PERHITUNGAN BESI BETONNO JENIS BESI UKURAN KOEFISIEN PANJANG 1 PANJANG 2 PANJANG 3 HARGA 1

1

BAJA BULAT

6 8 10 12 13 14 15 16 10 13 16 19 22 25 29

0.22 0.393 0.62 0.887 1.034 1.209 1.37 1.578 0.56 0.995 1.56 2.25 3.04 3.98 5.04

12 12 12 12 12

12 12 12

Rp Rp Rp Rp Rp

22,500 35,500 52,000 77,500 79,000

2

BATANG ULIR

0 0 0

12 12 12

Rp Rp Rp

-

HARGA RATA-RATA PER KG

ETONHARGA 2 HARGA 3 HARGA PER KG

Rp Rp Rp

40,100 62,000 89,250

Rp Rp Rp Rp Rp

8,523 8,015 7,661 7,833 6,367

Rp Rp Rp

107,350 162,650 229,000

Rp Rp Rp

8,991 8,689 8,481

Rp

8,070

DAFTAR HARGA SATUAN BAHAN DAN UPAH BULAN JANUARI TAHUN 2011A. Harga Satuan BahanNO1

NAMA BARANG2

SATUAN3

HARGA 1

HARGA 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

FINISHING Amplas Cat besi Cat dasar Cat emco Cat menie besi Cat menie kayu Cat tembok Decolith Cat tembok Dulux Cat tembok Emco Cat tembok Paragon Cat tembok Toyopaint Cat tembok Vinilex Cat tembok Vinippaint Dempul Kuas Mild Minyak cat Plamir kayu Plamir tembok Politur ultra Politur vernis Thiner A Bonanza Thiner B Spesial PENUTUP ATAP Alang-alang panjang 2,4 meter Alluminium foil Asbes Bubungan Asbes Gelombang 1,80 m x 0,80 m x 5 mm Asbes Gelombang 2,4 m x 1,05 m x 4 mm Asbes Rata 2 m x 1 m x 4 mm Atap metal Toratora 1 x 4 Extra Atap metal Toratora 1 x 4 Premium Atap metal Toratora 2 x 4 Extra Atap metal Toratora 2 x 4 Premium Atap metal Toratora 3 x 4 Extra Atap metal Toratora 3 x 4 Premium Atap metal Toratora 4 x 4 Extra Atap metal Toratora 4 x 4 Premium Bentala paras Bentala tanah liat Besi profil WF Besi strip Bubungan Biasa Bubungan Karang Pilang (glazur) isi 3,5/m Bubungan Karang Pilang isi 3,5/m Bubungan Ngalayur isi 3,5/m Bubungan Plentong Bubungan Utama isi 3,5/m Genteng Kanmuri (glazur) isi 14/m2 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 Genteng Morando Abadi isi 18/m2 Genteng Morando Jatiwangi isi 18/m2 Genteng Morando Ngalayur isi 20/m2 Genteng Plentong Genteng plentong dicat Genteng Plentong Jatiwangi isi 24/m2 Ijuk Ikut celedu paras Ikut celedu tanah liat Murda paras Murda tanah liat Seng BJLS 0,20 gelombang Seng BJLS 0,25 gelombang

lbr kg kg kg kg kg kg kg kg kg kg kg kg ltr bh zak ltr kg kg ltr ltr ltr ltr

24 25 26 27 28 29 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62

lbr m2 lbr lbr lbr lbr m2 m2 m2 m2 m2 m2 m2 m2 bh bh kg kg bj bj bj bj bj bj bj bj bj bj bj bj bj bj bj bj kg bh bh bh bh lbr lbrHal. 3

Harga Barang dan Upah

NO1

NAMA BARANG2

SATUAN3

HARGA 1

HARGA 2

63 64 65 66 67 68

Seng BJLS 0,28 gelombang Seng BJLS 0,32 gelombang Seng Plat 3" x 6" BJLS 28 Sirap Jati Tali Ijuk Tali pengikat alang-alang PENGGANTUNG Engsel kupu-kupu Engsel nylon Espagnoleth Grendel biasa Grendel hararo Kaca 3 mm bening Kaca 5 mm bening Kaca 6 mm bening Kaca 8 mm bening Kaca 10 mm bening Kaca 12 mm bening Kaca Es/Kapur 3 mm Kaca Es/Kapur 5 mm Kaca nako Kaca nako teralis bening Kaca ryben 3 mm Kaca ryben 5 mm Kait angin biasa Kunci pintu TOP Kunci pintu Union Kunci pintu Vanesa Kunci pintu Yale Kunci pintu YURI Kunci slot Kunci tanam 2 slag KAYU DAN PLAFOND Bambu besar Bambu sedang Bambu kecil Celling teak (0,62 x 2,40) m2 Eternit Formika Gedeg kulit kelas I Gypsum Old Hard board MDF Kalsiboard 4,5 mm Kayu bekesting Kayu bingkirai Kayu bingkirai papan Kayu dolken (pekerjaan sementara) Kayu jati Kayu jati papan Kayu kamper balok Kayu kamper usuk/reng Kayu kamper papan Kayu kruing balok Kayu kruing usuk/reng Kayu kruing papan Kayu meranti balok Kayu meranti usuk/reng Kayu meranti papan Kayu merbau Kayu merbau papan Kayu profil Kayu seseh balok Kayu seseh dolken Lem Aibond Lem Kayu List Gypsum standar Minyak bekisting Multiplek 12 mm Multiplek 18 mm Multiplek 6 mm Multiplek 9 mm

lbr lbr lbr bh kg ikat

69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93

ps ps set bh bh m2 m2 m2 m2 m2 m2 m2 m2 daun m2 m2 m2 bh bh bh bh bh bh bh bh

94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131

btg btg btg lbr lbr lbr m2 lbr lbr lbr m3 m3 m3 btg m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m1 m3 m3 kg ltr m' ltr lbr lbr lbr lbr

Harga Barang dan Upah

Hal. 4

NO1

NAMA BARANG2

SATUAN3

HARGA 1

HARGA 2

132 133 134 135 136 137 138 139

Plywood 12 mm Plywood 3 mm Plywood 4 mm Plywood 6 mm Plywood 9 mm Plywood aluminium Teak wood (0,9x2,00) m2 Teak wood (1,20x2,40) m2 KERAMIK IKAD Ikad (Keramik) Kw. I 10 x 20 cm Ikad (Keramik) Kw. I 20 x 20 cm Ikad (Keramik) Kw. I 20 x 30 cm Ikad (Keramik) Kw. I 30 x 30 cm Ikad (Keramik) Kw. I 40 x 40 cm Ikad (Keramik) Kw. II 10 x 20 cm Ikad (Keramik) Kw. II 20 x 20 cm Ikad (Keramik) Kw. II 20 x 30 cm Ikad (Keramik) Kw. II 30 x 30 cm Ikad (Keramik) Kw. II 40 x 40 cm INESA Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) ESSENZA Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) Keramik Kelas I Domus Keramik Kelas I Granity Imperiali Keramik Kelas I Lavagna Keramik Kelas I Mountain Peak GARUDA Keramik 20 x 20 kelas I Emboss Dasar Muda Keramik 20 x 20 kelas I Emboss Dasar Tua Keramik 20 x 20 kelas I Tesia Keramik 20 x 20 kelas II Emboss Dasar Muda Keramik 20 x 20 kelas II Emboss Dasar Tua Keramik 20 x 20 kelas II Tesia Keramik 20 x 25 kelas I Motif Dasar Medium Keramik 20 x 25 kelas I Motif Dasar Muda Keramik 20 x 25 kelas I Nuri Dark Keramik 20 x 25 kelas I Polos Keramik 30 x 30 kelas I Granity Keramik 30 x 30 kelas I Motif Embose Keramik 30 x 30 kelas II Granity Keramik 30 x 30 kelas II Motif Embose Keramik 40 x 40 kelas I Motif Dasar Muda Keramik 40 x 40 kelas I Motif Dasar Muda Keramik 40 x 40 kelas I Motif Embose Keramik 40 x 40 kelas I Motif Granity Tua Keramik 40 x 40 kelas I Motif Medium Color Keramik 40 x 40 kelas I Motif Spesial Color Keramik 50 x 50 kelas I ASIA

lbr lbr lbr lbr lbr lbr lbr lbr

140 141 142 143 144 145 146 147 148 149

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

150 151 152 153 154 155 156 157 158 159 160

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

161 162 163 164 165 166 167 168 169 170 171

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

Harga Barang dan Upah

Hal. 5

NO1

NAMA BARANG2

SATUAN3

HARGA 1

HARGA 2

193 194 195 196 197 198 199 200 201 202 203 204 205

Keramik 10 x 20 kelas I warna muda Keramik 20 x 20 kelas I warna muda Keramik 20 x 20 kelas I warna tua Keramik 20 x 25 kelas I warna tua Keramik 20 x 30 kelas I warna muda Keramik 30 x 30 kelas I warna muda Keramik 30 x 30 kelas I warna tua Keramik 40 x 40 kelas I warna muda Keramik 10 x 20 kelas II Keramik 20 x 20 kelas II Keramik 20 x 30 kelas II Keramik 30 x 30 kelas II Keramik 40 x 40 kelas II MULIA Keramik 10 x 20 cm kelas I Keramik 20 x 20 cm kelas I Keramik 20 x 30 cm kelas I Keramik 30 x 30 cm kelas I Keramik 40 x 40 cm kelas I Keramik 10 x 20 cm kelas II Keramik 20 x 20 cm kelas II Keramik 20 x 30 cm kelas II Keramik 30 x 30 cm kelas II Keramik 40 x 40 cm kelas II SANITAIR Bak mandi fibre glass 70x70x66 cm Bak mandi keramik Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " Floor drain plastik Floor drain stainless Kloset duduk INA Kloset duduk Amerika Standar Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT Kloset duduk " TOTO Type AVANTE CW 823 J Kloset duduk " TOTO Type CW 660J Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA Kloset duduk " TOTO Type CW 660J WARNA COMPLIT Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT Kloset jongkok " TOTO Type CE 6 COMPLIT Kloset jongkok " TOTO Type CE 7 COMPLIT Kloset porselin jongkok Kia (standar) Kloset porselin jongkok Ina (standar) Kran biasa Kran SunEi Kran TOTO T 205 LCSC Kran TOTO T 205 MC Kran TOTO T 23 B13 Kran TOTO T 23 B13V7N Kran TOTO T 26 - 13 Kran TOTO TX 109 LH Penyekat Urinoir " TOTO " Type A 100 " Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) Soap holder " TOTO " Type S 6 N " Seal tape Urinoir " TOTO U 57 M Urinoir " TOTO U 57 M BODI Urinoir " TOTO UW 447 JT 1 " Urinoir " TOTO UW 447 JT 1 BODI Urinoir " TOTO UW 447 JT 1,M " Urinoir " TOTO UW 447 JT 1,M "BODI Wastagel KIA Standard Wastagel KIA Warna Wastafel Komplit " TOTO Tx " Type L 521V1A " Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 "

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

206 207 208 209 210 211 212 213 214 215

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243

bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh

PAKU 244 Paku 10 cm

kg

Harga Barang dan Upah

Hal. 6

NO1

NAMA BARANG2

SATUAN3

HARGA 1

HARGA 2

245 246 247 248 249 250 251 252 253 254

Paku kalsiboard Paku list SQ Paku pancing 60 x 230 Paku reng/usuk SQ Paku seng Paku seng import Paku skrup 1/2" Paku skrup 2" Paku skrup 3.5" Paku sumbat 1/2" PASIR, BATU, KERIKIL, BATA DAN PARAS Bata gosok ex Tulikup Bata pasang klas I Batako kelas I Batu kali Batu karang Batu lahar Singaraja Batu pecah 5-7 cm (manual) Batu pipih Singaraja Glass block Kerawang Koral Beton Limestone Paras Batik Paras Buahan Paras Karang Bukit Paras Kerobokan Paras Malem Paras Putih Bukit Paras Silakarang tebal Paras Silakarang tipis Paras untuk pondasi Pasir beton Pasir pasang Pasir urug Sirtu Tanah urug PIPA Pipa Galvanis 1/2" Pipa Galvanis 3/4" Pipa Galvanis 1 1/4" Pipa Galvanis 1 1/2" Pipa Galvanis 1" Pipa Galvanis 1,5 BSA Pipa Galvanis 2" Pipa Galvanis 3" Pipa Maspion AW 1 Pipa Maspion AW 1/2 Pipa Maspion AW 10 Pipa Maspion AW 1-1/2 Pipa Maspion AW 1-1/4 Pipa Maspion AW 12 Pipa Maspion AW 14 Pipa Maspion AW 16 Pipa Maspion AW 2 Pipa Maspion AW 2-1/2 Pipa Maspion AW 3 Pipa Maspion AW 3/4 Pipa Maspion AW 4 Pipa Maspion AW 5 Pipa Maspion AW 6 Pipa Maspion AW 8 Pipa Maspion C 1 Pipa Maspion C 1-1/2 Pipa Maspion C 1-1/4 Pipa Maspion C 2 Pipa Maspion C 2-1/2 Pipa Maspion C 3 Pipa Maspion C 3/4 Pipa Maspion C 4 Pipa Maspion C 5/8

kg kg kg kg kg bj kg kg kg kg

255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280

bj bj bj m3 m3 m3 m3 m3 bj bh m3 m3 bh bh bh bh bh bh bh bh bh m3 m3 m3 m3 m3

281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313

m1 m1 m1 m1 m1 m1 m1 m1 ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr

Harga Barang dan Upah

Hal. 7

NO1

NAMA BARANG2

SATUAN3

HARGA 1

HARGA 2

314 315 316 317 318 319 320 321 322 323 324 325 326

Pipa Maspion D 10 Pipa Maspion D 1-1/2 Pipa Maspion D 1-1/4 Pipa Maspion D 12 Pipa Maspion D 14 Pipa Maspion D 16 Pipa Maspion D 2 Pipa Maspion D 2-1/2 Pipa Maspion D 3 Pipa Maspion D 4 Pipa Maspion D 5 Pipa Maspion D 6 Pipa Maspion D 8 SEMEN Semen Bosowa 50 kg Semen Gresik 40 kg Semen Gresik 50 kg Semen Tiga Roga 50 kg Semen Tonasa 50 kg Semen warna/semen grouting BESI BETON DAN PAGAR Besi beton Kawat berduri Kawat beton RRT Pagar BRC asli T.120 diameter 6mm Pagar BRC asli T.150 diameter 6mm Pagar BRC asli T.175 diameter 7mm Pagar BRC asli T.190 diameter 7mm Pagar BRC asli T.90 diameter 6mm Pagar HotDip Galvanized T.120 diameter 6mm Pagar HotDip Galvanized T.150 diameter 7mm Pagar HotDip Galvanized T.175 diameter 7mm Pagar HotDip Galvanized T.190 diameter 7mm Pagar HotDip Galvanized T.90 diameter 6mm Tiang BRC asli T. 120 diameter 1 1/2" Tiang BRC asli T. 150 diameter 2" Tiang BRC asli T. 175 diameter 2" Tiang BRC asli T. 190 diameter 2" Tiang BRC asli T. 90 diameter 1 1/2" Tiang HotDip Galvanized T. 120 diameter 1 1/2" Tiang HotDip Galvanized T. 150 diameter 2" Tiang HotDip Galvanized T. 175 diameter 2" Tiang HotDip Galvanized T. 190 diameter 2" Tiang HotDip Galvanized T. 90 diameter 1 1/2" BAHAN LISTRIK Saklar (Broco) Stop Kontak Fitting Steker Coaxial cable 5C - 75 ohm commscof Kabel NYM 3 x 2.5 mm ex. Supreme Kabel NYM 4 mm Kabel telephone Lampu pijar 10 Watt (Philip) Lampu pijar 15 Watt (Philip) Lampu pijar 25 Watt (Philip) Lampu TL 10 Watt (10 Watt) Lampu TL 20 Watt (10 Watt) Lampu TL 25 Watt (10 Watt) Pipa clipsal 20 mm Pipa flexible clipsal 20 mm Sock clipsal 20 mm Tee dos clipsal 20 mm Klem clipsal 20 mm Inbow dos plastik clipsal E 157 P

ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr

327 328 329 330 331 332

zak zak zak zak zak kg

333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355

kg roll kg m' m' m' m' m' m' m' m' m' m' bh bh bh bh bh bh bh bh bh bh

356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375

bh bh bh bh m1 m1 m1 m1 bh bh bh bh bh bh bt m1 bj bh bj bj

BUIS BETON 376 Buis beton 10 x 75 377 Buis beton 15 x 75 378 Buis beton 20 x 75

bh bh bh

Harga Barang dan Upah

Hal. 8

NO1

NAMA BARANG2

SATUAN3

HARGA 1

HARGA 2

379 Buis beton 25 x 75 380 Buis beton 30 x 75 381 Buis beton 50 x 75 PAVING Paving 10 x 20 cm tebal 6 cm K225 Paving 10 x 20 cm tebal 6 cm K300 Paving 10 x 20 cm tebal 6 cm standard Paving 10 x 20 cm tebal 8 cm K225 Paving 10 x 20 cm tebal 8 cm K300 Paving 10 x 20 cm tebal 8 cm standard Paving Tiga Berlian tebal 6 cm K225 Paving Tiga Berlian tebal 8 cm K225 Kanstein Bulat 15x20x50 cm K225 Kanstein Jumbo 15x30x50 cm K225 Kanstein Super 17x25x60 cm K225 Grass Block Koral sikat LAIN-LAIN Dugul batu hitam 50 x 50 x 200 Dugul batu hitam 60 x 70 x 250 Dugul batu hitam 70 x 70 x 250 Padmasari batu hitam 50 x 50 x 200 Padmasari batu hitam 70 x 70 x 250 Padmasari batu hitam 65 x 75 x 225

bh bh bh

382 383 384 385 386 387 388 389 390 391 392 393 394

m2 m2 m2 m2 m2 m2 m2 m2 m1 m1 m1 m2 zak

395 396 397 398 399 400

unit unit unit unit unit unit

Denpasar, April 2010 Kepala Dinas Cipta Karya Kabupaten Badung

Ir. I Dewa Made Apramana, MM Pembina Tk. I NIP. 195904211987111002

Harga Barang dan Upah

Hal. 9

AHAN DAN UPAH UN 2011

HARGA 3

HARGA 4

HARGA 5

RATA-RATA4

Harga Barang dan Upah

Hal. 10

HARGA 3

HARGA 4

HARGA 5

RATA-RATA4

Harga Barang dan Upah

Hal. 11

HARGA 3

HARGA 4

HARGA 5

RATA-RATA4

Harga Barang dan Upah

Hal. 12

HARGA 3

HARGA 4

HARGA 5

RATA-RATA4

Harga Barang dan Upah

Hal. 13

HARGA 3

HARGA 4

HARGA 5

RATA-RATA4

Harga Barang dan Upah

Hal. 14

HARGA 3

HARGA 4

HARGA 5

RATA-RATA4

Harga Barang dan Upah

Hal. 15

HARGA 3

HARGA 4

HARGA 5

RATA-RATA4

Harga Barang dan Upah

Hal. 16

DAFTAR HARGA SATUAN BAHAN DAN UPAH BULAN JANUARI TAHUN 2011A. Harga Satuan BahanNO1

NAMA BARANG2

SATUAN3

HARGA SATUAN4

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

FINISHING Amplas Cat besi Cat dasar Cat emco Cat menie besi Cat menie kayu Cat tembok Decolith Cat tembok Dulux Cat tembok Emco Cat tembok Paragon Cat tembok Toyopaint Cat tembok Vinilex Cat tembok Vinippaint Dempul Kuas Mild Minyak cat Plamir kayu Plamir tembok Politur ultra Politur vernis Thiner A Bonanza Thiner B Spesial PENUTUP ATAP Alang-alang panjang 2,4 meter Alluminium foil Asbes Bubungan Asbes Gelombang 1,80 m x 0,80 m x 5 mm Asbes Gelombang 2,4 m x 1,05 m x 4 mm Asbes Rata 2 m x 1 m x 4 mm Atap metal Toratora 1 x 4 Extra Atap metal Toratora 1 x 4 Premium Atap metal Toratora 2 x 4 Extra Atap metal Toratora 2 x 4 Premium Atap metal Toratora 3 x 4 Extra Atap metal Toratora 3 x 4 Premium Atap metal Toratora 4 x 4 Extra Atap metal Toratora 4 x 4 Premium Bentala paras Bentala tanah liat Besi profil WF Besi strip Bubungan Biasa Bubungan Karang Pilang (glazur) isi 3,5/m Bubungan Karang Pilang isi 3,5/m Bubungan Ngalayur isi 3,5/m Bubungan Plentong Bubungan Utama isi 3,5/m Genteng Kanmuri (glazur) isi 14/m2 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 Genteng Morando Abadi isi 18/m2 Genteng Morando Jatiwangi isi 18/m2 Genteng Morando Ngalayur isi 20/m2 Genteng Plentong Genteng plentong dicat Genteng Plentong Jatiwangi isi 24/m2 Ijuk Ikut celedu paras Ikut celedu tanah liat Murda paras Murda tanah liat Seng BJLS 0,20 gelombang Seng BJLS 0,25 gelombang

lbr kg kg kg kg kg kg kg kg kg kg kg kg ltr bh zak ltr kg kg ltr ltr ltr ltr

3,000.00 43,000.00 25,000.00 45,000.00 18,500.00 18,500.00 25,000.00 22,620.00 36,680.00 18,000.00 16,500.00 15,600.00 16,500.00 26,235.00 6,000.00 10,000.00 17,000.00 19,000.00 28,000.00 43,000.00 39,000.00 20,000.00 7,000.00

24 25 26 27 28 29 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62

lbr m2 lbr lbr lbr lbr m2 m2 m2 m2 m2 m2 m2 m2 bh bh kg kg bj bj bj bj bj bj bj bj bj bj bj bj bj bj bj bj kg bh bh bh bh lbr lbr

9,000.00 27,500.00 23,667.00 28,000.00 35,000.00 15,000.00 82,368.00 120,120.00 72,930.00 107,250.00 69,784.00 102,960.00 68,640.00 100,386.00 66,000.00 49,500.00 13,750.00 6,050.00 2,500.00 20,000.00 10,000.00 6,000.00 6,000.00 4,000.00 6,500.00 2,700.00 2,650.00 2,800.00 2,700.00 2,700.00 2,700.00 1,200.00 1,125.00 1,125.00 1,500.00 55,000.00 45,000.00 75,000.00 60,000.00 40,000.00 38,000.00Hal. 17

Harga Barang dan Upah

NO1

NAMA BARANG2

SATUAN3

HARGA SATUAN4

63 64 65 66 67 68

Seng BJLS 0,28 gelombang Seng BJLS 0,32 gelombang Seng Plat 3" x 6" BJLS 28 Sirap Jati Tali Ijuk Tali pengikat alang-alang PENGGANTUNG Engsel kupu-kupu Engsel nylon Espagnoleth Grendel biasa Grendel hararo Kaca 3 mm bening Kaca 5 mm bening Kaca 6 mm bening Kaca 8 mm bening Kaca 10 mm bening Kaca 12 mm bening Kaca Es/Kapur 3 mm Kaca Es/Kapur 5 mm Kaca nako Kaca nako teralis bening Kaca ryben 3 mm Kaca ryben 5 mm Kait angin biasa Kunci pintu TOP Kunci pintu Union Kunci pintu Vanesa Kunci pintu Yale Kunci pintu YURI Kunci slot Kunci tanam 2 slag KAYU DAN PLAFOND Bambu besar Ukuran 4 m Bambu sedang Ukuran 4 m Bambu kecil Ukuran 4 m Celling teak (0,62 x 2,40) m2 Eternit Formika Gedeg kulit kelas I Gypsum Old Hard board MDF Kalsiboard 4,5 mm Kayu bekesting Kayu bingkirai Kayu bingkirai papan Kayu dolken (pekerjaan sementara) Kayu jati Kayu jati papan Kayu kamper balok Kayu kamper usuk/reng Kayu kamper papan Kayu kruing balok Kayu kruing usuk/reng Kayu kruing papan Kayu meranti balok Kayu meranti usuk/reng Kayu meranti papan Kayu merbau Kayu merbau papan Kayu profil Kayu seseh balok Kayu seseh dolken Lem Aibond Lem Kayu List Gypsum standar Minyak bekisting Multiplek 12 mm Multiplek 18 mm Multiplek 6 mm Multiplek 9 mm

lbr lbr lbr bh kg ikat

40,000.00 45,000.00 45,000.00 7,900.00 33,000.00 7,700.00

69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93

ps ps set bh bh m2 m2 m2 m2 m2 m2 m2 m2 daun m2 m2 m2 bh bh bh bh bh bh bh bh

15,000.00 13,000.00 35,000.00 9,350.00 18,425.00 70,000.00 90,000.00 120,000.00 185,000.00 250,000.00 300,000.00 75,000.00 105,000.00 12,500.00 113,300.00 100,000.00 110,000.00 16,000.00 40,000.00 65,000.00 107,000.00 112,500.00 125,000.00 88,000.00 104,500.00

94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131

btg btg btg lbr lbr lbr m2 lbr lbr lbr m3 m3 m3 btg m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m1 m3 m3 kg ltr m' ltr lbr lbr lbr lbr

8,500.00 8,000.00 7,000.00 65,000.00 47,000.00 80,000.00 19,000.00 62,500.00 105,000.00 70,000.00 2,000,000.00 9,000,000.00 10,000,000.00 90,000.00 20,000,000.00 30,000,000.00 7,700,000.00 5,700,000.00 7,900,000.00 4,200,000.00 4,000,000.00 6,000,000.00 2,000,000.00 1,700,000.00 4,000,000.00 9,700,000.00 10,000,000.00 12,250.00 2,264,750.00 2,750,000.00 33,000.00 12,500.00 17,000.00 15,000.00 126,000.00 172,000.00 58,000.00 82,000.00

Harga Barang dan Upah

Hal. 18

NO1

NAMA BARANG2

SATUAN3

HARGA SATUAN4

132 133 134 135 136 137 138 139

Plywood 12 mm Plywood 3 mm Plywood 4 mm Plywood 6 mm Plywood 9 mm Plywood aluminium Teak wood (0,9x2,20) m2 Teak wood (1,20x2,40) m2 KERAMIK IKAD Ikad (Keramik) Kw. I 10 x 20 cm Ikad (Keramik) Kw. I 20 x 20 cm Ikad (Keramik) Kw. I 20 x 30 cm Ikad (Keramik) Kw. I 30 x 30 cm Ikad (Keramik) Kw. I 40 x 40 cm Ikad (Keramik) Kw. II 10 x 20 cm Ikad (Keramik) Kw. II 20 x 20 cm Ikad (Keramik) Kw. II 20 x 30 cm Ikad (Keramik) Kw. II 30 x 30 cm Ikad (Keramik) Kw. II 40 x 40 cm INESA Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) ESSENZA Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) Keramik Kelas I Domus Keramik Kelas I Granity Imperiali Keramik Kelas I Lavagna Keramik Kelas I Mountain Peak GARUDA Keramik 20 x 20 kelas I Emboss Dasar Muda Keramik 20 x 20 kelas I Emboss Dasar Tua Keramik 20 x 20 kelas I Tesia Keramik 20 x 20 kelas II Emboss Dasar Muda Keramik 20 x 20 kelas II Emboss Dasar Tua Keramik 20 x 20 kelas II Tesia Keramik 20 x 25 kelas I Motif Dasar Medium Keramik 20 x 25 kelas I Motif Dasar Muda Keramik 20 x 25 kelas I Nuri Dark Keramik 20 x 25 kelas I Polos Keramik 30 x 30 kelas I Granity Keramik 30 x 30 kelas I Motif Embose Keramik 30 x 30 kelas II Granity Keramik 30 x 30 kelas II Motif Embose Keramik 40 x 40 kelas I Motif Dasar Muda Keramik 40 x 40 kelas I Motif Dasar Muda Keramik 40 x 40 kelas I Motif Embose Keramik 40 x 40 kelas I Motif Granity Tua Keramik 40 x 40 kelas I Motif Medium Color Keramik 40 x 40 kelas I Motif Spesial Color Keramik 50 x 50 kelas I

lbr lbr lbr lbr lbr lbr lbr lbr

126,000.00 35,000.00 46,000.00 66,550.00 105,250.00 74,000.00 55,000.00 61,000.00

140 141 142 143 144 145 146 147 148 149

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

51,480.00 41,900.00 51,800.00 39,500.00 47,900.00 37,500.00 39,500.00 46,500.00 37,500.00 45,900.00

150 151 152 153 154 155 156 157 158 159 160

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

190,696.00 153,367.50 179,080.00 142,175.00 164,560.00 208,846.00 208,846.00 159,720.00 196,504.00 148,467.00 248,171.00

161 162 163 164 165 166 167 168 169 170 171

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

165,000.00 122,100.00 150,700.00 107,800.00 222,900.00 194,900.00 273,500.00 286,500.00 262,500.00 249,900.00 337,000.00

172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

43,000.00 45,000.00 45,000.00 43,000.00 44,000.00 43,000.00 46,000.00 46,000.00 48,000.00 40,000.00 45,000.00 45,000.00 43,000.00 43,000.00 48,000.00 48,000.00 50,050.00 55,000.00 45,000.00 44,550.00 70,000.00

Harga Barang dan Upah

Hal. 19

NO1

NAMA BARANG2

SATUAN3

HARGA SATUAN4

193 194 195 196 197 198 199 200 201 202 203 204 205

ASIA Keramik 10 x 20 kelas I warna muda Keramik 20 x 20 kelas I warna muda Keramik 20 x 20 kelas I warna tua Keramik 20 x 25 kelas I warna tua Keramik 20 x 30 kelas I warna muda Keramik 30 x 30 kelas I warna muda Keramik 30 x 30 kelas I warna tua Keramik 40 x 40 kelas I warna muda Keramik 10 x 20 kelas II Keramik 20 x 20 kelas II Keramik 20 x 30 kelas II Keramik 30 x 30 kelas II Keramik 40 x 40 kelas II MULIA Keramik 10 x 20 cm kelas I Keramik 20 x 20 cm kelas I Keramik 20 x 30 cm kelas I Keramik 30 x 30 cm kelas I Keramik 40 x 40 cm kelas I Keramik 10 x 20 cm kelas II Keramik 20 x 20 cm kelas II Keramik 20 x 30 cm kelas II Keramik 30 x 30 cm kelas II Keramik 40 x 40 cm kelas II SANITAIR Bak mandi fibre glass 70x70x66 cm Bak mandi keramik 50x50 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " Floor drain plastik Floor drain stainless Kloset duduk INA Komplit Kloset duduk Amerika Standar Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT Kloset duduk " TOTO Type AVANTE CW 823 J Kloset duduk " TOTO Type CW 660J Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA Kloset duduk " TOTO Type CW 660J WARNA COMPLIT Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT Kloset jongkok " TOTO Type CE 6 COMPLIT Kloset jongkok " TOTO Type CE 7 COMPLIT Kloset porselin jongkok Kia (standar) Kloset porselin jongkok Ina (standar) Kran biasa Kran SunEi Kran TOTO T 205 LCSC Kran TOTO T 205 MC Kran TOTO T 23 B13 Kran TOTO T 23 B13V7N Kran TOTO T 26 - 13 Kran TOTO TX 109 LH Penyekat Urinoir " TOTO " Type A 100 " Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) Soap holder " TOTO " Type S 6 N " Seal tape Urinoir " TOTO U 57 M Urinoir " TOTO U 57 M BODI Urinoir " TOTO UW 447 JT 1 " Urinoir " TOTO UW 447 JT 1 BODI Urinoir " TOTO UW 447 JT 1,M " Urinoir " TOTO UW 447 JT 1,M "BODI Wastagel KIA Standard Wastagel KIA Warna Wastafel Komplit " TOTO Tx " Type L 521V1A " Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 "

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

49,500.00 34,500.00 36,500.00 39,000.00 55,000.00 34,500.00 38,500.00 40,500.00 44,440.00 34,500.00 36,500.00 36,500.00 39,500.00

206 207 208 209 210 211 212 213 214 215

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

40,000.00 42,500.00 55,000.00 38,500.00 47,500.00 38,000.00 39,500.00 52,000.00 36,500.00 45,500.00

201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243

bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh

225,000.00 165,000.00 222,900.00 12,500.00 35,000.00 1,100,000.00 890,000.00 1,420,000.00 5,610,000.00 5,600,000.00 602,800.00 1,365,000.00 1,491,000.00 653,000.00 2,796,200.00 2,190,000.00 1,734,700.00 345,000.00 153,900.00 135,300.00 125,000.00 13,000.00 99,000.00 220,500.00 156,900.00 134,500.00 140,500.00 183,900.00 407,900.00 832,000.00 233,500.00 45,900.00 2,000.00 1,052,000.00 849,000.00 181,800.00 228,900.00 1,130,000.00 728,000.00

Harga Barang dan Upah

Hal. 20

NO1

NAMA BARANG2

SATUAN3

HARGA SATUAN4

244 245 246 247 248 249 250 251 252 253 254

PAKU Paku 10 cm Paku kalsiboard Paku list SQ Paku pancing 60 x 230 Paku reng/usuk SQ Paku seng Paku seng import Paku skrup 1/2" Paku skrup 2" Paku skrup 3.5" Paku sumbat 1/2" PASIR, BATU, KERIKIL, BATA DAN PARAS Bata gosok ex Tulikup Bata Merah 5 x 11 x 22 cm Batako kelas I Batu kali /batu bulat 15/20 cm Batu karang Batu lahar Singaraja Batu pecah 5-7 cm (manual) Batu pipih Singaraja Glass block Roster Keramik Koral Beton Limestone Paras Batik Paras Buahan Paras Karang Bukit Paras Kerobokan Tebal 5 Paras sarwagenep Paras Jogya Putih Paras Malem Paras Putih Bukit Paras Silakarang tebal Paras Silakarang tipis Paras untuk pondasi Pasir beton Pasir pasang Pasir urug Sirtu Tanah urug PIPA Pipa Galvanis 1/2" Pipa Galvanis 3/4" Pipa Galvanis 1 1/4" Pipa Galvanis 1 1/2" Pipa Galvanis 1" Pipa Galvanis 1,5 BSA Pipa Galvanis 2" Pipa Galvanis 3" Pipa Maspion AW 1 Pipa Maspion AW 1/2 Pipa Maspion AW 10 Pipa Maspion AW 1-1/2 Pipa Maspion AW 1-1/4 Pipa Maspion AW 12 Pipa Maspion AW 14 Pipa Maspion AW 16 Pipa Maspion AW 2 Pipa Maspion AW 2-1/2 Pipa Maspion AW 3 Pipa Maspion AW 3/4 Pipa Maspion AW 4 Pipa Maspion AW 5 Pipa Maspion AW 6 Pipa Maspion AW 8 Pipa Maspion C 1 Pipa Maspion C 1-1/2 Pipa Maspion C 1-1/4 Pipa Maspion C 2 Pipa Maspion C 2-1/2

kg kg kg kg kg kg bj kg kg kg kg

12,000.00 19,000.00 15,000.00 18,750.00 12,000.00 17,500.00 45,000.00 16,500.00 16,500.00 24,167.00 13,750.00

255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282

bj bj bj m3 m3 m3 m3 m3 bj bh m3 m3 bh bh bh bh bh bh bh bh bh bh bh m3 m3 m3 m3 m3

1,980.00 1,250.00 1,800.00 118,000.00 110,000.00 138,000.00 120,000.00 150,000.00 17,500.00 48,000.00 120,000.00 79,000.00 15,000.00 6,600.00 7,700.00 8,000.00 8,500.00 10,000.00 12,870.00 3,300.00 13,860.00 11,000.00 12,000.00 110,000.00 125,000.00 80,000.00 100,000.00 70,000.00

283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311

m1 m1 m1 m1 m1 m1 m1 m1 ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr

23,000.00 27,000.00 46,000.00 61,000.00 38,000.00 69,000.00 175,000.00 32,000.00 22,000.00 109,200.00 56,000.00 43,000.00 1,550,000.00 1,900,000.00 2,400,000.00 89,000.00 103,000.00 140,000.00 25,000.00 225,000.00 373,000.00 494,000.00 768,000.00 14,700.00 19,500.00 16,500.00 35,000.00 45,000.00

Harga Barang dan Upah

Hal. 21

NO1

NAMA BARANG2

SATUAN3

HARGA SATUAN4

312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328

Pipa Maspion C 3 Pipa Maspion C 3/4 Pipa Maspion C 4 Pipa Maspion C 5/8 Pipa Maspion D 10 Pipa Maspion D 1-1/2 Pipa Maspion D 1-1/4 Pipa Maspion D 12 Pipa Maspion D 14 Pipa Maspion D 16 Pipa Maspion D 2 Pipa Maspion D 2-1/2 Pipa Maspion D 3 Pipa Maspion D 4 Pipa Maspion D 5 Pipa Maspion D 6 Pipa Maspion D 8 SEMEN Semen Bosowa 50 kg Semen Gresik 40 kg Semen Gresik 50 kg Semen Tiga Roga 50 kg Semen Tonasa 50 kg Semen warna/semen grouting BESI BETON DAN PAGAR Besi beton Kawat berduri Kawat beton RRT Pagar BRC asli T.120 diameter 6mm Pagar BRC asli T.150 diameter 6mm Pagar BRC asli T.175 diameter 7mm Pagar BRC asli T.190 diameter 7mm Pagar BRC asli T.90 diameter 6mm Pagar HotDip Galvanized T.120 diameter 6mm Pagar HotDip Galvanized T.150 diameter 7mm Pagar HotDip Galvanized T.175 diameter 7mm Pagar HotDip Galvanized T.190 diameter 7mm Pagar HotDip Galvanized T.90 diameter 6mm Tiang BRC asli T. 120 diameter 1 1/2" Tiang BRC asli T. 150 diameter 2" Tiang BRC asli T. 175 diameter 2" Tiang BRC asli T. 190 diameter 2" Tiang BRC asli T. 90 diameter 1 1/2" Tiang HotDip Galvanized T. 120 diameter 1 1/2" Tiang HotDip Galvanized T. 150 diameter 2" Tiang HotDip Galvanized T. 175 diameter 2" Tiang HotDip Galvanized T. 190 diameter 2" Tiang HotDip Galvanized T. 90 diameter 1 1/2" BAHAN LISTRIK Saklar (Broco) Stop Kontak Fitting Steker Coaxial cable 5C - 75 ohm commscof Kabel NYM 3 x 2.5 mm ex. Supreme Kabel NYM 4 mm Kabel telephone Lampu pijar 10 Watt (Philip) Lampu pijar 15 Watt (Philip) Lampu pijar 25 Watt (Philip) Lampu TL 10 Watt (10 Watt) Lampu TL 20 Watt (10 Watt) Lampu TL 25 Watt (10 Watt) Pipa clipsal 20 mm Pipa flexible clipsal 20 mm Sock clipsal 20 mm Tee dos clipsal 20 mm Klem clipsal 20 mm Inbow dos plastik clipsal E 157 P

ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr ljr

50,000.00 10,000.00 63,000.00 5,500.00 784,000.00 32,000.00 28,000.00 1,877,568.00 1,270,000.00 1,650,000.00 42,000.00 62,000.00 86,000.00 120,000.00 209,000.00 254,000.00 449,000.00

329 330 331 332 333 334

zak zak zak zak zak kg

50,000.00 43,000.00 51,500.00 51,000.00 49,000.00 8,500.00

335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357

kg roll kg m' m' m' m' m' m' m' m' m' m' bh bh bh bh bh bh bh bh bh bh

7,111.00 80,000.00 15,000.00 161,700.00 172,000.00 249,000.00 267,000.00 134,000.00 136,000.00 187,000.00 203,000.00 218,000.00 118,000.00 160,000.00 209,000.00 240,000.00 246,000.00 136,000.00 142,000.00 169,000.00 185,000.00 197,000.00 123,000.00

358 359 360 361 362 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375

bh bh bh bh m1 m1 m1 m1 bh bh bh bh bh bh bt m1 bj bh bj bj

12,500.00 15,500.00 4,500.00 5,500.00 5,700.00 11,500.00 5,500.00 3,500.00 4,500.00 5,500.00 6,000.00 27,500.00 34,000.00 31,900.00 10,000.00 9,000.00 1,500.00 6,000.00 650.00 9,000.00

Harga Barang dan Upah

Hal. 22

NO1

NAMA BARANG2

SATUAN3

HARGA SATUAN4

376 377 378 379 380 381

BUIS BETON Buis beton 10 x 75 Buis beton 15 x 75 Buis beton 20 x 75 Buis beton 25 x 75 Buis beton 30 x 75 Buis beton 50 x 75 PAVING Paving 10 x 20 cm tebal 6 cm K225 Paving 10 x 20 cm tebal 6 cm K350 Paving 10 x 20 cm tebal 8 cm K225 Paving 10 x 20 cm tebal 8 cm K350 Paving 10 x 20 cm tebal 8 cm K425 Paving 20 x 20 cm tebal 6 cm K225 Paving 20 x 20 cm tebal 6 cm K350 Paving 20 x 20 cm tebal 8 cm K225 Paving 20 x 20 cm tebal 8 cm K350 Paving 20 x 20 cm tebal 8 cm K425 Paving 20 x 20 cm tebal 10 cm K225 Paving 20 x 20 cm tebal 10 cm K350 Paving 20 x 20 cm tebal 10 cm K425 Paving Tiga Berlian tebal 6 cm K225 Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225) Kanstein Jumbo (P:50,L:15,T:30 cm K225) Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) Grass Block 36 X 54 cm tebal 9 cm K 225 Koral Sikat LAIN-LAIN Dugul batu hitam 50 x 50 x 200 Dugul batu hitam 60 x 70 x 250 Dugul batu hitam 70 x 70 x 250 Padmasari batu hitam 50 x 50 x 200 Padmasari batu hitam 70 x 70 x 250 Padmasari batu hitam 65 x 75 x 225

bh bh bh bh bh bh

27,500.00 35,000.00 37,500.00 40,000.00 50,000.00 72,500.00

382 383 384 385 386 387 388 389 389 390 391 392 393 394 395 396 397 398 399

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m1 m1 m1 m2 zak/10 kg

46,000.00 54,500.00 53,500.00 60,000.00 69,500.00 46,000.00 54,500.00 53,500.00 60,000.00 69,500.00 60,500.00 70,000.00 79,000.00 47,000.00 52,000.00 58,000.00 62,000.00 47,500.00 30,000.00

1 2 3 4 5

unit unit unit unit unit unit

2,725,000.00 3,550,000.00 3,650,000.00 2,675,000.00 3,275,000.00 2,550,000.00

Mangupura, Januari 2011 Kepala Dinas Cipta Karya Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T Pembina NIP. 196110101994032001

Harga Barang dan Upah

Hal. 23

DAFTAR HARGA SATUAN UPAH BULAN JANUARI TAHUN 2011NO1

NAMA BARANG2

SPESIFIKASI3

SATUAN4

HARGA (Rp.)5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Mandor Kepala Tukang Tukang Politur Tukang Batu Tukang kayu Tukang Besi Tukang cat Tukang gali Tukang Listrik Tukang Pipa/ Tukang Ledeng Tukang Aspal Tukang masak Aspal Pekerja Tukang Ukir Operator Pembantu Operator Mekanik Pembantu Mekanik Pasang Atap Alang-Alang Pasang Bata Gosok Dua Muka Pasang Bata Gosok Satu Muka Pasang Batu Paras Diukir Pasang Patu Paras Siap Diukir Tukang Bongkar Begesting

Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari M2 M2 M2 M2 Hari

60,000.00 55,000.00 42,000.00 45,000.00 53,000.00 50,000.00 40,000.00 40,000.00 45,000.00 50,000.00 43,000.00 44,000.00 35,000.00 75,000.00 50,000.00 40,000.00 50,000.00 45,000.00 45,000.00 270,000.00 145,000.00 288,500.00 250,000.00 35,000.00

Catatan : 1. Harga - harga belum termasuk PPn 10 %; 2. Harga - harga hanya sebagai pedoman / pendukung dalam perhitungan konstruksi ( tidak mengikat ). Mangupura, Januari 2011 Kepala Dinas Cipta Karya Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T Pembina NIP. 196110101994032001

DAFTAR ANALISA PEKERJAAN BULAN JANUARI TAHUN 2011NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

I1

PEKERJAAN PERSIAPAN

(SNI 03-2835-2002)

1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER 1.2500 btg Bambu Sedang 2.5000 kg Semen Portland 1.2000 lbr Seng gelombang 3" - 5" 0.0050 m3 Pasir Beton 0.0090 m3 Koral beton 0.0720 m3 Kayu Meranti Usuk 5/7 0.0600 kg Paku biasa 2" - 5" 0.4500 kg Meni Besi 0.2000 oh Tukang Kayu 0.4000 oh Pekerja 0.0200 oh Kepala Tukang 0.0200 oh Mandor

8,000.00 1,030.00 40,000.00 110,000.00 120,000.00 1,700,000.00 12,000.00 18,500.00 53,000.00 35,000.00 55,000.00 60,000.00 Total :

10,000.00 2,575.00 48,000.00 550.00 1,080.00 122,400.00 720.00 8,325.00 10,600.00 14,000.00 1,100.00 1,200.00 26,900.00

193,650.00

2

1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK 0.0120 m3 Kayu Usuk Meranti 5/7 0.0200 kg Paku Biasa 2" - 5" 0.0070 m3 Kayu Papan Meranti 3/20 0.1000 oh Tukang Kayu 0.1000 oh Pekerja 0.0100 oh Kepala Tukang 0.0050 oh Mandor 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN 1.2500 btg Dolken Kayu 8 - 10/4m 0.1800 m3 Kayu Meranti 0.8500 kg Paku Biasa 2" - 5" 1.1000 kg Besi Strip 35.0000 kg Semen Portland 0.1500 m3 Pasir Pasang 0.1000 m3 Pasir Beton 0.1500 m3 Koral Beton 30.0000 bh Bata Merah 0.2500 lbr Seng Plat 2.0000 bh Jendela Nako 0.0800 m2 Kaca Polos 0.1500 bh Kunci Tanam 0.0600 lbr Plywood 4 mm 2.0000 oh Tukang Kayu 1.0000 oh Tukang Batu 2.0000 oh Pekerja 0.3000 oh Kepala Tukang 0.0500 oh Mandor

1,700,000.00 12,000.00 4,000,000.00 53,000.00 35,000.00 55,000.00 60,000.00 Total :

20,400.00 240.00 28,000.00 5,300.00 3,500.00 550.00 300.00 9,650.00

48,640.00

3

90,000.00 2,000,000.00 12,000.00 6,050.00 1,030.00 125,000.00 110,000.00 120,000.00 1,250.00 45,000.00 12,500.00 90,000.00 104,500.00 46,000.00 53,000.00 45,000.00 35,000.00 55,000.00 60,000.00 Total :

112,500.00 360,000.00 10,200.00 6,655.00 36,050.00 18,750.00 11,000.00 18,000.00 37,500.00 11,250.00 25,000.00 7,200.00 15,675.00 2,760.00 106,000.00 45,000.00 70,000.00 16,500.00 3,000.00 240,500.00

672,540.00

4

1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT 1.7000 btg Bambu Sedang 0.2100 m3 Kayu Meranti 0.3000 kg Paku Biasa 2" - 5" 10.5000 kg Semen Portland 0.0300 m3 Pasir Beton 0.0500 m3 Koral Beton 1.5000 lbr Seng gelombang BJLS 28 2.0000 oh Tukang Kayu 1.0000 oh Pekerja 0.2000 oh Kepala Tukang 0.0500 oh Mandor 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU 3.0000 btg Bambu Sedang 0.2760 m3 Kayu Meranti 0.7000 kg Paku biasa 2" - 5" 1.5000 lbr Seng gelombang BJLS 28 1.5000 oh Tukang Kayu 1.0000 oh Pekerja 0.1500 oh Kepala Tukang 0.0500 oh Mandor

8,000.00 2,000,000.00 12,000.00 1,030.00 110,000.00 120,000.00 40,000.00 53,000.00 35,000.00 55,000.00 60,000.00 Total : 8,000.00 2,000,000.00 12,000.00 40,000.00 53,000.00 35,000.00 55,000.00 60,000.00 Total :

13,600.00 420,000.00 3,600.00 10,815.00 3,300.00 6,000.00 60,000.00 106,000.00 35,000.00 11,000.00 3,000.00 155,000.00

517,315.00 24,000.00 552,000.00 8,400.00 60,000.00

5

79,500.00 35,000.00 8,250.00 3,000.00 125,750.00

644,400.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN6

(SNI 03-2835-2002)35,000.00 60,000.00 Total : 3,500.00 3,000.00 6,500.00

1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN 0.1000 oh Pekerja 0.0500 oh Mandor

7

1 M2 PEMBUATAN BEDENG BURUH 1.2500 btg Bambu Sedang 0.1860 m3 Kayu Meranti 0.3000 kg Paku Biasa 2" - 5" 18.0000 kg Semen Portland 0.0300 m3 Pasir Beton 0.0500 m3 Koral Beton 1.5000 lbr Seng gelombang BJLS 28 1.3500 lbr Plywood 4 mm 2.0000 oh Tukang Kayu 1.0000 oh Pekerja 0.2000 oh Kepala Tukang 0.0500 oh Mandor

8,000.00 2,000,000.00 12,000.00 1,030.00 110,000.00 120,000.00 40,000.00 46,000.00 53,000.00 35,000.00 55,000.00 60,000.00 Total :

10,000.00 372,000.00 3,600.00 18,540.00 3,300.00 6,000.00 60,000.00 62,100.00 106,000.00 35,000.00 11,000.00 3,000.00 155,000.00

535,540.00

8

1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM 0.0360 m3 Kayu Terentang 0.0800 kg Paku Biasa 2" - 5" 1.0000 btg Kaso 5/7 0.3000 oh Tukang kayu 0.0015 oh Mandor

2,000,000.00 12,000.00 56,000.00 53,000.00 60,000.00 Total :

72,000.00 960.00 56,000.00 15,900.00 90.00 15,990.00

128,960.00

9

1 M2 PEMBUATAN STEGGER DARI BAMBU 1.0000 btg Bambu 0.2500 kg Tali Ijuk 0.0170 oh Tukang Kayu 0.0020 oh Pekerja 0.2500 oh Kepala Tukang 0.0130 oh Mandor

7,000.00 33,000.00 53,000.00 35,000.00 55,000.00 60,000.00

7,000.00 8,250.00 901.00 70.00 13,750.00 780.00 15,501.00

15,250.00

10 1 M2 PEMBUATAN JALAN SEMENTARA 0.1500 m3 Batu Kali / Batu Bulat 15/20 0.0900 m3 Batu Pecah 5 - 7 0.0100 m3 Pasir Pasang 1.0000 oh Pekerja 0.0500 oh Mandor

118,000.00 120,000.00 125,000.00 35,000.00 60,000.00 Total :

17,700.00 10,800.00 1,250.00 35,000.00 3,000.00 38,000.00

29,750.00

11 1 M3 BONGKARAN BETON BERTULANG 6.6670 oh Pekerja 0.3330 oh Mandor

35,000.00 60,000.00 Total :

233,345.00 19,980.00 253,325.00

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH 6.6670 oh Pekerja 0.0330 oh Mandor

35,000.00 60,000.00 Total :

233,345.00 1,980.00 235,325.00

II1

PEKERJAAN TANAH

(SNI 2835 : 2008)35,000.00 60,000.00 Total : 35,000.00 60,000.00 Total : 26,250.00 1,500.00 27,750.00 31,500.00 2,700.00 34,200.00

1 M3 GALIAN TANAH BIASA DALAM 1 METER 0.7500 oh Pekerja 0.0250 oh Mandor 1 M3 GALIAN TANAH BIASA DALAM 2 METER 0.9000 oh Pekerja 0.0450 oh Mandor

2

3

1 M3 GALIAN TANAH BIASA DALAM 3 METER 1.0500 oh Pekerja 0.0670 oh Mandor

35,000.00 60,000.00 Total :

36,750.00 4,020.00 40,770.00

4

1 M3 GALIAN TANAH KERAS DALAM 1METER 1.0000 oh Pekerja 0.0320 oh Mandor

35,000.00 60,000.00 Total :

35,000.00 1,920.00 36,920.00

5

1 M3 GALIAN TANAH CADAS DALAM 1 METER 1.5000 oh Pekerja 0.0600 oh Mandor

35,000.00 60,000.00 Total :

52,500.00 3,600.00 56,100.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN6

(SNI 03-2835-2002)35,000.00 60,000.00 Total : 42,000.00 2,700.00 44,700.00

1 M3 GALIAN TANAH LUMPUR DALAM 1 METER 1.2000 oh Pekerja 0.0450 oh Mandor

7

1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER 0.0500 oh Pekerja 0.0050 oh Mandor

35,000.00 60,000.00 Total :

1,750.00 300.00 2,050.00

8

1 M3 PEMBUANGAN TANAH SEJAUH 15 METER 0.3300 oh Pekerja 0.0100 oh Mandor

35,000.00 60,000.00 Total :

11,550.00 600.00 12,150.00

9

1 M3 URUGAN KEMBALI Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm ) 0.5000 oh Pekerja 0.0500 oh Mandor

35,000.00 60,000.00 Total :

17,500.00 3,000.00 20,500.00

11 1 M3 URUGAN PASIR 1.2000 m3 Pasir Urug 0.3000 oh Pekerja 0.0100 oh Mandor

80,000.00 35,000.00 60,000.00 Total :

96,000.00 10,500.00 600.00 11,100.00

96,000.00

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM 6.0000 m3 Ijuk 0.1500 oh Pekerja 0.0150 oh Mandor

1,500.00 35,000.00 60,000.00 Total :

9,000.00 5,250.00 900.00 6,150.00

9,000.00

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan 1.2000 m3 Sirtu 0.2500 oh Pekerja 0.0250 oh Mandor

100,000.00 35,000.00 60,000.00 Total :

120,000.00 8,750.00 1,500.00 10,250.00

120,000.00

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN 1.2000 m3 Tanah Urug 0.5000 oh Pekerja 0.0500 oh Mandor 15 1 M3 URUGAN LIMESTONE PADAT 1.2000 m3 Limestone 0.2500 oh Pekerja 0.0250 oh Mandor

70,000.00 35,000.00 60,000.00 Total : 79,000.00 35,000.00 60,000.00 Total :

84,000.00 17,500.00 3,000.00 20,500.00

84,000.00 94,800.00

8,750.00 1,500.00 10,250.00

94,800.00

III1

PEKERJAAN PONDASI

(SNI 2836 : 2008)

1 M3 BATU KALI CAMP. 1 PC : 3 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 202.0000 kg Semen Portland 0.4850 m3 Pasir Pasang 1.5000 oh Pekerja 0.7500 oh Tukang Batu 0.0750 oh Kepala Tukang 0.0750 oh Mandor

118,000.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

141,600.00 208,060.00 60,625.00 52,500.00 33,750.00 4,125.00 4,500.00 94,875.00

410,285.00

2

1 M3 BATU KALI CAMP. 1 PC : 4 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 163.0000 kg Semen Portland 0.5200 m3 Pasir Pasang 1.5000 oh Pekerja 0.7500 oh Tukang Batu 0.0750 oh Kepala Tukang 0.0750 oh Mandor

118,000.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

141,600.00 167,890.00 65,000.00 52,500.00 33,750.00 4,125.00 4,500.00 94,875.00

374,490.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN3

(SNI 03-2835-2002)118,000.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total : 141,600.00 140,080.00 68,000.00 52,500.00 33,750.00 4,125.00 4,500.00 94,875.00

1 M3 BATU KALI CAMP. 1 PC : 5 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 136.0000 kg Semen Portland 0.5440 m3 Pasir Pasang 1.5000 oh Pekerja 0.7500 oh Tukang Batu 0.0750 oh Kepala Tukang 0.0750 oh Mandor

349,680.00

4

1 M3 BATU KALI CAMP. 1 PC : 6 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 117.0000 kg Semen Portland 0.5610 m3 Pasir Pasang 1.5000 oh Pekerja 0.7500 oh Tukang Batu 0.0750 oh Kepala Tukang 0.0750 oh Mandor

118,000.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

141,600.00 120,510.00 70,125.00 52,500.00 33,750.00 4,125.00 4,500.00 94,875.00

332,235.00

5

1 M3 BATU KALI CAMP. 1 PC : 8 PS 1.2000 m3 Batu Kali / Batu Bulat 15/20 91.0000 kg Semen Portland 0.5840 m3 Pasir Pasang 1.5000 oh Pekerja 0.7500 oh Tukang Batu 0.0750 oh Kepala Tukang 0.0750 oh Mandor

118,000.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

141,600.00 93,730.00 73,000.00 52,500.00 33,750.00 4,125.00 4,500.00 94,875.00

308,330.00

6

1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI 0.4800 m3 Batu Kali / Batu Bulat 15/20 194.0000 kg Semen Portland 0.3120 m3 Pasir Beton 0.4680 m3 Koral Beton 126.0000 kg Besi Beton 1.8000 kg Kawat Beton 3.4000 oh Pekerja 0.8500 oh Tukang Batu 0.0850 oh Kepala Tukang 0.1700 oh Mandor

118,000.00 1,030.00 110,000.00 120,000.00 7,111.00 15,000.00 35,000.00 45,000.00 55,000.00 60,000.00

56,640.00 199,820.00 34,320.00 56,160.00 895,986.00 27,000.00 119,000.00 38,250.00 4,675.00 10,200.00 172,125.00

1,269,926.00

7

1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M 0.4500 m3 Batu Kali / Batu Bulat 15/20 194.0000 kg Semen Portland 0.3120 m3 Pasir Beton 0.4680 m3 Koral Beton 2.4000 oh Pekerja 0.8000 oh Tukang Batu 0.0800 oh Kepala Tukang 0.1190 oh Mandor

118,000.00 1,030.00 110,000.00 120,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

53,100.00 199,820.00 34,320.00 56,160.00 84,000.00 36,000.00 4,400.00 7,140.00 131,540.00

343,400.00

8

1 M3 PASANGAN BATU KOSONG 1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 0.4320 m3 Pasir Urug 0.7800 oh Pekerja 0.3900 oh Tukang Batu 0.0390 oh Kepala Tukang 0.0390 oh Mandor

118,000.00 80,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

141,600.00 34,560.00 27,300.00 17,550.00 2,145.00 2,340.00 49,335.00

176,160.00

IV1

PEKERJAAN DINDING

(SNI 6897 : 2008)

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 43.5000 kg Semen Portland 0.0800 m3 Pasir Pasang 0.6000 oh Pekerja 0.2000 oh Tukang Batu 0.0200 oh Kepala Tukang 0.0300 oh Mandor

1,250.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00

175,000.00 44,805.00 10,000.00 21,000.00 9,000.00 1,100.00 1,800.00 32,900.00

229,805.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN2

(SNI 03-2835-2002)1,250.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 175,000.00 33,938.50 11,375.00 21,000.00 9,000.00 1,100.00 1,800.00 32,900.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 32.9500 kg Semen Portland 0.0910 m3 Pasir Pasang 0.6000 oh Pekerja 0.2000 oh Tukang Batu 0.0200 oh Kepala Tukang 0.0300 oh Mandor

220,313.50

3

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 26.5500 kg Semen Portland 0.0930 m3 Pasir Pasang 0.6000 oh Pekerja 0.2000 oh Tukang Batu 0.0200 oh Kepala Tukang 0.0300 oh Mandor

1,250.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00

175,000.00 27,346.50 11,625.00 21,000.00 9,000.00 1,100.00 1,800.00 32,900.00

213,971.50

4

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 22.2000 kg Semen Portland 0.1020 m3 Pasir Pasang 0.6000 oh Pekerja 0.2000 oh Tukang Batu 0.0200 oh Kepala Tukang 0.0300 oh Mandor

1,250.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00

175,000.00 22,866.00 12,750.00 21,000.00 9,000.00 1,100.00 1,800.00 32,900.00

210,616.00

5

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS 140.0000 bh Bata Merah 5 x 11 x 22 cm 18.5000 kg Semen Portland 0.1220 m3 Pasir Pasang 0.6000 oh Pekerja 0.2000 oh Tukang Batu 0.0200 oh Kepala Tukang 0.0300 oh Mandor

1,250.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00

175,000.00 19,055.00 15,250.00 21,000.00 9,000.00 1,100.00 1,800.00 32,900.00

209,305.00

6

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 18.9500 kg Semen Portland 0.0380 m3 Pasir Pasang 0.3000 oh Pekerja 0.1000 oh Tukang Batu 0.0100 oh Kepala Tukang 0.0150 oh Mandor

1,250.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00

87,500.00 19,518.50 4,750.00 10,500.00 4,500.00 550.00 900.00 16,450.00

111,768.50

7

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 14.3700 kg Semen Portland 0.0400 m3 Pasir Pasang 0.3000 oh Pekerja 0.1000 oh Tukang Batu 0.0100 oh Kepala Tukang 0.0150 oh Mandor

1,250.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

87,500.00 14,801.10 5,000.00 10,500.00 4,500.00 550.00 900.00 16,450.00

107,301.10

8

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 11.5000 kg Semen Portland 0.0430 m3 Pasir Pasang 0.3000 oh Pekerja 0.1000 oh Tukang Batu 0.0100 oh Kepala Tukang 0.0150 oh Mandor

1,250.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

87,500.00 11,845.00 5,375.00 10,500.00 4,500.00 550.00 900.00 16,450.00

104,720.00

9

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 9.6800 kg Semen Portland 0.0450 m3 Pasir Pasang 0.3000 oh Pekerja 0.1000 oh Tukang Batu 0.0100 oh Kepala Tukang 0.0150 oh Mandor

1,250.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

87,500.00 9,970.40 5,625.00 10,500.00 4,500.00 550.00 900.00 16,450.00

103,095.40

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 03-2835-2002) : 6 PS PEKERJAAN PERSIAPAN (SNI BATA CAMP. 1 PC 70.0000 bh Bata Merah 5 x 11 x 22 cm 8.3200 kg Semen Portland 0.0490 m3 Pasir Pasang 0.3000 oh Pekerja 0.1000 oh Tukang Batu 0.0100 oh Kepala Tukang 0.0150 oh Mandor

1,250.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

87,500.00 8,569.60 6,125.00 10,500.00 4,500.00 550.00 900.00 16,450.00

102,194.60

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS 70.0000 bh Bata Merah 5 x 11 x 22 cm 6.5000 kg Semen Portland 0.0500 m3 Pasir Pasang 0.3000 oh Pekerja 0.1000 oh Tukang Batu 0.0100 oh Kepala Tukang 0.0150 oh Mandor

1,250.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

87,500.00 6,695.00 6,250.00 10,500.00 4,500.00 550.00 900.00 16,450.00

100,445.00

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) 12.5000 bh Batako 7.5000 kg Semen Portland 0.0270 m3 Pasir Pasang 1.9500 kg Besi Beton 8 mm 0.3200 oh Pekerja 0.1000 oh Tukang Batu 0.0100 oh Kepala Tukang 0.0150 oh Mandor

1,800.00 1,030.00 125,000.00 7,111.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

22,500.00 7,725.00 3,375.00 13,866.45 11,200.00 4,500.00 550.00 900.00 17,150.00

47,466.45

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI 12.5000 bh Batako 7.5000 kg Semen Portland 0.0270 m3 Pasir Pasang 0.3200 oh Pekerja 0.1000 oh Tukang Batu 0.0100 oh Kepala Tukang 0.0150 oh Mandor

1,800.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

22,500.00 7,725.00 3,375.00 11,200.00 4,500.00 550.00 900.00 17,150.00

33,600.00

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM 30.0000 bh Roster Keramik 11.0000 kg Semen Portland 0.0350 m3 Pasir Pasang 0.3000 oh Pekerja 0.1000 oh Tukang Batu 0.0100 oh Kepala Tukang 0.0150 oh Mandor

48,000.00 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

1,440,000.00 11,330.00 4,375.00 10,500.00 4,500.00 550.00 900.00 16,450.00

1,455,705.00

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU 1.5000 m2 Bedeg/Bilik Bambu Kelas I 0.0140 m3 Kayu kamper usuk/reng 0.0120 kg Paku Biasa 0.0030 m3 List Kayu 2/4 0.1000 oh Pekerja 0.0500 oh Tukang Kayu 0.0050 oh Kepala Tukang 0.0020 oh Mandor

19,000.00 5,700,000.00 12,000.00 5,700,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

28,500.00 79,800.00 144.00 17,100.00 3,500.00 2,650.00 275.00 120.00 6,545.00

125,544.00

V1

PEKERJAAN PLESTERAN1 M2 PLESTERAN 15.5040 kg 0.0160 m3 0.3000 oh 0.1500 oh 0.0150 oh 0.0150 oh 1 M2 PLESTERAN 10.2240 kg 0.0200 m3 0.3000 oh 0.1500 oh 0.0150 oh 0.0150 oh

(SNI 2837 : 2008)1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total : 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total : 15,969.12 2,000.00 10,500.00 6,750.00 825.00 900.00 18,975.00

CAMP. 1 PC : 1 PS TEBAL 15 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor CAMP. 1 PC : 2 PS TEBAL 15 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

17,969.12 10,530.72 2,500.00

2

10,500.00 6,750.00 825.00 900.00 18,975.00

13,030.72

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN3 1 M2 PLESTERAN 7.7760 kg 0.0230 m3 0.3000 oh 0.1500 oh 0.0150 oh 0.0150 oh

(SNI 03-2835-2002)1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total : 8,009.28 2,875.00 10,500.00 6,750.00 825.00 900.00 18,975.00

CAMP. 1 PC : 3 PS TEBAL 15 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

10,884.28

4

1 M2 PLESTERAN 6.2400 kg 0.0240 m3 0.3000 oh 0.1500 oh 0.0150 oh 0.0150 oh

CAMP. 1 PC : 4 PS TEBAL 15 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

6,427.20 3,000.00 10,500.00 6,750.00 825.00 900.00 18,975.00

9,427.20

5

1 M2 PLESTERAN 5.1840 kg 0.0260 m3 0.3000 oh 0.1500 oh 0.0150 oh 0.0150 oh

CAMP. 1 PC : 5 PS TEBAL 15 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

5,339.52 3,250.00 10,500.00 6,750.00 825.00 900.00 18,975.00

8,589.52

6

1 M2 PLESTERAN 4.4160 kg 0.0270 m3 0.3000 oh 0.1500 oh 0.0150 oh 0.0150 oh

CAMP. 1 PC : 6 PS TEBAL 15 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

4,548.48 3,375.00 10,500.00 6,750.00 825.00 900.00 18,975.00

7,923.48

7

1 M2 PLESTERAN 3.4560 kg 0.0290 m3 0.3000 oh 0.1500 oh 0.0150 oh 0.0150 oh

CAMP. 1 PC : 8 PS TEBAL 15 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

3,559.68 3,625.00 10,500.00 6,750.00 825.00 900.00 18,975.00

7,184.68

8

1 M2 PLESTERAN 13.6320 kg 0.0270 m3 0.4000 oh 0.2000 oh 0.0200 oh 0.0220 oh

CAMP. 1 PC : 2 PS TEBAL 20 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

14,040.96 3,375.00 14,000.00 9,000.00 1,100.00 1,320.00 25,420.00

17,415.96

9

1 M2 PLESTERAN 10.3680 kg 0.0310 m3 0.4000 oh 0.2000 oh 0.0200 oh 0.0220 oh

CAMP. 1 PC : 3 PS TEBAL 20 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

10,679.04 3,875.00 14,000.00 9,000.00 1,100.00 1,320.00 25,420.00

14,554.04

10 1 M2 PLESTERAN 8.3200 kg 0.0320 m3 0.4000 oh 0.2000 oh 0.0200 oh 0.0220 oh 11 1 M2 PLESTERAN 6.9120 kg 0.0350 m3 0.4000 oh 0.2000 oh 0.0200 oh 0.0220 oh

CAMP. 1 PC : 4 PS TEBAL 20 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor CAMP. 1 PC : 5 PS TEBAL 20 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total : 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

8,569.60 4,000.00 14,000.00 9,000.00 1,100.00 1,320.00 25,420.00

12,569.60 7,119.36 4,375.00

14,000.00 9,000.00 1,100.00 1,320.00 25,420.00

11,494.36

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN12 1 M2 PLESTERAN 5.8880 kg 0.0360 m3 0.4000 oh 0.2000 oh 0.0200 oh 0.0220 oh

(SNI 03-2835-2002)1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total : 6,064.64 4,500.00 14,000.00 9,000.00 1,100.00 1,320.00 25,420.00

CAMP. 1 PC : 6 PS TEBAL 20 MM Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

10,564.64

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM 0.5000 kg Semen Portland 0.0130 m3 Pasir Pasang 0.0800 oh Pekerja 0.4000 oh Tukang Batu 0.0400 oh Kepala Tukang 0.0040 oh Mandor

1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

515.00 1,625.00 2,800.00 18,000.00 2,200.00 240.00 23,240.00

2,140.00

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS 4.3200 kg Semen Portland 0.0060 m3 Pasir Pasang 0.3000 oh Pekerja 0.1000 oh Tukang Batu 0.0100 oh Kepala Tukang 0.0150 oh Mandor

1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

4,449.60 750.00 10,500.00 4,500.00 550.00 900.00 16,450.00

5,199.60

15 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M') 3.1080 kg Semen Portland 0.1500 oh Pekerja 0.0750 oh Tukang Batu 0.0080 oh Kepala Tukang 0.0080 oh Mandor

1,030.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

3,201.24 5,250.00 3,375.00 440.00 480.00 9,545.00

3,201.24

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M') 1.6000 kg Semen Portland 0.0700 oh Pekerja 0.0350 oh Tukang Batu 0.0040 oh Kepala Tukang 0.0040 oh Mandor

1,030.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

1,648.00 2,450.00 1,575.00 220.00 240.00 4,485.00

1,648.00

17 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS 6.3400 kg Semen Portland 0.0120 m3 Pasir Pasang 0.3000 oh Pekerja 0.1500 oh Tukang Batu 0.0150 oh Kepala Tukang 0.0150 oh Mandor 1,030.00 125,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total : 6,530.20 1,500.00 10,500.00 6,750.00 825.00 900.00 18,975.00

8,030.20

18 1 M2 PEKERJAAN ACIAN 3.2500 zak Semen Portland 50 Kg 0.2000 oh Pekerja 0.1000 oh Tukang Labur/Cat 0.0100 oh Kepala Tukang 0.0100 oh Mandor

1,030.00 35,000.00 40,000.00 55,000.00 60,000.00 Total :

3,347.50 7,000.00 4,000.00 550.00 600.00 5,150.00

3,347.50

VI1

PEKERJAAN KAYU

(SNI 3434 : 2008)

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I 1.1000 m3 Balok Kayu Kamper 1.2500 Kg Paku 10 Cm 1.0000 Kg Lem Kayu 7.0000 oh Pekerja 21.0000 oh Tukang Kayu 2.1000 oh Kepala Tukang 0.3500 oh Mandor

7,700,000.00 12,000.00 12,500.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

8,470,000.00 15,000.00 12,500.00 245,000.00 1,113,000.00 115,500.00 21,000.00 1,494,500.00

8,497,500.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN2

(SNI 03-2835-2002)4,200,000.00 12,000.00 12,500.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 5,040,000.00 15,000.00 12,500.00 210,000.00 954,000.00 99,000.00 18,000.00 1,281,000.00

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III 1.2000 m3 Balok Kayu kruing 1.2500 Kg Paku 10 Cm 1.0000 Kg Lem Kayu 6.0000 oh Pekerja 18.0000 oh Tukang Kayu 1.8000 oh Kepala Tukang 0.3000 oh Mandor

5,067,500.00

3

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II 0.0400 m3 Papan Kayu Kamper 0.0500 Kg Paku 5-7 Cm 0.3500 oh Pekerja 1.0500 oh Tukang Kayu 0.1050 oh Kepala Tukang 0.0180 oh Mandor

7,900,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

316,000.00 600.00 12,250.00 55,650.00 5,775.00 1,080.00 74,755.00

316,600.00

4

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III 0.0400 m3 Papan Kayu Kruing 0.0500 Kg Paku 5-7 Cm 0.3500 oh Pekerja 1.0500 oh Tukang Kayu 0.1050 oh Kepala Tukang 0.0180 oh Mandor

6,000,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

240,000.00 600.00 12,250.00 55,650.00 5,775.00 1,080.00 74,755.00

240,600.00

5

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II 0.0400 m3 Papan Kayu Kamper 0.5000 Kg Lem Kayu 1.0000 oh Pekerja 3.0000 oh Tukang Kayu 0.3000 oh Kepala Tukang 0.0500 oh Mandor

7,900,000.00 12,500.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

316,000.00 6,250.00 35,000.00 159,000.00 16,500.00 3,000.00 213,500.00

322,250.00

6

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II 0.0240 m3 Papan Kayu Kamper 0.3000 Kg Lem Kayu 0.8000 oh Pekerja 2.4000 oh Tukang Kayu 0.2400 oh Kepala Tukang 0.0400 oh Mandor

7,900,000.00 12,500.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

189,600.00 3,750.00 28,000.00 127,200.00 13,200.00 2,400.00 170,800.00

193,350.00

7

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II 0.0640 m3 Papan Kayu Kamper 0.5000 Kg Lem Kayu 1.0000 oh Pekerja 3.0000 oh Tukang Kayu 0.3000 oh Kepala Tukang 0.0500 oh Mandor

7,900,000.00 12,500.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

505,600.00 6,250.00 35,000.00 159,000.00 16,500.00 3,000.00 213,500.00

511,850.00

8

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm) 0.0250 m3 Papan Kayu Kamper 0.0300 Kg Paku 1-2,5 Cm 0.5000 Kg Lem Kayu 1.0000 Lbr Plywood 4 mm 1.0000 oh Pekerja 3.0000 oh Tukang Kayu 0.3000 oh Kepala Tukang 0.0500 oh Mandor

7,900,000.00 12,000.00 12,500.00 46,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

197,500.00 360.00 6,250.00 46,000.00 35,000.00 159,000.00 16,500.00 3,000.00 213,500.00

250,110.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN9

(SNI 03-2835-2002)7,900,000.00 12,000.00 12,500.00 46,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 202,240.00 360.00 6,250.00 46,000.00 28,000.00 127,200.00 13,200.00 2,400.00 170,800.00

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I/II 0.0256 m3 Papan Kayu Kamper 0.0300 Kg Paku 1-2,5 Cm 0.5000 Kg Lem Kayu 1.0000 Lbr Plywood 4 mm 0.8000 oh Pekerja 2.4000 oh Tukang Kayu 0.2400 oh Kepala Tukang 0.0400 oh Mandor

254,850.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II 0.0600 0.1500 0.6700 2.0000 0.2000 0.3350 m3 Kg oh oh oh oh Papan Kayu Kamper Paku 1-2,5 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 7,900,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 474,000.00 1,800.00 23,450.00 106,000.00 11,000.00 20,100.00 160,550.00

475,800.00

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I 0.0256 m3 Papan Kayu Kamper 0.0300 Kg Paku 1-2,5 Cm 0.5000 Kg Lem Kayu 1.0000 Lbr Teakwood 4 mm uk 90x220 cm 0.8000 oh Pekerja 2.4000 oh Tukang Kayu 0.2400 oh Kepala Tukang 0.0400 oh Mandor

7,900,000.00 12,000.00 12,500.00 55,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

202,240.00 360.00 6,250.00 55,000.00 28,000.00 127,200.00 13,200.00 2,400.00 170,800.00

263,850.00

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE, KAYU KELAS II 0.0250 m3 Papan Kayu Kamper 0.0300 Kg Paku 1-2,5 Cm 0.8000 Kg Lem Kayu 1.0000 Lbr Teakwood 4 mm uk 90x220 cm 0.5000 Lbr Formika 0.8000 oh Pekerja 2.4000 oh Tukang Kayu 0.2400 oh Kepala Tukang 0.0400 oh Mandor

7,900,000.00 12,000.00 12,500.00 55,000.00 80,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

197,500.00 360.00 10,000.00 55,000.00 40,000.00 28,000.00 127,200.00 13,200.00 2,400.00 170,800.00

302,860.00

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS I,II,III Bentang 6 M' 1.1000 15.0000 5.6000 4.0000 12.0000 1.2000 0.2000 m3 Kg Kg oh oh oh oh Balok Kayu Kamper Besi Strip Tebal 5 cm Paku 12 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 7,700,000.00 6,050.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 8,470,000.00 90,750.00 67,200.00 140,000.00 636,000.00 66,000.00 12,000.00 854,000.00

8,627,950.00

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I 1.2000 15.0000 5.6000 6.7000 20.1000 2.0100 0.3350 m3 Kg Kg oh oh oh oh Balok Kayu Kamper Besi Strip Tebal 5 cm Paku 12 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 7,700,000.00 6,050.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 9,240,000.00 90,750.00 67,200.00 234,500.00 1,065,300.00 110,550.00 20,100.00 1,430,450.00

9,397,950.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II 1.1000 15.0000 3.0000 2.4000 7.2000 0.7200 0.1200 m3 Kg Kg oh oh oh oh Balok Kayu Kamper Besi Strip Tebal 5 cm Paku 12 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 7,700,000.00 6,050.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 8,470,000.00 90,750.00 36,000.00 84,000.00 381,600.00 39,600.00 7,200.00 512,400.00

8,596,750.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN

(SNI 03-2835-2002)

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II 0.0140 0.0036 0.2500 0.1000 0.1000 0.0100 0.0050 m3 m3 Kg oh oh oh oh Kaso-Kaso ( 5 x 7 ) Cm Reng ( 2 x 3 ) Cm Paku 5 Cm dan 10 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 1,700,000.00 5,700,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 23,800.00 20,520.00 3,000.00 3,500.00 5,300.00 550.00 300.00 9,650.00

47,320.00

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II 0.0140 0.0072 0.2500 0.1000 0.1000 0.0100 0.0050 m3 m3 Kg oh oh oh oh Kaso-Kaso ( 5 x 7 ) Cm Reng ( 2 x 3 ) Cm Paku 5 Cm dan 10 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 1,700,000.00 5,700,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 23,800.00 41,040.00 3,000.00 3,500.00 5,300.00 550.00 300.00 9,650.00

67,840.00

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II 0.1650 0.2000 0.1200 0.1200 0.0120 0.0060 m3 Kg oh oh oh oh Balok Kayu Kamper Paku 5 Cm dan 10 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 7,700,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 1,270,500.00 2,400.00 4,200.00 6,360.00 660.00 360.00 11,580.00

1,272,900.00

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III 0.0154 0.2000 0.1500 0.3000 0.0300 0.0750 m3 Kg oh oh oh oh Kaso-Kaso ( 5 x 7 ) Cm Paku 7 Cm dan 10 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 1,700,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 26,180.00 2,400.00 5,250.00 15,900.00 1,650.00 4,500.00 27,300.00

28,580.00

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III 0.0163 0.2500 0.2000 0.3000 0.0300 0.0100 m3 Kg oh oh oh oh Kaso-Kaso ( 5 x 7 ) Cm Paku 7 Cm dan 10 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 1,700,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 27,710.00 3,000.00 7,000.00 15,900.00 1,650.00 600.00 25,150.00

30,710.00

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II 0.0108 0.1000 0.1000 0.2000 0.0200 0.0050 m3 Kg oh oh oh oh Papan Kayu Kamper Paku 5 Cm dan 7 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 7,900,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 85,320.00 1,200.00 3,500.00 10,600.00 1,100.00 300.00 15,500.00

86,520.00

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II 0.0110 0.0500 0.1000 0.2000 0.0200 0.0050 m3 Kg oh oh oh oh Papan Kayu Kamper Paku 5 Cm dan 7 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 7,900,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 86,900.00 600.00 3,500.00 10,600.00 1,100.00 300.00 15,500.00

87,500.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN

(SNI 03-2835-2002)

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III 0.0280 0.1500 0.1500 0.4500 0.0450 0.0080 m3 Kg oh oh oh oh Balok Kayu Kamper Paku 5 Cm dan 7 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 7,700,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 215,600.00 1,800.00 5,250.00 23,850.00 2,475.00 480.00 32,055.00

217,400.00

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELAS II 0.0280 0.1500 0.8600 0.5600 0.1500 0.4500 0.0450 0.0080 m3 Kg Lbr Kg oh oh oh oh Balok Kayu Kamper Paku 5 Cm dan 7 Cm Teakwood 4 mm uk 90x220 cm Lem Kayu Pekerja Tukang Kayu Kepala Tukang Mandor 7,700,000.00 12,000.00 55,000.00 12,500.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 215,600.00 1,800.00 47,300.00 7,000.00 5,250.00 23,850.00 2,475.00 480.00 32,055.00

271,700.00

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KELAS II 0.0280 0.1500 0.8600 0.5600 0.2000 0.6000 0.0600 0.0100 m3 Kg Lbr Kg oh oh oh oh Balok Kayu Kamper Paku 5 Cm dan 7 Cm Plywood tebal 4 mm uk 120 x 240 cm Lem Kayu Pekerja Tukang Kayu Kepala Tukang Mandor 7,700,000.00 12,000.00 46,000.00 12,500.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 215,600.00 1,800.00 39,560.00 7,000.00 7,000.00 31,800.00 3,300.00 600.00 42,700.00

263,960.00

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I 0.0070 0.1000 0.1500 0.6000 1.8000 0.1800 0.0300 m3 Kg Kg oh oh oh oh Papan Kayu Kamper Paku 5 Cm dan 10 Cm Paku Skrup 10 cm Pekerja Tukang Kayu Kepala Tukang Mandor 7,900,000.00 12,000.00 16,500.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 55,300.00 1,200.00 2,475.00 21,000.00 95,400.00 9,900.00 1,800.00 128,100.00

58,975.00

26.a MEMASANG 1 M2 LAMBRIZIRING DARI SESEH KELAS I 0.0070 m3 Seseh 0.1000 Kg Paku 5 Cm dan 10 Cm 0.1500 Kg Paku Skrup 10 cm 0.6000 oh Pekerja 1.8000 oh Tukang Kayu 0.1800 oh Kepala Tukang 0.0300 oh Mandor

2,264,750.00 12,000.00 16,500.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

15,853.25 1,200.00 2,475.00 21,000.00 95,400.00 9,900.00 1,800.00 128,100.00

19,528.25

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM 0.4000 0.0500 0.0250 0.0750 0.0080 0.0010 Lbr Kg oh oh oh oh Plywood tebal 4 mm uk 120 x 240 cm Paku 1 Cm dan 2.5 Cm Pekerja Tukang Kayu Kepala Tukang Mandor 46,000.00 12,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total : 18,400.00 600.00 875.00 3,975.00 440.00 60.00 5,350.00

19,000.00

VII1

PEKERJAAN BETON ( SNI 7394:2008)1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR 218.0000 kg Semen Portland 0.5200 m3 Pasir Beton 0.8700 m3 Koral Beton 1.6500 oh Pekerja 0.2500 oh Tukang Batu 0.0250 oh Kepala Tukang 0.0800 oh Mandor 1,030.00 110,000.00 120,000.00 35,000.00 45,000.00 55,000.00 60,000.00 224,540.00 57,200.00 104,400.00 57,750.00 11,250.00 1,375.00 4,800.00 75,175.00

386,140.00

2

1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR 232.0000 kg Semen Portland 0.5200 m3 Pasir Beton

1,030.00 110,000.00

238,960.00 57,200.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

0.7800 m3 Koral Beton PEKERJAAN PERSIAPAN 1.6500 oh Pekerja 0.2500 oh Tukang Batu 0.0250 oh Kepala Tukang 0.0800 oh Mandor

(SNI 03-2835-2002)

120,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total :

93,600.00 57,750.00 11,250.00 1,375.00 4,800.00 75,175.00

389,760.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN3

(SNI 03-2835-2002)1,030.00 110,000.00 120,000.00 35,000.00 45,000.00 55,000.00 60,000.00 Total : 288,400.00 49,500.00 108,000.00 57,750.00 11,250.00 1,375.00 4,800.00 75,175.00

1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR 280.0000 kg Semen Portland 0.4500 m3 Pasir Beton 0.9000 m3 Koral Beton 1.6500 oh Pekerja 0.2500 oh Tukang Batu 0.0250 oh Kepala Tukang 0.0800 oh Mandor

445,900.00

4

PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR 10.0000 kg Besi Beton (Polos/ Ulir) 0.1500 kg Kawat Beton 0.0700 oh Pekerja 0.0700 oh Tukang Besi 0.0070 oh Kepala Tukang 0.0040 oh Mandor

4.a PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR 5 1 M2 PASANG BEKISTING UNTUK PONDASI 0.0400 m3 Kayu Kelas III 0.3000 kg Paku Biasa 5' - 10' 0.1000 ltr Minyak Bekisting 0.5200 oh Pekerja 0.2600 oh Tukang Kayu 0.0260 oh Kepala Tukang 0.0260 oh Mandor

7,111.00 15,000.00 35,000.00 50,000.00 55,000.00 60,000.00 Total : Total :

71,110.00 2,250.00 2,450.00 3,500.00 385.00 240.00 6,575.00 657.50

73,360.00 7,336.00

2,000,000.00 12,000.00 15,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

80,000.00 3,600.00 1,500.00 18,200.00 13,780.00 1,430.00 1,560.00 34,970.00

85,100.00

6

1 M2 PASANG BEKISTING UNTUK SLOOF 0.0400 m3 Kayu Kelas III 0.3000 kg Paku Biasa 5' - 10' 0.1000 ltr Minyak Bekisting 0.5200 oh Pekerja 0.2600 oh Tukang Kayu 0.0260 oh Kepala Tukang 0.0260 oh Mandor

2,000,000.00 12,000.00 15,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

80,000.00 3,600.00 1,500.00 18,200.00 13,780.00 1,430.00 1,560.00 34,970.00

85,100.00

7

1 M2 PASANG BEKISTING UNTUK KOLOM 0.0400 m3 Kayu Kelas III 0.4000 kg Paku Biasa 5' - 12' 0.2000 ltr Minyak Bekisting 0.0150 m3 Kayu Usuk 4/6 0.3500 lbr Plywood 9 mm 2.0000 btg Dolken Kayu 8" - 10"/4 m 0.6600 oh Pekerja 0.3300 oh Tukang Kayu 0.0330 oh Kepala Tukang 0.0330 oh Mandor

2,000,000.00 12,000.00 15,000.00 4,000,000.00 105,250.00 90,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

80,000.00 4,800.00 3,000.00 60,000.00 36,837.50 180,000.00 23,100.00 17,490.00 1,815.00 1,980.00 44,385.00

364,637.50

7.a 1 M2 PASANG BEKISTING UNTUK KOLOM 0.0400 m3 Kayu Kelas III 0.4000 kg Paku Biasa 5' - 12' 0.2000 ltr Minyak Bekisting 0.0150 m3 Kayu Usuk 4/6 0.3500 lbr Plywood 9 mm 0.6600 oh Pekerja 0.3300 oh Tukang Kayu 0.0330 oh Kepala Tukang 0.0330 oh Mandor

2,000,000.00 12,000.00 15,000.00 4,000,000.00 105,250.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

80,000.00 4,800.00 3,000.00 60,000.00 36,837.50 23,100.00 17,490.00 1,815.00 1,980.00 44,385.00

184,637.50

8

1 M2 PASANG BEKISTING UNTUK BALOK 0.0400 m3 Kayu Kelas III 0.4000 kg Paku Biasa 5' - 12' 0.2000 ltr Minyak Bekisting 0.0180 m3 Kayu Usuk 4/6 0.3500 lbr Plywood 9 mm 2.0000 btg Dolken Kayu 8" - 10"/4m 0.6600 oh Pekerja 0.3300 oh Tukang Kayu 0.0330 oh Kepala Tukang 0.0330 oh Mandor

2,000,000.00 12,000.00 15,000.00 4,000,000.00 105,250.00 90,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

80,000.00 4,800.00 3,000.00 72,000.00 36,837.50 180,000.00 23,100.00 17,490.00 1,815.00 1,980.00 44,385.00

376,637.50

8.a 1 M2 PASANG BEKISTING UNTUK BALOK 0.0400 m3 Kayu Kelas III 0.4000 kg Paku Biasa 5' - 12' 0.2000 ltr Minyak Bekisting

2,000,000.00 12,000.00 15,000.00

80,000.00 4,800.00 3,000.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

0.0180 m3 Kayu Usuk PEKERJAAN PERSIAPAN4/6 0.3500 lbr Plywood 9 mm 0.3100 m2 Scafolding 0.6600 oh Pekerja 0.3300 oh Tukang Kayu 0.0330 oh Kepala Tukang 0.0330 oh Mandor

(SNI 03-2835-2002)

4,000,000.00 105,250.00 40,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

72,000.00 36,837.50 12,400.00 23,100.00 17,490.00 1,815.00 1,980.00 44,385.00

209,037.50

9

1 M2 PASANG BEKISTING UNTUK LANTAI 0.0400 m3 Kayu Kelas III 0.4000 kg Paku Biasa 5' - 12' 0.2000 ltr Minyak Bekisting 0.0150 m3 Kayu Usuk 4/6 0.3500 lbr Plywood 9 mm 6.0000 btg Dolken Kayu 8" - 10"/4m 0.6600 oh Pekerja 0.3300 oh Tukang Kayu 0.0330 oh Kepala Tukang 0.0330 oh Mandor

2,000,000.00 12,000.00 15,000.00 4,000,000.00 105,250.00 90,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

80,000.00 4,800.00 3,000.00 60,000.00 36,837.50 540,000.00 23,100.00 17,490.00 1,815.00 1,980.00 44,385.00

724,637.50

9.a 1 M2 PASANG BEKISTING UNTUK LANTAI 0.0400 m3 Kayu Kelas III 0.4000 kg Paku Biasa 5' - 12' 0.2000 ltr Minyak Bekisting 0.0150 m3 Kayu Usuk 4/6 0.3500 lbr Plywood 9 mm 1.0000 m2 Scafolding 0.6600 oh Pekerja 0.3300 oh Tukang Kayu 0.0330 oh Kepala Tukang 0.0330 oh Mandor

2,000,000.00 12,000.00 15,000.00 4,000,000.00 105,250.00 40,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

80,000.00 4,800.00 3,000.00 60,000.00 36,837.50 40,000.00 23,100.00 17,490.00 1,815.00 1,980.00 44,385.00

224,637.50

9.b 1 M2 PASANG BEKISTING UNTUK PLAT PARAFET/MEJA PANTRY 0.0400 m3 Kayu Kelas III 0.4000 kg Paku Biasa 5' - 12' 0.2000 ltr Minyak Bekisting 0.0150 m3 Kayu Usuk 4/6 0.3500 lbr Plywood 9 mm 0.6600 oh Pekerja 0.3300 oh Tukang Kayu 0.0330 oh Kepala Tukang 0.0330 oh Mandor

2,000,000.00 12,000.00 15,000.00 4,000,000.00 105,250.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

80,000.00 4,800.00 3,000.00 60,000.00 36,837.50 23,100.00 17,490.00 1,815.00 1,980.00 44,385.00

184,637.50

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN

(SNI 03-2835-2002)2,000,000.00 12,000.00 15,000.00 4,000,000.00 105,250.00 90,000.00 2,000.00 35,000.00 53,000.00 55,000.00 60,000.00 60,000.00 4,800.00 3,000.00 80,000.00 36,837.50 270,000.00 8,000.00 23,100.00 17,490.00 1,815.00 1,980.00 44,385.00

10 1 M2 PASANG BEKISTING UNTUK DINDING 3 0.0300 M Kayu Kelas III 0.4000 Kg Paku Biasa 5' - 12' 0.2000 Ltr Minyak Bekisting 3 0.0200 M Kayu Usuk 4/6 0.3500 Lbr Plywood 9 mm 3.0000 Btng Dolken Kayu 8" - 10"/4m 4.0000 Bh Formite/penjaga jarak bekisting/spacer 0.6600 Oh Pekerja 0.3300 Oh Tukang Kayu 0.0330 Oh Kepala Tukang 0.0330 Oh Mandor

462,637.50

11 1 M2 PASANG BEKISTING UNTUK TANGGA 0.0300 m3 Kayu Kelas III 0.4000 kg Paku Biasa 5' - 12' 0.1500 ltr Minyak Bekisting 0.0150 m3 Kayu Usuk 4/6 0.3500 lbr Plywood 9 mm 2.0000 btg Dolken Kayu 8" - 10"/4m 0.6600 oh Pekerja 0.3300 oh Tukang Kayu 0.0330 oh Kepala Tukang 0.0330 oh Mandor

2,000,000.00 12,000.00 15,000.00 4,000,000.00 105,250.00 90,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

60,000.00 4,800.00 2,250.00 60,000.00 36,837.50 180,000.00 23,100.00 17,490.00 1,815.00 1,980.00 44,385.00

343,887.50

11.a 1 M2 PASANG BEKISTING UNTUK TANGGA 0.0300 m3 Kayu Kelas III 0.4000 kg Paku Biasa 5' - 12' 0.1500 ltr Minyak Bekisting 0.0150 m3 Kayu Usuk 4/6 0.3500 lbr Plywood 9 mm 1.0000 m2 Scafolding 0.6600 oh Pekerja 0.3300 oh Tukang Kayu 0.0330 oh Kepala Tukang 0.0330 oh Mandor

2,000,000.00 12,000.00 15,000.00 4,000,000.00 105,250.00 40,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

60,000.00 4,800.00 2,250.00 60,000.00 36,837.50 40,000.00 23,100.00 17,490.00 1,815.00 1,980.00 44,385.00

203,887.50

12 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON 0.0264 m3 Kayu Kelas III (Papan) 0.6000 kg Paku Biasa 5' - 12' 0.5000 btg Dolken Kayu 8" - 10"/4m 0.1500 oh Pekerja 0.0500 oh Tukang Kayu 0.0050 oh Kepala Tukang 0.0080 oh Mandor

2,000,000.00 12,000.00 90,000.00 35,000.00 53,000.00 55,000.00 60,000.00 Total :

52,800.00 7,200.00 45,000.00 5,250.00 2,650.00 275.00 480.00 8,655.00

105,000.00

13 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING) 0.2000 m3 Kayu Kelas III 2,000,000.00 1.5000 kg Paku Biasa 5' - 12' 12,000.00 0.4000 ltr Minyak Bekisting 15,000.00 157.0000 kg Besi Beton 7,111.00 2.2500 kg Kawat Beton 15,000.00 336.0000 kg Semen Portland 1,030.00 0.5400 m3 Pasir Beton 110,000.00 0.8100 m3 Koral Beton 120,000.00 5.3000 oh Pekerja 35,000.00 0.2750 oh Tukang Batu 45,000.00 1.3000 oh Tukang Kayu 53,000.00 1.0500 oh Tukang Besi 50,000.00 0.2620 oh Kepala Tukang 55,000.00 0.2650 oh Mandor 60,000.00 Total : 14 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING) 0.2700 m3 Kayu Kelas III 2,000,000.00 2.0000 kg Paku Biasa 5' - 12' 12,000.00 0.6000 ltr Minyak Bekisting 15,000.00 210.0000 kg Besi Beton 7,111.00 3.0000 kg Kawat Beton 15,000.00 336.0000 kg Semen Portland 1,030.00 0.5400 m3 Pasir Beton 110,000.00 0.8100 m3 Koral Beton 120,000.00 5.6500 oh Pekerja 35,000.00 0.2750 oh Tukang Batu 45,000.00 1.5600 oh Tukang Kayu 53,000.00 1.4000 oh Tukang Besi 50,000.00 0.3230 oh Kepala Tukang 55,000.00 0.2830 oh Mandor 60,000.00

400,000.00 18,000.00 6,000.00 1,116,427.00 33,750.00 346,080.00 59,400.00 97,200.00 185,500.00 12,375.00 68,900.00 52,500.00 14,410.00 15,900.00 349,585.00

2,076,857.00

540,000.00 24,000.00 9,000.00 1,493,310.00 45,000.00 346,080.00 59,400.00 97,200.00 197,750.00 12,375.00 82,680.00 70,000.00 17,765.00 16,980.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN

(SNI 03-2835-2002)

Total :

397,550.00

2,613,990.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

PEKERJAAN PERSIAPAN

(SNI 03-2835-2002)2,000,000.00 12,000.00 15,000.00 7,111.00 15,000.00 1,030.00 110,000.00 120,000.00 4,200,000.00 105,250.00 90,000.00 35,000.00 45,000.00 53,000.00 50,000.00 55,000.00 60,000.00 Total : 800,000.00 48,000.00 30,000.00 2,239,965.00 67,500.00 346,080.00 59,400.00 97,200.00 630,000.00 368,375.00 1,800,000.00 246,750.00 12,375.00 87,450.00 105,000.00 22,165.00 21,180.00 494,920.00

15 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING) 0.4000 m3 Kayu Kelas III 4.0000 kg Paku Biasa 5' - 12' 2.0000 ltr Minyak Bekisting 315.0000 kg Besi Beton 4.5000 kg Kawat Beton 336.0000 kg Semen Portland 0.5400 m3 Pasir Beton 0.8100 m3 Koral Beton 0.1500 m3 Kayu Kelas II balok 3.5000 lbr Plywood 9 mm 20.0000 btg Dolken Kayu 8" /4 m 7.0500 oh Pekerja 0.2750 oh Tukang Batu 1.6500 oh Tukang Kayu 2.1000 oh Tukang Besi 0.4030 oh Kepala Tukang 0.3530 oh Mandor

6,486,520.00

16 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING) 0.3200 m3 Kayu Kelas III 3.2000 kg Paku Biasa 5' - 12' 1.6000 ltr Minyak Bekisting 210.0000 kg Besi Beton 3.0000 kg Kawat Beton 336.0000 kg Semen Portland 0.5400 m3 Pasir Beton 0.8100 m3 Koral Beton 0.1400 m3 Kayu Kelas II balok 2.8000 lbr Plywood 9 mm 16.0000 btg Dolken Kayu 8" /4 m 6.3500 oh Pekerja 0.2750 oh Tukang Batu 1.6500 oh Tukang Kayu 1.4000 oh Tukang Besi 0.3330 oh Kepala Tukang 0.3180 oh Mandor 17 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING 0.3200 m3 Kayu Kelas III 3.2000 kg Paku Biasa 5' - 12' 1.6000 ltr Minyak Bekisting 157.5000 kg Besi Beton 2.2500 kg Kawat Beton 336.0000 kg Semen Portland 0.5400 m3 Pasir Beton 0.8100 m3 Koral Beton 0.1200 m3 Kayu Kelas II balok 2.8000 lbr Plywood 9 mm 32.0000 btg Dolken Kayu 8" /4 m 5.3000 oh Pekerja 0.2750 oh Tukang Batu 1.3000 oh Tukang Kayu 1.0500 oh Tukang Besi 0.2650 oh Kepala Tukang 0.2650 oh Mandor 18 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING) 0.2400 m3 Kayu Kelas III 3.2000 kg Paku Biasa 5' - 12' 1.6000 ltr Minyak Bekisting 157.0000 kg Besi Beton 2.2500 kg Kawat Beton 336.0000 kg Semen Portland 0.5400 m3 Pasir Beton 0.8100 m3 Koral Beton 0.1600 m3 Kayu Kelas II balok 2.8000 lbr Plywood 9 mm 24.0000 btg Dolken Kayu 8" /4 m 5.3000 oh Pekerja 0.2750 oh Tukang Batu 1.3000 oh Tukang Kayu 1.0500 oh Tukang Besi 0.2620 oh Kepala Tukang 0.2650 oh Mandor

2,000,000.00 12,000.00 15,000.00 7,111.00 15,000.00 1,030.00 110,000.00 120,000.00 4,200,000.00 105,250.00 90,000.00 35,000.00 45,000.00 53,000.00 50,000.00 55,000.00 60,000.00 Total :

640,000.00 38,400.00 24,000.00 1,493,310.00 45,000.00 346,080.00 59,400.00 97,200.00 588,000.00 294,700.00 1,440,000.00 222,250.00 12,375.00 87,450.00 70,000.00 18,315.00 19,080.00 429,470.00

5,066,090.00

2,000,000.00 12,000.00 15,000.00 7,111.00 15,000.00 1,030.00 110,000.00 120,000.00 4,200,000.00 105,250.00 90,000.00 35,000.00 45,000.00 53,000.00 50,000.00 55,000.00 60,000.00

640,000.00 38,400.00 24,000.00 1,119,982.50 33,750.00 346,080.00 59,400.00 97,200.00 504,000.00 294,700.00 2,880,000.00 185,500.00 12,375.00 68,900.00 52,500.00 14,575.00 15,900.00 349,750.00

6,037,512.50

2,000,000.00 12,000.00 15,000.00 7,111.00 15,000.00 1,030.00 110,000.00 120,000.00 4,200,000.00 105,250.00 90,000.00 35,000.00 45,000.00 53,000.00 50,000.00 55,000.00 60,000.00

480,000.00 38,400.00 24,000.00 1,116,427.00 33,750.00 346,080.00 59,400.00 97,200.00 672,000.00 294,700.00 2,160,000.00 185,500.00 12,375.00 68,900.00 52,500.00 14,410.00 15,900.00 349,585.00

5,321,957.00

NO1

URAIAN2

HARGA SATUAN (Rp)3

HARGA UPAH (Rp)4

HARGA BAHAN (Rp)5

19 1 M3 MEMBUAT PERSIAPAN PEKERJAAN DINDING BETON BERTULANG (200 KG BESI + (SNI 03-2835-2002) BEKISTING) 0.2500 m3 Kayu Kelas III 3.0000 kg Paku Biasa 5' - 12' 1.2000 ltr Minyak Bekisting 210.0000 kg Besi Beton 3.0000 kg Kawat Beton 336.0000 kg Semen Portland 0.5400 m3 Pasir Beton 0.8100 m3 Koral Beton 0.1050 m3 Kayu Kelas II balok 2.5000 lbr Plywood 9 mm 14.0000 btg Dolken Kayu 8" /4 m 5.6500 oh Pekerja 0.2750 oh Tukang Batu 1.5600 oh Tukang Kayu 1.4000 oh Tukang Besi 0.3230 oh Kepala Tukang 0.2830 oh Mandor

2,000,000.00 12,000.00 15,000.00 7,111.00 15,000.00 1,030.00 110,000.00 120,000.00 4,200,000.00 105,250.00 90,000.00 35,000.00 45,000.00 53,000.00 50,000.00 55,000.00 60,000.00

500,000.00 36,000.00 18,000.00 1,493,310.00 45,000.00 346,080.00 59,400.00 97,200.00 441,000.00 263,125.00 1,260,000.00 197,750.00 12,375.00 82,680.00 70,000.00 17,765.00 16,980.00 397,550.00

4,559,115.00

20 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM) 0.0020 m3 Kayu Kelas III 0.0100 kg Paku Biasa 5' - 12' 3.0000 kg Besi Beton 0.0450 kg Kawat Beton 4.0000 kg Semen Portland 0.0060 m3 Pasir Beton 0.0090 m3 Koral Beton 0.1800 oh Pekerja 0.0200 oh Tukang Batu 0.0200 oh Tukang Kayu 0.0200 oh Tukang Besi 0.0060 oh Kepala Tukang 0.0090 oh Mandor 21 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM) 0.0030 m3 Kayu Kelas III 0.0200 kg Paku Biasa 5' - 12' 3.6000 kg Besi Beton 0.0500 kg Kawat Beton 5.5000 kg Semen Portland 0.0090 m3 Pasir Beton 0.0150 m3 Koral Beton 0.2970 oh Pekerja 0.0330 oh Tukang Batu 0.0330 oh Tukang Kayu 0.0330 oh T