PEMERINTAH KABUPATEN MOROWALI UTARA
ADENDUM DOKUMEN PENGADAAN
Nomor : 51.a/ADP/ POKJA PK-I/ULP-MU/VI/2016
Tanggal : 10 Juni 2016
untuk
Pengadaan Pekerjaan Konstruksi
Pembangunan Talud Penahan Tanah Depan Rumah Sakit
UNIT LAYANAN PENGADAAN ULP)
POKJA PENGADAAN PEKERJAAN KONSTRUKSI I
TAHUN ANGGARAN 2016
-
7/26/2019 51. Adendum Talud Rumah Sakit
2/7
Adendum Dokumen Pengadaan Pekerjaan KonstruksiMetode e-Pemilihan Langsung dengan Pascakualifikasi
Pokja Pengadaan Pekerjaan Konstruksi IULP Kabupaten Morowali Utara
DAFTAR ISI
BAB I. UMUM ................................................................................................................ TETAP
BAB II. PENGUMUMAN DENGAN PASCAKUALIFIKASI ........................................... DIUBAH
PENGUMUMAN PELELANGAN TERCANTUM DALAM PADA APLIKASI SPSE ............. TETAP
BAB III. INSTRUKSI KEPADA PESERTA IKP) ................................................................. TETAP
A.UMUM...................................................................................................................... TETAP
1. LINGKUP PEKERJAAN................................................................................................... TETAP2. SUMBER DANA.......................................................................................................... TETAP3. PESERTA..................................................................................................................... TETAP4. LARANGAN KORUPSI,KOLUSI,DAN NEPOTISME (KKN),PERSEKONGKOLAN SERTA PENIPUANTETAP
5. LARANGAN PERTENTANGAN KEPENTINGAN................................................................... TETAP6. PENDAYAGUNAAN PRODUKSI DALAM NEGERI.............................................................. TETAP7. SATU PENAWARAN TIAP PESERTA................................................................................ TETAP
B. DOKUMEN PENGADAAN ......................................................................................... TETAP
8. ISI DOKUMEN PENGADAAN........................................................................................ TETAP9. BAHASA DOKUMEN PENGADAAN................................................................................ TETAP10. PEMBERIAN PENJELASAN............................................................................................. TETAP11. PERUBAHAN DOKUMEN PENGADAAN.......................................................................... TETAP12. TAMBAHAN WAKTU PEMASUKAN DOKUMEN PENAWARAN.......................................... TETAP
C. PENYIAPAN DOKUMEN PENAWARAN .................................................................... TETAP
13. BIAYA DALAM PENYIAPAN PENAWARAN....................................................................... TETAP14. BAHASA PENAWARAN................................................................................................. TETAP15. DOKUMEN PENAWARAN............................................................................................. TETAP16. HARGA PENAWARAN.................................................................................................. TETAP17. MATA UANG PENAWARAN DAN CARA PEMBAYARAN.................................................... TETAP18. MASA BERLAKU PENAWARAN DANJANGKA WAKTU PELAKSANAAN............................... TETAP19. PENGISIAN DATA KUALIFIKASI..................................................................................... TETAP20. PAKTA INTEGRITAS..................................................................................................... TETAP
D. PEMASUKAN DOKUMEN PENAWARAN .................................................................. TETAP
21. PENYAMPULAN DAN PENANDAAN SAMPUL PENAWARAN............................................... TETAP22. PEMASUKKAN/PENYAMPAIAN DOKUMEN PENAWARAN............................................... TETAP23. BATAS AKHIR WAKTU PEMASUKAN PENAWARAN......................................................... TETAP24. PENAWARAN TERLAMBAT........................................................................................... TETAP
E. PEMBUKAAN DAN EVALUASI PENAWARAN .......................................................... TETAP
25. PEMBUKAAN PENAWARAN.......................................................................................... TETAP26. EVALUASI PENAWARAN............................................................................................... TETAP27. [KLARIFIKASI DAN NEGOSIASI TEKNIS DAN HARGA]...................................................... TETAP28. EVALUASIKUALIFIKASI................................................................................................ TETAP29. PEMBUKTIAN KUALIFIKASI.......................................................................................... TETAP30. BERITA ACARA HASIL PELELANGAN.............................................................................. TETAP
F. PENETAPAN PEMENANG .......................................................................................... TETAP
31. PENETAPANPEMENANG ...................................................................................... TETAP
-
7/26/2019 51. Adendum Talud Rumah Sakit
3/7
Adendum Dokumen Pengadaan Pekerjaan KonstruksiMetode e-Pemilihan Langsung dengan Pascakualifikasi
Pokja Pengadaan Pekerjaan Konstruksi IULP Kabupaten Morowali Utara
32. PENGUMUMANPEMENANG ............................................................................... TETAP33. SANGGAHAN ......................................................................................................... TETAP
G. PENUNJUKAN PEMENANG ....................................................................................... TETAP
34. PENUNJUKAN PENYEDIA BARANG/JASA....................................................................... TETAP35. BAHP,BERITA ACARA LAINNYA,DAN KERAHASIAAN PROSES........................................ TETAP
H. PELELANGAN GAGAL DAN TINDAK LANJUT PELELANGAN GAGAL ..................... TETAP
36. PELELANGAN GAGAL DAN TINDAK LANJUT PELELANGAN GAGAL................................... TETAP
I. JAMINAN PELAKSANAAN ......................................................................................... TETAP
37. JAMINAN PELAKSANAAN............................................................................................. TETAP
J. PENANDATANGANAN KONTRAK ............................................................................ TETAP
38. PENANDA-TANGANAN KONTRAK................................................................................. TETAPBAB IV. LEMBAR DATA PEMILIHAN LDP) .................................................................. TETAP
A. LINGKUPPEKERJAAN ............................................................................................ TETAPB. SUMBERDANA ...................................................................................................... TETAPC. JENISKONTRAK ................................................................................................... TETAPD. JADWALTAHAPANPEMILIHAN .......................................................................... TETAPE. PENINJAUANLAPANGAN(APABILA DIPERLUKAN) .................................................. TETAPF. MATAUANGPENAWARANDANCARAPEMBAYARAN .................................... TETAPG. MASABERLAKUNYAPENAWARAN ................................................................. DIUBAH
Masa berlaku penawaran selama 60 (enam puluh) hari kalender sejak batas akhir pemasukanDokumen Penawaran
H. JADWALPEMASUKANDOKUMENPENAWARAN ............................................. TETAPI. BATASAKHIRWAKTUPEMASUKANPENAWARAN ........................................... TETAPJ. PEMBUKAANPENAWARAN ................................................................................. TETAPK. DOKUMENPENAWARAN................................................................................. DIUBAH1.Daftar Personil Inti/tenaga ahli/teknis/terampil minimal yang diperlukan untuk
pelaksanaan pekerjaan:
NoPendidikan
MinimalJumlah
(Orang)
Pengalaman
(Tahun)
SKA/SKT
Profesi/Keahlian Kategori
1. D-III Teknik Sipil 1 5Pelaksana BangunanGedung/Pekerjaan Gedung
SKT
2. STM/SMK Bangunan 1 4 Juru Hitung Kuantitas SKT
3. - 1 5Tukang Besi-beton/Barbender/Bar bending
SKT
4.- 1 5
Tukang Cor Beton/Concretor/Concrete Operations
SKT
5. SMU/Sederajat1 4
Mandor Tukang Batu/Bata/Beton
SKT
6. SMU/Sederajat 1 3 Administrasi -
-
7/26/2019 51. Adendum Talud Rumah Sakit
4/7
Adendum Dokumen Pengadaan Pekerjaan KonstruksiMetode e-Pemilihan Langsung dengan Pascakualifikasi
Pokja Pengadaan Pekerjaan Konstruksi IULP Kabupaten Morowali Utara
L. [AMBANGBATASSISTIMGUGUR] ...................................................................... TETAP
M. SANGGAHAN,PENGADUAN ................................................................................ TETAPN. JAMINANPELAKSANAAN ..................................................................................... TETAPO. JAMINANUANGMUKA ........................................................................................ TETAPP. JAMINANPEMELIHARAAN................................................................................... TETAPQ. LAINNYA ............................................................................................................... TETAP
BAB V. LEMBAR DATA KUALIFIKASI LDK) ................................................................. TETAP
A. LINGKUPKUALIFIKASI .......................................................................................... TETAPB. PERSYARATANKUALIFIKASI ............................................................................ DIUBAH
BAB VI. BENTUK DOKUMEN PENAWARAN ................................................................. TETAP
A. BENTUK SURAT PENAWARAN PESERTA BADAN USAHA/KEMITRAAN (KSO)(UNTUK1(SATU)FILE)......................................................................................... TETAP
B. BENTUKPERJANJIANKEMITRAAN/KERJASAMAOPERASI(KSO) ................... TETAPC. BENTUKDOKUMENPENAWARANTEKNIS(UNTUK1(SATU)FILE) ............... TETAPD. [BENTUKFORMULIRREKAPITULASIPERHITUNGANTINGKATKOMPONENTETAP
DALAMNEGERI(TKDN),APABILA DIBERIKAN PREFERENSI HARGA]............................ TETAPE. BENTUKPAKTAINTEGRITAS ................................................................................ TETAPL.DATA ISIANKUALIFIKASI....................................................................................... TETAPBABVII.PETUNJUKPENGISIANDATAKUALIFIKASI ................................................. TETAPA. DATA ADMINISTRASI.................................................................................................. TETAPB. LANDASAN HUKUM PENDIRIAN USAHA....................................................................... TETAP
C. PENGURUS BADAN USAHA.......................................................................................... TETAPD. IZIN USAHA ............................................................................................................... TETAPE. IZIN LAINNYA (APABILA DIPERSYARATKAN) .................................................................. TETAPF. DATA KEUANGAN...................................................................................................... TETAPG. DATA PERSONALIA..................................................................................................... TETAPH. DATA FASILITAS/PERALATAN/PERLENGKAPAN............................................................. TETAPI. DATA PENGALAMAN PERUSAHAAN.............................................................................. TETAP
J. DATA PENGALAMAN PERUSAHAAN DALAM KURUN WAKTU 4TAHUN TERAKHIR........... TETAPK. DATA PEKERJAAN YANG SEDANG DILAKSANAKAN........................................................ TETAPL. MODAL KERJA........................................................................................................... TETAPKEMITRAAN/KSO ............................................................................................................. TETAPBABVIII.TATACARAEVALUASIKUALIFIKASI ........................................................... TETAP
SURATPERJANJIAN ....................................................................................................... TETAP
BAB X. SYARAT-SYARAT UMUM KONTRAK SSUK) ................................................... TETAP
A. KETENTUAN UMUM ................................................................................................. TETAP
1. DEFINISI.................................................................................................................... TETAP2. PENERAPAN................................................................................................................ TETAP3. BAHASA DAN HUKUM................................................................................................ TETAP4. LARANGAN KORUPSI,KOLUSI DAN NEPOTISME (KKN),PERSEKONGKOLAN SERTA PENIPUANTETAP5. ASAL MATERIAL/BAHAN........................................................................................... TETAP6. KORESPONDENSI........................................................................................................ TETAP7. WAKIL SAH PARA PIHAK............................................................................................. TETAP
8. PEMBUKUAN.............................................................................................................. TETAP
-
7/26/2019 51. Adendum Talud Rumah Sakit
5/7
Adendum Dokumen Pengadaan Pekerjaan KonstruksiMetode e-Pemilihan Langsung dengan Pascakualifikasi
Pokja Pengadaan Pekerjaan Konstruksi IULP Kabupaten Morowali Utara
9. PERPAJAKAN............................................................................................................... TETAP10. PENGALIHAN DAN/ATAU SUBKONTRAK....................................................................... TETAP
11. PENGABAIAN.............................................................................................................. TETAP12. PENYEDIA MANDIRI................................................................................................... TETAP13. KEMITRAAN/KSO...................................................................................................... TETAP14. PENEMUAN-PENEMUAN.............................................................................................. TETAP
B. PELAKSANAAN, PENYELESAIAN, ADENDUM DAN PEMUTUSAN KONTRAK ........ TETAP
15. JADWAL PELAKSANAAN PEKERJAAN.............................................................................. TETAP
B.1.PELAKSANAAN PEKERJAAN..................................................................................... TETAP
16. PENYERAHAN LOKASI KERJA........................................................................................ TETAP17. SURAT PERINTAH MULAI KERJA (SPMK) ..................................................................... TETAP18. PROGRAM MUTU....................................................................................................... TETAP
19. RAPAT PERSIAPAN PELAKSANAAN KONTRAK.................................................................. TETAP20. MOBILISASI PERALATAN,FASILITAS DAN PERSONIL........................................................ TETAP21. PENGAWASAN PELAKSANAAN PEKERJAAN..................................................................... TETAP22. PERSETUJUAN PENGAWAS PEKERJAAN.......................................................................... TETAP23. PERINTAH.................................................................................................................. TETAP24. AKSES KE LOKASI KERJA.............................................................................................. TETAP25. PEMERIKSAAN BERSAMA............................................................................................. TETAP26. WAKTU PENYELESAIAN PEKERJAAN.............................................................................. TETAP27. PERPANJANGAN WAKTU............................................................................................. TETAP28. PENUNDAAN OLEH PENGAWAS PEKERJAAN................................................................... TETAP29. RAPAT PEMANTAUAN................................................................................................. TETAP30. PERINGATAN DINI...................................................................................................... TETAP
B.2.PENYELESAIAN KONTRAK ...................................................................................... TETAP
31. SERAH TERIMA PEKERJAAN.......................................................................................... TETAP32. PENGAMBILALIHAN.................................................................................................... TETAP33. PEDOMAN PENGOPERASIAN DAN PERAWATAN.............................................................. TETAP
B.3PERUBAHAN KONTRAK ........................................................................................... TETAP
34. PERUBAHAN KONTRAK............................................................................................... TETAP35. PERUBAHAN LINGKUP PEKERJAAN................................................................................ TETAP36. PERUBAHANJADWAL PELAKSANAAN PEKERJAAN........................................................... TETAP
B.4KEADAAN KAHAR .................................................................................................... TETAP
37. KEADAAN KAHAR....................................................................................................... TETAP
B.5PENGHENTIAN DAN PEMUTUSAN KONTRAK ....................................................... TETAP
38. PENGHENTIAN KONTRAK............................................................................................ TETAP39. PEMUTUSAN KONTRAK............................................................................................... TETAP40. PEMUTUSAN KONTRAK OLEH PPK ............................................................................... TETAP41. PEMUTUSAN KONTRAK OLEH PENYEDIA....................................................................... TETAP42. [KETERLAMBATAN PELAKSANAAN PEKERJAAN DAN KONTRAK KRITIS.............................. TETAP(UNTUK PEKERJAAN KONSTRUKSI BANGUNAN)]................................................................... TETAP43. PEMUTUSAN KONTRAK AKIBAT LAINNYA...................................................................... TETAP44. PENINGGALAN........................................................................................................... TETAP
C. HAK DAN KEWAJIBAN PENYEDIA ........................................................................... TETAP
-
7/26/2019 51. Adendum Talud Rumah Sakit
6/7
Adendum Dokumen Pengadaan Pekerjaan KonstruksiMetode e-Pemilihan Langsung dengan Pascakualifikasi
Pokja Pengadaan Pekerjaan Konstruksi IULP Kabupaten Morowali Utara
45. HAK DAN KEWAJIBAN PENYEDIA................................................................................ TETAP46. PENGGUNAAN DOKUMEN KONTRAK DAN INFORMASI................................................... TETAP
47. HAK ATAS KEKAYAAN INTELEKTUAL............................................................................ TETAP48. PENANGGUNGAN DAN RISIKO..................................................................................... TETAP49. PERLINDUNGAN TENAGA KERJA................................................................................... TETAP50. PEMELIHARAAN LINGKUNGAN..................................................................................... TETAP51. ASURANSI.................................................................................................................. TETAP52. TINDAKAN PENYEDIA YANG MENSYARATKAN PERSETUJUAN PPKATAU PENGAWAS PEKERJAANTETAP53. LAPORAN HASIL PEKERJAAN........................................................................................ TETAP54. KEPEMILIKAN DOKUMEN............................................................................................ TETAP55. KERJASAMA ANTARA PENYEDIA DAN SUB PENYEDIA..................................................... TETAP56. USAHA MIKRO,USAHA KECIL DAN KOPERASI KECIL..................................................... TETAP57. PENYEDIA LAIN.......................................................................................................... TETAP58. KESELAMATAN DAN KESEHATAN KERJA........................................................................ TETAP
59. PEMBAYARAN DENDA................................................................................................. TETAP60. JAMINAN................................................................................................................... TETAP
D. HAK DAN KEWAJIBAN PPK ...................................................................................... TETAP
61. HAK DAN KEWAJIBAN PPK ......................................................................................... TETAP62. FASILITAS................................................................................................................... TETAP63. PERISTIWA KOMPENSASI............................................................................................. TETAP
E. PERSONIL DAN/ATAU PERALATAN PENYEDIA ....................................................... TETAP
64. PERSONIL INTI DAN/ATAU PERALATAN........................................................................ TETAP
F. PEMBAYARAN KEPADA PENYEDIA .......................................................................... TETAP
65. HARGA KONTRAK...................................................................................................... TETAP66. PEMBAYARAN............................................................................................................ TETAP67. HARI KERJA............................................................................................................... TETAP68. PERHITUNGAN AKHIR................................................................................................. TETAP69. PENANGGUHAN PEMBAYARAN.................................................................................... TETAP70. [PENYESUAIAN HARGA (UNTUK KONTRAK HARGA SATUAN ATAU KONTRAK GABUNGAN LUMP
SUMDAN HARGA SATUAN)]....................................................................................... TETAP
G. PENGAWASAN MUTU .............................................................................................. TETAP
71. PENGAWASAN DAN PEMERIKSAAN............................................................................... TETAP72. PENILAIAN PEKERJAAN SEMENTARA OLEH PPK .............................................................. TETAP73. CACAT MUTU............................................................................................................ TETAP74. PENGUJIAN................................................................................................................ TETAP75. PERBAIKAN CACAT MUTU........................................................................................... TETAP76. KEGAGALAN KONSTRUKSI DAN KEGAGALAN BANGUNAN.............................................. TETAP
H. PENYELESAIAN PERSELISIHAN ................................................................................. TETAP
77. PENYELESAIAN PERSELISIHAN....................................................................................... TETAP78. ITIKAD BAIK.............................................................................................................. TETAP
BAB XI. SYARAT-SYARAT KHUSUS KONTRAK SSKK) ................................................. TETAP
A. KORESPONDENSI........................................................................................................ TETAPB. WAKIL SAH PARA PIHAK............................................................................................. TETAPC. JENIS KONTRAK.......................................................................................................... TETAPD. TANGGAL BERLAKU KONTRAK..................................................................................... TETAP
-
7/26/2019 51. Adendum Talud Rumah Sakit
7/7
Adendum Dokumen Pengadaan Pekerjaan KonstruksiMetode e-Pemilihan Langsung dengan Pascakualifikasi
Pokja Pengadaan Pekerjaan Konstruksi IULP Kabupaten Morowali Utara
E. JADWAL PELAKSANAAN PEKERJAAN.............................................................................. TETAPF. MASA PEMELIHARAAN................................................................................................ TETAP
G. UMUR KONSTRUKSI................................................................................................... TETAPH. PEDOMAN PENGOPERASIAN DAN PERAWATAN.............................................................. TETAPI. PEMBAYARAN TAGIHAN.............................................................................................. TETAP
J. PENCAIRANJAMINAN................................................................................................. TETAPK. TINDAKAN PENYEDIA YANG MENSYARATKAN PERSETUJUAN PPKATAU PENGAWAS PEKERJAANTETAPL. KEPEMILIKAN DOKUMEN............................................................................................ TETAPM. FASILITAS................................................................................................................... TETAPN. SUMBER PEMBIAYAAN................................................................................................ TETAPO. PEMBAYARAN UANG MUKA........................................................................................ TETAPP. PEMBAYARAN PRESTASI PEKERJAAN.............................................................................. TETAPQ. [PENYESUAIAN HARGA].............................................................................................. TETAPR. PERISTIWA KOMPENSASI............................................................................................. TETAP
S. DENDA DAN GANTI RUGI............................................................................................ TETAPT. SANKSI...................................................................................................................... TETAPU. PENYELESAIAN PERSELISIHAN....................................................................................... TETAPV. LAINNYA(APABILA ADA) ........................................................................................ TETAPLAMPIRAN ASYARAT-SYARAT KHUSUS KONTRAK............................................................. TETAP
BAB XII. SPESIFIKASI TEKNIS DAN GAMBAR ............................................................... TETAP
KETERANGAN..................................................................................................................... TETAP
BAB XIII. DAFTAR KUANTITAS DAN HARGA ............................................................... TETAP
KETERANGAN (UNTUK KONTRAK HARGA SATUAN ATAU KONTRAK GABUNGAN HARGA SATUAN DANLUMP SUM) ............................................................................................................... TETAP
KETERANGAN (UNTUK KONTRAK LUMP SUM) ..................................................................... TETAP
BAB XIV. BENTUK DOKUMEN LAIN ............................................................................ TETAP
A. BENTUKSURATPENUNJUKANPENYEDIABARANG/JASA(SPPBJ) .................. TETAPB. BENTUKSURATPERINTAHMULAIKERJA(SPMK) ............................................. TETAPC. BENTUKSURAT-SURATJAMINAN ....................................................................... TETAP
Jaminan Pelaksanaan dari Bank ..................................................................... TETAPJaminan Pelaksanaan dari Asuransi/Perusahaan Penjaminan ................... TETAPJaminan Uang Muka dari Bank ...................................................................... TETAPJaminan Uang Muka dari Asuransi/Perusahaan Penjaminan .................... TETAPJaminan Pemeliharaan dari Bank .................................................................. TETAPJaminan Pemeliharaan dari Asuransi/Perusahaan Penjaminan ................. TETAP
Pemerintah Kabupaten Morowali Utara
Unit Layanan Pengadaan
Pokja Pengadaan Pekerjaan Konstruksi I
T T D