4
1 ANALISA BIAYA KONTRUKSI BAJA RINGAN 1.11 1 m² Pasang Kuda-kuda baja ringan + reng untuk atap asbes/spandek 238,532.00 1.111 Bahan No Uraian Satuan Koef Harga Jumlah Harga 1 C-75 , 0.8 m' 1.488 20,000 29,760.00 2 C-75 , 0.6 m' 2.232 18,000 40,176.00 3 Baut (screw driver) bh 28.000 1,000 28,000.00 4 Dynabolt bh 1.600 9,500 15,200.00 5 Reng m' 3.600 13,000 46,800.00 6 Talang jurai m' 0.124 54,000 6,696.00 TOTAL 166,632.00 1.112 Tenaga No Uraian Satuan Koef Harga Jumlah Harga 1 Pekerja Oh 0.200 85,000.00 17,000.00 2 Tukang Besi Oh 0.450 105,000.00 47,250.00 3 Kepala Tukang Oh 0.010 115,000.00 1,150.00 4 Mandor Oh 0.050 130,000.00 6,500.00 TOTAL 71,900.00 1.11 1 m² Pasang Kuda-kuda baja ringan + reng untuk atap genteng biasa/me 271,932.00 1.111 Bahan No Uraian Satuan Koef Harga Jumlah Harga 1 C-75 , 0.8 m' 1.488 20,000 29,760.00 2 C-75 , 0.6 m' 2.232 18,000 40,176.00 3 Baut (screw driver) bh 38.000 1,000 38,000.00 4 Dynabolt bh 1.600 9,500 15,200.00 5 Reng m' 5.400 13,000 70,200.00 6 Talang jurai m' 0.124 54,000 6,696.00 TOTAL 200,032.00 1.112 Tenaga No Uraian Satuan Koef Harga Jumlah Harga 1 Pekerja Oh 0.200 85,000.00 17,000.00 2 Tukang Besi Oh 0.450 105,000.00 47,250.00 3 Kepala Tukang Oh 0.010 115,000.00 1,150.00 4 Mandor Oh 0.050 130,000.00 6,500.00 TOTAL 71,900.00

description

Konstruksi Baja Ringan

Transcript of Analisa Baja Ringan c 75 Reng 0.45

Baja ringan1ANALISA BIAYA KONTRUKSI BAJA RINGAN1.111 m Pasang Kuda-kuda baja ringan + reng untuk atap asbes/spandek238,532.001.111BahanNoUraianSatuanKoefHargaJumlah Harga1C-75 , 0.8m'1.48820,00029,760.002C-75 , 0.6m'2.23218,00040,176.003Baut (screw driver)bh28.0001,00028,000.004Dynaboltbh1.6009,50015,200.005Rengm'3.60013,00046,800.001656Talang juraim'0.12454,0006,696.00TOTAL166,632.00661.112Tenaga231NoUraianSatuanKoefHargaJumlah Harga1PekerjaOh0.20085,000.0017,000.00231.0002Tukang BesiOh0.450105,000.0047,250.003Kepala TukangOh0.010115,000.001,150.0062,816,292.004MandorOh0.050130,000.006,500.00TOTAL71,900.001.111 m Pasang Kuda-kuda baja ringan + reng untuk atap genteng biasa/metal271,932.001.111BahanNoUraianSatuanKoefHargaJumlah Harga1C-75 , 0.8m'1.48820,00029,760.002C-75 , 0.6m'2.23218,00040,176.003Baut (screw driver)bh38.0001,00038,000.004Dynaboltbh1.6009,50015,200.005Rengm'5.40013,00070,200.006Talang juraim'0.12454,0006,696.00TOTAL200,032.001.112TenagaNoUraianSatuanKoefHargaJumlah Harga1PekerjaOh0.20085,000.0017,000.002Tukang BesiOh0.450105,000.0047,250.003Kepala TukangOh0.010115,000.001,150.004MandorOh0.050130,000.006,500.00TOTAL71,900.00

upahDAFTAR HARGA UPAH UNTUK BANGUNAN GEDUNGKODEURAIANUPAH PER HARI RP.TA - 022Pekerja85,000.00TA - 024Tukang Besi105,000.00TA - 025Kepala Tukang115,000.00TA - 026Mandor130,000.00

bahanDAFTAR HARGA BAHAN/MATERIALNOBAHAN BANGUNANSPESIFIKASISATUANHARGA BAHAN (Rp)KETERANGANBAHAN BAJA RINGAN1C-75, 0.8m'20,000141672C-75, 0.55m'18,000126673Reng 0.43m'13,00070004Baut (screw driver)bh1,0003505Dynaboltbh9,50035006Talang juraim'54,00048000