84818867 STANDARD ANALISA Harga Satuan Pekerjaan Struktur WTE

download 84818867 STANDARD ANALISA Harga Satuan Pekerjaan Struktur WTE

of 53

Transcript of 84818867 STANDARD ANALISA Harga Satuan Pekerjaan Struktur WTE

Harga BahanTABEL DAFTAR HARGA BAHAN BANGUNANPeriode:November 2008Jenis Bangunan:Bangunan UmumKlasifikasi:MenengahProyek:Renovasi - Bangun BaruLokasi:JakartaWilayah:JabodetabekNo.Jenis Bahan BangunanSatVolHarga SatuanKeterangan( Rupiah )Spesifikasi Material1Accessories, Talang PVCls1.00Rp25,000.002Alkasit, Kallektg1.00Rp17,500.00MOWILEX3Aluminium Foilm21.00Rp4,000.00Uk 1,2x45 m24Amplas Besilbr1.00Rp5,000.005Amplas Dindinglbr1.00Rp5,000.006Amplas Kayulbr1.00Rp5,000.007Amplas Kayulbr1.00Rp6,000.00Niken8Balok Kayu, Borneom31.00Rp3,500,000.00Panj.Ef.4.00m9Balok Kayu, Kamper Samarindam31.00Rp7,500,000.00Panj.Ef.4.00m10Balok Kayu, Kamper Singkilm31.00Rp6,000,000.00Panj.Ef.4.00m11Balok Kayu, Merantim31.00Rp5,000,000.00Panj.Ef.4.00m12Bambubtg1.00Rp6,000.00Panj.Ef.5.00m13Batu Batabh1.00Rp380.00Uk 5x10x2014Batako Semenbh1.00Rp1,500.00Uk 10x20x4015Batako Kapurbh1.00Rp800.00Uk 7.5x14x2816Batu Kalim31.00Rp185,000.00Uk 10x15-15x2017Batu Karangm31.00Rp350,000.0018Batu Seplitm31.00Rp185,000.00Uk 1/2 dan 2/319Batu Tempel, Andesit Biasa, Polosm21.00Rp130,000.00Uk 15x3020Batu Tempel, Andesit Bakar, Alurm21.00Rp150,000.00Uk 15x3021Batu Tempel, Bali Greenm21.00Rp100,000.00Uk 15x3022Batu Tempel, Breksim21.00Rp80,000.00Uk 15x3023Batu Tempel, Candi Permukaan Ratam21.00Rp85,000.00Uk 15x3024Batu Tempel, Candi Permukaan Motifm21.00Rp110,000.00Uk 15x3025Batu Tempel, Hijau Sukabumim21.00Rp60,000.00Uk 15x3026Batu Tempel, Pacito Rosom21.00Rp95,000.00Uk 15x3027Batu Tempel, Pacito Roso, Alurm21.00Rp110,000.00Uk 15x3028Batu Tempel, Palimananm21.00Rp70,000.00Uk 15x3029Batu Tempel, Parasm21.00Rp85,000.00Uk 15x3030Batu Tempel, Paras, Bevel Kelilingm21.00Rp110,000.00Uk 15x3031Batu Tempel, Susun Sirihm21.00Rp120,000.00Uk 3x2032Batu Tempel, Templek Garutm21.00Rp35,000.00Uk Tidak Beraturan33Baut Aisan Kapkg1.00Rp8,000.0034Baut Gording Baja/ Besi Kanal Cbh1.00Rp1,500.00Dia 12mm-1"35Benang Ramiglg1.00Rp2,000.0036Bendradkg1.00Rp18,000.0037Besi Beton Polos U.240, fy=2400kg/cm2kg1.00Rp8,000.00Panjang 12.00m38Besi Beton Ulir U.390, fy=3900 kg/cm2kg1.00Rp8,500.00Panjang 12.00m39Besi CNPkg1.00Rp8,500.00Panj.Ef.6.00m40Besi Wiremeshkg1.00Rp8,500.0041Besi Hollow 4x4x400cmbtg1.00Rp25,000.00Panj.Ef.4.00m42Besi Hollow 2x4x400cmbtg1.00Rp20,000.00Panj.Ef.4.00m43Besi Kanal Ckg1.00Rp8,000.00Panj.Ef.6.00m44Besi Sikukg1.00Rp7,500.00Panj.Ef.6.00m45Besi Tempam21.00Rp500,000.00Standar46Besi WFkg1.00Rp9,000.00Panj.Ef.12.00m47Beton Ready Mix K.350m31.00Rp577,500.0048Beton Ready Mix K.300m31.00Rp566,500.0049Beton Ready Mix K.275m31.00Rp550,000.0050Beton Ready Mix K.250m31.00Rp539,000.0051Beton Ready Mix K.225m31.00Rp528,000.0052Beton Ready Mix K.175m31.00Rp506,000.0053Blok Hebel T.10cmbh1.00Rp7,000.00Uk 60x20x10cm54Blok Hebel T.7,5cmbh1.00Rp6,000.00Uk 60x20x7,5cm55Box Sikring 2 Groupbh1.00Rp60,000.00Hanger56Box Sikring 4 Groupbh1.00Rp70,000.00Hanger57Box Sikring 6 Groupbh1.00Rp80,000.00Hanger58Box Sikring 8 Groupbh1.00Rp100,000.00Hanger59Buis beton, d100cmbh1.00Rp100,000.0060Calbond, (4L)ltr1.00Rp17,500.00INCONA RAYA61Cat Besi, Emcokg1.00Rp40,000.0062Cat Besi, Glotekkg1.00Rp32,500.0063Cat Besi, Ftalitkg1.00Rp35,000.0064Cat Dasar Besi, Zinkromatkg1.00Rp35,000.00Kansai Paint65Cat Duko, NIPPEkg1.00Rp42,500.0066Cat Kayu, Emcokg1.00Rp40,000.0067Cat Kayu, Glotekkg1.00Rp32,500.0068Cat Kayu, Ftalitkg1.00Rp35,000.0069Cat Lantai, TEKNOKOTEkg1.00Rp44,000.00ds = 1,5-2m2/kg (3x kuas)70Cat Melamik, IMPRA Wood Filler (muda)kg1.00Rp23,000.00Propan71Cat Melamik, IMPRA Wood Filler (tua)kg1.00Rp28,000.00Propan72Cat Melamik, IMPRA Wood Stain (muda)kg1.00Rp39,000.00Propan73Cat Melamik, IMPRA Wood Stain (tua)kg1.00Rp43,000.00Propan74Cat Politur P0-1, IMPRAkg1.00Rp35,000.00Propan75Cat Politur P0-3, IMPRAkg1.00Rp37,500.00Furniture76Casting, (25kg)kg1.00Rp4,000.00JAYA BOARD77Cat Genteng, (5L)kg1.00Rp23,000.00MOWILEX78Cat Primer Alkali Resisting ICI, Duluxkg1.00Rp34,000.00ds = 7-10m2/L (1x kuas)79Cat Tembok, Danabrite Exteriorkg1.00Rp40,000.00Danapaits80Cat Tembok, Danabrite Interiorkg1.00Rp28,000.00Danapaits81Cat Tembok, Elastometric Wall Coatingkg1.00Rp56,000.00MOWILEX82Cat Tembok ICI, Catylac Warna Biasakg1.00Rp13,000.00ICI Paints83Cat Tembok ICI, Catylac Warna Khususkg1.00Rp15,000.00ICI Paints84Cat Tembok ICI, Dulux Exteriorkg1.00Rp68,000.00ICI Paints85Cat Tembok ICI, Dulux Interiorkg1.00Rp50,000.00ICI Paints86Cat Tembok Super Vinilexkg1.00Rp14,000.00NIPPON PAINTS87Cat Tembok Vinyl Matt, (5L)kg1.00Rp19,000.00Cendana MOWILEX88Cat Waterproff, AQUAPROFFkg1.00Rp42,000.00ds = 1m2/L (2x kuas)89Dolkenbtg1.00Rp8,000.00Panj.Ef.4.00m90Drop Hammer, Mini Pile- 28m'1.00Rp77,000.00Panj.Ef.6.00m91Drop Hammer, Mini Pile- 32m'1.00Rp87,500.00Panj.Ef.6.00m92Drop Hammer, Square Pile - 20 x 20m'1.00Rp79,000.00Panj.Ef.6.00m93Drop Hammer, Square Pile - 25 x 25m'1.00Rp115,000.00Panj.Ef.6.00m94Drop Hammer, Spun Pile - 30 x 30m'1.00Rp130,000.00Panj.Ef.6.00m95Drop Hammer, Spun Pile - 35 x 35m'1.00Rp148,000.00Panj.Ef.6.00m96Drop Hammer, Spun Pile - 40 x 40m'1.00Rp188,000.00Panj.Ef.6.00m97Drop Hammer, Spun Pile - 45 x 45m'1.00Rp225,000.00Panj.Ef.6.00m98Drop Hammer, Spun Pile - 50 x 50m'1.00Rp288,000.00Panj.Ef.6.00m99Drop Hammer, Spun Pile - 60 x 60m'1.00Rp388,000.00Panj.Ef.6.00m100Engsel Jendela, 3x2,5", Kuninganbh1.00Rp15,000.00Boss101Engsel Jendela, 3x2,5", Kuninganbh1.00Rp27,500.00Solid102Engsel kupu-kupubh1.00Rp7,500.00103Engsel Pintu, 3x4", Kuninganbh1.00Rp17,500.00Boss104Engsel Pintu, 3x4", Kuninganbh1.00Rp32,500.00Solid105Engsel Pintu, 3x5", Kuninganbh1.00Rp20,000.00Boss106Fitting Lampu Plafondbh1.00Rp15,000.00DL107Floor drain, biasa KMbh1.00Rp25,000.00Standar108Floor drain, khusus dak betonbh1.00Rp160,000.00TOTO109Floor drain, khusus KMbh1.00Rp190,000.00TOTO110Folding Gatem21.00Rp400,000.00111Gagang Kunci KM, Kend Extra, T200x551psg1.00Rp1,500,000.00Standar112Gagang Kunci Pintu, SOLID Ziala HREpsg1.00Rp350,000.00Standar113Gagang Kunci Pintu Utamapsg1.00Rp550,000.00Standar114Genteng Beton Badan Besarbh1.00Rp6,900.00Cisangkan115Genteng Beton Badan Sedangbh1.00Rp6,500.00Cisangkan116Genteng Beton Nokbh1.00Rp13,000.00Cisangkan117Genteng Keramik, Badan(Warna Standar)bh1.00Rp5,500.00Kanimuri118Genteng Keramik, Flashingbh1.00Rp12,000.00Kanimuri119Genteng Keramik, Juraibh1.00Rp30,000.00Kanimuri120Genteng Keramik, Nokbh1.00Rp14,000.00Kanimuri121Genteng Keramik, Penangkal Petirbh1.00Rp26,000.00Kanimuri122Genteng Tanah Liat Badanbh1.00Rp3,500.00123Genteng Tanah Liat Nokbh1.00Rp7,000.00124Glassblock Uk20x20, Standarbh1.00Rp17,000.00Mulia125Glassblock Uk20x20, Corakbh1.00Rp28,500.00Mulia126Granito Lantai 40x40m21.00Rp175,000.00Niro Granite127Granito Lantai 60x60m21.00Rp250,000.00Niro Granite128GRC Board, t=4mmlbr1.00Rp45,000.00129Grendel Jendelapcs1.00Rp25,000.00SOLID130Grendel Pintupcs1.00Rp35,000.00SOLID131Grendel Tanam Pintu, Ataspcs1.00Rp50,000.00SOLID132Grendel Tanam Pintu, Bawahpcs1.00Rp75,000.00SOLID133Gypsum Board T.9mm, ELEPHANTlbr1.00Rp52,000.00Uk 1,2X2,40 m2134Gypsum Board T.9mm, JAYA BOARDlbr1.00Rp58,000.00Uk 1,2X2,40 m2135Hak Angin Jendelapcs1.00Rp35,000.00SOLID136Hydraulic Hammer, Square Pile - 30 x 30m'1.00Rp120,000.00Panj.Ef.6.00m137Hydraulic Hammer, Square Pile - 35 x 35m'1.00Rp150,000.00Panj.Ef.6.00m138Hydraulic Hammer, Square Pile - 40 x 40m'1.00Rp190,000.00Panj.Ef.6.00m139Hydraulic Hammer, Square Pile - 45 x 45m'1.00Rp235,000.00Panj.Ef.6.00m140Hydraulic Hammer, Square Pile - 50 x 50m'1.00Rp280,000.00Panj.Ef.6.00m141Ijuk Resapanikt1.00Rp10,000.00142Isolasi listrikglg1.00Rp6,000.00143Isolasi pipaglg1.00Rp5,000.00144Jack In Piles, Square Pile - 20 x 20m'1.00Rp125,000.00Panj.Ef.6.00m145Kaca Cermin Asahimas, t=5mmm21.00Rp175,000.00146Kaca Es, t=5mmm21.00Rp115,000.00147Kaca Polos, t=5mmm21.00Rp70,000.00148Kaca Polos, t=6mmm21.00Rp95,000.00149Kaca Polos, t=8mmm21.00Rp130,000.00150Kaca Polos, t=10mmm21.00Rp200,000.00151Kaca Polos, t=12mmm21.00Rp240,000.00152Kaca Ryban, t=5mmm21.00Rp115,000.00153Kaca Ryban, t=6mmm21.00Rp120,000.00154Kabel NYM 2x1,5 Putih, (50m)roll1.00Rp250,000.00Eterna155Kabel NYM 2x2,5 Putih, (50m)roll1.00Rp350,000.00Eterna156Kabel NYM 3x1,5 Putih, (50m)roll1.00Rp375,000.00Eterna157Kabel NYM 3x2,5 Putih, (50m)roll1.00Rp450,000.00Eterna158Kabel NYY 4x16mm Putih, (50m)m'1.00Rp15,000.00Eterna159Kabel Telepon, (50m)m'1.00Rp3,000.00160Kabel TV, 5Cm'1.00Rp4,000.00161Kawat BC dia 6mmm'1.00Rp15,000.00Tembaga162Kawat Ayamm'1.00Rp15,000.00163Kawat Galvanizedkg1.00Rp15,000.00164Kawat Laskg1.00Rp20,000.00165Kaso, Borneom31.00Rp3,500,000.00Panj.Ef.4.00m166Kaso, Kamper Samarindam31.00Rp7,500,000.00Panj.Ef.4.00m167Kaso, Kamper Singkilm31.00Rp6,000,000.00Panj.Ef.4.00m168Kaso, Merantim31.00Rp5,000,000.00Panj.Ef.4.00m169Keramik Lantai 20x20, Warna Mudam21.00Rp35,000.00Asia170Keramik Lantai 20x20, Warna Mudam21.00Rp32,500.00OK171Keramik Lantai 20x20, Warna Mudam21.00Rp42,000.00Roman Gress172Keramik Lantai 20x20, Warna Tuam21.00Rp45,000.00Roman Gress173Keramik Dinding 20x25, Warna Mudam21.00Rp45,000.00Roman Gress174Keramik Dinding 20x25, Warna Tuam21.00Rp48,000.00Roman Gress175Keramik Lantai 30x30, Warna Mudam21.00Rp40,000.00Hercules176Keramik Lantai 30x30, Warna Mudam21.00Rp45,000.00Roman177Keramik Lantai 30x30, Warna Khususm21.00Rp48,000.00Roman Royal178Keramik Lantai 33.3x33.3, Warna Khususm21.00Rp58,000.00Roman Gress179Keramik Lantai 40x40, Warna Khususm21.00Rp55,000.00Roman Royal180Kitchen Zink, Royal SB9, 1 Lubang lengkappcs1.00Rp350,000.00Royal181Kitchen Zink, Royal SB1, 1 Lubang lengkappcs1.00Rp375,000.00Royal182Kitchen Zink, Royal SB2, 2 Lubang lengkappcs1.00Rp570,000.00Royal183Klem Kabelbks1.00Rp5,000.00184Klem Pipa Listrikbh1.00Rp500.00185Kunci Gembokbh1.00Rp35,000.00186Kwas Catbh1.00Rp5,500.00187Lakban plastikroll1.00Rp10,000.00188Lampu PLC 5Wbh1.00Rp22,000.00PHILLIPS189Lampu PLC 18Wbh1.00Rp27,000.00PHILLIPS190Lampu PLC 20Wbh1.00Rp35,000.00PHILLIPS191Lem PVCtube1.00Rp10,000.00192Lem Fox, (3kg)gln1.00Rp110,000.00193Lentrekklg1.00Rp35,000.00194List Keramik, 10x20pcs1.00Rp10,000.00195List Profil Gypsum, Kecilbtg1.00Rp8,000.00Panjang 2.00m196List Profil Gypsum, Sedangbtg1.00Rp10,000.00Panjang 2.00m197List Profil Gypsum, Besarbtg1.00Rp15,000.00Panjang 2.00m198List Profil Kayu, Kecilbtg1.00Rp6,000.00Uk 3 x 3 cm199List Profil Kayu, Sedangbtg1.00Rp8,000.00Uk 5 x 5 cm200List Profil Kayu, Besarbtg1.00Rp10,000.00Uk 7,5 x 7,5 cm201Marmer Lantai 40x40m21.00Rp400,000.00Standar202Marmer Lantai 40x60m21.00Rp500,000.00Standar203Mata Bor U.Pek.Besibh1.00Rp25,000.00204Mata Gerinda U.Pek.Besibh1.00Rp20,000.00205Meni Besikg1.00Rp15,000.00206Meni Kayukg1.00Rp15,000.00207MCB Sikring, Merlin Gerinbh1.00Rp25,000.00208Neorefer, (2L)gln1.00Rp30,000.00209Paku Triplexkg1.00Rp16,000.00210Paku 5-7cmkg1.00Rp12,000.00211Paku 10-12cmkg1.00Rp12,000.00212Paku Sengkg1.00Rp16,000.00213Papan Cor, Jenjenglbr1.00Rp10,000.00Panj.Ef.4.00m214Papan, Borneom31.00Rp3,500,000.00Panj.Ef.4.00m215Papan, Kamper Samarindam31.00Rp7,500,000.00Panj.Ef.4.00m216Papan, Kamper Singkilm31.00Rp6,000,000.00Panj.Ef.4.00m217Papan, Merantim31.00Rp5,000,000.00Panj.Ef.4.00m218Pasir Extra Betonm31.00Rp200,000.00219Pasir Putihm31.00Rp240,000.00220Pasir Pasangm31.00Rp185,000.00221Pasir Urugm31.00Rp125,000.00222Paving Block, T.6cmm21.00Rp30,000.00223Paving Block, T.8cmm21.00Rp35,000.00224Pintu PVC, 70x212, Warna Standardunit1.00Rp350,000.00PLATINDO225Pipa Flexible Listrik, (30m)m'1.00Rp2,500.00226Pipa GIP dia 1/2"btg1.00Rp65,000.00227Pipa PE dia 1/2"m'1.00Rp20,000.00228Pipa Listrik Clipsalbtg1.00Rp10,000.00CLIPSAL229Pipa PVC AW dia 1/2"btg1.00Rp15,000.00WAVIN230Pipa PVC AW dia 3/4"btg1.00Rp18,000.00WAVIN231Pipa PVC AW dia 1"btg1.00Rp25,000.00WAVIN232Pipa PVC Type D dia 1,5"btg1.00Rp38,000.00WAVIN233Pipa PVC Type D dia 2"btg1.00Rp48,000.00WAVIN234Pipa PVC Type D dia 3"btg1.00Rp90,000.00WAVIN235Pipa PVC Type D dia 4"btg1.00Rp155,000.00WAVIN236Pipa PVC Type D dia 5"btg1.00Rp260,000.00WAVIN237Pipa PVC Type D dia 6"btg1.00Rp350,000.00WAVIN238Plamur Besi, SANPOLAC, 5kgkg1.00Rp17,000.00239Plamur Besi, ISAMU, 1kgkg1.00Rp25,000.00Isamu240Plamur Kayukg1.00Rp12,000.00241Plamur Tembok, MATEX, (2kg)kg1.00Rp19,000.00Matex242Plastik corroll1.00Rp100,000.00243Plastaid HE, (4L), Incona Rayaltr1.00Rp15,000.000,35L/50kg244Dekabond+conbex 100, (1L)ltr1.00Rp45,000.00INCONA RAYA245Pompa airbh1.00Rp1,000,000.00SHIMIZU246Reng, Borneom31.00Rp3,500,000.00Panjang 4.00m247Reng, Kamper Samarindam31.00Rp7,500,000.00Panjang 4.00m248Reng, Kamper Singkilm31.00Rp6,000,000.00Panjang 4.00m249Reng, Merantim31.00Rp5,000,000.00Panjang 4.00m250Rasidi Kayultr1.00Rp5,000.00251Roll Catbh1.00Rp15,000.00252Rooster Uk10x20cmbh1.00Rp3,500.00253Rooster Uk15x15cmbh1.00Rp5,500.00254Rooster Uk20x20cmbh1.00Rp11,000.00255Rumah Downlight, 3"pcs1.00Rp17,000.00256Rumah Downlight, 4"pcs1.00Rp20,000.00257Rumah Kunci Pintu Biasa, SOLIDbh1.00Rp55,000.00SOLID258Rumah Kunci Pintu Utama, SOLIDbh1.00Rp55,000.00SOLID259Sekrup Gypsum, 5cm (2000bj)bh1.00Rp50.00260Sicosol, Invisible Water_RepellentL1.00Rp40,000.00Propan261Semen PCzak1.00Rp53,000.00262Semen Putihzak1.00Rp65,000.00263Semen Groutkg1.00Rp15,000.00264Seng Gelombang BJLS 30lbr1.00Rp40,000.00265Seng Plat L.45cmm'1.00Rp35,000.00266Step Nosingpcs1.00Rp1,500.00Uk 10cm267Step Nosingpcs1.00Rp25,000.00Uk 10X60cm268Sikat Kawatbh1.00Rp7,000.00269Sirtu Galim31.00Rp150,000.00270Sok & Knee Besi Kuningan dia 1/2"bh1.00Rp7,500.00271Sok & Knee PE dia 1/2"bh1.00Rp55,000.00272Sok & Knee PVC AW dia 1/2"bh1.00Rp4,000.00WAVIN273Sok & Knee PVC AW dia 3/4"bh1.00Rp5,000.00WAVIN274Sok & Knee PVC AW dia 1"bh1.00Rp6,000.00WAVIN275Sok & Knee PVC D dia 1,5"bh1.00Rp8,000.00WAVIN276Sok & Knee PVC D dia 2"bh1.00Rp10,000.00WAVIN277Sok & Knee PVC D dia 3"bh1.00Rp30,000.00WAVIN278Sok & Knee PVC D dia 4"bh1.00Rp50,000.00WAVIN279Sok & Knee PVC D dia 5"bh1.00Rp100,000.00WAVIN280Sok & Knee PVC D dia 6"bh1.00Rp110,000.00WAVIN281Splice Joint, 30x30bh1.00Rp335,000.00Square Pile282Splice Joint, 35x35bh1.00Rp525,000.00Square Pile283Splice Joint, 40x40bh1.00Rp725,000.00Square Pile284Splice Joint, 45x45bh1.00Rp900,000.00Square Pile285Splice Joint, 50x50bh1.00Rp1,100,000.00Square Pile286Stop Kran, dia 1/2"bh1.00Rp90,000.00KITZ287Stop Kran, dia 3/4"bh1.00Rp115,000.00KITZ288Stop Kran, dia 1"bh1.00Rp150,000.00KITZ289Stop Kran, dia 1/2"bh1.00Rp40,000.00ONDA290Stop Kran, dia 3/4"bh1.00Rp50,000.00ONDA291Stop Kran, dia 1"bh1.00Rp75,000.00ONDA292Stop Kran, dia 1/2"bh1.00Rp60,000.00SAN EI293Stop Kran, dia 3/4"bh1.00Rp90,000.00SAN EI294Stop Kran, dia 1"bh1.00Rp120,000.00SAN EI295Saklar Tunggalbh1.00Rp20,000.00BROCO296Saklar Gandabh1.00Rp22,000.00BROCO297Saklar Hotelbh1.00Rp150,000.00BROCO298Stop Kontak Biasabh1.00Rp18,000.00BROCO299Stop Kontak Khusus ACbh1.00Rp65,000.00BROCO300Stop Kontak Khusus TELbh1.00Rp75,000.00BROCO301Stop Kontak Khusus TVbh1.00Rp75,000.00BROCO302T Doos Listrik, Biasabh1.00Rp1,000.00BIASA303T Doos Listrikbh1.00Rp2,500.00CLIPSAL304Tanah Urugm31.00Rp80,000.00KELAS 1305Talang PVCbh1.00Rp25,000.00306Textileroll1.00Rp5,000.00307Thinner, COBRA, (5L)gln1.00Rp25,000.00COBRA308Thinner, IMPALA, (5L)gln1.00Rp20,000.00IMPALA309Torent air, 650L, Pinguin Plastikunit1.00Rp650,000.00PINGUIN310Torent air, 1000L, Pinguin Plastikunit1.00Rp1,100,000.00PINGUIN311Torent air, 1000L, Excel Plastikunit1.00Rp900,000.00EXCEL312Torent air, 1000L, Excel Stainlessunit1.00Rp1,650,000.00EXCEL313Torent air, 1000L, Excel Stainless+Kakiunit1.00Rp1,700,000.00EXCEL314Teakwood t=3mm, Melamintolbr1.00Rp70,000.00Uk 1,21X2,42 m2315Teakwood t=3mm, Sungkailbr1.00Rp95,000.00Uk 1,21X2,42 m2316Triplex 3mmlbr1.00Rp40,000.00Uk 1,21X2,42 m2317Triplex 4mmlbr1.00Rp48,000.00Uk 1,21X2,42 m2318Triplex 6mmlbr1.00Rp65,000.00Uk 1,21X2,42 m2319Triplex 9mmlbr1.00Rp110,000.00Uk 1,21X2,42 m2320Triplex 12mmlbr1.00Rp150,000.00Uk 1,21X2,42 m2321Triplex 15mmlbr1.00Rp180,000.00Uk 1,21X2,42 m2322Vernis Batu Alam, Bitasol Batu Alamkg1.00Rp45,000.00BITAL ASIA323Wallfiller, Dulux, (4L)kg1.00Rp17,000.00ICI Paints324Wallfiller, MOWILEX, (4L)kg1.00Rp14,000.00MOWILEX325Waterproffing Coating, Incona Raya, 5Lgln1.00Rp80,000.00ds = 3-4m2/L (2x kuas)326Waterproffing Membrane, Incona Rayam21.00Rp62,000.00Uk 1,0x22x1.02mm327Waterproffing Membrane, CSMm21.00Rp60,000.00Screed=Rp30000328Water Repellent, Bitasilm21.00Rp35,000.00BITAL ASIA

&L&"Arial Black,Bold"&11WIJAYA TARA ESTETIKA&"Bradley Hand ITC,Italic"Berkarya untuk estetika&"Arial Black,Bold"&12&R&"Bookman Old Style,Bold Italic"&11PROGRAM ANALISA HARGA SATUAN PEKERJAAN&L&"Arial Narrow,Bold"&11TABEL DAFTAR HARGA BAHAN BANGUNAN&C&"Helv,Italic"&11Page &P of &N&R&"Arial Narrow,Bold"&11STANDAR&L&"Arial Black,Bold"&11WIJAYA TARA ESTETIKA&"Bradley Hand ITC,Italic"Berkarya untuk estetika&"Arial Black,Bold"&12&R&"Bookman Old Style,Bold Italic"&11PROGRAM ANALISA HARGA SATUAN PEKERJAAN&L&"Arial Narrow,Bold"&11TABEL DAFTAR HARGA BAHAN BANGUNAN&C&11Page &P of &N&R&"Arial Narrow,Bold"&11STANDAR PROYEK WTE&"Book Antiqua,Italic"ESTIMATE : Ir. Leonardy Wijaya

Harga Upah TABEL DAFTAR UPAH HARIAN PEKERJAPeriode:November 2008Jenis Bangunan:Bangunan UmumKlasifikasi:MenengahProyek:Renovasi - Bangun BaruLokasi:JakartaWilayah:JabodetabekUpahNoDaftar KeahlianSatVolHarianWaktu Kerja( Rupiah )( Jam )1Kenekhari1.0040,000.007 Jam Kerja2Kenek Baja"1.0060,000.00"3Kenek Gypsum"1.0045,000.00"4Kepala Tukang"1.0060,000.00"5Mandor Baja"1.00100,000.00"6Mandor Batu"1.0065,000.00"7Mandor Gypsum"1.0065,000.00"8Tukang Baja"1.0075,000.00"9Tukang Batu Halus"1.0055,000.00"10Tukang Batu Kasar"1.0050,000.00"11Tukang Besi"1.0055,000.00"12Tukang Cat"1.0055,000.00"13Tukang Gali Tanah"1.0060,000.00"14Tukang Gypsum Halus"1.0055,000.00"15Tukang Gypsum Kasar"1.0050,000.00"16Tukang Kayu Halus"1.0055,000.00"17Tukang Kayu Kasar"1.0050,000.00"18Tukang Listrik"1.0055,000.00"19Tukang Pipa"1.0055,000.00"

&L&"Arial Black,Bold"&11WIJAYA TARA ESTETIKA&"Arial Black,Italic"&"Bradley Hand ITC,Italic"Berkarya untuk estetika&R&"Bookman Old Style,Bold Italic"&11PROGRAM ANALISAHARGA SATUAN PEKERJAAN&L&"Arial Narrow,Bold"&11TABEL DAFTAR UPAH HARIAN PEKERJA&C&"Helv,Italic"&11Page &P of &N&R&"Arial Narrow,Bold"&11STANDAR&L&"Arial Black,Bold"&11WIJAYA TARA ESTETIKA&"Arial Black,Italic"&"Bradley Hand ITC,Italic"Berkarya untuk estetika&R&"Bookman Old Style,Bold Italic"&11PROGRAM ANALISAHARGA SATUAN PEKERJAAN&L&"Arial Narrow,Bold"&11TABEL DAFTAR UPAH HARIAN PEKERJA&C&11Page &P of &N&R&"Arial Narrow,Bold"&11STANDAR PROYEK WTE&"Book Antiqua,Italic"ESTIMATE : Ir. Leonardy Wijaya

HSA & PABTABEL DAFTAR HARGA SEWA ALAT,PERAWATAN ALAT BANTUDAN JASA PEKERJAANPeriode:November 2008Jenis Bangunan:Bangunan UmumKlasifikasi:MenengahProyek:Renovasi - Bangun BaruLokasi:JakartaWilayah:JabodetabekNoNama Alat BantuSatVolHarga SatuanKap.Prod AlatPekerjaan( Rupiah )1Bar Binderkg1.00500.002Bar Cutterkg1.00500.003Blencongbh1.0040,000.004Concrete Mixerm31.0060,000.005Crawler CraneJam1.00190,000.006Ember Adukbh1.006,000.007Genzet 20KVaunit1.0070,000.008Mesin Borunit1.0050,000.009Mesin Bor Untuk PondasiJam1.00160,000.0010Mesin Gurindaunit1.0050,000.0011Pacul Adukbh1.0035,000.0012Pahat Besibh1.0025,000.0013Pengkibh1.0015,000.0014Pompa Betonm31.00100,000.0015Sekopbh1.0040,000.0016Sendok semenbh1.007,500.0017Timbrisan Tanahbh1.0030,000.0018Timbrisan Mesinm31.0060,000.0037,50M3/hari19Travo Lasunit1.0070,000.0020Vibratorm31.0040,000.00NoJasa PekerjaanSatVolHarga SatuanKeterangan( Rupiah )1Jasa Pemancanganm'1.0042,500.00HH, 7 Ton2Jasa Pemancanganm'1.0027,500.00DH, 3.5 Ton3Jasa Pengelasanbh1.0060,000.00SQ 30 X 304Jasa Pengelasanbh1.0080,000.00SQ 35 X 355Jasa Pengelasanbh1.00100,000.00SQ 40 X 406Jasa Pengelasanbh1.00120,000.00SQ 45 X 457Jasa Pengelasanbh1.00150,000.00SQ 50 X 508Jasa Pengelasanbh1.00100,000.00SP 30 X 309Jasa Pengelasanbh1.00125,000.00SP 35 X 3510Jasa Pengelasanbh1.00150,000.00SP 40 X 4011Jasa Pengelasanbh1.00175,000.00SP 45 X 4512Jasa Pengelasanbh1.00200,000.00SP 50 X 5013Jasa Pengelasanbh1.00225,000.00SP 60 X 6014Loading & Unloadingm'1.003,500.00SQ15Loading & Unloadingm'1.003,000.00SPKet :HH = Hydraulic Hammer, Kapasitas Alat = 7 TonDH = Drop Hammer, Kapasitas Alat = 3.5 TonSP = Spun PileSQ = Square Pile

&L&"Arial Black,Bold"&11WIJAYA TARA ESTETIKA&"Bradley Hand ITC,Italic"Berkarya untuk estetika&R&"Bookman Old Style,Bold Italic"&11PROGRAM ANALISAHARGA SATUAN PEKERJAAN&L&"Arial Narrow,Bold"&11TABEL DAFTAR HARGA SEWA ALAT DAN PERAWATAN ALAT BANTU &C&"Helv,Italic" &11Page &P of &N&R&"Arial Narrow,Bold"&11STANDAR&L&"Arial Black,Bold"&11WIJAYA TARA ESTETIKA&"Bradley Hand ITC,Italic"Berkarya untuk estetika&R&"Bookman Old Style,Bold Italic"&11PROGRAM ANALISAHARGA SATUAN PEKERJAAN&L&"Arial Narrow,Bold"&11TABEL DAFTAR HARGA SEWA ALAT DAN PERAWATAN ALAT BANTU &C &11Page &P of &N&R&"Arial Narrow,Bold"&11STANDAR PROYEK WTE&"Book Antiqua,Italic"ESTIMATE : Ir. Leonardy Wijaya

A H S PDAFTAR ANALISAHARGA SATUAN PEKERJAANPerihal: ANALISA HARGA SATUAN PEKERJAANPekerjaan: StruktrurPeriode: November 2008Lokasi: JakartaBangunan: Bangunan UmumWilayah: JabodetabekKlasifikasi: MenengahHARGANO.URAIAN PEKERJAANSATKOEFSATUANJUMLAH HARGARpRpI.STRUKTURA.PEK.PERSIAPAN1Pembersihan Lapangan/m2aBahan :-Pacul adukbh0.05035,000.001,750.00-Pengkibh0.02515,000.00375.00Jumlah.a2,125.00b.Upah :-Kenekht0.02040,000.00800.00-Tukang Batu Kasarht0.01050,000.00500.00Jumlah.b1,300.00Jumlah.a+b4,000.002Pas. Bouwplank/m'aBahan :-Kaso 5/7, Kayu Borneom30.0053,500,000.0017,500.00-Papan 2/20, Kayu Borneom30.0063,500,000.0019,250.00-Benang Ramiglg0.1002,000.00200.00-Paku 7cmkg0.10012,000.001,200.00Jumlah.a38,150.00bUpah :-Kenekht0.28040,000.0011,200.00Jumlah.b11,200.00Jumlah.a+b50,000.00B.PEKERJAAN TANAH1Galian Tanah/m3aUpah :-Tk.Gali Tanahht0.75060,000.0045,000.00Jumlah.a45,000.00bAlat Bantu :-Paculbh0.02535,000.00875.00-Benang Ramiglg0.0152,000.0030.00Jumlah.b905.00Jumlah.a+b46,000.002Urugan Tanah Kembali/m3aUpah :-Tk.Gali Tanahht0.35060,000.0021,000.00Jumlah.a21,000.00bAlat Bantu :-Paculbh0.02535,000.00875.00-Pengkibh0.01515,000.00225.00Jumlah.b1,100.00Jumlah.a+b23,000.003Perataan Tanah/m2aUpah :-Kenekht0.05040,000.002,000.00-Mandor Batuht0.00365,000.00195.00Jumlah.a3,000.00bAlat Bantu :-Paculbh0.02535,000.00875.00-Pengkibh0.01515,000.00225.00Jumlah.b1,100.00Jumlah.a+b5,000.004Pemadatan Tanah Pondasi/m2, ManualaUpah :-Kenekht0.20040,000.008,000.00-Tk.Gali Tanahht0.05060,000.003,000.00-Kep.Tukanght0.01060,000.00600.00-Mandor Batuht0.00365,000.00195.00Jumlah.a11,795.00bAlat Bantu :-Timbrisan Tanahbh0.12530,000.003,750.00Jumlah.b3,750.00Jumlah.a+b16,000.005Pemadatan Tanah Pondasi/m2, MesinaUpah :-Kenekht0.20040,000.008,000.00-Tk.Gali Tanahht0.05060,000.003,000.00-Kep.Tukanght0.01060,000.00600.00-Mandor Batuht0.00365,000.00195.00Jumlah.a11,795.00bAlat Bantu :-Tibrisan Mesinm30.25060,000.0015,000.00Jumlah.b15,000.00Jumlah.a+b27,000.006Urugan Pasir Pondasi/m3aBahan :-Pasir Urugm31.200125,000.00150,000.00Jumlah.a150,000.00bUpah :-Kenekht0.35040,000.0014,000.00Jumlah.b14,000.00cAlat Bantu :-Paculbh0.02535,000.00875.00-Pengkibh0.01515,000.00225.00Jumlah.c1,100.00Jumlah.a+b+c166,000.007Urugan Tanah Dari Luar Lokasi/m3aBahan :-Tanah Urug, Klas-1m31.20080,000.0096,000.00Jumlah.a96,000.00bUpah :-Kenekht0.35040,000.0014,000.00Jumlah.b14,000.00cAlat Bantu :-Paculbh0.02535,000.00875.00-Pengkibh0.01515,000.00225.00Jumlah.c1,100.00Jumlah.a+b+c112,000.008Urugan Sirtu Dari Luar Lokasi/m3aBahan :-Sirtu Urug, Klas-1m31.200150,000.00180,000.00Jumlah.a180,000.00bUpah :-Kenekht0.35040,000.0014,000.00Jumlah.b14,000.00cAlat Bantu :-Paculbh0.02535,000.00875.00-Pengkibh0.01515,000.00225.00Jumlah.c1,100.00Jumlah.a+b+c196,000.009Buang Tanah Keluar Lokasi/m3aUpah :-Tk.Gali Tanahht0.35060,000.0021,000.00-Mandor Batuht0.01265,000.00780.00Jumlah.a22,000.00bAlat Bantu :-Paculbh0.20035,000.007,000.00-Pengkibh0.15015,000.002,250.00Jumlah.b9,250.00Jumlah.a+b32,000.00C.PEKERJAAN PONDASIC.1.PEKERJAAN PONDASI DANGKAL1Pondasi Batu Kali 1:4/m3aBahan :-Batu Kali/Belahm31.200185,000.00222,000.00-Semen PCzak2.70053,000.00143,100.00-Pasir Pasangm30.500185,000.0092,500.00-Bambu Profilbtg0.2506,000.001,500.00-Kawat Beton/ bendradkg0.01018,000.00180.00-Benang Ramiglg0.0152,000.0030.00Jumlah.a459,310.00bUpah Pasang :-Kenekht0.50040,000.0020,000.00-Tk.Batu Kasarht0.25050,000.0012,500.00-Kep.Tukanght0.02560,000.001,500.00-Mandor Batuht0.08365,000.005,416.67Jumlah.b39,416.67cAlat Bantu :-Ember adukbh1.0006,000.006,000.00-Pacul adukbh0.10035,000.003,500.00-Sekopbh0.10040,000.004,000.00Jumlah.c13,500.00Jumlah.a+b+c513,000.002Pondasi Batu Kali 1:5/m3aBahan :-Batu Kali/Belahm31.200185,000.00222,000.00-Semen PCzak2.50053,000.00132,500.00-Pasir Pasangm30.500185,000.0092,500.00-Bambu Profilbtg0.2506,000.001,500.00-Kawat Beton/ bendradkg0.01018,000.00180.00-Benang Ramiglg0.0152,000.0030.00Jumlah.a448,710.00bUpah Pasang :-Kenekht0.50040,000.0020,000.00-Tk.Batu Kasarht0.25050,000.0012,500.00-Kep.Tukanght0.02560,000.001,500.00-Mandor Batuht0.08365,000.005,416.67Jumlah.b39,416.67cAlat Bantu :-Ember adukbh1.0006,000.006,000.00-Pacul adukbh0.10035,000.003,500.00-Sekopbh0.10040,000.004,000.00Jumlah.c13,500.00Jumlah.a+b+c502,000.003Pas.Rollag Bata 1:4/m3aBahan :-Batu Bata Pressbh510380.00193,800.00-Semen PCzak3.20053,000.00169,600.00-Pasir Pasangm30.320185,000.0059,200.00-Bambu U. Patokbtg0.0506,000.00300.00-Benang Ramim30.0502,000.00100.00Jumlah.a423,000.00bUpah Pasang :-Kenekht3.60040,000.00144,000.00-Tk.Batu Kasarht1.20050,000.0060,000.00Jumlah.b204,000.00cAlat Bantu :-Ember adukbh0.2506,000.001,500.00-Pacul adukbh0.12535,000.004,375.00Jumlah.c5,875.00Jumlah.a+b+c633,000.004Pas.Rollag Bata 1:5/m3aBahan :-Batu Bata Pressbh510380.00193,800.00-Semen PCzak2.50053,000.00132,500.00-Pasir Pasangm30.250185,000.0046,250.00-Bambu U. Patokm30.0506,000.00300.00-Benang Ramim30.0502,000.00100.00Jumlah.a372,950.00bUpah Pasang :-Kenekht3.60040,000.00144,000.00-Tk.Batu Kasarht1.20050,000.0060,000.00Jumlah.b204,000.00cAlat Bantu :-Ember adukbh0.2506,000.001,500.00-Pacul adukbh0.12535,000.004,375.00Jumlah.c5,875.00Jumlah.a+b+c583,000.005Pas.Batako Kapur 1:3/m2 (Bekisting Pile Cap,Tie Beam)aBahan :-Batako Kapurbh25.000800.0020,000.00-Semen PCzak0.30053,000.0015,900.00-Pasir Pasangm30.030185,000.005,550.00Jumlah.a41,450.00bUpah Pasang :-Kenekht0.40040,000.0016,000.00-Tk.Batu Kasarht0.20050,000.0010,000.00Jumlah.b26,000.00cAlat Bantu :-Kaso Profil 5/7, borneom30.0033,500,000.008,750.00-Benang Ramim30.0652,000.00130.00-Ember adukbh0.0256,000.00150.00-Pacul adukbh0.01535,000.00525.00Jumlah.c9,555.00Jumlah.a+b+c78,000.006Pas.Batako Kapur 1:4/m2 (Bekisting Pile Cap,Tie Beam)aBahan :-Batako Kapurbh25.000800.0020,000.00-Semen PCzak0.25053,000.0013,250.00-Pasir Pasangm30.025185,000.004,625.00Jumlah.a37,875.00bUpah Pasang :-Kenekht0.40040,000.0016,000.00-Tk.Batu Kasarht0.20050,000.0010,000.00Jumlah.b26,000.00cAlat Bantu :-Kaso Profil 5/7, borneom30.0033,500,000.008,750.00-Benang Ramim30.0652,000.00130.00-Ember adukbh0.0256,000.00150.00-Pacul adukbh0.01535,000.00525.00Jumlah.c9,555.00Jumlah.a+b+c74,000.007Pas.Batako Kapur 1:5/m2 (Bekisting Pile Cap,Tie Beam)aBahan :-Batako Kapurbh25.000800.0020,000.00-Semen PCzak0.20053,000.0010,600.00-Pasir Pasangm30.020185,000.003,700.00Jumlah.a34,300.00bUpah Pasang :-Kenekht0.40040,000.0016,000.00-Tk.Batu Kasarht0.20050,000.0010,000.00Jumlah.b26,000.00cAlat Bantu :-Kaso Profil 5/7, borneom30.0033,500,000.008,750.00-Benang Ramim30.0652,000.00130.00-Ember adukbh0.0256,000.00150.00-Pacul adukbh0.01535,000.00525.00Jumlah.c9,555.00Jumlah.a+b+c70,000.008Pas.Batako Kapur 1:6/m2 (Bekisting Pile Cap,Tie Beam)aBahan :-Batako Kapurbh25.000800.0020,000.00-Semen PCzak0.18053,000.009,540.00-Pasir Pasangm30.018185,000.003,330.00Jumlah.a32,870.00bUpah Pasang :-Kenekht0.40040,000.0016,000.00-Tk.Batu Kasarht0.20050,000.0010,000.00Jumlah.b26,000.00cAlat Bantu :-Kaso Profil 5/7, borneom30.0033,500,000.008,750.00-Benang Ramim30.0652,000.00130.00-Ember adukbh0.0256,000.00150.00-Pacul adukbh0.01535,000.00525.00Jumlah.c9,555.00Jumlah.a+b+c69,000.00C.2.PEKERJAAN PONDASI DALAM1Pengeboran D50cm & D60cm /m', Bored PileaAlat Bantu :-Crawler Cranejam0.130190,000.0024,700.00-Mesin Borjam0.130160,000.0020,800.00Jumlah.a45,500.00bUpah Pasang :-Tk. Gali Tanahht0.16060,000.009,600.00-Mandorht0.00865,000.00520.00Jumlah.b10,120.00cLain-Lain :-Oli + Solarls1.00013,500.0013,500.00-Alat Bantuls0.22045,500.0010,010.00Jumlah.c23,510.00Jumlah.a+b+c80,000.00Profit 10% :8,000.00Total :88,000.00Pembulatan :88,000.002Pengeboran D70cm, D80cm, D90cm, D100cm /m', Bored PileaAlat Bantu :-Crawler Cranejam0.133190,000.0025,270.00-Mesin Borjam0.135160,000.0021,600.00Jumlah.a46,870.00bUpah Pasang :-Tk. Gali Tanahht0.16060,000.009,600.00-Mandorht0.00865,000.00520.00Jumlah.b10,120.00cLain-Lain :-Oli + Solarls1.00014,000.0014,000.00-Alat Bantuls0.22046,870.0010,311.40Jumlah.c24,311.40Jumlah.a+b+c82,000.00Profit 10% :8,200.00Total :90,200.00Pembulatan :91,000.003Pengeboran D110cm /m', Bored PileaAlat Bantu :-Crawler Cranejam0.140190,000.0026,600.00-Mesin Borjam0.140160,000.0022,400.00Jumlah.a49,000.00bUpah Pasang :-Tk. Gali Tanahht0.16060,000.009,600.00-Mandorht0.00865,000.00520.00Jumlah.b10,120.00cLain-Lain :-Oli + Solarls1.00014,000.0014,000.00-Alat Bantuls0.22049,000.0010,780.00Jumlah.c24,780.00Jumlah.a+b+c84,000.00Profit 10% :8,400.00Total :92,400.00Pembulatan :93,000.004Pengeboran D120cm & D150cm /m', Bored PileaAlat Bantu :-Crawler Cranejam0.155190,000.0029,450.00-Mesin Borjam0.155160,000.0024,800.00Jumlah.a54,250.00bUpah Pasang :-Tk. Gali Tanahht0.18060,000.0010,800.00-Mandorht0.00965,000.00585.00Jumlah.b11,385.00cLain-Lain :-Oli + Solarls1.00015,000.0015,000.00-Alat Bantuls0.22054,250.0011,935.00Jumlah.c26,935.00Jumlah.a+b+c93,000.00Profit 10% :9,300.00Total :102,300.00Pembulatan :103,000.005Beton Readymix D50cm /m3, Bored PileaBahan :-Beton Readymix K-350m31.400577,500.00808,500.00Jumlah.a808,500.00bUpah Pasang :-Tk. Batu Halusht0.42555,000.0023,375.00-Mandorht0.02165,000.001,381.25Jumlah.b24,756.25cLain-Lain :-Alat Bantu : Pipa Tremi+Casing Pelindungls1.00012,500.0012,500.00Jumlah.c12,500.00Jumlah.a+b+c846,000.00Profit 10% :84,600.00Total :930,600.00Pembulatan :931,000.006Beton Readymix D60cm /m3, Bored PileaBahan :-Beton Readymix K-350m31.300577,500.00750,750.00Jumlah.a750,750.00bUpah Pasang :-Tk. Batu Halusht0.42555,000.0023,375.00-Mandorht0.02165,000.001,381.25Jumlah.b24,756.25cLain-Lain :-Alat Bantu : Pipa Tremi+Casing Pelindungls1.00012,500.0012,500.00Jumlah.c12,500.00Jumlah.a+b+c789,000.00Profit 10% :78,900.00Total :867,900.00Pembulatan :868,000.007Beton Readymix D70cm - D100cm /m3, Bored PileaBahan :-Beton Readymix K-350m31.200577,500.00693,000.00Jumlah.a693,000.00bUpah Pasang :-Tk. Batu Halusht0.42555,000.0023,375.00-Mandorht0.02165,000.001,381.25Jumlah.b24,756.25cLain-Lain :-Alat Bantu : Pipa Tremi+Casing Pelindungls1.00012,500.0012,500.00Jumlah.c12,500.00Jumlah.a+b+c731,000.00Profit 10% :73,100.00Total :804,100.00Pembulatan :805,000.008Beton Readymix D120cm - D150cm /m3, Bored PileaBahan :-Beton Readymix K-350m31.150577,500.00664,125.00Jumlah.a664,125.00bUpah Pasang :-Tk. Batu Halusht0.42555,000.0023,375.00-Mandorht0.02165,000.001,381.25Jumlah.b24,756.25cLain-Lain :-Alat Bantu : Pipa Tremi+Casing Pelindungls1.00012,500.0012,500.00Jumlah.c12,500.00Jumlah.a+b+c702,000.00Profit 10% :70,200.00Total :772,200.00Pembulatan :773,000.009Pembesian Bored Pile /kgaBahan :-Besi Beton Ulirkg1.0008,500.008,500.00-Kawat Betonls1.000180.00180.00-Kawat Lasls1.00050.0050.00-Kawat Gantungls1.000400.00400.00Jumlah.a9,130.00bUpah Pasang :-Tk. Besiht0.00555,000.00247.50-Mandorht0.00065,000.0029.25Jumlah.b276.75cLain-Lain :-Alat Bantuls1.000100.00100.00Jumlah.c100.00Jumlah.a+b+c10,000.00Profit 10% :1,000.00Total :11,000.00Pembulatan :11,000.0010Pondasi Tiang Pancang, Mini Pile 28 /m'aBahan :-Tiang Pancang, MP-28, Drop Hammerm'1.00077,000.0077,000.00Mutu Beton : K-450Mutu Baja : fy=4000kg/cm2, 3 D16Jumlah.a77,000.00PPN 10% :7,700.00Total :84,700.00Pembulatan :85,000.0011Pondasi Tiang Pancang, Mini Pile 32 /m'aBahan :-Tiang Pancang, MP-32, Drop Hammerm'1.00087,500.0087,500.00Mutu Beton : K-450Mutu Baja : fy=4000kg/cm2, 3 D16Jumlah.a88,000.00PPN 10% :8,800.00Total :96,800.00Pembulatan :97,000.0012Pondasi Tiang Pancang, Square Pile 20x20 /m'aBahan :-Tiang Pancang, SQ 20 X 20, Drop Hammerm'1.00079,000.0079,000.00Mutu Beton : K-450Mutu Baja : fy=4000kg/cm2, 4 D13Jumlah.a79,000.00PPN 10% :7,900.00Total :86,900.00Pembulatan :87,000.0013Pondasi Tiang Pancang, Square Pile 25x25 /m'aBahan :-Tiang Pancang, SQ 25 X 25, Drop Hammerm'1.000115,000.00115,000.00Mutu Beton : K-450Mutu Baja : fy=4000kg/cm2, 4 D16Jumlah.a115,000.00PPN 10% :11,500.00Total :126,500.00Pembulatan :127,000.0014Pondasi Tiang Pancang, Square Pile 20x20 /m'aBahan :-Tiang Pancang, SQ 20 X 20, Jack In Pilesm'1.000125,000.00125,000.00Mutu Beton : K-450Mutu Baja : fy=4000kg/cm2, 4 D13Jumlah.a125,000.00PPN 10% :12,500.00Total :137,500.00Pembulatan :138,000.0015Pondasi Tiang Pancang, Square Pile 30x30 /m'aBahan :-Tiang Pancang, SQ 30 X 30, Hydraulic Hammerm'1.000120,000.00120,000.00Mutu Beton : K-450Mutu Baja : fy=4000kg/cm2, Strand 4 d3/8Jumlah.a120,000.00b.Jasa :- Splice Joint, (Tiap L=3m)bh1.000335,000.00335,000.00- Loading & Unloadingm'1.0003,500.003,500.00- Jasa Pengelasan, (Tiap L=3m)bh1.00060,000.0060,000.00Jumlah.b398,500.00Jumlah.a+b519,000.00PPN 10% :51,900.00Total :570,900.00Pembulatan :571,000.0016Pondasi Tiang Pancang, Square Pile 35x35 /m'aBahan :-Tiang Pancang, SQ 35 X 35, Hydraulic Hammerm'1.000150,000.00150,000.00Mutu Beton : K-450Mutu Baja : fy=4000kg/cm2, Strand 5 d3/8Jumlah.a150,000.00b.Jasa :- Splice Joint, (Tiap L=3m)bh1.000525,000.00525,000.00- Loading & Unloadingm'1.0003,500.003,500.00- Jasa Pengelasan, (Tiap L=3m)bh1.00080,000.0080,000.00Jumlah.b608,500.00Jumlah.a+b759,000.00PPN 10% :75,900.00Total :834,900.00Pembulatan :835,000.0017Pondasi Tiang Pancang, Square Pile 40x40 /m'aBahan :-Tiang Pancang, SQ 40 X 40, Hydraulic Hammerm'1.000190,000.00190,000.00Mutu Beton : K-450Mutu Baja : fy=4000kg/cm2, Strand 4 d1/2Jumlah.a190,000.00b.Jasa :- Splice Joint, (Tiap L=3m)bh1.000725,000.00725,000.00- Loading & Unloadingm'1.0003,500.003,500.00- Jasa Pengelasan, (Tiap L=3m)bh1.000100,000.00100,000.00Jumlah.b828,500.00Jumlah.a+b1,019,000.00PPN 10% :101,900.00Total :1,120,900.00Pembulatan :1,121,000.0018Pondasi Tiang Pancang, Square Pile 45x45 /m'aBahan :-Tiang Pancang, SQ 45 X 45, Hydraulic Hammerm'1.000235,000.00235,000.00Mutu Beton : K-450Mutu Baja : fy=4000kg/cm2, Strand 5 d1/2Jumlah.a235,000.00b.Jasa :- Splice Joint, (Tiap L=3m)bh1.000900,000.00900,000.00- Loading & Unloadingm'1.0003,500.003,500.00- Jasa Pengelasan, (Tiap L=3m)bh1.000120,000.00120,000.00Jumlah.b1,023,500.00Jumlah.a+b1,259,000.00PPN 10% :125,900.00Total :1,384,900.00Pembulatan :1,385,000.0019Pondasi Tiang Pancang, Square Pile 50x50 /m'aBahan :-Tiang Pancang, SQ 50 X 50, Hydraulic Hammerm'1.000280,000.00280,000.00Mutu Beton : K-450Mutu Baja : fy=4000kg/cm2, Strand 5 d1/2Jumlah.a280,000.00b.Jasa :- Splice Joint, (Tiap L=3m)bh1.0001,100,000.001,100,000.00- Loading & Unloadingm'1.0003,500.003,500.00- Jasa Pengelasan, (Tiap L=3m)bh1.000150,000.00150,000.00Jumlah.b1,253,500.00Jumlah.a+b1,534,000.00PPN 10% :153,400.00Total :1,687,400.00Pembulatan :1,688,000.0020Pondasi Tiang Pancang, Spun Pile 30x30 /m'aBahan :-Tiang Pancang, SP 30 X 30, Drop Hammerm'1.000130,000.00130,000.00Mutu Beton : K-600Mutu Baja : fy=4000kg/cm2Jumlah.a130,000.00b.Jasa :- Loading & Unloadingm'1.0003,000.003,000.00- Jasa Pengelasan, (Tiap L=12m)bh1.000100,000.00100,000.00Jumlah.b103,000.00Jumlah.a+b233,000.00PPN 10% :23,300.00Total :256,300.00Pembulatan :257,000.0021Pondasi Tiang Pancang, Spun Pile 35x35 /m'aBahan :-Tiang Pancang, SP 35 X 35, Drop Hammerm'1.000148,000.00148,000.00Mutu Beton : K-600Mutu Baja : fy=4000kg/cm2Jumlah.a148,000.00b.Jasa :- Loading & Unloadingm'1.0003,000.003,000.00- Jasa Pengelasan, (Tiap L=12m)bh1.000125,000.00125,000.00Jumlah.b128,000.00Jumlah.a+b276,000.00PPN 10% :27,600.00Total :303,600.00Pembulatan :304,000.0022Pondasi Tiang Pancang, Spun Pile 40x40 /m'aBahan :-Tiang Pancang, SP 40 X 40, Drop Hammerm'1.000188,000.00188,000.00Mutu Beton : K-600Mutu Baja : fy=4000kg/cm2Jumlah.a188,000.00b.Jasa :- Loading & Unloadingm'1.0003,000.003,000.00- Jasa Pengelasan, (Tiap L=12m)bh1.000150,000.00150,000.00Jumlah.b153,000.00Jumlah.a+b341,000.00PPN 10% :34,100.00Total :375,100.00Pembulatan :376,000.0023Pondasi Tiang Pancang, Spun Pile 45x45 /m'aBahan :-Tiang Pancang, SP 45 X 45, Drop Hammerm'1.000225,000.00225,000.00Mutu Beton : K-600Mutu Baja : fy=4000kg/cm2Jumlah.a225,000.00b.Jasa :- Loading & Unloadingm'1.0003,000.003,000.00- Jasa Pengelasan, (Tiap L=12m)bh1.000175,000.00175,000.00Jumlah.b178,000.00Jumlah.a+b403,000.00PPN 10% :40,300.00Total :443,300.00Pembulatan :444,000.0024Pondasi Tiang Pancang, Spun Pile 50x50 /m'aBahan :-Tiang Pancang, SP 50 X 50, Drop Hammerm'1.000288,000.00288,000.00Mutu Beton : K-600Mutu Baja : fy=4000kg/cm2Jumlah.a288,000.00b.Jasa :- Loading & Unloadingm'1.0003,000.003,000.00- Jasa Pengelasan, (Tiap L=12m)bh1.000200,000.00200,000.00Jumlah.b203,000.00Jumlah.a+b491,000.00PPN 10% :49,100.00Total :540,100.00Pembulatan :541,000.0025Pondasi Tiang Pancang, Spun Pile 60x60 /m'aBahan :-Tiang Pancang, SP 60 X 60, Drop Hammerm'1.000388,000.00388,000.00Mutu Beton : K-600Mutu Baja : fy=4000kg/cm2Jumlah.a388,000.00b.Jasa :- Loading & Unloadingm'1.0003,000.003,000.00- Jasa Pengelasan, (Tiap L=12m)bh1.000225,000.00225,000.00Jumlah.b228,000.00Jumlah.a+b616,000.00PPN 10% :61,600.00Total :677,600.00Pembulatan :678,000.0026Bobok kepala tiang < d30 /ttk, Tiang Pancang Solida.Upah Pasang :-Kenekht0.60040,000.0024,000.00-Mandorht0.06065,000.003,900.00Jumlah.a27,900.00Jumlah.a28,000.00Pembulatan :28,000.0027Bobok kepala tiang d30-d40 /ttk, Tiang Pancang Solida.Upah Pasang :-Kenekht0.85040,000.0034,000.00-Mandorht0.08565,000.005,525.00Jumlah.a39,525.00Jumlah.a40,000.00Pembulatan :40,000.0028Bobok kepala tiang d45-d50 /ttk, Tiang Pancang Solida.Upah Pasang :-Kenekht1.10040,000.0044,000.00-Mandorht0.11065,000.007,150.00Jumlah.a51,150.00Jumlah.a52,000.00Pembulatan :52,000.0029Bobok kepala tiang d30-d40 /ttk, Tiang Pancang Spuna.Upah Pasang :-Kenekht0.65040,000.0026,000.00-Mandorht0.06565,000.004,225.00Jumlah.a30,225.00Jumlah.a31,000.00Pembulatan :31,000.0030Bobok kepala tiang d45-d60 /ttk, Tiang Pancang Spuna.Upah Pasang :-Kenekht0.85040,000.0034,000.00-Mandorht0.08565,000.005,525.00Jumlah.a39,525.00Jumlah.a40,000.00Pembulatan :40,000.0031Bobok kepala tiang d30-d40 /ttk, Bored Pilea.Upah Pasang :-Kenekht0.85040,000.0034,000.00-Mandorht0.08565,000.005,525.00Jumlah.a39,525.00Jumlah.a40,000.00Pembulatan :40,000.0032Bobok kepala tiang d50-d60 /ttk, Bored Pilea.Upah Pasang :-Kenekht1.10040,000.0044,000.00-Mandorht0.11065,000.007,150.00Jumlah.a51,150.00Jumlah.a52,000.00Pembulatan :52,000.0033Bobok kepala tiang d70-d100 /ttk, Bored Pilea.Upah Pasang :-Kenekht1.20040,000.0048,000.00-Mandorht0.12065,000.007,800.00Jumlah.a55,800.00Jumlah.a56,000.00Pembulatan :56,000.0034Bobok kepala tiang d110 /ttk, Bored Pilea.Upah Pasang :-Kenekht1.25040,000.0050,000.00-Mandorht0.12565,000.008,125.00Jumlah.a58,125.00Jumlah.a59,000.00Pembulatan :59,000.0035Bobok kepala tiang d120-d150 /ttk, Bored Pilea.Upah Pasang :-Kenekht1.50040,000.0060,000.00-Mandorht0.15065,000.009,750.00Jumlah.a69,750.00Jumlah.a70,000.00Pembulatan :70,000.0036Bobok kepala tiang > d150 /ttk, Bored Pilea.Upah Pasang :-Kenekht1.75040,000.0070,000.00-Mandorht0.17565,000.0011,375.00Jumlah.a81,375.00Jumlah.a82,000.00Pembulatan :82,000.00D.PEKERJAAN MORTAR & BETON1Spesi 1:3/m3aBahan :-Semen PCzak2.65053,000.00140,450.00-Pasir Extra Betonm30.300200,000.0060,000.00Jumlah.a201,000.002Spesi 1:4/m3aBahan :-Semen PCzak2.15053,000.00113,950.00-Pasir Extra Betonm30.300200,000.0060,000.00Jumlah.a174,000.003Spesi 1:5/m3aBahan :-Semen PCzak1.75053,000.0092,750.00-Pasir Extra Betonm30.350200,000.0070,000.00Jumlah.a163,000.004Spesi 1:6/m3aBahan :-Semen PCzak1.55053,000.0082,150.00-Pasir Extra Betonm30.350200,000.0070,000.00Jumlah.a153,000.005Beton Site Mix 1:1,5:2,5/m3,dgn SeplitaBahan :-Semen PCzak7.20053,000.00381,600.00-Pasir Extra Betonm30.500200,000.00100,000.00-Seplit 2X3m30.700185,000.00129,500.00Jumlah.a611,100.00bUpah:-Kenekht3.00040,000.00120,000.00-Tk.Batu Kasarht0.50050,000.0025,000.00-Kep.Tukanght0.05060,000.003,000.00-Mandor Batuht0.01065,000.00650.00Jumlah.b148,650.00cAlat Bantu :-Concrete Mixerm30.50060,000.0030,000.00-Vibratorm30.50040,000.0020,000.00-Ember adukbh0.2006,000.001,200.00-Pacul adukbh0.20035,000.007,000.00-Sekopbh0.20040,000.008,000.00Jumlah.c66,200.00Jumlah.a+b+c826,000.006Beton Site Mix 1:2:3/m3,dgn SeplitaBahan :-Semen PCsak6.40053,000.00339,200.00-Pasir Extra Betonm30.550200,000.00110,000.00-Seplit 2X3m30.800185,000.00148,000.00Jumlah.a597,200.00bUpah :-Kenekht3.00040,000.00120,000.00-Tk.Batu Kasarht0.50050,000.0025,000.00-Kep.Tukanght0.05060,000.003,000.00-Mandor Batuht0.01065,000.00650.00Jumlah.b148,650.00cAlat Bantu :-Concrete Mixerm30.50060,000.0030,000.00-Vibratorm30.50040,000.0020,000.00-Ember adukbh0.2006,000.001,200.00-Pacul adukbh0.20035,000.007,000.00-Sekopbh0.20040,000.008,000.00Jumlah.c66,200.00Jumlah.a+b+c813,000.007Beton Site Mix 1:3:5/m3,dgn seplitaBahan :-Semen PCsak4.80053,000.00254,400.00-Pasir Extra Betonm30.650200,000.00130,000.00-Seplit 2X3m30.900185,000.00166,500.00Jumlah.a550,900.00bUpah :-Kenekht3.00040,000.00120,000.00-Tk.Batu Kasarht0.50050,000.0025,000.00-Kep.Tukanght0.05060,000.003,000.00-Mandor Batuht0.01065,000.00650.00Jumlah.b148,650.00cAlat Bantu :-Concrete Mixerm30.50060,000.0030,000.00-Vibratorm30.50040,000.0020,000.00-Ember adukbh0.2006,000.001,200.00-Pacul adukbh0.20035,000.007,000.00-Sekopbh0.20040,000.008,000.00Jumlah.c66,200.00Jumlah.a+b+c766,000.008Beton Ready Mix K.350/m3aBahan :-Beton K.350m31.150577,500.00664,125.00Jumlah.a664,125.00bUpah :-Kenekht2.50040,000.00100,000.00-Tk.Batu Kasarht0.41750,000.0020,833.33-Kep.Tukanght0.04260,000.002,500.00-Mandor Batuht0.00865,000.00541.67Jumlah.b123,875.00cAlat Bantu Utama :-Pompa betonm31.000100,000.00100,000.00-Vibratorm31.00040,000.0040,000.00-Ember adukbh0.0506,000.00300.00-Pacul adukbh0.05035,000.001,750.00-Sekopbh0.05040,000.002,000.00Jumlah.c144,050.00Jumlah.a+b+c933,000.009Beton Ready Mix K.300/m3aBahan :-Beton K.300m31.150566,500.00651,475.00Jumlah.a651,475.00bUpah :-Kenekht2.50040,000.00100,000.00-Tk.Batu Kasarht0.41750,000.0020,833.33-Kep.Tukanght0.04260,000.002,500.00-Mandor Batuht0.00865,000.00541.67Jumlah.b123,875.00cAlat Bantu Utama :-Pompa betonm31.000100,000.00100,000.00-Vibratorm31.00040,000.0040,000.00-Ember adukbh0.0506,000.00300.00-Pacul adukbh0.05035,000.001,750.00-Sekopbh0.05040,000.002,000.00Jumlah.c144,050.00Jumlah.a+b+c920,000.0010Beton Ready Mix K.275/m3aBahan :-Beton K.275m31.150550,000.00632,500.00Jumlah.a632,500.00bUpah :-Kenekht2.50040,000.00100,000.00-Tk.Batu Kasarht0.41750,000.0020,833.33-Kep.Tukanght0.04260,000.002,500.00-Mandor Batuht0.00865,000.00541.67Jumlah.b123,875.00cAlat Bantu Utama :-Pompa betonm31.000100,000.00100,000.00-Vibratorm31.00040,000.0040,000.00-Ember adukbh0.0506,000.00300.00-Pacul adukbh0.05035,000.001,750.00-Sekopbh0.05040,000.002,000.00Jumlah.c144,050.00Jumlah.a+b+c901,000.0011Beton Ready Mix K.250/m3aBahan :-Beton K.250m31.150539,000.00619,850.00Jumlah.a619,850.00bUpah :-Kenekht2.50040,000.00100,000.00-Tk.Batu Kasarht0.41750,000.0020,833.33-Kep.Tukanght0.04260,000.002,500.00-Mandor Batuht0.00865,000.00541.67Jumlah.b123,875.00cAlat Bantu Utama :-Pompa betonm31.000100,000.00100,000.00-Vibratorm31.00040,000.0040,000.00-Ember adukbh0.0506,000.00300.00-Pacul adukbh0.05035,000.001,750.00-Sekopbh0.05040,000.002,000.00Jumlah.c144,050.00Jumlah.a+b+c888,000.0012Beton Ready Mix K.225/m3aBahan :-Beton K.225m31.150528,000.00607,200.00Jumlah.a607,200.00bUpah :-Kenekht2.50040,000.00100,000.00-Tk.Batu Kasarht0.41750,000.0020,833.33-Kep.Tukanght0.04260,000.002,500.00-Mandor Batuht0.00865,000.00541.67Jumlah.b123,875.00cAlat Bantu Utama :-Pompa betonm31.000100,000.00100,000.00-Vibratorm31.00040,000.0040,000.00-Ember adukbh0.0506,000.00300.00-Pacul adukbh0.05035,000.001,750.00-Sekopbh0.05040,000.002,000.00Jumlah.c144,050.00Jumlah.a+b+c876,000.0013Beton Ready Mix K.175/m3aBahan :-Beton K.175m31.150506,000.00581,900.00Jumlah.a581,900.00bUpah :-Kenekht2.50040,000.00100,000.00-Tk.Batu Kasarht0.41750,000.0020,833.33-Kep.Tukanght0.04260,000.002,500.00-Mandor Batuht0.00865,000.00541.67Jumlah.b123,875.00cAlat Bantu Utama :-Pompa betonm31.000100,000.00100,000.00-Vibratorm31.00040,000.0040,000.00-Ember adukbh0.0506,000.00300.00-Pacul adukbh0.05035,000.001,750.00-Sekopbh0.05040,000.002,000.00Jumlah.c144,050.00Jumlah.a+b+c850,000.00E.PEKERJAAN BEKISTING & PEMBESIAN1Bekisting Poer/m2 2xpakai dgn Triplex 9mmaBahan :-Triplex Tepi, 121x242, MP9mmlbr0.250110,000.0027,500.00-Kaso Klam 4x6, Kayu Borneom30.0073,500,000.0022,750.00-Kaso Stut 4x6, Kayu Borneom30.0073,500,000.0022,750.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.20012,000.002,400.00-Paku 7cmkg0.20012,000.002,400.00Jumlah.a77,900.00bUpah :-Kenekht0.12040,000.004,800.00-Tk.Kayu Halusht0.15055,000.008,250.00-Kep.Tukanght0.15060,000.009,000.00-Mandor Batuht0.05065,000.003,250.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b31,900.00Jumlah.a+b110,000.002Bekisting Poer/m2 2xpakai dgn Triplex 12mmaBahan :-Triplex Tepi, 121x242, MP12mmlbr0.250150,000.0037,500.00-Kaso Klam 4x6, Kayu Borneom30.0073,500,000.0022,750.00-Kaso Stut 4x6, Kayu Borneom30.0073,500,000.0022,750.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.20012,000.002,400.00-Paku 7cmkg0.20012,000.002,400.00Jumlah.a87,900.00bUpah :-Kenekht0.12040,000.004,800.00-Tk.Kayu Halusht0.15055,000.008,250.00-Kep.Tukanght0.15060,000.009,000.00-Mandor Batuht0.05065,000.003,250.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b31,900.00Jumlah.a+b120,000.003Bekisting Sloof/m2 2xpakai dgn Triplex 9mmaBahan :-Triplex Tepi, 121x242, MP9mmlbr0.250110,000.0027,500.00-Kaso Klam 4x6, Kayu Borneom30.0073,500,000.0022,750.00-Kaso Stut 5x7, Kayu Borneom30.0073,500,000.0022,750.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.20012,000.002,400.00-Paku 7cmkg0.20012,000.002,400.00Jumlah.a77,900.00bUpah :-Kenekht0.12040,000.004,800.00-Tk.Kayu Halusht0.15055,000.008,250.00-Kep.Tukanght0.15060,000.009,000.00-Mandor Batuht0.05065,000.003,250.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b31,900.00Jumlah.a+b110,000.004Bekisting Sloof/m2 2xpakai dgn Triplex 12mmaBahan :-Triplex Tepi, 121x242, MP12mmlbr0.250150,000.0037,500.00-Kaso Klam 4x6, Kayu Borneom30.0073,500,000.0022,750.00-Kaso Stut 4x6, Kayu Borneom30.0073,500,000.0022,750.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.20012,000.002,400.00-Paku 10cmkg0.20012,000.002,400.00Jumlah.a87,900.00bUpah :-Kenekht0.12040,000.004,800.00-Tk.Kayu Halusht0.15055,000.008,250.00-Kep.Tukanght0.15060,000.009,000.00-Mandor Batuht0.05065,000.003,250.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b31,900.00Jumlah.a+b120,000.005Bekisting Kolom/m2 2xpakai dgn Triplex 9mmaBahan :-Triplex Tepi, 121x242, MP9mmlbr0.250110,000.0027,500.00-Kaso Klam 4x6, Kayu Kamper Singkilm30.0086,000,000.0045,000.00-Kaso Stut 5x7, Kayu Kamper Singkilm30.0086,000,000.0045,000.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.45012,000.005,400.00-Paku 10cmkg0.45012,000.005,400.00Jumlah.a128,400.00bUpah :-Kenekht0.27040,000.0010,800.00-Tk.Kayu Halusht0.35055,000.0019,250.00-Kep.Tukanght0.35060,000.0021,000.00-Mandor Batuht0.06065,000.003,900.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b61,550.00Jumlah.a+b190,000.006Bekisting Kolom/m2 2xpakai dgn Triplex 12mmaBahan :-Triplex Tepi, 121x242, MP12mmm30.250150,000.0037,500.00-Kaso Klam 4x6, Kayu Kamper Singkilm30.0086,000,000.0045,000.00-Kaso Stut 5x7, Kayu Kamper Singkilm30.0086,000,000.0045,000.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.45012,000.005,400.00-Paku 10cmkg0.45012,000.005,400.00Jumlah.a138,400.00bUpah :-Kenekht0.27040,000.0010,800.00-Tk.Kayu Halusht0.35055,000.0019,250.00-Kep.Tukanght0.35060,000.0021,000.00-Mandor Batuht0.06065,000.003,900.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b61,550.00Jumlah.a+b200,000.007Bekisting Balok/m2 2xpakai dgn Triplex 9mmaBahan :-Triplex Tepi Ulbr0.250110,000.0027,500.00-Kaso Klam 4x6, Kayu Kamper Singkilm30.0086,000,000.0045,000.00-Kaso Stut 5x7, Kayu Kamper Singkilm30.0086,000,000.0045,000.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.45012,000.005,400.00-Paku 10cmkg0.45012,000.005,400.00Jumlah.a128,400.00bUpah :-Kenekht0.27040,000.0010,800.00-Tk.Kayu Halusht0.35055,000.0019,250.00-Kep.Tukanght0.35060,000.0021,000.00-Mandor Batuht0.06065,000.003,900.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b61,550.00Jumlah.a+b190,000.008Bekisting Balok/m2 2xpakai dgn Triplex 12mmaBahan :-Triplex Tepi Ulbr0.250150,000.0037,500.00-Kaso Klam 4x6, Kayu Kamper Singkilm30.0086,000,000.0045,000.00-Kaso Stut 5x7, Kayu Kamper Singkilm30.0086,000,000.0045,000.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.45012,000.005,400.00-Paku 10cmkg0.45012,000.005,400.00Jumlah.a138,400.00bUpah :-Kenekht0.27040,000.0010,800.00-Tk.Kayu Halusht0.35055,000.0019,250.00-Kep.Tukanght0.35060,000.0021,000.00-Mandor Batuht0.06065,000.003,900.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b61,550.00Jumlah.a+b200,000.009Bekisting Plat/m2 2xpakai dgn Triplex 9mmaBahan :-Triplex Bawahlbr0.250110,000.0027,500.00-Kaso Klam 4x6, Kayu Kamper Singkilm30.0096,000,000.0054,000.00-Kaso Stut 5x7, Kayu Kamper Singkilm30.0096,000,000.0054,000.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.45012,000.005,400.00-Paku 10cmkg0.45012,000.005,400.00Jumlah.a146,400.00bUpah :-Kenekht0.27040,000.0010,800.00-Tk.Kayu Halusht0.35055,000.0019,250.00-Kep.Tukanght0.35060,000.0021,000.00-Mandor Batuht0.06065,000.003,900.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b61,550.00Jumlah.a+b208,000.0010Bekisting Plat/m2 2xpakai dgn Triplex 12mmaBahan :-Triplex Bawahlbr0.250150,000.0037,500.00-Kaso Klam 4x6, Kayu Kamper Singkilm30.0096,000,000.0054,000.00-Kaso Stut 5x7, Kayu Kamper Singkilm30.0096,000,000.0054,000.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.45012,000.005,400.00-Paku 10cmkg0.45012,000.005,400.00Jumlah.a156,400.00bUpah :-Kenekht0.27040,000.0010,800.00-Tk.Kayu Halusht0.35055,000.0019,250.00-Kep.Tukanght0.35060,000.0021,000.00-Mandor Batuht0.06065,000.003,900.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b61,550.00Jumlah.a+b218,000.0011Bekisting Tangga/m2 2xpakai dgn Triplex 9mmaBahan :-Triplex Bawahlbr0.250110,000.0027,500.00-Kaso Klam 4x6, Kayu Kamper Singkilm30.0106,000,000.0060,000.00-Kaso Stut 5x7, Kayu Kamper Singkilm30.0106,000,000.0060,000.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.45012,000.005,400.00-Paku 10cmkg0.45012,000.005,400.00Jumlah.a158,400.00bUpah :-Kenekht0.27040,000.0010,800.00-Tk.Kayu Halusht0.35055,000.0019,250.00-Kep.Tukanght0.35060,000.0021,000.00-Mandor Batuht0.06065,000.003,900.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b61,550.00Jumlah.a+b220,000.0012Bekisting Tangga/m2 2xpakai dgn Triplex 12mmaBahan :-Triplex Bawahlbr0.250150,000.0037,500.00-Kaso Klam 4x6, Kayu Kamper Singkilm30.0106,000,000.0060,000.00-Kaso Stut 5x7, Kayu Kamper Singkilm30.0106,000,000.0060,000.00-Benang Ramiglg0.0502,000.00100.00-Paku 5cmkg0.45012,000.005,400.00-Paku 10cmkg0.45012,000.005,400.00Jumlah.a168,400.00bUpah :-Kenekht0.27040,000.0010,800.00-Tk.Kayu Halusht0.35055,000.0019,250.00-Kep.Tukanght0.35060,000.0021,000.00-Mandor Batuht0.06065,000.003,900.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.12055,000.006,600.00Jumlah.b61,550.00Jumlah.a+b230,000.0013Bekisting Beton Praktis/m2aBahan :-Papan Tepi 2/20, Kayu Borneom30.0453,500,000.00157,500.00-Paku 5cmkg0.15012,000.001,800.00-Kawat Beton/ bendradkg0.10018,000.001,800.00Jumlah.a161,100.00bUpah :-Kenekht0.13540,000.005,400.00-Tk.Kayu Kasarht0.17550,000.008,750.00-Kep.Tukanght0.17560,000.0010,500.00-Mandor Batuht0.03065,000.001,950.00-Tukang Kayu Halus (Bongkar Cetakan)ht0.06055,000.003,300.00Jumlah.b26,600.00Jumlah.a+b191,000.0014Pembesian Polos/kgaBahan :-Besi Poloskg1.1008,000.008,800.00-Kawat Beton/ bendradkg0.02018,000.00360.00Jumlah.a9,160.00bUpah Buat & Pasang :-Kenekht0.01040,000.00400.00-Tk.Besiht0.00555,000.00275.00-Kep.Tukanght0.00160,000.0060.00-Mandorht0.00065,000.0021.67Jumlah.b756.67cAlat Bantu :-Bar Cutterkg0.250500.00125.00-Bar Binderkg0.250500.00125.00Jumlah.c250.00Jumlah.a+b+c10,200.0015Pembesian Ulir/kgaBahan :-Besi Ulirkg1.1008,500.009,350.00-Kawat Beton/ bendradkg0.02018,000.00360.00Jumlah.a9,710.00bUpah Buat & Pasang :-Kenekht0.01040,000.00400.00-Tk.Besiht0.00555,000.00275.00-Kep.Tukanght0.00160,000.0060.00-Mandorht0.00065,000.0021.67Jumlah.b756.67cAlat Bantu :-Bar Cutterkg0.250500.00125.00-Bar Binderkg0.250500.00125.00Jumlah.c250.00Jumlah.a+b+c10,800.00F.PEKERJAAN BETON BERTULANG1Beton Praktis /m3aBeton 1Pc:2Psr:3Splm31.000813,000.00813,000.00bBekisting Praktism26.50096,000.00624,000.00cPembesian Poloskg80.00010,200.00816,000.00dTambahan Upah Tk.Batu+Kenekht0.05090,000.004,500.00Jumlah.a2,258,000.002Pile Cap /m3aBeton Ready Mix, K-350m31.000933,000.00933,000.00bBekistingm24.00074,000.00296,000.00cPembesian Ulirkg150.00010,800.001,620,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,858,000.003Pile Cap /m3aBeton Ready Mix, K-300m31.000920,000.00920,000.00bBekistingm24.00074,000.00296,000.00cPembesian Ulirkg150.00010,800.001,620,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,845,000.004Pile Cap /m3aBeton Ready Mix, K-275m31.000901,000.00901,000.00bBekistingm24.00074,000.00296,000.00cPembesian Ulirkg140.00010,800.001,512,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,718,000.005Pile Cap /m3aBeton Ready Mix, K-250m31.000888,000.00888,000.00bBekistingm24.00074,000.00296,000.00cPembesian Ulirkg135.00010,800.001,458,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,651,000.006Pile Cap /m3aBeton Ready Mix, K-225m31.000876,000.00876,000.00bBekistingm24.00074,000.00296,000.00cPembesian Ulirkg130.00010,800.001,404,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,585,000.007Pile Cap /m3aBeton Ready Mix, K-175m31.000850,000.00850,000.00bBekistingm24.00074,000.00296,000.00cPembesian Ulirkg125.00010,800.001,350,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,505,000.008Tie Beam /m3aBeton Ready Mix, K-350m31.000933,000.00933,000.00bBekistingm26.50074,000.00481,000.00cPembesian Ulirkg220.00010,800.002,376,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,799,000.009Tie Beam /m3aBeton Ready Mix, K-300m31.000920,000.00920,000.00bBekistingm26.50074,000.00481,000.00cPembesian Ulirkg220.00010,800.002,376,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,786,000.0010Tie Beam /m3aBeton Ready Mix, K-275m31.000901,000.00901,000.00bBekistingm26.50074,000.00481,000.00cPembesian Ulirkg210.00010,800.002,268,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,659,000.0011Tie Beam /m3aBeton Ready Mix, K-250m31.000888,000.00888,000.00bBekistingm26.50074,000.00481,000.00cPembesian Ulirkg200.00010,800.002,160,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,538,000.0012Tie Beam /m3aBeton Ready Mix, K-225m31.000876,000.00876,000.00bBekistingm26.50074,000.00481,000.00cPembesian Ulirkg180.00010,800.001,944,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,310,000.0013Tie Beam /m3aBeton Ready Mix, K-175m31.000850,000.00850,000.00bBekistingm26.50074,000.00481,000.00cPembesian Ulirkg170.00010,800.001,836,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,176,000.0014Pelat Lantai /m3aBeton Ready Mix, K-350m31.000933,000.00933,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg90.00010,800.00972,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,841,000.0015Pelat Lantai /m3aBeton Ready Mix, K-300m31.000920,000.00920,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg90.00010,800.00972,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,828,000.0016Pelat Lantai /m3aBeton Ready Mix, K-275m31.000901,000.00901,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg90.00010,800.00972,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,809,000.0017Pelat Lantai /m3aBeton Ready Mix, K-250m31.000888,000.00888,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg90.00010,800.00972,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,796,000.0018Pelat Lantai /m3aBeton Ready Mix, K-225m31.000876,000.00876,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg80.00010,800.00864,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,676,000.0019Pelat Lantai /m3aBeton Ready Mix, K-175m31.000850,000.00850,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg80.00010,800.00864,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a2,650,000.0020Pelat Kantilever /m3aBeton Ready Mix, K-350m31.000933,000.00933,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg150.00010,800.001,620,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,489,000.0021Pelat Kantilever /m3aBeton Ready Mix, K-300m31.000920,000.00920,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg150.00010,800.001,620,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,476,000.0022Pelat Kantilever /m3aBeton Ready Mix, K-275m31.000901,000.00901,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg140.00010,800.001,512,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,349,000.0023Pelat Kantilever /m3aBeton Ready Mix, K-250m31.000888,000.00888,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg140.00010,800.001,512,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,336,000.0024Pelat Kantilever /m3aBeton Ready Mix, K-225m31.000876,000.00876,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg125.00010,800.001,350,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,162,000.0025Pelat Kantilever /m3aBeton Ready Mix, K-175m31.000850,000.00850,000.00bBekistingm28.500109,000.00926,500.00cPembesian Ulirkg125.00010,800.001,350,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,136,000.0026Balok Anak /m3aBeton Ready Mix, K-350m31.000933,000.00933,000.00bBekistingm28.000100,000.00800,000.00cPembesian Ulirkg275.00010,800.002,970,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a4,712,000.0027Balok Anak /m3aBeton Ready Mix, K-300m31.000920,000.00920,000.00bBekistingm28.000100,000.00800,000.00cPembesian Ulirkg275.00010,800.002,970,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a4,699,000.0028Balok Anak /m3aBeton Ready Mix, K-275m31.000901,000.00901,000.00bBekistingm28.000100,000.00800,000.00cPembesian Ulirkg250.00010,800.002,700,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a4,410,000.0029Balok Anak /m3aBeton Ready Mix, K-250m31.000888,000.00888,000.00bBekistingm28.000100,000.00800,000.00cPembesian Ulirkg240.00010,800.002,592,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a4,289,000.0030Balok Anak /m3aBeton Ready Mix, K-225m31.000876,000.00876,000.00bBekistingm28.000100,000.00800,000.00cPembesian Ulirkg150.00010,800.001,620,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,305,000.0031Balok Anak /m3aBeton Ready Mix, K-175m31.000850,000.00850,000.00bBekistingm28.000100,000.00800,000.00cPembesian Ulirkg150.00010,800.001,620,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,279,000.0032Balok Induk /m3aBeton Ready Mix, K-350m31.000933,000.00933,000.00bBekistingm29.000100,000.00900,000.00cPembesian Ulirkg300.00010,800.003,240,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a5,085,000.0033Balok Induk /m3aBeton Ready Mix, K-300m31.000920,000.00920,000.00bBekistingm29.000100,000.00900,000.00cPembesian Ulirkg300.00010,800.003,240,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a5,072,000.0034Balok Induk /m3aBeton Ready Mix, K-275m31.000901,000.00901,000.00bBekistingm29.000100,000.00900,000.00cPembesian Ulirkg275.00010,800.002,970,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a4,783,000.0035Balok Induk /m3aBeton Ready Mix, K-250m31.000888,000.00888,000.00bBekistingm29.000100,000.00900,000.00cPembesian Ulirkg250.00010,800.002,700,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a4,500,000.0036Balok Induk /m3aBeton Ready Mix, K-225m31.000876,000.00876,000.00bBekistingm28.000100,000.00800,000.00cPembesian Ulirkg175.00010,800.001,890,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a3,578,000.0037Balok Induk /m3aBeton Ready Mix, K-175m31.000850,000.00850,000.00bBekistingm28.000100,000.00800,000.00cPembesian Ulirkg175.00010,800.001,890,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a3,552,000.0038Kolom Beton /m3aBeton Ready Mix, K-350m31.000933,000.00933,000.00bBekistingm210.000100,000.001,000,000.00cPembesian Ulirkg350.00010,800.003,780,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a5,725,000.0039Kolom Beton /m3aBeton Ready Mix, K-300m31.000920,000.00920,000.00bBekistingm210.000100,000.001,000,000.00cPembesian Ulirkg350.00010,800.003,780,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a5,712,000.0040Kolom Beton /m3aBeton Ready Mix, K-275m31.000901,000.00901,000.00bBekistingm210.000100,000.001,000,000.00cPembesian Ulirkg300.00010,800.003,240,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a5,153,000.0041Kolom Beton /m3aBeton Ready Mix, K-250m31.000888,000.00888,000.00bBekistingm210.000100,000.001,000,000.00cPembesian Ulirkg275.00010,800.002,970,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a4,870,000.0042Kolom Beton /m3aBeton Ready Mix, K-225m31.000876,000.00876,000.00bBekistingm210.000100,000.001,000,000.00cPembesian Ulirkg225.00010,800.002,430,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a4,318,000.0043Kolom Beton /m3aBeton Ready Mix, K-175m31.000850,000.00850,000.00bBekistingm210.000100,000.001,000,000.00cPembesian Ulirkg225.00010,800.002,430,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a4,292,000.0044Tangga Beton /m3aBeton Ready Mix, K-350m31.000933,000.00933,000.00bBekistingm28.000115,000.00920,000.00cPembesian Ulirkg180.00010,800.001,944,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,806,000.0045Tangga Beton /m3aBeton Ready Mix, K-300m31.000920,000.00920,000.00bBekistingm28.000115,000.00920,000.00cPembesian Ulirkg180.00010,800.001,944,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,793,000.0046Tangga Beton /m3aBeton Ready Mix, K-275m31.000901,000.00901,000.00bBekistingm28.000115,000.00920,000.00cPembesian Ulirkg170.00010,800.001,836,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,666,000.0047Tangga Beton /m3aBeton Ready Mix, K-250m31.000888,000.00888,000.00bBekistingm28.000115,000.00920,000.00cPembesian Ulirkg160.00010,800.001,728,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,545,000.0048Tangga Beton /m3aBeton Ready Mix, K-225m31.000876,000.00876,000.00bBekistingm26.500115,000.00747,500.00cPembesian Ulirkg150.00010,800.001,620,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,253,000.0049Tangga Beton /m3aBeton Ready Mix, K-175m31.000850,000.00850,000.00bBekistingm26.500115,000.00747,500.00cPembesian Ulirkg150.00010,800.001,620,000.00dTambahan Upah Tk.Batu+Kenekht0.10090,000.009,000.00Jumlah.a3,227,000.0050Retaining Wall Beton /m3aBeton Ready Mix, K-350m31.000933,000.00933,000.00bBekistingm215.000131,000.001,965,000.00cPembesian Ulirkg200.00010,800.002,160,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a5,070,000.0051Retaining Wall Beton /m3aBeton Ready Mix, K-300m31.000920,000.00920,000.00bBekistingm215.000131,000.001,965,000.00cPembesian Ulirkg200.00010,800.002,160,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a5,057,000.0052Retaining Wall Beton /m3aBeton Ready Mix, K-275m31.000901,000.00901,000.00bBekistingm215.000131,000.001,965,000.00cPembesian Ulirkg180.00010,800.001,944,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a4,822,000.0053Retaining Wall Beton /m3aBeton Ready Mix, K-250m31.000888,000.00888,000.00bBekistingm215.000131,000.001,965,000.00cPembesian Ulirkg175.00010,800.001,890,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a4,755,000.0054Retaining Wall Beton /m3aBeton Ready Mix, K-225m31.000876,000.00876,000.00bBekistingm212.000131,000.001,572,000.00cPembesian Ulirkg150.00010,800.001,620,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a4,080,000.0055Retaining Wall Beton /m3aBeton Ready Mix, K-175m31.000850,000.00850,000.00bBekistingm212.000131,000.001,572,000.00cPembesian Ulirkg150.00010,800.001,620,000.00dTambahan Upah Tk.Batu+Kenekht0.12590,000.0011,250.00Jumlah.a4,054,000.0056Shear Wall Beton /m3aBeton Ready Mix, K-350m31.000933,000.00933,000.00bBekistingm212.000131,000.001,572,000.00cPembesian Ulirkg200.00010,800.002,160,000.00dTambahan Upah Tk.Batu+Kenekht0.15090,000.0013,500.00Jumlah.a4,679,000.0057Shear Wall Beton /m3aBeton Ready Mix, K-300m31.000920,000.00920,000.00bBekistingm212.000131,000.001,572,000.00cPembesian Ulirkg200.00010,800.002,160,000.00dTambahan Upah Tk.Batu+Kenekht0.15090,000.0013,500.00Jumlah.a4,666,000.0058Shear Wall Beton /m3aBeton Ready Mix, K-275m31.000901,000.00901,000.00bBekistingm212.000131,000.001,572,000.00cPembesian Ulirkg200.00010,800.002,160,000.00dTambahan Upah Tk.Batu+Kenekht0.15090,000.0013,500.00Jumlah.a4,647,000.0059Shear Wall Beton /m3aBeton Ready Mix, K-250m31.000888,000.00888,000.00bBekistingm212.000131,000.001,572,000.00cPembesian Ulirkg210.00010,800.002,268,000.00dTambahan Upah Tk.Batu+Kenekht0.15090,000.0013,500.00Jumlah.a4,742,000.0060Shear Wall Beton /m3aBeton Ready Mix, K-225m31.000876,000.00876,000.00bBekistingm212.000131,000.001,572,000.00cPembesian Ulirkg210.00010,800.002,268,000.00dTambahan Upah Tk.Batu+Kenekht0.15090,000.0013,500.00Jumlah.a4,730,000.0061Shear Wall Beton /m3aBeton Ready Mix, K-175m31.000850,000.00850,000.00bBekistingm212.000131,000.001,572,000.00cPembesian Ulirkg200.00010,800.002,160,000.00dTambahan Upah Tk.Batu+Kenekht0.15090,000.0013,500.00Jumlah.a4,596,000.00G.PEK.ATAP1Kuda-kuda Baja dgn WF/kgaBahan :-Baja WFkg1.1009,000.009,900.00-Genzet 20KVaunit0.00270,000.00140.00-Travo Lasunit0.00270,000.00140.00-Mesin Gurindaunit0.00150,000.0050.00-Mesin Borunit0.00150,000.0050.00-Mata Gerindabh0.00320,000.0060.00-Mata Borbh0.00325,000.0075.00-Kawat Laskg0.00320,000.0060.00Jumlah.a10,475.00bUpah Buat :-Kenek Bajaht0.02060,000.001,200.00-Tukang Bajaht0.02075,000.001,500.00-Mandor Bajaht0.007100,000.00700.00Jumlah.b3,400.00cUpah Erection :-Transportkg1.0001,047.501,047.50-Kenek Bajaht0.01060,000.00600.00-Tukang Bajaht0.00575,000.00375.00-Mandor Bajaht0.002100,000.00200.00Jumlah.c2,222.50Jumlah.a+b+c16,100.002Kuda-kuda Baja dgn Siku/kgaBahan :-Baja Sikukg1.1007,500.008,250.00-Genzet 20KVaunit0.00270,000.00140.00-Travo Lasunit0.00270,000.00140.00-Mesin Gurindaunit0.00150,000.0050.00-Mesin Borunit0.00150,000.0050.00-Mata Gerindabh0.00320,000.0060.00-Mata Borbh0.00325,000.0075.00-Kawat Laskg0.00320,000.0060.00Jumlah.a8,825.00bUpah Buat :-Kenek Bajaht0.02060,000.001,200.00-Tukang Bajaht0.02075,000.001,500.00-Mandor Bajaht0.007100,000.00700.00Jumlah.b3,400.00cUpah Erection+Transport :-Transportkg1.000882.50882.50-Kenek Bajaht0.01060,000.00600.00-Tukang Bajaht0.00575,000.00375.00-Mandor Bajaht0.002100,000.00200.00Jumlah.c2,057.50Jumlah.a+b+c14,300.003Gording Baja CNP/kgaBahan :-Baja CNPkg1.1008,000.008,800.00-Genzet 20KVaunit0.00270,000.00140.00-Travo Lasunit0.00270,000.00140.00-Mesin Gurindaunit0.00150,000.0050.00-Mesin Borunit0.00150,000.0050.00-Mata Gerindabh0.00320,000.0050.00-Mata Borbh0.00325,000.0062.50-Kawat Laskg0.00320,000.0050.00-Baut dia 12mm-1"bh0.1501,500.00225.00Jumlah.a9,567.50bUpah Buat :-Kenek Bajaht0.02060,000.001,200.00-Tukang Bajaht0.02075,000.001,500.00-Mandor Bajaht0.007100,000.00700.00Jumlah.b3,400.00cUpah Erection+Transport :-Transportkg1.000956.75956.75-Kenek Bajaht0.01060,000.00600.00-Tukang Bajaht0.00575,000.00375.00-Mandor Bajaht0.002100,000.00200.00Jumlah.c2,131.75Jumlah.a+b+c15,100.00H.PEK.LANTAI1Urugan Tanah Lantai/m3(Tanah Dari Dalam)aBahan :-Tanah Urugm30.00080,000.000.00Jumlah.a0.00bUpah :-Mengurug Tanah Padatm31.25023,000.0028,750.00-Pemadatan Tanah 2X, Menggunakan : Mesin Stamperm26.00027,000.00162,000.00Jumlah.b190,750.00Jumlah.a+b191,000.002Urugan Tanah Lantai/m3(Tanah Dari Luar)aBahan :-Tanah Urugm31.25080,000.00100,000.00Jumlah.a100,000.00bUpah :-Mengurug Tanah Padatm31.25023,000.0028,750.00-Pemadatan Tanah 2X, Menggunakan : Mesin Stamperm26.00027,000.00162,000.00Jumlah.b190,750.00Jumlah.a+b291,000.003Pemadatan Tanah Lantai/m2(Dgn Mesin Stamper)aUpah :-Pemadatan Tanah 2X, Menggunakan : Mesin Stamperm22.00027,000.0054,000.00Jumlah.a54,000.00bAlat :-Mesin Stamperm30.05360,000.003,198.00Jumlah.b3,198.00Jumlah.a+b58,000.004Rabat Beton T.5cm/m2, Tanpa TulangaBahan :-Beton 1Pc:3psr:5Splm30.050766,000.0038,300.00Jumlah.a38,300.00bUpah :-Kenekht0.10040,000.004,000.00-Tk.Batu Halusht0.05055,000.002,750.00-Kep.Tukanght0.01060,000.00600.00-Mandor batuht0.00365,000.00216.67Jumlah.b7,566.67Jumlah.a+b46,000.005Rabat Beton T.7cm/m2, Tanpa TulangaBahan :-Beton 1Pc:3psr:5Splm30.070766,000.0053,620.00Jumlah.a53,620.00bUpah :-Kenekht0.15040,000.006,000.00-Tk.Batu Halusht0.07555,000.004,125.00-Kep.Tukanght0.01560,000.00900.00-Mandorht0.00565,000.00325.00Jumlah.b11,350.00Jumlah.a+b65,000.006Plat Duiker Pintu Masuk L.Sal.0,50M/m'(Tebal Plat 10cm)aBeton 1Pc:2Psr:3Splm30.070813,000.0056,910.00bBekisting Papanm20.500191,000.0095,500.00cBesi dia 10mm, 2 Lapis Jarak 15cmkg9.50210,200.0096,920.40dBesi dia 8mm, 2 Lapis Jarak 20cmkg2.60710,200.0026,591.40Jumlah.a276,000.007Plat Duiker Pintu Masuk L.0,75M/m'(Tebal Plat 12,5cm)aBeton 1Pc:2Psr:3Splm30.119813,000.0096,503.10bBekisting Papanm20.750191,000.00143,250.00cBesi dia 10mm, 2 Lapis Jarak 12,5cmkg10.85910,200.00110,763.84dBesi dia 8mm, 2 Lapis Jarak 20cmkg2.60710,200.0026,591.40Jumlah.a378,000.008Plat Duiker Pintu Masuk L.1,00M/m'(Tebal Plat 15cm)aBeton 1Pc:2Psr:3Splm30.180813,000.00146,340.00bBekisting Papanm21.000191,000.00191,000.00cBesi dia 10mm, 2 Lapis Jarak 10cmkg16.28910,200.00166,145.76dBesi dia 8mm, 2 Lapis Jarak 15cmkg5.21410,200.0053,182.80Jumlah.a557,000.00

&L&"Arial Black,Bold"&11WIJAYA TARA ESTETIKA&"Bradley Hand ITC,Italic"Berkarya untuk estetika&R&"Bookman Old Style,Bold Italic"&11PROGRAM ANALISAHARGA SATUAN PEKERJAAN&L&"Arial Narrow,Bold"&11DAFTAR ANALISA HARGA SATUAN PEKERJAAN&C&11 &"Helv,Italic"Page &P of &N&R&"Arial Narrow,Bold"&11STANDAR&L&"Arial Black,Bold"&11WIJAYA TARA ESTETIKA&"Bradley Hand ITC,Italic"Berkarya untuk estetika&R&"Bookman Old Style,Bold Italic"&11PROGRAM ANALISAHARGA SATUAN PEKERJAAN&L&"Arial Narrow,Bold"&11DAFTAR ANALISA HARGA SATUAN PEKERJAAN&C&11 Page &P of &N&R&"Arial Narrow,Bold"&11STANDAR PROYEK WTE&"Book Antiqua,Italic"ESTIMATE : Ir. Leonardy Wijaya

Rekapitulasi H S PJakarta, November 2008Perihal: Rekapitulasi Harga Satuan PekerjaanBangunan: Rumah TinggalKlasifikasi: MenengahProyek: RenovasiLokasi: JAKARTAWilayah: JABODETABEKREKAPITULASI DAFTAR HARGA SATUAN PEK.STRUKTURKesimpulanNoUraian PekerjaanSatMaterialSpek.RingkasHarga SatuanHalamanRp.I.STRUKTURA.PEK. PERSIAPAN1Pembersihan Lapanganm2Rp4,000.002Pas.Bouwplankm'Papan & KasoRp50,000.00B.PEK.TANAH1Galian Tanahm3Dalam max.1,00MRp46,000.002Urugan Tanah kembalim3Rp23,000.003Perataan Tanahm2Rp5,000.004Pemadatan Tanah, Manualm2Timbrisan ManualRp16,000.005Pemadatan Tanah, Mesinm2Timbrisan MesinRp27,000.006Urugan Pasir Pondasim3Urug DaratRp166,000.007Urugan Tanah Dari Luar lokasim3TanahRp112,000.008Urugan Sirtu Dari Luar lokasim3SirtuRp196,000.009Buang Tanah Ke Luar lokasim3Rp32,000.00C.PEK. PONDASIC.1.PEK. PONDASI DANGKAL1Pondasi Batu Kali, 1 : 4m3Ps. Batu KaliRp513,000.002Pondasi Batu Kali, 1 : 5m3Ps. Batu KaliRp502,000.003Pas. Rollag Bata, 1 : 4m3Ps. Rollag BataRp633,000.004Pas. Rollag Bata, 1 : 5m3Ps. Rollag BataRp583,000.005Pas. Batako Kapur, 1 : 3m3Ps. Batako KapurRp78,000.006Pas. Batako Kapur, 1 : 4m3Ps. Batako KapurRp74,000.007Pas. Batako Kapur, 1 : 5m3Ps. Batako KapurRp70,000.008Pas. Batako Kapur, 1 : 6m3Ps. Batako KapurRp69,000.00C.2.PEK. PONDASI DALAM1Pengeboran D50 cm & D60 cmm'Bored PilePondasi DalamRp88,000.002Pengeboran D70 cm - D100 cmm'Bored PilePondasi DalamRp91,000.003Pengeboran D110 cmm'Bored PilePondasi DalamRp93,000.004Pengeboran D120 cm & D150 cmm'Bored PilePondasi DalamRp103,000.005Beton Ready Mix K-350, D50 cmm3Bored PilePondasi DalamRp931,000.006Beton Ready Mix K-350, D60 cmm3Bored PilePondasi DalamRp868,000.007Beton Ready Mix K-350, D70 cm - D100 cmm3Bored PilePondasi DalamRp805,000.008Beton Ready Mix K-350, D120 cm & D150 cmm3Bored PilePondasi DalamRp773,000.009Pembesian Bored PilekgBored PilePondasi DalamRp11,000.0010Pondasi Tiang Pancang, Mini Pile 28m'M 28Drop HammerRp85,000.0011Pondasi Tiang Pancang, Mini Pile 32m'M 32Drop HammerRp97,000.0012Pondasi Tiang Pancang, Square Pile 20x20m'SQ 20X20Drop HammerRp87,000.0013Pondasi Tiang Pancang, Square Pile 25x25m'SQ 25X25Drop HammerRp127,000.0014Pondasi Tiang Pancang, Square Pile 20x20m'SQ 20X20Jack In PilesRp138,000.0015Pondasi Tiang Pancang, Square Pile 30x30m'SQ 30X30Drop HammerRp571,000.0016Pondasi Tiang Pancang, Square Pile 35x35m'SQ 35X35Drop HammerRp835,000.0017Pondasi Tiang Pancang, Square Pile 40x40m'SQ 40X40Drop HammerRp1,121,000.0018Pondasi Tiang Pancang, Square Pile 45x45m'SQ 45X45Drop HammerRp1,385,000.0019Pondasi Tiang Pancang, Square Pile 50x50m'SQ 50X50Drop HammerRp1,688,000.0020Pondasi Tiang Pancang, Spun Pile 30x30m'SP 30X30Drop HammerRp257,000.0021Pondasi Tiang Pancang, Spun Pile 35x35m'SP 35X35Drop HammerRp304,000.0022Pondasi Tiang Pancang, Spun Pile 40x40m'SP 40X40Drop HammerRp376,000.0023Pondasi Tiang Pancang, Spun Pile 45x45m'SP 45X45Drop HammerRp444,000.0024Pondasi Tiang Pancang, Spun Pile 50x50m'SP 50X50Drop HammerRp541,000.0025Pondasi Tiang Pancang, Spun Pile 60x60m'SP 60X60Drop HammerRp678,000.0026Bobok Kepala Tiang < d30, Tiang SolidttkM, SQTiang PancangRp28,000.0027Bobok Kepala Tiang d30-d40, Tiang SolidttkM, SQTiang PancangRp40,000.0028Bobok Kepala Tiang d45-d50, Tiang SolidttkM, SQTiang PancangRp52,000.0029Bobok Kepala Tiang d30-d40, Tiang SpunttkSPTiang PancangRp31,000.0030Bobok Kepala Tiang d45-d60, Tiang SpunttkSPTiang PancangRp40,000.0031Bobok Kepala Tiang d30-d40, Tiang BorttkBored PileBored PileRp40,000.0032Bobok Kepala Tiang d50-d60, Tiang BorttkBored PileBored PileRp52,000.0033Bobok Kepala Tiang d70-d100, Tiang BorttkBored PileBored PileRp56,000.0034Bobok Kepala Tiang d110, Tiang BorttkBored PileBored PileRp59,000.0035Bobok Kepala Tiang d120-d150, Tiang BorttkBored PileBored PileRp70,000.0036Bobok Kepala Tiang > d150, Tiang BorttkBored PileBored PileRp82,000.00D.PEK. MORTAR & BETON1Spesi 1:3m3Pasir PasangRp201,000.002Spesi 1:4m3Pasir PasangRp174,000.003Spesi 1:5m3Pasir PasangRp163,000.004Spesi 1:6m3Pasir PasangRp153,000.005Beton Site Mix 1Pc:1,5Psr:2,5Seplitm3Uk: 2/3Beton.Site MixRp826,000.006Beton Site Mix 1Pc:2Psr:3Seplitm3Uk: 2/3Beton.Site MixRp813,000.007Beton Site Mix 1Pc:3Psr:5Seplitm3Uk: 2/3Beton.Site MixRp766,000.008Beton Ready Mix K.350m3Beton.Ready MixRp933,000.009Beton Ready Mix K.300m3Beton.Ready MixRp920,000.0010Beton Ready Mix K.275m3Beton.Ready MixRp901,000.0011Beton Ready Mix K.250m3Beton.Ready MixRp888,000.0012Beton Ready Mix K.225m3Beton.Ready MixRp876,000.0013Beton Ready Mix K.175m3Beton.Ready MixRp850,000.00E.PEK. BEKISTING & PEMBESIAN1Bekisting Poer dgn Triplex 9mmm21,21x2,42Tripleks 9mmRp110,000.002Bekisting Poer dgn Triplex 12mmm21,21x2,42Tripleks 12mmRp120,000.003Bekisting Sloof dgn Triplex 9mmm21,21x2,42Tripleks 9mmRp110,000.004Bekisting Sloof dgn Triplex 12mmm2"Tripleks 12mmRp120,000.005Bekisting Kolom dgn Triplex 9mmm21,21x2,42Tripleks 9mmRp190,000.006Bekisting Kolom dgn Triplex 12mmm2"Tripleks 12mmRp200,000.007Bekisting Balok dgn Triplex 9mmm21,21x2,42Tripleks 9mmRp190,000.008Bekisting Balok dgn Triplex 12mmm2"Tripleks 12mmRp200,000.009Bekisting Plat dgn Triplex 9mmm21,21x2,42Tripleks 9mmRp208,000.0010Bekisting Plat dgn Triplex 12mmm2"Tripleks 12mmRp218,000.0011Bekisting Tangga dgn Triplex 9mmm21,21x2,42Tripleks 9mmRp220,000.0012Bekisting Tangga dgn Triplex 12mmm2"Tripleks 12mmRp230,000.0013Bekisting Beton Praktism22x20cmKolom & RingbalkRp191,000.0014Pembesian Poloskg12,00mBJTP.U.24Rp10,200.0015Pembesian Ulirkg12,00mBJTD.U.39Rp10,800.00F.PEK. BETON BERTULANG1Beton Praktism3Beton.1Pc:2Psr:3SplRp2,258,000.002Pile Cap, K-350m3K-350Beton.Ready MixRp2,858,000.003Pile Cap, K-300m3K-300Beton.Ready MixRp2,845,000.004Pile Cap, K-275m3K-275Beton.Ready MixRp2,718,000.005Pile Cap, K-250m3K-250Beton.Ready MixRp2,651,000.006Pile Cap, K-225m3K-225Beton.Ready MixRp2,585,000.007Pile Cap, K-175m3K-175Beton.Ready MixRp2,505,000.008Tie Beam, K-350m3K-350Beton.Ready MixRp3,799,000.009Tie Beam, K-300m3K-300Beton.Ready MixRp3,786,000.0010Tie Beam, K-275m3K-275Beton.Ready MixRp3,659,000.0011Tie Beam, K-250m'K-250Beton.Ready MixRp3,538,000.0012Tie Beam, K-225m'K-225Beton.Ready MixRp3,310,000.0013Tie Beam, K-175m'K-175Beton.Ready MixRp3,176,000.0014Pelat Lantai, K-350m3K-350Beton.Ready MixRp2,841,000.0015Pelat Lantai, K-300m3K-300Beton.Ready MixRp2,828,000.0016Pelat Lantai, K-275m3K-275Beton.Ready MixRp2,809,000.0017Pelat Lantai, K-250m'K-250Beton.Ready MixRp2,796,000.0018Pelat Lantai, K-225m'K-225Beton.Ready MixRp2,676,000.0019Pelat Lantai, K-175m'K-175Beton.Ready MixRp2,650,000.0020Pelat Kantilever, K-350m3K-350Beton.Ready MixRp3,489,000.0021Pelat Kantilever, K-300m3K-300Beton.Ready MixRp3,476,000.0022Pelat Kantilever, K-275m3K-275Beton.Ready MixRp3,349,000.0023Pelat Kantilever, K-250m'K-250Beton.Ready MixRp3,336,000.0024Pelat Kantilever, K-225m'K-225Beton.Ready MixRp3,162,000.0025Pelat Kantilever, K-175m'K-175Beton.Ready MixRp3,136,000.0026Balok Anak, K-350m3K-350Beton.Ready MixRp4,712,000.0027Balok Anak, K-300m3K-300Beton.Ready MixRp4,699,000.0028Balok Anak, K-275m3K-275Beton.Ready MixRp4,410,000.0029Balok Anak, K-250m'K-250Beton.Ready MixRp4,289,000.0030Balok Anak, K-225m'K-225Beton.Ready MixRp3,305,000.0031Balok Anak, K-175m'K-175Beton.Ready MixRp3,279,000.0032Balok Induk, K-350m3K-350Beton.Ready MixRp5,085,000.0033Balok Induk, K-300m3K-300Beton.Ready MixRp5,072,000.0034Balok Induk, K-275m3K-275Beton.Ready MixRp4,783,000.0035Balok Induk, K-250m'K-250Beton.Ready MixRp4,500,000.0036Balok Induk, K-225m'K-225Beton.Ready MixRp3,578,000.0037Balok Induk, K-175m'K-175Beton.Ready MixRp3,552,000.0038Kolom Beton, K-350m3K-350Beton.Ready MixRp5,725,000.0039Kolom Beton, K-300m3K-300Beton.Ready MixRp5,712,000.0040Kolom Beton, K-275m3K-275Beton.Ready MixRp5,153,000.0041Kolom Beton, K-250m3K-250Beton.Ready MixRp4,870,000.0042Kolom Beton, K-225m3K-225Beton.Ready MixRp4,318,000.0043Kolom Beton, K-175m3K-175Beton.Ready MixRp4,292,000.0044Tangga Beton, K-350m3K-350Beton.Ready MixRp3,806,000.0045Tangga Beton, K-300m3K-300Beton.Ready MixRp3,793,000.0046Tangga Beton, K-275m3K-275Beton.Ready MixRp3,666,000.0047Tangga Beton, K-250m3K-250Beton.Ready MixRp3,545,000.0048Tangga Beton, K-225m3K-225Beton.Ready MixRp3,253,000.0049Tangga Beton, K-175m3K-175Beton.Ready MixRp3,227,000.0050Retaining Wall Beton, K-350m3K-350Beton.Ready MixRp5,070,000.0051Retaining Wall Beton, K-300m3K-300Beton.Ready MixRp5,057,000.0052Retaining Wall Beton, K-275m3K-275Beton.Ready MixRp4,822,000.0053Retaining Wall Beton, K-250m3K-250Beton.Ready MixRp4,755,000.0054Retaining Wall Beton, K-225m3K-225Beton.Ready MixRp4,080,000.0055Retaining Wall Beton, K-175m3K-175Beton.Ready MixRp4,054,000.0056Shear Wall Beton, K-350m3K-350Beton.Ready MixRp4,679,000.0057Shear Wall Beton, K-300m3K-300Beton.Ready MixRp4,666,000.0058Shear Wall Beton, K-275m3K-275Beton.Ready MixRp4,647,000.0059Shear Wall Beton, K-250m3K-250Beton.Ready MixRp4,742,000.0060Shear Wall Beton, K-225m3K-225Beton.Ready MixRp4,730,000.0061Shear Wall Beton, K-175m3K-175Beton.Ready MixRp4,596,000.00G.PEK.ATAP1Kuda-kuda Baja Dengan WFkgWFRp16,100.002Kuda-kuda Baja Dengan SikukgSikuRp14,300.003Gording Baja CNPkgCNPRp15,100.00H.PEK.LANTAI1Urugan Tanah Lantaim3Tanah Dari DalamRp191,000.002Urugan Tanah Lantaim3Tanah Dari LuarRp291,000.003Pemadatan Tanah Lantaim2Dgn Mesin StamperRp58,000.004Rabat Beton Bwh Pel.Lantai T.Tulangm2T.5cmBeton.1Pc:3Psr:5SplRp46,000.005Rabat Beton Bwh Pel.Lantai T.Tulangm2T.7cmBeton.1Pc:3Psr:5SplRp65,000.006Plat Duiker Pintu Masuk L.0,50mm'T.10cmBeton.1Pc:2Psr:3SplRp276,000.007Plat Duiker Pintu Masuk L.0,75mm'T.12,5cmBeton.1Pc:2Psr:3SplRp378,000.008Plat Duiker Pintu Masuk L.1,00mm'T.15cmBeton.1Pc:2Psr:3SplRp557,000.00

&L&"Arial Black,Bold"&11WIJAYA TARA ESTETIKA&"Helv,Regular"&"Bradley Hand ITC,Italic"Berkarya untuk estetika&R&"Bookman Old Style,Bold Italic"&11PROGRAM ANALISAHARGA SATUAN PEKERJAAN&L&"Arial Narrow,Bold"&11Rekapitulasi Harga Satuan Pekerjaan&C&11Page &P of &N&R&"Arial Narrow,Bold"&11STANDAR PROYEK WTE&"Helv,Regular"&"Book Antiqua,Italic"Estimate : Ir. Leonardy Wijaya&L&"Arial Black,Bold"&11WIJAYA TARA ESTETIKA&"Helv,Regular"&"Bradley Hand ITC,Italic"Berkarya untuk estetika&R&"Bookman Old Style,Bold Italic"&11PROGRAM ANALISAHARGA SATUAN PEKERJAAN&L&"Arial Narrow,Bold"&11Rekapitulasi Harga Satuan Pekerjaan&C&11Page &P of &N&R&"Arial Narrow,Bold"&11STANDAR PROYEK WTE&"Helv,Regular"&"Book Antiqua,Italic"Estimate : Ir. Leonardy Wijaya