900 Gambar Kerja

39
ISOMETRI RUMAH

description

Gambar Kerja

Transcript of 900 Gambar Kerja

Page 1: 900 Gambar Kerja

ISOMETRI RUMAH

Page 2: 900 Gambar Kerja

SITE PLAN (R1)

SITE PLANSKALA 1:200

R1

250

500

680

1500

1500

380

330

JALAN JEND. SUDIRMAN

GSB

Page 3: 900 Gambar Kerja

DENAH (R2)

300300300

300

200

175

125

200

150

150450300

RUANGTIDUR

RUANGTAMU

RUANGKELUARGA

TERAS

RUANGTIDUR

±000

±000 ±000

-005

±000

-005

-005

D E N A HSKALA 1:100

R2

100

100

RUANGTIDUR±000

B

R2

B

R2

A

R2

A

R2

C

R2

A B C D

1

2

3

4

Page 4: 900 Gambar Kerja

DETAIL A-R2

300300

±000

+350

+575

+300

POTONGAN A-ASKALA 1:100

A

R2

RINGBALK 15/20

GENTENG KERAMIK

BALOK GAPIT 2 X 6/12

GORDING 6/12

KAKI KUDA-KUDA 8/12

TIANG RAJA 8/12

-020

-105

Page 5: 900 Gambar Kerja

DETAIL B-R2

300300300

±000

+350

+575

+300

POTONGAN B-BSKALA 1:100

B

R2

KAKI KUDA-KUDA 8/12

BALOK ANGIN 8/12

GORDING 6/12

RINGBALK 15/20

SLOOF 15/20

PASANGAN ½ BATA

PASIR URUG

TANAH URUG

PONDASI BATU KALI

PASANGAN BATU KOSONG

-020

-105

Page 6: 900 Gambar Kerja

DETAIL C-R2

100300300

350

15/2015/20 15/15

15/15 15/15 15/1515/15

15/20 15/20

15/2015/20

175

PORTAL ASKALA 1:50

C2-CR2

C1-CR2

C

R2

Page 7: 900 Gambar Kerja

DETAIL C1, C2-C-R2

DETAIL C1SKALA 1:20

C1-C

R2

15

20

2Ø10

Ø8–150

2Ø10

15

20

2Ø10

Ø8–150

2Ø10

15

15

2Ø10

Ø8–150

2Ø10

4040

DETAIL C2SKALA 1:20

C2-C

R2

1515

2Ø10

Ø8–150

2Ø10

15

20

2Ø10

Ø8–150

2Ø1040

Page 8: 900 Gambar Kerja

TAMPAK DEPANSKALA 1:100

R3

TAMPAK DEPAN (R3)

Page 9: 900 Gambar Kerja

TAMPAK KANANSKALA 1:100

R3

TAMPAK KANAN (R3)

Page 10: 900 Gambar Kerja

TAMPAK BELAKANGSKALA 1:100

R3

TAMPAK BELAKANG (R3)

Page 11: 900 Gambar Kerja

TAMPAK KIRI (R3)

TAMPAK KIRISKALA 1:100

R3

Page 12: 900 Gambar Kerja

RENCANA PONDASI (R4)

RENCANA PONDASISKALA 1:100

R4

A

R4

A

R4

B

R4

B

R4

Page 13: 900 Gambar Kerja

ISOMETRI R4

Page 14: 900 Gambar Kerja

DETAIL A-R4

± 000

- 010

- 02020±000

-005

- 090

- 100- 105

± 000- 005

- 015- 020

- 035- 040

SLOOF 15/20

KERAMIK

PAS. BATU KALI 1:4

PASIR URUG

TANAH URUG

BATA ROLLAG

PAS. BATU KOSONG

PASIR URUG

20

30

70

80

POTONGAN A-ASKALA 1:20

AR4

15

Page 15: 900 Gambar Kerja

DETAIL B-R4

± 000

- 010

- 020

20

15

- 090

- 100- 105

SLOOF 15/20

PAS. BATU KALI 1:4

TANAH URUG

PAS. BATU KOSONG

PASIR URUG30

70

80

KERAMIK

PASIR URUG

TANAHURUG

POTONGAN B-BSKALA 1:20

BR4

MUKA TANAH

Page 16: 900 Gambar Kerja

KUDA-KUDA AKUDA-KUDA A

JURAI CJURAI C

JURAI BJURAI B

JURAI BJURAI B

KUDA-KUDA AKUDA-KUDA A

KUDA-KUDA DKUDA-KUDA DJURAI EJURAI E

JURAI EJURAI E

Page 17: 900 Gambar Kerja

RENCANA ATAP (R5)

RENCANA ATAPSKALA 1:100

R5

KUDA-KUDA A-R5

JURAI B-R5

JURAI C-R5

KUDA-KUDA D-R5

JURAI E-R5

2 UNIT

2 UNIT

1 UNIT

1 UNIT

2 UNIT

E

R5

E

R5

D

R5

A

R5

B

R5

C

R5

B

R5

Page 18: 900 Gambar Kerja
Page 19: 900 Gambar Kerja

DETAIL A,B-R5

JURAI BSKALA 1:50

B

R5

425 140

190

300

KUDA-KUDA ASKALA 1:50

90 300 90

190

2 X 6/12

8/12 8/12

8/128/12

8/12

2 X 6/12 2 X 6/122 X 6/12

8/12

A

R5

6/12

A1-A

R5

A3-A

R5

A2-A

R5

A4-A

R5

Page 20: 900 Gambar Kerja

DETAIL C,D-R5

JURAI CSKALA 1:50

C

R5

300 90

190

300

190

300

KUDA-KUDA DSKALA 1:50

D

R5

Page 21: 900 Gambar Kerja

DETAIL E-R5

JURAI ESKALA 1:50

360 140

190

E

R5

Page 22: 900 Gambar Kerja

DETAIL A1-A-R5

30

8

12

7

12

5

8

TIANG RAJA 8/12

NOK

GORDING 6/12

KASAU 5/7

RENG 2/3

GENTENG KERAMIK

KAKI KUDA-KUDA 8/12100

DETAIL A1SKALA 1:20

A1-A

R5

Page 23: 900 Gambar Kerja

DETAIL A2-A-R5

8

12

8

12

12

8

BALOK SOKONG 8/12

TIANG RAJA 8/12

PELAT BESI ≠5 MM

MUR-BAUT Ø16 MM

BALOK KUNCI 8/12

BALOK TARIK 8/12

DETAIL A2SKALA 1:20

A2-A

R5

Page 24: 900 Gambar Kerja

DETAIL A3-A-R5

8

GORDING 6/12

KASAU 5/7

RENG 2/3

GENTENG KERAMIK

BALOK SOKONG 8/12

66

12

8

5

12

712

8

BALOK GAPIT 2 X 6/12

KAKI KUDA-KUDA 8/12

DETAIL A3SKALA 1:20

A3-A

R5

Page 25: 900 Gambar Kerja

DETAIL A4-4-R5GORDING 6/12

KASAU 5/7

RENG 2/3

GENTENG KERAMIK

BALOK TARIK 8/12

6

MUR-BAUT Ø16 MM

KAKI KUDA-KUDA 8/12

DETAIL A4SKALA 1:20

A4-A

R5

100

LISTPLANK 3/25

86

12

7

5

8

12

RINGBALK 15/20

PASANGAN ½ BATA

BALOK GAPIT 2 X 6/12

Page 26: 900 Gambar Kerja

RENCANA PINTU-JENDELA (R6)

RENCANA PINTU – JENDELASKALA 1:100

R6

KUSEN PJ1

KUSEN P1

KUSEN J1

KUSEN J2

KUSEN V

1 BUAH

4 BUAH

1 BUAH

3 BUAH

1 BUAH

KUSEN P2 1 BUAH

P1

R6

P1

R6

P1

R6

P2

R6

P1

R6

V

R6

J1

R6

J2

R6

J2

R6

J2

R6

PJ1

R6

Page 27: 900 Gambar Kerja

DETAIL PJ1-R6

545

520

0

515 75 5 75 5 75 5

10

10

545

514

05

DETAIL PJ1SKALA 1:20

PJ1

R6

Page 28: 900 Gambar Kerja

DETAIL J1,J2-R6

DETAIL J1SKALA 1:20

15

595

455

5

107015

10

5 5

J1

R6

75

595

75

455

5

5515 15

10

105

DETAIL J2SKALA 1:20

J2

R6

Page 29: 900 Gambar Kerja

DETAIL P1,P2-R6

4520

05

5

10

158515

75 55

10

DETAIL P1SKALA 1:20

P1

R6

DETAIL P2SKALA 1:20

200

5

1075 55

10

158515

P2

R6

Page 30: 900 Gambar Kerja

DETAIL V-R6

75

5

155515

455

10

10

DETAIL VSKALA 1:20

V

R6

Page 31: 900 Gambar Kerja

RENCANA PLAFOND (R7)

+300

+300

+300

RENCANA PLAFONSKALA 1:100

R7

+300

AR7

+300

Page 32: 900 Gambar Kerja

ISOMETRI R7

Page 33: 900 Gambar Kerja

DETAIL A-R7 & A1-A-R7PLAFONDGIPSUM

+300

DETAIL PANELSKALA 1:50

A

R7

A1-A

R7

5/10

5/10

5/7

5/7

RANGKA PLAFOND 5/10

RANGKA PLAFOND 5/7

RANGKA PLAFOND 5/7

RANGKA PLAFOND 5/7

KLOS 3/4+300

PLAFOND GIPSUM

DINDING ½ BATA

A1-A

R7

DETAIL RANGKA PLAFONDSKALA 1:10

Page 34: 900 Gambar Kerja

RENCANA INSTALASI LISTRIK (R8)

RENCANA INSTALASI LISTRIKSKALA 1:100

R8

TITIK LAMPU

SAKLAR TUNGGAL

SAKLAR GANDA

STOPKONTAK

SEKERING

SAKLAR INDUK

8 UNIT

6 UNIT

1 UNIT

6 UNIT

1 UNIT

1 UNIT

Page 35: 900 Gambar Kerja

RENCANA SANITASI (R9)

RENCANA SANITASI DAN PIPASKALA 1:100

R9

SEPTICTANK

PERESAPAN

SA

LUR

AN

DR

AIN

AS

E

SALURAN LIMBAH PADAT

SALURAN LIMBAH CAIR

SALURAN AIR BERSIH

KERAN

KERAN INDUK

PVC 4"

PVC 3"

GIP ¾"

2 UNIT

1 UNIT

DRAIN 1 UNIT

A

R9

A

R9

B

R9

B

R9

C

R9

Page 36: 900 Gambar Kerja

DETAIL A-R9

Ø100

150

300

15 15

3010

0

50

MUKA TANAH

PVC 4"DIPERFORASI

1515

PIPA VENTILASI GIP ¾"

LUBANG KONTROL

LAPISAN PASIR

LAPISAN IJUK

LAPISAN KERIKIL

DETAIL SEPTIC TANK DAN PERESAPANSKALA 1:20

A

R9

A1-A

R9

A1-A

R9

Page 37: 900 Gambar Kerja

DETAIL A1-A, B-R9

3010

0

100

50

PASIR

IJUK

KERIKIL

POTONGAN A1-A1SKALA 1:20

A1-A

R9

5

25

20

B

R9PENAMPANG SALURANSKALA 1:10

5

GRATING

PASANGAN ½ BATA

Page 38: 900 Gambar Kerja

DETAIL C-R9

150

175

DENAH KM/WCSKALA 1:20

C

R9

C1-C

R9

C1-C

R9

175

POTONGAN C1-C1SKALA 1:20

C1-C

R9

Page 39: 900 Gambar Kerja

RENCANA LANTAI (R10)

40x40±000

30x30-005

40x40±000

40x40±000

40x40±000

40x40±000

30x30-005

20x20-005

RENCANA LANTAISKALA 1:100

R10