ these characteristics >ith$istorical data or other pre-establishe7 criteria to assessmachinery con7ition'

    CBM permits con7ition base7 rather than time base7 initiation o+the maintenance e++ort to correct any problems i7enti+ie7'

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    32/36

    Total Pro7*cti0e Maintenance

    1TPM3

    Tah*n "!H" =iichi a&a/ima seoran$ pelopor 7ari &onsep Total pro7*cti0e

    Maintenace 1TPM3 7i epan$'

    TPM a7alah proses mana/emen yan$ 7i&emban$&an *nt*& menin$&at&an

    '

    “ Continuously improve all operational conditions, within a production

    system; by stim*latin$ the 7aily a>areness o+ all employees” (by Seiichi

    Nakaima, !apan, !"#$)

    T*/*an a>al 7ari TPM:

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    33/36

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    34/36

    Total Pro7*cti0e Maintenance

    1TPM3 -2

    Total Pro7*cti0e Maintenance 1TPM3 memp*nyai #t*/*an 7asar:

     ' '

    2' ero peralatan yan$ $a$al secara ta& terencana

    #' ero &ecela&aan'

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    35/36

    TPM memp*nyai ; pilar a&ti0itas:

    1. Focused improvement (Kobetsu Kaizen) - Continuously even small steps ofimprovement.

    2. Planned Maintenance - It focuses on Increasing Availability of Equipments& reducing Breakdown of Machines.

    3. Initial Control - To establish the system to launch the production of new

    product & new equipment in a minimum run up time.4. Education & Trainin - Formation of Autonomous workers who have skill &

    technique for autonomous maintenance.5. Autonomous Maintenance (Jishu Hozen) - It means "Maintaining one's

    equipment by oneself". There are 7 Steps in & Activities of Jishu Hozen.6. Quality Maintenance (Hinshitsu Hozen) - Quality Maintenance is

    establishment of machine conditions that will not allow the occurrence ofdefects & control of such conditions is required to sustain Zero Defect.

    7. Office TPM - To make an efficient working office that eliminate losses.8. Safety, Hygiene & Environment - The main role of SHE (Safety, Hygiene &

    Environment) is to create Safe & healthy work place where accidents do

    not occur, uncover & improve hazardous areas & do activities that preserve

    environment.

  • 8/17/2019 Analisis Kerusakan Dan Perawatan Mesin (TEM 404) - Pertemuan 2 Versi 2015

    36/36

    Dasar *nt*& TPM bera&ti0itas a7alah 5=:

    Seiri (Sorting out the required or not required items);

    Seition (Systematic Arrangement of the required items);Seiso (Cleaniness);Seiketsu (Standardisation);Shitsuke (Self Discipline).

    The Pillars & their details

    a) Efficient Equipment Utilisation

    b) Efficient Worker Utilisationc) Efficient Material & Energy Utilisation