NO 161

URAIAN PEKERJAAN BEKISTING KOLOM BETON 1 M2 Bahan : Kayu/ Papan Kls. III Paku Minyak Bekisting Kayu Kls. II ( Papan ) Dolken Kayu Galam/ Bambu Polywood 9 mm Upah : Pekerja Tukang Kayu Kepala Tukang Mandor2

KOFESIEN3

HARGA SATUAN (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 2,000,000.00 15,000.00 2,000.00 2,500,000.00 7,500.00 90,000.00 45,000.00 50,000.00 55,000.00 55,000.004

BAHAN (Rp) Rp Rp Rp Rp Rp Rp Rp5

JUMLAH

UPAH (Rp)6

JUMLAH HARGA (Rp)7

0.040 0.400 0.200 0.015 2.000 0.350 Jumlah Harga Satuan 0.660 0.330 0.033 0.033

17

COR KOLOM K1 (40/40) BETON K-250/ M3 ( A ) Beton K-250 ( B ) Pembesian 100 Kg ( C ) Bekisting/ Cetakan/ M3 COR KOLOM K2 (40/40) BETON K-250/ M3 ( A ) Beton K-250 ( B ) Pembesian 100 Kg ( C ) Bekisting/ Cetakan/ M3

18

1.000 M3 3.000 100Kg 10.000 M2 Jumlah Harga Satuan 1.000 M3 3.000 100Kg 10.000 M2 Jumlah Harga Satuan 1.000 M3 2.570 100Kg 16.667 M2 Jumlah Harga Satuan

Org Org Org Org

M3 Kg Ltr M3 Btg Lbr

80,000.00 6,000.00 400.00 37,500.00 15,000.00 31,500.00

1,355,425.00 1,254,000.00 110,115.00 1,355,425.00 1,254,000.00 110,115.00 693,125.53 1,254,000.00 110,115.00 693,125.53 1,254,000.00 51,980.00 1,355,425.00 1,254,000.00 51,980.00 1 110,000.00 45,000.00 50,000.00 55,000.00 55,000.00 45,000.00 6,750.00 45,000.00 50,000.00 55,000.00 55,000.00 1 1 1 1

0.50

170,400.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

1,355,425.00 3,762,000.00 1,101,150.00 4,863,150.00 1,355,425.00 3,762,000.00 1,101,150.00 4,863,150.00 693,125.53 3,222,780.00 1,835,286.71 5,058,066.71 693,125.53 2,839,056.00 866,350.66 3,705,406.66 1,355,425.00 1,812,030.00 693,049.34 2,505,079.34 675.00 7,500.00 825.00 55.00 9,055.00

29,700.00 16,500.00 1,815.00 1,815.00 49,830.00

Rp

110,115.00

Rp

4,863,150.00

19

COR KOLOM PRAKTIS 12 x 12 BETON K-225/ M3 ( A ) Beton K-225 ( B ) Pembesian 100 Kg ( C ) Bekisting/ Cetakan/ M3 COR BALOK PRAKTIS 12 x 15 BETON K-225/ M3 ( A ) Beton K-225 ( B ) Pembesian 100 Kg ( C ) Bekisting/ Cetakan/ M3

Rp

4,863,150.00

20

21

22

23

24

1.000 M3 2.264 100Kg 16.667 M2 Jumlah Harga Satuan COR BALOK LISTPLANK (15 x 40) BETON K-250/ M3 ( A ) Beton K-250 1.000 M3 ( B ) Pembesian 100 Kg 1.445 100Kg ( C ) Bekisting/ Cetakan/ M3 13.333 M2 Jumlah Harga Satuan PASANG KACA 5 mm/ M2 Bahan : Kaca Polos 1.100 M2 Upah : Pekerja 0.015 Org Tukang Kayu 0.150 Org Kepala Tukang 0.015 Org Mandor 0.001 Org Jumlah Harga Satuan PASANG KUSEN ALUMUNIUM/ M Bahan : Kusen Alumunium 1.050 M1 Perlengkapan ( 15% x Kusen ) 0.100 Upah : Pekerja 0.015 Org Tukang Kayu 0.150 Org Kepala Tukang 0.015 Org Mandor 0.0075 Org Jumlah Harga Satuan VERTICAL BLINDS/ M2 Bahan : Ventilation Blinds dan Vertical Blinds 1.000 M2 Upah : Pekerja 0.350 Org Tukang Kayu 0.350 Org Kepala Tukang 0.035 Org Mandor 0.0180 Org Jumlah Harga Satuan

Rp

5,058,066.71

Rp

3,705,406.66

Rp

2,505,079.34

Rp Rp Rp Rp Rp Rp Rp

121,000.00 121,000.00 47,250.00 675.00 47,925.00

1

Rp

130,055.00

1

180,000.00 45,000.00 50,000.00 55,000.00 55,000.00

180,000.00 180,000.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

675.00 7,500.00 825.00 412.50 9,412.50 15,750.00 17,500.00 1,925.00 990.00 36,165.00

Rp

57,337.50

1

Rp

216,165.00

NO 251

URAIAN PEKERJAAN2

KOFESIEN3

HARGA SATUAN (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp4

BAHAN (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp5

JUMLAH

UPAH (Rp)6

JUMLAH HARGA (Rp)7

26

27

28

PASANG RANGKA JENDELA/ PINTU ALUMUNIUM/ M Bahan : Kusen Alumunium 1.050 Perlengkapan ( 15% x Kusen ) 0.150 Upah : Pekerja 0.015 Tukang Kayu 0.150 Kepala Tukang 0.015 Mandor 0.0008 Jumlah Harga Satuan JENDELA J1 / UNIT Bahan : Frame Alumunium 27.900 Frame Daun Jendela 18.960 Kaca Polos 5 mm 10.200 Karet Kaca/ Sealent 39.200 Pintu Teak Wood 6 mm L/D (Jati) 0.000 Kunci Pintu 2 x Slagh 0.000 Grendel Pintu 0.000 Engsel Pintu 0.000 Tarikan Jendela/ Ventilasi Alumunium 4.000 Grendel Jendela Alumunium 8.000 Engsel Jendela Alumunium 8.000 Hak Angin Alumunium 8.000 Vertical Blinds 0.000 Upah : Pemasangan 0.000 Jumlah Harga Satuan JENDELA J2 / UNIT Bahan : Frame Alumunium 39.200 Frame Daun Jendela 18.960 Kaca Polos 5 mm 16.320 Karet Kaca/ Sealent 60.000 Pintu Teak Wood 6 mm L/D (Jati) 0.000 Kunci Pintu 2 x Slagh 0.000 Grendel Pintu 0.000 Engsel Pintu 0.000 Tarikan Jendela/ Ventilasi Alumunium 4.000 Grendel Jendela Alumunium 8.000 Engsel Jendela Alumunium 8.000 Hak Angin Alumunium 8.000 Vertical Blinds 0.000 Upah : Pemasangan 0.000 Jumlah Harga Satuan JENDELA J3 / UNIT Bahan : Frame Alumunium 23.550 Frame Daun Jendela 19.770 Kaca Polos 5 mm 9.180 Karet Kaca/ Sealent 34.800 Pintu Teak Wood 6 mm L/D (Jati) 0.000 Kunci Pintu 2 x Slagh 0.000 Grendel Pintu 0.000 Engsel Pintu 0.000 Tarikan Jendela/ Ventilasi Alumunium 4.000 Grendel Jendela Alumunium 8.000 Engsel Jendela Alumunium 8.000 Hak Angin Alumunium 8.000 Vertical Blinds 0.000 Upah : Pemasangan 0.000 Jumlah Harga Satuan

Org Org Org Org M' M' M2 M' Bh Bh Bh Bh Bh Bh Bh Bh M2

M1

45,000.00 6,750.00 45,000.00 50,000.00 55,000.00 55,000.00

47,250.00 1,012.50 48,262.50

1

57,337.50 57,306.50 130,055.00 2,500.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 216,165.00 1 -

Bhn M' M' M2 M' Bh Bh Bh Bh Bh Bh Bh Bh M2

1,599,716.25 1,086,531.24 1,326,561.00 98,000.00 40,000.00 80,000.00 80,000.00 80,000.00 4,390,808.49 2,247,630.00 1,086,531.24 2,122,497.60 150,000.00 40,000.00 80,000.00 80,000.00 80,000.00 5,886,658.84 1,350,298.13 1,132,949.51 1,193,904.90 87,000.00 40,000.00 80,000.00 80,000.00 80,000.00 4,044,152.53

Rp Rp Rp Rp Rp

675.00 7,500.00 825.00 44.00 9,044.00

Rp

57,306.50

Bhn M' M' M2 M' Bh Bh Bh Bh Bh Bh Bh Bh M2

57,337.50 57,306.50 130,055.00 2,500.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 216,165.00 1 -

Rp Rp

-

Rp

4,390,808.49

Bhn

57,337.50 57,306.50 130,055.00 2,500.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 216,165.00 1 -

Rp Rp

-

Rp

5,886,658.84

Rp Rp

-

Rp

4,044,152.53

NO 291

URAIAN PEKERJAAN JENDELA J4 / UNIT Bahan : Frame Alumunium Frame Daun Jendela Kaca Polos 5 mm Karet Kaca/ Sealent Pintu Teak Wood 6 mm L/D (Jati) Kunci Pintu 2 x Slagh Grendel Pintu Engsel Pintu Tarikan Jendela/ Ventilasi Alumunium Grendel Jendela Alumunium Engsel Jendela Alumunium Hak Angin Alumunium Upah : Pemasangan JENDELA J7 / UNIT Bahan : Frame Alumunium Frame Daun Jendela Kaca Polos 5 mm Karet Kaca/ Sealent Pintu Teak Wood 6 mm L/D (Jati) Kunci Pintu 2 x Slagh Grendel Pintu Engsel Pintu Tarikan Jendela/ Ventilasi Alumunium Grendel Jendela Alumunium Engsel Jendela Alumunium Hak Angin Alumunium Upah : Pemasangan PINTU P1 / UNIT Bahan : Frame Alumunium Frame Daun Jendela Kaca Polos 5 mm Karet Kaca/ Sealent Pintu Teak Wood 6 mm L/D (Jati) Kunci Pintu 2 x Slagh Grendel Pintu Engsel Pintu Tarikan Jendela/ Ventilasi Alumunium Grendel Jendela Alumunium Engsel Jendela Alumunium Hak Angin Alumunium Upah : Pemasangan PINTU P2 / UNIT Bahan : Frame Alumunium Frame Daun Jendela Kaca Polos 5 mm Karet Kaca/ Sealent Gipsum Board 9 mm Kunci Pintu 2 x Slagh Grendel Pintu Engsel Pintu Tarikan Jendela/ Ventilasi Alumunium Grendel Jendela Alumunium Engsel Jendela Alumunium Hak Angin Alumunium Upah : Pemasangan2

KOFESIEN3

HARGA SATUAN (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 57,337.50 57,306.50 130,055.00 2,500.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1 4

BAHAN (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp5

JUMLAH

UPAH (Rp)6

JUMLAH HARGA (Rp)7

30

0.000 Bhn Jumlah Harga Satuan 14.520 0.000 3.128 14.520 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 M' M' M2 M' Bh Bh Bh Bh Bh Bh Bh Bh

15.000 0.000 5.440 20.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

M' M' M2 M' Bh Bh Bh Bh Bh Bh Bh Bh

31

0.000 Bhn Jumlah Harga Satuan 11.900 20.240 5.680 13.500 0.000 1.000 4.000 6.000 0.000 0.000 4.000 4.000 M' M' M2 M' Bh Bh Bh Bh Bh Bh Bh Bh

57,337.50 57,306.50 130,055.00 2,500.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1 -

1,617,561.70 832,540.50 406,812.04 36,300.00 -

860,062.50 707,499.20 50,000.00 -

Rp Rp

-

Rp

1,617,561.70

32

0.000 Bhn Jumlah Harga Satuan 39.700 5.800 8.648 45.550 7.682 1.000 2.000 3.000 0.000 0.000 0.000 0.000 M' M' M2 M' Lbr Bh Bh Bh Bh Bh Bh Bh

57,337.50 57,306.50 130,055.00 2,500.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1 -

1,275,652.54 682,316.25 1,159,883.56 738,712.40 33,750.00 180,000.00 40,000.00 90,000.00 40,000.00 40,000.00 3,004,662.21 2,276,298.75 332,377.70 1,124,715.64 113,875.00 460,920.00 180,000.00 20,000.00 45,000.00 4,553,187.09

Rp Rp

-

Rp

1,275,652.54

0.000 Bhn Jumlah Harga Satuan

57,337.50 57,306.50 130,055.00 2,500.00 60,000.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1 -

Rp Rp

-

Rp

3,004,662.21

Rp Rp

-

Rp

4,553,187.09

NO 331

URAIAN PEKERJAAN PINTU P3 / UNIT Bahan : Frame Alumunium Frame Daun Jendela Kaca Polos 5 mm Karet Kaca/ Sealent Gipsum Board 9 mm Kunci Pintu 2 x Slagh Grendel Pintu Engsel Pintu Tarikan Jendela/ Ventilasi Alumunium Grendel Jendela Alumunium Engsel Jendela Alumunium Hak Angin Alumunium Upah : Pemasangan PINTU P4 / UNIT Bahan : Frame Alumunium Frame Daun Jendela Kaca Polos 5 mm Karet Kaca/ Sealent Gipsum Board 9 mm Kunci Pintu 2 x Slagh Grendel Pintu Engsel Pintu Tarikan Jendela/ Ventilasi Alumunium Grendel Jendela Alumunium Engsel Jendela Alumunium Hak Angin Alumunium Upah : Pemasangan PINTU P5 / UNIT Bahan : Frame Alumunium Frame Daun Jendela Kaca Polos 5 mm Karet Kaca/ Sealent Pintu Alumunium+Asesoris Kunci Pintu 2 x Slagh Grendel Pintu Engsel Pintu Tarikan Jendela/ Ventilasi Alumunium Grendel Jendela Alumunium Engsel Jendela Alumunium Hak Angin Alumunium Upah : Pemasangan PINTU P6 / UNIT Bahan : Frame Alumunium Frame Daun Jendela Kaca Polos 5 mm Karet Kaca/ Sealent Gipsum Board 9 mm Kunci Pintu 2 x Slagh Grendel Pintu Engsel Pintu Tarikan Jendela/ Ventilasi Alumunium Grendel Jendela Alumunium Engsel Jendela Alumunium Hak Angin Alumunium Upah : Pemasangan2

KOFESIEN3

HARGA SATUAN (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 57,337.50 57,306.50 130,055.00 2,500.00 60,000.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1 4

BAHAN (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp5

JUMLAH

UPAH (Rp)6

JUMLAH HARGA (Rp)7

34

0.000 Bhn Jumlah Harga Satuan 11.100 5.800 1.880 9.430 1.670 1.000 2.000 3.000 0.000 0.000 0.000 0.000 M' M' M2 M' Lbr Bh Bh Bh Bh Bh Bh Bh

28.600 5.800 6.768 30.690 6.012 1.000 2.000 3.000 0.000 0.000 0.000 0.000

M' M' M2 M' Lbr Bh Bh Bh Bh Bh Bh Bh

1,639,852.50 332,377.70 880,212.24 76,725.00 360,720.00 180,000.00 20,000.00 45,000.00 3,534,887.44 636,446.25 332,377.70 244,503.40 23,575.00 100,200.00 180,000.00 20,000.00 45,000.00 -

35

0.000 Bhn Jumlah Harga Satuan 5.000 0.000 0.000 0.000 1.670 1.000 2.000 3.000 0.000 0.000 0.000 0.000 M' M' M2 M' M2 Bh Bh Bh Bh Bh Bh Bh

57,337.50 57,306.50 130,055.00 2,500.00 60,000.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1 -

Rp Rp

-

Rp

3,534,887.44

36

0.000 Bhn Jumlah Harga Satuan 32.150 0.000 6.768 36.120 6.012 0.000 0.000 3.000 0.000 0.000 0.000 0.000 M' M' M2 M' Lbr Bh Bh Bh Bh Bh Bh Bh

57,337.50 57,306.50 130,055.00 2,500.00 3,000,000.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1 -

1,582,102.35 286,687.50 5,010,000.00 180,000.00 20,000.00 45,000.00 5,541,687.50 1,843,400.63 880,212.24 90,300.00 360,720.00 45,000.00 3,219,632.87

Rp Rp

-

Rp

1,582,102.35

0.000 Bhn Jumlah Harga Satuan

57,337.50 57,306.50 130,055.00 2,500.00 60,000.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1 -

Rp Rp

-

Rp

5,541,687.50

Rp Rp

-

Rp

3,219,632.87

NO 371

URAIAN PEKERJAAN PINTU P7 / UNIT Bahan : Frame Alumunium Frame Daun Jendela Kaca Polos 5 mm Karet Kaca/ Sealent Gipsum Board 9 mm Kunci Pintu 2 x Slagh Grendel Pintu Engsel Pintu Tarikan Jendela/ Ventilasi Alumunium Grendel Jendela Alumunium Engsel Jendela Alumunium Hak Angin Alumunium Upah : Pemasangan PINTU P13 / UNIT Bahan : Frame Alumunium Frame Daun Jendela Kaca Polos 5 mm Karet Kaca/ Sealent Gipsum Board 9 mm Kunci Pintu 2 x Slagh Grendel Pintu Engsel Pintu Tarikan Jendela/ Ventilasi Alumunium Grendel Jendela Alumunium Engsel Jendela Alumunium Hak Angin Alumunium Upah : Pemasangan VENTILASI V1 / UNIT Bahan : Frame Alumunium Frame Daun Jendela Kaca Polos 5 mm Karet Kaca/ Sealent Gipsum Board 9 mm Kunci Pintu 2 x Slagh Grendel Pintu Engsel Pintu Tarikan Jendela/ Ventilasi Alumunium Grendel Jendela Alumunium Engsel Jendela Alumunium Hak Angin Alumunium Upah : Pemasangan PEKERJAAN PENGELASAN/ 10 Cm Bahan : Solar Minyak Pelumas Kawat Las Upah : Pekerja Tukang Kepala Tukang Mandor Alat2

KOFESIEN3

HARGA SATUAN (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 57,337.50 57,306.50 130,055.00 2,500.00 60,000.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1 4

BAHAN (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp5

JUMLAH

UPAH (Rp)6

JUMLAH HARGA (Rp)7

38

0.000 Bhn Jumlah Harga Satuan 30.800 5.800 7.740 36.120 4.068 1.000 2.000 3.000 0.000 0.000 0.000 0.000 M' M' M2 M' Lbr Bh Bh Bh Bh Bh Bh Bh

38.700 0.000 8.178 0.000 7.265 0.000 0.000 0.000 0.000 0.000 0.000 0.000

M' M' M2 M' Lbr Bh Bh Bh Bh Bh Bh Bh

2,218,961.25 1,063,589.79 435,900.00 3,718,451.04 1,765,995.00 332,377.70 1,006,625.70 90,300.00 244,080.00 180,000.00 20,000.00 45,000.00 3,684,378.40 114,675.00 31,213.20 145,888.20 1,650.00 1,200.00 2,000.00

39

0.000 Bhn Jumlah Harga Satuan 2.000 0.000 0.240 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 M' M' M2 M' Lbr Bh Bh Bh Bh Bh Bh Bh

57,337.50 57,306.50 130,055.00 2,500.00 60,000.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1 -

Rp Rp

-

Rp

3,718,451.04

40

0.000 Bhn Jumlah Harga Satuan 0.300 0.040 0.400 0.040 0.020 0.002 0.002 0.170 Ltr Ltr Btg

57,337.50 57,306.50 130,055.00 2,500.00 60,000.00 180,000.00 10,000.00 15,000.00 10,000.00 10,000.00 10,000.00 10,000.00 1 -

Rp Rp

-

Rp

3,684,378.40

Jumlah Harga Satuan

Org Org Org Org Bhn

5,500.00 30,000.00 5,000.00 45,000.00 50,000.00 55,000.00 55,000.00 4,850.00

Rp Rp

-

Rp

145,888.20

1

Rp

4,850.00

Rp Rp Rp Rp Rp Rp

1,800.00 1,000.00 110.00 110.00 824.50 3,844.50

Rp

8,694.50

NO 411

URAIAN PEKERJAAN PASANG TERALIS PINTU/ JENDELA/ M2 Bahan : Besi Beton 10 Besi Strip # 5 mm Pengelasan Upah : Pekerja Tukang Kepala Tukang Mandor PAS. BATU BATA 1:4/ M2 Bahan : Batu Bata Portland Cement (PC) Pasir Pasang Upah : Pekerja Tukang Batu Kepala Tukang Mandor PAS. BATU BATA 1:2/ M2 Bahan : Batu Bata Portland Cement (PC) Pasir Pasang Upah : Pekerja Tukang Batu Kepala Tukang Mandor PLESTERAN 1:4/ M2 Bahan : Portland Cement (PC) Pasir Pasang Upah : Pekerja Tukang Batu Kepala Tukang Mandor PLESTERAN 1:2/ M2 Bahan : Portland Cement (PC) Pasir Pasang Upah : Pekerja Tukang Batu Kepala Tukang Mandor2

KOFESIEN3

HARGA SATUAN (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp4

BAHAN (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp5

JUMLAH

UPAH (Rp)6

JUMLAH HARGA (Rp)7

6.000 Kg 0.230 Kg 0.043 10 Cm Jumlah Harga Satuan 70.000 11.500 0.043 0.300 0.100 0.010 0.015 1.670 1.670 0.167 0.083 Org Org Org Org Bh Kg M3

11,000.00 10,000.00 8,694.50 45,000.00 50,000.00 55,000.00 55,000.00 1,000.00 1,140.00 80,000.00 45,000.00 50,000.00 55,000.00 55,000.00 1,000.00 1,140.00 80,000.00 45,000.00 50,000.00 55,000.00 55,000.00 1,140.00 80,000.00 45,000.00 50,000.00 55,000.00 55,000.00 1,140.00 80,000.00 45,000.00 50,000.00 55,000.00 55,000.00 5,000.00 57,000.00 80,000.00 4,000.00 45,000.00 50,000.00 55,000.00 55,000.00

66,000.00 2,300.00 373.86 68,673.86 70,000.00 13,110.00 3,440.00 86,550.00 70,000.00 21,603.00 3,040.00 94,643.00 7,113.60 1,920.00 9,033.60

42

1

Rp Rp Rp Rp Rp

75,150.00 83,500.00 9,185.00 4,565.00 172,400.00

Rp

241,073.86

43

Jumlah Harga Satuan 70.000 18.950 0.038 0.300 0.100 0.010 0.015 6.240 0.024 0.300 0.150 0.015 0.015

Org Org Org Org Bh Kg M3

1

Rp Rp Rp Rp Rp

13,500.00 5,000.00 550.00 825.00 19,875.00

Rp

106,425.00

44

Jumlah Harga Satuan

Org Org Org Org Kg M3

1

Rp Rp Rp Rp Rp

13,500.00 5,000.00 550.00 825.00 19,875.00

Rp

114,518.00

45

Jumlah Harga Satuan 10.224 0.024 0.300 0.150 0.015 0.010

Org Org Org Org Kg M3

1

46

Jumlah Harga Satuan PASANG KERAMIK DINDING KM/ WC Uk. 25x40 Cm/ M2 Bahan : Keramik Dinding KM/ WC Uk. 25 x 40 10.000 Portland Cement (PC) 0.228 Pasir Pasang 0.042 Tepung AA 1.500 Upah : Pekerja 0.620 Tukang Batu 0.350 Kepala Tukang 0.035 Mandor 0.030 Jumlah Harga Satuan

Org Org Org Org Bh Zak M3 Kg

11,655.36 1,920.00 13,575.36 50,000.00 12,996.00 3,360.00 6,000.00 72,356.00

Rp Rp Rp Rp Rp

13,500.00 7,500.00 825.00 825.00 22,650.00

Rp

31,683.60

1

Rp Rp Rp Rp Rp

13,500.00 7,500.00 825.00 550.00 22,375.00

Rp

35,950.36

Org Org Org Org

1

Rp Rp Rp Rp Rp

27,900.00 17,500.00 1,925.00 1,650.00 48,975.00

Rp

121,331.00