Total Rekap (2)Kegiatan:............................Pekerjaan:............................Lokasi:............................T A:............................REKAPITULASI KUANTITAS DAN HARGANO.URAIAN PEKERJAANHARGAA.........................................0.0B.........................................0.0C.........................................0.0D.........................................0.0Jumlah(a)0.0Jasa 10%(b)0.0Jumlah(c) = (a)+(b)0.0PPN 10%(d)0.0Jumlah Total(e) = (c)+(d)0.0(199,297,000.00)Dibulatkan0.0199,297,000.00Terbilang :............................................Bantul, ... 2012N I H I LN I H I L0.0100000000000000000000000000000000000( Rupiah )( Rupiah )( Rupiah )( Rupiah )( Rupiah )( Rupiah )( Rupiah )( Rupiah )( Rupiah )( Rupiah )( Rupiah )( Rupiah )....................................................0.0................................................................................................

RAB (2)Kegiatan:............................Pekerjaan:............................Lokasi:............................T A:............................DAFTAR KUANTITAS DAN HARGANO.URAIAN PEKERJAANVOLUMEHARGA SATUANHARGAPPNA....................0.03galian0.00.01...................0.00.00.40bataRp4,635.401,854.162...................0.00.00.35plesterRp2,587.20905.523...................0.00.04...................0.00.00.02,759.68B....................0.03galianRp28,250.00847.501...................0.00.02...................0.00.03...................0.00.04...................0.00.05...................0.00.00.0847.50C....................18.001...................0.00.025.002...................0.00.03...................0.00.04...................0.00.05...................0.00.06...................0.00.07...................0.00.08...................0.00.09...................0.00.00.043.00D.Dst...............................0.00.018.00...................0.00.0...................0.00.0...................0.00.0

Bahan&UpahDAFTAR HARGA SATUAN BAHAN DAN UPAHTAHUN 2011NO.URAIANSATUANHARGAKETERANGAN12345UPAH1PekerjaOhRp36,000.002Tenaga gali tanah/pondasiOhRp36,000.003Tukang batuOhRp42,500.004Tukang kayuOhRp45,000.005Tukang catOhRp42,500.006Tukang besiOhRp42,500.007Tukang politurOhRp42,500.008Tukang ListrikOhRp45,000.009Tukang Pipa ledengOhRp45,000.0010Kepala tukang batuOhRp47,500.0011Kepala tukang kayuOhRp50,000.0012Kepala tukang catOhRp47,500.0013Kepala tukang besiOhRp47,500.0014Kepala tukang politurOhRp47,500.0015MandorOhRp50,000.00BAHAN1Airm3Rp40,250.00Belum termasuk pajak dan2Alumnium foilrollRp85,000.00retribusi bahan galian C3Aspal curahkgRp9,400.00Aspal drum AC 60/70kgRp9,400.004Asbes gelombang kecil3000x1050x4 mmlbrRp64,000.002400x1050x4 mmlbrRp52,000.002100x1050x4 mmlbrRp46,000.001800x1050x4 mmlbrRp42,000.005Asbes gelombang besar3000x920x5 mmlbrRp115,550.002250x920x5 mmlbrRp92,000.001500x920x5 mmlbrRp57,500.003000x920x6 mmlbrRp132,250.002250x920x6 mmlbrRp108,100.001500x920x6 mmlbrRp85,500.006Asbes plat1000x1000x3 mmlbrRp12,750.001000x2000x3 mmlbrRp26,500.00500x2000x3 mmlbrRp13,800.00250x2000x4 mmlbrRp11,500.001200x2400x4 mmlbrRp42,500.001000x1000x4 mmlbrRp41,400.001200x2400x5 mmlbrRp57,500.001200x2400x6 mmlbrRp63,250.007Asbes nokGelombang kecilbjRp25,000.00Gelombang besarbjRp54,100.008Batu bata apple 4bjRp540.009Batu bata apple 5bjRp585.0010Batu belah hitambatu belah 15/20m3Rp154,100.00batu belah 10/15m3Rp154,100.00batu belah 5/7m3Rp262,775.00batu belah 4/6m3Rp273,700.00batu kricak 3/5 (MS)m3Rp308,200.00batu kricak 2/3 (MS)m3Rp319,700.0011Batu belah putihm3Rp93,200.0012Baja dan BesiBaja WFkgRp20,000.00Besi corkgRp10,350.00Besi betonkgRp9,000.0013Batako pejalbjRp2,300.0014BambubtgBambu apusbtgRp7,500.00Bambu wulungbtgRp10,500.00Bambu petungbtgRp58,000.0015Buis betondiameter 15 mm x 1 mbjRp26,000.00diameter 20 mm x 1 mbjRp32,000.00diameter 25 mm x 1 mbjRp38,000.00diameter 30 mm x 1 mbjRp44,500.00diameter 40 mm x 1 mbjRp56,000.00diameter 60 mm x 0,5 mbjRp42,000.00diameter 80 mm x 0,5 mbjRp48,500.00diameter 100 mm x 0,5 mbjRp66,000.0016Catcat kayukgRp58,650.00Emcocat menikgRp18,000.00cat besikgRp58,650.00cat tembokkgRp16,000.00DecolithDempul tembok/ plamirkgRp12,500.00Dempul kayukgRp17,500.00Engsel pintubhRp17,500.00Engsel jendelabhRp15,000.00eternit 100 x 100 (polos)lbrRp14,000.0017FiberglaslbrRp52,000.0018FillerkgRp4,000.0019Formika 120 x 240 cmlbrRp68,500.0020Gebalan rumputm2Rp7,500.0029GrendelGrendel pintubhRp12,500.00Grendel jendelabhRp10,000.0030Gentenggenteng beton besarbjRp7,600.00genteng beton kecilbjRp3,800.00genteng tanah parisbjRp850.00genteng tanah kodokbjRp1,600.00genteng kaca 3 mmbjRp13,500.00genteng kaca kodokbjRp16,000.00Bubungan genteng tanahbjRp3,500.00Bubungan genteng betonbjRp13,500.0031Geotekstilm2Rp24,500.0032HandelbhRp12,500.0033Hak anginbhRp13,000.0034IjukkgRp14,000.0029Kacakaca bening 3 mmm2Rp45,500.00kaca bening 5 mmm2Rp60,000.00Kaca buram 3 mmm2Rp60,000.00kaca buram 5 mmm2Rp75,000.00kaca reyband 5 mmm2Rp66,000.0030Karpet lebar 90 cmm'Rp14,000.0031kayu bakarm3Rp2,000,000.0032kayu begestengm3Rp2,500,000.00dpt untuk begesteng33Kayu dolkenm3Rp2,400,000.0034Kayu jatiKelas Ipapanm3Rp20,000,000.00balokm3Rp18,500,000.00rengm'Rp4,100.00Rp6,833,333.3335Kayu kamperpapanm3Rp9,000,000.00balokm3Rp8,500,000.00rengm'Rp2,800.00$5,000,00036Kayu Bangkirei833.3333333333papanm3Rp9,000,000.00balokm3Rp8,600,000.001666.6666666667rengm'Rp2,300.00Rp3,833,333.3337Kayu kruingpapanm3Rp7,000,000.00balokm3Rp6,200,000.00rengm'Rp2,000.0038Kayu merantipapanm3Rp5,900,000.00balokm3Rp5,400,000.00rengm'Rp1,800.0039Kayu glugum3Rp3,500,000.00Klas I40Kayu lapis tripleks 3 mmlbrRp40,000.0041Kayu lapis tripleks 4 mmlbrRp52,000.0042Kayu lapis tripleks 6 mmlbrRp70,000.0043Kayu lapis tripleks 12 mmlbrRp147,500.0044Kayu lapis teakwood 4 mmlbrRp80,000.0045Kapur pasangm3Rp180,000.0046Kapur sirihm3Rp250,000.0047Kawat ayakanm2Rp12,500.0048Kawat beton / bendratkgRp13,000.0049Kawat bronjongkgRp15,000.0050Krilkil betonm3Rp308,200.0051Krokos/ kroco 2-4 cmm3Rp163,300.0052Kunci tanam besarbhRp240,000.00SES53Kunci tanam kecilbhRp115,000.00PIONEER54Kloset duduk lengkapbhRp1,050,000.0055Kloset jongkokbhRp135,000.0056Lem aica aibonkgRp48,000.0057MelaminkgRp47,500.0058Minyak cat/ ThinnerltrRp20,000.0059Minyak tanahltrRp7,850.0060Oli gardanltrRp47,500.0061Oli mesinltrRp32,500.0062Pasir pasangpasir pasangm3Rp123,000.00pasir betonm3Rp123,000.0063Pasir urugm3Rp87,600.0064Paku besar, sedangkgRp16,000.0065Paku kecilkgRp20,000.0066Paku payungkgRp20,000.0067Pipagalvanis diameter 0,5 "btgRp87,400.00galvanis diameter 0,75 "btgRp115,000.00galvanis diameter 1"btgRp143,750.00galvanis diameter 1,5 "btgRp345,000.00galvanis diameter 3"btgRp759,000.00galvanis diameter 4"btgRp1,150,000.00PVC 4 m diameter 0,5"btgRp16,250.00PVC 4 m diameter 0,75"btgRp21,500.00PVC 4 m diameter 1"btgRp29,000.00PVC 4 m diameter 1,25"btgRp40,500.00PVC 4 m diameter 3"btgRp110,000.00PVC 4 m diameter 4"btgRp178,500.0068Paving (abu - abu)m2Rp38,000.0069Paving ( warna )m2Rp52,000.002.695Paving beton pressm2Rp61,000.0070Plastik gelombangbhRp69,000.003M71Plamuur kayukgRp20,500.0072Plywood 9000x2100x4 mmlbrRp69,000.0073Plywood 1200x2400x4 mmlbrRp98,000.0074PoliturltrRp41,000.0075Semen (PC)Semen nusantara, Tiga rodazakRp48,000.00Semen putihzakRp92,000.00Semen warnakgRp2,300.0076Semen merahm3Rp125,000.0077Seng platseng BJLS 20 lebar 45 cmlbrRp16,250.00seng BJLS 20 lebar 55 cmlbrRp17,500.00seng BJLS 20 lebar 60 cmlbrRp20,000.00seng BJLS 20 lebar 70 cmlbrRp22,000.00seng BJLS 20 lebar 80 cmlbrRp23,500.00seng BJLS 20 lebar 90 cmlbrRp25,500.00seng BJLS 25 lebar 90 cmlbrRp43,000.0078Seng gelombangBJLS 30 90x180 cmlbrRp75,900.00BJLS 25 90x180 cmlbrRp88,550.00BJLS 20 90x240 cmlbrRp101,200.00BJLS 20 90x300 cmlbrRp126,500.0079SolarltrRp4,500.0080SirlakkgRp113,000.0081Sirtum3Rp111,600.0082SpritusltrRp9,000.0083Tanah uruganm3Rp57,500.0084Teak oilltrRp18,400.0085TeerltrRp11,500.0086TerpentinltrRp16,000.0087Tegelmarmer 40x40 cmm2Rp115,000.00keramik 20x20 cmm2Rp42,550.00keramik 20x25 cmm2Rp42,550.00keramik 30x30 cmm2Rp40,250.00keramik 40x40 cmm2Rp50,000.00erwin prasporselin 11x11 cmm20.0anangteraso 30x30 cmm20.0heru wkembang 20x20 cmm20.0sunu wkembang 30x30 cmm20.0ir. Mukhlisintim leaderwarna 20x20 cmm20.0andi dartomoinspectorwarna 30x30 cmm20.0abu - abu 20x20 cmm20.0abu - abu 30x30 cmm20.088Thinner melaminltrRp28,750.0089UrioirbhRp260,000.0090VetkgRp25,000.0091WashtafelbhRp240,000.0092Bak mandi lps porselin/ keramikbhRp240,000.00uk. 50x50x50 cm93NakodaunRp17,500.00

ANALISAANALISA HARGA SATUAN PEKERJAAN KONSTRUKSIBANGUNAN GEDUNG DAN PERUMAHANTAHUN 2012Dinas Pekerjaan UmumKabupaten BantulJl. Panembahan Senopati, Palbapang, Bantul, Telp. (0274) 367310A.PEKERJAAN PERSIAPAN1 m' Pengukuran dan Pasang bouwplankSNI 03-2835-2002BAHAN0.012m3Kayu 5/7 (glugu)Rp3,500,000.00Rp42,000.000.020KgPaku biasa 2" - 5"Rp16,000.00Rp320.000.007m3Kayu sengon papan 3/20Rp2,500,000.00Rp17,500.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.100OHTukang KayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.005OHMandorRp50,000.00Rp250.00JUMLAHRp68,670.00HARGA SATUANRp68,670.001 m2 Membersihkan lapangan dan perataanSNI 03-2835-2002TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp6,100.00HARGA SATUANRp6,100.001 m2 Membuat jalan sementaraSNI 03-2835-2002BAHAN0.150m3Batu belah 15/20Rp154,100.00Rp23,115.000.090m3Batu pecah 5/7Rp262,775.00Rp23,649.750.010m3Pasir pasangRp123,000.00Rp1,230.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp86,494.75HARGA SATUANRp86,494.75B.PEKERJAAN TANAH1 m3 Galian tanah biasa sedalam 1 meterSNI : 2835:2008TENAGA0.750OHPekerjaRp36,000.00Rp27,000.000.025OHMandorRp50,000.00Rp1,250.00JUMLAHRp28,250.00HARGA SATUANRp28,250.001 m3 Galian tanah biasa sedalam 2 meterSNI : 2835:2008TENAGA0.900OHPekerjaRp36,000.00Rp32,400.000.045OHMandorRp50,000.00Rp2,250.00JUMLAHRp34,650.00HARGA SATUANRp34,650.001 m3 Galian tanah biasa sedalam 3 meterSNI : 2835:2008TENAGA1.050OHPekerjaRp36,000.00Rp37,800.000.067OHMandorRp50,000.00Rp3,350.00JUMLAHRp41,150.00HARGA SATUANRp41,150.001 m3 Galian tanah keras sedalam 1 meterSNI : 2835:2008TENAGA1.000OHPekerjaRp36,000.00Rp36,000.000.032OHMandorRp50,000.00Rp1,600.00JUMLAHRp37,600.00HARGA SATUANRp37,600.001 m3 Galian tanah cadas sedalam 1 meterSNI : 2835:2008TENAGA1.500OHPekerjaRp36,000.00Rp54,000.000.060OHMandorRp50,000.00Rp3,000.00JUMLAHRp57,000.00HARGA SATUANRp57,000.001 m3 Galian tanah lumpur sedalam 1 meterSNI : 2835:2008TENAGA1.200OHPekerjaRp36,000.00Rp43,200.000.045OHMandorRp50,000.00Rp2,250.00JUMLAHRp45,450.00HARGA SATUANRp45,450.001 m2 Stripping tebing setinggi 1 meterSNI : 2835:2008TENAGA0.050OHPekerjaRp36,000.00Rp1,800.000.005OHMandorRp50,000.00Rp250.00JUMLAHRp2,050.00HARGA SATUANRp2,050.00Membuang 1 m3 tanah sejauh 15 meterSNI : 2835:2008TENAGA0.330OHPekerjaRp36,000.00Rp11,880.000.010OHMandorRp50,000.00Rp500.00JUMLAHRp12,380.00HARGA SATUANRp12,380.001 m3 Urugan kembaliSNI : 2835:2008Mengurug kembali dihitung dari 1/3 kali dari indeks pekerjaan galian1 m3 Urugan kembali tanah biasa galian sedalam 1 meterRp28,250.00Rp9,416.671 m3 Urugan kembali tanah biasa galian sedalam 2 meterRp34,650.00Rp11,550.001 m3 Urugan kembali tanah biasa galian sedalam 3 meterRp41,150.00Rp13,716.67Memadatkan 1 m3 tanah (per 20 cm)SNI : 2835:2008TENAGA0.500OHPekerjaRp36,000.00Rp18,000.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp20,500.00HARGA SATUANRp20,500.001 m3 Urugan pasirSNI : 2835:2008BAHAN1.200m3Pasir urugRp87,600.00Rp105,120.00TENAGA0.300OHPekerjaRp36,000.00Rp10,800.000.010OHMandorRp50,000.00Rp500.00JUMLAHRp116,420.00HARGA SATUANRp116,420.001 m3 Urugan TanahSNI : 2835:2008BAHAN1.100m3Tanah urugRp57,500.00Rp63,250.00TENAGA0.250OHPekerjaRp36,000.00Rp9,000.000.025OHMandorRp50,000.00Rp1,250.00JUMLAHRp73,500.00HARGA SATUANRp73,500.001 m3 Sirtu padat untuk peninggian lantai bangunanSNI : 2835:2008BAHAN1.200m3SirtuRp111,600.00Rp133,920.00TENAGA0.250OHPekerjaRp36,000.00Rp9,000.000.025OHMandorRp50,000.00Rp1,250.00JUMLAHRp144,170.00HARGA SATUANRp144,170.00C.PEKERJAAN PONDASI1 m3 Pondasi batu putih 1PC : 4 PPSNI : 2836:2008BAHAN1.200m3Batu putihRp93,200.00Rp111,840.00163.000KgPCRp1,200.00Rp195,600.000.520m3Pasir pasangRp123,000.00Rp63,960.00TENAGA1.500OHPekerjaRp36,000.00Rp54,000.000.750OHTukang batuRp42,500.00Rp31,875.000.075OHKepala TukangRp47,500.00Rp3,562.500.075OHMandorRp50,000.00Rp3,750.00JUMLAHRp464,587.50HARGA SATUANRp464,587.501 m3 Pondasi batu belah 1PC : 6 PPSNI : 2836:2008BAHAN1.200m3Batu putihRp93,200.00Rp111,840.00117.000KgPCRp1,200.00Rp140,400.000.561m3Pasir pasangRp123,000.00Rp69,003.00TENAGA1.500OHPekerjaRp36,000.00Rp54,000.000.750OHTukang batuRp42,500.00Rp31,875.000.075OHKepala TukangRp47,500.00Rp3,562.500.075OHMandorRp50,000.00Rp3,750.00JUMLAHRp414,430.50HARGA SATUANRp414,430.501 m3 Pondasi batu belah 1PC : 3 KP : 10 PPSNI : 2836:2008BAHAN1.200m3Batu putihRp93,200.00Rp111,840.0061.000KgPCRp1,200.00Rp73,200.000.147m3Kapur pasangRp180,000.00Rp26,460.000.492m3Pasir pasangRp123,000.00Rp60,516.00TENAGA1.500OHPekerjaRp36,000.00Rp54,000.000.750OHTukang batuRp42,500.00Rp31,875.000.075OHKepala TukangRp47,500.00Rp3,562.500.075OHMandorRp50,000.00Rp3,750.00JUMLAHRp365,203.50HARGA SATUANRp365,203.501 m3 Pondasi batu kosong (aanstamping)SNI : 2836:2008BAHAN1.200m3Batu putihRp93,200.00Rp111,840.000.432m3Pasir urugRp87,600.00Rp37,843.20TENAGA0.780OHPekerjaRp36,000.00Rp28,080.000.390OHTukang batuRp42,500.00Rp16,575.000.039OHKepala TukangRp47,500.00Rp1,852.500.039OHMandorRp50,000.00Rp1,950.00JUMLAHRp198,140.70HARGA SATUANRp198,140.701 m3 Pondasi siklop, 60% beton camp. 1 PC : 2 PB : 3 KR & 40% batu belahSNI : 2836:2008BAHAN0.480m3Batu putihRp93,200.00Rp44,736.00194.000KgPCRp1,200.00Rp232,800.000.312m3Pasir BetonRp123,000.00Rp38,376.000.468m3Kerikil BetonRp308,200.00Rp144,237.60126.000kgBesi BetonRp9,000.00Rp1,134,000.001.800KgKawat BetonRp13,000.00Rp23,400.00TENAGA3.400OHPekerjaRp36,000.00Rp122,400.000.850OHTukang batuRp42,500.00Rp36,125.000.085OHKepala TukangRp47,500.00Rp4,037.500.170OHMandorRp50,000.00Rp8,500.00JUMLAHRp1,788,612.10HARGA SATUANRp1,788,612.101 m3 Pondasi Sumuran, diameter 100 cmSNI : 2836:2008BAHAN0.450m3Batu putihRp93,200.00Rp41,940.00194.000KgPCRp1,200.00Rp232,800.000.312m3Pasir BetonRp123,000.00Rp38,376.000.468m3Kerikil BetonRp308,200.00Rp144,237.60TENAGA2.400OHPekerjaRp36,000.00Rp86,400.000.800OHTukang batuRp42,500.00Rp34,000.000.080OHKepala TukangRp47,500.00Rp3,800.000.119OHMandorRp50,000.00Rp5,950.00JUMLAHRp587,503.60HARGA SATUANRp587,503.60D.PEKERJAAN DINDING1 m2 Dinding Bata merah tebal 1 bata 1PC : 4PPSNI : 6897:2008BAHAN140.000bhBatu bataRp540.00Rp75,600.0026.550kgPCRp1,200.00Rp31,860.000.093m3Pasir pasangRp123,000.00Rp11,439.00TENAGA0.600OHPekerjaRp36,000.00Rp21,600.000.200OHTukang batuRp42,500.00Rp8,500.000.020OHKepala TukangRp47,500.00Rp950.000.030OHMandorRp50,000.00Rp1,500.00JUMLAHRp151,449.00HARGA SATUANRp151,449.001 m2 Dinding Bata merah tebal 1/2 bata 1PC : 3PPSNI : 6897:2008BAHAN70.000bhBatu bataRp540.00Rp37,800.0014.370kgPCRp1,200.00Rp17,244.000.040m3Pasir pasangRp123,000.00Rp4,920.00TENAGA0.300OHPekerjaRp36,000.00Rp10,800.000.100OHTukang batuRp42,500.00Rp4,250.000.010OHKepala TukangRp47,500.00Rp475.000.015OHMandorRp50,000.00Rp750.00JUMLAHRp76,239.00HARGA SATUANRp76,239.001 m2 Dinding Bata merah tebal 1/2 bata 1PC : 4PPSNI : 6897:2008BAHAN70.000bhBatu bataRp540.00Rp37,800.0011.500kgPCRp1,200.00Rp13,800.000.043m3Pasir pasangRp123,000.00Rp5,289.00TENAGA0.300OHPekerjaRp36,000.00Rp10,800.000.100OHTukang batuRp42,500.00Rp4,250.000.010OHKepala TukangRp47,500.00Rp475.000.015OHMandorRp50,000.00Rp750.00JUMLAHRp73,164.00HARGA SATUANRp73,164.001 m2 Dinding Bata merah tebal 1/2 bata 1PC : 6PPSNI : 6897:2008BAHAN70.000bhBatu bataRp540.00Rp37,800.008.320kgPCRp1,200.00Rp9,984.000.049m3Pasir pasangRp123,000.00Rp6,027.00TENAGA0.300OHPekerjaRp36,000.00Rp10,800.000.100OHTukang batuRp42,500.00Rp4,250.000.010OHKepala TukangRp47,500.00Rp475.000.015OHMandorRp50,000.00Rp750.00JUMLAHRp70,086.00HARGA SATUANRp70,086.001 m2 Dinding Bata merah tebal 1/2 bata 1PC : 3 KP : 10PPSNI : 6897:2008BAHAN70.000bhBatu bataRp540.00Rp37,800.004.500kgPCRp1,200.00Rp5,400.000.015m3Kapur pasangRp180,000.00Rp2,700.000.050m3Pasir pasangRp123,000.00Rp6,150.00TENAGA0.300OHPekerjaRp36,000.00Rp10,800.000.100OHTukang batuRp42,500.00Rp4,250.000.010OHKepala TukangRp47,500.00Rp475.000.015OHMandorRp50,000.00Rp750.00JUMLAHRp68,325.00HARGA SATUANRp68,325.001 m2 Dinding terawang (roster) uk. (12x11x24) cm, 1PC : 4PPSNI : 6897:2008BAHAN30.000bhTerawang (roster)Rp2,500.00Rp75,000.0011.000kgPCRp1,200.00Rp13,200.000.035m3Pasir pasangRp123,000.00Rp4,305.00TENAGA0.300OHPekerjaRp36,000.00Rp10,800.000.150OHTukang batuRp42,500.00Rp6,375.000.015OHKepala TukangRp47,500.00Rp712.500.015OHMandorRp50,000.00Rp750.00JUMLAHRp111,142.50HARGA SATUANRp111,142.50E.PEKERJAAN PLESTERAN1 m2 Plesteran , 1PC : 3PP tebal 15 mmSNI : 2837:2008BAHAN7.776kgPCRp1,200.00Rp9,331.200.023m3Pasir pasangRp123,000.00Rp2,829.00TENAGA0.300OHPekerjaRp36,000.00Rp10,800.000.150OHTukang batuRp42,500.00Rp6,375.000.015OHKepala TukangRp47,500.00Rp712.500.015OHMandorRp50,000.00Rp750.00JUMLAHRp30,797.70HARGA SATUANRp30,797.701 m2 Plesteran , 1PC : 4PP tebal 15 mmSNI : 2837:2008BAHAN6.240kgPCRp1,200.00Rp7,488.000.024m3Pasir pasangRp123,000.00Rp2,952.00TENAGA0.300OHPekerjaRp36,000.00Rp10,800.000.150OHTukang batuRp42,500.00Rp6,375.000.015OHKepala TukangRp47,500.00Rp712.500.015OHMandorRp50,000.00Rp750.00JUMLAHRp29,077.50HARGA SATUANRp29,077.501 m2 Plesteran , 1PC : 6PP tebal 15 mmSNI : 2837:2008BAHAN4.416kgPCRp1,200.00Rp5,299.200.027m3Pasir pasangRp123,000.00Rp3,321.00TENAGA0.300OHPekerjaRp36,000.00Rp10,800.000.150OHTukang batuRp42,500.00Rp6,375.000.015OHKepala TukangRp47,500.00Rp712.500.015OHMandorRp50,000.00Rp750.00JUMLAHRp27,257.70HARGA SATUANRp27,257.701 m2 Plesteran , 1PC : 2Kp : 8Ps tebal 15 mmSNI : 2837:2008BAHAN3.000kgPCRp1,200.00Rp3,600.000.005m3Kapur pasangRp180,000.00Rp900.000.020m3Pasir pasangRp123,000.00Rp2,460.00TENAGA0.360OHPekerjaRp36,000.00Rp12,960.000.120OHTukang batuRp42,500.00Rp5,100.000.012OHKepala TukangRp47,500.00Rp570.000.018OHMandorRp50,000.00Rp900.00JUMLAHRp26,490.00HARGA SATUANRp26,490.001 m2 Plesteran , 1PC : 4PP tebal 20 mmSNI : 2837:2008BAHAN8.320kgPCRp1,200.00Rp9,984.000.032m3Pasir pasangRp123,000.00Rp3,936.00TENAGA0.400OHPekerjaRp36,000.00Rp14,400.000.200OHTukang batuRp42,500.00Rp8,500.000.020OHKepala TukangRp47,500.00Rp950.000.022OHMandorRp50,000.00Rp1,100.00JUMLAHRp38,870.00HARGA SATUANRp38,870.001 m' Plesteran Skoning, 1PC : 2PP lebar 10 mm0.0BAHAN0.500kgPCRp1,200.00Rp600.000.013m3Pasir pasangRp123,000.00Rp1,599.00TENAGA0.080OHPekerjaRp36,000.00Rp2,880.000.400OHTukang batuRp42,500.00Rp17,000.000.040OHKepala TukangRp47,500.00Rp1,900.000.004OHMandorRp50,000.00Rp200.00JUMLAHRp24,179.00HARGA SATUANRp24,179.001 m2 Plesteran ciprat (kamprot), 1PC : 2PPSNI : 2837:2008BAHAN4.320kgPCRp1,200.00Rp5,184.000.006m3Pasir pasangRp123,000.00Rp738.00TENAGA0.300OHPekerjaRp36,000.00Rp10,800.000.100OHTukang batuRp42,500.00Rp4,250.000.010OHKepala TukangRp47,500.00Rp475.000.015OHMandorRp50,000.00Rp750.00JUMLAHRp22,197.00HARGA SATUANRp22,197.001 m2 Finishing siar pas. Batu kali adukan 1 PC : 2 PPSNI : 2837:2008BAHAN6.340kgPCRp1,200.00Rp7,608.000.012m3Pasir pasangRp123,000.00Rp1,476.00TENAGA0.300OHPekerjaRp36,000.00Rp10,800.000.150OHTukang batuRp42,500.00Rp6,375.000.015OHKepala TukangRp47,500.00Rp712.500.015OHMandorRp50,000.00Rp750.00JUMLAHRp27,721.50HARGA SATUANRp27,721.501 m2 AcianSNI : 2837:2008BAHAN3.250kgPCRp1,200.00Rp3,900.00TENAGA0.200OHPekerjaRp36,000.00Rp7,200.000.100OHTukang batuRp42,500.00Rp4,250.000.010OHKepala TukangRp47,500.00Rp475.000.010OHMandorRp50,000.00Rp500.00JUMLAHRp16,325.00HARGA SATUANRp16,325.00F.PEKERJAAN BETON1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa (K 100), slump (3-6) cmSNI : 7394:2008BAHAN230.000kgPCRp1,200.00Rp276,000.000.638m3Pasir betonRp123,000.00Rp78,456.430.761m3Kerikil betonRp308,200.00Rp234,460.30200.000literAirRp40.25Rp8,050.00TENAGA1.200OHPekerjaRp36,000.00Rp43,200.000.200OHTukang batuRp42,500.00Rp8,500.000.020OHKepala TukangRp47,500.00Rp950.000.060OHMandorRp50,000.00Rp3,000.00JUMLAHRp652,616.72HARGA SATUANRp652,616.721 m3 Beton mutu f'c = 19,3 Mpa (K 225), slump (12 2) cm, w/c = 0,58SNI : 7394:2008BAHAN371.000kgPCRp1,200.00Rp445,200.000.499m3Pasir betonRp123,000.00Rp61,324.290.776m3Kerikil betonRp308,200.00Rp239,026.22215.000literAirRp40.25Rp8,653.75TENAGA1.650OHPekerjaRp36,000.00Rp59,400.000.275OHTukang batuRp42,500.00Rp11,687.500.028OHKepala TukangRp47,500.00Rp1,330.000.083OHMandorRp50,000.00Rp4,150.00JUMLAHRp830,771.76HARGA SATUANRp830,771.76Pembesian 10 kg dengan besi polos atau ulirSNI : 7394:2008BAHAN10.500kgBesi beton (polos/ulir)Rp9,000.00Rp94,500.000.150kgKawat betonRp13,000.00Rp1,950.00TENAGA0.070OHPekerjaRp36,000.00Rp2,520.000.070OHTukang besiRp42,500.00Rp2,975.000.007OHKepala TukangRp47,500.00Rp332.500.004OHMandorRp50,000.00Rp200.00JUMLAHRp102,477.50HARGA SATUANRp102,477.501 kg ------------------->Rp10,247.751 m2 bekisting untuk pondasiSNI : 7394:2008BAHAN0.040m3Kayu kelas IIIRp2,500,000.00Rp100,000.000.300kgPaku 5 cm - 10 cmRp16,000.00Rp4,800.000.100literMinyak bekistingRp19,000.00Rp1,900.00TENAGA0.520OHPekerjaRp36,000.00Rp18,720.000.260OHTukang kayuRp45,000.00Rp11,700.000.026OHKepala TukangRp50,000.00Rp1,300.000.026OHMandorRp50,000.00Rp1,300.00JUMLAHRp139,720.00HARGA SATUANRp139,720.001 m2 bekisting untuk sloofSNI : 7394:2008BAHAN0.045m3Kayu kelas IIIRp2,500,000.00Rp112,500.000.300kgPaku 5 cm - 10 cmRp16,000.00Rp4,800.000.100literMinyak bekistingRp19,000.00Rp1,900.00TENAGA0.520OHPekerjaRp36,000.00Rp18,720.000.260OHTukang kayuRp45,000.00Rp11,700.000.026OHKepala TukangRp50,000.00Rp1,300.000.026OHMandorRp50,000.00Rp1,300.00JUMLAHRp152,220.00HARGA SATUANRp152,220.001 m2 bekisting untuk kolomSNI : 7394:2008BAHAN0.040m3Kayu kelas IIIRp2,500,000.00Rp100,000.000.400kgPaku 5 cm - 12 cmRp16,000.00Rp6,400.000.200literMinyak bekistingRp19,000.00Rp3,800.000.015m3Balok kayu kelas IIRp5,400,000.00Rp81,000.000.350lbrPlywoodRp69,000.00Rp24,150.002.000btgDolkenRp9,000.00Rp18,000.00TENAGA0.660OHPekerjaRp36,000.00Rp23,760.000.330OHTukang kayuRp45,000.00Rp14,850.000.033OHKepala TukangRp50,000.00Rp1,650.000.033OHMandorRp50,000.00Rp1,650.00JUMLAHRp275,260.00HARGA SATUANRp275,260.001 m2 bekisting untuk balokSNI : 7394:2008BAHAN0.040m3Kayu kelas IIIRp2,500,000.00Rp100,000.000.400kgPaku 5 cm - 12 cmRp16,000.00Rp6,400.000.200literMinyak bekistingRp19,000.00Rp3,800.000.018m3Balok kayu kelas IIRp5,400,000.00Rp97,200.000.350lbrPlywoodRp69,000.00Rp24,150.002.000btgDolkenRp9,000.00Rp18,000.00TENAGA0.660OHPekerjaRp36,000.00Rp23,760.000.330OHTukang kayuRp45,000.00Rp14,850.000.033OHKepala TukangRp50,000.00Rp1,650.000.033OHMandorRp50,000.00Rp1,650.00JUMLAHRp291,460.00HARGA SATUANRp291,460.001 m2 bekisting untuk plat lantaiSNI : 7394:2008BAHAN0.040m3Kayu kelas IIIRp2,500,000.00Rp100,000.000.400kgPaku 5 cm - 12 cmRp16,000.00Rp6,400.000.200literMinyak bekistingRp19,000.00Rp3,800.000.015m3Balok kayu kelas IIRp5,400,000.00Rp81,000.000.350lbrPlywoodRp69,000.00Rp24,150.006.000btgDolkenRp9,000.00Rp54,000.00TENAGA0.660OHPekerjaRp36,000.00Rp23,760.000.330OHTukang kayuRp45,000.00Rp14,850.000.033OHKepala TukangRp50,000.00Rp1,650.000.033OHMandorRp50,000.00Rp1,650.00JUMLAHRp311,260.00HARGA SATUANRp311,260.001 m2 bekisting untuk tanggaSNI : 7394:2008BAHAN0.030m3Kayu kelas IIIRp2,500,000.00Rp75,000.000.400kgPaku 5 cm - 12 cmRp16,000.00Rp6,400.000.150literMinyak bekistingRp19,000.00Rp2,850.000.015m3Balok kayu kelas IIRp5,400,000.00Rp81,000.000.350lbrPlywoodRp69,000.00Rp24,150.002.000btgDolkenRp9,000.00Rp18,000.00TENAGA0.660OHPekerjaRp36,000.00Rp23,760.000.330OHTukang kayuRp45,000.00Rp14,850.000.033OHKepala TukangRp50,000.00Rp1,650.000.033OHMandorRp50,000.00Rp1,650.00JUMLAHRp249,310.00HARGA SATUANRp249,310.001 m2 bekisting jembatan untuk pengecoran betonSNI : 7394:2008BAHAN0.0264m3Kayu kelas IIIRp2,500,000.00Rp66,000.000.600kgPaku 5 cm - 12 cmRp16,000.00Rp9,600.000.500btgDolkenRp9,000.00Rp4,500.00TENAGA0.150OHPekerjaRp36,000.00Rp5,400.000.050OHTukang kayuRp45,000.00Rp2,250.000.005OHKepala TukangRp50,000.00Rp250.000.008OHMandorRp50,000.00Rp400.00JUMLAHRp88,400.00HARGA SATUANRp88,400.001 m1 Kolom praktis beton bertulang (12 x 12) cmSNI : 7394:2008BAHAN0.002m3Kayu bekistingRp2,500,000.00Rp5,000.000.010kgPaku biasa 5 - 12 cmRp16,000.00Rp160.003.000kgBesi betonRp9,000.00Rp27,000.000.045kgKawat betonRp13,000.00Rp585.004.000kgPCRp1,200.00Rp4,800.000.006m3Pasir betonRp123,000.00Rp738.000.009m3Kerikil betonRp308,200.00Rp2,773.80TENAGA0.180OHPekerjaRp36,000.00Rp6,480.000.020OHTukang batuRp42,500.00Rp850.000.020OHTukang kayuRp45,000.00Rp900.000.020OHTukang besiRp42,500.00Rp850.000.006OHKepala TukangRp50,000.00Rp300.000.009OHMandorRp50,000.00Rp450.00JUMLAHRp50,886.80HARGA SATUANRp50,886.801 m3Rp4,205,520.661 m' Balok latei beton bertulang, (10 x 15) cmSNI : 7394:2008BAHAN0.003m3Kayu bekistingRp2,500,000.00Rp7,500.000.020kgPaku biasa 5 - 12 cmRp16,000.00Rp320.003.600kgBesi betonRp9,000.00Rp32,400.000.050kgKawat betonRp13,000.00Rp650.005.500kgPCRp1,200.00Rp6,600.000.009m3Pasir betonRp123,000.00Rp1,107.000.015m3Kerikil betonRp308,200.00Rp4,623.00TENAGA0.297OHPekerjaRp36,000.00Rp10,692.000.033OHTukang batuRp42,500.00Rp1,402.500.033OHTukang kayuRp45,000.00Rp1,485.000.033OHTukang besiRp42,500.00Rp1,402.500.010OHKepala TukangRp50,000.00Rp500.000.015OHMandorRp50,000.00Rp750.00JUMLAHRp69,432.00HARGA SATUANRp69,432.001 m3Rp2,893,000.001 m' Ring gunung beton bertulang, (12 x 15) cmSNI : 7394:2008BAHAN0.003m3Kayu bekistingRp2,500,000.00Rp7,500.000.020kgPaku biasa 5 - 12 cmRp16,000.00Rp320.004.154kgBesi betonRp9,000.00Rp37,386.000.050kgKawat betonRp13,000.00Rp650.005.500kgPCRp1,200.00Rp6,600.000.009m3Pasir betonRp123,000.00Rp1,107.000.015m3Kerikil betonRp308,200.00Rp4,623.00TENAGA0.297OHPekerjaRp36,000.00Rp10,692.000.033OHTukang batuRp42,500.00Rp1,402.500.033OHTukang kayuRp45,000.00Rp1,485.000.033OHTukang besiRp42,500.00Rp1,402.500.010OHKepala TukangRp50,000.00Rp500.000.015OHMandorRp50,000.00Rp750.00JUMLAHRp74,418.00HARGA SATUANRp74,418.001 m3Rp3,100,750.001 m3 Membongkar bekistingRp50,000TENAGA4.000OHPekerjaRp36,000.00Rp144,000.00JUMLAHRp144,000.00HARGA SATUANRp144,000.001 m3 Pondasi Footplat Beton mutu f'c = 19,3 Mpa, uk. 100x100 cm, tul. 12 mm - 20 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76120.0000kgBesi beton1,229,730.004.0000m2Bekisting untuk pondasi558,880.000.2500m3Membongkar bekisting36,000.00JUMLAH2,655,381.76DIBULATKAN2,655,381.001 m3 Sloof Beton mutu f'c = 19,3 Mpa, uk. 12x20 cm, tul. 4 12 mm, begel 6 - 20 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76177.6667kgBesi beton1,820,683.585.8333m2Bekisting untuk sloof887,950.000.5000m3Membongkar bekisting72,000.00JUMLAH3,611,405.34DIBULATKAN3,611,405.001 m3 Sloof Beton mutu f'c = 19,3 Mpa, uk. 20x30 cm, tul. 6 16 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76201.3333kgBesi beton2,063,213.675.0000m2Bekisting untuk sloof761,100.000.5000m3Membongkar bekisting72,000.00JUMLAH3,727,085.42DIBULATKAN3,727,085.001 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 30x40 cm, tul. 12 16 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76188.3333kgBesi beton1,929,992.925.3288m2Bekisting untuk kolom1,466,794.620.5000m3Membongkar bekisting72,000.00JUMLAH4,299,559.29DIBULATKAN4,299,559.001 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 30x30 cm, tul. 8 16 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76175.1111kgBesi beton1,794,494.894.9677m2Bekisting untuk kolom1,367,405.110.5000m3Membongkar bekisting72,000.00JUMLAH4,064,671.75DIBULATKAN4,064,671.001 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 12x20 cm, tul. 4 12 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76217.6667kgBesi beton2,230,593.586.1749m2Bekisting untuk kolom1,699,712.310.6250m3Membongkar bekisting90,000.00JUMLAH4,851,077.65DIBULATKAN4,851,077.001 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 15x20 cm, tul. 4 12 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76179.3333kgBesi beton1,837,763.175.0875m2Bekisting untuk kolom1,400,375.530.6571m3Membongkar bekisting94,628.57JUMLAH4,163,539.03DIBULATKAN4,163,539.001 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 15x25 cm, tul. 4 12 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76150.4000kgBesi beton1,541,261.604.2667m2Bekisting untuk kolom1,174,441.340.7000m3Membongkar bekisting100,800.00JUMLAH3,647,274.70DIBULATKAN3,647,274.001 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 15x15 cm, tul. 4 12 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76227.5556kgBesi beton2,331,932.446.6667m2Bekisting untuk kolom1,835,066.670.5000m3Membongkar bekisting72,000.00JUMLAH5,069,770.87DIBULATKAN5,069,770.001 m3 RingBalok Beton mutu f'c = 19,3 Mpa, uk. 12x20 cm, tul. 4 12 mm, begel 6 - 20 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76177.6667kgBesi beton1,820,683.581.5617m2Bekisting untuk balok455,170.900.6250m3Membongkar bekisting90,000.00JUMLAH3,196,626.24DIBULATKAN3,196,626.001 m3 Balok Beton mutu f'c = 19,3 Mpa, uk. 15x25 cm, tul. 6 12 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76173.6889kgBesi beton1,779,920.316.6667m2Bekisting untuk balok1,943,066.670.6250m3Membongkar bekisting90,000.00JUMLAH4,643,758.74DIBULATKAN4,643,758.001 m3 Balok Beton mutu f'c = 19,3 Mpa, uk. 20x35 cm, tul. 8 16 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76221.4286kgBesi beton2,269,144.646.6667m2Bekisting untuk balok1,943,066.670.8000m3Membongkar bekisting115,200.00JUMLAH5,158,183.07DIBULATKAN5,158,183.001 m3 Balok Beton mutu f'c = 19,3 Mpa, uk. 25x45 cm, tul. 10 16 mm, begel 8 - 15 cm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76172.8000kgBesi beton1,770,811.205.1111m2Bekisting untuk balok1,489,684.440.8214m3Membongkar bekisting118,285.71JUMLAH4,209,553.12DIBULATKAN4,209,553.001 m3 Plat Beton mutu f'c = 19,3 Mpa, tebal 12 cm, tul. 8 mm1.0000m3Beton mutu f'c = 19,3 Mpa (K225), slump (12 2) cm, w/c=0,58830,771.76109.2000kgBesi beton1,119,054.304.6738m2Bekisting untuk plat1,454,770.591.0000m3Membongkar bekisting144,000.00JUMLAH3,548,596.65DIBULATKAN3,548,596.00G.PEKERJAAN KAYU1 m3 Membuat dan memasang kusen pintu/jendela kayu jatiSNI : 3434:2008BAHAN1.100m3Kayu jati, balokRp18,500,000.00Rp20,350,000.001.250KgPaku biasa 2" - 5"Rp16,000.00Rp20,000.001.000KgLem kayuRp12,000.00Rp12,000.00TENAGA7.000OHPekerjaRp36,000.00Rp252,000.0021.000OHTukang KayuRp45,000.00Rp945,000.002.100OHKepala TukangRp50,000.00Rp105,000.000.350OHMandorRp50,000.00Rp17,500.00JUMLAHRp21,701,500.00HARGA SATUANRp21,701,500.001 m3 Membuat dan memasang kusen pintu/jendela kayu kamperSNI : 3434:2008BAHAN1.200m3Kayu kamper, balokRp8,500,000.00Rp10,200,000.001.250KgPaku biasa 2" - 5"Rp16,000.00Rp20,000.001.000KgLem kayuRp12,000.00Rp12,000.00TENAGA6.000OHPekerjaRp36,000.00Rp216,000.0018.000OHTukang KayuRp45,000.00Rp810,000.001.800OHKepala TukangRp50,000.00Rp90,000.000.300OHMandorRp50,000.00Rp15,000.00JUMLAHRp11,363,000.00HARGA SATUANRp11,363,000.001 m3 Membuat dan memasang kusen pintu/jendela kayu bangkireiSNI : 3434:2008BAHAN1.200m3Kayu bangkirei, balokRp8,600,000.00Rp10,320,000.001.250KgPaku biasa 2" - 5"Rp16,000.00Rp20,000.001.000KgLem kayuRp12,000.00Rp12,000.00TENAGA6.000OHPekerjaRp36,000.00Rp216,000.0018.000OHTukang KayuRp45,000.00Rp810,000.001.800OHKepala TukangRp50,000.00Rp90,000.000.300OHMandorRp50,000.00Rp15,000.00JUMLAHRp11,483,000.00HARGA SATUANRp11,483,000.001 m3 Memasang kusen pintu/jendela lamaSNI : 3434:2008Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baruBAHAN0.417KgPaku biasa 2" - 5"Rp16,000.00Rp6,666.670.333KgLem kayuRp12,000.00Rp4,000.00TENAGA2.000OHPekerjaRp36,000.00Rp72,000.006.000OHTukang KayuRp45,000.00Rp270,000.000.600OHKepala TukangRp50,000.00Rp30,000.000.100OHMandorRp50,000.00Rp5,000.00JUMLAHRp387,666.67HARGA SATUANRp387,666.671 m2 Membuat dan memasang daun pintu panel kayu jatiSNI : 3434:2008BAHAN0.040m3Kayu jati, papanRp20,000,000.00Rp800,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.003.000OHTukang KayuRp45,000.00Rp135,000.000.300OHKepala TukangRp50,000.00Rp15,000.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp994,500.00HARGA SATUANRp994,500.001 m2 Membuat dan memasang daun pintu panel kayu kamperSNI : 3434:2008BAHAN0.040m3Kayu kamper, papanRp9,000,000.00Rp360,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.003.000OHTukang KayuRp45,000.00Rp135,000.000.300OHKepala TukangRp50,000.00Rp15,000.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp554,500.00HARGA SATUANRp554,500.001 m2 Membuat dan memasang daun pintu panel multipleks 12 mm ram kayu kamperSNI : 3434:2008BAHAN0.024m3Kayu kamper, papanRp9,000,000.00Rp216,000.000.382lbrMultipleks 12 mmRp147,500.00Rp56,336.810.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.003.000OHTukang KayuRp45,000.00Rp135,000.000.300OHKepala TukangRp50,000.00Rp15,000.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp466,836.81HARGA SATUANRp466,836.811 m2 Membuat dan memasang daun pintu panel kayu bangkireiSNI : 3434:2008BAHAN0.040m3Kayu bangkirei, papanRp9,000,000.00Rp360,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.003.000OHTukang KayuRp45,000.00Rp135,000.000.300OHKepala TukangRp50,000.00Rp15,000.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp554,500.00HARGA SATUANRp554,500.001 m2 Memasang daun pintu panel lamaSNI : 3434:2008Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baruBAHAN0.167KgLem kayuRp12,000.00Rp2,000.00TENAGA0.333OHPekerjaRp36,000.00Rp12,000.001.000OHTukang KayuRp45,000.00Rp45,000.000.100OHKepala TukangRp50,000.00Rp5,000.000.017OHMandorRp50,000.00Rp833.33JUMLAHRp64,833.33HARGA SATUANRp64,833.331 m2 Membuat dan memasang daun pintu/jendela kaca kayu jatiSNI : 3434:2008BAHAN0.024m3Kayu jati, papanRp20,000,000.00Rp480,000.000.300KgLem kayuRp12,000.00Rp3,600.00TENAGA0.800OHPekerjaRp36,000.00Rp28,800.002.400OHTukang KayuRp45,000.00Rp108,000.000.240OHKepala TukangRp50,000.00Rp12,000.000.040OHMandorRp50,000.00Rp2,000.00JUMLAHRp634,400.00HARGA SATUANRp634,400.001 m2 Membuat dan memasang daun pintu/jendela kaca kayu kamperSNI : 3434:2008BAHAN0.024m3Kayu kamper, papanRp9,000,000.00Rp216,000.000.300KgLem kayuRp12,000.00Rp3,600.00TENAGA0.800OHPekerjaRp36,000.00Rp28,800.002.400OHTukang KayuRp45,000.00Rp108,000.000.240OHKepala TukangRp50,000.00Rp12,000.000.040OHMandorRp50,000.00Rp2,000.00JUMLAHRp370,400.00HARGA SATUANRp370,400.001 m2 Membuat dan memasang daun pintu/jendela kaca kayu bangkireiSNI : 3434:2008BAHAN0.024m3Kayu bangkirei, papanRp9,000,000.00Rp216,000.000.300KgLem kayuRp36,000.00Rp10,800.00TENAGA0.800OHPekerjaRp36,000.00Rp28,800.002.400OHTukang KayuRp45,000.00Rp108,000.000.240OHKepala TukangRp50,000.00Rp12,000.000.040OHMandorRp50,000.00Rp2,000.00JUMLAHRp377,600.00HARGA SATUANRp377,600.001 m2 Memasang daun pintu/jendela kaca lamaSNI : 3434:2008Dipakai koefisien 1/3 dari biaya pembuatan dan pemasangan kusen pintu/jendela baru0.100KgLem kayuRp50,000.00Rp5,000.00TENAGA0.267OHPekerjaRp36,000.00Rp9,600.000.800OHTukang KayuRp45,000.00Rp36,000.000.080OHKepala TukangRp50,000.00Rp4,000.000.013OHMandorRp50,000.00Rp666.67JUMLAHRp55,266.67HARGA SATUANRp55,266.671 m2 Membuat dan memasang daun pintu dan jendela jalusi kayu jatiSNI : 3434:2008BAHAN0.064m3Kayu jati, papanRp20,000,000.00Rp1,280,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.003.000OHTukang KayuRp45,000.00Rp135,000.000.300OHKepala TukangRp50,000.00Rp15,000.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp1,474,500.00HARGA SATUANRp1,474,500.001 m2 Membuat dan memasang daun pintu dan jendela jalusi kayu kamperSNI : 3434:2008BAHAN0.040m3Kayu kamper, papanRp9,000,000.00Rp360,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.003.000OHTukang KayuRp45,000.00Rp135,000.000.300OHKepala TukangRp50,000.00Rp15,000.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp554,500.00HARGA SATUANRp554,500.001 m2 Membuat dan memasang pintu dan jendela jalusi kayu bangkireiSNI : 3434:2008BAHAN0.040m3Kayu bangkirei, papanRp9,000,000.00Rp360,000.000.500KgLem kayuRp12,000.00Rp6,000.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.003.000OHTukang KayuRp45,000.00Rp135,000.000.300OHKepala TukangRp50,000.00Rp15,000.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp554,500.00HARGA SATUANRp554,500.001 m2 Membuat dan memasang daun pintu lapis (plywood) rangkap, rangka tertutup, kayu kamper (lebar s/d 90 cm)SNI : 3434:2008BAHAN0.025m3Kayu kamper, papanRp9,000,000.00Rp225,000.000.030kgPaku 1 cm - 2,5 cmRp16,000.00Rp480.000.500kgLem kayuRp12,000.00Rp6,000.001.000lbrPlywoodRp69,000.00Rp69,000.00TENAGA0.700OHPekerjaRp36,000.00Rp25,200.002.100OHTukang KayuRp45,000.00Rp94,500.000.210OHKepala TukangRp50,000.00Rp10,500.000.035OHMandorRp50,000.00Rp1,750.00JUMLAHRp432,430.00HARGA SATUANRp432,430.001 m2 Membuat dan memasang daun pintu plywood rangkap, rangka ekspose, kayu kamperSNI : 3434:2008BAHAN0.0256m3Kayu kamper, papanRp9,000,000.00Rp230,400.000.030kgPaku 1 cm - 2,5 cmRp16,000.00Rp480.000.500kgLem kayuRp12,000.00Rp6,000.001.000lbrPlywoodRp69,000.00Rp69,000.00TENAGA0.800OHPekerjaRp36,000.00Rp28,800.002.400OHTukang KayuRp45,000.00Rp108,000.000.240OHKepala TukangRp50,000.00Rp12,000.000.040OHMandorRp50,000.00Rp2,000.00JUMLAHRp456,680.00HARGA SATUANRp456,680.001 m2 Memasang jalusi kusen kayu jatiSNI : 3434:2008BAHAN0.060m3Kayu jati, papanRp20,000,000.00Rp1,200,000.000.150KgPaku kecilRp20,000.00Rp3,000.00TENAGA0.670OHPekerjaRp36,000.00Rp24,120.002.400OHTukang KayuRp45,000.00Rp108,000.000.200OHKepala TukangRp50,000.00Rp10,000.000.335OHMandorRp50,000.00Rp16,750.00JUMLAHRp1,361,870.00HARGA SATUANRp1,361,870.001 m2 Memasang jalusi kusen kayu kamperSNI : 3434:2008BAHAN0.060m3Kayu kamper, papanRp9,000,000.00Rp540,000.000.150KgPaku kecilRp20,000.00Rp3,000.00TENAGA0.670OHPekerjaRp36,000.00Rp24,120.002.400OHTukang KayuRp45,000.00Rp108,000.000.200OHKepala TukangRp50,000.00Rp10,000.000.335OHMandorRp50,000.00Rp16,750.00JUMLAHRp701,870.00HARGA SATUANRp701,870.001 m2 Memasang jalusi kusen kayu bangkireiSNI : 3434:2008BAHAN0.060m3Kayu bangkirei, papanRp9,000,000.00Rp540,000.000.150KgPaku kecilRp20,000.00Rp3,000.00TENAGA0.670OHPekerjaRp36,000.00Rp24,120.002.400OHTukang KayuRp45,000.00Rp108,000.000.200OHKepala TukangRp50,000.00Rp10,000.000.335OHMandorRp50,000.00Rp16,750.00JUMLAHRp701,870.00HARGA SATUANRp701,870.001 m3 Memasang kuda-kuda kayu bangkireiSNI : 3434:2008BAHAN1.100m3Kayu bangkirei, balokRp8,600,000.00Rp9,460,000.005.600KgPaku biasa 2" - 5"Rp16,000.00Rp89,600.0015.000KgBesi stripRp9,000.00Rp135,000.00TENAGA4.000OHPekerjaRp36,000.00Rp144,000.0012.000OHTukang KayuRp45,000.00Rp540,000.001.200OHKepala TukangRp50,000.00Rp60,000.000.200OHMandorRp50,000.00Rp10,000.00JUMLAHRp10,438,600.00HARGA SATUANRp10,438,600.001 m3 Memasang kuda-kuda lamaSNI : 3434:2008Pemasangan kuda-kuda lama dipakai koefisien 50% tenaga kerjaTENAGA2.000OHPekerjaRp36,000.00Rp72,000.006.000OHTukang KayuRp45,000.00Rp270,000.000.600OHKepala TukangRp50,000.00Rp30,000.000.100OHMandorRp50,000.00Rp5,000.00JUMLAHRp377,000.00HARGA SATUANRp377,000.001 m3 Konstruksi Gording kayu bangkireiSNI : 3434:2008BAHAN1.100m3Kayu bangkirei, balokRp8,600,000.00Rp9,460,000.003.000KgPaku biasa 2" - 5"Rp16,000.00Rp48,000.0015.000KgBesi stripRp9,000.00Rp135,000.00TENAGA2.400OHPekerjaRp36,000.00Rp86,400.007.200OHTukang KayuRp45,000.00Rp324,000.000.720OHKepala TukangRp50,000.00Rp36,000.000.120OHMandorRp50,000.00Rp6,000.00JUMLAHRp10,095,400.00HARGA SATUANRp10,095,400.001 m3 Konstruksi Gording lamaSNI : 3434:2008BAHAN3.000KgPaku biasa 2" - 5"Rp16,000.00Rp48,000.0015.000KgBesi stripRp9,000.00Rp135,000.00TENAGA2.400OHPekerjaRp36,000.00Rp86,400.007.200OHTukang KayuRp45,000.00Rp324,000.000.720OHKepala TukangRp50,000.00Rp36,000.000.120OHMandorRp50,000.00Rp6,000.00JUMLAHRp635,400.00HARGA SATUANRp635,400.001 m2 Rangka atap genteng keramik, kayu bangkireiSNI : 3434:2008BAHAN0.014m3Kaso-kaso (5/7), kayu bangkireiRp8,600,000.00Rp120,400.000.0036m3Reng (2/3), kayu bangkireiRp5,000,000.00Rp18,000.000.250KgPaku biasa 2" - 5"Rp16,000.00Rp4,000.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.100OHTukang KayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp153,500.00HARGA SATUANRp153,500.001 m2 Rangka atap genteng keramik, kaso kruing reng jatiSNI : 3434:2008BAHAN0.014m3Kaso-kaso (5/7), kayu kruingRp6,200,000.00Rp86,800.000.0036m3Reng (2/3), kayu jatiRp6,650,000.00Rp23,940.000.250KgPaku biasa 2" - 5"Rp16,000.00Rp4,000.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.100OHTukang KayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp125,840.00HARGA SATUANRp125,840.001 m2 Rangka atap genteng beton, kayu bangkireiSNI : 3434:2008BAHAN0.014m3Kaso-kaso (5/7), kayu bangkireiRp8,600,000.00Rp120,400.000.0072m3Reng (3/4), kayu bangkireiRp5,000,000.00Rp36,000.000.250KgPaku biasa 2" - 5"Rp16,000.00Rp4,000.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.100OHTukang KayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp171,500.00HARGA SATUANRp171,500.001 m2 Rangka atap genteng keramik, kayu lamaSNI : 3434:2008BAHAN0.250KgPaku biasa 2" - 5"Rp16,000.00Rp4,000.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.100OHTukang KayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp15,100.00HARGA SATUANRp15,100.001 m2 Rangka langit-langit, kayu kruing uk. (50x100) cmSNI : 3434:2008BAHAN0.0154m3Kayu kruing, balokRp6,200,000.00Rp95,480.000.200KgPaku biasa 2" - 5"Rp16,000.00Rp3,200.00TENAGA0.150OHPekerjaRp36,000.00Rp5,400.000.300OHTukang KayuRp45,000.00Rp13,500.000.030OHKepala TukangRp50,000.00Rp1,500.000.075OHMandorRp50,000.00Rp3,750.00JUMLAHRp122,830.00HARGA SATUANRp122,830.001 m2 Rangka langit-langit, kayu meranti uk. (50x100) cmSNI : 3434:2008BAHAN0.0154m3Kayu meranti, balokRp5,400,000.00Rp83,160.000.200KgPaku biasa 2" - 5"Rp16,000.00Rp3,200.00TENAGA0.150OHPekerjaRp36,000.00Rp5,400.000.300OHTukang KayuRp45,000.00Rp13,500.000.030OHKepala TukangRp50,000.00Rp1,500.000.075OHMandorRp50,000.00Rp3,750.00JUMLAHRp110,510.00HARGA SATUANRp110,510.001 m2 Rangka langit-langit, kayu kruing uk. (60x60) cmSNI : 3434:2008BAHAN0.0163m3Kayu kruing, balokRp6,200,000.00Rp101,060.000.250KgPaku biasa 2" - 5"Rp16,000.00Rp4,000.00TENAGA0.200OHPekerjaRp36,000.00Rp7,200.000.300OHTukang KayuRp45,000.00Rp13,500.000.030OHKepala TukangRp50,000.00Rp1,500.000.075OHMandorRp50,000.00Rp3,750.00JUMLAHRp131,010.00HARGA SATUANRp131,010.001 m2 Rangka langit-langit, kayu meranti uk. (60x60) cmSNI : 3434:2008BAHAN0.0163m3Kayu meranti, balokRp5,400,000.00Rp88,020.000.250KgPaku biasa 2" - 5"Rp16,000.00Rp4,000.00TENAGA0.200OHPekerjaRp36,000.00Rp7,200.000.300OHTukang KayuRp45,000.00Rp13,500.000.030OHKepala TukangRp50,000.00Rp1,500.000.075OHMandorRp50,000.00Rp3,750.00JUMLAHRp117,970.00HARGA SATUANRp117,970.001 m2 Rangka langit-langit, kayu kruing uk. (100x100) cmSNI : 2002BAHAN0.0120m3Kayu kruing, balokRp6,200,000.00Rp74,400.000.100KgPaku biasa 2" - 5"Rp16,000.00Rp1,600.00TENAGA0.150OHPekerjaRp36,000.00Rp5,400.000.250OHTukang KayuRp45,000.00Rp11,250.000.025OHKepala TukangRp50,000.00Rp1,250.000.075OHMandorRp50,000.00Rp3,750.00JUMLAHRp97,650.00HARGA SATUANRp97,650.001 m2 Rangka langit-langit miring, kayu meranti uk. (100x100) cmSNI : 2002BAHAN0.0060m3Kayu meranti, balokRp5,400,000.00Rp32,400.000.060KgPaku biasa 2" - 5"Rp16,000.00Rp960.00TENAGA0.150OHPekerjaRp36,000.00Rp5,400.000.250OHTukang KayuRp45,000.00Rp11,250.000.025OHKepala TukangRp50,000.00Rp1,250.000.075OHMandorRp50,000.00Rp3,750.00JUMLAHRp55,010.00HARGA SATUANRp55,010.001 m2 Rangka langit-langit, kayu lama uk. (100x100) cmSNI : 2002BAHAN0.0120m3Kayu kruing balokRp6,200,000.00Rp74,400.000.100KgPaku biasa 2" - 5"Rp16,000.00Rp1,600.00TENAGA0.150OHPekerjaRp36,000.00Rp5,400.000.250OHTukang KayuRp45,000.00Rp11,250.000.025OHKepala TukangRp50,000.00Rp1,250.000.075OHMandorRp50,000.00Rp3,750.00JUMLAHRp97,650.00HARGA SATUANRp97,650.001 m1 Memasang Lisplank uk. (3x20) cm kayu bangkireiSNI : 3434:2008BAHAN0.0108m3Kayu bangkirei, papanRp9,000,000.00Rp97,200.000.100KgPaku biasa 2" - 5"Rp16,000.00Rp1,600.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.200OHTukang KayuRp45,000.00Rp9,000.000.020OHKepala TukangRp50,000.00Rp1,000.000.005OHMandorRp50,000.00Rp250.00JUMLAHRp112,650.00HARGA SATUANRp112,650.001 m1 Memasang riuter uk. (2x15) cm kayu kruingSNI : 3434:2008BAHAN0.0030m3Kayu Kruing papanRp6,200,000.00Rp18,600.000.050KgPaku biasa 2" - 5 "Rp16,000.00Rp800.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.200OHTukang KayuRp45,000.00Rp9,000.000.020OHKepala TukangRp50,000.00Rp1,000.000.005OHMandorRp50,000.00Rp250.00JUMLAHRp33,250.00HARGA SATUANRp33,250.001 m1 Memasang winvier uk. (2x10) cm kayu bengkireiSNI : 3434:2008BAHAN0.0020m3Kayu bangkirai papanRp9,000,000.00Rp18,000.000.050Kgpaku biasa 2"- 5"Rp16,000.00Rp800.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.200OHTukang KayuRp45,000.00Rp9,000.000.020OHKepala TukangRp50,000.00Rp1,000.000.005OHMandorRp50,000.00Rp250.00JUMLAHRp32,650.00HARGA SATUANRp32,650.00H.PEKERJAAN PENUTUP ATAP1 m2 Memasang atap genteng kodok/glazzurSNI : 03-3436-2002BAHAN25.0000bhGenteng kodokRp1,600.00Rp40,000.00TENAGA0.150OHPekerjaRp36,000.00Rp5,400.000.075OHTukang KayuRp45,000.00Rp3,375.000.008OHKepala TukangRp50,000.00Rp400.000.008OHMandorRp50,000.00Rp400.00JUMLAHRp49,575.00HARGA SATUANRp49,575.001 m2 Memasang atap genteng palentong/paris, kecilSNI : 03-3436-2002BAHAN25.0000bhGenteng palentong/parisRp850.00Rp21,250.00TENAGA0.150OHPekerjaRp36,000.00Rp5,400.000.075OHTukang KayuRp45,000.00Rp3,375.000.008OHKepala TukangRp50,000.00Rp400.000.008OHMandorRp50,000.00Rp400.00JUMLAHRp30,825.00HARGA SATUANRp30,825.001 m2 Memasang atap genteng betonSNI : 03-3436-2002BAHAN9.0000bhGenteng betonRp7,600.00Rp68,400.000.0300kgPaku biasa 2"-5"Rp16,000.00Rp480.00TENAGA0.200OHPekerjaRp36,000.00Rp7,200.000.100OHTukang KayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.010OHMandorRp50,000.00Rp500.00JUMLAHRp81,580.00HARGA SATUANRp81,580.001 m2 Memasang atap genteng metal uk. 0,77 x 0,8 mSNI : 03-3436-2002BAHAN1.0200lbrGenteng metalRp50,000.00Rp51,000.00500000.2000kgPaku biasa 2"-5"Rp16,000.00Rp3,200.00TENAGA0.200OHPekerjaRp36,000.00Rp7,200.000.100OHTukang KayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.010OHMandorRp50,000.00Rp500.00JUMLAHRp66,900.00HARGA SATUANRp66,900.001 m2 Memasang atap genteng metal berpasir uk. 0,77 x 0,8 mSNI : 03-3436-2002BAHAN1.0200lbrGenteng metalRp116,000.00Rp118,320.00116071.4285714290.2000kgPaku biasa 2"-5"Rp16,000.00Rp3,200.00TENAGA0.200OHPekerjaRp36,000.00Rp7,200.000.100OHTukang KayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.010OHMandorRp50,000.00Rp500.00JUMLAHRp134,220.00HARGA SATUANRp134,220.001 m2 Memasang atap genteng metal berpasir uk. 0,77 x 1 mSNI : 03-3436-2002BAHAN1.0200lbrGenteng metalRp135,700.00Rp138,414.000.2000kgPaku biasa 2"-5"Rp16,000.00Rp3,200.00135714.285714286TENAGA0.200OHPekerjaRp36,000.00Rp7,200.000.100OHTukang KayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.010OHMandorRp50,000.00Rp500.00JUMLAHRp154,314.00HARGA SATUANRp154,314.001 m1 Memasang bubung genteng kodok/ glazzurSNI : 03-3436-2002BAHAN5.0000bhBubung genteng kodokRp3,500.00Rp17,500.008.0000kgPCRp1,200.00Rp9,600.000.0320m3Pasir pasangRp123,000.00Rp3,936.00TENAGA0.400OHPekerjaRp36,000.00Rp14,400.000.200OHTukang KayuRp45,000.00Rp9,000.000.020OHKepala TukangRp50,000.00Rp1,000.000.002OHMandorRp50,000.00Rp100.00JUMLAHRp55,536.00HARGA SATUANRp55,536.001 m1 Memasang bubung genteng palentong/parisSNI : 03-3436-2002BAHAN5.0000bhBubung genteng palentong/parisRp3,500.00Rp17,500.008.0000kgPCRp1,200.00Rp9,600.000.0320m3Pasir pasangRp123,000.00Rp3,936.00TENAGA0.400OHPekerjaRp36,000.00Rp14,400.000.200OHTukang KayuRp45,000.00Rp9,000.000.020OHKepala TukangRp50,000.00Rp1,000.000.002OHMandorRp50,000.00Rp100.00JUMLAHRp55,536.00HARGA SATUANRp55,536.001 m1 Memasang nok genteng betonSNI : 03-3436-2002BAHAN3.5000bhNok genteng betonRp13,500.00Rp47,250.000.0500kgPaku biasa 2"-5"Rp16,000.00Rp800.0010.8000kgPCRp1,200.00Rp12,960.000.0320kgPasir pasangRp123,000.00Rp3,936.001.0000m3Semen warnaRp57.50Rp57.50TENAGA0.400OHPekerjaRp36,000.00Rp14,400.000.200OHTukang KayuRp45,000.00Rp9,000.000.020OHKepala TukangRp50,000.00Rp1,000.000.002OHMandorRp50,000.00Rp100.00JUMLAHRp89,503.50HARGA SATUANRp89,503.501 m1 Memasang nok genteng metalSNI : 03-3436-2002BAHAN1.1000bhNok genteng metalRp20,000.00Rp22,000.000.0500kgPaku biasa 1/2"-1"Rp16,000.00Rp800.00TENAGA0.250OHPekerjaRp36,000.00Rp9,000.000.150OHTukang KayuRp45,000.00Rp6,750.000.015OHKepala TukangRp50,000.00Rp750.000.013OHMandorRp50,000.00Rp650.00JUMLAHRp39,950.00HARGA SATUANRp39,950.001 m2 Pasang atap asbes gelombang (2,25 x 0,92 m) x 5 mmSNI : 03-3436-2002BAHAN0.6000lbrAsbes gelombangRp92,000.00Rp55,200.000.1200bhPaku pancingRp20,000.00Rp2,400.00TENAGA0.140OHPekerjaRp36,000.00Rp5,040.000.075OHTukang KayuRp45,000.00Rp3,375.000.008OHKepala TukangRp50,000.00Rp400.000.008OHMandorRp50,000.00Rp400.00JUMLAHRp66,815.00HARGA SATUANRp66,815.001 m2 Pasang atap asbes gelombang (1,5 x 0,92 m) x 5 mmSNI : 03-3436-2002BAHAN0.7250lbrAsbes gelombangRp57,500.00Rp41,687.500.1200bhPaku pancingRp20,000.00Rp2,400.00TENAGA0.140OHPekerjaRp36,000.00Rp5,040.000.070OHTukang KayuRp45,000.00Rp3,150.000.007OHKepala TukangRp50,000.00Rp350.000.007OHMandorRp50,000.00Rp350.00JUMLAHRp52,977.50HARGA SATUANRp52,977.501 m2 Pasang atap asbes gelombang (3,0 x 1,05 m) x 4 mmSNI : 03-3436-2002BAHAN0.3500lbrAsbes gelombangRp64,000.00Rp22,400.000.1200bhPaku pancingRp20,000.00Rp2,400.00TENAGA0.140OHPekerjaRp36,000.00Rp5,040.000.070OHTukang KayuRp45,000.00Rp3,150.000.007OHKepala TukangRp50,000.00Rp350.000.007OHMandorRp50,000.00Rp350.00JUMLAHRp33,690.00HARGA SATUANRp33,690.001 m2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mmSNI : 03-3436-2002BAHAN0.4400lbrAsbes gelombangRp52,000.00Rp22,880.000.1200bhPaku pancingRp20,000.00Rp2,400.00TENAGA0.140OHPekerjaRp36,000.00Rp5,040.000.070OHTukang KayuRp45,000.00Rp3,150.000.007OHKepala TukangRp50,000.00Rp350.000.007OHMandorRp50,000.00Rp350.00JUMLAHRp34,170.00HARGA SATUANRp34,170.001 m2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mmSNI : 03-3436-2002BAHAN0.5100lbrAsbes gelombangRp46,000.00Rp23,460.000.1200bhPaku pancingRp20,000.00Rp2,400.00TENAGA0.140OHPekerjaRp36,000.00Rp5,040.000.067OHTukang KayuRp45,000.00Rp3,015.000.007OHKepala TukangRp50,000.00Rp350.000.007OHMandorRp50,000.00Rp350.00JUMLAHRp34,615.00HARGA SATUANRp34,615.001 m' Pasang bubung stel gelombang 0,92 mSNI : 03-3436-2002BAHAN2.4000lbrBubung stel gelombangRp54,100.00Rp129,840.006.0000bhPaku sekrup 3,5"Rp500.00Rp3,000.00TENAGA0.084OHPekerjaRp36,000.00Rp3,024.000.125OHTukang KayuRp45,000.00Rp5,625.000.013OHKepala TukangRp50,000.00Rp650.000.004OHMandorRp50,000.00Rp200.00JUMLAHRp142,339.00HARGA SATUANRp142,339.001 m' Pasang bubung stel gelombang 1,05 mSNI : 03-3436-2002BAHAN2.1000lbrBubung stel gelombangRp25,000.00Rp52,500.006.0000bhPaku sekrup 3,5"Rp500.00Rp3,000.00TENAGA0.084OHPekerjaRp36,000.00Rp3,024.000.125OHTukang KayuRp45,000.00Rp5,625.000.013OHKepala TukangRp50,000.00Rp650.000.004OHMandorRp50,000.00Rp200.00JUMLAHRp64,999.00HARGA SATUANRp64,999.001 m2 Pasang atap seng gelombangSNI : 03-3436-2002BAHAN0.7000lbrSeng gelombangRp65,000.00Rp45,500.000.0200bhPaku payungRp20,000.00Rp400.00TENAGA0.120OHPekerjaRp36,000.00Rp4,320.000.060OHTukang KayuRp45,000.00Rp2,700.000.006OHKepala TukangRp50,000.00Rp300.000.006OHMandorRp50,000.00Rp300.00JUMLAHRp53,520.00HARGA SATUANRp53,520.001 m' Pasang atap nok sengSNI : 03-3436-2002BAHAN0.3000lbrSeng plat 3" x 6" bjls 25Rp43,000.00Rp12,900.000.0400bhPaku payungRp20,000.00Rp800.00TENAGA0.150OHPekerjaRp36,000.00Rp5,400.000.070OHTukang KayuRp45,000.00Rp3,150.000.008OHKepala TukangRp50,000.00Rp400.000.008OHMandorRp50,000.00Rp400.00JUMLAHRp23,050.00HARGA SATUANRp23,050.001 m2 Pasang aluminium foil/ SisalationSNI : 03-3436-2002BAHAN1.0500m2Sisalation/ aluminium foilRp8,500.00Rp8,925.00TENAGA0.150OHPekerjaRp36,000.00Rp5,400.000.050OHTukang KayuRp45,000.00Rp2,250.000.005OHKepala TukangRp50,000.00Rp250.000.008OHMandorRp50,000.00Rp400.00JUMLAHRp17,225.00HARGA SATUANRp17,225.00I.PEKERJAAN LANGIT-LANGIT1 m2 Memasang langit-langit asbes semen, tebal 4 mm, 5mm, 6 mmSNI : 2839:2008BAHAN1.1000lbrAsbes semenRp12,750.00Rp14,025.000.0100kgPaku kecilRp20,000.00Rp200.00TENAGA0.030OHPekerjaRp36,000.00Rp1,080.000.070OHTukang KayuRp45,000.00Rp3,150.000.007OHKepala TukangRp50,000.00Rp350.000.004OHMandorRp50,000.00Rp200.00JUMLAHRp19,005.00HARGA SATUANRp19,005.001 m2 Memasang langit-langit akustik uk. (30 x 60) cmSNI : 2839:2008BAHAN5.8000lbrAkustikRp25,000.00Rp145,000.000.0500kgPaku kecilRp20,000.00Rp1,000.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.100OHTukang KayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.005OHMandorRp50,000.00Rp250.00JUMLAHRp154,850.00HARGA SATUANRp154,850.001 m2 Memasang langit-langit tripleks uk. (120 x 240) cm, tebal 3 mmSNI : 2839:2008BAHAN0.3750lbrTripleksRp40,000.00Rp15,000.000.0300kgPaku kecilRp20,000.00Rp600.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.100OHTukang KayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.005OHMandorRp50,000.00Rp250.00JUMLAHRp24,450.00HARGA SATUANRp24,450.001 m2 Memasang langit-langit gypsum board, uk. (1200 x 2400 x 9) mmSNI : 2839:2008BAHAN0.3640lbrGypsum boardRp60,000.00Rp21,840.000.1100kgPaku sekrupRp20,000.00Rp2,200.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.050OHTukang KayuRp45,000.00Rp2,250.000.005OHKepala TukangRp50,000.00Rp250.000.005OHMandorRp50,000.00Rp250.00JUMLAHRp30,390.00HARGA SATUANRp30,390.001 m1 Memasang list gypsum profilSNI : 2839:2008BAHAN1.0500m'List gypsum profilRp12,000.00Rp12,600.000.1500kgTepung gypsumRp3,500.00Rp525.00TENAGA0.060OHPekerjaRp36,000.00Rp2,160.000.060OHTukang KayuRp45,000.00Rp2,700.000.006OHKepala TukangRp50,000.00Rp300.000.003OHMandorRp50,000.00Rp150.00JUMLAHRp18,435.00HARGA SATUANRp18,435.001 m1 Memasang list langit-langit kayu profilSNI : 2839:2008BAHAN1.0500m'List kayu profilRp3,000.00Rp3,150.000.1000kgPakuRp16,000.00Rp1,600.00TENAGA0.050OHPekerjaRp36,000.00Rp1,800.000.050OHTukang KayuRp45,000.00Rp2,250.000.005OHKepala TukangRp50,000.00Rp250.000.003OHMandorRp50,000.00Rp150.00JUMLAHRp9,200.00HARGA SATUANRp9,200.00J.PEKERJAAN PENUTUP LANTAI & DINDING1 m2 Memasang lantai keramik uk.(30x30) cmSNI : 7395:2008BAHAN11.8700bhUbin keramik 30x30Rp3,659.09Rp43,433.4110.0000kgPCRp1,200.00Rp12,000.000.0450m3Pasir pasangRp123,000.00Rp5,535.001.5000kgSemen warnaRp57.50Rp86.25TENAGA0.700OHPekerjaRp36,000.00Rp25,200.000.350OHTukang batuRp42,500.00Rp14,875.000.035OHKepala TukangRp47,500.00Rp1,662.500.035OHMandorRp50,000.00Rp1,750.00JUMLAHRp104,542.16HARGA SATUANRp104,542.161 m2 Memasang lantai keramik uk.(30x30) cm anti slipSNI : 7395:2008BAHAN11.8700bhUbin keramik 30x30 anti slipRp3,545.45Rp42,084.5510.0000kgPCRp1,200.00Rp12,000.000.0450m3Pasir pasangRp123,000.00Rp5,535.001.5000kgSemen warnaRp57.50Rp86.25TENAGA0.700OHPekerjaRp36,000.00Rp25,200.000.350OHTukang batuRp42,500.00Rp14,875.000.035OHKepala TukangRp47,500.00Rp1,662.500.035OHMandorRp50,000.00Rp1,750.00JUMLAHRp103,193.30HARGA SATUANRp103,193.301 m2 Memasang lantai keramik uk.(20x20) cmSNI : 7395:2008BAHAN26.5000bhUbin keramik 20x20Rp1,702.00Rp45,103.0010.4000kgPCRp1,200.00Rp12,480.000.0450m3Pasir pasangRp123,000.00Rp5,535.001.6200kgSemen warnaRp57.50Rp93.15TENAGA0.700OHPekerjaRp36,000.00Rp25,200.000.350OHTukang batuRp42,500.00Rp14,875.000.035OHKepala TukangRp47,500.00Rp1,662.500.035OHMandorRp50,000.00Rp1,750.00JUMLAHRp106,698.65HARGA SATUANRp106,698.651 m1 Memasang plint keramik uk.(10x30) cmSNI : 7395:2008BAHAN3.5300bhPlint keramikRp1,219.70Rp4,305.531.1400kgPCRp1,200.00Rp1,368.000.0030m3Pasir pasangRp123,000.00Rp369.000.1000kgSemen warnaRp57.50Rp5.75TENAGA0.090OHPekerjaRp36,000.00Rp3,240.000.090OHTukang batuRp42,500.00Rp3,825.000.009OHKepala TukangRp47,500.00Rp427.500.005OHMandorRp50,000.00Rp250.00JUMLAHRp13,790.78HARGA SATUANRp13,790.781 m2 Memasang dinding keramik uk.(20x20) cmSNI : 7395:2008BAHAN26.5000bhKeramik dinding 20x20Rp1,702.00Rp45,103.009.3000kgPCRp1,200.00Rp11,160.000.0180m3Pasir pasangRp123,000.00Rp2,214.001.9400kgSemen warnaRp57.50Rp111.55TENAGA0.090OHPekerjaRp36,000.00Rp3,240.000.450OHTukang batuRp42,500.00Rp19,125.000.045OHKepala TukangRp47,500.00Rp2,137.500.045OHMandorRp50,000.00Rp2,250.00JUMLAHRp85,341.05HARGA SATUANRp85,341.051 m2 Memasang dinding keramik uk.(20x25) cmSNI : 7395:2008BAHAN21.2000bhKeramik dinding 20x25Rp2,127.50Rp45,103.009.3000kgPCRp1,200.00Rp11,160.000.0180m3Pasir pasangRp123,000.00Rp2,214.001.5520kgSemen warnaRp57.50Rp89.24TENAGA0.090OHPekerjaRp36,000.00Rp3,240.000.450OHTukang batuRp42,500.00Rp19,125.000.045OHKepala TukangRp47,500.00Rp2,137.500.045OHMandorRp50,000.00Rp2,250.00JUMLAHRp85,318.74HARGA SATUANRp85,318.741 m2 Memasang dinding batu tempel hitamSNI : 7395:2008BAHAN1.1000m2Batu tempel hitamRp60,000.00Rp66,000.0011.7500kgPCRp1,200.00Rp14,100.000.0350m3Pasir pasangRp123,000.00Rp4,305.00TENAGA0.700OHPekerjaRp36,000.00Rp25,200.000.350OHTukang batuRp42,500.00Rp14,875.000.035OHKepala TukangRp47,500.00Rp1,662.500.035OHMandorRp50,000.00Rp1,750.00JUMLAHRp127,892.50HARGA SATUANRp127,892.50K.PEKERJAAN BESI1 kg Pasang besi profilSNI : 7393:2008BAHAN1.1500bhBesi profilRp20,000.00Rp23,000.00TENAGA0.060OHPekerjaRp36,000.00Rp2,160.000.060OHTukang las konstruksiRp42,500.00Rp2,550.000.006OHKepala TukangRp47,500.00Rp285.000.003OHMandorRp50,000.00Rp150.00JUMLAHRp28,145.00HARGA SATUANRp28,145.001 kg Pasang rangka kuda-kuda baja IWFSNI : 7393:2008BAHAN1.1500bhBesi baja IWFRp20,000.00Rp23,000.00TENAGA0.060OHPekerjaRp36,000.00Rp2,160.000.060OHTukang las konstruksiRp42,500.00Rp2,550.000.006OHKepala TukangRp47,500.00Rp285.000.003OHMandorRp50,000.00Rp150.00JUMLAHRp28,145.00HARGA SATUANRp28,145.00100 kg Pekerjaan perakitanSNI : 7393:2008BAHAN1.0000ltrSolarRp4,500.00Rp4,500.000.1000ltrMinyak pelumasRp32,500.00Rp3,250.00TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.100OHTukang besi konstruksiRp42,500.00Rp4,250.000.001OHKepala TukangRp47,500.00Rp47.500.005OHMandorRp50,000.00Rp250.00ALAT0.800JamSewa alatRp10,000.00Rp8,000.00JUMLAHRp23,897.50HARGA SATUANRp23,897.501 m2 Pintu besi plat baja tebal 2 mm rangkap, rangkap baja sikuSNI : 7393:2008BAHAN15.0000kgBesi siku L 30.30.3Rp20,000.00Rp300,000.0032.8000kgBesi plat bajaRp20,000.00Rp656,000.000.0500kgKawat lasRp22,000.00Rp1,100.00TENAGA1.050OHPekerjaRp36,000.00Rp37,800.001.050OHTukang las biasaRp42,500.00Rp44,625.000.105OHKepala TukangRp47,500.00Rp4,987.500.0520OHMandorRp50,000.00Rp2,600.00JUMLAHRp1,047,112.50HARGA SATUANRp1,047,112.5010 cm Pengelasan dengan las listrikSNI : 7393:2008BAHAN0.4000kgKawat las listrikRp22,000.00Rp8,800.000.3000literSolarRp4,500.00Rp1,350.000.0400literMinyak pelumasRp32,500.00Rp1,300.00TENAGA0.040OHPekerjaRp36,000.00Rp1,440.000.020OHTukang besi konstruksiRp42,500.00Rp850.000.002OHKepala TukangRp47,500.00Rp95.000.002OHMandorRp50,000.00Rp100.00ALAT0.170JamSewa alatRp50,000.00Rp8,500.00JUMLAHRp22,435.00HARGA SATUANRp22,435.001 m2 Pasang pintu rolling door besiSNI : 7393:2008BAHAN1.0000m2Pintu gulung besiRp150,000.00Rp150,000.00TENAGA1.200OHPekerjaRp36,000.00Rp43,200.001.200OHTukang kayuRp45,000.00Rp54,000.000.120OHTukang las biasaRp42,500.00Rp5,100.000.006OHMandorRp50,000.00Rp300.00JUMLAHRp252,600.00HARGA SATUANRp252,600.001 m2 Pasang pintu lipat (folding gate)SNI : 7393:2008BAHAN1.0000m2Pintu lipatRp400,000.00Rp400,000.00TENAGA0.440OHPekerjaRp36,000.00Rp15,840.000.440OHTukangRp45,000.00Rp19,800.000.044OHKepala TukangRp42,500.00Rp1,870.000.022OHMandorRp50,000.00Rp1,100.00JUMLAHRp438,610.00HARGA SATUANRp438,610.001 m2 Pasang sunscreen alluminiumSNI : 7393:2008BAHAN1.0000m2Sunscreen aluminiumRp35,000.00Rp35,000.00TENAGA0.080OHPekerjaRp36,000.00Rp2,880.000.800OHTukangRp45,000.00Rp36,000.000.080OHKepala TukangRp42,500.00Rp3,400.000.00400OHMandorRp50,000.00Rp200.00JUMLAHRp77,480.00HARGA SATUANRp77,480.001 m2 Pasang rolling door aluminiumSNI : 7393:2008BAHAN1.0000m2Rolling door aluminiumRp250,000.00Rp250,000.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.001.000OHTukang khusus aluminiumRp45,000.00Rp45,000.000.100OHKepala TukangRp42,500.00Rp4,250.000.050OHMandorRp50,000.00Rp2,500.00JUMLAHRp337,750.00HARGA SATUANRp337,750.001 m' Pasang kusen pintu aluminiumSNI : 7393:2008BAHAN1.1000m'Profil aluminiumRp60,000.00Rp66,000.002.0000buahSkrup fixerRp1,000.00Rp2,000.000.0600tubeSealantRp8,000.00Rp480.00TENAGA0.043OHPekerjaRp36,000.00Rp1,548.000.043OHTukang khusus aluminiumRp45,000.00Rp1,935.000.0043OHKepala TukangRp42,500.00Rp182.750.0021OHMandorRp50,000.00Rp105.00JUMLAHRp72,250.75HARGA SATUANRp72,250.751 m2 Pasang pintu aluminium strip lebar 8 cmSNI : 7393:2008BAHAN4.4000m'Profil aluminiumRp60,000.00Rp264,000.0014.6000m'Alluminium stripRp2,000.00Rp29,200.00TENAGA0.085OHPekerjaRp36,000.00Rp3,060.000.085OHTukang khusus aluminiumRp45,000.00Rp3,825.000.0085OHKepala TukangRp42,500.00Rp361.250.0042OHMandorRp50,000.00Rp210.00JUMLAHRp300,656.25HARGA SATUANRp300,656.251 m2 Pasang pintu kaca rangka aluminiumSNI : 7393:2008BAHAN4.4000mProfil aluminiumRp60,000.00Rp264,000.004.5000mProfil kacaRp7,000.00Rp31,500.000.2700tubeSealantRp8,000.00Rp2,160.00TENAGA0.085OHPekerjaRp36,000.00Rp3,060.000.085OHTukang aluminium/ kacaRp45,000.00Rp3,825.000.009OHKepala TukangRp42,500.00Rp382.500.005OHMandorRp50,000.00Rp250.00JUMLAHRp305,177.50HARGA SATUANRp305,177.501 m2 Pasang terali besi strip (20 x 3) mmSNI : 7393:2008BAHAN6.1770kgBesi stripRp10,350.00Rp63,931.9527.0800cmPengelasanRp2,000.00Rp54,160.00TENAGA1.670OHPekerjaRp36,000.00Rp60,120.001.670OHTukang kayuRp45,000.00Rp75,150.000.167OHKepala TukangRp42,500.00Rp7,097.500.083OHMandorRp50,000.00Rp4,150.00JUMLAHRp264,609.45HARGA SATUANRp264,609.451 m2 Pasang kawat nyamukSNI : 7393:2008BAHAN1.1000m2Kawat nyamukRp15,000.00Rp16,500.0011.1100cmPengelasanRp2,000.00Rp22,220.001.7160kgBaja strip (0,2 x 2) cmRp10,350.00Rp17,760.60TENAGA0.100OHPekerjaRp36,000.00Rp3,600.000.100OHTukangRp45,000.00Rp4,500.000.010OHKepala TukangRp42,500.00Rp425.000.005OHMandorRp50,000.00Rp250.00JUMLAHRp65,255.60HARGA SATUANRp65,255.601 m2 Pasang jendela nako dan tralisSNI : 7393:2008BAHAN1.1000m2Jendela nako (rangka + kaca 5 mm)Rp17,500.00Rp19,250.0010.0000bhPaku skrupRp150.00Rp1,500.007.0000m'Besi stripRp10,350.00Rp72,450.00TENAGA0.200OHPekerjaRp36,000.00Rp7,200.000.200OHTukangRp45,000.00Rp9,000.000.020OHKepala TukangRp42,500.00Rp850.000.010OHMandorRp50,000.00Rp500.00JUMLAHRp110,750.00HARGA SATUANRp110,750.001 m' Pasang talang datar/ jurai seng BJLS 28 lebar 90 cmSNI : 7393:2008BAHAN1.0500m'Seng platRp43,000.00Rp45,150.000.0150kgPaku 1 cm - 2,5 cmRp20,000.00Rp300.000.0190m3Papan kayu Klas II/ IIIRp2,500,000.00Rp47,500.00TENAGA0.200OHPekerjaRp36,000.00Rp7,200.000.400OHTukangRp45,000.00Rp18,000.000.025OHKepala TukangRp42,500.00Rp1,062.500.010OHMandorRp50,000.00Rp500.00JUMLAHRp119,712.50HARGA SATUANRp119,712.501 m' Pasang talang 1/2 lingkaran D-15 cm, seng plat BJLS 30 lebar 45 cmSNI : 7393:2008BAHAN1.0500m'Seng platRp16,250.00Rp17,062.500.0100kgPaku 1 cm - 2,5 cmRp20,000.00Rp200.000.5000kgBesi stripRp10,350.00Rp5,175.00TENAGA0.150OHPekerjaRp36,000.00Rp5,400.000.300OHTukangRp45,000.00Rp13,500.000.030OHKepala TukangRp42,500.00Rp1,275.000.008OHMandorRp50,000.00Rp400.00JUMLAHRp43,012.50JASA 10%Rp4,301.25HARGA SATUANRp47,313.75L.PEKERJAAN SANITAIR1 buah Pasang kloset duduk/monoblokSNI : 2002BAHAN1.0000bhkloset duduk/monoblokRp1,050,000.00Rp1,050,000.006% Harga klosetPerlengkapanRp63,000.00TENAGA3.300OHPekerjaRp36,000.00Rp118,800.001.100OHTukang batuRp42,500.00Rp46,750.000.001OHKepala TukangRp47,500.00Rp47.500.1600OHMandorRp50,000.00Rp8,000.00JUMLAHRp1,286,597.50HARGA SATUANRp1,286,597.501 buah Pasang kloset jongkokSNI : 2002BAHAN1.0000bhkloset jongkokRp135,000.00Rp135,000.006.0000kgPCRp1,200.00Rp7,200.000.0100m3Pasir pasangRp123,000.00Rp1,230.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.001.500OHTukang batuRp42,500.00Rp63,750.001.500OHKepala TukangRp47,500.00Rp71,250.000.1600OHMandorRp50,000.00Rp8,000.00JUMLAHRp322,430.00HARGA SATUANRp322,430.001 buah urinoirSNI : 2002BAHAN1.0000bhUrinoirRp260,000.00Rp260,000.0030% harga urinoirPerlengkapanRp78,000.006.0000kgPCRp1,200.00Rp7,200.000.0100m3Pasir pasangRp123,000.00Rp1,230.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.001.000OHTukang batuRp42,500.00Rp42,500.000.100OHKepala TukangRp47,500.00Rp4,750.000.1000OHMandorRp50,000.00Rp5,000.00JUMLAHRp434,680.00HARGA SATUANRp434,680.001 buah washtafelSNI : 2002BAHAN1.0000bhWashtafelRp240,000.00Rp240,000.0012% hrg WashtafelPerlengkapanRp28,800.006.0000kgPCRp1,200.00Rp7,200.000.0100m3Pasir pasangRp123,000.00Rp1,230.00TENAGA1.200OHPekerjaRp36,000.00Rp43,200.000.750OHTukang batuRp42,500.00Rp31,875.000.070OHKepala TukangRp47,500.00Rp3,325.000.1100OHMandorRp50,000.00Rp5,500.00JUMLAHRp361,130.00HARGA SATUANRp361,130.001 buah bak mandi batu bata vol. 0,3 m3SNI : 2002BAHAN252.000bhBatu bataRp540.00Rp136,080.00120.000kgPCRp1,200.00Rp144,000.000.3000m3Pasir pasangRp123,000.00Rp36,900.00108.900bhKeramik 20x20Rp1,702.00Rp185,347.806.0000kgSemen natRp57.50Rp345.00TENAGA6.000OHPekerjaRp36,000.00Rp216,000.003.000OHTukang batuRp42,500.00Rp127,500.000.300OHKepala TukangRp47,500.00Rp14,250.000.3000OHMandorRp50,000.00Rp15,000.00JUMLAHRp875,422.80HARGA SATUANRp875,422.801 buah bak kontrol batu bata uk. (60x60) cm, tinggi 65 cmSNI : 2002BAHAN234.000bhBatu bataRp540.00Rp126,360.00114.000kgPCRp1,200.00Rp136,800.000.1840m3Pasir pasangRp123,000.00Rp22,632.000.0330m3Batu koralRp163,300.00Rp5,388.904.8500kgBesi betonRp9,000.00Rp43,650.000.1200m3Pasir betonRp123,000.00Rp14,760.00TENAGA2.160OHPekerjaRp36,000.00Rp77,760.000.720OHTukang batuRp42,500.00Rp30,600.000.072OHKepala TukangRp47,500.00Rp3,420.000.108OHMandorRp50,000.00Rp5,400.000.1000OHTukang galiRp36,000.00Rp3,600.00JUMLAHRp470,370.90HARGA SATUANRp470,370.901 m1 Pasang pipa galvanis dia 1/2"SNI : 2002BAHAN1.2000m'Pipa galvanisRp14,566.67Rp17,480.0035% Harga pipaPerlengkapanRp5,098.33TENAGA0.054OHPekerjaRp36,000.00Rp1,944.000.090OHTukang batuRp42,500.00Rp3,825.000.009OHKepala TukangRp47,500.00Rp427.500.0270OHMandorRp50,000.00Rp1,350.00JUMLAHRp30,124.83HARGA SATUANRp30,124.831 m1 Pasang pipa PVC tipe AW dia 1/2"SNI : 2002BAHAN1.2000m'Pipa PVCRp4,062.50Rp4,875.0035% Harga pipaPerlengkapanRp1,421.88TENAGA0.036OHPekerjaRp36,000.00Rp1,296.000.060OHTukang batuRp42,500.00Rp2,550.000.006OHKepala TukangRp47,500.00Rp285.000.0018OHMandorRp50,000.00Rp90.00JUMLAHRp10,517.88HARGA SATUANRp10,517.881 m1 Pasang pipa PVC tipe AW dia 3/4"SNI : 2002BAHAN1.2000m'Pipa PVCRp5,375.00Rp6,450.0035% Harga pipaPerlengkapanRp1,881.25TENAGA0.036OHPekerjaRp36,000.00Rp1,296.000.060OHTukang batuRp42,500.00Rp2,550.000.006OHKepala TukangRp47,500.00Rp285.000.0018OHMandorRp50,000.00Rp90.00JUMLAHRp12,552.25HARGA SATUANRp12,552.251 m1 Pasang pipa PVC tipe AW dia 1"SNI : 2002BAHAN1.2000m'Pipa PVCRp7,250.00Rp8,700.0035% Harga pipaPerlengkapanRp2,537.50TENAGA0.036OHPekerjaRp36,000.00Rp1,296.000.060OHTukang batuRp42,500.00Rp2,550.000.006OHKepala TukangRp47,500.00Rp285.000.0018OHMandorRp50,000.00Rp90.00JUMLAHRp15,458.50HARGA SATUANRp15,458.501 m1 Pasang pipa PVC tipe AW dia 1,25"SNI : 2002BAHAN1.2000m'Pipa PVCRp10,125.00Rp12,150.0035% Harga pipaPerlengkapanRp3,543.75TENAGA0.036OHPekerjaRp36,000.00Rp1,296.000.060OHTukang batuRp42,500.00Rp2,550.000.006OHKepala TukangRp47,500.00Rp285.000.0018OHMandorRp50,000.00Rp90.00JUMLAHRp19,914.75HARGA SATUANRp19,914.751 m1 Pasang pipa PVC tipe AW dia 3"SNI : 2002BAHAN1.2000m'Pipa PVCRp27,500.00Rp33,000.0035% Harga pipaPerlengkapanRp9,625.00TENAGA0.036OHPekerjaRp36,000.00Rp1,296.000.060OHTukang batuRp42,500.00Rp2,550.000.006OHKepala TukangRp47,500.00Rp285.000.0018OHMandorRp50,000.00Rp90.00JUMLAHRp46,846.00HARGA SATUANRp46,846.001 m1 Pasang pipa PVC tipe AW dia 4"SNI : 2002BAHAN1.2000m'Pipa PVCRp44,625.00Rp53,550.0035% Harga pipaPerlengkapanRp15,618.75TENAGA0.036OHPekerjaRp36,000.00Rp1,296.000.060OHTukang batuRp42,500.00Rp2,550.000.006OHKepala TukangRp47,500.00Rp285.000.0018OHMandorRp50,000.00Rp90.00JUMLAHRp73,389.75HARGA SATUANRp73,389.751 m1 Pasang kran dia 1/2" dan 3/4"SNI : 2002BAHAN1.0000m'KranRp25,000.00Rp25,000.000.0250bhSeal tapeRp2,000.00Rp50.00TENAGA0.010OHPekerjaRp36,000.00Rp360.000.100OHTukang batuRp42,500.00Rp4,250.000.010OHKepala TukangRp47,500.00Rp475.000.0050OHMandorRp50,000.00Rp250.00JUMLAHRp30,385.00HARGA SATUANRp30,385.001 m1 Pasang floordrainSNI : 2002BAHAN1.0000m'FloordrainRp15,000.00Rp15,000.00TENAGA0.010OHPekerjaRp36,000.00Rp360.000.100OHTukang batuRp42,500.00Rp4,250.000.010OHKepala TukangRp47,500.00Rp475.000.0050OHMandorRp50,000.00Rp250.00JUMLAHRp20,335.00HARGA SATUANRp20,335.00M.PEKERJAAN PENGGANTUNG & PENGUNCI1 buah Pasang kunci tanam biasa (besar)SNI : 2002BAHAN1.0000bhKunci tanam besarRp240,000.00Rp240,000.00TENAGA0.010OHPekerjaRp36,000.00Rp360.000.500OHTukang kayuRp45,000.00Rp22,500.000.010OHKepala TukangRp50,000.00Rp500.000.005OHMandorRp50,000.00Rp250.00JUMLAHRp263,610.00HARGA SATUANRp263,610.001 buah Pasang kunci tanam biasa (kecil)SNI : 2002BAHAN1.0000bhKunci tanam kecilRp115,000.00Rp115,000.00TENAGA0.010OHPekerjaRp36,000.00Rp360.000.500OHTukang kayuRp45,000.00Rp22,500.000.010OHKepala TukangRp50,000.00Rp500.000.005OHMandorRp50,000.00Rp250.00JUMLAHRp138,610.00HARGA SATUANRp138,610.001 buah Pasang kunci silinderSNI : 2002BAHAN1.0000bhKunci silinderRp65,000.00Rp65,000.00TENAGA0.005OHPekerjaRp36,000.00Rp180.000.500OHTukang kayuRp45,000.00Rp22,500.000.005OHKepala TukangRp50,000.00Rp250.000.0025OHMandorRp50,000.00Rp125.00JUMLAHRp88,055.00HARGA SATUANRp88,055.001 buah Pasang engsel pintuSNI : 2002BAHAN1.0000bhEngsel pintuRp17,500.00Rp17,500.00TENAGA0.015OHPekerjaRp36,000.00Rp540.000.150OHTukang kayuRp45,000.00Rp6,750.000.015OHKepala TukangRp50,000.00Rp750.000.00075OHMandorRp50,000.00Rp37.50JUMLAHRp25,577.50HARGA SATUANRp25,577.501 buah Pasang engsel jendelaSNI : 2002BAHAN1.0000bhEngsel jendelaRp15,000.00Rp15,000.00TENAGA0.010OHPekerjaRp36,000.00Rp360.000.100OHTukang kayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.00050OHMandorRp50,000.00Rp25.00JUMLAHRp20,385.00HARGA SATUANRp20,385.001 buah Pasang engsel jendela kupu-kupuSNI : 2002BAHAN1.0000bhEngsel jendela kupu-kupuRp7,500.00Rp7,500.00TENAGA0.010OHPekerjaRp36,000.00Rp360.000.100OHTukang kayuRp45,000.00Rp4,500.000.010OHKepala TukangRp50,000.00Rp500.000.00050OHMandorRp50,000.00Rp25.00JUMLAHRp12,885.00HARGA SATUANRp12,885.001 buah Pasang grendel pintuSNI : 2002BAHAN1.0000bhGrendel pintuRp12,500.00Rp12,500.00TENAGA0.020OHPekerjaRp36,000.00Rp720.000.200OHTukang kayuRp45,000.00Rp9,000.000.020OHKepala TukangRp50,000.00Rp1,000.000.00100OHMandorRp50,000.00Rp50.00JUMLAHRp23,270.00HARGA SATUANRp23,270.001 buah Pasang grendel jendelaSNI : 2002BAHAN1.0000bhGrendel jendelaRp10,000.00Rp10,000.00TENAGA0.015OHPekerjaRp36,000.00Rp540.000.150OHTukang kayuRp45,000.00Rp6,750.000.015OHKepala TukangRp50,000.00Rp750.000.00050OHMandorRp50,000.00Rp25.00JUMLAHRp18,065.00HARGA SATUANRp18,065.001 buah Pasang hak anginSNI : 2002BAHAN1.0000bhHak anginRp13,000.00Rp13,000.00TENAGA0.015OHPekerjaRp36,000.00Rp540.000.150OHTukang kayuRp45,000.00Rp6,750.000.015OHKepala TukangRp50,000.00Rp750.000.00075OHMandorRp50,000.00Rp37.50JUMLAHRp21,077.50HARGA SATUANRp21,077.501 buah Pasang pegangan pintu/ door holderSNI : 2002BAHAN1.0000bhPegangan pintuRp95,000.00Rp95,000.00TENAGA0.050OHPekerjaRp36,000.00Rp1,800.000.500OHTukang kayuRp45,000.00Rp22,500.000.050OHKepala TukangRp50,000.00Rp2,500.000.00250OHMandorRp50,000.00Rp125.00JUMLAHRp121,925.00HARGA SATUANRp121,925.001 buah Pasang pegangan jendela/handelSNI : 2002BAHAN1.0000bhPegangan jendela/ handelRp12,500.00Rp12,500.00TENAGA0.015OHPekerjaRp36,000.00Rp540.000.150OHTukang kayuRp45,000.00Rp6,750.000.015OHKepala TukangRp50,000.00Rp750.000.00015OHMandorRp50,000.00Rp7.50JUMLAHRp20,547.50HARGA SATUANRp20,547.501 buah Pasang door closerSNI : 2002BAHAN1.0000bhDoor closerRp250,000.00Rp250,000.00TENAGA0.050OHPekerjaRp36,000.00Rp1,800.000.500OHTukang kayuRp45,000.00Rp22,500.000.050OHKepala TukangRp50,000.00Rp2,500.000.00250OHMandorRp50,000.00Rp125.00JUMLAHRp276,925.00HARGA SATUANRp276,925.001 m2 Pasang kaca bening 3 mmSNI : 2002BAHAN1.1000bhKaca bening 3 mmRp45,500.00Rp50,050.00TENAGA0.015OHPekerjaRp36,000.00Rp540.000.150OHTukang kayuRp45,000.00Rp6,750.000.015OHKepala TukangRp50,000.00Rp750.000.00075OHMandorRp50,000.00Rp37.50JUMLAHRp58,127.50HARGA SATUANRp58,127.501 m2 Pasang kaca bening 5 mmSNI : 2002BAHAN1.1000bhKaca bening 5 mmRp60,000.00Rp66,000.00TENAGA0.015OHPekerjaRp36,000.00Rp540.000.150OHTukang kayuRp45,000.00Rp6,750.000.015OHKepala TukangRp50,000.00Rp750.000.00075OHMandorRp50,000.00Rp37.50JUMLAHRp74,077.50HARGA SATUANRp74,077.501 m2 Pasang kaca reyben 5 mmSNI : 2002BAHAN1.1000bhKaca reyben 5 mmRp66,000.00Rp72,600.00TENAGA0.015OHPekerjaRp36,000.00Rp540.000.150OHTukang kayuRp45,000.00Rp6,750.000.015OHKepala TukangRp50,000.00Rp750.000.00075OHMandorRp50,000.00Rp37.50JUMLAHRp80,677.50HARGA SATUANRp80,677.50N.PEKERJAAN CAT1 m2 Mengecat bidang kayu lamaSNI : 2002BAHAN0.1500kgPlamirRp17,500.00Rp2,625.000.1700kgCat dasarRp58,650.00Rp9,970.500.1700kgCat penutupRp58,650.00Rp9,970.50TENAGA0.070OHPekerjaRp36,000.00Rp2,520.000.075OHTukang catRp42,500.00Rp3,187.500.008OHKepala TukangRp47,500.00Rp356.250.0025OHMandorRp50,000.00Rp125.00JUMLAHRp28,754.75HARGA SATUANRp28,754.751 m2 Mengecat bidang kayu baruSNI : 2002BAHAN0.2000kgCat meniRp18,000.00Rp3,600.000.1500kgPlamirRp17,500.00Rp2,625.000.1700kgCat dasarRp58,650.00Rp9,970.500.2600kgCat penutupRp58,650.00Rp15,249.00TENAGA0.070OHPekerjaRp36,000.00Rp2,520.000.009OHTukang catRp42,500.00Rp382.500.006OHKepala TukangRp47,500.00Rp285.000.0025OHMandorRp50,000.00Rp125.00JUMLAHRp34,757.00HARGA SATUANRp34,757.001 m2 Mengecat bidang tembok lamaSNI : 2002BAHAN0.1200kgCat dasarRp16,000.00Rp1,920.000.1800kgCat penutupRp16,000.00Rp2,880.00TENAGA0.028OHPekerjaRp36,000.00Rp1,008.000.042OHTukang catRp42,500.00Rp1,785.000.004OHKepala TukangRp47,500.00Rp199.500.0025OHMandorRp50,000.00Rp125.00JUMLAHRp7,917.50HARGA SATUANRp7,917.501 m2 Mengecat bidang tembok baruSNI : 2002BAHAN0.1000kgPlamirRp12,500.00Rp1,250.000.1000kgCat dasarRp16,000.00Rp1,600.000.2600kgCat penutupRp16,000.00Rp4,160.00TENAGA0.020OHPekerjaRp36,000.00Rp720.000.063OHTukang catRp42,500.00Rp2,677.500.006OHKepala TukangRp47,500.00Rp299.250.0025OHMandorRp50,000.00Rp125.00JUMLAHRp10,831.75HARGA SATUANRp10,831.751 m2 Mengecat plafon eternit/ gypsumSNI : 2002BAHAN0.1200kgCat dasarRp16,000.00Rp1,920.000.1800kgCat penutupRp16,000.00Rp2,880.00TENAGA0.028OHPekerjaRp36,000.00Rp1,008.000.042OHTukang catRp42,500.00Rp1,785.000.004OHKepala TukangRp47,500.00Rp199.500.0025OHMandorRp50,000.00Rp125.00JUMLAHRp7,917.50HARGA SATUANRp7,917.501 m2 Mengecat gentengSNI : 2002BAHAN0.2600kgCat gentengRp21,250.00Rp5,525.00TENAGA0.020OHPekerjaRp16,000.00Rp320.000.063OHTukang catRp36,000.00Rp2,268.000.006OHKepala TukangRp42,500.00Rp267.750.0025OHMandorRp47,500.00Rp118.75JUMLAHRp8,499.50HARGA SATUANRp8,499.50O.PEKERJAAN LINGKUNGAN1 m1 Memasang got U - 20 cmSNI : .BAHAN0.0060m3Pas. Bata merah 1PC : 4 PsRp73,164.00Rp438.981.0000m3Got -U 20Rp35,000.00Rp35,000.00TENAGA0.700OHPekerjaRp36,000.00Rp25,200.00JUMLAHRp60,638.98HARGA SATUANRp60,638.981 m2 Memasang konblok, tebal 6 cmSNI :BAHAN1.0500m2ConblockRp38,000.00Rp39,900.000.1200m3Pasir PasangRp123,000.00Rp14,760.00TENAGA0.240OHPekerjaRp36,000.00Rp8,640.000.080OHTukang batuRp42,500.00Rp3,400.000.008OHKepala TukangRp47,500.00Rp380.000.012OHMandorRp50,000.00Rp600.00JUMLAHRp67,680.00HARGA SATUANRp67,680.001 m2 Memasang konblok, tebal 8 cmSNI :BAHAN1.0500m2ConblockRp61,000.00Rp64,050.000.1200m3Pasir PasangRp123,000.00Rp14,760.00TENAGA0.240OHPekerjaRp36,000.00Rp8,640.000.080OHTukang batuRp42,500.00Rp3,400.000.008OHKepala TukangRp47,500.00Rp380.000.012OHMandorRp50,000.00Rp600.00JUMLAHRp91,830.00HARGA SATUANRp91,830.00P.PEKERJAAN ME1 titik Pasang Stop kontakSNI : ..BAHAN15.000m'Kabel NYA 1 x 2,5 mmRp2,000.00Rp30,000.001.200btgPipa pralon 5/8"Rp10,000.00Rp12,000.001.000bhStop kontak + indoosRp17,500.00Rp17,500.00TENAGA0.050OHPekerjaRp36,000.00Rp1,800.000.500OHTukang listrikRp40,000.00Rp20,000.000.050OHKepala TukangRp50,000.00Rp2,500.00JUMLAHRp83,800.00HARGA SATUANRp83,800.001 titik Pasang Saklar tunggalSNI : ..BAHAN12.000m'Kabel NYA 1 x 2,5 mmRp2,000.00Rp24,000.002.000btgPipa pralon 5/8"Rp10,000.00Rp20,000.001.000bhSaklar tunggal + indoosRp15,000.00Rp15,000.00TENAGA0.050OHTukang listrikRp40,000.00Rp2,000.00JUMLAHRp61,000.00HARGA SATUANRp61,000.001 titik Pasang Saklar gandaSNI : ..BAHAN18.000m'Kabel NYA 1 x 2,5 mmRp2,000.00Rp36,000.002.000btgPipa pralon 5/8"Rp10,000.00Rp20,000.001.000bhSaklar gandaRp17,500.00Rp17,500.00TENAGA0.050OHTukang listrikRp40,000.00Rp2,000.00JUMLAHRp75,500.00HARGA SATUANRp75,500.001 buah Pasang Lampu TL 20 wattSNI : ..BAHAN1.000bhLampu TL 20 wattRp45,000.00Rp45,000.00TENAGA0.010OHPekerjaRp36,000.00Rp360.000.020OHTukang listrikRp40,000.00Rp800.000.005OHKepala TukangRp50,000.00Rp250.00JUMLAHRp46,410.00HARGA SATUANRp46,410.001 buah Pasang Lampu SL 18 wattSNI : ..BAHAN1.000bhLampu SL 18 wattRp30,000.00Rp30,000.001.000bhFiting keramikRp12,000.00Rp12,000.00TENAGA0.010OHPekerjaRp36,000.00Rp360.000.020OHTukang listrikRp40,000.00Rp800.000.005OHKepala TukangRp50,000.00Rp250.00JUMLAHRp43,410.00HARGA SATUANRp43,410.001 buah Pasang Lampu Pijar 25 wattSNI : ..BAHAN1.000bhLampu pijar 25 wattRp10,000.00Rp10,000.001.000bhFiting keramikRp12,000.00Rp12,000.00TENAGA0.010OHPekerjaRp36,000.00Rp360.000.020OHTukang listrikRp40,000.00Rp800.000.005OHKepala TukangRp50,000.00Rp250.00JUMLAHRp23,410.00HARGA SATUANRp23,410.001 buah Pasang Panel box + MCBSNI : ..BAHAN1.000bhPanel Box + MCBRp125,000.00Rp125,000.0012.000m'Kabel NYA 1 x 2,5 mmRp2,000.00Rp24,000.001.000bhIsolasiRp12,000.00Rp12,000.00TENAGA1.000OHPekerjaRp36,000.00Rp36,000.001.000OHTukang listrikRp40,000.00Rp40,000.000.005OHKepala TukangRp50,000.00Rp250.00JUMLAHRp237,250.00HARGA SATUANRp237,250.00Q.PEKERJAAN BONGKARAN1 m3 Membongkar beton bertulangSNI : 2002TENAGA6.667OHPekerjaRp36,000.00Rp240,012.000.333OHMandorRp50,000.00Rp16,650.00JUMLAHRp256,662.00HARGA SATUANRp256,662.001 m3 Membongkar dinding tembok bata merahSNI Rev. : 2005TENAGA2.000OHPekerjaRp36,000.00Rp72,000.000.090OHMandorRp50,000.00Rp4,500.00JUMLAHRp76,500.00HARGA SATUANRp76,500.001 m3 Membongkar plesteran dindingSNI Rev. : 2005TENAGA0.050OHPekerjaRp36,000.00Rp1,800.000.025OHMandorRp50,000.00Rp1,250.00JUMLAHRp3,050.00HARGA SATUANRp3,050.001 m3 Membongkar genteng dipakai lagiSNI Rev. : 2005TENAGA0.040OHPekerjaRp36,000.00Rp1,440.000.020OHMandorRp50,000.00Rp1,000.00JUMLAHRp2,440.00HARGA SATUANRp2,440.001 m3 Membongkar reng/kaso-kaso dipakai lagiSNI Rev. : 2005TENAGA0.050OhPekerjaRp36,000.00Rp1,800.000.200OhTukang kayuRp45,000.00Rp9,000.000.005OhKepala TukangRp50,000.00Rp250.000.010OhMandorRp50,000.00Rp500.00JUMLAHRp11,550.00HARGA SATUANRp11,550.001 m3 Membongkar kuda-kuda/gording dipakai lagiSNI Rev. : 2005TENAGA6.000OhPekerjaRp36,000.00Rp216,000.004.000OhTukang kayuRp45,000.00Rp180,000.000.600OhKepala TukangRp50,000.00Rp30,000.000.200OhMandorRp50,000.00Rp10,000.00JUMLAHRp436,000.00HARGA SATUANRp436,000.001 m2 Membongkar rangka plafon dipakai lagiSNI Rev. : 2005TENAGA0.100OhPekerjaRp36,000.00Rp3,600.000.250OhTukang kayuRp45,000.00Rp11,250.000.015OhKepala TukangRp50,000.00Rp750.000.005OhMandorRp50,000.00Rp250.00JUMLAHRp15,850.00HARGA SATUANRp15,850.00

BesiDATA KG BAJA TULANGAN TIAP 1M3 BETON BERTULANGNO.ELEMENTAMPANGJUMLAH TULANGANJUMLAHm2POKOKBAGISUSUTTUMPUANLAPANGANGESER1FP100x10012012mm120.00kg681012162K130x400.121216mm8-15cm188.33kg0.220.390.620.891.583K230x300.09816mm8-15cm175.11kg0.220.390.620.891.584KP12x120.0144412mm8-15cm333.89kg4.8080.220.390.620.891.584.8085K315x200.03412mm8-15cm179.33kg0.220.390.620.891.586K415x250.0375412mm8-15cm150.40kg0.220.390.620.891.587K515x150.0225412mm8-15cm227.56kg0.220.390.620.891.588K615x250.0375612mm8-15cm197.87kg0.220.390.620.891.589K712x200.024412mm8-15cm217.67kg0.220.390.620.891.587B15x400.02810mmmmmm8-15cm365.00kg0.220.390.620.891.588Plat100x1000.128mm109.20kg0.220.390.620.891.589SL12x200.024412mmmmmm6-20cm177.6666666667kg0.220.390.620.891.5810SL212x150.018410mmmmmm8-20cm196.2777777778kg0.220.390.620.891.5812Blat10x150.015410mmmmmm6-20cm202kg3.030.220.390.620.891.5813RG12x200.024412mmmmmm6-20cm177.6666666667kg4.2640.220.390.620.891.5814BGnd15x250.0375612mmmmmm6-15cm173.689kg3.12640.220.390.620.891.5815B220x350.07816mmmmmm8-15cm221.429kg0.220.390.620.891.5816B325x450.11251016mmmmmm8-15cm172.800kg0.220.390.620.891.5817B425x550.13751216mmmmmm8-15cm168.145kg0.220.390.620.891.5818RGG12x150.018412mmmmmm6-20cm230.778kg4.1540.220.390.620.891.5819SL320x300.06616mmmmmm8-15cm201.333kg0.220.390.620.891.58

Besi (2)DATA KG BAJA TULANGAN TIAP 1M3 BETON BERTULANGNO.ELEMENTAMPANGJUMLAH TULANGANJUMLAHm2POKOKBAGISUSUTTUMPUANLAPANGANGESER68101216191FP1120x1501.82012mm100.076kg0.220.390.620.891.582.232FP2120x1201.442012mm125.094kg0.220.390.620.891.582.232KS1 (30/50)30x500.151019mm8-15cm176.400kg0.220.390.620.891.582.233KS2 (30/30)30x300.09819mm8-15cm232.889kg0.220.390.620.891.582.234KS3 (30/30)30x300.09619mm8-15cm183.333kg0.220.390.620.891.582.235KP12x120.0144412mm8-20cm312.222kg4.4960.220.390.620.891.582.234.4966Plat100x1001288mm91.000kg0.220.390.620.891.582.237SL1 (25/35)25x350.0875416mmmmmm8-12.5cm115.017kg0.220.390.620.891.582.238SL2 (25/35)25x350.0875416mmmmmm8-12.5cm115.017kg0.220.390.620.891.582.239SL3 (25/35)25x350.0875416mmmmmm8-12.5cm115.017kg0.220.390.620.891.582.2310SL4 (15/25)15x250.0375612mmmmmm8-12.5cm208.960kg0.220.390.620.891.582.2311SL5 (15/25)15x250.0375612mmmmmm8-12.5cm208.960kg0.220.390.620.891.582.2312SL6 (25/35)25x350.0875416mmmmmm8-15cm107.886kg0.220.390.620.891.582.2313SL7 (15/25)15x250.0375612mmmmmm8-15cm197.867kg0.220.390.620.891.582.2314SL8 (15/25)15x250.0375412mmmmmm8-15cm150.400kg0.220.390.620.891.582.2315Blat1 (15/15)15x150.0225412mmmmmm8-15cm258.186kg3.87279233330.220.390.620.891.582.2316Blat2 (15/15)15x150.0225412mmmmmm8-15cm227.556kg3.41333333330.220.390.620.891.582.2317BS1 (25/60)25x600.15819mm210mmmmmm8-12.5cm162.560kg0.220.390.620.891.582.2318BS2 (25/50)25x500.125819mmmmmm8-12.5cm180.160kg0.220.390.620.891.582.2319BS3 (25/60)25x600.15819mm210mmmm319mm8-12.5cm184.860kg0.220.390.620.891.582.2320BS4 (25/50)25x500.125819mm210mmmmmm8-12.5cm190.080kg0.220.390.620.891.582.2321BS5 (25/30)25x300.075419mmmmmm8-15cm157.067kg0.220.390.620.891.582.2322BS6 (25/50)25x500.125819mmmmmm8-12.5cm210.640kg0.220.390.620.891.582.2323BS7 (25/50)25x500.125819mmmmmm8-12.5cm210.640kg0.220.390.620.891.582.2324BS8 (25/60)25x600.15819mm210mmmm319mm8-12.5cm184.860kg0.220.390.620.891.582.2325BS9 (25/50)25x500.125819mm210mmmmmm8-12.5cm190.080kg0.220.390.620.891.582.2326BS10 (20/40)20x400.08516mm210mmmmmm8-12.5cm199.800kg0.220.390.620.891.582.2327BA1 (20/35)20x350.07616mmmmmm8-12.5cm184.457kg0.220.390.620.891.582.2328BA2 (15/25)15x250.0375512mmmmmm8-15cm174.133kg0.220.390.620.891.582.2329BT (20/50)20x500.1819mm210mmmmmm8-12.5cm234.480kg0.220.390.620.891.582.2330BR1 (20/35)20x350.07616mmmmmm8-15cm176.286kg0.220.390.620.891.582.2331BR2 (20/35)20x350.07616mmmmmm8-15cm176.286kg0.220.390.620.891.582.2332BR3 (20/3520x350.07616mmmmmm8-15cm176.286kg0.220.390.620.891.582.2333BR4 (20/35)20x350.07616mmmmmm9-16cm173.732kg0.220.390.620.891.582.2334BR5 (15/25)15x250.0375612mmmmmm10-17cm191.341kg0.220.390.620.891.582.23KKS-130X50KS-230X30KS-330X30KP-115X15KP-215X15BS-1BS-2BS-3BS-4BS-5BS-6BS-7BS-8BS-9BS-10Balok tanggaSL-125X35SL-225X35SL-325X35SL-415X25SL-515X25SL-625X35SL-715X25SL-815X25