59161240-DAFTAR-SPLN

36
BIDANG PEMBANGKIT No. SPLN No. 1 SPLN 19 : 1979 2 SPLN 20 : 1980 3 SPLN 20A : 1978 4 SPLN 21A : 1980 5 SPLN 22 : 1980 6 SPLN 23A : 1980 7 SPLN 23B : 1980 8 SPLN 23C : 1980 9 SPLN 23D : 1980 10 SPLN 23E : 1980 11 SPLN 23F : 1980 12 SPLN 23G : 1980 13 SPLN 23H : 1980 14 SPLN 24 : 1980 15 SPLN 25 : 1980

description

jjhhhhhh

Transcript of 59161240-DAFTAR-SPLN

Page 1: 59161240-DAFTAR-SPLN

BIDANG PEMBANGKITANNo. SPLN No.

1 SPLN 19 : 1979

2 SPLN 20 : 1980

3 SPLN 20A : 1978

4 SPLN 21A : 1980

5 SPLN 22 : 1980

6 SPLN 23A : 1980

7 SPLN 23B : 1980

8 SPLN 23C : 1980

9 SPLN 23D : 1980

10 SPLN 23E : 1980

11 SPLN 23F : 1980

12 SPLN 23G : 1980

13 SPLN 23H : 1980

14 SPLN 24 : 1980

15 SPLN 25 : 1980

Page 2: 59161240-DAFTAR-SPLN

16 SPLN 30 : 1980

17 SPLN 32 S1 : 1984

18 SPLN 32 : 1980

19 SPLN 33 : 1980

20 SPLN 34-1 : 1980

21 SPLN 34A : 1980

22 SPLN 34B : 1980

23 SPLN 34C : 1980

24 SPLN 34D : 1980

25 SPLN 34E : 1980

26 SPLN 35 : 1981

27 SPLN 35A : 1980

28 SPLN 38 : 1980

29 SPLN 44 : 1981

30 SPLN 46-1 : 1981

Page 3: 59161240-DAFTAR-SPLN

31 SPLN 46-2 : 1981

32 SPLN 46-3 : 1982

33 SPLN 47-1 S1 : 1984

34 SPLN 47-1 : 1981

35 SPLN 47-2 : 1982

36 SPLN 47-3 : 1986

37 SPLN 47-4 : 1983

38 SPLN 47-4 : 1984

39 SPLN 47-5 : 1986

40 SPLN 48 : 1981

41 SPLN 51 : 1982

42 SPLN 53 : 1983

43 SPLN 58 : 1984

44 SPLN 62-1 : 1986

45 SPLN 62-2 : 1987

46 SPLN 73 : 1987

Page 4: 59161240-DAFTAR-SPLN

47 SPLN 79 : 1987

48 SPLN 80 : 1989

49 SPLN 85 : 1990

50 SPLN 86-2 : 1992

51 SPLN 86 : 1990

52 SPLN 89-1 : 1991

53 SPLN 89-2 : 1994

54 SPLN 90-2-1 : 1995

55 SPLN 90 : 1990

56 SPLN 111-1 : 1994

57 SPLN 111-4 : 1995

58 SPLN 112 : 1994

59 SPLN 68-1A : 1986

Page 5: 59161240-DAFTAR-SPLN

BIDANG PEMBANGKITANJUDUL

PEMBAKUAN PERALATAN LABORATORIUM PLTU

PEDOMAN PENERAPAN UNTUK KOMISIONING, PENGUSAHAANDAN PEMELIHARAN TURBIN AIR

GUIDE FOR COMISSIONING, OPERATION AND MAINTENANCE OFHYDROLIC TURBINES

INTERNATIONAL CODE FOR THE FIELD ACCEPTANCE TESTS OFHYDROLIC TURBINES

IKHTISAR PERENCANAAN DAN HAL-HAL YANG PERLU DIPERHATIPADA BLOK PONDASI UNTUK MESIN DIESEL MENURUT BSI CP2021 : PART 1

RECIPROCATING INTERNAL COMBUSTION ENGINES - DEFINITIONSOF LOCATIONS ON AN ENGINE

RECIPROCATING INTERNAL COMBUSTION ENGINES - VOCABULARY

RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCEPART 1 : STANDARD REFERENCE CONDITIONS AND DECLARATIONS OF POWER, FUEL CONSUMPTION AND LUBRICATING OIL CONSUMPTION

RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCEPART 2 : TEST METHODS

RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCEPART 3 : TEST MEASUMENTS

RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCEPART 4 : SPEED GOVERNING

RECIPROCATING INTERNAL COMBUSTION ENGINES - DESIGNATIONOF THE DIRECTION OF ROTATION

RECIPROCATING INTERNAL COMBUSTION ENGINES - DESIGNATIONOF THE CYLINDERS

GUIDE FOR COMISSIONING, OPERATION AND MAINTENANCE OFDIESEL ENGINES

PEDOMAN PENERAPAN UNTUK KOMISIONING, PENGUSAHAAN DANPEMELIHARAAN MESIN DIESEL.

Page 6: 59161240-DAFTAR-SPLN

PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA KIMIA AIR

SUPLEMEN PERTAMA SPLN 32 1980PEMBAKUAN KAPASITAS SATUAN PEMBANGKIT DIESEL DAN KAPASITASPUSAT LISTRIK TENAGA DIESEL

PEMBAKUAN KAPASITAS SATUAN PEMBANGKIT DIESEL DAN KAPASITAS PUSAT LISTRIK TENAGA DIESEL

PEDOMAN PENERAPAN PUBLIKASI IEC 34 MESIN LISTRIK YANG BERPUTARBAGIAN 1 : PUBLIKASI 34-1 S/D 34-5

ROTATING ELECTRICAL MACHINESPART 1 : RATING AND PERFORMANCE

ROTATING ELECTRICAL MACHINESPART 2 : METHODS OF DETERMINING LOSSES AND EFFICIENCY OF ROTATING ELECTRICAL MACHINERY FROM TESTS ( EXCLUDING MACHINES FOR TRACTION VEHICLES )

ROTATING ELECTRICAL MACHINESPART 3 : RATINGS AND CHARACTERISTICS OF THREE PHASE, 50 HZ TURBINE TYPE MACHINES

RECOMMENDATIONS FOR ROTATING ELECTRICAL MACHINERY (EXCLUDING MACHINES FOR TRACTION VEHICLESPART 4 : METHODS FOR DETERMINING FOR SYNCHRONOUS MACHINE QUANTITIES FROM TESTS

ROTATING ELECTRICAL MACHINESPART 5 : DEGREES OF PROTECTION BY ENCLOSERS FOR ROTATING MACHINERY

PEDOMAN PENERAPAN PUBLIKASI IEC 193 (1965) DAN 193A (1972)

INTERNATIONAL CODE FOR MODEL ACCEPTANCE TESTS OF HYDROLIC TURBINESFIRST SUPPLEMENT TO PUBLICATION 193 (1965)

PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA MINYAKPELUMAS

PEDOMAN PENERAPAN METODA ASME UNTUK ANALISA GAS BUANG

PEDOMAN PEMBATASAN TINGKAT BISINGBAGIAN 1 : TINGKAT BISING DI TEMPAT KERJA

Page 7: 59161240-DAFTAR-SPLN

PEDOMAN PEMBATASAN TINGKAT BISINGBAGIAN 2 : TINGKAT BISING PUSAT LISTRIK TERHADAP LINGKUNGAN

PEDOMAN PEMBATASAN TINGKAT BISINGBAGIAN 3 : PEDOMAN PENGUKURAN TINGKAT BISING DI-TEMPAT KERJA DAN TINGKAT BISING LINGKUNGAN

SUPLEMEN PERTAMA SPLN 47-1 : 1981 PEMBAKUAN PLTDBAGIAN 1 : PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG

PEMBAKUAN PLTDBAGIAN 1 : PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG

PEMBAKUAN PLTDBAGIAN 2 : PLTD BESAR

PEMBAKUAN PLTDBAGIAN 3 : GENERATOR

PEMBAKUAN PLTDBAGIAN 4 : KONTROL DAN PENGAMANA. BAGIAN MEKANIS UNTUK PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG

PEMBAKUAN PLTDBAGIAN 4 : KONTROL DAN PENGAMANC. PLTD BESAR

PEMBAKUAN PLTDBAGIAN 5 : UJI SIAP GUNA

PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA BATUBARA

PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA BAHAN BAKAR GAS ALAM

PEDOMAN PENERAPAN STANDAR ISO 3744 DAN 3746MENENTUKAN TINGKAT DAYA BUNYI SUMBER BISING

KOMISIONING PLTG

STANDAR OPERASI PUSAT LISTRIK TENAGA UAPBAGIAN SATU : POLA PENGUSAHAAN

STANDAR OPERASI PUSAT LISTRIK TENAGA UAPBAGIAN DUA : FAKTOR-FAKTOR PENGUSAHAAN

KOMISIONING JARINGAN

Page 8: 59161240-DAFTAR-SPLN

STANDAR OPERASI PUSAT LISTRIK TENAGA DIESEL

STANDAR OPERASI PUSAT LISTRIK TENAGA GAS

KOMISIONING KETEL UAP

KOMISIONING TURBIN UAP PUSAT LISTRIKBAGIAN 2 : PERHITUNGAN UNJUK KERJA TURBIN UAP

KOMISIONING TURBIN UAP PUSAT LISTRIKBAGIAN 1 : UMUM

GETARAN MESIN PEMBANGKITBAGIAN 1 : PEMANTAUAN GETARAN MESIN PEMBANGKIT DALAM KONDISI OPERASI NORMAL

GETARAN MESIN PEMBANGKITBAGIAN 2 : IDENTIFIKASI GETARAN TIDAK NORMAL PADA MESIN PEMBANGKIT

KOMISIONING PLTABAGIAN 2-1 : PEDOMAN PENGUJIAN PRAJALAN TURBIN AIR DAN PERALATAN BANTUNYA

KOMISIONING PLTA

MANAJEMEN PEMELIHARAAN PUSAT LISTRIKBAGIAN 1 : UMUM

MANAJEMEN PEMELIHARAAN PUSAT LISTRIKBAGIAN 4 : MANAJEMEN PEMELIHARAAN PLTD

AMBANG BATAS KUAT MEDAN LISTRIK DAN INDUKSI MEDAN MAGNITDIBAWAH SALURAN TEGANGAN TINGGI DAN EKSTRA TINGGI

TINGKAT JAMINAN SISTEM TENAGA LISTRIKBAGIAN SATU : SISTEM TENAGA HULU A. PEMBANGKITAN

Page 9: 59161240-DAFTAR-SPLN

BIDANG TRANSMISINo. SPLN No.

1 SPLN 2 : 1978

2 SPLN 7 : 1978

3 SPLN 7A : 1978

4 SPLN 7B : 1978

5 SPLN 7C : 1978

6 SPLN 7D : 1978

7 SPLN 8-1 : 1991

8 SPLN 8-2 : 1991

9 SPLN 8-3-1 : 1991

10 SPLN 8-3 : 1991

11 SPLN 8-4 : 1991

12 SPLN 8-5 : 1991

13 SPLN 9A : 1978

14 SPLN 9B : 1978

15 SPLN 9C : 1978

16 SPLN 9D : 1978

Page 10: 59161240-DAFTAR-SPLN

17 SPLN 9E : 1978

18 SPLN 9F : 1978

19 SPLN 9G : 1978

20 SPLN 10-1 : 1978

21 SPLN 10-1A : 1996

22 SPLN 10-1B : 1978

23 SPLN 10-1C : 1978

24 SPLN 10-1D : 1978

25 SPLN 10-1E-1 : 1996

26 SPLN 10-1E-2 : 1996

27 SPLN 10-1F : 1989

28 SPLN 10-2A : 1978

29 SPLN 10-2B : 1978

Page 11: 59161240-DAFTAR-SPLN

30 SPLN 10-3B : 1993

31 SPLN 10-4A : 1994

32 SPLN 10-4B : 1995

33 SPLN 10-4C : 1997

34 SPLN 11A : 1978

35 SPLN 11B : 1978

36 SPLN 11C : 1978

37 SPLN 11D : 1978

38 SPLN 13 : 1978

39 SPLN 15 : 1979

40 SPLN 16 : 1979

41 SPLN 17 : 1979

42 SPLN 17A : 1979

43 SPLN 18A : 1979

44 SPLN 18B : 1979

45 SPLN 31 : 1980

46 SPLN 37A : 1980

Page 12: 59161240-DAFTAR-SPLN

47 SPLN 49-1 : 1982

48 SPLN 49-1A : 1982

49 SPLN 49-1B : 1982

50 SPLN 49-2 : 1982

51 SPLN 52-1 : 1983

52 SPLN 52-1 : 1983

53 SPLN 52-2 : 1985

54 SPLN 52-3 : 1983

55 SPLN 61 : 1997

56 SPLN 65 : 1985

57 SPLN 73 : 1987

58 SPLN 78 : 1987

59 SPLN 82-1 : 1991

60 SPLN 82-2 : 1991

61 SPLN 82-3 : 1993

62 LAMPIRANSPLN 82-3 : 1993

Page 13: 59161240-DAFTAR-SPLN

63 SPLN 100-3 : 1993

64 SPLN 112 : 1994

65 SPLN 119 : 1996

66 SPLN 120 : 1996

67 SPLN 121 : 1996

SPLN 68-1B : 1986

Page 14: 59161240-DAFTAR-SPLN

BIDANG TRANSMISIJUDUL

PENTANAHAN NETRAL SISTEM TRANSMISI, SUB-TRANSMISIDAN DISTRIBUSI BESERTA PENGAMANANNYA

PEDOMAN PEMILIHAN TINGKAT ISOLASI TRANSFORMATORDAN PENANGKAP PETIR

KOORDINASI ISOLASIBAGIAN 1 : ISTILAH, DEFINISI,PRINSIP DAN KETENTUAN

KOORDINASI ISOLASIBAGIAN 2 : PEDOMAN APLIKASI

LIGHTNING ARRESTERPART 1 : NON LINEAR RESISTOR TYPE ARRESTER FOR AC SYSTEM

RECOMMENDATIONS FOR LIGHTNING ARRESTERSPART 1 : NON LINEAR RESISTOR -TYPE ARRESTERS

TRANSFORMATOR TENAGABAGIAN 1 : UMUM

TRANSFORMATOR TENAGABAGIAN 2 : KENAIKAN SUHU

TRANSFORMATOR TENAGABAGIAN 3-1 : TINGKAT ISOLASI DAN UJI DIELEKTRIK JARAK BEBAS LUAR DI UDARA

TRANSFORMATOR TENAGABAGIAN 3 : TINGKAT ISOLASI DAN UJI DIELEKTRIK

TRANSFORMATOR TENAGABAGIAN 4 : SADAPAN DAN HUBUNGAN

TRANSFORMATOR TENAGABAGIAN 5 : KEMAMPUAN MENAHAN HUBUNG SINGKAT

HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERSPART 1 : GENERAL AND DEFINITIONS

HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERSPART 2 : RATING

HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERSPART 3 : DESIGN AND CONSTRUCTION

HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS

Page 15: 59161240-DAFTAR-SPLN

PART 4 : TYPE TESTS AND ROUTINE TESTS

HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERSPART 4 : TYPE TESTS AND ROUTINE TESTSAPPENDIX E- : METHODS OF DETERMINING PROSPECTIVE TRANSIENT RECOVERY VOLTAGE WAVES

HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERSPART 5 : RULES FOR THE SELECTION OF CIRCUIT BREAKERS FOR SERVICE

HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERSPART 6 : INFORMATION TO BE GIVEN WITH ENQUIRIES,TENDERS AND ORDERS RULES FOR TRANSPORT, ERECTION AND MAINTENANCE

KETENTUAN TENTANG JENIS DAN UKURAN ISOLATOR YANG DIPILIH

ISOLATOR RENTENG JENIS KAP DAN PIN

DIMENSI BOLA DAN KOPLING SENDI DARI UNIT (SATUAN)ISOLATOR RENTENGAN

LOCKING DEVICES FOR BALL AND SOCKET COUPLINGS OFSTRING INSULATOR UNITSPART 1 : DIMENSIONS AND GENERAL RULES

LOCKING DEVICES FOR BALL AND SOCKET COUPLINGS OFSTRING INSULATOR UNITSPART 2 : TESTS

ISOLATOR UNTUK SALURAN UDARA DENGAN TEGANGAN NOMINAL DIATAS 1000 VOLTBAGIAN 1 : UNIT ISOLATOR KERAMIK ATAU GELAS UNTUK SISTEM ARUS BOLAK BALIK, DEFINISI ,METODE UJI DAN KRITERIA SERAH TERIMA.

ISOLATOR UNTUK SALURAN UDARA DENGAN TEGANGAN NOMINAL DIATAS 1000 VOLTBAGIAN 2 : RENTENGAN ISOLATOR DAN SET ISOLATOR UNTUK SISTEM ARUS BOLAK BALIK, DEFINISI ,METODE UJI DAN KRITERIA SERAH TERIMA.

PENGUJIAN TEGANGAN IMPULS HUBUNG PADA ISOLATOR TEGANGAN TINGGI

TEST ON INDOOR AND OUTDOOR POST INSULATORS FORSYSTEM WITH NOMINAL VOLTAGE GREATER THAN 1000V

DIMENSIONS OF INDOOR AND OUTDOOR POST INSULATORS

Page 16: 59161240-DAFTAR-SPLN

AND POST INSULATOR UNITS FOR SYSTEMS WITH NOMINALVOLTAGES GREATER THAN 1000 V

TINGKAT INTENSITAS POLUSI SEHUBUNGAN DENGAN PEDOMANPEMILIHAN ISOLATOR

ISOLATOR TONGGAK PIN (PIN POST) UNTUK SALURAN UDARATEGANGAN MENENGAH 20 kV

ISOLATOR TONGGAK SALURAN UNTUK SALURAN UDARATEGANGAN MENENGAH 20 kV

ISOLATOR PIN UNTUK SALURAN UDARA TEGANGAN MENENGAH 20 kV

HIGH VOLTAGE TEST TECHNIQUESPART 1 : GENERAL DEFINITIONS AND TEST REQUIREMENTS

HIGH VOLTAGE TEST TECHNIQUESPART 2 : TEST PROCEDURES

HIGH VOLTAGE TEST TECHNIQUESPART 3 : MEASURING DEVICES

REKOMENDASI PENGUKURAN TEGANGAN DENGAN MENGGUNAKAN SELA BOLA (SATU BOLA DITANAHKAN)

KRITERIA DASAR BAGI PERENCANAAN SALURAN UDARA TEGANGAN TINGGI 66 kV DAN 150 kV

PEDOMAN PEMILIHAN JENIS DAN UKURAN PENGHANTAR ALUMINIUM BAGI SALURAN UDARA 20 kV, 66 kV dan 150 kV

PEDOMAN PENERAPAN SALURAN UDARA TEGANGAN TINGGI66 KV DAN 150 KV DENGAN ISOLATOR TONGGAK SALURAN

PEDOMAN PEMBEBANAN TRANSFORMATOR TERENDAM MINYAK

LOADING GUIDE FOR OIL-IMMERSED TRANSFORMERS

ON LOAD TAP CHANGERS

PEDOMAN PENERAPAN PENGUBAH SADAPAN BERBEBAN

TEGANGAN PENGENAL TRANSFORMATOR DAN JANGKAUAN PENYADAPAN PENGUBAH SADAPAN BERBEBAN PADA SISTEM66 KV DAN 150 KV

APLICATION GUIDE FOR POWER TRANSFORMERS

Page 17: 59161240-DAFTAR-SPLN

MINYAK ISOLASIBAGIAN 1 : PEDOMAN PENERAPAN SPESIFIKASI DAN PEMELIHARAAN MINYAK ISOLASI

SPESIFICATION FOR NEW INSULATING OILS FOR TRANSFORMERS AND SWITCHGEAR

MAINTENANCE AND SUPERVISION GUIDE FOR INSULATING OILSIN SERVICE

MINYAK ISOLASIBAGIAN 2 : PEDOMAN PENERAPAN METODE IEC UNTUK ANALISA MINYAK ISOLASI

POLA PENGAMANAN SISTEM BAGIAN 1 : A. SISTEM TRANSMISI 66 KV

POLA PENGAMANAN SISTEM BAGIAN 1 : C. TRANSFORMATOR 150/66 KV, 150/20 KV DAN 66/20 KV

POLA PENGAMANAN SISTEM BAGIAN 2 : GENERATOR

POLA PENGAMANAN SISTEM BAGIAN 3 : SISTEM DISTRIBUSI 6 KV DAN 20 KV

SPESIFIKASI TRANSFORMATOR TENAGA TEGANGAN TINGGI

PETUNJUK PEMILIHAN DAN PENGGUNAAN RELAI STATIS

KOMISIONING JARINGAN

PERHITUNGAN PENGARUH ARUS HUBUNG SINGKAT

PEKERJAAN DALAM KEADAAN BERTEGANGANBAGIAN 1 : PERATURAN UMUM

PEKERJAAN DALAM KEADAAN BERTEGANGANBAGIAN 2 : - JARINGAN TEGANGAN RENDAH - PERSYARATAN KERJA DAN LEMBARAN TEKNIK PERKAKAS.

PEKERJAAN DALAM KEADAAN BERTEGANGANBAGIAN 3 : - JARINGAN TEGANGAN MENENGAH - PERSYARATAN KERJA DAN LEMBARAN TEKNIK PERKAKAS.

LEMBARAN TEKNIK PERKAKAS DAN LEMBARAN TEKNIK-METODEOPERASI

Page 18: 59161240-DAFTAR-SPLN

SALURAN UDARA TEGANGAN TINGGIPEMBEBANAN PENYANGGA SALURAN UDARABAGIAN III : PEMBEBANAN KHUSUS

AMBANG BATAS KUAT MEDAN LISTRIK DAN INDUKSI MEDAN MAGNIT DIBAWAH SALURAN TEGANGAN TINGGI DAN EKSTRATINGGI

TIANG BETON PRATEKAN UNTUK SALURAN UDARA TEGANGANTINGGI 70 KV DAN 150 KV

TIANG BAJA UNTUK SALURAN UDARA TEGANGAN TINGGI 70 KVDAN 150 KV

KONSTRUKSI SALURAN UDARA TEGANGAN TINGGI 70 KV DAN 150 KV DENGAN TIANG BETON/BAJA

TINGKAT JAMINAN SISTEM TENAGA LISTRIKBAGIAN SATU : SISTEM TENAGA HULU A. TRANSMISI

Page 19: 59161240-DAFTAR-SPLN

BIDANG DISTRIBUSINo. SPLN No.

1 SPLN 1 : 19952 SPLN 3 :1978

3 SPLN 12 : 1978

4 SPLN 14 : 1979

5 SPLN 26 : 1980

6 SPLN 27 : 1980

7 SPLN 39-1 :19818 SPLN 39-2 :1981

9 SPLN 40-1 : 1981

10 SPLN 41-1 :1991

11 SPLN 41-2 :1981

12 SPLN 41-2 : 1991

13 SPLN 41-3 : 1981

14 SPLN 41-4 : 1981

15 SPLN 41-5 : 198116 SPLN 41-6 : 198117 SPLN 41-7 : 198118 SPLN 41-8 : 198119 SPLN 41-9 : 1986

20 SPLN 41-10 : 1991

21 SPLN 41-11 :199222 SPLN 42-1 : 1991

23 SPLN 42-2 : 1992

24 SPLN 42-3 : 1992

25 SPLN 42-4 : 1992

Page 20: 59161240-DAFTAR-SPLN

26 SPLN 42-5 : 1981

27 SPLN 42-6-1 : 1991

28 SPLN 42-6-2 : 1991

29 SPLN 42-6-3 : 1991

30 SPLN 42-7 : 1992

31 SPLN 42-8 : 1981

32 SPLN 42-9 : 1981

33 SPLN 42-10 : 1993

34 SPLN 42-11 : 1991

35 SPLN 43-1 : 1994

36 SPLN 43-2 : 1994

37 SPLN 43-3 :1994

38 SPLN 43-4 : 1994

39 SPLN 43-5-1 : 1995

40 SPLN 43-5-2 : 1995

41 SPLN 43-5-3 :1995

42 SPLN 43-5-4 : 1995

43 SPLN 43-5-5 : 1995

Page 21: 59161240-DAFTAR-SPLN

44 SPLN 43-5-6 : 1995

45 SPLN 43-6 : 1994

46 SPLN 43-7 : 1994

47 SPLN 43-8 : 1994

48 SPLN 50 : 1997

49 SPLN 54 : 1983

50 SPLN 55 : 1990

51 SPLN 56-1 : 1993

52 SPLN 56-2 : 1994

53 SPLN 56-3-1 : 1996

54 SPLN 56 : 1984

55 SPLN 57-1 : 1991

56 SPLN 57-2 : 1993

57 SPLN 57-3 : 1993

58 SPLN 57-4 : 1994

59 SPLN 59 : 1985

60 SPLN 60-1 : 1992

61 SPLN 60-2 : 1992

Page 22: 59161240-DAFTAR-SPLN

62 SPLN 60-3 : 1992

63 SPLN 60-4 : 1992

64 SPLN 60-5 : 1992

65 SPLN 60-6 : 1992

66 SPLN 60-7 : 1992

67 SPLN 60 : 1985

68 SPLN 63 : 1991

69 SPLN 64 : 1985

70 SPLN 72 : 1987

71 SPLN 74 : 1987

72 SPLN 75 : 1987

73 SPLN 76 : 1987

74 SPLN 77 : 1987

75 SPLN 83 : 1991

76 SPLN 84 : 1992

77 SPLN 87 : 1991

78 SPLN 88 : 1991

79 SPLN 91-1 : 1992

Page 23: 59161240-DAFTAR-SPLN

80 SPLN 91-2 : 1994

81 SPLN 91-3 : 1994

82 SPLN 91-4 : 1994

83 SPLN 91-5 : 1995

84 SPLN 93 : 1991

85 SPLN 94 : 1993

86 SPLN 95 : 1994

87 SPLN 96 : 1993

88 SPLN 97 : 1993

89 SPLN 98 : 1992

90 SPLN 101 : 1992

91 SPLN 102 : 1993

92 SPLN 103 : 1993

93 SPLN 108 : 1993

94 SPLN 114 : 1993

95 SPLN 115 : 1995

96 SPLN 118-3-1 : 1996

97 SPLN 118-4-1 : 1996

98 SPLN D3.002-1 : 2007

Page 24: 59161240-DAFTAR-SPLN

99 SPLN 68-2 : 1986

Page 25: 59161240-DAFTAR-SPLN

BIDANG DISTRIBUSIJUDUL

TEGANGAN-TEGANGAN STANDAR

PENTANAHAN INSTALASI KONSUMEN UNTUK PELISTRIKAN DESAPENGUJIAN KABEL LISTRIKPENGUJIAN KABEL LISTRIK - Pengujian Latu Listrik - Pengujian retak pada suhu rendah untuk isolasi dan selubung PVC

HANTARAN TEMBAGA TELANJANG JENIS KERAS (BCC H)HANTARAN ALUMINIUM (AAC)HANTARAN ALUMINIUM BERPENGUAT BAJA (ACSR)HANTARAN ALUMINIUM CAMPURAN (AAAC)

PERSYARATAN ISOLASI DAN SELUBUNG PE KABEL LISTRIK

KAWAT BERISOLASI PVC TEGANGAN PENGENAL 450/750 V (NYA)

PENTANAHAN JARING TEGANGAN RENDAH PLN DAN PENTANAHAN INSTALASIPEDOMAN PENERAPAN SISTEM DISTRIBUSI 20 KV FASA-TIGA, 4-KAWAT

KRITERIA DASAR BAGI PERENCANAAN SALURAN UDARA TEGANGAN MENENGAH 20 KV SERTA TEGANGAN TINGGI 66 KV DAN 150 KVPEDOMAN PENERAPAN SISTEM DISTRIBUSI 20 KV FASA-TIGA, 3-KAWAT DENGAN TAHANAN RENDAH DAN TAHANAN TINGGI

TANDA TANDA PENGENAL UNTUK KAWAT DAN KABEL LISTRIK BERISOLASIPERSYARATAN PENGHANTAR TEMBAGA DAN ALUMINIUM UNTUK KABEL LISTRIK BERISOLASIPERSYARATAN KOMPON PVC UNTUK KAWAT DAN KABEL LISTRIK TEGANGAN NOMINAL 0,6/1 KVPERSYARATAN KOMPON PVC UNTUK ISOLASI DAN SELUBUNG KABEL LISTRIKPERSYARATAN KOMPON KARET UNTUK KAWAT DAN KABEL LISTRIK TEGANGAN NOMINAL S/D 1000 VHANTARAN TEMBAGA TELANJANG JENIS SETENGAH KERAS (BCC 1/2 H)

PERSYARATAN KOMPON XLPE UNTUK KABEL BERTEGANGAN PENGENAL DIATAS 1 kV S/D 30 kVPENGHANTAR ALUMINIUM PADUAN BERSELUBUNG POLIETILEN IKAT SILANG (AAAC-S)

KABEL BERISOLASI DAN BERSELUBUNG PVC TEGANGAN PENGENAL 300/500 VOLT (NYM)KAWAT FLEKSIBEL BERISOLASI PVC TEGANGAN PENGENAL 450/750 V (NYAF)KAWAT FLEKSIBEL KEMBAR DUA DAN TIGA BERISOLASI PVC TEGANGAN PENGENAL 300/300 VOLT (NYZ/NYD)

Page 26: 59161240-DAFTAR-SPLN

KAWAT BERISOLASI KARET TEGANGAN NOMINAL 1000 V (NGA)KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC

KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC

KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC

TEGANGAN PENGENAL 450/750 V UNTUK BEBAN MEKANIS BERAT (NYSHY)

TEGANGAN PENGENAL 300/300 V UNTUK BEBAN MEKANIS RINGAN (NYLHYrd/NYLHYf1)

TEGANGAN PENGENAL 300/500 V UNTUK BEBAN MEKANIS SEDANG (NYLHYrd/NYLHYf1)

KABEL PIPIH BERISOLASI DAN BERSELUBUNG PVC TEGANGAN PENGENAL 300/500 V (NYIFY)

NYMT PVC INSULATED SELF SUPPORTING AERIAL CABLE WITH BLACK OUTER SHEATH RATED VOLTAGE 500 V (UNOFFICIAL)KABEL BERISOLASI DAN BERSELUBUNG PVC TEGANGAN NOMINAL 500 V (NYM OVAL)KABEL PILIN UDARA TEGANGAN PENGENAL 0,6/1 KV (NFA2X-T/NFA2X/NF2X)

KABEL SAMBUNGAN RUMAH BERISOLASI XLPE DAN B ERSELUBUNG PVC DENGAN PENGHANTAR KONSENTRIS TEMBAGA TEGANGAN PENGENAL 0,6/1 KV (N2XCY-SR/NA2XCY-SR)KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, TEGANGAN PENGENAL 0,6/1 KV (NYY/NAYY)

KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, BERPERISAI KAWAT BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (NYFGbY/NAYFGbY/NYRGbY/NAYRGbY)KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, BERPERISAI PITA BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (NYBY/NAYBY)

KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, DENGAN PENGHANTAR KONSENTRIS TEMBAGA TEGANGAN PENGENAL 0,6/1 KV (NYCY/NAYCY)

KABEL PILIN TANAH BERISOLASI XLPE DAN BERSELUBUNG PE/PVC DENGAN TEGANGAN PENGENAL 12/20 (24) KV

KABEL PILIN UDARA BERISOLASI XLPE DAN BERSELUBUNG PVC BERPENGGANTUNG KAWAT BAJA DENGAN TEGANGAN PENGENAL 12/20 (24) KV

KABEL TANAH INTI TUNGGAL BERISOLASI XLPE DAN BERSELUBUNG PE/PVC DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV

KABEL TANAH INTI TIGA BERISOLASI XLPE DAN BERSELUBUNG PE/PVC DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV

KABEL TANAH INTI TUNGGAL BERISOLASI XLPE DAN BERSELUBUNG PE/PVC BERPENGHANTAR KONSENTRIS DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV

Page 27: 59161240-DAFTAR-SPLN

SPESIFIKASI TRANSFORMATOR DISTRIBUSI

STANDAR TIANG BAJA

ALAT PENGUKUR, PEMBATAS DAN PERLENGKAPANNYA - LAMPIRAN D : APP TIPE KHUSUS II A S/D II F DGN TUTUP PELINDUNG

SAMBUNGAN TENAGA LISTRIK TEGANGAN RENDAH (SLTR)

SAMBUNGAN TENAGA LISTRIK TEGANGAN MENENGAH (SLTM)

SAMBUNGAN TENAGA LISTRIK TEGANGAN MENENGAH DIATAS 8 MVA S/D 60 MVABAGIAN 1 : SALURAN KABEL DIBAWAH TANAH

SAMBUNGAN LISTRIK

KWH METER ARUS BOLAK BALIKKELAS 0,5 ; 1 DAN 2BAGIAN 1 : PASANGAN DALAM

KETENTUAN UJI TAMBAHAN UNTUK KWH METER PASANGANLUAR

METER STATIK ARUS BOLAK BALIK UNTUK ENERGI AKTIF(KELAS 0,2S DAN 0,5S)

METER STATIS ENERGI AKTIF ARUS BOLAK BALIK (KELAS 1 DAN 2 )

KEANDALAN PADA SISTEM DISTRIBUSI 20 kVdan 6 kV

KAMAR UJI INSTRUMEN UKUR LISTRIK

KAMAR UJI INSTRUMEN UKUR LISTRIKBAGIAN 2 : PROSEDUR SALING BANDING SEL STANDAR DAN

KABEL TANAH INTI TIGA BERISOLASI XLPE DAN BERSELUBUNG PE/PVC BERPENGHANTAR KONSENTRIS DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KVKABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC TEGANGAN PENGENAL 0,6/1 KV (N2XY/NA2XY)

KABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC BERPERISAI KAWAT BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (N2XFGbY/NA2XFGbY/N2XRGbY/NA2XRGbY)

KABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC BERPERISAI PITA BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV (N2XBY/NA2XBY)

Page 28: 59161240-DAFTAR-SPLN

RESISTOR STANDAR.

KAMAR UJI INSTRUMEN UKUR LISTRIKBAGIAN 3 : PROSEDUR UJI INSTRUMEN UKUR ENERGI LISTRIK

KAMAR UJI INSTRUMEN UKUR LISTRIKBAGIAN 4 : PROSEDUR UJI PENUNJUK KEBUTUHAN MAKSIMUM

KAMAR UJI INSTRUMEN UKUR LISTRIKBAGIAN 5 : PROSEDUR UJI PERLENGKAPAN UJI METER ENERGI LISTRIK

KAMAR UJI INSTRUMEN UKUR LISTRIKBAGIAN 6 : PROSEDUR UJI INSTRUMEN UKUR LISTRIK PENUN JUK LANGSUNG

KAMAR UJI INSTRUMEN UKUR LISTRIKBAGIAN 7 : PROSEDUR UJI TRANSFORMATOR INSTRUMEN

STANDARISASI KAMAR TERA

INSPEKSI PENERIMAAN METER KILOWATTJAM ARUS BOLAK BALIK KELAS 2

PETUNJUK PEMILIHAN DAN PENGGUNAAN PELEBUR PADA SISTEM DISTRIBUSI TEGANGAN MENENGAH

SPESIFIKASI DESAIN UNTUK JARINGAN TEGANGAN MENENGAHDAN JARINGAN TEGANGAN RENDAH

STANDAR LISTRIK PEDESAAN

GANGGUAN PADA SISTEM SUPLAI YANG DIAKIBATKAN OLEHPEMANFAAT LISTRIK DAN PERLENGKAPAN SERUPA

TRANSFORMATOR ARUS

TRANSFORMATOR TEGANGAN

LENGKAPAN SAMBUNGAN RUMAH DENGAN SALURAN UDARABERISOLASI

KONEKTOR TEMBUS KEDAP AIR UNTUK KABEL PILIN UDARATEGANGAN RENDAH

STANDAR KONSTRUKSI LISTRIK PEDESAAN

PEMBUMIAN NETRAL SISTEM 20 KV DENGAN LEBIH DARI SATU SUMBER

SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK

Page 29: 59161240-DAFTAR-SPLN

BAGIAN 1 : PERSYARATAN UMUM

SPESIFIKASI PIPA UNTUK INSTALASI LISTRIKBAGIAN 2 : DIAMETER LUAR PIPA DAN ULIR

SPESIFIKASI PIPA UNTUK INSTALASI LISTRIKBAGIAN 3 : PERSYARATAN KHUSUS PIPA LOGAM

SPESIFIKASI PIPA UNTUK INSTALASI LISTRIKBAGIAN 4 : PERSYARATAN KHUSUS PIPA LISTRIK ISOLASI KAKU RATA

SPESIFIKASI PIPA UNTUK INSTALASI LISTRIKBAGIAN 5 : PERSYARATAN KHUSUS PIPA LISTRIK FLEKSIBEL

TIANG BETON PRATEKAN UNTUK JARINGAN DISTRIBUSI

METER VAR - JAM (ENERGI REAKTIF)

TRANSFORMATOR DENGAN PENGAMAN SENDIRI FASE TUNGGAL UNTUK JARINGAN SISTEM FASE TIGA 4 - KAWAT

PERLENGKAPAN UJI UNTUK METER ENERGI LISTRIK

ALAT PENUNJUK KEBUTUHAN DAYA MAKSIMUM KELAS 1

LENGKAPAN PEGANG KABEL PILIN SALURAN UDARA TEGANGANRENDAH

KONEKTOR ALUR PARALEL UNTUK PENGHANTAR TELANJANG

ELEKTRODA BUMI JENIS BATANG BULAT BERLAPIS TEMBAGA

SAKLAR WAKTU UNTUK KONTROL TARIF DAN KENDALI BEBAN

PEMUTUS TENAGA MINI UNTUK PEMBATAS DAN PENGAMANARUS LEBIH UNTUK INSTALASI GEDUNG DAN RUMAH

BLOK TERMINAL

TIANG KAYU UNTUK JARINGAN DISTRIBUSI

PERANGKAT HUBUNG BAGIBAGIAN 3-1 : SPESIFIKASI PERANGKAT HUBUNG BAGI TEGANGAN RENDAH GARDU DISTRIBUSI

PERANGKAT HUBUNG BAGIBAGIAN 4-1 : SPESIFIKASI PERANGKAT HUBUNG BAGI TEGANGAN MENENGAH GARDU DISTRIBUSI

SPESIFIKASI TRANSFORMATOR DISTRIBUSI

Page 30: 59161240-DAFTAR-SPLN

BAGAIAN 1 : TRANSFORMATOR FASE TIGA, 20 KV-400V & TRANSFORMATOR FASE TUNGGAL, 20 KV-231 DAN

TINGKAT JAMINAN SISTEM TENAGA LISTRIKBAGIAN DUA : SISTEM DISTRIBUSI

20/√3 KV-231 V

Page 31: 59161240-DAFTAR-SPLN

BIDANG SCADANo. SPLN No.

1 SPLN 109-1 : 1996

2 SPLN 109-2 : 1996

3 SPLN 109-3 : 1996

4 SPLN 109-4 : 1996

5 SPLN 109-5 : 1996

6 SPLN 109-6 : 1996

Page 32: 59161240-DAFTAR-SPLN

BIDANG SCADAJUDUL

POLA SCADABAGIAN 1 : PEDOMAN DASAR

POLA SCADABAGIAN 2 : PENGATUR ANTAR REGIONAL

POLA SCADABAGIAN 3 : PENGATUR WILAYAH

POLA SCADABAGIAN 4 : PENGATUR REGIONAL

POLA SCADABAGIAN 5 : PENGATUR DISTRIBUSI

POLA SCADABAGIAN 6 : PENGATUR SUBREGIONAL

Page 33: 59161240-DAFTAR-SPLN

BIDANG UMUMNo. SPLN No.

1 SPLN 4 : 1978

2 SPLN 5 : 1978

3 SPLN 6 : 1978

4 SPLN 29 : 1980

5 SPLN 36A : 1980

6 SPLN 66 : 1986

7 SPLN 66A : 1986

8 SPLN 67-1A : 1986

9 SPLN 67-1B : 1986

10 SPLN 67-1C : 1987

11 SPLN 67-2A : 1986

12 SPLN 67-2B : 1986

13 SPLN 67-2C : 1986

14 SPLN 69-1 : 1986

15 SPLN 69-2 : 1987

Page 34: 59161240-DAFTAR-SPLN

16 SPLN 70-1 : 1985

17 SPLN 70-2 : 1986

18 SPLN 70-3 : 1987

19 SPLN 70-4 : 1992

20 SPLN 70-5 : 1995

21 SPLN 70-6 : 1995

22 SPLN 70-7 : 1995

23 SPLN 71-1 : 1987

24 SPLN 71-2 : 1989

25 SPLN 71-3 : 1993

26 SPLN 99 : 1992

27 SPLN 104 : 1993

28 SPLN 105 : 1995

29 SPLN 106 : 1993

30 SPLN 107 : 1993

Page 35: 59161240-DAFTAR-SPLN

BIDANG UMUMJUDUL

PEMBAGIAN TUGAS KELOMPOK-KELOMPOK PEMBAKUAN

TATA TERTIB PEMBAHASAN KONSEP PEMBAKUAN

PEDOMAN UNTUK PENYUSUNAN NASKAH STANDAR

PENYUSUNAN KONSEP PEMBAKUAN UNTUK PERALATAN LISTRIK PRODUKSI DALAM NEGERI

LOADING TESTS ON OVERHEAD LINE TOWERS

STANDAR PERALATAN KESELAMATAN KERJA

TERMINOLOGI UNTUK PERKAKAS DAN PERLENGKAPAN YANGDIGUNAKAN UNTUK PEKERJAAN BERTEGANGAN

KONDISI SPESIFIK INDONESIABAGIAN SATU : A. KONDISI ALAM

KONDISI SPESIFIK INDONESIABAGIAN SATU : B. DESAIN DAN OPERASI SISTEM

KONDISI SPESIFIK DI INDONESIABAGIAN SATU : C. PUSAT LISTRIK TENAGA TERMAL

KONDISI SPESIFIK INDONESIABAGIAN DUA : A. PEMBANGKIT LISTRIK TENAGA AIR

KONDISI SPESIFIK INDONESIABAGIAN DUA : B. KOMISIONING DAN PENGUJIAN INSTALASI LISTRIK

KONDISI SPESIFIK INDONESIABAGIAN DUA : C. PENGENDALIAN DAN PENGAWASAN MUTU

STANDARISASI PERALATAN UJIBAGIAN SATU : KOMISIONING INSTALASI DAN PENGUJIAN PERALATAN

STANDARISASI PERALATAN UJIBAGIAN DUA : STANDAR PERALATAN UJI

Page 36: 59161240-DAFTAR-SPLN

PEMBAKUAN ISTILAH TEKNIK BIDANG KELISTRIKAN

PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN

PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN

PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN

PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN

PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN

PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN

PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN

PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN

PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN

WARNA LAMBANG STANDAR UNTUK DIAGRAM MIMIK

WARNA STANDAR

PERWAJAHAN PUBLIKASI SPLN

TANDA KESELAMATAN KERJA

WARNA PIPA DAN TANGKI PUSAT LISTRIK

(SERI KEDUA)

(SERI KETIGA)

(SERI KEEMPAT)

(SERI KELIMA)

(SERI KEENAM)

(SERI KETUJUH)

(SERI PERTAMA)

(SERI KEDUA)

(SERI KETIGA)