Analisa Harga Satuan Sni,Bq,Rab,Rekap

182
Dalam bahasa Indonesia 0 1 Satu 0 2 Dua 85 3 Tiga 85,820 4 Empat 85,820,000 5 Lima 0 6 Enam 0 7 Tujuh 0 8 Delapan 8 9 Sembilan 0 10 Sepuluh 0 11 Sebelas 0 12 Dua belas 8 13 Tiga Belas 2 14 Empat Belas 0 15 Lima Belas 0 16 Enam Belas 0 17 Tujuh Belas 5 18 Delapan belas 0 19 Sembilan Belas 0 Puluh 0 Ratus Juta Ribu Terbilang : Delapan Puluh Lima Juta Delapan Ratus Dua Puluh Ribu Rupiah In English 0 1 One 0 2 Two 85 3 Three 85,820 4 Four 85,820,000 5 Five 0 6 Six 0 7 Seven 0 8 Eight 8 Masukan Angka di sini Ü Enter number here Ü

Transcript of Analisa Harga Satuan Sni,Bq,Rab,Rekap

Sheet1

Dalam bahasa IndonesiaMasukan Angka di sini 85,820,000.00

001 Satu002 Dua85853 Tiga85,8208204 Empat85,820,00005 Lima06 Enam07 Tujuh08 Delapan8 Delapan Ratus9 Sembilan010 Sepuluh011 Sebelas012 Dua belas8 Delapan Puluh13 Tiga Belas2 Dua Puluh14 Empat Belas015 Lima Belas016 Enam Belas017 Tujuh Belas5 Lima18 Delapan belas019 Sembilan Belas0 Puluh0 Ratus Delapan Puluh Lima Juta Juta Delapan Ratus Dua Puluh Ribu Ribu RupiahTerbilang : Delapan Puluh Lima Juta Delapan Ratus Dua Puluh Ribu Rupiah

In EnglishEnter number here 85,820,000.00

001 One002 Two85853 Three85,8208204 Four85,820,00005 Five06 Six07 Seven08 Eight8 Eight Hundred9 Nine010 Ten011 Eleven012 Twelve85 Eighty Five13 Thirteen20 Twenty14 Forteen015 Fifteen016 Sixteen17 Seventeen18 Eighteen19 Nineteen20 Twenty21 Twenty One22 Twenty Two23 Twenty Three24 Twenty Four25 Twenty Five26 Twenty Six27 Twenty Seven28 Twenty Eight29 Twenty Nine30 Thirty31 Thirty One32 Thirty Two33 Thirty Three34 Thirty Four35 Thirty Five36 Thirty Six37 Thirty Seven38 Thirty Eight39 Thirty Nine40 Forty41 Forty One42 Forty Two43 Forty Three44 Forty Four45 Forty Five46 Forty Six47 Forty Seven48 Forty Eight49 Forty Nine50 Fifty51 Fifty One52 Fifty Two53 Fifty Three54 Fifty Four55 Fifty Five56 Fifty Six57 Fifty Seven58 Fifty Eight59 Fifty Nine60 Sixty61 Sixty One62 Sixty Two63 Sixty Three64 Sixty Four65 Sixty Five66 Sixty Six67 Sixty Seven68 Sixty Eight69 Sixty Nine70 Seventy71 Seventy One72 Seventy Two73 Seventy Three74 Seventy Four75 Seventy Five76 Seventy Six77 Seventy Seven78 Seventy Eight79 Seventy Nine80 Eighty81 Eighty One82 Eighty Two83 Eighty Three84 Eighty Four85 Eighty Five86 Eighty Six87 Eighty Seven88 Eighty Eight89 Eighty Nine90 Ninety91 Ninety One92 Ninety Two93 Ninety Three94 Ninety Four95 Ninety Five96 Ninety Six97 Ninety Seven98 Ninety Eight99 Ninety Nine Hundred Eighty Five Million Million Eight Hundred Twenty Thousand Thousand Rupiahin Words : Eighty Five Million Eight Hundred Twenty Thousand Rupiah

Rekap Biaya

REKAPITULASI BIAYA

PEKERJAANLOKASITAHUN

NOURAIANJUMLAH HARGA (Rp)

IPEKERJAAN PERSIAPAN2,200,000.00

IIPEKERJAAN PERBAIKAN DRAENASE DAERAH I73,821,376.27

IIIPEKERJAAN LAIN-LAIN2,000,000.00

Sub Total Rp.78,021,376.27PPn (10%) Rp.7,802,137.63Total Rp.85,823,513.90

Pembulatan85,820,000.00

Terbilang : Delapan Puluh Lima Juta Delapan Ratus Dua Puluh Ribu Rupiah

500

250000

Belawan, 2012

Dibuat Oleh :STAF FASILITAS

RIZALDY HASIAN HARAHAP

RAB OWNERS ESTIMATE (OE)

PEKERJAANLOKASITAHUN

No.UraianSatuanVolumeHarga satuan (Rp)Jumlah harga (Rp)UpahBahanUpah + BahanUpahBahanUpah + Bahan2345678910

IPEKERJAAN PERSIAPANls1Survey lokasi 1.00ls200,000.000.00200,000.00200,000.000.00200,000.00ls2Mobilisasi dan Demobilisasi Alat1.00ls2,000,000.000.002,000,000.002,000,000.000.002,000,000.00

JUMLAH2,200,000.00IIPEKERJAAN PERBAIKAN DRAENASE DAERAH Ils1Pekerjaan perbaikan beton dudukan grill1.00ls200,000.00300,000.00500,000.00200,000.00300,000.00500,000.00pbk32Pekerjaan bongkar beton3.13m464,000.000.00464,000.001,453,248.000.001,453,248.00pbk23Pekerjaan bongkar pasangan bata6.28m165,500.000.00165,500.001,039,298.630.001,039,298.63spl514Pekerjaan beton bertulang dinding drainase13.46m508,679.602,866,161.243,374,840.846,849,040.1738,590,998.0945,440,038.26PBS15Pekerjaan besi siku pinggir 40.40.4309.33kg8,880.0013,915.0022,795.002,746,880.004,304,373.337,051,253.33PBS16Pekerjaan besi pelat strip 5.30128.00kg8,880.0013,915.0022,795.001,136,640.001,781,120.002,917,760.00PBS17Pekerjaan besi kotak 40x40 t 1,2676.45kg8,880.0013,915.0022,795.006,006,915.079,412,862.9815,419,778.05

JUMLAH73,821,376.27IIIPEKERJAAN LAIN-LAIN1 Pembersihan akhir1.00ls1,000,000.000.001,000,000.001,000,000.000.001,000,000.002Dokumentasi dan laporan1.00ls1,000,000.000.001,000,000.001,000,000.000.001,000,000.00

JUMLAH2,000,000.00

Belawan, 2012

Dibuat Oleh :STAF FASILITAS

RIZALDY HASIAN HARAHAP

Upah&BahanDAFTAR UPAH DAN BAHAN

PEKERJAANLOKASITAHUN

KODENO.NAMA BARANG / BAHAN / TENAGASATUANHARGA SATUAN (Rp.)

UPHUPAHUPHUPH1Tukang kayuOH80,000UPHUPH2Tukang batuOH80,000UPHUPH3Tukang alumuniumOH80,000UPHUPH4Tukang besiOH80,000UPHUPH5Tukang lasOH80,000UPHUPH6Tukang catOH80,000UPHUPH7Tukang pliturOH80,000UPHUPH8Tukang borOHUPHUPH9Tukang listrikOHUPHUPH10Tukang pipa ledengOHUPHUPH11Tukang PancangOHUPHUPH12Kepala tukangOH90,000UPHUPH13Tukan gali/timbunOHUPHUPH14PekerjaOH55,000UPHUPH15MandorOH80,000UPHUPH16PengawasOHUPHUPH17Ahli ukurOHUPHUPH18Asisten ahli ukurOHUPHUPH19SopirOHUPHUPH20MasinisOHUPHUPH21Kernet / pembantu sopirOHUPHUPH22Mekanik terlatihOHUPHUPH23Operator tak terlatihOHUPHUPH24Operator terlatihOHUPHUPH25Pembantu OperatorOHUPHUPH26Operator semi terlatihOHUPHUPH27PenjagaOHUPHUPH28PenyelamOHUPHUPH29Tukang GroutingOHUPHUPH30Operator mesin sondirOHUPHUPH31Analis test sondirOH

ASBASBESASBASB1Asbes plat ( 100 x 100 x 0,3 )lbrASBASB2Asbes gelombang besar ( 225 x 92 x 0,5 )lbrASBASB3Asbes gelombang besar ( 200 x 92 x 0,5 )lbrASBASB4Asbes gelombang besar ( 180 x 92 x 0,5 )lbrASBASB5Asbes gelombang besar ( 240 x 108 x 0,6 )lbrASBASB6Asbes gelombang besar ( 210 x 108 x 0,6 )lbrASBASB7Asbes gelombang besar ( 180 x 108 x 0,6 )lbrASBASB8Asbes gelombang kecil ( 210 x 105 x 0,4 )lbrASBASB9Asbes gelombang kecil ( 180 x 105 x 0,4 )lbrASBASB10Asbes gelombang kecil ( 150 x 105 x 0,4 )lbrASBASB11Asbes gelombang kecil ( 240 x 105 x 0,4 )lbrASBASB12Asbes nok gelombang besarlbrASBASB13Asbes nok gelombang kecillbrASBASB14Nok paten (Rabung)lbrASBASB15Nok stel ratalbr

ASPASPALASPASP1Aspal cairkg9,400ASPASP2Aspal curahkgASPASP3Aspal drumkgASPASP4Aspal modifer / asphalt jointkgASPASP5Drum aspal bekasbhASPASP6Rubber Fillerm1 ASPASP7FillerkgASPASP8Karoseneltr

ATPGENTENGATPATP1Genteng beton besar natural 1m 9 bijibhATPATP2Genteng beton besar warna 1m 9 bijibhATPATP3Genteng beton kecil natural 1m 11 bijibhATPATP4Genteng beton kecil warna 1m 11 bijibhATPATP5Genteng beton kecil natural 1m 20 bijibhATPATP6Genteng beton kecil warna 1m 20 bijibhATPATP7Genteng metalm2 ATPATP8Genteng bubungan betonbhATPATP9Bubung stel gelombanglbrATPATP10Genteng bubungan warnabhATPATP11GENTENG & RABUNGATPATP12Genteng keramik lengkung cekung / vlaamsbhATPATP13Genteng keramik lengkung ratabhATPATP14Genteng keramik rata / kodokbhATPATP15Genteng keramik berglasir KIA, Kanmuri NaturalbhATPATP16Nok metalbhATPATP17ATAP GENTENG METALATPATP18Atap metal gelombang t 0,35 mmm2 ATPATP19Nok standar 40 cm 18 SWG 22m'ATPATP20Paku anti karatkgATPATP21Atap alumunium gelombang tebal 0,55m2 ATPATP22Atap polykarbonatm2 ATPATP23Paku skrup anti karat atap metal/polykarbonatbhATPATP24Rabung Atap spandekm'ATPATP25Atap spandekm2 ATPATP26Baut + Hak SpandekbhATPATP27SENG BJLSATPATP28Seng BJLS 0,20 gelombang P = 180 cmlbr51,000.00ATPATP29Seng BJLS 0,20 gelombang P = 240 cmlbrATPATP30Seng plat 3" x 6" BJLS 28lbrATPATP31Seng gelombang 2" - 5" BJLS 24lbrATPATP32Alumunium gelombang tebal 0,55m2 ATPATP33Alumunium foilm2ATPATP34Rabung alumunium standar 40 cm 18 SWG 22m1

BBMBAHAN PELARUT, PELUMASBBMBBM1Oli SAE 30ltrBBMBBM2Minyak bakar / keroseneltr18,900.00BBMBBM3Minyak bekisting ltr6,000BBMBBM4Bensin premiumltrBBMBBM5SolarltrBBMBBM6Minyak pelumasltrBBMBBM7VetkgBBMBBM8Gas ElpijikgBBMBBM9Minyak bekistingltr

BKMBAHAN KIMIA PEMBANTU UNTUK BETONBKMBKM1Bahan kimia B (kuat ikat cepat )kgBKMBKM2Bahan kimia E (kuat ikat cepat )kgBKMBKM3BKMBKM4BAHAN PENGAWET DAN BITUMENBKMBKM5Teer kayuboxBKMBKM6ResidultrBKMBKM7Flincoatltr

BSIBESI BETONBSIBSI1Besi beton poloskg11,600BSIBSI2Besi beton ulirkg12,300BSIBSI3Besi baja profilkgBSIBSI4Besi tuang / corkgBSIBSI5Besi plat lembarankg12,500.00BSIBSI6Besi scuare tubemlBSIBSI7Besi lis kaca (1 x 1) cmmlBSIBSI8Besi gording canalkg12,100BSIBSI9Baja profil IWFkgBSIBSI10Besi stripkg13,300BSIBSI11Besi profilkg12,100BSIBSI12Besi siku rata-ratakg13,300BSIBSI13Besi angkur dia. 8mmkgBSIBSI14Plat baja t = 3 mm KgBSIBSI15Formite/penjaga jarak bekisting/spacer bhBSIBSI16ScafoldingunitBSIBSI17Profil alumuniumm1BSIBSI18Skrup fixerbhBSIBSI19Sealenttube7,500.00BSIBSI20Alumunium stripmlBSIBSI21Besi pelat/baja tulangan dia 19 mmkgBSIBSI22Al. Composite Panel (Alucopan)m2 239,400.00BSI23BSIBSI24KAWATBSIBSI25Kawat beton / bindratkg20,000BSIBSI26Kawat bronjongkgBSIBSI27Kawat nyamukm2 BSIBSI28Kawat jaringm2 BSIBSI29Kawat laskgBSIBSI30Kawat galvaniskgBSIBSI31Kawat durikgBSIBSI32Besi jaring kawat bajakgBSIBSI33Kawat harmonikam2 20,000BSIBSI34Kawat penggantung rangka hollowm1 BSIBSI35Profil Alumunium "T"m1 BSIBSI36Baja ringanm2 BSIBSI37Pipa hollowm1 BSIBSI38Kusen alumunium uk 2"x4" tebal 1.2 mm sekualitas YKK putihm1 BSIBSI39Jendela nakobhBSIBSI40Pintu besi bajam2 BSIBSI41Jendela besi bajam2 BSIBSI42Jendela besi tahan apim2 BSIBSI43Pintu gulung besim2 BSIBSI44Pintu lipat besim2 BSIBSI45Sunscreen alumuniumm2 BSIBSI46Roll doorm2 BSIBSI47Pintu alumuniumm2 BSIBSI48Vertikal blindm2 BSIBSI49Wall paperm2 BSI50BSIBSI51ScafoldingBSIBSI52Main Frame (MF-1219/h = 190 cm)bhBSIBSI53Ladder Frame (LF-1209/h =90) bhBSIBSI54Join Pin (JP-42) bhBSIBSI55Cross Brase (CB-1218/I = 220 cm)-MF bhBSIBSI56Cross Brase (CB-0618/I = 193)-LF bhBSIBSI57Head Jack (HJ-60) bhBSIBSI58Base Jack (BJ-60) bhBSIBSI59Balok 8/12 (10x pakai) m3BSIBSI60Papan Alas 3/20 (3x pakai) m3BSIBSI61Kawat Pengikat kg

BTNBUIS BETON / KERBBTNBTN1Buis beton bulat dia. 80 cm P=0,5 mm1 BTNBTN2BETON DAN BARANG DARI BETON (BATAKO)BTNBTN3Panel beton pracetaklbrBTNBTN4Kolom beton pracetakbtgBTNBTN5Tiang Pancang Beton dia cm (bottom)m'BTNBTN6Tiang Pancang Beton dia cm (upper)m'

BTUBATU ALAM / AGREGAT / BAHAN TUMBUHANBTUBATU ALAMBTUBTU1Batu kalim3 195,300.00BTUBTU2Batu apungKgBTUBTU3Batu Granitm3 BTUBTU4Batu hias tempelm2 BTUBTU5Batu hias bulat putihm3 BTUBTU6Ubin granit uk. 40/40m272,000BTUBTU7Ubin granit uk. 30/30m266,000BTUBTU8Ubin keramik artistikm2BTUBTU9Ubin marmer ( 40 x 40 x 2 ) Baitik/Citatahm2 BTUBTU10Ubin marmer ( 40 x 60 x 2 ) Baitikm2 BTUBTU11Ubin marmer ( 15 x 30 x 2 ) Baitikm2 BTUBTU12VinylbhBTUBTU13Riol 20 cmbhBTUBTU14Floor hardenerkgBTUBTU15Agregat hakus/pasir klas A ( Uk. butir 5 mm )m3 288,000BTUBTU16Agregat kasar/krikil/pasir klas B ( Uk. 20 - 40 )m3 276,000BTUBTU17Agregat kasar/krikil/pasir klas C ( Uk. 4 - 19 )m3 BTUBTU18Batu tempelm2BTUBTU19Bata pelapis dindingm2BTUBTU20Batu Bata 5 x 11 x 22bh600BTUBTU21Batu pecah 2/3 ( split )m3 214,200BTUBTU22Batu pecah 3/4m3 214,200BTUBTU23Batu pecah 4/6m3 214,200BTUBTU24Batu pecah 5/7m3 214,200BTUBTU25Batu pecah 1/2m3 214,200BTUBTU26Batu belah hitamm3 BTUBTU27Batu belah putihm3 BTUBTU28Sirtu Klas A lewat ayakan 1"m3 BTUBTU29Sirtu klas B lewat ayakan 2"m3 BTUBTU30Pasir urug daratm3 94,500BTUBTU31Pasir betonm3 120,000BTUBTU32Pasir pasang ( progo )m3 120,000BTUBTU33Pasir pasang ( krasak )m3 BTUBTU34Krikil betonm3 170,100BTUBTU35Kerikil tidak tersaringm3 BTUBTU36Split D 30 - 40 mmm3 BTUBTU37Split D 10 - 20 mmm3 214,200BTUBTU38Split D 1 - 2 cmm3 214,200BTUBTU39Batu merah ( 5x11x23 )bjBTUBTU40Batu merah ( 4x9x19 )bjBTUBTU41Tanah liatm3 BTUBTU42Tanah urugm3 100,800BTUBTU43Tanah timbunm3100,800BTUBTU44Sirtum3 110,900.00BTUBTU45BatakobhBTUBTU46Bata expose 5 x 11 x 24 cmbhBTUBTU47Terawang / roster 12x11x24 cmbhBTUBTU48Roster 25/25bh

CATCATCATCAT1Cat dasar menikg35,300CATCAT2Cat tembok melaminkg24,000CATCAT3Cat dasar meni kayukg35,300CATCAT4Cat alkali resisting primerkgCATCAT5Cat ICI WeathershieldkgCATCAT6Cat penutupkg51,800CATCAT7Cat kayukg59,200CATCAT8Cat Epoxy/TarkgCATCAT9Dempul kayu typa A (putih) Jagokg22,700.00CATCAT10Plamur FujikgCATCAT11KalkariumkgCATCAT12Politur jadiltrCATCAT13Teak oil FujiltrCATCAT14Pernisltr44,100.00CATCAT15Minyak catltr12,000CATCAT16Thinnerltr12,000CATCAT17Kuas rollbhCATCAT18Kuas ukuran 3,5"bhCATCAT19Kuas ukuran 2,5"bh7,800CATCAT20Kuas ukuran kecil 1"bh4,800CATCAT21Soda apikgCATCAT22Sabun deterjenkgCATCAT23AmplaslbrCATCAT24Perekatkg

CBKBATA HALAMAN / PAVING BLOCKCBKWARNA NATURAL / ABU-ABUCBKCBK1Tipe segi empat, uni, segi 6 tebal = 8 cm K 400m2 CBKCBK2Tipe uni dan segi empat tebal = 8 cm K 300m2 CBKCBK3Tipe segi empat tebal = 6 cm K 200m2 CBKCBK4Tipe segi empat tebal = 8 cm K 200m2 CBKCBK5Tipe segi enam tebal = 6 cm K 200m2 CBKCBK6Tipe segi enam tebal = 8 cm K 200m2 CBKCBK7Conblock t=10 cmm2 CBKCBK8HB 10bhCBKCBK9HB 15bhCBKCBK10HB 20bhCBKCBK11Conblock tipe segi-empat, abu-abu 10 cm, K-450m2 193,600.00CBKCBK12CBKCBK13WARNA MERAH / HITAMCBKCBK14Tipe grass blok bulat tebal = 10 cmm2 CBKCBK15Tipe grass blok tebal = 10 cmm2

LAIN-LAINDLLDLL1Tiang benderaDLLDLL2-Pondasi umpakbuahDLLDLL3-Ompak ornamenbuahDLLDLL4-Tiang galvanis 3"m'DLLDLL5-Bendera 120 x 180buahDLLDLL6Rambu lalu lintas (terpasang)buahDLLDLL7Papan nama jalan (terpasang)buahDLLDLL8Sumur peresapan 5 mbuahDLLDLL9Air minum, instalasi dalam dengan pipa pralon 1" medium, acesories dihitung sendirim1DLLDLL10Air minum, instalasi luar dengan pipa pralon 1" medium, acesoris dihitung sendirim1DLLDLL11AsbutonkgDLLDLL12Tumpuan konstruksimDLLDLL13Geotextile Polyfelt. TS 70m2DLLDLL14Pelapisan kedap air lantai dengan coating ( terpasang )m2DLLDLL15Pelapisan kedap air lantai dengan membran ( terpasang )m2

KCABAHAN KACAKCAKCA1Kaca polosm2 60,900.00KCAKCA2Kaca patrim2 KCAKCA3Fiber glasslbrKCAKCA4Profil kacaml

KCIPENGGANTUNG / PENGUNCIKCIKCI1Engsel pintubh31,500.00KCIKCI2Engsel jendelabh22,100.00KCIKCI3Grendelbh16,800.00KCIKCI4Hak anginbh12,600.00KCIKCI5Engsel anginbhKCIKCI6Kait anginbhKCIKCI7Door holderbhKCIKCI8Door stopbhKCIKCI9Penggantung + rel pintu dorongbhKCIKCI10Kunci tanambh69,300.00KCIKCI11Kunci tanam antikbh157,500.00KCIKCI12Kunci tanam biasabh69,300.00KCIKCI13Kunci kamar mandibh69,300.00KCIKCI14Kunci gembokbh8,200.00KCIKCI15Kunci selotbhKCIKCI16Kunci silinderbhKCIKCI17Kunci lemaribhKCIKCI18Spring knipbhKCIKCI19Door closerbhKCIKCI20Ramset / dina boltbh

KPGKAPUR & GIPSKPGKPG1Kapur pasangm3 KPGKPG2Kapur sirihm3 KPGKPG3Tepung GypsumkgKPGKPG4Gypsum boardlbr68,000.00KPGKPG5Kasa gypsumrollKPGKPG6List profil gypsum lebar sampai 5 cmm1KPGKPG7List profil gypsum lebar sampai 6 - 10 cmm1KPGKPG8List profil gypsum lebar lebih 10 cmm1KPGKPG9Kalsiboard ( 122 x 244 x 0,35 ) cmlbr63,000.00KPGKPG10Kalsiboard ( 122 x 244 x 0,60 ) cmlbr78,800.00

KYUKAYUKYUKYU1Kayu Kelas IIIm3 5,937,500KYUKYU2Damar Laut (Kelas I)m315,625,000KYUKYU3Kayu meranti balokm39,200,000KYUKYU4Kayu meranti papanm3 9,200,000KYUKYU5Papan kayu damar lautm3KYUKYU6Papan cetakan / bekestingm3 5,937,500KYUKYU7Kayu dolkenbtg15,800KYUKYU8Kayu dolken 8 - 10/400 cmbtgKYUKYU9Perancah kayum3 KYUKYU10KYUKYU11LIST KAYU PROFIL KYUKYU12List kayu profilm1 KYUKYU13Kayu plepet eternit 1/5 cmm1 KYUKYU14KYUKYU15KAYU LAPISKYUKYU16Akustik soft board 60 x 120lbrKYUKYU17Akustik soft board 40 x 60lbrKYUKYU18Akustik soft board 30 x 60lbrKYUKYU19Melamin wood 90 x 120 cmlbrKYUKYU20Melamin wood 120 x 240 cmlbrKYUKYU21Formika 4" x 8" x 0,3 cmlbr56,100.00KYUKYU22Tripleklbr62,400.00KYUKYU23Teak wood ( 90 x 240 )lbrKYUKYU24Plywood 4 mmlbrKYUKYU25Multipleklbr79,200

LNTTEGEL / KERAMIKLNTLNT1Plint tegel abu-abu 15/20bhLNTLNT2Plint tegel abu-abu 10/20bhLNTLNT3Plint tegel abu-abu 10/30bhLNTLNT4Plint tegel abu-abu 10/40bhLNTLNT5Plint tegel warna 10/20bhLNTLNT6Plint tegel warna 10/30bhLNTLNT7Plint tegel warna 10/40bhLNTLNT8Plint ubin teraso 10/30bhLNTLNT9Plint ubin teraso 10/40bhLNTLNT10Plint ubin granit 10/30bhLNTLNT11Plint ubin granit 10/40bhLNTLNT12Plint ubin teralux marmer 10/60bhLNTLNT13Plint ubin teralux marmer 10/40bhLNTLNT14Plint ubin teralux marmer 10/30bhLNTLNT15Tegel keramik 5/20 berglasirbhLNTLNT16Tegel keramik 10/20 berglasirbhLNTLNT17Tegel keramik 10/30 berglasirbhLNTLNT18Tegel keramik 20/20 berglasirbhLNTLNT19Tegel keramik 30/30 berglasirbhLNTLNT20Tegel keramik 40/40 berglasirbhLNTLNT21Tegel keramik mosaikm2 LNTLNT22MarmerbhLNTLNT23Tegel porselinm2 LNTLNT24Stepnosing granitobhLNTLNT25List keramik dinding motif 5/20bhLNTLNT26Plint keramik artistikbhLNTLNT27Keramik dinding 20/25m2 LNTLNT28Internal covebhLNTLNT29Bahan teraso corm3

LST LISTRIK LSTLST1Pasang instalasi / titiktitikLSTLST2Penyambungan bebanlsLSTLST3Kabel Snoor 2 x 0,23 "Supreme"rollLSTLST4Kabel NYA 2,5 sqmm "Supreme"roll498,800.00LSTLST5Kabel NYA 1,5 sqmm "Supreme"roll354,400.00LSTLST6Kabel NYA 2,5 sqmm "Supreme"m'498,800.00LSTLST7Kabel NYA 1,5 sqmm "Supreme"m'354,400.00LSTLST8Kabel NYM 2 x 1,5 sqmm "Supreme"m1LSTLST9Kabel NYM 2 x 2,5 sqmm "Supreme"m1LSTLST10Kabel NYM 2 x 4 sqmm "Supreme"m1LSTLST11Kabel NYM 3 x 1,5 sqmm "Supreme"m1LSTLST12Kabel NYM 3 x 2,5 sqmm "Supreme"m1LSTLST13Kabel NYM 3 x 4 sqmm "Supreme"m1LSTLST14Kabel NYY 3 x 6 sqmm "Supreme"m1LSTLST15Kabel NYY 3 x 1,5 sqmm "Supreme"m1LSTLST16Kabel NYY 3 x 2,5 sqmm "Supreme"m1LSTLST17Kabel NYY 3 x 4 sqmm "Supreme"m1LSTLST18Kabel NYY 3 x 6 sqmm "Supreme"m1LSTLST19Kabel NYY 3 x 10 sqmm "Supreme"m1LSTLST20Kabel NYY 4 x 10 sqmm "Supreme"m1LSTLST21Kabel NYFGBY 3 x 10 sqmm "Supreme"m1LSTLST22Kabel DX 2 x 10 sqmm "Supreme" m1LSTLST23Kabel DX 2 x 16 sqmm "Supreme" m1LSTLST24Kabel DX 2 x 25 sqmm "Supreme" m1LSTLST25Kapasitor 12,5 uFbuahLSTLST26MCB 10 Ampere + box "MG"buahLSTLST27MCB 6 Ampere "MG"buahLSTLST28Tutup panel 30x30buahLSTLST29Pipa pralon 3"m'LSTLST30Pasang panel kontrolunit / lsLSTLST31Penyetelan dan penyalaantitikLSTLST32Alat bantusetLSTLST33Retur material existingunitLSTLST34Angkutanjam

PKBPERALATAN KEBERSIHANPKBPKB1Sapu lidibhPKBPKB2Tangkai SapubhPKBPKB3SeragambhPKBPKB4Sarung tanganbh3,900.00PKBPKB5Maskerbh17,100.00PKBPKB6Gerobak (alat baru)bhPKBPKB7Gerobak (sewa)bhPKBPKB8SerokbhPKBPKB9Gunting pangkasbhPKBPKB10Mesin potong rumputbhPKBPKB11Garpu tanahbhPKBPKB12AritbhPKBPKB13SepatupsPKBPKB14EmberbhPKBPKB15PaculbhPKBPKB16Sewa kendaraan untuk membuang lumpurhrPKBPKB17Gas oksigen 5 kgtbPKBPKB18Pipa dia. 3/8" - 15 cmbhPKBPKB19Nitobond ECkgPKBPKB20Conbextra EPkg

PKUPAKUPKUPKU1Paku gording 125 x 5,1 mmkgPKUPKU2Paku usuk 80 x 3,8 mmkgPKUPKU3Paku reng 55 x 3,1 mmkgPKUPKU4Paku eternit 20 x 1,5 mmkgPKUPKU5Water murkgPKUPKU6Angkur / bautbhPKUPKU7Paku biasakg16,300PKUPKU8Paku asbesbhPKUPKU9Paku sumbatbhPKUPKU10Paku sekrup 3.5"bhPKUPKU11Paku skrupkgPKUPKU12Paku triplekkgPKUPKU13Paku gypsumkgPKUPKU14Paku hak panjang 15 cmkgPKUPKU15Paku biasa 1/2" - 1"kg16,300.00

PIPAPPAPPA1Pipa beton 20 x 30 Panjang 1 mmPPAPPA2Pipa beton 15 x 30 Panjang 1 mmPPAPPA3Pipa tanah dia. 15 cmbhPPAPPA4Pipa tanah dia. 20 cmbhPPAPPA5Pipa galvanis dia. 1/2"m1 PPAPPA6Pipa galvanis dia. 3/4"m1 PPAPPA7Pipa galvanis dia. 1"m1 PPAPPA8Pipa galvanis dia. 1 1/2"m1 PPAPPA9Pipa galvanis dia. 3"m1 PPAPPA10Pipa galvanis dia. 4"m1 PPAPPA11 Riol 20 cmbhPPAPPA12 Riol RCP 60 t 10 cmbh820,000.00PPAPPA13BAHAN PLASTIKPPAPPA14Pipa PVC abu-abu dia. 1/2" Wavinbtg13,700.00PPAPPA15Pipa PVC abu-abu dia. 3/4" Wavinbtg18,900.00PPAPPA16Pipa PVC abu-abu dia. 1" Wavinbtg25,900.00PPAPPA17Pipa PVC abu-abu dia. 1 1/2" Wavinbtg44,500.00PPAPPA18Pipa PVC abu-abu dia. 2" Wavinbtg56,900.00PPAPPA19Pipa PVC abu-abu dia. 2 1/2" Wavinbtg83,100.00PPAPPA20Pipa PVC abu-abu dia. 3" Wavinbtg112,100.00PPAPPA21Pipa PVC abu-abu dia. 4" Wavinbtg185,800.00

PRKBAHAN PEREKAT HIDROLIS & ORGANIKPRKPRK1Portland Cement (PC)kg1,375PRKPRK2Semen putihkg1,875PRKPRK3Semen warnakgPRKPRK4Lem kayu (putih) FoxkgPRKPRK5Lem plastik AcrylickgPRKPRK6Lem plastik VinylkgPRKPRK7Lem Aica AibonkgPRKPRK8Semen batu batam3

SNTBAK MANDISNTSNT1Bak mandi fiber glass 1,00 m3bh459,400.00SNTSNT2Bak mandi fiber glass 0,30 m3bh360,900.00SNTSNT3KLOSETSNTSNT4Kloset jongkok porselin type CE8 standarbhSNTSNT5Kloset duduk standar / porselin ( dengan tangki KIA standart) "Toto"bhSNTSNT6Kloset duduk putih dengan tangki "Toto"set1,890,000.00SNTSNT7Kloset jongkok terasobh113,400.00SNTSNT8WASTAFELSNTSNT9Wastafel putih (KIA)set535,500.00SNTSNT10BadkipbhSNTSNT11Bak cuci terasobhSNTSNT12Bak cuci stainless steelbhSNTSNT13Water drain + asesoriessetSNTSNT14Shower dindingsetSNTSNT15URINOIRSNTSNT16Urinoir putihsetSNTSNT17Kran air diameter 3/4" atau 1/2" exs. Totobh19,700.00SNTSNT18Seal tapebhSNTSNT19Floordrainbh78,100.00SNTSNT20Kran air angsabh206,700.00SNTSNT21PerlengkapansetSNTSNT22Tempat sabunbh52,500.00

TNMBAHAN TUMBUHANTNMTNM1Bambu petungbtgTNMTNM2Gedek bambu kulitm2 TNMTNM3Gedek bambu dagingm2 TNMTNM4Ijukm3 TNMTNM5Tali ijukkgTNMTNM6Gebalan rumputm2

ALTALATALTALT1Crane Kap. 35 tonhari3,900,000.00ALTALT2Crane Kap. 10-15 Tonhari2,800,000.00ALTALT3Hammer + Pile driverhari1,850,000.00ALTALT4Crawler Crane Kap. 35 tonhariALTALT5Alat Pancang Pile CompactorhariALTALT6Generator 150 kVAhariALTALT7Piling Barge DrivinghariALTALT8Ponton Kap. 1000 tonhari4,000,000.00ALTALT9Work Boathari1,000,000.00ALTALT10Kotrek 2,5 tonbh200,000.00ALTALT11Kunciset125,000.00ALTALT12Perancahhari350,000.00ALTALT13WaterpassunitALTALT14TheodoliteunitALTALT15Gensethari275,000.00ALTALT16Bor betonhariALTALT17Sewa alat lashrALTALT18Sewa alat sondirhrALTALT19Sewa alat perakitan tulanganhrALTALT20Sewa ScaffoldingunitALTALT21Biaya tes beton per benda ujibhALTALT22Vienetions dan vertikal blinds (tirai)m2ALTALT23Karpetm2ALTALT24Biaya analisis tes beton perbeda ujibhALTALT25Sewa Compressor untuk pekerjaan groutinghrALTALT26Sewa Mesin GroutinghrALTALT27Sewa mesin gerinda untuk pekerjaan groutinghrALTALT28Sewa mixer ubtuk pekerjaan groutinghrALTALT29Sewa alar borhrALTALT30Sewa Alat UkurhrALTALT31Sewa Motor WallshrALTALT32Alat bantu pekerjaan groutinglsALTALT33Alat bantu pekerjaan pekerjaan markalsALTALT34Alat bantu pekerjaan pekerjaan expantion jointlsALTALT35Waterstop lebar 230 mm - 320 mm m'ALTALT36Waterstop lebar 200 mm m'ALTALT37Waterstop lebar 150 mm m'ALT37Medan, Maret 2012

KEMBALI KE MENU

Analisa_Pekerjaan

ANALISA HARGA SATUAN

PEKERJAANLOKASITAHUN

KODEMacam PekerjaanUpahBahanJumlah(1)(2)(2)(3)(4)(5)

PPSPEKERJAAN PERSIAPANPPSPPSPPS1PPS1100 M Pekerjaan Pengukuran GedungPPSPPS1Pekerja8.0000OHX Rp.55,000.00440,000.00PPSPPS1Mandor2.0000OHX Rp.80,000.00160,000.00PPSPPS1Pengawas0.5000OHX Rp.0.00.00PPSPPS1Asisten Ahli Ukur2.0000OHX Rp.0.00.00PPSPPS1Sewa Alat Ukur1.0000hrX Rp.0.00.00PPSPPS1JUMLAH600,000.000.00600,000.00PPSPPS1PPSPPS1Pekerjaan Pengukuran0.0100m2x600,000.006,000.000.006,000.00PPSPPS1PPSPPS2PPS21 M' Pengukuran dan pemasangan bouwplank untuk gedung dan saluranPPSPPS2Kayu meranti balok0.0120m3X Rp.9,200,000.00110,400.00PPSPPS2Paku reng 55 x 3,1 mm0.0200kgX Rp.0.00.00PPSPPS2Kayu meranti papan0.0070m3 X Rp.9,200,000.0064,400.00PPSPPS2Tukang kayu0.1000OHX Rp.80,000.008,000.00PPSPPS2Kepala tukang0.0100OHX Rp.90,000.00900.00PPSPPS2Pekerja0.1000OHX Rp.55,000.005,500.00PPSPPS2Mandor0.0050OHX Rp.80,000.00400.00PPSPPS2JUMLAH14,800.00174,800.00189,600.00PPSPPS2PPSPPS3PPS31 M Membersihkan lapangan dan perataanPPSPPS3Pekerja0.1000orgX Rp.55,000.005,500.00PPSPPS3Mandor0.0500orgX Rp.80,000.004,000.00PPSPPS3JUMLAH9,500.000.009,500.00PPSPPS3PPSPPS4PPS41 bh Membuat Papan Nama Proyek 80x120 cmPPSPPS4Kayu meranti balok0.0350m3X Rp.9,200,000.00322,000.00PPSPPS4Seng BJLS 0,20 gelombang P = 180 cm1.4000lbrX Rp.51,000.0071,400.00PPSPPS4Paku biasa 1/2" - 1"0.6000kgX Rp.16,300.009,780.00PPSPPS4Cat kayu1.5000kgX Rp.59,200.0088,800.00PPSPPS4Portland Cement (PC)16.8000kgX Rp.1,375.0023,100.00PPSPPS4Pasir beton0.0270m3 X Rp.120,000.003,240.00PPSPPS4Krikil beton0.0405m3 X Rp.170,100.006,889.05PPSPPS4Tukang batu0.0175OHX Rp.80,000.001,400.00PPSPPS4Tukang kayu1.0000OHX Rp.80,000.0080,000.00PPSPPS4Tukang cat1.0000OHX Rp.80,000.0080,000.00PPSPPS4Pekerja2.1000OHX Rp.55,000.00115,500.00PPSPPS4Mandor1.0050OHX Rp.80,000.0080,400.00PPSPPS4JUMLAH 357,300.00525,209.05882,509.05PPSPPS4PPSPPS5PPS51,00 m2 Pembuatan jalan sementara, tebal 25 cmPPSPPS5Batu belah hitam0.2750m3 X Rp.0.00.00PPSPPS5Krikil beton0.0300m3 X Rp.170,100.005,103.00PPSPPS5Pasir beton0.0500m3 X Rp.120,000.006,000.00PPSPPS5Pekerja1.0000OHX Rp.55,000.0055,000.00PPSPPS5Mandor0.1000OHX Rp.80,000.008,000.00PPSPPS5JUMLAH 63,000.0011,103.0074,103.00PPSPPS5PPSPPS6PPS61,00 m2 Pembuatan kantor sementara, dengan lantai plesteranPPSPPS6Kayu dolken 8 - 10/400 cm1.2500btg0.00.00PPSPPS6Kayu meranti balok0.1800m3X Rp.9,200,000.001,656,000.00PPSPPS6Paku biasa0.8500kgX Rp.16,300.0013,855.00PPSPPS6Besi strip1.1000kgX Rp.13,300.0014,630.00PPSPPS6Portland Cement (PC)35.0000kgX Rp.1,375.001,203.13PPSPPS6Pasir pasang ( progo )0.1500m3 X Rp.120,000.0018,000.00PPSPPS6Pasir beton0.1000m3 X Rp.120,000.0012,000.00PPSPPS6Krikil beton0.1500m3 X Rp.170,100.0025,515.00PPSPPS6Batu merah ( 5x11x23 )30.0000bjX Rp.0.00.00PPSPPS6Seng plat 3" x 6" BJLS 280.2500lbrX Rp.0.00.00PPSPPS6Jendela nako2.0000bhX Rp.0.00.00PPSPPS6Kaca polos0.0800m2 X Rp.60,900.004,872.00PPSPPS6Kunci tanam0.1500bhX Rp.69,300.0010,395.00PPSPPS6Plywood 4 mm0.0600lbrX Rp.0.00.00PPSPPS6Tukang kayu2.0000OHX Rp.80,000.00160,000.00PPSPPS6Tukang batu1.0000OHX Rp.80,000.0080,000.00PPSPPS6Kepala tukang0.3000OHX Rp.90,000.0027,000.00PPSPPS6Pekerja2.0000OHX Rp.55,000.00110,000.00PPSPPS6Mandor0.0500OHX Rp.80,000.004,000.00PPSPPS6JUMLAH 381,000.001,756,470.132,137,470.13PPSPPS6PPSPPS7PPS71 M' Pembuatan pagar sementara dari seng gelombang tinggi 2 meterPPSPPS7Kayu dolken 8 - 10/400 cm1.2500btgX Rp.0.00.00PPSPPS7Portland Cement (PC)2.5000kgX Rp.1,375.003,437.50PPSPPS7Seng gelombang 2" - 5" BJLS 241.2000lbrX Rp.0.00.00PPSPPS7Pasir beton0.0050m3 X Rp.120,000.00600.00PPSPPS7Krikil beton0.0090m3 X Rp.170,100.001,530.90PPSPPS7Kayu meranti balok0.0250m3X Rp.9,200,000.00230,000.00PPSPPS7Paku biasa0.0600kgX Rp.16,300.00978.00PPSPPS7Cat dasar meni0.4000kgX Rp.35,300.0014,120.00PPSPPS7Tukang kayu0.2000OHX Rp.80,000.0016,000.0016,000.00PPSPPS7Kepala tukang0.0200OHX Rp.90,000.001,800.001,800.00PPSPPS7Pekerja0.4000OHX Rp.55,000.0022,000.0022,000.00PPSPPS7Mandor0.0200OHX Rp.80,000.001,600.001,600.00PPSPPS7JUMLAH 41,400.00292,066.40333,466.40PPSPPS7PPSPPS8PPS81 M' Pembuatan pagar sementara dari kawat duri tinggi 1,80 meterPPSPPS8Kayu dolken 8 - 10/400 cm1.0000btgX Rp.0.00.00PPSPPS8Portland Cement (PC)2.0000kgX Rp.1,375.002,750.00PPSPPS8Kawat duri25.0000kgX Rp.0.00.00PPSPPS8Pasir beton0.0050m3 X Rp.120,000.00600.00PPSPPS8Krikil beton0.0090m3 X Rp.170,100.001,530.90PPSPPS8Paku biasa0.0600kgX Rp.16,300.00978.00PPSPPS8Tukang kayu0.2000OHX Rp.80,000.0016,000.00PPSPPS8Kepala tukang0.0200OHX Rp.90,000.001,800.00PPSPPS8Pekerja0.3000OHX Rp.55,000.0016,500.00PPSPPS8Mandor0.0200OHX Rp.80,000.001,600.00PPSPPS8JUMLAH35,900.005,858.9041,758.90PPSPPS8PPSPPS9PPS91 m2 Pembuatan gudang semen dan alat-alatPPSPPS9Kayu dolken 8 - 10/400 cm1.7000btgX Rp.0.00.00PPSPPS9Kayu Kelas III0.2100m3 X Rp.5,937,500.001,246,875.00PPSPPS9Paku biasa0.3000kgX Rp.16,300.004,890.00PPSPPS9Portland Cement (PC)10.5000kgX Rp.1,375.0014,437.50PPSPPS9Pasir beton0.0300m3 X Rp.120,000.003,600.00PPSPPS9Krikil beton0.0500m3 X Rp.170,100.008,505.00PPSPPS9Seng gelombang 2" - 5" BJLS 241.5000lbrX Rp.0.00.00PPSPPS9Tukang kayu2.0000OHX Rp.80,000.00160,000.00PPSPPS9Kepala tukang0.2000OHX Rp.90,000.0018,000.00PPSPPS9Pekerja1.0000OHX Rp.55,000.0055,000.00PPSPPS9Mandor0.0500OHX Rp.80,000.004,000.00PPSPPS9JUMLAH237,000.001,278,307.501,515,307.50PPSPPS9PPSPPS10PPS101 m2 Pembuatan rumah jaga/konstruksi kayuPPSPPS10Kayu dolken 8 - 10/400 cm3.0000btgX Rp.0.00.00PPSPPS10Kayu Kelas III0.2760m3X Rp.5,937,500.001,638,750.00PPSPPS10Paku biasa0.7000kgX Rp.16,300.0011,410.00PPSPPS10Seng gelombang 2" - 5" BJLS 241.5000lbrX Rp.0.00.00PPSPPS10Tukang kayu1.5000orgX Rp.80,000.00120,000.00PPSPPS10Kepala tukang0.1500orgX Rp.90,000.0013,500.00PPSPPS10Pekerja1.0000orgX Rp.55,000.0055,000.00PPSPPS10Mandor0.0500orgX Rp.80,000.004,000.00PPSPPS10JUMLAH 192,500.001,650,160.001,842,660.00PPSPPS10PPSPPS11PPS111 m2 Pembuatan bedeng buruhPPSPPS11Kayu dolken 8 - 10/400 cm1.2500btgX Rp.0.00.00PPSPPS11Kayu Kelas III0.1860m3X Rp.5,937,500.001,104,375.00PPSPPS11Paku biasa0.3000kgX Rp.16,300.004,890.00PPSPPS11Portland Cement (PC)18.0000kgX Rp.1,375.0024,750.00PPSPPS11Pasir beton0.0300m3X Rp.120,000.003,600.00PPSPPS11Krikil beton0.0500m3X Rp.170,100.008,505.00PPSPPS11Seng gelombang 2" - 5" BJLS 241.5000lbrX Rp.0.00.00PPSPPS11Plywood 4 mm4.3500lbrX Rp.0.00.00PPSPPS11Tukang kayu2.0000orgX Rp.80,000.00160,000.00PPSPPS11Kepala tukang0.2000orgX Rp.90,000.0018,000.00PPSPPS11Pekerja1.0000orgX Rp.55,000.0055,000.00PPSPPS11Mandor0.0500orgX Rp.80,000.004,000.00PPSPPS11JUMLAH237,000.001,146,120.001,383,120.00PPSPPS11PPSPPS12PPS121 M' Pasang pagar kawat jaring galvanis, tinggi 1,00 mPPSPPS12Kawat jaring0.4340lbrX Rp.0.00.00PPSPPS12Tukang besi0.0420orgX Rp.80,000.003,360.00PPSPPS12Kepala tukang0.0040orgX Rp.90,000.00360.00PPSPPS12Pekerja0.0420orgX Rp.55,000.002,310.00PPSPPS12Mandor0.0020orgX Rp.80,000.00160.00PPSPPS12JUMLAH 6,190.000.006,190.00PPSPPS12PPSPPS13PPS131 M' Pasang pagar beton pracetak ( 5 x 50 x 213 ) cmPPSPPS13Panel beton pracetak0.9860lbrX Rp.0.00.00PPSPPS13Kolom beton pracetak0.5250btgX Rp.0.00.00PPSPPS13Pasir beton0.0740m3X Rp.120,000.008,880.00PPSPPS13Batu pecah 2/3 ( split )0.1460m3X Rp.214,200.0031,273.20PPSPPS13Portland Cement (PC)45.0000kgX Rp.1,375.0061,875.00PPSPPS13Tukang batu0.1250orgX Rp.80,000.0010,000.00PPSPPS13Kepala tukang0.0120orgX Rp.90,000.001,080.00PPSPPS13Pekerja0.3750orgX Rp.55,000.0020,625.00PPSPPS13Mandor0.0190orgX Rp.80,000.001,520.00PPSPPS13JUMLAH 33,225.00102,028.20135,253.20PPSPPS13PTNPEKERJAAN TANAHPTNPTNPTN1PTN11 m3 Galian tanah biasa sedalam sampai 1 meterPTNPTN1Pekerja0.7500orgX Rp.55,000.0041,250.00PTNPTN1Mandor0.0250orgX Rp.80,000.002,000.00PTNPTN1JUMLAH 43,250.000.0043,250.00PTNPTN1PTNPTN2PTN21 M Galian tanah biasa sedalam 1 - 2 meterPTNPTN2Pekerja0.9000orgX Rp.55,000.0049,500.00PTNPTN2Mandor0.0450orgX Rp.80,000.003,600.00PTNPTN2JUMLAH53,100.000.0053,100.00PTNPTN2PTNPTN3PTN31 M3 Galian tanah biasa sedalam 2 - 3 meterPTNPTN3Pekerja1.0500orgX Rp.55,000.0057,750.00PTNPTN3Mandor0.0670orgX Rp.80,000.005,360.00PTNPTN3JUMLAH63,110.000.0063,110.00PTNPTN3PTNPTN4PTN41 m3 Galian tanah keras sedalam sampai 1 meterPTNPTN4Pekerja1.0000orgX Rp.55,000.0055,000.00PTNPTN4Mandor0.0320orgX Rp.80,000.002,560.00PTNPTN4JUMLAH57,560.000.0057,560.00PTNPTN4PTNPTN5PTN51 m3 Galian tanah cadas sedalam sampai 1 meterPTNPTN5Pekerja1.5000orgX Rp.55,000.0082,500.00PTNPTN5Mandor0.0600orgX Rp.80,000.004,800.00PTNPTN5JUMLAH87,300.000.0087,300.00PTNPTN5PTNPTN6PTN61 M3 Galian tanah lumpur sedalam 1 meterPTNPTN6Pekerja1.2000orgX Rp.55,000.0066,000.00PTNPTN6Mandor0.0450orgX Rp.80,000.003,600.00PTNPTN6JUMLAH69,600.000.0069,600.00PTNPTN6PTNPTN7PTN71 M3 Stripping tebing setinggi 1 meterPTNPTN7Pekerja0.0500orgX Rp.55,000.002,750.00PTNPTN7Mandor0.0050orgX Rp.80,000.00400.00PTNPTN7JUMLAH 3,150.000.003,150.00PTNPTN7PTNPTN8PTN81 m3 Pengangkutan tanah sejauh 15 meterPTNPTN8Pekerja0.3300orgX Rp.55,000.0018,150.00PTNPTN8Mandor0.0100orgX Rp.80,000.00800.00PTNPTN8JUMLAH 18,950.0018,950.00PTNPTN8PTNPTN9PTN91 m3 Pemadatkan tanah per 20 cmPTNPTN9Pekerja0.5000orgX Rp.55,000.0027,500.00PTNPTN9Mandor0.0500orgX Rp.80,000.004,000.00PTNPTN9JUMLAH 31,500.0031,500.00PTNPTN9PTNPTN10PTN101 m3 Urug kembali bekas galian (dihitung 1/3 kali galian tanah)PTNPTN10Pekerja0.2500orgX Rp.55,000.0013,750.00PTNPTN10Mandor0.0083orgX Rp.80,000.00664.00PTNPTN10JUMLAH 14,414.0014,414.00PTNPTN10PTNPTN11PTN111 M3 Urugan pasirPTNPTN11Pasir urug darat1.2000m3X Rp.94,500.00113,400.00PTNPTN11Pekerja0.3000orgX Rp.55,000.0016,500.00PTNPTN11Mandor0.0100orgX Rp.80,000.00800.00PTNPTN11JUMLAH17,300.00113,400.00130,700.00PTNPTN11PTNPTN12PTN121 m3 Urugan sirtu padat untuk peninggian lantai bangunanPTNPTN12Sirtu1.2000m3X Rp.110,900.00133,080.00PTNPTN12Pekerja0.2500orgX Rp.55,000.0013,750.00PTNPTN12Mandor0.0250orgX Rp.80,000.002,000.00PTNPTN12JUMLAH15,750.00133,080.00148,830.00PTNPTN12PTNPTN13PTN131 M3 Urug tanah mendatangkanPTNPTN13Tanah urug1.2000m3X Rp.100,800.00120,960.00PTNPTN13Pekerja0.3000orgX Rp.55,000.0016,500.00PTNPTN13Mandor0.0100orgX Rp.80,000.00800.00PTNPTN13JUMLAH17,300.00120,960.00138,260.00PTNPTN13PTNPTN14PTN141 M3 Memasang Lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi PTNPTN14Kapur pasang0.2480m3X Rp.0.00.00PTNPTN14Tanah liat1.2400m3X Rp.0.00.00PTNPTN14Tukang Batu0.4000orgX Rp.80,000.0032,000.00PTNPTN14Kepala Tukang0.0400orgX Rp.90,000.003,600.00PTNPTN14Pekerja0.8000orgX Rp.55,000.0044,000.00PTNPTN14Mandor0.0800orgX Rp.80,000.006,400.00PTNPTN14JUMLAH86,000.000.0086,000.00PTNPTN14PTNPTN15PTN151 M2 Gebalan rumputPTNPTN15Bambu petung0.2000btgX Rp.0.00.00PTNPTN15Gebalan rumput1.0000m2X Rp.0.00.00PTNPTN15Pekerja0.5000orgX Rp.55,000.0027,500.00PTNPTN15Mandor0.0250orgX Rp.80,000.002,000.00PTNPTN15JUMLAH29,500.000.0029,500.00PTNPTN15PTNPTN16PTN161 M3 Pemasangan lapisan ijuk tebal 10cm untuk peresapanPTNPTN16Ijuk6.0000kgX Rp.0.00.00PTNPTN16Pekerja0.1500orgX Rp.55,000.008,250.00PTNPTN16Mandor0.0150orgX Rp.80,000.001,200.00PTNPTN16JUMLAH9,450.000.009,450.00PTNPTN16PTNPTN17PTN171 m3 Pembuangan Tanah sampai dengan sejauh 150 meterPTNPTN17Pekerja0.5160orgX Rp.55,000.0028,380.00PTNPTN17Mandor0.0500orgX Rp.80,000.004,000.00PTNPTN17JUMLAH32,380.000.0032,380.00PTNPTN17PTNPTN18PTN181 ttk Mengerjakan Sondir TanahPTNPTN18Sewa alat sondir0.50hrX Rp.0.00.00PTNPTN18Operator mesin sondir1.00orgX Rp.0.00.00PTNPTN18Analis test sondir0.50orgX Rp.0.00.00PTNPTN18Pekerja2.00orgX Rp.55,000.00110,000.00PTNPTN18Mandor0.10orgX Rp.80,000.008,000.00PTNPTN18JUMLAH118,000.000.00118,000.00PTNPTN18PTNPTN18PTNPTN19PTN191 m3 Membuang lumpur SAL sejauh 15 kmPTNPTN19Pekerja0.50orgX Rp.55,000.0027,500.00PTNPTN19Mandor0.02orgX Rp.80,000.001,600.00PTNPTN19Sewa kendaraan untuk membuang lumpur0.41hrX Rp.0.00.00PTNPTN19JUMLAH29,100.000.0029,100.00PTNPTN19PTNPTN20PTN201 m3 Mengangkut lumpur SAL sejauh 30 mPTNPTN20Pekerja0.40orgX Rp.55,000.0022,000.00PTNPTN20Mandor0.02orgX Rp.80,000.001,200.00PTNPTN20Gerobak (sewa)0.50hrX Rp.0.00.00PTNPTN20JUMLAH23,200.000.0023,200.00PTNPTN20PPOPEKERJAAN PASANGANPPOPPOPasangan pondasiPPOPPOPPO1PPO11 M3 Pasangan pondasi batu kosong (anstamping)PPOPPO1Batu belah hitam1.2000m3X Rp.0.00.00PPOPPO1Pasir urug darat0.4320m3X Rp.94,500.0040,824.00PPOPPO1Tukang Batu0.3900orgX Rp.80,000.0031,200.00PPOPPO1Kepala Tukang0.0390orgX Rp.90,000.003,510.00PPOPPO1Pekerja0.7800orgX Rp.55,000.0042,900.00PPOPPO1Mandor0.0390orgX Rp.80,000.003,120.00PPOPPO1JUMLAH80,730.0040,824.00121,554.00PPOPPO1PPOPPO2PPO21 M3 Pasangan pondasi 1 Kp : 1 Sm : 1 PsPPOPPO2Batu belah putih1.2000m3X Rp.0.00.00PPOPPO2Kapur pasang0.2290m3X Rp.0.00.00PPOPPO2Semen warna0.2290m3X Rp.0.00.00PPOPPO2Pasir pasang ( progo )0.5440m3X Rp.120,000.0065,280.00PPOPPO2Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO2Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO2Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO2Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO2JUMLAH155,250.0065,280.00220,530.00PPOPPO2PPOPPO3PPO31 M3 Pasangan pondasi 1 Kp : 1 Sm : 2 PsPPOPPO3Batu belah putih1.2000m3X Rp.0.00.00PPOPPO3Kapur pasang0.1700m3X Rp.0.00.00PPOPPO3Semen warna0.1700m3X Rp.0.00.00PPOPPO3Pasir pasang ( progo )0.3400m3X Rp.120,000.0040,800.00PPOPPO3Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO3Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO3Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO3Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO3JUMLAH155,250.0040,800.00196,050.00PPOPPO3PPOPPO4PPO41 M3 Pasangan pondasi 1 Pc : 3 Kp : 5 PsPPOPPO4Batu belah putih1.2000m3X Rp.0.00.00PPOPPO4Portland Cement (PC)95.4200kgX Rp.1,375.00131,202.50PPOPPO4Kapur pasang0.2290m3X Rp.0.00.00PPOPPO4Pasir pasang ( progo )0.3820m3X Rp.120,000.0045,840.00PPOPPO4Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO4Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO4Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO4Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO4JUMLAH155,250.00177,042.50332,292.50PPOPPO4PPOPPO5PPO51 M3 Pasangan pondasi 1 Pc : 3 Kp : 10 PsPPOPPO5Batu belah putih1.2000m3X Rp.0.00.00PPOPPO5Portland Cement (PC)61.0000kgX Rp.1,375.0083,875.00PPOPPO5Kapur pasang0.1470m3X Rp.0.00.00PPOPPO5Pasir pasang ( progo )0.4920m3X Rp.120,000.0059,040.00PPOPPO5Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO5Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO5Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO5Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO5JUMLAH155,250.00142,915.00298,165.00PPOPPO5PPOPPO6PPO61 M3 Pasangan pondasi 1/4 Pc : 1 Kp : 4 PsPPOPPO6Batu belah putih1.2000m3X Rp.0.00.00PPOPPO6Portland Cement (PC)41.0000kgX Rp.1,375.0056,375.00PPOPPO6Kapur pasang0.1310m3X Rp.0.00.00PPOPPO6Pasir pasang ( progo )0.5230m3X Rp.120,000.0062,760.00PPOPPO6Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO6Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO6Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO6Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO6JUMLAH155,250.00119,135.00274,385.00PPOPPO6PPOPPO7PPO71 M3 Pasangan pondasi 1 Pc : 4 PsPPOPPO7Batu belah putih1.2000m3X Rp.0.00.00PPOPPO7Portland Cement (PC)163.0000kgX Rp.1,375.00224,125.00PPOPPO7Pasir pasang ( progo )0.5200m3X Rp.120,000.0062,400.00PPOPPO7Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO7Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO7Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO7Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO7JUMLAH155,250.00286,525.00441,775.00PPOPPO7PPOPPO8PPO81 M3 Pasangan pondasi 1 Pc : 3 PsPPOPPO8Batu belah putih1.2000m3X Rp.0.00.00PPOPPO8Portland Cement (PC)202.0000kgX Rp.1,375.00277,750.00PPOPPO8Pasir pasang ( progo )0.4850m3X Rp.120,000.0058,200.00PPOPPO8Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO8Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO8Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO8Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO8JUMLAH155,250.00335,950.00491,200.00PPOPPO8PPOPPO9PPO91 M3 Pasangan pondasi 1 Pc : 1 PsPPOPPO9Batu belah putih1.2000m3X Rp.0.00.00PPOPPO9Portland Cement (PC)392.0000kgX Rp.1,375.00539,000.00PPOPPO9Pasir pasang ( progo )0.3140m3X Rp.120,000.0037,680.00PPOPPO9Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO9Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO9Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO9Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO9JUMLAH 155,250.00576,680.00731,930.00PPOPPO9PPOPPO10PPO101 M3 Pasangan pondasi 1 Pc : 2 PsPPOPPO10Batu belah putih1.2000m3X Rp.0.00.00PPOPPO10Portland Cement (PC)267.0000kgX Rp.1,375.00367,125.00PPOPPO10Pasir pasang ( progo )0.4270m3X Rp.120,000.0051,240.00PPOPPO10Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO10Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO10Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO10Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO10JUMLAH155,250.00418,365.00573,615.00PPOPPO10PPOPPO11PPO111 M3 Pasangan pondasi 1 Pc : 5 PsPPOPPO11Batu belah putih1.2000m3X Rp.0.00.00PPOPPO11Portland Cement (PC)136.0000kgX Rp.1,375.00187,000.00PPOPPO11Pasir pasang ( progo )0.5440m3X Rp.120,000.0065,280.00PPOPPO11Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO11Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO11Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO11Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO11JUMLAH155,250.00252,280.00407,530.00PPOPPO11PPOPPO12PPO121 M3 Pasangan pondasi 1 Pc : 6 PsPPOPPO12Batu belah putih1.2000m3X Rp.0.00.00PPOPPO12Portland Cement (PC)117.0000kgX Rp.1,375.00160,875.00PPOPPO12Pasir pasang ( progo )0.5610m3X Rp.120,000.0067,320.00PPOPPO12Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO12Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO12Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO12Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO12JUMLAH155,250.00228,195.00383,445.00PPOPPO12PPOPPO13PPO131 M3 Pasangan pondasi 1 Pc : 8 PsPPOPPO13Batu belah putih1.2000m3X Rp.0.00.00PPOPPO13Portland Cement (PC)91.0000kgX Rp.1,375.00125,125.00PPOPPO13Pasir pasang ( progo )0.5840m3X Rp.120,000.0070,080.00PPOPPO13Tukang Batu0.7500orgX Rp.80,000.0060,000.00PPOPPO13Kepala Tukang0.0750orgX Rp.90,000.006,750.00PPOPPO13Pekerja1.5000orgX Rp.55,000.0082,500.00PPOPPO13Mandor0.0750orgX Rp.80,000.006,000.00PPOPPO13JUMLAH155,250.00195,205.00350,455.00PPOPPO13PPOPPO14PPO141 M3 Beton cyclope 60% beton camp. 1pc:2ps:3kr, 40% batu belahPPOPPO14Batu belah putih0.4800m3X Rp.0.00.00PPOPPO14Portland Cement (PC)194.0000kgX Rp.1,375.00266,750.00PPOPPO14Pasir beton0.3120m3X Rp.120,000.0037,440.00PPOPPO14Krikil beton0.4680m3X Rp.170,100.0079,606.80PPOPPO14Besi beton polos126.0000kgX Rp.11,600.001,461,600.00PPOPPO14Kawat beton / bindrat1.8000kgX Rp.20,000.0036,000.00PPOPPO14Tukang batu0.8500orgX Rp.80,000.0068,000.00PPOPPO14Kepala Tukang0.0850orgX Rp.90,000.007,650.00PPOPPO14Pekerja3.4000orgX Rp.55,000.00187,000.00PPOPPO14Mandor0.1700orgX Rp.80,000.0013,600.00PPOPPO14JUMLAH276,250.001,881,396.802,157,646.80PPOPPO14PPOPPO15PPO151 M3 Pasangan pondasi sumuran dia. 100 cmPPOPPO15Batu belah putih0.4500m3X Rp.0.00.00PPOPPO15Portland Cement (PC)194.0000kgX Rp.1,375.00266,750.00PPOPPO15Pasir beton312.0000m3X Rp.120,000.0037,440,000.00PPOPPO15Krikil beton0.4680m3X Rp.170,100.0079,606.80PPOPPO15Tukang Batu0.8000orgX Rp.80,000.0064,000.00PPOPPO15Kepala Tukang0.0800orgX Rp.90,000.007,200.00PPOPPO15Pekerja2.4000orgX Rp.55,000.00132,000.00PPOPPO15Mandor0.1190orgX Rp.80,000.009,520.00PPOPPO15JUMLAH212,720.0037,786,356.8037,999,076.80PPOPPO15PPDPASANGAN DINDINGPPDPPDPPD1PPD11 m2 Pasangan dinding HB/CB 10, camp. 1pc : 4psPPDPPD1HB 1012.5000bhX Rp.0.00.00PPDPPD1Portland Cement (PC)12.1300kgX Rp.1,375.0016,678.75PPDPPD1Pasir pasang ( progo )0.3880m3X Rp.120,000.0046,560.00PPDPPD1Besi angkur dia. 8mm0.2800kgX Rp.0.00.00PPDPPD1Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD1Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD1Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD1Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD1JUMLAH26,600.0063,238.7589,838.75PPDPPD1PPDPPD2PPD21 m2 Pasangan dinding HB/CB 10, camp. 1pc : 3psPPDPPD2HB 1012.5000bhX Rp.0.00.00PPDPPD2Portland Cement (PC)15.1600kgX Rp.1,375.0020,845.00PPDPPD2Pasir pasang ( progo )0.3640m3X Rp.120,000.0043,680.00PPDPPD2Besi angkur dia. 8mm0.2800kgX Rp.0.00.00PPDPPD2Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD2Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD2Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD2Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD2JUMLAH26,600.0064,525.0091,125.00PPDPPD2PPDPPD3PPD31 M2 Pasangan dinding HB/CB 15, camp. 1pc : 4psPPDPPD3HB 1512.5000bhX Rp.0.00.00PPDPPD3Portland Cement (PC)18.2000kgX Rp.1,375.0025,025.00PPDPPD3Pasir pasang ( progo )0.5820m3X Rp.120,000.0069,840.00PPDPPD3Besi angkur dia. 8mm0.2800kgX Rp.0.00.00PPDPPD3Tukang Batu0.1200orgX Rp.80,000.009,600.00PPDPPD3Kepala Tukang0.0120orgX Rp.90,000.001,080.00PPDPPD3Pekerja0.3200orgX Rp.55,000.0017,600.00PPDPPD3Mandor0.0160orgX Rp.80,000.001,280.00PPDPPD3JUMLAH29,560.0094,865.00124,425.00PPDPPD3PPDPPD4PPD41 m2 Pasangan dinding HB/CB 15, camp. 1pc : 3psPPDPPD4HB 1512.5000bhX Rp.0.00.00PPDPPD4Portland Cement (PC)22.7400kgX Rp.1,375.0031,267.50PPDPPD4Pasir pasang ( progo )0.5500m3X Rp.120,000.0066,000.00PPDPPD4Besi angkur dia. 8mm0.2800kgX Rp.0.00.00PPDPPD4Tukang Batu0.1200orgX Rp.80,000.009,600.00PPDPPD4Kepala Tukang0.0120orgX Rp.90,000.001,080.00PPDPPD4Pekerja0.3200orgX Rp.55,000.0017,600.00PPDPPD4Mandor0.0160orgX Rp.80,000.001,280.00PPDPPD4JUMLAH29,560.0097,267.50126,827.50PPDPPD4PPDPPD5PPD51 m2 Pasangan dinding HB/CB 20, camp. 1pc : 4psPPDPPD5HB 2012.5000bhX Rp.0.00.00PPDPPD5Portland Cement (PC)24.2600kgX Rp.1,375.0033,357.50PPDPPD5Pasir pasang ( progo )0.7720m3X Rp.120,000.0092,640.00PPDPPD5Besi angkur dia. 8mm0.2800kgX Rp.0.00.00PPDPPD5Tukang Batu0.1500orgX Rp.80,000.0012,000.00PPDPPD5Kepala Tukang0.0150orgX Rp.90,000.001,350.00PPDPPD5Pekerja0.3500orgX Rp.55,000.0019,250.00PPDPPD5Mandor0.0175orgX Rp.80,000.001,400.00PPDPPD5JUMLAH 34,000.00125,997.50159,997.50PPDPPD5PPDPPD6PPD61 m2 Pasangan dinding HB/CB 20, camp. 1pc : 3psPPDPPD6HB 2012.5000bhX Rp.0.00.00PPDPPD6Portland Cement (PC)30.3200kgX Rp.1,375.0041,690.00PPDPPD6Pasir pasang ( progo )0.7280m3X Rp.120,000.0087,360.00PPDPPD6Besi angkur dia. 8mm0.2800kgX Rp.0.00.00PPDPPD6Tukang Batu0.1500orgX Rp.80,000.0012,000.00PPDPPD6Kepala Tukang0.0150orgX Rp.90,000.001,350.00PPDPPD6Pekerja0.3500orgX Rp.55,000.0019,250.00PPDPPD6Mandor0.0175orgX Rp.80,000.001,400.00PPDPPD6JUMLAH34,000.00129,050.00163,050.00PPDPPD6PPDPPD7PPD71 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2PsPPDPPD7Batu Bata 5 x 11 x 2270.0000bhX Rp.600.0042,000.00PPDPPD7Kapur pasang0.0140m3X Rp.0.00.00PPDPPD7Semen warna0.0140m3X Rp.0.00.00PPDPPD7Pasir pasang ( progo )0.0280m3X Rp.120,000.003,360.00PPDPPD7Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD7Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD7Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD7Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD7JUMLAH26,600.0045,360.0071,960.00PPDPPD7PPDPPD8PPD81 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1PsPPDPPD8Batu Bata 5 x 11 x 2270.0000bhX Rp.600.0042,000.00PPDPPD8Kapur pasang0.0180m3X Rp.0.00.00PPDPPD8Semen warna0.0180m3X Rp.0.00.00PPDPPD8Pasir pasang ( progo )0.0180m3X Rp.120,000.002,160.00PPDPPD8Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD8Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD8Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD8Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD8JUMLAH26,600.0044,160.0070,760.00PPDPPD8PPDPPD9PPD91 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 PsPPDPPD9Batu Bata 5 x 11 x 2270.0000bhX Rp.600.0042,000.00PPDPPD9Portland Cement (PC)4.5000kgX Rp.1,375.006,187.50PPDPPD9Kapur pasang0.0150m3X Rp.0.00.00PPDPPD9Pasir pasang ( progo )0.0500m3X Rp.120,000.006,000.00PPDPPD9Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD9Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD9Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD9Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD9JUMLAH26,600.0054,187.5080,787.50PPDPPD9PPDPPD10PPD101 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 PsPPDPPD10Batu Bata 5 x 11 x 2270.0000bhX Rp.600.0042,000.00PPDPPD10Portland Cement (PC)6.5000kgX Rp.1,375.008,937.50PPDPPD10Pasir pasang ( progo )0.0500m3X Rp.120,000.006,000.00PPDPPD10Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD10Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD10Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD10Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD10JUMLAH26,600.0056,937.5083,537.50PPDPPD10PPDPPD11PPD111 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 PsPPDPPD11Batu Bata 5 x 11 x 2270.0000bhX Rp.600.0042,000.00PPDPPD11Portland Cement (PC)8.3200kgX Rp.1,375.0011,440.00PPDPPD11Pasir pasang ( progo )0.0490m3X Rp.120,000.005,880.00PPDPPD11Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD11Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD11Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD11Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD11JUMLAH26,600.0059,320.0085,920.00PPDPPD11PPDPPD12PPD121 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 PsPPDPPD12Batu Bata 5 x 11 x 2270.0000bhX Rp.600.0042,000.00PPDPPD12Portland Cement (PC)9.6800kgX Rp.1,375.0013,310.00PPDPPD12Pasir pasang ( progo )0.0450m3X Rp.120,000.005,400.00PPDPPD12Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD12Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD12Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD12Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD12JUMLAH26,600.0060,710.0087,310.00PPDPPD12PPDPPD13PPD131 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 PsPPDPPD13Batu Bata 5 x 11 x 2270.0000bhX Rp.600.0042,000.00PPDPPD13Portland Cement (PC)11.5000kgX Rp.1,375.0015,812.50PPDPPD13Pasir pasang ( progo )0.0430m3X Rp.120,000.005,160.00PPDPPD13Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD13Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD13Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD13Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD13JUMLAH 26,600.0062,972.5089,572.50PPDPPD13PPDPPD14PPD141 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 PsPPDPPD14Batu Bata 5 x 11 x 2270.0000bhX Rp.600.0042,000.00PPDPPD14Portland Cement (PC)14.3700kgX Rp.1,375.0019,758.75PPDPPD14Pasir pasang ( progo )0.0400m3X Rp.120,000.004,800.00PPDPPD14Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD14Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD14Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD14Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD14JUMLAH 26,600.0066,558.7593,158.75PPDPPD14PPDPPD15PPD151 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 PsPPDPPD15Batu Bata 5 x 11 x 2270.0000bhX Rp.600.0042,000.00PPDPPD15Portland Cement (PC)18.9500kgX Rp.1,375.0026,056.25PPDPPD15Pasir pasang ( progo )0.0380m3X Rp.120,000.004,560.00PPDPPD15Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD15Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD15Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD15Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD15JUMLAH26,600.0072,616.2599,216.25PPDPPD15PPDPPD16PPD161 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 PsPPDPPD16Batu Bata 5 x 11 x 22140.0000bhX Rp.600.0084,000.00PPDPPD16Portland Cement (PC)10.0800kgX Rp.1,375.0013,860.00PPDPPD16Kapur pasang0.0275m3X Rp.0.00.00PPDPPD16Pasir pasang ( progo )0.0925m3X Rp.120,000.0011,100.00PPDPPD16Tukang Batu0.2000orgX Rp.80,000.0016,000.00PPDPPD16Kepala Tukang0.0200orgX Rp.90,000.001,800.00PPDPPD16Pekerja0.6000orgX Rp.55,000.0033,000.00PPDPPD16Mandor0.0300orgX Rp.80,000.002,400.00PPDPPD16JUMLAH 53,200.00108,960.00162,160.00PPDPPD16PPDPPD17PPD171 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 PsPPDPPD17Batu Bata 5 x 11 x 22140.0000bhX Rp.600.0084,000.00PPDPPD17Portland Cement (PC)18.5000kgX Rp.1,375.0025,437.50PPDPPD17Pasir pasang ( progo )0.1220m3X Rp.120,000.0014,640.00PPDPPD17Tukang Batu0.2000orgX Rp.80,000.0016,000.00PPDPPD17Kepala Tukang0.0200orgX Rp.90,000.001,800.00PPDPPD17Pekerja0.6000orgX Rp.55,000.0033,000.00PPDPPD17Mandor0.0300orgX Rp.80,000.002,400.00PPDPPD17JUMLAH53,200.00124,077.50177,277.50PPDPPD17PPDPPD18PPD181 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 PsPPDPPD18Batu Bata 5 x 11 x 22140.0000bhX Rp.600.0084,000.00PPDPPD18Portland Cement (PC)22.2000kgX Rp.1,375.0030,525.00PPDPPD18Pasir pasang ( progo )0.1020m3X Rp.120,000.0012,240.00PPDPPD18Tukang Batu0.2000orgX Rp.80,000.0016,000.00PPDPPD18Kepala Tukang0.0200orgX Rp.90,000.001,800.00PPDPPD18Pekerja0.6000orgX Rp.55,000.0033,000.00PPDPPD18Mandor0.0300orgX Rp.80,000.002,400.00PPDPPD18JUMLAH53,200.00126,765.00179,965.00PPDPPD18PPDPPD19PPD191 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 PsPPDPPD19Batu Bata 5 x 11 x 22140.0000bhX Rp.600.0084,000.00PPDPPD19Portland Cement (PC)26.5500kgX Rp.1,375.0036,506.25PPDPPD19Pasir pasang ( progo )0.0930m3X Rp.120,000.0011,160.00PPDPPD19Tukang Batu0.2000orgX Rp.80,000.0016,000.00PPDPPD19Kepala Tukang0.0200orgX Rp.90,000.001,800.00PPDPPD19Pekerja0.6000orgX Rp.55,000.0033,000.00PPDPPD19Mandor0.0300orgX Rp.80,000.002,400.00PPDPPD19JUMLAH53,200.00131,666.25184,866.25PPDPPD19PPDPPD20PPD201 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 PsPPDPPD20Batu Bata 5 x 11 x 22140.0000bhX Rp.600.0084,000.00PPDPPD20Portland Cement (PC)32.9500kgX Rp.1,375.0045,306.25PPDPPD20Pasir pasang ( progo )0.0910m3X Rp.120,000.0010,920.00PPDPPD20Tukang Batu0.2000orgX Rp.80,000.0016,000.00PPDPPD20Kepala Tukang0.0200orgX Rp.90,000.001,800.00PPDPPD20Pekerja0.6000orgX Rp.55,000.0033,000.00PPDPPD20Mandor0.0300orgX Rp.80,000.002,400.00PPDPPD20JUMLAH53,200.00140,226.25193,426.25PPDPPD20PPDPPD21PPD211 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 PsPPDPPD21Batu Bata 5 x 11 x 22140.0000bhX Rp.600.0084,000.00PPDPPD21Portland Cement (PC)43.5000kgX Rp.1,375.0059,812.50PPDPPD21Pasir pasang ( progo )0.0800m3X Rp.120,000.009,600.00PPDPPD21Tukang Batu0.2000orgX Rp.80,000.0016,000.00PPDPPD21Kepala Tukang0.0200orgX Rp.90,000.001,800.00PPDPPD21Pekerja0.6000orgX Rp.55,000.0033,000.00PPDPPD21Mandor0.0300orgX Rp.80,000.002,400.00PPDPPD21JUMLAH53,200.00153,412.50206,612.50PPDPPD21PPDPPD22PPD221 M2 Pasangan roster 12 x 11 x 24 cm, camp. 1pc : 4psPPDPPD22Terawang / roster 12x11x24 cm30.0000bhX Rp.0.00.00PPDPPD22Portland Cement (PC)11.0000kgX Rp.1,375.0015,125.00PPDPPD22Pasir pasang ( progo )0.0350m3X Rp.120,000.004,200.00PPDPPD22Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD22Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD22Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD22Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD22JUMLAH26,600.0019,325.0045,925.00PPDPPD22PPDPPD23PPD231 M2 Pasangan roster 12 x 11 x 24 cm, camp. 1pc : 3psPPDPPD23Terawang / roster 12x11x24 cm30.0000bhX Rp.0.00.00PPDPPD23Portland Cement (PC)14.0000kgX Rp.1,375.0019,250.00PPDPPD23Pasir pasang ( progo )0.0320m3X Rp.120,000.003,840.00PPDPPD23Tukang Batu0.1000orgX Rp.80,000.008,000.00PPDPPD23Kepala Tukang0.0100orgX Rp.90,000.00900.00PPDPPD23Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD23Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD23JUMLAH26,600.0023,090.0049,690.00PPDPPD23PPDPPD24PPD241 m2 Pasangan bata merah expose (5 x 11 x 24 cm), camp. 1 Pc : 3 PsPPDPPD24Bata expose 5 x 11 x 24 cm70.0000bhX Rp.0.00.00PPDPPD24Portland Cement (PC)14.0000kgX Rp.1,375.0019,250.00PPDPPD24Pasir pasang ( progo )0.0320m3X Rp.120,000.003,840.00PPDPPD24Tukang Batu0.1500orgX Rp.80,000.0012,000.00PPDPPD24Kepala Tukang0.0150orgX Rp.90,000.001,350.00PPDPPD24Pekerja0.3000orgX Rp.55,000.0016,500.00PPDPPD24Mandor0.0150orgX Rp.80,000.001,200.00PPDPPD24JUMLAH31,050.0023,090.0054,140.00PPDPPD24PPDPPD25PPD251 m2 Pasangan dinding batacoPPDPPD25Batako12.5000bhX Rp.0.00.00PPDPPD25Portland Cement (PC)12.5000kgX Rp.1,375.0017,187.50PPDPPD25Pasir pasang ( progo )0.0400m3X Rp.120,000.004,800.00PPDPPD25Tukang batu0.1000orgX Rp.80,000.008,000.00PPDPPD25Kepala tukang0.0100orgX Rp.90,000.00900.00PPDPPD25Pekerja0.5000orgX Rp.55,000.0027,500.00PPDPPD25Mandor0.0250orgX Rp.80,000.002,000.00PPDPPD25JUMLAH38,400.0021,987.5060,387.50PPDPPD25PPDPPD26PPD261 M2 Pasangan roster 25/25 cmPPDPPD26Roster 25/2516.0000bhX Rp.0.00.00PPDPPD26Portland Cement (PC)12.5000kgX Rp.1,375.0017,187.50PPDPPD26Pasir pasang ( progo )0.0400m3X Rp.120,000.004,800.00PPDPPD26Tukang batu0.1000orgX Rp.80,000.008,000.00PPDPPD26Kepala tukang0.0100orgX Rp.90,000.00900.00PPDPPD26Pekerja0.5000orgX Rp.55,000.0027,500.00PPDPPD26Mandor0.0250orgX Rp.80,000.002,000.00PPDPPD26JUMLAH0.0021,987.5021,987.50PPDPPD26PBTPEKERJAAN BETONPBTPBTPBT1PBT11 M3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 KrPBTPBT1Portland Cement (PC)336.0000kgX Rp.1,375.00462,000.00PBTPBT1Pasir beton0.5400m3X Rp.120,000.0064,800.00PBTPBT1Krikil beton0.8100m3X Rp.170,100.00137,781.00PBTPBT1Tukang batu0.2500orgX Rp.80,000.0020,000.00PBTPBT1Kepala tukang0.0250orgX Rp.90,000.002,250.00PBTPBT1Pekerja1.6500orgX Rp.55,000.0090,750.00PBTPBT1Mandor0.0800orgX Rp.80,000.006,400.00PBTPBT1JUMLAH119,400.00664,581.00783,981.00PBTPBT1PBTPBT2PBT21 M3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 KrPBTPBT2Portland Cement (PC)218.0000kgX Rp.1,375.00299,750.00PBTPBT2Pasir beton0.5200m3X Rp.120,000.0062,400.00PBTPBT2Krikil beton0.8700m3X Rp.170,100.00147,987.00PBTPBT2Tukang batu0.2500orgX Rp.80,000.0020,000.00PBTPBT2Kepala tukang0.0250orgX Rp.90,000.002,250.00PBTPBT2Pekerja1.6500orgX Rp.55,000.0090,750.00PBTPBT2Mandor0.0800orgX Rp.80,000.006,400.00PBTPBT2JUMLAH119,400.00510,137.00629,537.00PBTPBT2PBTPBT3PBT31 M3 Beton mutu f'c = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87 PBTPBT3Portland Cement (PC)247.000kgX Rp.1,375.00339,625.00PBTPBT3Pasir beton0.621m3X Rp.120,000.0074,485.71PBTPBT3Split D 1 - 2 cm0.740m3X Rp.214,200.00158,508.00PBTPBT3Pekerja1.650OHX Rp.55,000.0090,750.00PBTPBT3Tukang Batu0.275OHX Rp.80,000.0022,000.00PBTPBT3Kepala Tukang0.028OHX Rp.90,000.002,475.00PBTPBT3Mandor0.083OHX Rp.80,000.006,600.00PBTPBT3JUMLAH121,825.00572,618.71694,443.71PBTPBT3PBTPBT4PBT41 M3 Beton mutu f = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78PBTPBT4Portland Cement (PC)276.000kgX Rp.1,375.00379,500.00PBTPBT4Pasir beton0.591m3X Rp.120,000.0070,971.43PBTPBT4Split D 1 - 2 cm0.750m3X Rp.214,200.00160,570.67PBTPBT4Pekerja1.650OHX Rp.55,000.0090,750.00PBTPBT4Tukang Batu0.275OHX Rp.80,000.0022,000.00PBTPBT4Kepala Tukang0.028OHX Rp.90,000.002,475.00PBTPBT4Mandor0.083OHX Rp.80,000.006,600.00PBTPBT4JUMLAH121,825.00611,042.10732,867.10PBTPBT4PBTPBT5PBT51 M3 Beton mutu f'c = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72 PBTPBT5Portland Cement (PC)299.000kgX Rp.1,375.00411,125.00PBTPBT5Pasir beton0.571m3X Rp.120,000.0068,485.71PBTPBT5Split D 1 - 2 cm0.753m3X Rp.214,200.00161,364.00PBTPBT5Pekerja1.650OHX Rp.55,000.0090,750.00PBTPBT5Tukang Batu0.275OHX Rp.80,000.0022,000.00PBTPBT5Kepala Tukang0.028OHX Rp.90,000.002,475.00PBTPBT5Mandor0.083OHX Rp.80,000.006,600.00PBTPBT5JUMLAH121,825.00640,974.71762,799.71PBTPBT5PBTPBT6PBT61 M3 Lantai kerja Beton mutu f'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87 PBTPBT6Portland Cement (PC)230.000kgX Rp.1,375.00316,250.00PBTPBT6Pasir beton0.638m3X Rp.120,000.0076,542.86PBTPBT6Split D 1 - 2 cm0.761m3X Rp.214,200.00162,950.67PBTPBT6Pekerja1.200OHX Rp.55,000.0066,000.00PBTPBT6Tukang Batu0.200OHX Rp.80,000.0016,000.00PBTPBT6Kepala Tukang0.020OHX Rp.90,000.001,800.00PBTPBT6Mandor0.060OHX Rp.80,000.004,800.00PBTPBT6JUMLAH 88,600.00555,743.52644,343.52PBTPBT6PBTPBT7PBT71 M3 Beton mutu f'c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66 PBTPBT7Portland Cement (PC)326.000kgX Rp.1,375.00448,250.00PBTPBT7Pasir beton0.543m3X Rp.120,000.0065,142.86PBTPBT7Split D 1 - 2 cm0.762m3X Rp.214,200.00163,268.00PBTPBT7Pekerja1.650OHX Rp.55,000.0090,750.00PBTPBT7Tukang Batu0.275OHX Rp.80,000.0022,000.00PBTPBT7Kepala Tukang0.028OHX Rp.90,000.002,475.00PBTPBT7Mandor0.083OHX Rp.80,000.006,600.00PBTPBT7JUMLAH121,825.00676,660.86798,485.86PBTPBT7PBTPBT8PBT81 M3 Beton mutu f'c = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61 PBTPBT8Portland Cement (PC)352.000kgX Rp.1,375.00484,000.00PBTPBT8Pasir beton0.522m3X Rp.120,000.0062,657.14PBTPBT8Split D 1 - 2 cm0.764m3X Rp.214,200.00163,585.33PBTPBT8Pekerja1.650OHX Rp.55,000.0090,750.00PBTPBT8Tukang Batu0.275OHX Rp.80,000.0022,000.00PBTPBT8Kepala Tukang0.028OHX Rp.90,000.002,475.00PBTPBT8Mandor0.083OHX Rp.80,000.006,600.00PBTPBT8JUMLAH121,825.00710,242.48832,067.48PBTPBT8PBTPBT9PBT91 M3 Beton mutu f'c = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58 PBTPBT9Portland Cement (PC)371.000kgX Rp.1,375.00510,125.00PBTPBT9Pasir beton0.499m3X Rp.120,000.0059,828.57PBTPBT9Split D 1 - 2 cm0.776m3X Rp.214,200.00166,124.00PBTPBT9Pekerja1.650OHX Rp.55,000.0090,750.00PBTPBT9Tukang Batu0.275OHX Rp.80,000.0022,000.00PBTPBT9Kepala Tukang0.028OHX Rp.90,000.002,475.00PBTPBT9Mandor0.083OHX Rp.80,000.006,600.00PBTPBT9JUMLAH121,825.00736,077.57857,902.57PBTPBT9PBTPBT10PBT101 M3 Beton mutu f'c = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56 PBTPBT10Portland Cement (PC)384.000kgX Rp.1,375.00528,000.00PBTPBT10Pasir beton0.494m3X Rp.120,000.0059,314.29PBTPBT10Split D 1 - 2 cm0.770m3X Rp.214,200.00164,854.67PBTPBT10Pekerja1.650OHX Rp.55,000.0090,750.00PBTPBT10Tukang Batu0.275OHX Rp.80,000.0022,000.00PBTPBT10Kepala Tukang0.028OHX Rp.90,000.002,475.00PBTPBT10Mandor0.083OHX Rp.80,000.006,600.00PBTPBT10JUMLAH121,825.00752,168.95873,993.95PBTPBT10PBTPBT11PBT111 M3 Beton mutu f'c = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53 PBTPBT11Portland Cement (PC)406.000kgX Rp.1,375.00558,250.00PBTPBT11Pasir beton0.489m3X Rp.120,000.0058,628.57PBTPBT11Split D 1 - 2 cm0.760m3X Rp.214,200.00162,792.00PBTPBT11Pekerja1.650OHX Rp.55,000.0090,750.00PBTPBT11Tukang Batu0.275OHX Rp.80,000.0022,000.00PBTPBT11Kepala Tukang0.028OHX Rp.90,000.002,475.00PBTPBT11Mandor0.083OHX Rp.80,000.006,600.00PBTPBT11JUMLAH121,825.00779,670.57901,495.57PBTPBT11PBTPBT12PBT121 M3 Beton mutu f'c = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52PBTPBT12Portland Cement (PC)413.000kgX Rp.1,375.00567,875.00PBTPBT12Pasir beton0.486m3X Rp.120,000.0058,371.43PBTPBT12Split D 1 - 2 cm0.756m3X Rp.214,200.00161,998.67PBTPBT12Pekerja1.650OHX Rp.55,000.0090,750.00PBTPBT12Tukang Batu0.275OHX Rp.80,000.0022,000.00PBTPBT12Kepala Tukang0.028OHX Rp.90,000.002,475.00PBTPBT12Mandor0.083OHX Rp.80,000.006,600.00PBTPBT12JUMLAH121,825.00788,245.10910,070.10PBTPBT12PBTPBT13PBT131 M3 Beton mutu f'c = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49PBTPBT13Portland Cement (PC)439.000kgX Rp.1,375.00603,625.00PBTPBT13Pasir beton0.479m3X Rp.120,000.0057,428.57PBTPBT13Split D 1 - 2 cm0.745m3X Rp.214,200.00159,618.67PBTPBT13Pekerja2.100OHX Rp.55,000.00115,500.00PBTPBT13Tukang Batu0.350OHX Rp.80,000.0028,000.00PBTPBT13Kepala Tukang0.035OHX Rp.90,000.003,150.00PBTPBT13Mandor0.105OHX Rp.80,000.008,400.00PBTPBT13JUMLAH155,050.00820,672.24975,722.24PBTPBT13PBTPBT14PBT141 M3 Beton mutu f'c = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48PBTPBT14Portland Cement (PC)448.000kgX Rp.1,375.00616,000.00PBTPBT14Pasir beton0.476m3X Rp.120,000.0057,171.43PBTPBT14Split D 1 - 2 cm0.741m3X Rp.214,200.00158,666.67PBTPBT14Pekerja2.100OHX Rp.55,000.00115,500.00PBTPBT14Tukang Batu0.350OHX Rp.80,000.0028,000.00PBTPBT14Kepala Tukang0.035OHX Rp.90,000.003,150.00PBTPBT14Mandor0.105OHX Rp.80,000.008,400.00PBTPBT14JUMLAH155,050.00831,838.10986,888.10PBTPBT14PBTPBT15PBT151 M3 Membongkar cetakanPBTPBT15Pekerja4.0000orgX Rp.55,000.00220,000.00PBTPBT15JUMLAH 220,000.000.00220,000.00PBTPBT15PBTPBT16PBT16Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken )PBTPBT16Kayu dolken 8 - 10/400 cm0.7000m3X Rp.0.00.00PBTPBT16Tukang kayu10.5000orgX Rp.80,000.00840,000.00PBTPBT16Kepala Tukang1.0500orgX Rp.90,000.0094,500.00PBTPBT16Pekerja3.5000orgX Rp.55,000.00192,500.00PBTPBT16Mandor0.1750orgX Rp.80,000.0014,000.00PBTPBT16JUMLAH1,141,000.000.001,141,000.00PBTPBT16PBTPBT17PBT17Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding )PBTPBT17Scafolding32.0000unit X Rp.0.00.00PBTPBT17Tukang kayu3.5000orgX Rp.80,000.00280,000.00PBTPBT17Kepala Tukang0.3500orgX Rp.90,000.0031,500.00PBTPBT17Pekerja2.2000orgX Rp.55,000.00121,000.00PBTPBT17Mandor0.1200orgX Rp.80,000.009,600.00PBTPBT17JUMLAH442,100.000.00442,100.00PBTPBT17PBTPBT18PBT181 m' PVC Waterstop lebar 150 mm PBTPBT18Waterstop lebar 150 mm 1.050m'X Rp.0.00.00PBTPBT18Pekerja0.060OHX Rp.55,000.003,300.00PBTPBT18Tukang Batu0.030OHX Rp.80,000.002,400.00PBTPBT18Kepala Tukang0.003OHX Rp.90,000.00270.00PBTPBT18Mandor0.003OHX Rp.80,000.00240.00PBTPBT18JUMLAH6,210.000.006,210.00PBTPBT18PBTPBT19PBT191 m' PVC Waterstop lebar 200 mm PBTPBT19Waterstop lebar 200 mm 1.050m'X Rp.0.00.00PBTPBT19Pekerja0.070OHX Rp.55,000.003,850.00PBTPBT19Tukang Batu0.035OHX Rp.80,000.002,800.00PBTPBT19Kepala Tukang0.004OHX Rp.90,000.00315.00PBTPBT19Mandor0.007OHX Rp.80,000.00560.00PBTPBT19JUMLAH7,525.000.007,525.00PBTPBT19PBTPBT20PBT201 m' PVC Waterstop lebar 230 mm - 320 mm PBTPBT20Waterstop lebar 230 mm - 320 mm 1.050m'X Rp.0.00.00PBTPBT20Pekerja0.080OHX Rp.55,000.004,400.00PBTPBT20Tukang Batu0.040OHX Rp.80,000.003,200.00PBTPBT20Kepala Tukang0.004OHX Rp.90,000.00360.00PBTPBT20Mandor0.004OHX Rp.80,000.00320.00PBTPBT20JUMLAH8,280.000.008,280.00PBTPBT20PBTPBT21PBT211 Kg Pembesian dengan besi polosPBTPBT21Besi beton polos1.0500kgX Rp.11,600.0012,180.00PBTPBT21Kawat beton / bindrat0.0150kgX Rp.20,000.00300.00PBTPBT21Tukang Besi0.0070orgX Rp.80,000.00560.00PBTPBT21Kepala Tukang0.0007orgX Rp.90,000.0063.00PBTPBT21Pekerja0.0070orgX Rp.55,000.00385.00PBTPBT21Mandor0.0004orgX Rp.80,000.0028.00PBTPBT21JUMLAH1,036.0012,480.0013,516.00PBTPBT21PBTPBT22PBT221 Kg Pembesian dengan besi ulirPBTPBT22Besi beton ulir1.0500kgX Rp.12,300.0012,915.00PBTPBT22Kawat beton / bindrat0.0150kgX Rp.20,000.00300.00PBTPBT22Tukang Besi0.0070orgX Rp.80,000.00560.00PBTPBT22Kepala Tukang0.0007orgX Rp.90,000.0063.00PBTPBT22Pekerja0.0070orgX Rp.55,000.00385.00PBTPBT22Mandor0.0004orgX Rp.80,000.0028.00PBTPBT22JUMLAH 1,036.0013,215.0014,251.00PBTPBT22PBTPBT23PBT231 Kg Memasang kabel presstressed polos/strands PBTPBT23Besi beton polos1.0500kgX Rp.11,600.0012,180.00PBTPBT23Kawat beton / bindrat0.0100kgX Rp.20,000.00200.00PBTPBT23Tukang Besi0.0050orgX Rp.80,000.00400.00PBTPBT23Kepala Tukang0.0005orgX Rp.90,000.0045.00PBTPBT23Pekerja0.0050orgX Rp.55,000.00275.00PBTPBT23Mandor0.0003orgX Rp.80,000.0020.00PBTPBT23JUMLAH740.0012,380.0013,120.00PBTPBT23PBTPBT24PBT241 Kg Memasang jaring kawat baja/wire meshPBTPBT24Besi beton polos1.0200kgX Rp.11,600.0011,832.00PBTPBT24Kawat beton / bindrat0.0050kgX Rp.20,000.00100.00PBTPBT24Tukang Besi0.0025orgX Rp.80,000.00200.00PBTPBT24Kepala Tukang0.0025orgX Rp.90,000.00225.00PBTPBT24Pekerja0.0025orgX Rp.55,000.00137.50PBTPBT24Mandor0.0001orgX Rp.80,000.0010.00PBTPBT24JUMLAH572.5011,932.0012,504.50PBTPBT24PBTPBT25PBT251 M2 Cetakan beton / begisting memakai papanPBTPBT25Kayu meranti balok0.0170m3X Rp.9,200,000.00156,400.00PBTPBT25Kayu meranti papan0.0240m3X Rp.9,200,000.00220,800.00PBTPBT25Paku biasa 1/2" - 1"0.4000kgX Rp.16,300.006,520.00PBTPBT25Tukang kayu0.5000orgX Rp.80,000.0040,000.00PBTPBT25Kepala Tukang0.0500orgX Rp.90,000.004,500.00PBTPBT25Pekerja0.2000orgX Rp.55,000.0011,000.00PBTPBT25Mandor0.0100orgX Rp.80,000.00800.00PBTPBT25JUMLAH56,300.00383,720.00440,020.00PBTPBT252 kali pemakaian28,150.00191,860.00220,010.00PBTPBT25PBTPBT26PBT261 M2 Cetakan beton / begisting memakai multiplekPBTPBT26Kayu meranti balok0.0170m3X Rp.9,200,000.00156,400.00PBTPBT26Multiplek0.3470lbrX Rp.79,200.0027,482.40PBTPBT26Paku biasa 1/2" - 1"0.4000kgX Rp.16,300.006,520.00PBTPBT26Tukang kayu0.5000orgX Rp.80,000.0040,000.00PBTPBT26Kepala Tukang0.0500orgX Rp.90,000.004,500.00PBTPBT26Pekerja0.2000orgX Rp.55,000.0011,000.00PBTPBT26Mandor0.0100orgX Rp.80,000.00800.00PBTPBT26JUMLAH56,300.00190,402.40246,702.40PBTPBT262 kali pemakaian28,150.0095,201.20123,351.20PBTPBT26PBTPBT27PBT271 M2 Begesting untuk pondasiPBTPBT27Papan cetakan / bekesting0.0400m3X Rp.5,937,500.00237,500.00PBTPBT27Paku biasa 1/2" - 1"0.3000kgX Rp.16,300.004,890.00PBTPBT27Minyak bekisting 0.1000ltrX Rp.6,000.00600.00PBTPBT27Pekerja0.5200orgX Rp.55,000.0028,600.00PBTPBT27Tukang Kayu0.2600orgX Rp.80,000.0020,800.00PBTPBT27Kepala Tukang0.0260orgX Rp.90,000.002,340.00PBTPBT27Mandor0.0260orgX Rp.80,000.002,080.00PBTPBT27JUMLAH53,820.00242,990.00296,810.00PBTPBT272 kali pemakaian26,910.00121,495.00148,405.00PBTPBT27PBTPBT28PBT281 M2 Begesting untuk sloofPBTPBT28Papan cetakan / bekesting0.0450m3X Rp.5,937,500.00267,187.50PBTPBT28Paku biasa 1/2" - 1"0.3000kgX Rp.16,300.004,890.00PBTPBT28Minyak bekisting 0.1000ltrX Rp.6,000.00600.00PBTPBT28Pekerja0.5200orgX Rp.55,000.0028,600.00PBTPBT28Tukang Kayu0.2600orgX Rp.80,000.0020,800.00PBTPBT28Kepala Tukang0.0260orgX Rp.90,000.002,340.00PBTPBT28Mandor0.0260orgX Rp.80,000.002,080.00PBTPBT28JUMLAH53,820.00272,677.50326,497.50PBTPBT282 kali pemakaian26,910.00136,338.75163,248.75PBTPBT28PBTPBT29PBT291 M2 Begesting untuk kolomPBTPBT29Papan cetakan / bekesting0.0400m3X Rp.5,937,500.00237,500.00PBTPBT29Paku biasa 1/2" - 1"0.4000kgX Rp.16,300.006,520.00PBTPBT29Minyak bekisting 0.2000ltrX Rp.6,000.001,200.00PBTPBT29Kayu meranti balok0.0150m3X Rp.9,200,000.00138,000.00PBTPBT29Multiplek0.3500lbrX Rp.79,200.0027,720.00PBTPBT29Kayu dolken2.0000btgX Rp.15,800.0031,600.00PBTPBT29Pekerja0.6600orgX Rp.55,000.0036,300.00PBTPBT29Tukang Kayu0.3300orgX Rp.80,000.0026,400.00PBTPBT29Kepala Tukang0.0330orgX Rp.90,000.002,970.00PBTPBT29Mandor0.0330orgX Rp.80,000.002,640.00PBTPBT29JUMLAH68,310.00442,540.00510,850.00PBTPBT292 kali pemakaian34,155.00221,270.00255,425.00PBTPBT29PBTPBT30PBT301 M2 Begesting untuk balokPBTPBT30Papan cetakan / bekesting0.0400m3X Rp.5,937,500.00237,500.00PBTPBT30Paku biasa 1/2" - 1"0.4000kgX Rp.16,300.006,520.00PBTPBT30Minyak bekisting 0.2000ltrX Rp.6,000.001,200.00PBTPBT30Kayu meranti balok0.0180m3X Rp.9,200,000.00165,600.00PBTPBT30Multiplek0.3500lbrX Rp.79,200.0027,720.00PBTPBT30Kayu dolken2.0000btgX Rp.15,800.0031,600.00PBTPBT30Pekerja0.6600orgX Rp.55,000.0036,300.00PBTPBT30Tukang Kayu0.3300orgX Rp.80,000.0026,400.00PBTPBT30Kepala Tukang0.0330orgX Rp.90,000.002,970.00PBTPBT30Mandor0.0330orgX Rp.80,000.002,640.00PBTPBT30JUMLAH68,310.00470,140.00538,450.00PBTPBT302 kali pemakaian34,155.00235,070.00269,225.00PBTPBT30PBTPBT31PBT311 M2 Begesting untuk lantaiPBTPBT31Papan cetakan / bekesting0.0400m3X Rp.5,937,500.00237,500.00PBTPBT31Paku biasa 1/2" - 1"0.4000kgX Rp.16,300.006,520.00PBTPBT31Minyak bekisting 0.2000ltrX Rp.6,000.001,200.00PBTPBT31Kayu meranti balok0.0150m3X Rp.9,200,000.00138,000.00PBTPBT31Multiplek0.3500lbrX Rp.79,200.0027,720.00PBTPBT31Kayu dolken6.0000btgX Rp.15,800.0094,800.00PBTPBT31Pekerja0.6600orgX Rp.55,000.0036,300.00PBTPBT31Tukang Kayu0.3300orgX Rp.80,000.0026,400.00PBTPBT31Kepala Tukang0.0330orgX Rp.90,000.002,970.00PBTPBT31Mandor0.0330orgX Rp.80,000.002,640.00PBTPBT31JUMLAH 68,310.00505,740.00574,050.00PBTPBT312 kali pemakaian34,155.00252,870.00287,025.00PBTPBT31PBTPBT32PBT321 M2 Begesting untuk dindingPBTPBT32Papan cetakan / bekesting0.0300m3X Rp.5,937,500.00178,125.00PBTPBT32Paku biasa 1/2" - 1"0.4000kgX Rp.16,300.006,520.00PBTPBT32Minyak bekisting 0.2000ltrX Rp.6,000.001,200.00PBTPBT32Kayu meranti balok0.0200m3X Rp.9,200,000.00184,000.00PBTPBT32Multiplek0.3500lbrX Rp.79,200.0027,720.00PBTPBT32Kayu dolken3.0000btgX Rp.15,800.0047,400.00PBTPBT32Formite/penjaga jarak bekisting/spacer 4.0000bhX Rp.0.00.00PBTPBT32Pekerja0.6600orgX Rp.55,000.0036,300.00PBTPBT32Tukang Kayu0.3300orgX Rp.80,000.0026,400.00PBTPBT32Kepala Tukang0.0330orgX Rp.90,000.002,970.00PBTPBT32Mandor0.0330orgX Rp.80,000.002,640.00PBTPBT32JUMLAH68,310.00444,965.00513,275.00PBTPBT322 kali pemakaian34,155.00222,482.50256,637.50PBTPBT32PBTPBT33PBT331 M2 Begesting untuk tanggaPBTPBT33Papan cetakan / bekesting0.0300m3X Rp.5,937,500.00178,125.00PBTPBT33Paku biasa 1/2" - 1"0.4000kgX Rp.16,300.006,520.00PBTPBT33Minyak bekisting 0.1500ltrX Rp.6,000.00900.00PBTPBT33Kayu meranti balok0.0150m3X Rp.9,200,000.00138,000.00PBTPBT33Multiplek0.3500lbrX Rp.79,200.0027,720.00PBTPBT33Kayu dolken2.0000btgX Rp.15,800.0031,600.00PBTPBT33Pekerja0.6600orgX Rp.55,000.0036,300.00PBTPBT33Tukang Kayu0.3300orgX Rp.80,000.0026,400.00PBTPBT33Kepala Tukang0.0330orgX Rp.90,000.002,970.00PBTPBT33Mandor0.0330orgX Rp.80,000.002,640.00PBTPBT33JUMLAH68,310.00382,865.00451,175.00PBTPBT332 kali pemakaian34,155.00191,432.50225,587.50PBTPBT33PBTPBT34PBT34Jembatan untuk pengecoran betonPBTPBT34Papan cetakan / bekesting0.0264m3X Rp.5,937,500.00156,750.00PBTPBT34Paku biasa 1/2" - 1"0.6000kgX Rp.16,300.009,780.00PBTPBT34Kayu dolken0.5000btgX Rp.15,800.007,900.00PBTPBT34Pekerja0.1500orgX Rp.55,000.008,250.00PBTPBT34Tukang Kayu0.0500orgX Rp.80,000.004,000.00PBTPBT34Kepala Tukang0.0500orgX Rp.90,000.004,500.00PBTPBT34Mandor0.0075orgX Rp.80,000.00600.00PBTPBT34JUMLAH17,350.00174,430.00191,780.00PBTPBT34JASA 10 %19,178.00PBTPBT34PBTPBT35PBT351 m' Kolom praktis beton bertulang (11 x 11) cmPBTPBT35Papan cetakan / bekesting0.0020m3X Rp.5,937,500.0011,875.00PBTPBT35Paku biasa 1/2" - 1"0.0100kgX Rp.16,300.00163.00PBTPBT35Besi beton polos3.0000kgX Rp.11,600.0034,800.00PBTPBT35Kawat beton / bindrat0.4500kgX Rp.20,000.009,000.00PBTPBT35Portland Cement (PC)4.0000kgX Rp.1,375.005,500.00PBTPBT35Pasir beton0.0060m3X Rp.120,000.00720.00PBTPBT35Split D 1 - 2 cm0.0090m3X Rp.214,200.001,927.80PBTPBT35Pekerja0.1800OHX Rp.55,000.009,900.00PBTPBT35Tukang Batu0.0200OHX Rp.80,000.001,600.00PBTPBT35Tukang Kayu0.0200OHX Rp.80,000.001,600.00PBTPBT35Tukang Besi0.0200OHX Rp.80,000.001,600.00PBTPBT35Kepala Tukang0.0060OHX Rp.90,000.00540.00PBTPBT35Mandor0.0090OHX Rp.80,000.00720.00PBTPBT35JUMLAH15,960.0063,985.8079,945.80PBTPBT35PBTPBT36PBT361 m' Ring balok beton bertulang (10 x 15) cmPBTPBT36Papan cetakan / bekesting0.0030m3X Rp.5,937,500.0017,812.50PBTPBT36Paku biasa 1/2" - 1"0.0200kgX Rp.16,300.00326.00PBTPBT36Besi beton polos3.6000kgX Rp.11,600.0041,760.00PBTPBT36Kawat beton / bindrat0.0500kgX Rp.20,000.001,000.00PBTPBT36Portland Cement (PC)5.5000kgX Rp.1,375.007,562.50PBTPBT36Pasir beton0.0090m3X Rp.120,000.001,080.00PBTPBT36Split D 1 - 2 cm0.0150m3X Rp.214,200.003,213.00PBTPBT36Pekerja0.2970OHX Rp.55,000.0016,335.00PBTPBT36Tukang Batu0.0330OHX Rp.80,000.002,640.00PBTPBT36Tukang Kayu0.0330OHX Rp.80,000.002,640.00PBTPBT36Tukang Besi0.0330OHX Rp.80,000.002,640.00PBTPBT36Kepala Tukang0.0100OHX Rp.90,000.00900.00PBTPBT36Mandor0.0150OHX Rp.80,000.001,200.00PBTPBT36JUMLAH26,355.0072,754.0099,109.00PBTPBT36PBTPBT37PBT371 m' Pembuatan tiang pancang (40 x 40) cm, beton bertulangPBTPBT37Pasir urug darat0.0190m3X Rp.94,500.001,795.50PBTPBT37Pasir beton0.0940m3X Rp.120,000.0011,280.00PBTPBT37Batu pecah 2/3 ( split )0.1500m3X Rp.214,200.0032,130.00PBTPBT37Portland Cement (PC)60.5000kgX Rp.1,375.0083,187.50PBTPBT37Besi beton polos45.0000kgX Rp.11,600.00522,000.00PBTPBT37Kawat beton / bindrat0.9000kgX Rp.20,000.0018,000.00PBTPBT37Kayu meranti balok0.0320m3X Rp.9,200,000.00294,400.00PBTPBT37Paku reng 55 x 3,1 mm0.1200kgX Rp.0.00.00PBTPBT37Minyak bekisting0.0900ltrX Rp.0.00.00PBTPBT37Plamur Fuji0.2400kgX Rp.0.00.00PBTPBT37Tukang batu0.6700orgX Rp.80,000.0053,600.00PBTPBT37Kepala tukang0.0670orgX Rp.90,000.006,030.00PBTPBT37Pekerja1.0000orgX Rp.55,000.0055,000.00PBTPBT37Mandor0.0500orgX Rp.80,000.004,000.00PBTPBT37JUMLAH118,630.00962,793.001,081,423.00PBTPBT37PBTPBT38PBT381 m' Pembuatan tiang pancang (35 x 35) cm, beton bertulangPBTPBT38Pasir urug darat0.0160m3X Rp.94,500.001,512.00PBTPBT38Pasir beton0.0800m3X Rp.120,000.009,600.00PBTPBT38Batu pecah 2/3 ( split )0.1250m3X Rp.214,200.0026,775.00PBTPBT38Portland Cement (PC)49.0000kgX Rp.1,375.0067,375.00PBTPBT38Besi beton polos34.5000kgX Rp.11,600.00400,200.00PBTPBT38Kawat beton / bindrat0.7000kgX Rp.20,000.0014,000.00PBTPBT38Kayu meranti balok0.0270m3X Rp.9,200,000.00248,400.00PBTPBT38Paku reng 55 x 3,1 mm0.1200kgX Rp.0.00.00PBTPBT38Minyak bekisting0.0900ltrX Rp.0.00.00PBTPBT38Plamur Fuji0.2000kgX Rp.0.00.00PBTPBT38Tukang batu0.5000orgX Rp.80,000.0040,000.00PBTPBT38Kepala tukang0.0500orgX Rp.90,000.004,500.00PBTPBT38Pekerja0.8000orgX Rp.55,000.0044,000.00PBTPBT38Mandor0.0400orgX Rp.80,000.003,200.00PBTPBT38JUMLAH91,700.00767,862.00859,562.00PBTPBT38PPTPEKERJAAN PELESTERANPPTPPTPPT1PPT11 M2 Plesteran 1 Sm : 1 Kp : 1 Ps, tebal 15 mmPPTPPT1Semen warna0.0090m3X Rp.0.00.00PPTPPT1Kapur pasang0.0090m3X Rp.0.00.00PPTPPT1Pasir pasang ( progo )0.0090m3X Rp.120,000.001,080.00PPTPPT1Tukang Batu0.1200orgX Rp.80,000.009,600.00PPTPPT1Kepala Tukang0.0120orgX Rp.90,000.001,080.00PPTPPT1Pekerja0.3600orgX Rp.55,000.0019,800.00PPTPPT1Mandor0.0180orgX Rp.80,000.001,440.00PPTPPT1JUMLAH31,920.001,080.0033,000.00PPTPPT1PPTPPT2PPT21 M2 Plesteran 1 Sm : 1 Kp : 2 Ps, tebal 15 mmPPTPPT2Semen warna0.0070m3X Rp.0.00.00PPTPPT2Kapur pasang0.0070m3X Rp.0.00.00PPTPPT2Pasir pasang ( progo )0.0150m3X Rp.120,000.001,800.00PPTPPT2Tukang Batu0.1200orgX Rp.80,000.009,600.00PPTPPT2Kepala Tukang0.0120orgX Rp.90,000.001,080.00PPTPPT2Pekerja0.3600orgX Rp.55,000.0019,800.00PPTPPT2Mandor0.0180orgX Rp.80,000.001,440.00PPTPPT2JUMLAH31,920.001,800.0033,720.00PPTPPT2PPTPPT3PPT31 m2 Plesteran 1 Pc : 1/2 Kp : 3 Ps, tebal 15 mmPPTPPT3Portland Cement (PC)5.7600kgX Rp.1,375.007,920.00PPTPPT3Kapur pasang0.0030m3X Rp.0.00.00PPTPPT3Pasir pasang ( progo )0.0130m3X Rp.120,000.001,560.00PPTPPT3Tukang Batu0.1200orgX Rp.80,000.009,600.00PPTPPT3Kepala Tukang0.0120orgX Rp.90,000.001,080.00PPTPPT3Pekerja0.3600orgX Rp.55,000.0019,800.00PPTPPT3Mandor0.0180orgX Rp.80,000.001,440.00PPTPPT3JUMLAH31,920.009,480.0041,400.00PPTPPT3PPTPPT4PPT41 m2 Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mmPPTPPT4Portland Cement (PC)3.0000kgX Rp.1,375.004,125.00PPTPPT4Kapur pasang0.0050m3X Rp.0.00.00PPTPPT4Pasir pasang ( progo )0.0200m3X Rp.120,000.002,400.00PPTPPT4Tukang Batu0.1200orgX Rp.80,000.009,600.00PPTPPT4Kepala Tukang0.0120orgX Rp.90,000.001,080.00PPTPPT4Pekerja0.3600orgX Rp.55,000.0019,800.00PPTPPT4Mandor0.0180orgX Rp.80,000.001,440.00PPTPPT4JUMLAH31,920.006,525.0038,445.00PPTPPT4PPTPPT5PPT51 m2 Plesteran 1 Pc : 1 Ps, tebal 15 mmPPTPPT5Portland Cement (PC)15.5040kgX Rp.1,375.0021,318.00PPTPPT5Kapur pasang0.0160m3X Rp.0.00.00PPTPPT5Pasir pasang ( progo )0.1500orgX Rp.120,000.0018,000.00PPTPPT5Kepala Tukang0.0150orgX Rp.90,000.001,350.00PPTPPT5Pekerja0.3000orgX Rp.55,000.0016,500.00PPTPPT5Mandor0.0150orgX Rp.80,000.001,200.00PPTPPT5JUMLAH37,050.0021,318.0058,368.00PPTPPT5PPTPPT6PPT61 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mmPPTPPT6Portland Cement (PC)10.2240kgX Rp.1,375.0014,058.00PPTPPT6Kapur pasang0.0200m3X Rp.0.00.00PPTPPT6Pasir pasang ( progo )0.1500orgX Rp.120,000.0018,000.00PPTPPT6Kepala Tukang0.0150orgX Rp.90,000.001,350.00PPTPPT6Pekerja0.3000orgX Rp.55,000.0016,500.00PPTPPT6Mandor0.0150orgX Rp.80,000.001,200.00PPTPPT6JUMLAH37,050.0014,058.0051,108.00PPTPPT6PPTPPT7PPT71 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mmPPTPPT7Portland Cement (PC)7.7760kgX Rp.1,375.0010,692.00PPTPPT7Pasir pasang ( progo )0.0230m3X Rp.120,000.002,760.00PPTPPT7Tukang Batu0.1500orgX Rp.80,000.0012,000.00PPTPPT7Kepala Tukang0.0150orgX Rp.90,000.001,350.00PPTPPT7Pekerja0.3000orgX Rp.55,000.0016,500.00PPTPPT7Mandor0.0150orgX Rp.80,000.001,200.00PPTPPT7JUMLAH 31,050.0013,452.0044,502.00PPTPPT7PPTPPT8PPT81 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mmPPTPPT8Portland Cement (PC)6.2400kgX Rp.1,375.008,580.00PPTPPT8Pasir pasang ( progo )0.0240m3X Rp.120,000.002,880.00PPTPPT8Tukang Batu0.1500orgX Rp.80,000.0012,000.00PPTPPT8Kepala Tukang0.0150orgX Rp.90,000.001,350.00PPTPPT8Pekerja0.3000orgX Rp.55,000.0016,500.00PPTPPT8Mandor0.0150orgX Rp.80,000.001,200.00PPTPPT8JUMLAH31,050.0011,460.0042,510.00PPTPPT8PPTPPT9PPT91 m2 Plesteran 1 Pc : 5 Ps, tebal 15 mmPPTPPT9Portland Cement (PC)5.1840kgX Rp.1,375.007,128.00PPTPPT9Pasir pasang ( progo )0.0260m3X Rp.120,000.003,120.00PPTPPT9Tukang Batu0.1500orgX Rp.80,000.0012,000.00PPTPPT9Kepala Tukang0.0150orgX Rp.90,000.001,350.00PPTPPT9Pekerja0.3000orgX Rp.55,000.0016,500.00PPTPPT9Mandor0.0150orgX Rp.80,000.001,200.00PPTPPT9JUMLAH 31,050.0010,248.0041,298.00PPTPPT9PPTPPT10PPT101 m2 Plesteran 1 Pc : 6 Ps, tebal 15 mmPPTPPT10Portland Cement (PC)4.4160kgX Rp.1,375.006,072.00PPTPPT10Pasir pasang ( progo )0.0270m3X Rp.120,000.003,240.00PPTPPT10Tukang Batu0.1500orgX Rp.80,000.0012,000.00PPTPPT10Kepala Tukang0.0150orgX Rp.90,000.001,350.00PPTPPT10Pekerja0.3000orgX Rp.55,000.0016,500.00PPTPPT10Mandor0.0150orgX Rp.80,000.001,200.00PPTPPT10JUMLAH31,050.009,312.0040,362.00PPTPPT10PPTPPT11PPT111 m2 Plesteran granit 1 Pc : 2 Batu granit, tebal 10 mmPPTPPT11Portland Cement (PC)10.0000kgX Rp.1,375.0013,750.00PPTPPT11Batu granit15.0000kgX Rp.0.00.00PPTPPT11Tukang Batu0.2250orgX Rp.80,000.0018,000.00PPTPPT11Kepala Tukang0.0225orgX Rp.90,000.002,025.00PPTPPT11Pekerja0.4500orgX Rp.55,000.0024,750.00PPTPPT11Mandor0.0225orgX Rp.80,000.001,800.00PPTPPT11JUMLAH46,575.0013,750.0060,325.00PPTPPT11PPTPPT12PPT121 m2 Plesteran traso 1 Pc : 2 Batu traso, tebal 10 mmPPTPPT12Portland Cement (PC)10.0000kgX Rp.1,375.0013,750.00PPTPPT12Batu granit15.0000kgX Rp.0.00.00PPTPPT12Tukang Batu0.2250orgX Rp.80,000.0018,000.00PPTPPT12Kepala Tukang0.0225orgX Rp.90,000.002,025.00PPTPPT12Pekerja0.4500orgX Rp.55,000.0024,750.00PPTPPT12Mandor0.0225orgX Rp.80,000.001,800.00PPTPPT12JUMLAH46,575.0013,750.0060,325.00PPTPPT12PPTPPT13PPT131 m2 Finishing siar pas. Bata merah (=20m')PPTPPT13Portland Cement (PC)3.1080kgX Rp.1,375.004,273.50PPTPPT13Tukang Batu0.0750orgX Rp.80,000.006,000.00PPTPPT13Kepala Tukang0.0075orgX Rp.90,000.00675.00PPTPPT13Pekerja0.1500orgX Rp.55,000.008,250.00PPTPPT13Mandor0.0075orgX Rp.80,000.00600.00PPTPPT13JUMLAH15,525.004,273.5019,798.50PPTPPT13PPTPPT14PPT141 m2 Finishing siar pas. Batu kali 1 pc : 2 psPPTPPT14Portland Cement (PC)6.3400kgX Rp.1,375.008,717.50PPTPPT14Pasir pasang ( progo )0.0120m3X Rp.120,000.001,440.00PPTPPT14Tukang Batu0.1500orgX Rp.80,000.0012,000.00PPTPPT14Kepala Tukang0.0150orgX Rp.90,000.001,350.00PPTPPT14Pekerja0.3000orgX Rp.55,000.0016,500.00PPTPPT14Mandor0.0150orgX Rp.80,000.001,200.00PPTPPT14JUMLAH31,050.0010,157.5041,207.50PPTPPT14PPTPPT15PPT151 m2 Plesteran Ciprat, 1 Pc : 2 PsPPTPPT15Portland Cement (PC)4.3200kgX Rp.1,375.005,940.00PPTPPT15Pasir pasang ( progo )0.0060m3X Rp.120,000.00720.00PPTPPT15Tukang Batu0.1000orgX Rp.80,000.008,000.00PPTPPT15Kepala Tukang0.0100orgX Rp.90,000.00900.00PPTPPT15Pekerja0.3000orgX Rp.55,000.0016,500.00PPTPPT15Mandor0.0150orgX Rp.80,000.001,200.00PPTPPT15JUMLAH26,600.006,660.0033,260.00PPTPPT15PPTPPT16PPT161 m2 AcianPPTPPT16Portland Cement (PC)3.2500kgX Rp.1,375.004,468.75PPTPPT16Tukang Batu0.1000orgX Rp.80,000.008,000.00PPTPPT16Kepala Tukang0.0100orgX Rp.90,000.00900.00PPTPPT16Pekerja0.2000orgX Rp.55,000.0011,000.00PPTPPT16Mandor0.0100orgX Rp.80,000.00800.00PPTPPT16JUMLAH20,700.004,468.7525,168.75PPTPPT16PPTPPT17PPT171 m2 Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mmPPTPPT17Portland Cement (PC)5.1000kgX Rp.1,375.007,012.50PPTPPT17Kapur pasang0.0014m3X Rp.0.00.00PPTPPT17Pasir pasang ( progo )0.0136m3X Rp.120,000.001,632.00PPTPPT17Tukang batu0.2000orgX Rp.80,000.0016,000.00PPTPPT17Kepala Tukang0.0200orgX Rp.90,000.001,800.00PPTPPT17Pekerja0.4000orgX Rp.55,000.0022,000.00PPTPPT17Mandor0.0200orgX Rp.80,000.001,600.00PPTPPT17JUMLAH41,400.008,644.5050,044.50PPTPPT17PPTPPT18PPT181 m2 Plesteran batu kali 1pc:3psPPTPPT18Portland Cement (PC)8.1600kgX Rp.1,375.0011,220.00PPTPPT18Pasir pasang ( progo )0.0194m3X Rp.120,000.002,328.00PPTPPT18Tukang batu0.2000orgX Rp.80,000.0016,000.00PPTPPT18Kepala Tukang0.0200orgX Rp.90,000.001,800.00PPTPPT18Pekerja0.4000orgX Rp.55,000.0022,000.00PPTPPT18Mandor0.0200orgX Rp.80,000.001,600.00PPTPPT18JUMLAH41,400.0013,548.0054,948.00PPTPPT18PPTPPT19PPT191 m2 Plesteran batu kali 1pc:4psPPTPPT19Portland Cement (PC)6.5110kgX Rp.1,375.008,952.63PPTPPT19Pasir pasang ( progo )0.0209m3X Rp.120,000.002,508.00PPTPPT19Tukang batu0.2000orgX Rp.80,000.0016,000.00PPTPPT19Kepala Tukang0.0200orgX Rp.90,000.001,800.00PPTPPT19Pekerja0.4000orgX Rp.55,000.0022,000.00PPTPPT19Mandor0.0200orgX Rp.80,000.001,600.00PPTPPT19JUMLAH 41,400.0011,460.6352,860.63PPT19PPLPEKERJAAN PASANG LANTAIPPLPasang ubin granit, teralux dan marmerPPLPPLPPL1PPL11 M2 Pasang lantai ubin granit 40/40PPLPPL1Ubin granit uk. 40/406.6300bhX Rp.72,000.00477,360.00PPLPPL1Portland Cement (PC)9.8000kgX Rp.1,375.0013,475.00PPLPPL1Pasir pasang ( progo )0.0450m3X Rp.120,000.005,400.00PPLPPL1Semen warna1.3000kgX Rp.0.00.00PPLPPL1Tukang Batu0.1250orgX Rp.80,000.0010,000.00PPLPPL1Kepala Tukang0.0125orgX Rp.90,000.001,125.00PPLPPL1Pekerja0.2500orgX Rp.55,000.0013,750.00PPLPPL1Mandor0.0125orgX Rp.80,000.001,000.00PPLPPL1JUMLAH25,875.00496,235.00522,110.00PPLPPL1PPLPPL2PPL21 M2 Pasang lantai ubin granit 30/30PPLPPL2Ubin granit uk. 30/3011.8700bhX Rp.66,000.00783,420.00PPLPPL2Portland Cement (PC)10.0000kgX Rp.1,375.0013,750.00PPLPPL2Pasir pasang ( progo )0.0450m3X Rp.120,000.005,400.00PPLPPL2Semen warna1.5000kgX Rp.0.00.00PPLPPL2Tukang Batu0.1300orgX Rp.80,000.0010,400.00PPLPPL2Kepala Tukang0.0130orgX Rp.90,000.001,170.00PPLPPL2Pekerja0.2600orgX Rp.55,000.0014,300.00PPLPPL2Mandor0.0130orgX Rp.80,000.001,040.00PPLPPL2JUMLAH 26,910.00802,570.00829,480.00PPLPPL2PPLPPL2PPLPasang plint tegel dan terasoPPLPPLPPL3PPL31 M' Pasang plint ubin PC abu-abu ukuran 15 x 20 cmPPLPPL3Plint tegel abu-abu 15/205.3000bhX Rp.0.00.00PPLPPL3Portland Cement (PC)1.6500kgX Rp.1,375.002,268.75PPLPPL3Pasir pasang ( progo )0.0040m3X Rp.120,000.00480.00PPLPPL3Tukang Batu0.0900orgX Rp.80,000.007,200.00PPLPPL3Kepala Tukang0.0090orgX Rp.90,000.00810.00PPLPPL3Pekerja0.0900orgX Rp.55,000.004,950.00PPLPPL3Mandor0.0045orgX Rp.80,000.00360.00PPLPPL3JUMLAH13,320.002,748.7516,068.75PPLPPL3PPLPPL4PPL41 M' Pasang plint ubin PC abu-abu ukuran 10 x 30 cmPPLPPL4Plint tegel abu-abu 10/303.5300bhX Rp.0.00.00PPLPPL4Portland Cement (PC)1.2400kgX Rp.1,375.001,705.00PPLPPL4Pasir pasang ( progo )0.0030m3X Rp.120,000.00360.00PPLPPL4Tukang Batu0.0900orgX Rp.80,000.007,200.00PPLPPL4Kepala Tukang0.0090orgX Rp.90,000.00810.00PPLPPL4Pekerja0.0900orgX Rp.55,000.004,950.00PPLPPL4Mandor0.0045orgX Rp.80,000.00360.00PPLPPL4JUMLAH13,320.002,065.0015,385.00PPLPPL4PPLPPL5PPL51 M' Pasang plint ubin PC abu-abu ukuran 10 x 40 cmPPLPPL5Plint tegel abu-abu 10/402.6500bhX Rp.0.00.00PPLPPL5Portland Cement (PC)1.2400kgX Rp.1,375.001,705.00PPLPPL5Pasir pasang ( progo )0.0030m3X Rp.120,000.00360.00PPLPPL5Tukang Batu0.0900orgX Rp.80,000.007,200.00PPLPPL5Kepala Tukang0.0090orgX Rp.90,000.00810.00PPLPPL5Pekerja0.0900orgX Rp.55,000.004,950.00PPLPPL5Mandor0.0045orgX Rp.80,000.00360.00PPLPPL5JUMLAH13,320.002,065.0015,385.00PPLPPL5PPLPPL6PPL61 M' Pasang plint ubin PC warna ukuran 10 x 20 cmPPLPPL6Plint tegel warna 10/205.3000bhX Rp.0.00.00PPLPPL6Portland Cement (PC)1.1400kgX Rp.1,375.001,567.50PPLPPL6Pasir pasang ( progo )0.0030m3X Rp.120,000.00360.00PPLPPL6Semen warna0.1000kgX Rp.0.00.00PPLPPL6Tukang Batu0.0900orgX Rp.80,000.007,200.00PPLPPL6Kepala Tukang0.0090orgX Rp.90,000.00810.00PPLPPL6Pekerja0.0900orgX Rp.55,000.004,950.00PPLPPL6Mandor0.0045orgX Rp.80,000.00360.00PPLPPL6JUMLAH13,320.001,927.5015,247.50PPLPPL6PPLPPL7PPL71 M' Pasang plint ubin PC warna ukuran 10 x 30 cmPPLPPL7Plint tegel warna 10/303.5300bhX Rp.0.00.00PPLPPL7Portland Cement (PC)1.1400kgX Rp.1,375.001,567.50PPLPPL7Pasir pasang ( progo )0.0030m3X Rp.120,000.00360.00PPLPPL7Semen warna0.1000kgX Rp.0.00.00PPLPPL7Tukang Batu0.0900ohX Rp.80,000.007,200.00PPLPPL7Kepala Tukang0.0090ohX Rp.90,000.00810.00PPLPPL7Pekerja0.0900ohX Rp.55,000.004,950.00PPLPPL7Mandor0.0045ohX Rp.80,000.00360.00PPLPPL7JUMLAH13,320.001,927.5015,247.50PPLPPL7PPLPPL8PPL81 M' Pasang plint ubin PC warna ukuran 10 x 40 cmPPLPPL8Plint tegel warna 10/402.6500bhX Rp.0.00.00PPLPPL8Portland Cement (PC)1.1400kgX Rp.1,375.001,567.50PPLPPL8Pasir pasang ( progo )0.0030m3X Rp.120,000.00360.00PPLPPL8Semen warna0.1000kgX Rp.0.00.00PPLPPL8Tukang Batu0.0900ohX Rp.80,000.007,200.00PPLPPL8Kepala Tukang0.0090ohX Rp.90,000.00810.00PPLPPL8Pekerja0.0900ohX Rp.55,000.004,950.00PPLPPL8Mandor0.0045ohX Rp.80,000.00360.00PPLPPL8JUMLAH13,320.001,927.5015,247.50PPLPPL8PPLPPL9PPL91 M' Pasang plint ubin traso ukuran 10 x 30 cmPPLPPL9Plint ubin teraso 10/303.5300bhX Rp.0.00.00PPLPPL9Portland Cement (PC)1.1400kgX Rp.1,375.001,567.50PPLPPL9Pasir pasang ( progo )0.0030m3X Rp.120,000.00360.00PPLPPL9Semen warna0.1000kgX Rp.0.00.00PPLPPL9Tukang Batu0.0900ohX Rp.80,000.007,200.00PPLPPL9Kepala Tukang0.0090ohX Rp.90,000.00810.00PPLPPL9Pekerja0.0900ohX Rp.55,000.004,950.00PPLPPL9Mandor0.0045ohX Rp.80,000.00360.00PPLPPL9JUMLAH13,320.001,927.5015,247.50PPLPPL9PPLPPL10PPL101 M' Pasang plint ubin traso ukuran 10 x 40 cmPPLPPL10Plint ubin teraso 10/402.6500bhX Rp.0.00.00PPLPPL10Portland Cement (PC)1.1400kgX Rp.1,375.001,567.50PPLPPL10Pasir pasang ( progo )0.0030m3X Rp.120,000.00360.00PPLPPL10Semen warna0.1000kgX Rp.0.00.00PPLPPL10Tukang Batu0.0900ohX Rp.80,000.007,200.00PPLPPL10Kepala Tukang0.0090ohX Rp.90,000.00810.00PPLPPL10Pekerja0.0900ohX Rp.55,000.004,950.00PPLPPL10Mandor0.0045ohX Rp.80,000.00360.00PPLPPL10JUMLAH13,320.001,927.5015,247.50PPLPPL10PPLPasang plint ubin dan marmerPPLPPLPPL11PPL111 M' Pasang plint ubin granit ukuran 10 x 30 cmPPLPPL11Plint ubin granit 10/303.5300bhX Rp.0.00.00PPLPPL11Portland Cement (PC)1.1400kgX Rp.1,375.001,567.50PPLPPL11Pasir pasang ( progo )0.0030m3X Rp.120,000.00360.00PPLPPL11Semen warna0.1000kgX Rp.0.00.00PPLPPL11Tukang Batu0.0900ohX Rp.80,000.007,200.00PPLPPL11Kepala Tukang0.0090ohX Rp.90,000.00810.00PPLPPL11Pekerja0.0900ohX Rp.55,000.004,950.00PPLPPL11Mandor0.0045ohX Rp.80,000.00360.00PPLPPL11JUMLAH13,320.001,927.5015,247.50PPLPPL11PPLPPL12PPL121 M' Pasang plint ubin granit ukuran 10 x 40 cmPPLPPL12Plint ubin granit 10/402.6500bhX Rp.0.00.00PPLPPL12Portland Cement (PC)1.1400kgX Rp.1,375.001,567.50PPLPPL12Pasir pasang ( progo )0.0030m3X Rp.120,000.00360.00PPLPPL12Semen warna0.1000kgX Rp.0.00.00PPLPPL12Tukang Batu0.0900ohX Rp.80,000.007,200.00PPLPPL12Kepala Tukang0.0090ohX Rp.90,000.00810.00PPLPPL12Pekerja0.0900ohX Rp.55,000.004,950.00PPLPPL12Mandor0.0045ohX Rp.80,000.00360.00PPLPPL12JUMLAH13,320.001,927.5015,247.50PPLPPL12PPLPPL13PPL131 m' Pasang plint ubin teralux marmer ukuran 10 x 60