A.

ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN1 M2 Membersihkan Lapangan dan Peralatan upah: 1.000 0.050 Oh Oh Pekerja Mandor @ Rp. @ Rp. 0.00 0.00 = Rp. = Rp. 0.00 0.00

1 M3 Bongkaran Lantai Keramik upah: 6.667 0.333 Oh Oh Pekerja Mandor @ Rp. @ Rp. 0.00 0.00 = Rp. = Rp. 0.00 0.00

B.

PEKERJAAN TANAH1 m Galian Tanah Biasa sedalam 2 Meter upah: 0.526 0.052 Oh Oh Pekerja Mandor @ Rp. @ Rp. 0.00 0.00 = Rp. = Rp. 0.00 0.00

1 M3 Urugan Kembali upah: 0.192 0.019 Oh Oh Pekerja Mandor @ Rp. @ Rp. 0.00 0.00 = Rp. = Rp. 0.00 0.00

1 M3 Pemadatan Tanah upah: 0.500 0.050 1 M3 Urugan Pasir bahan: 1.200 upah: 0.300 0.010 Oh Oh Pekerja Mandor @ Rp. @ Rp. 0.00 0.00 = Rp. = Rp. 0.00 0.00 Oh Pasir Urug @ Rp. 0.00 = Rp. 0.00 Oh Oh Pekerja Mandor @ Rp. @ Rp. 0.00 0.00 = Rp. = Rp. 0.00 0.00

+

+

+

+

+

+

DAFTAR ANALISAA. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN1 1M Pagar Sementara dari Kayu Setinggi 2 Meter Bahan : 1.250 0.050 0.005 0.009 0.072 0.060 0.400 Upah : 0.200 0.400 0.020 0.020 2 Btg Zak 3 M M3 M3

Dolken Kayu 0 8-10/400 Cm Semen Portland Pasir Beton Koral Beton Kayu 5/7 Paku Biasa 2 " - 5 " Residu Tukang Kayu Pekerja Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

17,600.00 43,155.00 165,000.00 137,500.00 880,000.00 7,700.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

22,000.00 2,157.75 825.00 1,237.50 63,360.00 462.00 0.00 5,700.00 9,600.00 560.00 600.00 = Rp. = Rp. 16,460.00 106,502.25 = Rp. 90,042.25

Kg Lt Oh Oh Oh Oh

28,500.00 24,000.00 28,000.00 30,000.00

1M Pagar Sementara dari Seng Golombang Tinggi 2 Meter Bahan : 1.250 0.050 1.200 0.005 0.009 0.072 0.060 0.450 Upah : 0.200 0.400 0.020 0.020 Btg Zak Lbr M3 M 3 M Kg Kg Oh Oh Oh Oh3

Dolken Kayu 0 8-10/400 Cm Semen Portland Seng Gelombang 3 " - 5 " Pasir Beton Koral Beton Kayu 5/7 Paku Biasa 2 " - 5 " Meni besi Tukang Kayu Pekerja Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

17,600.00 43,155.00 31,000.00 165,000.00 137,500.00 880,000.00 7,700.00 12,650.00 28,500.00 24,000.00 28,000.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

22,000.00 2,157.75 37,200.00 825.00 1,237.50 63,360.00 462.00 5,692.50 5,700.00 9,600.00 560.00 600.00 = Rp. = Rp. 16,460.00 149,394.75 = Rp. 132,934.75

3

1M Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter Bahan : 1.000 0.040 25.000 0.005 0.009 0.060 Upah : 0.200 0.300 0.020 0.020 Btg Zak Kg M3 M3 Kg Oh Oh Oh Oh Dolken Kayu 0 8-10/400 Cm Semen Portland Kawat Duri Pasir Beton Koral Beton Paku Biasa 2 " - 5 " Tukang Kayu Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 17,600.00 43,155.00 50,000.00 165,000.00 137,500.00 7,700.00 28,500.00 24,000.00 28,000.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 17,600.00 1,726.20 1,250,000.00 825.00 1,237.50 462.00 5,700.00 7,200.00 560.00 600.00 = Rp. = Rp. 14,060.00 1,285,910.70

= Rp.

1,271,850.70

4

Pengukuran dan Pemasangan Bouplank Bahan : 0.012 0.020 0.007 Upah : 0.100 0.100 0.010 0.005 Oh Oh Oh Oh Tukang Kayu Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. 28,500.00 24,000.00 28,000.00 30,000.00 = Rp. = Rp. = Rp. = Rp. 2,850.00 2,400.00 280.00 150.00 M3 Kg M3 Kayu 5/7 Paku Biasa 2" - 5 " Kayu Papan 3/20 @ Rp. @ Rp. @ Rp. 880,000.00 7,700.00 990,000.00 Jumlah I = Rp. = Rp. = Rp. Rp. 10,560.00 154.00 6,930.00 17,644.00

= Rp.

17,644.00

= Rp. = Rp.

5,680.00 23,324.00

5

1 M2 Pembuatan Kantor Sementara, dengan Lantai Plesteran Bahan : 1.250 0.180 0.850 1.100 0.700 0.150 0.100 0.150 30.000 0.250 2.000 0.080 0.150 0.060 Upah : 2.000 1.000 2.000 0.300 0.050 Btg 3 M M3 Kg Zak 3 M 3 M 3 M Bh Lbr Bh 2 M Bh Lbr Oh Oh Oh Oh Oh Dolken Kayu 0 8-10/400 Cm Kayu Kayu Biasa Besi Strip Semen Portland Pasir Pasang Pasir Beton Koral Beton Bata Merah Seng Plat Jendela Nako Kaca Polos Kunci Tanam Plywood 4 mm Tukang Kayu Tukang Batu Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 17,600.00 880,000.00 880,000.00 20,000.00 43,155.00 145,000.00 165,000.00 137,500.00 900.00 25,000.00 22,000.00 50,550.00 70,000.00 28,500.00 28,000.00 24,000.00 28,000.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 22,000.00 158,400.00 748,000.00 22,000.00 30,208.50 21,750.00 16,500.00 20,625.00 27,000.00 6,250.00 0.00 1,760.00 7,582.50 4,200.00 57,000.00 28,000.00 48,000.00 8,400.00 1,500.00 = Rp. = Rp. 142,900.00 1,229,176.00

= Rp.

1,086,276.00

6

1 M2 Pembuatan Gudang Semen dan alat - alat Bahan : 1.700 0.210 0.300 0.210 0.030 0.050 1.500 Upah : 2.000 1.000 0.200 0.050 Oh Oh Oh Oh Tukang Kayu Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. 28,500.00 24,000.00 28,000.00 30,000.00 = Rp. = Rp. = Rp. = Rp. 57,000.00 24,000.00 5,600.00 1,500.00 = Rp. = Rp. 88,100.00 378,937.55 Btg 3 M Kg Zak 3 M M3 Lbr Dolken Kayu 0 8-10/400 Cm Kayu Paku Biasa Semen Portland Pasir Beton Koral Beton Seng Gelombang Bjls 32 @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 17,600.00 880,000.00 9,100.00 43,155.00 165,000.00 137,500.00 35,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 29,920.00 184,800.00 2,730.00 9,062.55 4,950.00 6,875.00 52,500.00

= Rp.

290,837.55

7

1 M Pembuatan Rumah Jaga / Konstruksi Kayu Bahan : 3.000 0.276 0.700 1.500 Upah : 1.500 1.000 0.150 0.050 Btg M3 Kg Lbr Oh Oh Oh Oh Dolken Kayu 0 8-10/400 Cm Kayu Paku Biasa Seng Gelombang Bjls 32 Tukang Kayu Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 17,600.00 880,000.00 9,100.00 35,000.00 28,500.00 24,000.00 28,000.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 52,800.00 242,880.00 6,370.00 52,500.00 42,750.00 24,000.00 4,200.00 1,500.00 = Rp. = Rp. 72,450.00 427,000.00

2

= Rp.

354,550.00

8

1 M2 Membersihkan Lapangan dan Peralatan Upah : 1.000 0.050 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 24,000.00 1,500.00

= Rp. = Rp.

25,500.00 25,500.00

9

1 M2 Pembuatan Bedeng Buruh Bahan : 1.250 0.186 0.300 0.360 Btg M3 Kg Zak Dolken Kayu 0 8-10/400 Cm Kayu Paku Biasa Semen Portland @ Rp. @ Rp. @ Rp. @ Rp. 17,600.00 880,000.00 9,100.00 43,155.00 = Rp. = Rp. = Rp. = Rp. 22,000.00 163,680.00 2,730.00 15,535.80

0.030 0.050 1.500 1.350 Upah : 2.000 1.000 0.200 0.050 102

M3 M3 Lbr Lbr Oh Oh Oh Oh

Pasir Beton Koral Beton Seng Gelombang Bjls 32 Plywood Tukang Kayu Pekerja Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

165,000.00 137,500.00 31,000.00 70,000.00 28,500.00 24,000.00 28,000.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

4,950.00 6,875.00 46,500.00 94,500.00 57,000.00 24,000.00 5,600.00 1,500.00 = Rp. = Rp. 88,100.00 444,870.80 = Rp. 356,770.80

1 M Pembuatan Bak Adukan Ukuran (40x50x20) Cm Bahan : 0.036 0.080 1.000 Upah : 0.300 0.0015 M3

Kg Btg Oh Oh

Kayu Terentang Paku Biasa Kaso 5/7 Tukang Kayu Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

715,000.00 9,100.00 17,600.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp.

25,740.00 728.00 17,600.00 8,550.00 45.00

= Rp.

44,068.00

= Rp. = Rp.

8,595.00 52,663.00

11

1 M2 Pembuatan Stegger dari Bambu, Ukuran (40x50x20) Cm Bahan : 1.000 0.250 Upah : 0.017 0.002 0.250 0.013 Btg Kg Oh Oh Oh Oh Bambu 0 6 -10/600 Cm Tali Ijuk Tukang Kayu Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 8,250.00 27,500.00 28,500.00 24,000.00 28,000.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 8,250.00 6,875.00 484.50 48.00 7,000.00 390.00 = Rp. = Rp. 7,922.50 23,047.50 = Rp. 15,125.00

12

1 M Pembuatan Jalan Sementara Bahan : 0.150 0.090 0.010 Upah : 1.000 0.050 M 3 M M3 Oh Oh3

2

Batu Belah 15/20 Batu Pecah 5/7 Pasir Pasang Pekerja Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

95,000.00 110,000.00 145,000.00 24,000.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp.

14,250.00 9,900.00 1,450.00 24,000.00 1,500.00 = Rp. = Rp. 25,500.00 51,100.00 = Rp. 25,600.00

13

1 M Bongkaran Beton Bertulang Upah : 6.667 0.333 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 160,008.00 9,990.00 = Rp. = Rp. 169,998.00 169,998.00

3

14

1 M3 Bongkaran Dinding Tembok Bata Merah Upah : 6.667 0.033 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 160,008.00 990.00

= Rp. = Rp.

160,998.00 160,998.00

15

1 M Pagar Kawat Jaring Galvanis, Tinggi 1.00 Meter Bahan : 0.434 Lbr Pagar Kawat Jaring Upah : 0.042 0.004 0.042 0.002 Oh Oh Oh Oh Pekerja Kepala Tukang Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

15,000.00 24,000.00 28,000.00 28,000.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp.

6,510.00 1,008.00 112.00 1,176.00 60.00

= Rp.

6,510.00

= Rp. = Rp.

2,356.00 8,866.00

16

1 M Pagar Beton Pracetak (5x50x213) Cm Bahan : 0.986 Lbr Panel Beton Pracetak 0.525 Btg Kolom Beton Pracetak

@ Rp. @ Rp.

715,000.00 17,600.00

= Rp. = Rp.

704,990.00 9,240.00

0.074 0.146 45.000 Upah : 0.125 0.375 0.012 0.019

M3 M3 Kg Oh Oh Oh Oh

Pasir Beton Koral 2/3 Semen Abu - abu Tukang Batu Pekerja Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

165,000.00 137,500.00 3,200.00 28,000.00 24,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

12,210.00 20,075.00 144,000.00 3,500.00 9,000.00 342.00 570.00

= Rp.

890,515.00

= Rp. = Rp.

13,412.00 903,927.00

B.1

PEKERJAAN TANAH1 m Galian Tanah Biasa sedalam 1 Meter Upah : 0.400 0.040 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 9,600.00 1,200.00 = Rp. = Rp. 10,800.00 10,800.00

2

1 m Galian Tanah Biasa sedalam 2 Meter Upah : 0.526 0.052 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 12,624.00 1,560.00 = Rp. = Rp. 14,184.00 14,184.00

3

1 m Galian Tanah Biasa sedalam 3 Meter Upah : 0.735 0.073 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 17,640.00 2,190.00 = Rp. = Rp. 19,830.00 19,830.00

4

1 m Galian Tanah Keras sedalam 1 Meter Upah : 0.625 0.062 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 15,000.00 1,860.00 = Rp. = Rp. 16,860.00 16,860.00

5

1 m Galian Tanah Cadas sedalam 1 Meter Upah : 1.250 0.125 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 30,000.00 3,750.00 = Rp. = Rp. 33,750.00 33,750.00

6

1 m Galian Tanah Lumpur sedalam 1 Meter Upah : 0.823 0.083 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 19,752.00 2,490.00

= Rp. = Rp.

22,242.00 22,242.00

7

1 m Pekerjaan Stripping Setinggi 1 Meter Upah : 0.050 0.005 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 1,200.00 150.00

= Rp. = Rp.

1,350.00 1,350.00

8

1 M3 Pembuangan Tanah Sejauh 150 Meter Upah : 0.516 0.050 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 12,384.00 1,500.00 = Rp. = Rp. 13,884.00 13,884.00

9

1 M3 Urugan Kembali Upah : 0.192 0.019 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 4,608.00 570.00

= Rp. = Rp.

5,178.00 5,178.00

10

1 M3 Pemadatan Tanah Upah : 0.500 0.050 Oh Oh Pekerja Mandor @ Rp. @ Rp. 24,000.00 30,000.00 = Rp. = Rp. 12,000.00 1,500.00

= Rp. = Rp.

13,500.00 13,500.00

11

1 M3 Urugan Pasir

Bahan : 1.200 Upah : 0.300 0.010 123

Oh Oh Oh

Pasir Urug Pekerja Mandor

@ Rp. @ Rp. @ Rp.

130,000.00 24,000.00 30,000.00

= Rp. = Rp. = Rp.

156,000.00 7,200.00 300.00

= Rp.

156,000.00

= Rp. = Rp.

7,500.00 163,500.00

1 M Lapisan Pudel Camp. 1 Kp : 3 Ps : 7 TL Bahan : 0.330 0.109 0.763 Upah : 0.833 0.416 0.040 0.083 Oh Oh Oh Oh Oh Oh Oh Pasir Urug Kapur Padam Tanah Liat Pekerja Tukang Gali Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 130,000.00 27,500.00 0.00 24,000.00 24,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 42,900.00 2,997.50 0.00 19,992.00 9,984.00 1,140.00 2,490.00

= Rp.

45,897.50

= Rp. = Rp.

33,606.00 79,503.50

13

1 M Lapisan Pudel Camp. 1 Kp : 5 TL Bahan : 0.200 1.000 Upah : 0.833 0.416 0.041 0.081 Oh Oh Oh Oh Oh Oh Kapur Padam Tanah Liat Pekerja Tukang Gali Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 27,500.00 0.00 24,000.00 24,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 5,500.00 0.00 19,992.00 9,984.00 1,168.50 2,430.00 = Rp. = Rp. 33,574.50 39,074.50 = Rp. 5,500.00

3

15

1 M Pemasangan Lapisan Ijuk Bahan : 1.200 Upah : 0.150 0.015 Oh Oh Oh Ijuk Pekerja Mandor @ Rp. @ Rp. @ Rp. 27,500.00 24,000.00 30,000.00 = Rp. = Rp. = Rp. 33,000.00 3,600.00 450.00 = Rp. = Rp. 4,050.00 37,050.00 = Rp. 33,000.00

3

16

1 M3 Pemasangan Lapisan Ijuk Bahan : 1.200 Upah : 0.250 0.025 Oh Oh Oh Sirtu Pekerja Mandor @ Rp. @ Rp. @ Rp. 110,000.00 24,000.00 30,000.00 = Rp. = Rp. = Rp. 132,000.00 6,000.00 750.00 = Rp. 132,000.00

= Rp. = Rp.

6,750.00 138,750.00

17

1 M2 Pembuatan Jalan Sementara, Tebal 25 Cm Bahan : 0.275 0.030 0.050 Upah : 1.000 0.040 0.100 Oh Oh Oh Oh Oh Oh Batu Belah Kerikil Pasir Urug Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 95,000.00 137,500.00 130,000.00 24,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 26,125.00 4,125.00 6,500.00 24,000.00 1,140.00 3,000.00 = Rp. 36,750.00

= Rp. = Rp.

28,140.00 64,890.00

C 1

ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI 1 M3 Pasangan Pondasi Batu Kosong Bahan : 1.200 0.300 Upah : 0.780 0.300 0.039 0.039 M3 M3 Oh Oh Oh Oh Batu Belah 15 / 20 Pasir Urug Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 95,000.00 130,000.00 24,000.00 30,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 114,000.00 39,000.00 18,720.00 9,000.00 1,111.50 1,170.00 = Rp. 153,000.00

= Rp.

30,001.50

= Rp. 2 1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 1 Ps Bahan : 1.100 7.840 0.314 Upah : 1.500 0.600 0.060 0.075 33

183,001.50

M

3

Batu Belah 15 / 20 Semen Portland Pasir Pasang Pekerja Tukang Gali Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

95,000.00 43,155.00 145,000.00 24,000.00 24,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

104,500.00 338,335.20 45,530.00 36,000.00 14,400.00 1,710.00 2,250.00 = Rp. 488,365.20

Zak M3 Oh Oh Oh Oh

= Rp. = Rp.

54,360.00 542,725.20

1 M Pasangan Pondasi Batu Kali, 1 Pc : 2 Ps Bahan : 1.100 5.340 0.427 Upah : 1.500 0.600 0.060 0.075 Oh Oh Oh Oh Pekerja Tukang Gali Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 24,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. 36,000.00 14,400.00 1,710.00 2,250.00 = Rp. = Rp. 54,360.00 451,222.70 M3

Zak 3 M

Batu Belah 15 / 20 Semen Portland Pasir Pasang

@ Rp. @ Rp. @ Rp.

95,000.00 43,155.00 145,000.00

= Rp. = Rp. = Rp.

104,500.00 230,447.70 61,915.00

= Rp.

396,862.70

4

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 2.5 Ps Bahan : 1.100 5.000 0.314 Upah : 1.500 0.600 0.060 0.075 M3 Zak 3 M Oh Oh Oh Oh Batu Belah 15 / 20 Semen Portland Pasir Pasang Pekerja Tukang Gali Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 95,000.00 43,155.00 145,000.00 24,000.00 24,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 104,500.00 215,775.00 45,530.00 36,000.00 14,400.00 1,710.00 2,250.00 = Rp. = Rp. 54,360.00 420,165.00 = Rp. 365,805.00

5

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 3 Ps Bahan : 1.100 4.040 0.485 Upah : 1.500 0.600 0.060 0.075 M3

Zak 3 M Oh Oh Oh Oh

Batu Belah 15 / 20 Semen Portland Pasir Pasang Pekerja Tukang Gali Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

95,000.00 43,155.00 145,000.00 24,000.00 24,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

104,500.00 174,346.20 70,325.00 36,000.00 14,400.00 1,710.00 2,250.00

= Rp.

349,171.20

= Rp. = Rp.

54,360.00 403,531.20

6

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 4 Ps Bahan : 1.100 3.260 0.520 Upah : 1.500 0.600 0.060 0.075 M3

Zak M3 Oh Oh Oh Oh

Batu Belah 15 / 20 Semen Portland Pasir Pasang Pekerja Tukang Gali Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

95,000.00 43,155.00 145,000.00 24,000.00 24,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

104,500.00 140,685.30 75,400.00 36,000.00 14,400.00 1,710.00 2,250.00

= Rp.

320,585.30

= Rp. = Rp.

54,360.00 374,945.30

7

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 5 Ps Bahan : 1.100 2.720 0.544 M3 Zak M3 Batu Belah 15 / 20 Semen Portland Pasir Pasang @ Rp. @ Rp. @ Rp. 95,000.00 43,155.00 145,000.00 = Rp. = Rp. = Rp. 104,500.00 117,381.60 78,880.00

= Rp.

300,761.60

Upah : 1.500 0.600 0.060 0.075 83

Oh Oh Oh Oh

Pekerja Tukang Gali Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

24,000.00 24,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp.

36,000.00 14,400.00 1,710.00 2,250.00 = Rp. = Rp. 54,360.00 355,121.60

1 M Pasangan Pondasi Batu Kali, 1 Pc : 6 Ps Bahan : 1.100 2.340 0.561 Upah : 1.500 0.600 0.060 0.075 M3

Zak 3 M Oh Oh Oh Oh

Batu Belah 15 / 20 Semen Portland Pasir Pasang Pekerja Tukang Gali Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

95,000.00 43,155.00 145,000.00 24,000.00 24,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

104,500.00 100,982.70 81,345.00 36,000.00 14,400.00 1,710.00 2,250.00

= Rp.

286,827.70

= Rp. = Rp.

54,360.00 341,187.70

9

1 M Pasangan Pondasi Batu Kali, 1 Pc : 8 Ps Bahan : 1.100 1.820 0.561 Upah : 1.500 0.600 0.060 0.075 M3 Zak M3 Oh Oh Oh Oh Batu Belah 15 / 20 Semen Portland Pasir Pasang Pekerja Tukang Gali Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 95,000.00 43,155.00 145,000.00 24,000.00 24,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 104,500.00 78,542.10 81,345.00 36,000.00 14,400.00 1,710.00 2,250.00 = Rp. 264,387.10

3

= Rp. = Rp.

54,360.00 318,747.10

10

1 M Pasangan Pondasi Batu Kali, 1 Kp : 1 Sm : 1 Ps Bahan : 1.100 0.229 0.229 0.544 Upah : 1.500 0.600 0.060 0.075 M3 Kg Kg M3 Oh Oh Oh Oh Batu Belah 15 / 20 Kapur Pasang Semen Merah Pasir Pasang Pekerja Tukang Gali Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 95,000.00 165,000.00 78,400.00 145,000.00 24,000.00 24,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 104,500.00 37,785.00 17,953.60 78,880.00 36,000.00 14,400.00 1,710.00 2,250.00 = Rp. 239,118.60

3

= Rp. = Rp.

54,360.00 293,478.60

11

1 M Pasangan Pondasi Batu Kali, 1 Kp : 1 Sm : 2 Ps Bahan : 1.100 0.170 0.170 0.340 Upah : 1.500 0.600 0.060 0.075 M3 Kg M3 M3 Oh Oh Oh Oh Batu Belah 15 / 20 Kapur Pasang Semen Merah Pasir Pasang Pekerja Tukang Gali Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 95,000.00 165,000.00 78,400.00 145,000.00 24,000.00 24,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 104,500.00 28,050.00 13,328.00 49,300.00 36,000.00 14,400.00 1,710.00 2,250.00 = Rp. 195,178.00

3

= Rp. = Rp.

54,360.00 249,538.00

12

1 M3 Pasangan Pondasi Batu Kali, 1 Pc : 1/4 Kp : 4 Ps Bahan : 1.100 3.120 0.032 0.584 Upah : 1.500 0.600 M3 Zak M3 M3 Oh Oh Batu Belah 15 / 20 Semen Portland Kapur Pasang Pasir Pasang Pekerja Tukang Gali @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 95,000.00 43,155.00 27,500.00 145,000.00 24,000.00 24,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 104,500.00 134,643.60 880.00 84,680.00 36,000.00 14,400.00

= Rp.

324,703.60

0.060 0.075 133

Oh Oh

Kepala Tukang Mandor

@ Rp. @ Rp.

28,500.00 30,000.00

= Rp. = Rp.

1,710.00 2,250.00

= Rp. = Rp.

54,360.00 379,063.60

1 M Pasangan Pondasi Batu Kali, 3 Pc : 3 Kp : 10 Ps Bahan : 1.100 1.220 0.147 0.492 Upah : 1.500 0.600 0.060 0.075 M3 Zak 3 M 3 M Oh Oh Oh Oh Batu Belah 15 / 20 Semen Portland Kapur Pasang Pasir Pasang Pekerja Tukang Gali Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 95,000.00 43,155.00 27,500.00 145,000.00 24,000.00 24,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 104,500.00 52,649.10 4,042.50 71,340.00 36,000.00 14,400.00 1,710.00 2,250.00 = Rp. = Rp. 54,360.00 286,891.60 = Rp. 232,531.60

14

1 M3 Pasangan Pondasi Batu Kali, 1/4 Pc : 1 Kp : 4 Ps Bahan : 1.100 0.820 0.131 0.523 Upah : 1.500 0.600 0.060 0.075 M3

Batu Belah 15 / 20 Semen Portland Kapur Pasang Pasir Pasang Pekerja Tukang Gali Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

95,000.00 43,155.00 27,500.00 145,000.00 24,000.00 24,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

104,500.00 35,387.10 3,602.50 75,835.00 36,000.00 14,400.00 1,710.00 2,250.00 = Rp. = Rp. 54,360.00 273,684.60 = Rp. 219,324.60

Zak M3 M3 Oh Oh Oh Oh

15

1 M Pasang Pondasi Siklop 40 % Batu Kali Bahan : 75.000 4.04 0.320 0.490 0.800 Upah : 3.000 0.850 0.085 0.150 Kg Zak 3 M 3 M Kg Oh Oh Oh Oh Besi Beton Semen Portland Pasir Beton Koral Beton Kawat Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 5,850.00 43,155.00 165,000.00 137,500.00 13,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 438,750.00 174,346.20 52,800.00 67,375.00 10,400.00 72,000.00 25,500.00 2,677.50 4,500.00 = Rp. 743,671.20

3

= Rp. = Rp.

104,677.50 848,348.70

16

1 M Pasang Pondasi Sumuran Diameter 100 Cm Bahan : 0.450 5.60 0.450 0.670 Upah : 2.380 0.300 0.030 0.080 M3 Zak M3 M3 Oh Oh Oh Oh Batu Belah 15 / 20 Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 95,000.00 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 42,750.00 241,668.00 74,250.00 92,125.00 57,120.00 9,000.00 945.00 2,400.00 = Rp. 450,793.00

3

= Rp. = Rp.

69,465.00 520,258.00

17

Pembuatan Tiang Pancang (40x40) Cm, Beton Bertulang Bahan : M3 0.019 Pasir Urug Darat M3 0.09 Pasir Beton M3 0.150 Koral Beton 1.21 45.00 0.90 0.032 Zak Kg Kg M3 Semen Portland Besi Beton Kawat Beton Kayu Kaso 5/7

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

130,000.00 165,000.00 137,500.00 43,155.00 5,850.00 13,000.00 715,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

2,470.00 15,510.00 20,625.00 52,217.55 263,250.00 11,700.00 22,880.00

0.120 0.090 0.240 Upah : 1.000 0.670 0.067 0.050 18

Kg Lt Kg Oh Oh Oh Oh

Paku Minyak Bekisting Plamuur Tembok Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

9,100.00 18,050.00 35,000.00 24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

1,092.00 1,624.50 8,400.00 24,000.00 20,100.00 2,110.50 1,500.00

= Rp.

399,769.05

= Rp. = Rp.

47,710.50 447,479.55

Pembuatan Tiang Pancang (35x35) Cm, Beton Bertulang Bahan : 3 M 0.016 Pasir Urug Darat 3 M 0.08 Pasir Beton 3 M 0.125 Koral Beton 0.98 34.50 0.700 0.027 0.120 0.090 0.200 Upah : 0.800 0.500 0.050 0.040 Zak Kg Kg 3 M Kg Lt Kg Oh Oh Oh Oh Semen Portland Besi Beton Kawat Beton Kayu Kaso 5/7 Paku Minyak Bekisting Plamuur Tembok Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

130,000.00 165,000.00 137,500.00 43,155.00 5,850.00 13,000.00 880,000.00 9,350.00 18,050.00 35,000.00 24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

2,080.00 13,200.00 17,187.50 42,291.90 201,825.00 9,100.00 23,760.00 1,122.00 1,624.50 7,000.00 19,200.00 15,000.00 1,575.00 1,200.00 = Rp. = Rp. 36,975.00 356,165.90 = Rp. 319,190.90

D 1

Analisa Biaya Konstruksi Pekerjaan Beton 3 1 M Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr Bahan : 5.620 0.520 0.870 Upah : 1.650 0.250 0.025 0.080 Zak 3 M 3 M Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 242,531.10 85,800.00 119,625.00 39,600.00 7,500.00 787.50 2,400.00 = Rp. = Rp. 50,287.50 498,243.60 = Rp. 447,956.10

2

1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr Bahan : 3.940 0.470 0.940 Upah : 1.650 0.250 0.025 0.080 Zak M3 M3 Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 170,030.70 77,550.00 129,250.00 39,600.00 7,500.00 787.50 2,400.00 = Rp. = Rp. 50,287.50 427,118.20

= Rp.

376,830.70

3

1 M3 Membuat Beton Tumbuk, 1 Pc : 4 Ps : 6 Kr Bahan : 3.460 0.570 0.870 Upah : 1.650 0.250 0.025 0.080 Zak M3 M3 Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 149,316.30 94,050.00 119,625.00 39,600.00 7,500.00 787.50 2,400.00

= Rp.

376,830.70

= Rp. = Rp.

50,287.50 427,118.20

4

1 M3 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr Bahan : 0.200 0.026 0.044 Upah : 1.150 0.020 0.002 0.006 Zak 3 M M3 Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 8,631.00 4,290.00 6,050.00 27,600.00 600.00 63.00 180.00 = Rp. 18,971.00

= Rp. = Rp.

28,443.00 47,414.00

5

1 M Membuat Beton Bertulang, 1 Pc : 2 Ps : 3 Kr Bahan : 4.640 0.520 0.780 Upah : 1.650 0.250 0.025 0.080 Zak 3 M M3 Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 200,239.20 85,800.00 107,250.00 39,600.00 7,500.00 787.50 2,400.00 = Rp. = Rp. 50,287.50 443,576.70

3

= Rp.

393,289.20

6

1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 4 Kr Bahan : 5.600 0.450 0.900 Upah : 1.650 0.250 0.025 0.080 Zak M3 M3

Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

241,668.00 74,250.00 123,750.00 39,600.00 7,500.00 787.50 2,400.00

= Rp.

439,668.00

Oh Oh Oh Oh

= Rp. = Rp.

50,287.50 489,955.50

7

1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 2.5 Kr Bahan : 7.040 0.560 0.700 Upah : 1.650 0.250 0.025 0.080 Zak 3 M M3

Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

303,811.20 92,400.00 96,250.00 39,600.00 7,500.00 787.50 2,400.00 = Rp. = Rp. 50,287.50 542,748.70 = Rp. 492,461.20

Oh Oh Oh Oh

8

1 M3 Membuat Beton Bertulang, 1 Pc : 5 Ps : 3 Kr Bahan : 7.140 0.420 0.540 Upah : 1.650 0.250 0.025 0.080 Zak 3 M M3 Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 308,126.70 69,300.00 74,250.00 39,600.00 7,500.00 787.50 2,400.00 = Rp. 451,676.70

= Rp. = Rp.

50,287.50 501,964.20

9

1 M3 Membuat Beton Bertulang, 1 Pc : 1,5 Ps : 2.5 Kr Bahan : 7.720 0.470 0.780 Upah : Zak M3 M3 Semen Portland Pasir Beton Koral Beton @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 = Rp. = Rp. = Rp. 333,156.60 77,550.00 107,250.00

= Rp.

517,956.60

1.650 0.250 0.025 0.080 10

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp.

39,600.00 7,500.00 787.50 2,400.00 = Rp. = Rp. 50,287.50 568,244.10

1 M3 Membuat Beton Bertulang, 1 Pc : 1 Ps : 2 Kr Bahan : 9.580 0.370 0.740 Upah : 1.650 0.250 0.025 0.080 Zak 3 M 3 M Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 413,424.90 61,050.00 101,750.00 39,600.00 7,500.00 787.50 2,400.00

= Rp.

576,224.90

= Rp. = Rp.

50,287.50 626,512.40

11

1 M Membuat Tiang Pancang Prestressed Beton Bahan : 8.800 0.500 0.800 2.460 Upah : 1.650 0.250 0.025 0.080 Zak M3 M3 Gln Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Rapidrant Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 379,764.00 82,500.00 110,000.00 0.00 39,600.00 7,500.00 787.50 2,400.00 = Rp. 572,264.00

3

24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp.

50,287.50 622,551.50

12

1 M Membuat Beton dengan Puzzdith - 100 XR Bahan : 6.720 0.540 0.810 1.000 Upah : 1.650 0.250 0.025 0.080 Zak 3 M 3 M Ltr Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Puzzdith - 100 XR Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 30,000.00 31,500.00 30,000.00 43,155.00 165,000.00 137,500.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 290,001.60 89,100.00 111,375.00 0.00 39,600.00 7,500.00 787.50 2,400.00 = Rp. 490,476.60

3

= Rp. = Rp.

50,287.50 540,764.10

13

1 M Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr Bahan : 6.720 0.540 0.810 Upah : 2.000 0.350 0.035 1.000 Zak M3 M3 Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 290,001.60 89,100.00 111,375.00 48,000.00 10,500.00 1,102.50 30,000.00 = Rp. 490,476.60

3

= Rp. = Rp.

89,602.50 580,079.10

14

1 M3 Membuat Beton Bertulang 1 Pc : 2 Ps : 4 Kr Bahan : 5.820 0.470 0.930 Upah : 2.000 0.350 0.035 1.000 Zak M3 M3 Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 251,162.10 77,550.00 127,875.00 48,000.00 10,500.00 1,102.50 30,000.00 = Rp. 456,587.10

= Rp.

89,602.50

= Rp. 15 1 M3 Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3 Kr Bahan : 7.340 0.440 0.880 Upah : 2.000 0.350 0.035 1.000 163

546,189.60

Zak M3 M3 Oh Oh Oh Oh

Semen Portland Pasir Beton Koral Beton 2/3 Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

316,757.70 72,600.00 121,000.00 48,000.00 10,500.00 1,102.50 30,000.00 = Rp. 510,357.70

= Rp. = Rp.

89,602.50 599,960.20

1 M Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5 Kr Bahan : 8.000 0.480 0.880 Upah : 2.000 0.350 0.035 1.000 Oh Oh Oh Oh Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. 48,000.00 10,500.00 1,102.50 30,000.00 = Rp. = Rp. 89,602.50 635,042.50 Zak M3 M3

Semen Portland Pasir Beton Koral Beton 2/3

@ Rp. @ Rp. @ Rp.

43,155.00 165,000.00 137,500.00

= Rp. = Rp. = Rp.

345,240.00 79,200.00 121,000.00

= Rp.

545,440.00

17

1 M3 Membuat Beton Bertulang 1 Pc : 1 Ps : 1 Kr Bahan : 12.300 0.520 0.520 Upah : 2.000 0.350 0.035 1.000 Zak 3 M 3 M Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 530,806.50 85,800.00 71,500.00 48,000.00 10,500.00 1,102.50 30,000.00 = Rp. = Rp. 89,602.50 777,709.00 = Rp. 688,106.50

18

1 M3 Membuat Beton Kedap Air dengan Strorox - 100 Bahan : 8.000 0.480 0.800 1.200 Upah : 2.000 0.350 0.035 1.000 Zak 3 M 3 M Kg Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Strorox - 100 Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 345,240.00 79,200.00 110,000.00 0.00 48,000.00 10,500.00 1,102.50 30,000.00 = Rp. = Rp. 89,602.50 624,042.50

= Rp.

534,440.00

24,000.00 30,000.00 31,500.00 30,000.00

19

1 M' Memasang PVC Waterstop Lebar 150 mm Bahan : 1.050 Upah : 0.050 0.030 0.003 0.002 M1 Oh Oh Oh Oh Waterstop Lebar 150 mm Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 150,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. 157,500.00 1,200.00 900.00 94.50 60.00 = Rp. 157,500.00

= Rp. = Rp.

2,254.50 159,754.50

20

1 M' Memasang PVC Waterstop Lebar 200 mm Bahan : M1 1.050 Waterstop Lebar 200 mm Upah : 0.050 Oh Pekerja 0.030 Oh Tukang Batu

@ Rp. @ Rp. @ Rp.

155,000.00 24,000.00 30,000.00

= Rp. = Rp. = Rp.

162,750.00 1,200.00 900.00

= Rp.

162,750.00

0.003 0.002 21

Oh Oh

Kepala Tukang Mandor

@ Rp. @ Rp.

31,500.00 30,000.00

= Rp. = Rp.

94.50 60.00

= Rp. = Rp.

2,254.50 165,004.50

1 M' Memasang PVC Waterstop Lebar 230 mm Bahan : 1.050 Upah : 0.550 0.035 0.003 M1 Oh Oh Oh Waterstop Lebar 230 mm Pekerja Tukang Batu Mandor @ Rp. @ Rp. @ Rp. @ Rp. 155,000.00 24,000.00 30,000.00 30,000.00 = Rp. = Rp. = Rp. = Rp. 162,750.00 13,200.00 1,050.00 90.00 = Rp. 162,750.00

= Rp. = Rp.

14,340.00 177,090.00

22

1 M' Memasang PVC Waterstop Lebar 250 mm Bahan : 1.050 Upah : 0.550 0.035 0.003 M1

Waterstop Lebar 250 mm Pekerja Tukang Batu Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

155,000.00 24,000.00 30,000.00 30,000.00

= Rp. = Rp. = Rp. = Rp.

162,750.00 13,200.00 1,050.00 90.00

= Rp.

162,750.00

Oh Oh Oh

= Rp. = Rp.

14,340.00 177,090.00

23

1 M' Memasang PVC Waterstop Lebar 300 mm Bahan : 1.050 Upah : 0.550 0.035 0.003 M1 Oh Oh Oh Waterstop Lebar 300 mm Pekerja Tukang Batu Mandor @ Rp. @ Rp. @ Rp. @ Rp. 155,000.00 24,000.00 30,000.00 30,000.00 = Rp. = Rp. = Rp. = Rp. 162,750.00 13,200.00 1,050.00 90.00 = Rp. = Rp. 14,340.00 177,090.00 = Rp. 162,750.00

24

1 M' Memasang PVC Waterstop Lebar 320 mm Bahan : 1 M 1.050 Waterstop Lebar 320 mm Upah : 0.550 Oh Pekerja 0.035 0.003 Oh Oh Tukang Batu Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

155,000.00 24,000.00 30,000.00 30,000.00

= Rp. = Rp. = Rp. = Rp.

162,750.00 13,200.00 1,050.00 90.00

= Rp.

162,750.00

= Rp. = Rp.

14,340.00 177,090.00

25

1 Kg Pembesian Dengan Besi Polos atau Besi Ulir Bahan : 1.050 0.015 Upah : 0.007 0.007 0.0007 0.0003 Kg Kg Oh Oh Oh Oh Besi Beton ( Polos/ Ulir ) Kawat Beton Pekerja Tukang Besi Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 5,850.00 13,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 6,142.50 195.00 168.00 210.00 22.05 9.00

= Rp.

6,337.50

= Rp. = Rp.

409.05 6,746.55

26

1 Kg Kabel Presstressed Polos / Strands Bahan : 1.050 0.010 Upah : 0.005 0.005 0.0005 0.0003 Kg Kg Oh Oh Oh Oh Besi Presstressed Polos Kawat Beton Pekerja Tukang Besi Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 5,850.00 13,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 6,142.50 130.00 120.00 150.00 15.75 9.00 = Rp. 6,272.50

= Rp. = Rp.

294.75 6,567.25

27

1 Kg Jaring Kawat Baja Bahan : 1.020 Kg Besi Jaring Kawat Baja 0.805 Kg Kawat Beton Upah : 0.025 Oh Pekerja

@ Rp. @ Rp. @ Rp.

75,000.00 13,000.00 24,000.00

= Rp. = Rp. = Rp.

76,500.00 10,465.00 600.00

= Rp.

86,965.00

0.025 0.0025 0.0015 28

Oh Oh Oh

Tukang Besi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp.

30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp.

750.00 78.75 45.00

= Rp. = Rp.

1,473.75 88,438.75

1 M2 Pasangan Bekisting untuk Pondasi Bahan : 0.040 0.300 0.100 Upah : 0.300 0.260 0.026 0.005 M3

Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

715,000.00 8,250.00 18,050.00 24,000.00 28,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

28,600.00 2,475.00 1,805.00 7,200.00 7,280.00 741.00 150.00 = Rp. = Rp. 15,371.00 48,251.00 = Rp. 32,880.00

Kg Ltr Oh Oh Oh Oh

29

1 M2 Pasangan Bekisting untuk Sloof Bahan : 0.045 0.300 0.100 Upah : 0.300 0.260 0.026 0.005 M3

Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

715,000.00 8,250.00 18,050.00 24,000.00 28,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

32,175.00 2,475.00 1,805.00 7,200.00 7,280.00 741.00 150.00 = Rp. = Rp. 15,371.00 51,826.00 = Rp. 36,455.00

Kg Ltr Oh Oh Oh Oh

30

1 M Pasangan Bekisting untuk Kolom Bahan : 0.040 0.400 0.200 0.015 0.350 2.000 Upah : 0.300 0.330 0.033 0.006 M3

2

Kg Ltr 3 M Lbr Btg Oh Oh Oh Oh

Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Balok kayu Borneo Plywood Tebal 9 mm Dolken kayu Galam o - 8-10/4 m Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

715,000.00 8,250.00 18,050.00 880,000.00 70,000.00 17,600.00 24,000.00 28,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

28,600.00 3,300.00 3,610.00 13,200.00 24,500.00 35,200.00 7,200.00 9,240.00 940.50 180.00 = Rp. 108,410.00

= Rp. = Rp.

17,560.50 125,970.50

31

1 M Pasangan Bekisting untuk Balok Bahan : 0.040 0.400 0.200 0.018 0.350 2.000 Upah : 0.320 0.330 0.033 0.006 M3 Kg Ltr M3 Lbr Btg Oh Oh Oh Oh Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Balok kayu Borneo Plywood Tebal 9 mm Dolken kayu Galam o - 8-10/4 m Pekerja Tukang Kayu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 715,000.00 8,250.00 18,050.00 880,000.00 70,000.00 17,600.00 24,000.00 28,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 28,600.00 3,300.00 3,610.00 15,840.00 24,500.00 35,200.00 7,680.00 9,240.00 940.50 180.00 = Rp. = Rp. 18,040.50 129,090.50 = Rp. 111,050.00

2

32

1 M2 Pasangan Bekisting untuk Lantai Bahan : 0.040 0.400 0.200 0.015 0.350 M3 Kg Ltr M3 Lbr Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Balok kayu Borneo Plywood Tebal 9 mm @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 715,000.00 8,250.00 18,050.00 880,000.00 70,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. 28,600.00 3,300.00 3,610.00 13,200.00 24,500.00

6.000 Upah : 0.320 0.330 0.033 0.006 332

Btg Oh Oh Oh Oh

Dolken kayu Galam o - 8-10/4 m Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

17,600.00 24,000.00 28,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp.

105,600.00 7,680.00 9,240.00 940.50 180.00

= Rp.

178,810.00

= Rp. = Rp.

18,040.50 196,850.50

1 M Pasangan Bekisting untuk Dinding Bahan : 0.030 0.400 0.200 0.020 0.350 3.000 4.000 Upah : 0.320 0.330 0.033 0.006 M3

Kg Ltr 3 M Lbr Btg Bh Oh Oh Oh Oh

Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Balok kayu Borneo Plywood Tebal 9 mm Dolken kayu Galam o - 8-10/4 m Formtie/ Penjaga jarak Bekisting/ Spacer Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

715,000.00 8,250.00 18,050.00 880,000.00 70,000.00 17,600.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

21,450.00 3,300.00 3,610.00 17,600.00 24,500.00 52,800.00 0.00 7,680.00 9,240.00 940.50 180.00 = Rp. = Rp. 18,040.50 141,300.50

= Rp.

123,260.00

24,000.00 28,000.00 28,500.00 30,000.00

34

1 M2 Pasangan Bekisting untuk Tangga Bahan : 0.030 0.400 0.150 0.015 0.350 2.000 Upah : 0.320 0.330 0.033 0.006 M3 Kg Ltr 3 M Lbr Btg Oh Oh Oh Oh Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Balok kayu Borneo Plywood Tebal 9 mm Dolken kayu Galam o - 8-10/4 m Pekerja Tukang Kayu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 715,000.00 8,250.00 18,050.00 880,000.00 70,000.00 17,600.00 24,000.00 28,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 21,450.00 3,300.00 2,707.50 13,200.00 24,500.00 35,200.00 7,680.00 9,240.00 940.50 180.00 = Rp. = Rp. 18,040.50 118,398.00

= Rp.

100,357.50

35

1 M Membuat Beton dengan Mutu K225 Bahan : 7.760 0.650 0.650 Upah : 6.000 1.000 0.100 0.300 Zak M3 M3

3

Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

334,882.80 107,250.00 89,375.00 144,000.00 30,000.00 3,150.00 9,000.00

= Rp.

531,507.80

Oh Oh Oh Oh

= Rp. = Rp.

186,150.00 717,657.80

36

1 M Membuat Beton dengan Mutu K275 Bahan : 8.000 0.400 0.820 Upah : 6.000 1.000 0.100 0.300 Zak M3 M3 Oh Oh Oh Oh Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 137,500.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 345,240.00 66,000.00 112,750.00 144,000.00 30,000.00 3,150.00 9,000.00 = Rp. = Rp. 186,150.00 710,140.00 = Rp. 523,990.00

3

37

1 M2 Pasangan Jembatan Cor Bahan : 0.0264 M3 Kayu Terentang @ Rp. 715,000.00 = Rp. 18,876.00

0.600 0.500 Upah : 0.150 0.050 0.005 0.007 383

Kg Btg Oh Oh Oh Oh

Paku Biasa 2" - 5" Dolken kayu Galam o - 8-10/4 m Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

7,700.00 17,600.00 24,000.00 28,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

4,620.00 8,800.00 3,600.00 1,400.00 157.50 210.00

= Rp.

32,296.00

= Rp. = Rp.

5,367.50 37,663.50

1 M Membuat Pondasi Beton Bertulang (150 Kg Besi dan Bekisting) Bahan : 0.200 1.500 0.400 150.000 2.250 6.460 0.520 0.780 Upah : 3.900 0.350 1.040 1.050 0.245 0.165 M3

Kg Ltr Kg Kg Zak 3 M 3 M Oh Oh Oh Oh Oh Oh

Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

715,000.00 7,700.00 18,050.00 5,850.00 13,000.00 43,155.00 165,000.00 137,500.00 24,000.00 28,000.00 28,000.00 28,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

143,000.00 11,550.00 7,220.00 877,500.00 29,250.00 278,781.30 85,800.00 107,250.00 93,600.00 9,800.00 29,120.00 29,400.00 6,982.50 4,950.00 = Rp. = Rp. 173,852.50 1,714,203.80 = Rp. 1,540,351.30

39

1 M Membuat Pondasi Beton Bertulang (200 Kg Besi dan Bekisting) Bahan : 0.270 2.000 0.600 200.000 3.000 6.460 0.520 0.780 Upah : 4.850 0.350 1.560 1.400 0.331 0.170 M3

3

Kg Ltr Kg Kg Zak M3 M3

Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

715,000.00 7,700.00 18,050.00 5,850.00 13,000.00 43,155.00 165,000.00 137,500.00 24,000.00 28,000.00 28,000.00 28,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

193,050.00 15,400.00 10,830.00 1,170,000.00 39,000.00 278,781.30 85,800.00 107,250.00 116,400.00 9,800.00 43,680.00 39,200.00 9,433.50 5,100.00 = Rp. = Rp. 223,613.50 2,123,724.80

= Rp.

1,900,111.30

Oh Oh Oh Oh Oh Oh

40

1 M3 Membuat Balok Beton Bertulang (200 Kg Besi dan Bekisting) Bahan : 0.320 3.200 1.600 200.000 3.000 6.460 0.520 0.780 0.140 2.800 16.000 Upah : 5.960 0.350 2.800 M3 Kg Ltr Kg Kg Zak M3 M3 M3 Lbr Btg Oh Oh Oh Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Koral Beton Kayu Borneo balok Plywood 9 mm Dolken o - 8 Cm/ 4 m Pekerja Tukang Batu Tukang Kayu @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 715,000.00 7,700.00 18,050.00 5,850.00 13,000.00 43,155.00 165,000.00 137,500.00 880,000.00 70,000.00 17,600.00 24,000.00 28,000.00 28,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 228,800.00 24,640.00 28,880.00 1,170,000.00 39,000.00 278,781.30 85,800.00 107,250.00 123,200.00 196,000.00 281,600.00 143,040.00 9,800.00 78,400.00 = Rp. 2,563,951.30

1.400 0.455 0.208 41

Oh Oh Oh

Tukang Besi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp.

28,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp.

39,200.00 12,967.50 6,240.00

= Rp. = Rp.

289,647.50 2,853,598.80

1 M3 Membuat Balok Beton Bertulang (150 Kg Besi dan Bekisting) Bahan : 0.320 3.200 1.600 150.000 2.250 6.460 0.520 0.780 0.120 2.800 32.000 Upah : 5.800 0.350 2.800 1.050 0.420 0.185 Oh Oh Oh Oh Oh Oh Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 28,000.00 28,000.00 28,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 139,200.00 9,800.00 78,400.00 29,400.00 11,970.00 5,550.00 = Rp. = Rp. 274,320.00 2,800,021.30 M3

Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Koral Beton Kayu Borneo balok Plywood 9 mm Dolken o - 8 Cm/ 4 m

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

715,000.00 7,700.00 18,050.00 5,850.00 13,000.00 43,155.00 165,000.00 137,500.00 880,000.00 70,000.00 17,600.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

228,800.00 24,640.00 28,880.00 877,500.00 29,250.00 278,781.30 85,800.00 107,250.00 105,600.00 196,000.00 563,200.00

Kg Ltr Kg Kg Zak 3 M 3 M 3 M Lbr Btg

= Rp.

2,525,701.30

42

1 M3 Membuat Dinding Beton Bertulang (150 Kg Besi dan Bekisting) Bahan : 0.240 3.200 1.600 150.000 2.250 6.460 0.520 0.780 0.160 2.800 24.000 Upah : 5.600 0.350 2.640 1.050 0.400 0.193 M3

Kg Ltr Kg Kg Zak M3 M3 M3

Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Koral Beton Kayu Borneo balok Plywood 9 mm Dolken o - 8 Cm/ 4 m Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

715,000.00 7,700.00 18,050.00 5,850.00 13,000.00 43,155.00 165,000.00 137,500.00 880,000.00 70,000.00 17,600.00 24,000.00 28,000.00 28,000.00 28,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

171,600.00 24,640.00 28,880.00 877,500.00 29,250.00 278,781.30 85,800.00 107,250.00 140,800.00 196,000.00 422,400.00 134,400.00 9,800.00 73,920.00 29,400.00 11,400.00 5,790.00 = Rp. = Rp. 264,710.00 2,627,611.30 = Rp. 2,362,901.30

Lbr Btg Oh Oh Oh Oh Oh Oh

43

1 M3 Membuat Tangga Beton Bertulang (200 Kg Besi dan Bekisting) Bahan : 0.250 3.000 1.200 200.000 3.000 6.460 0.520 0.780 0.105 2.500 14.000 Upah : 5.600 M3 Kg Ltr Kg Kg Zak M3 M3 M3 Lbr Btg Oh Kayu Terentang Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Koral Beton Kayu Borneo balok Plywood 9 mm Dolken o - 8 Cm/ 4 m Pekerja @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 715,000.00 7,700.00 18,050.00 5,850.00 13,000.00 43,155.00 165,000.00 137,500.00 880,000.00 70,000.00 17,600.00 24,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 178,750.00 23,100.00 21,660.00 1,170,000.00 39,000.00 278,781.30 85,800.00 107,250.00 92,400.00 175,000.00 246,400.00 134,400.00

= Rp.

2,418,141.30

0.350 2.300 1.400 0.405 0.202 44

Oh Oh Oh Oh Oh

Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

28,000.00 28,000.00 28,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp.

9,800.00 64,400.00 39,200.00 11,542.50 6,060.00 = Rp. = Rp. 265,402.50 2,683,543.80

1 M' Membuat Kolom Penguat Beton Bertulang ( 11 x 11 ) Cm Bahan : 0.002 0.010 3.000 0.450 0.080 0.006 0.009 Upah : 0.060 0.020 0.020 0.020 0.006 0.003 M3

Kg Kg Kg Zak 3 M 3 M Oh Oh Oh Oh Oh Oh

Kayu Terentang Paku Biasa 2" - 5" Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Koral Beton Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

715,000.00 7,700.00 5,850.00 13,000.00 43,155.00 165,000.00 137,500.00 24,000.00 28,000.00 28,000.00 28,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

1,430.00 77.00 17,550.00 5,850.00 3,452.40 990.00 1,237.50 1,440.00 560.00 560.00 560.00 171.00 90.00 = Rp. = Rp. 3,381.00 33,967.90

= Rp.

30,586.90

45

1 M' Membuat Ring Balok Beton Bertulang ( 10 x 15 ) Cm Bahan : 0.003 0.020 3.600 0.050 0.110 0.009 0.015 Upah : 0.100 0.033 0.033 0.033 0.010 0.005 Oh Oh Oh Oh Oh Oh Pekerja Tukang Batu Tukang Kayu Tukang Besi Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 28,000.00 28,000.00 28,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 2,400.00 924.00 924.00 924.00 285.00 150.00 M3 Kg Kg Kg Zak M3 M3

Kayu Terentang Paku Biasa 2" - 5" Besi Beton Polos Kawat Beton Semen Portland Pasir Beton Koral Beton

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

715,000.00 7,700.00 5,850.00 13,000.00 43,155.00 165,000.00 137,500.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

2,145.00 154.00 21,060.00 650.00 4,747.05 1,485.00 2,062.50

= Rp.

32,303.55

= Rp. = Rp.

5,607.00 37,910.55

E 1

ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALLUMINIUM 1 Kg Pasang Rangka Atap Baja Bahan : 1.100 Kg Besi Profil WF 0.080 Upah : 0.006 0.060 0.006 0.0003 Kg Oh Oh Oh Oh Meni Besi Tukang Besi Pekerja Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 12,650.00 30,000.00 24,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

0.00 1,012.00 180.00 1,440.00 189.00 9.00 = Rp. 1,012.00

= Rp. = Rp.

1,818.00 2,830.00

2

1 M2 Pasang Pintu Besi Baja Bahan : 1.000 Upah : 0.650 0.650 0.065 0.032 M2 Oh Oh Oh Oh Pintu Besi Baja Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 0.00 30,000.00 24,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. 0.00 19,500.00 15,600.00 2,047.50 960.00 = Rp. 0.00

= Rp. = Rp.

38,107.50 38,107.50

3

1 M2 Pasang Jendela Besi

Bahan : 1.000 Upah : 1.050 1.050 0.105 0.00525 42

M2 Oh Oh Oh Oh

Jendela Besi Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 30,000.00 24,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp.

0.00 31,500.00 25,200.00 3,307.50 157.50

= Rp.

0.00

= Rp. = Rp.

60,165.00 60,165.00

1 M Pasang Jendela Besi Tahan Api Bahan : 1.000 Upah : 1.200 1.022 0.120 0.006 M2

Jendela Besi Tahan Api Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 30,000.00 24,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp.

0.00 36,000.00 24,528.00 3,780.00 180.00

= Rp.

0.00

Oh Oh Oh Oh

= Rp. = Rp.

64,488.00 64,488.00

5

1 M Pasang Pintu Gulung Besi Bahan : 1.000 Upah : 1.200 1.200 0.120 0.006 M2 Oh Oh Oh Oh Pintu Gulung Besi Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 0.00 30,000.00 24,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. 0.00 36,000.00 28,800.00 3,780.00 180.00 = Rp. = Rp. 68,760.00 68,760.00 = Rp. 0.00

2

6

1 M Pasang Pintu Lipat Bahan : 1.000 Upah : 1.050 1.050 0.105 0.0052 M2

2

Pintu Lipat Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 30,000.00 24,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp.

0.00 31,500.00 25,200.00 3,307.50 156.00

= Rp.

0.00

Oh Oh Oh Oh

= Rp. = Rp.

60,163.50 60,163.50

7

1 M Pasang Pintu Sunscreen Alluminium Bahan : 1.000 Upah : 0.800 0.080 0.080 0.004 M2

2

Sunscreen Alluminium Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

0.00 30,000.00 24,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp.

0.00 24,000.00 1,920.00 2,520.00 120.00

= Rp.

0.00

Oh Oh Oh Oh

= Rp. = Rp.

28,560.00 28,560.00

8

1 M2 Pasang Pintu Rolling Door Bahan : 1.000 Upah : 1.500 1.050 0.105 0.0052 M2 Oh Oh Oh Oh Rolling Door Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 30,000.00 24,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. 0.00 45,000.00 25,200.00 3,307.50 156.00 = Rp. = Rp. 73,663.50 73,663.50 = Rp. 0.00

9

1 M2 Pasang Pintu Alluminium Bahan : 1.000 Upah : 1.050 1.050 0.105 0.0052 M2 Oh Oh Oh Oh Pintu Alluminium Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 0.00 30,000.00 24,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. 0.00 31,500.00 25,200.00 3,307.50 156.00 = Rp. 0.00

= Rp.

60,163.50

= Rp. 10 1 M2 Pasang Venetions Blinds Bahan : 1.000 Upah : 0.350 0.350 0.035 0.00175 112

60,163.50

M

2

Venetion Blinds Tukang Kayu Pekerja Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 30,000.00 24,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp.

0.00 10,500.00 8,400.00 1,102.50 52.50

= Rp.

0.00

Oh Oh Oh Oh

= Rp. = Rp.

20,055.00 20,055.00

1 M Pasang Vertikal Blinds Bahan : 1.000 Upah : 0.350 0.350 0.035 0.00175 M2

Vertikal Blinds Tukang Kayu Pekerja Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 30,000.00 24,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp.

0.00 10,500.00 8,400.00 1,102.50 52.50

= Rp.

0.00

Oh Oh Oh Oh

= Rp. = Rp.

20,055.00 20,055.00

12

1 M2 Pasang Terali Besi Bahan : 11.500 Upah : 1.200 1.200 0.012 0.0006 M' Oh Oh Oh Oh Besi Strip 2x3 Tukang Las Pekerja Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 0.00 27,000.00 24,000.00 28,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. 0.00 32,400.00 28,800.00 342.00 18.00 = Rp. 0.00

= Rp. = Rp.

61,560.00 61,560.00

13

1 M Pasang Kawat Harmonika Bahan : 1.100 0.020 0.0018 Upah : 0.100 0.100 0.010 0.0005 M2 Kg 3 M Oh Oh Oh Oh Kawat Harmonika Paku Biasa 1/2" - 1" Kayu Kamper, Papan Pekerja Tukang Kayu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 75,000.00 8,250.00 715,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 82,500.00 165.00 1,287.00 2,400.00 3,000.00 315.00 15.00 = Rp. = Rp. 5,730.00 89,682.00 = Rp. 83,952.00

2

14

1 M2 Pasang Kawat Nyamuk Bahan : 1.100 0.020 0.0018 Upah : 0.100 0.100 0.010 0.0005 M2 Kg M3 Oh Oh Oh Oh Kawat Nyamuk Paku Biasa 1/2" - 1" Kayu Kamper, Papan Pekerja Tukang Kayu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 12,000.00 8,250.00 715,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 13,200.00 165.00 1,287.00 2,400.00 3,000.00 315.00 15.00 = Rp. = Rp. 5,730.00 20,382.00

= Rp.

14,652.00

15

1 M2 Pasang Kawat Kassa Bahan : 1.100 0.020 0.0018 Upah : 0.100 0.100 0.010 0.0005 M2 Kg M3 Oh Oh Oh Oh Kawat Nyamuk Paku Biasa 1/2" - 1" Kayu Kamper, Papan Pekerja Tukang Kayu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 12,000.00 8,250.00 715,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 13,200.00 165.00 1,287.00 2,400.00 3,000.00 315.00 15.00

= Rp.

14,652.00

= Rp. = Rp.

5,730.00 20,382.00

16

1 M2 Pasang Kawat Burung Bahan : 1.100 0.020 0.0018 Upah : 0.100 0.100 0.010 0.0005 M2

Kawat Burung Paku Biasa 1/2" - 1" Kayu Kamper, Papan Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

13,000.00 8,250.00 715,000.00 24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

14,300.00 165.00 1,287.00 2,400.00 3,000.00 315.00 15.00 = Rp. 15,752.00

Kg M3 Oh Oh Oh Oh

= Rp. = Rp.

5,730.00 21,482.00

17

1 M Pasang Jendela Nako dan Tralis Bahan : 1.100 0.020 0.025 Upah : 0.200 0.200 0.020 0.001 M2

2

Kg M2 Oh Oh Oh Oh

Jendela Nako Paku Biasa 1/2" - 1" atau Skrup Besi Strip Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

27,500.00 8,250.00 0.00 24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

30,250.00 165.00 0.00 4,800.00 6,000.00 630.00 30.00

= Rp.

30,415.00

= Rp. = Rp.

11,460.00 41,875.00

18

1 M' Pasang Talang Datar, Seng Bjls 28 Bahan : 0.500 0.015 0.0096 0.250 Upah : 0.150 0.400 0.025 0.00125 Lbr Kg 3 M Kg Oh Oh Oh Oh Seng Plat 3'x6' Bjls 28 Paku Biasa 1/2" - 1" Kayu Borneo, Papan Flincote / Meni Besi Pekerja Tukang Kayu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 26,400.00 19,600.00 715,000.00 12,650.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 13,200.00 294.00 6,864.00 3,162.50 3,600.00 12,000.00 787.50 37.50 = Rp. = Rp. 16,425.00 39,945.50 = Rp. 23,520.50

19

1 M' Pasang Talang Miring, Seng Bjls 28 Bahan : 0.50 0.015 0.019 0.300 Upah : 0.040 0.400 0.025 0.00125 Lbr Kg 3 M Kg Oh Oh Oh Oh Seng Plat 3'x6' Bjls 28 Paku Biasa 1/2" - 1" Kayu Borneo, Papan Flincote / Meni Besi Pekerja Tukang Kayu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 26,400.00 19,600.00 715,000.00 12,650.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 13,200.00 294.00 13,585.00 3,795.00 960.00 12,000.00 787.50 37.50 = Rp. = Rp. 13,785.00 44,659.00

= Rp.

30,874.00

20

1 M' Pasang Talang 1/2 Lingkaran D -10 Cm, Seng Bjls 28 Bahan : 0.300 0.100 0.019 0.500 Upah : 0.150 0.250 0.025 0.00125 Lbr Kg M3 Kg Oh Oh Oh Oh Seng Plat 3'x6' Bjls 28 Paku Biasa 1/2" - 1" Kayu Borneo, Papan Besi Strip Pekerja Tukang Kayu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 26,400.00 19,600.00 715,000.00 0.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 7,920.00 1,960.00 13,585.00 0.00 3,600.00 7,500.00 787.50 37.50 = Rp. = Rp. 11,925.00 35,390.00 = Rp. 23,465.00

21

1 M' Pasang Talang 1/2 Lingkaran D -10 Cm, Seng Bjls 24 Bahan : 0.300 Lbr Seng Plat 3'x6' Bjls 24

@ Rp.

26,400.00

= Rp.

7,920.00

0.100 0.019 0.500 Upah : 0.150 0.250 0.025 0.00125 F 1

Kg M3 Kg Oh Oh Oh Oh

Paku Biasa 1/2" - 1" Kayu Borneo, Papan Besi Strip Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

19,600.00 715,000.00 0.00 24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

1,960.00 13,585.00 0.00 3,600.00 7,500.00 787.50 37.50

= Rp.

23,465.00

= Rp. = Rp.

11,925.00 35,390.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING 2 1 M Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 1Ps Bahan : 140.000 1.281 0.059 Upah : 0.650 0.200 0.020 0.030 Bh Zak 3 M Oh Oh Oh Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 140,000.00 55,264.29 8,555.00 15,600.00 6,000.00 630.00 900.00 = Rp. = Rp. 23,130.00 226,949.29

= Rp.

203,819.29

2

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 2Ps Bahan : 140.000 0.872 0.080 Upah : 0.650 0.200 0.020 0.030 Bh Zak M3 Oh Oh Oh Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 140,000.00 37,631.16 11,600.00 15,600.00 6,000.00 630.00 900.00 = Rp. 189,231.16

= Rp. = Rp.

23,130.00 212,361.16

3

1 M Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3Ps Bahan : 140.000 0.659 0.091 Upah : 0.650 0.200 0.020 0.030 Bh Zak 3 M Oh Oh Oh Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 140,000.00 28,439.15 13,195.00 15,600.00 6,000.00 630.00 900.00 = Rp. = Rp. 23,130.00 204,764.15 = Rp. 181,634.15

2

4

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4Ps Bahan : 140.000 0.531 0.093 Upah : 0.650 0.200 0.020 0.030 Bh Zak 3 M Oh Oh Oh Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 140,000.00 22,915.31 13,485.00 15,600.00 6,000.00 630.00 900.00 = Rp. = Rp. 23,130.00 199,530.31 = Rp. 176,400.31

5

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5Ps Bahan : 140.000 0.444 0.102 Upah : 0.650 Bh Zak M3 Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 24,000.00 = Rp. = Rp. = Rp. = Rp. 140,000.00 19,160.82 14,790.00 15,600.00

= Rp.

173,950.82

0.200 0.020 0.030 6

Oh Oh Oh

Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp.

30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp.

6,000.00 630.00 900.00

= Rp. = Rp.

23,130.00 197,080.82

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 6Ps Bahan : 140.000 0.355 0.112 Upah : 0.650 0.200 0.020 0.030 Bh Zak 3 M Oh Oh Oh Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 140,000.00 15,328.66 16,240.00 15,600.00 6,000.00 630.00 900.00 = Rp. = Rp. 23,130.00 194,698.66 = Rp. 171,568.66

7

1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Kp : 10 Ps Bahan : 140.000 0.202 0.093 0.0275 Upah : 0.650 0.200 0.020 0.030 Bh Zak M3 M3 Oh Oh Oh Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Kapur Pasang Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 165,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 140,000.00 8,700.05 13,412.50 4,537.50 15,600.00 6,000.00 630.00 900.00 = Rp. = Rp. 23,130.00 189,780.05 = Rp. 166,650.05

8

1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 1 Ps Bahan : 70.000 0.556 0.028 Upah : 0.320 0.100 0.010 0.015 Oh Oh Oh Oh Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. 7,680.00 3,000.00 315.00 450.00 = Rp. = Rp. 11,445.00 109,499.18 Bh Zak 3 M Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 = Rp. = Rp. = Rp. 70,000.00 23,994.18 4,060.00

2

= Rp.

98,054.18

9

1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2Ps Bahan : 70.000 0.379 0.038 Upah : 0.320 0.100 0.010 0.015 Bh Zak M3 Oh Oh Oh Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 70,000.00 16,355.75 5,510.00 7,680.00 3,000.00 315.00 450.00 = Rp. = Rp. 11,445.00 103,310.75 = Rp. 91,865.75

2

10

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3Ps Bahan : 70.000 0.287 0.040 Upah : 0.320 0.100 0.010 0.015 Bh Zak M3 Oh Oh Oh Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 70,000.00 12,402.75 5,800.00 7,680.00 3,000.00 315.00 450.00

= Rp.

88,202.75

= Rp. = Rp.

11,445.00 99,647.75

11

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4Ps

Bahan : 70.000 0.230 0.043 Upah : 0.320 0.100 0.010 0.015 122

Bh Zak 3 M Oh Oh Oh Oh

Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

1,000.00 43,155.00 145,000.00 24,000.00 30,000.00 31,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

70,000.00 9,925.65 6,235.00 7,680.00 3,000.00 315.00 450.00 = Rp. = Rp. 11,445.00 97,605.65 = Rp. 86,160.65

1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5Ps Bahan : 70.000 0.194 0.045 Upah : 0.320 0.100 0.010 0.015 Bh Zak 3 M Oh Oh Oh Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 70,000.00 8,354.81 6,525.00 7,680.00 3,000.00 315.00 450.00 = Rp. = Rp. 11,445.00 96,324.81

= Rp.

84,879.81

13

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 6Ps Bahan : 70.000 0.166 0.049 Upah : 0.320 0.100 0.010 0.015 Bh Zak M3 Oh Oh Oh Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 70,000.00 7,180.99 7,105.00 7,680.00 3,000.00 315.00 450.00 = Rp. 84,285.99

= Rp. = Rp.

11,445.00 95,730.99

14

1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 8Ps Bahan : 70.000 6.500 0.050 Upah : 0.320 0.100 0.010 0.015 Bh Kg 3 M Oh Oh Oh Oh Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 24,000.00 30,000.00 31,500.00 30,000.00 = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. 70,000.00 280,507.50 7,250.00 7,680.00 3,000.00 315.00 450.00 = Rp. = Rp. 11,445.00 369,202.50 = Rp. 357,757.50

2

15 Bahan

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps 70.000 4.500 0.050 0.015 Bh Kg M3 M3

Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Kapur Padam

@ Rp. @ Rp. @ Rp. @ Rp.

1,000.00 43,155.00 145,000.00 165,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

70,000.00 194,197.50 7,250.00 2,475.00 273,922.50 7,680.00 3,000.00 315.00 450.00 11,445.00 285,367.50

Tenaga

0.320 0.100 0.010 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

16 Bahan

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 1 Ps 70.000 27.800 0.028 Bh Kg M3 Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 = Rp. = Rp. = Rp. 70,000.00 1,199,709.00 4,060.00

Jumlah I Tenaga 0.320 0.100 0.010 0.015 Oh Oh Oh Oh Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II 17 Bahan 1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps 70.000 18.950 0.038 Bh Kg 3 M Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II2

Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

1,273,769.00 7,680.00 3,000.00 315.00 450.00 11,445.00 1,285,214.00

= Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

70,000.00 817,787.25 5,510.00 893,297.25 7,680.00 3,000.00 315.00 450.00 11,445.00 904,742.25

Tenaga

0.320 0.100 0.010 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

18 1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps Bahan 70.000 14.370 0.040 Bh Kg M3 Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II2 19 1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps Bahan 70.000 Bh Bata Merah 5x11x22 Cm 11.500 Kg Semen Portland 3 M 0.043 Pasir Pasang

2

= Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

70,000.00 620,137.35 5,800.00 695,937.35 7,680.00 3,000.00 315.00 450.00 11,445.00 707,382.35

Tenaga

0.320 0.100 0.010 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

@ Rp. @ Rp. @ Rp.

1,000.00 43,155.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

70,000.00 496,282.50 6,235.00 572,517.50 7,680.00 3,000.00 315.00 450.00 11,445.00 583,962.50

Tenaga

0.320 0.100 0.010 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

2 20 1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5 Ps Bahan 70.000 Bh Bata Merah 5x11x22 Cm 9.680 Kg Semen Portland M3 0.045 Pasir Pasang

@ Rp. @ Rp. @ Rp.

1,000.00 43,155.00 145,000.00

= Rp. = Rp. = Rp.

70,000.00 417,740.40 6,525.00

Jumlah I Tenaga 0.320 0.100 0.010 0.015 Oh Oh Oh Oh Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II 21 1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 6 Ps Bahan 70.000 Bh Bata Merah 5x11x22 Cm 8.320 Kg Semen Portland 3 M 0.049 Pasir Pasang2

Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

494,265.40 7,680.00 3,000.00 315.00 450.00 11,445.00 505,710.40

@ Rp. @ Rp. @ Rp.

1,000.00 43,155.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

70,000.00 359,049.60 7,105.00 436,154.60 7,680.00 3,000.00 315.00 450.00 11,445.00 447,599.60

Tenaga

0.320 0.100 0.010 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

2 22 1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 8 Ps Bahan 70.000 Bh Bata Merah 5x11x22 Cm

@ Rp. @ Rp. @ Rp.

1,000.00 43,155.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

70,000.00 280,507.50 7,250.00 357,757.50 7,680.00 3,000.00 315.00 450.00 11,445.00 369,202.50

6.500 0.050

Kg M3

Semen Portland Pasir Pasang

Tenaga

0.320 0.100 0.010 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

23 1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Kp : 10 Ps Bahan 70.000 4.500 0.050 0.015 Bh Kg 3 M M3 Bata Merah 5x11x22 Cm Semen Portland Pasir Pasang Kapur Padam @ Rp. @ Rp. @ Rp. @ Rp. 1,000.00 43,155.00 145,000.00 165,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II = Rp. = Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp. 70,000.00 194,197.50 7,250.00 2,475.00 273,922.50 7,680.00 3,000.00 315.00 450.00 11,445.00 285,367.50

2

Tenaga

0.320 0.100 0.010 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

2 24 1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Kp : 1 Sm : 1 Ps Bahan 70.000 Bh Bata Merah 5x11x22 Cm 0.018 Kg Semen Merah/Bata Merah Tumbuk

@ Rp. @ Rp.

1,000.00 78,400.00

= Rp. = Rp.

70,000.00 1,411.20

0.018 0.018

M3 M3

Pasir Pasang Kapur Padam

@ Rp. @ Rp.

145,000.00 165,000.00 Jumlah I

= Rp. = Rp. Rp.

2,610.00 2,970.00 76,991.20

Tenaga

0.320 0.100 0.010 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. = Rp. Rp. Rp.

7,680.00 3,000.00 315.00 450.00 11,445.00 88,436.20

25 1 M Pasangan Bata Merah Tebal 1/2 Bata, 1 Kp : 1 Sm : 2 Ps Bahan 70.000 Bh Bata Merah 5x11x22 Cm 0.014 Kg Semen Merah/Bata Merah Tumbuk 3 M 0.028 Pasir Pasang 0.014 M3

2

@ Rp. @ Rp. @ Rp. @ Rp.

1,000.00 78,400.00 145,000.00 165,000.00 Jumlah I

= Rp. = Rp. = Rp. = Rp. Rp.

70,000.00 1,097.60 4,060.00 2,310.00 77,467.60

Kapur Padam

Tenaga

0.320 0.100 0.010 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. = Rp. Rp. Rp.

7,680.00 3,000.00 315.00 450.00 11,445.00 88,912.60

26 1 M Pasangan Dinding Hollowblock ( Hb 20 ) Bahan 12.500 13.500 0.048 1.950 Bh Kg M3 Kg Hollowblock Hb 20 Semen Portland Pasir Pasang Besi Beton Polos @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 145,000.00 0.00 Jumlah I = Rp. = Rp. = Rp. = Rp. Rp. 0.00 582,592.50 6,960.00 0.00 589,552.50

2

Tenaga

0.350 0.150 0.015 0.017

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. = Rp. Rp. Rp.

8,400.00 4,500.00 472.50 510.00 13,882.50 603,435.00

2 27 1 M Pasangan Dinding Hollowblock ( Hb 15 ) Bahan 12.500 Bh Hollowblock Hb 15 10.450 Kg Semen Portland M3 0.038 Pasir Pasang M3 1.950 Besi Beton Polos

@ Rp. @ Rp. @ Rp. @ Rp.

43,155.00 145,000.00 0.00 Jumlah I

= Rp. = Rp. = Rp. = Rp. Rp.

0.00 450,969.75 5,510.00 0.00 456,479.75

Tenaga

0.320 0.120 0.012 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II

= Rp. = Rp. = Rp. = Rp. Rp.

7,680.00 3,600.00 378.00 450.00 12,108.00

Jumlah I + II

Rp.

468,587.75

2 28 1 M Pasangan Dinding Hollowblock ( Hb 10 ) Bahan 12.500 Bh Hollowblock Hb 10 7.500 Kg Semen Portland 3 M 0.027 Pasir Pasang 3 M 1.950 Besi Beton Polos

@ Rp. @ Rp. @ Rp. @ Rp.

43,155.00 145,000.00 0.00 Jumlah I

= Rp. = Rp. = Rp. = Rp. Rp.

0.00 323,662.50 3,915.00 0.00 327,577.50

Tenaga

0.320 0.100 0.010 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. = Rp. Rp. Rp.

7,680.00 3,000.00 315.00 450.00 11,445.00 339,022.50

2 29 1 M Pasangan Dinding Conblock ( Cb 20 ) Bahan 12.500 Bh Concreate Block Cb 20 14.050 Kg Semen Portland 3 M 0.004 Pasir Beton

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

43,155.00 165,000.00 145,000.00 0.00 9,350.00 715,000.00 13,000.00 165,000.00 Jumlah I 24,000.00 28,000.00 28,000.00 28,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

0.00 606,327.75 660.00 6,090.00 0.00 56.10 715.00 390.00 825.00 615,063.85 8,880.00 4,396.00 196.00 467.40 555.00 14,494.40 629,558.25

0.042 3.870 0.006 0.001 0.030 0.005

M

3

Kg Kg 3 M Kg M3

Pasir Pasang Besi Beton Polos Paku Biasa 2 " - 5 " Kayu Terentang Kawat Beton Koral Beton

Tenaga

0.370 0.157 0.007 0.0164 0.0185

Oh Oh Oh Oh Oh

Pekerja Tukang Batu Tukang Besi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

2 30 1 M Pasangan Dinding Conblock ( Cb 15 ) Bahan 12.500 Bh Concreate Block Cb 15 10.460 Kg Semen Portland 3 M 0.003 Pasir Beton M3 0.032 Pasir Pasang

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

43,155.00 165,000.00 145,000.00 0.00 9,350.00 715,000.00 13,000.00 165,000.00 Jumlah I 24,000.00 28,000.00 28,000.00 28,500.00 30,000.00

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

0.00 451,401.30 495.00 4,640.00 0.00 37.40 715.00 260.00 660.00 458,208.70 8,160.00 3,640.00 196.00 390.45 510.00

0.870 0.004 0.001 0.020 0.004

Kg Kg Kg Kg M3

Besi Beton Polos Paku Biasa 2 " - 5 " Kayu Terentang Kawat Beton Koral Beton

Tenaga

0.340 0.130 0.007 0.0137 0.0170

Oh Oh Oh Oh Oh

Pekerja Tukang Batu Tukang Besi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

Jumlah II Jumlah I + II 31 1 M Pasangan Dinding Conblock ( Cb 10 ) Bahan 12.500 7.200 0.002 0.021 2.540 0.003 0.001 0.015 0.003 Bh Kg 3 M 3 M Kg Kg Kg Kg 3 M Concreate Block Cb 10 Semen Portland Pasir Beton Pasir Pasang Besi Beton Polos Paku Biasa 2 " - 5 " Kayu Terentang Kawat Beton Koral Beton @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. 43,155.00 165,000.00 145,000.00 0.00 9,350.00 715,000.00 13,000.00 165,000.00 Jumlah I 24,000.00 28,000.00 28,000.00 28,500.00 30,000.00 Jumlah II Jumlah I + II2 32 1 M Pasangan Dinding Lantai 2

Rp. Rp.

12,896.45 471,105.15

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

0.00 310,716.00 330.00 3,045.00 0.00 28.05 715.00 195.00 495.00 315,524.05 8,160.00 2,996.00 196.00 324.90 510.00 12,186.90 327,710.95

Tenaga

0.340 0.107 0.007 0.0114 0.017

Oh Oh Oh Oh Oh

Pekerja Tukang Batu Tukang Besi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

Bahan

2.500 5.100 0.080 1.500 0.150

Bh Kg 3 M Kg 3 M

Bondbeam 40x20x20 Cm Semen Portland Pasir Beton Besi Beton Polos Koral Beton

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

43,155.00 165,000.00 0.00 165,000.00 Jumlah I 24,000.00 28,000.00 28,000.00 28,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

0.00 220,090.50 13,200.00 0.00 24,750.00 258,040.50 2,400.00 840.00 840.00 171.00 150.00 4,401.00 262,441.50

Tenaga

0.100 0.030 0.030 0.006 0.005

Oh Oh Oh Oh Oh

Pekerja Tukang Batu Tukang Besi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

2 33 1 M Pasangan Dinding Roster/Terawang (12x11x24)Cm Bahan 36.000 Bh Roster Terawang 12.800 Kg Semen Portland M3 0.035 Pasir Pasang

@ Rp. @ Rp. @ Rp.

43,155.00 145,000.00 Jumlah I

= Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp.

0.00 552,384.00 5,075.00 557,459.00 7,200.00 3,000.00 315.00 450.00

Tenaga

0.300 0.100 0.010 0.015

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

24,000.00 30,000.00 31,500.00 30,000.00

Jumlah II Jumlah I + II 34 1 M Pasang Bata Berongga Ukuran (5x11x24) Cm Bahan 80.000 23.650 0.570 Bh Kg 3 M Bata Berongga Semen Portland Pasir Pasang @ Rp. @ Rp. @ Rp. 1,550.00 43,155.00 145,000.00 Jumlah I Tenaga 0.320 0.150 0.015 0.015 Oh Oh Oh Oh Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II2

Rp. Rp.

10,965.00 568,424.00

= Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

124,000.00 1,020,615.75 82,650.00 1,227,265.75 7,680.00 4,500.00 472.50 450.00 13,102.50 1,240,368.25

35 1 M Pasang Dinding Anyaman Bambu, Rangka Kayu 3 M Bahan 1.500 Bilik Bambu 0.014 0.012 0.003 M3

2

@ Rp. @ Rp. @ Rp. @ Rp.

11,000.00 880,000.00 9,100.00 Jumlah I

= Rp. = Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

16,500.00 12,320.00 109.20 0.00 28,929.20 2,400.00 1,500.00 157.50 60.00 4,117.50 33,046.70

Kg M3

Kayu 5/7 Paku List Kayu 2/4

Tenaga

0.100 0.050 0.005 0.002

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

G 1

Analisa Biaya Konstruksi Pekerjaan Plesteran 2 1 M Plesteran 1 Pc : 1 Ps, Tebal 15 mm Bahan 12.920 0.013 Kg M3 Semen Portland Pasir Pasang @ Rp. @ Rp. 43,155.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp. 557,562.60 1,885.00 559,447.60 4,800.00 4,500.00 472.50 300.00 10,072.50 569,520.10

Tenaga

0.200 0.150 0.015 0.010

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

2

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm Bahan 8.520 0.017 Kg M3 Semen Portland Pasir Pasang @ Rp. @ Rp. 43,155.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp. 367,680.60 2,465.00 370,145.60 4,800.00 4,500.00 472.50 300.00 10,072.50 380,218.10

Tenaga

0.200 0.150 0.015 0.010

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

3

1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm Bahan 6.480 0.019 Kg M3 Semen Portland Pasir Pasang @ Rp. @ Rp. 43,155.00 145,000.00 Jumlah I 24,000.00 = Rp. = Rp. Rp. = Rp. 279,644.40 2,755.00 282,399.40 4,800.00

Tenaga

0.200

Oh

Pekerja

@ Rp.

0.150 0.015 0.010

Oh Oh Oh

Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp.

30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. Rp. Rp.

4,500.00 472.50 300.00 10,072.50 292,471.90

4

1 M Plesteran 1 Pc : 4 Ps, Tebal 15 mm Bahan 5.200 0.02 Kg M3 Semen Portland Pasir Pasang @ Rp. @ Rp. 43,155.00 145,000.00 Jumlah I Tenaga 0.200 0.150 0.015 0.010 Oh Oh Oh Oh Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp. 224,406.00 2,900.00 227,306.00 4,800.00 4,500.00 472.50 300.00 10,072.50 237,378.50

2

5

1 M Plesteran 1 Pc : 5 Ps, Tebal 15 mm Bahan 4.320 0.022 Kg 3 M Semen Portland Pasir Pasang @ Rp. @ Rp. 43,155.00 145,000.00 Jumlah I Tenaga 0.200 0.150 0.015 0.010 Oh Oh Oh Oh Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp. 186,429.60 3,190.00 189,619.60 4,800.00 4,500.00 472.50 300.00 10,072.50 199,692.10

2

6

1 M2 Plesteran 1 Pc : 6 Ps, Tebal 15 mm Bahan 3.680 0.023 Kg M3 Semen Portland Pasir Pasang @ Rp. @ Rp. 43,155.00 145,000.00 Jumlah I Tenaga 0.200 0.150 0.015 0.010 Oh Oh Oh Oh Pekerja Tukang Batu Kepala Tukang Mandor @ Rp. @ Rp. @ Rp. @ Rp. 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp. 158,810.40 3,335.00 162,145.40 4,800.00 4,500.00 472.50 300.00 10,072.50 172,217.90

7

1 M2 Plesteran 1 Pc : 8 Ps, Tebal 15 mm Bahan 2.880 0.024 Kg M3 Semen Portland Pasir Pasang @ Rp. @ Rp. 43,155.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 = Rp. = Rp. Rp. = Rp. = Rp. = Rp. 124,286.40 3,480.00 127,766.40 4,800.00 4,500.00 472.50

Tenaga

0.200 0.150 0.015

Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang

@ Rp. @ Rp. @ Rp.

0.010

Oh

Mandor

@ Rp.

30,000.00 Jumlah II Jumlah I + II

= Rp. Rp. Rp.

300.00 10,072.50 137,838.90

8

1 M2 Plesteran 1 Pc : 0.5 Kp : 3 Ps, Tebal 15 mm Bahan 5.760 0.003 0.013 Kg 3 M 3 M Semen Portland Kapur Padam Pasir Pasang @ Rp. @ Rp. @ Rp. 43,155.00 27,500.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II = Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp. 248,572.80 82.50 1,885.00 250,540.30 4,800.00 4,500.00 472.50 300.00 10,072.50 260,612.80

Tenaga

0.200 0.150 0.015 0.010

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

9

1 M Plesteran 1 Pc : 3 Kp : 10 Ps, Tebal 15 mm Bahan 1.840 0.006 0.014 Kg M3 M3 Semen Portland Kapur Padam Pasir Pasang @ Rp. @ Rp. @ Rp. 43,155.00 27,500.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II = Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp. 79,405.20 165.00 2,030.00 81,600.20 4,800.00 4,500.00 472.50 300.00 10,072.50 91,672.70

2

Tenaga

0.200 0.150 0.015 0.010

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

2 10 1 M Plesteran 0.5 Pc : 1 Kp : 4 Ps, Tebal 15 mm Bahan 3.000 Kg Semen Portland M3 0.005 Kapur Padam M3 0.019 Pasir Pasang

@ Rp. @ Rp. @ Rp.

43,155.00 27,500.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

129,465.00 137.50 2,755.00 132,357.50 4,800.00 4,500.00 472.50 300.00 10,072.50 142,430.00

Tenaga

0.200 0.150 0.015 0.010

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

2 11 1 M Plesteran 1 Kp : 1 Sm : 1 Ps, Tebal 15 mm

Bahan

0.009 0.009 0.009

Kg M3 M3

Semen Merah Kapur Padam Pasir Pasang

@ Rp. @ Rp. @ Rp.

78,400.00 27,500.00 145,000.00 Jumlah I 24,000.00

= Rp. = Rp. = Rp. Rp. = Rp.

705.60 247.50 1,305.00 2,258.10 4,800.00

Tenaga

0.200

Oh

Pekerja

@ Rp.

0.150 0.015 0.010

Oh Oh Oh

Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp.

30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II

= Rp. = Rp. = Rp. Rp. Rp.

4,500.00 472.50 300.00 10,072.50 12,330.60

12 1 M Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 15 mm Bahan 0.007 0.007 0.015 Kg 3 M 3 M Semen Merah Kapur Padam Pasir Pasang @ Rp. @ Rp. @ Rp. 78,400.00 27,500.00 145,000.00 Jumlah I 24,000.00 30,000.00 31,500.00 30,000.00 Jumlah II Jumlah I + II2 13 1 M Plesteran 1 Pc : 2 Ps, Tebal 20 mm

2

= Rp. = Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

548.80 192.50 2,175.00 2,916.30 4,800.00 4,500.00 472.50 300.00 10,072.50 12,988.80

Tenaga

0.200 0.150 0.015 0.010

Oh Oh Oh Oh

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Bahan

14.280 0.023

Kg M3

Semen Portland Pasir Pasang

@ Rp. @ Rp.

43,155.00 145,000.00 Jumlah I

= Rp. = Rp. Rp. = Rp. = Rp. = Rp. = Rp. Rp. Rp.

616,253.40 3,335.00 619,588.40 6,000.00 6,000.00 630.00 375.00 13,005.00 632,593.40

Tenaga

0.250 0.200 0.020 0.0125

Oh Oh Oh Oh

Pekerja Tukan